GREEN LINE OVERVIEW May 2014
description
Transcript of GREEN LINE OVERVIEW May 2014
![Page 1: GREEN LINE OVERVIEW May 2014](https://reader036.fdocuments.us/reader036/viewer/2022062305/568163fb550346895dd590dc/html5/thumbnails/1.jpg)
1
Beverly A . Scott, Ph.D.MBTA General Manager
MassDOT Rail & Transit Administrator
Richard A. DaveyMassDOT Secretary and CEO
GREEN LINE OVERVIEWMay 2014
![Page 2: GREEN LINE OVERVIEW May 2014](https://reader036.fdocuments.us/reader036/viewer/2022062305/568163fb550346895dd590dc/html5/thumbnails/2.jpg)
2
•226,000 weekday riders•205 Vehicle Fleeto111 Type 7’s (1987, 1997)o94 Type 8’s (2007)
•26 miles of track•23 miles of overhead catenary wire•64 grade crossings•91 switches, 497 signals, 497 track circuits, and 40 switch heaters •10 unit sub-stations•750,000 feet of DC feeder cable•2,019 MBTA parking spaces•66 stops/stations
Green Line: About
![Page 3: GREEN LINE OVERVIEW May 2014](https://reader036.fdocuments.us/reader036/viewer/2022062305/568163fb550346895dd590dc/html5/thumbnails/3.jpg)
3
Green Line
1. Speed
2. Frequency
3. Capacity
4. Transparency
5. Accessibility
![Page 4: GREEN LINE OVERVIEW May 2014](https://reader036.fdocuments.us/reader036/viewer/2022062305/568163fb550346895dd590dc/html5/thumbnails/4.jpg)
4
SpeedStop Consolidation:Preferred Station Spacing: 1,200 – 1,400 feet
![Page 5: GREEN LINE OVERVIEW May 2014](https://reader036.fdocuments.us/reader036/viewer/2022062305/568163fb550346895dd590dc/html5/thumbnails/5.jpg)
5
FrequencyIncrease Fleet Size:
Overhaul of Type 7 and Acquisition of Type 9
•$140.6 million invested in fleet reliability•$164.0 million invested in fleet expansion
![Page 6: GREEN LINE OVERVIEW May 2014](https://reader036.fdocuments.us/reader036/viewer/2022062305/568163fb550346895dd590dc/html5/thumbnails/6.jpg)
6
Capacity3 Car Trains:
$3.9 million investment to study power system upgrades to run more 3 car trains at peak
![Page 7: GREEN LINE OVERVIEW May 2014](https://reader036.fdocuments.us/reader036/viewer/2022062305/568163fb550346895dd590dc/html5/thumbnails/7.jpg)
7
TransparencyGreen Line Tracking:December 2014 Planned
Launch
![Page 8: GREEN LINE OVERVIEW May 2014](https://reader036.fdocuments.us/reader036/viewer/2022062305/568163fb550346895dd590dc/html5/thumbnails/8.jpg)
8
Accessibility
Park St Station Elevators Government Center Overhaul
Station Upgrades:
PATIPlan for Accessible Transit Infrastructure
![Page 9: GREEN LINE OVERVIEW May 2014](https://reader036.fdocuments.us/reader036/viewer/2022062305/568163fb550346895dd590dc/html5/thumbnails/9.jpg)
9
Green Line Mid-Term Improvements
Fare Evasion:Front Door Boarding PolicyReduce Use of Tickets
Traffic Signal Prioritization:Improve Street Level Speed
Capacity Study:Identify power needs on the
Green Line
![Page 10: GREEN LINE OVERVIEW May 2014](https://reader036.fdocuments.us/reader036/viewer/2022062305/568163fb550346895dd590dc/html5/thumbnails/10.jpg)
10
Green Line Long-Term Improvements
Green Line Extension (GLX)
New Facilities
Power System Overhaul
Additional Stop Consolidation
New Fare Collection strategies
![Page 11: GREEN LINE OVERVIEW May 2014](https://reader036.fdocuments.us/reader036/viewer/2022062305/568163fb550346895dd590dc/html5/thumbnails/11.jpg)
11
Thank youTake the MBTA Survey @ mbtasurvey.com