Green Dot Criteria
No Criteria Bad Good
1. Groove line – smooth / blowholes
repaired
2. Chamfer edge –
grind/smooth
3. Repair – done and
satisfied as specs
7/24/2019 Green Dot Criteria
http://slidepdf.com/reader/full/green-dot-criteria 2/3
4. Bolt Socket- freefrom slurry
5. Plastic Sheath –
clean
6. Coating – touch up
7. Stamping –
markings are
correct and clear.
7/24/2019 Green Dot Criteria
http://slidepdf.com/reader/full/green-dot-criteria 3/3
8 Bagging – smoothsurface / no visible
blowholes
9. Grout Socket -
clean
10. Stacking –
Segments are
stacked in a
complete ring