Green Cluster Summit - GCDPo @BAZI

36
Micro Experiences

description

Green Cluster Summit - GCDPo @BAZI 2013.1

Transcript of Green Cluster Summit - GCDPo @BAZI

Page 1: Green Cluster Summit - GCDPo @BAZI

Micro Experiences

Page 2: Green Cluster Summit - GCDPo @BAZI

The XP Team is a program that promotes the EPs interaction between each other and it also increases the connextion between EPs and AIESEC Entity. This program is about raising a strong engagement with AIESEC Entity while exchange.

Objectives:To engage and to link EPs with AIESEC opportunities, generating showcasing and informations about the countries chosen by EPs.

Why is it important to AIESEC? To generate leadership positions, forming AIESEC ambassadors, increasing the EPs reintegration rate in LC (X+T), producting informations updated (showcasing, booklets) even more reliable.

Duration and Structure:Minimum of 12 weeks up to 18 weeks - The start should be given three weeks prior to the first departure of a team member, and end up to 3 weeks after the arrival of the latest member of the team.

Page 3: Green Cluster Summit - GCDPo @BAZI

Before Exchange

In the 3 first meetings before the first departure (of a team member) should contentBefore X First Meeting •The GCDP role •Internship goals •Metas para Match

Before X Seccond Meeting • To do List for X – main informations that should be collected (gastronomy and tipical clothes, places to visit, cost of living, general informations, curiosity, videos, photos...)• Feedback and Sharing culture•Reflection on strengths and weaknesses

*In this project the EP Manager will lead the EPs team

Page 4: Green Cluster Summit - GCDPo @BAZI

During Exchange

Page 5: Green Cluster Summit - GCDPo @BAZI

AMP (Host, Buddy and OC) *AMP = associated membership programPresent the proposal of AMP at the first meeting of EP and EP Manager anddetecting interests in a form or standard document. The structure of Host andBuddy is made by ICX, and OCs are the responsibility of Conference Managers. AMP provides EPs Micro XPs and encourages participation in programs andmembership as Host ,Buddy and OC’s Events - all short term positions.

-Objectives:Integration with the organization, awareness of the exchange experience, contacts and knowledge of the products of AIESEC.

- Why is it important to AIESEC: Can solve problems with Host, helping in improving the service and connecting with our values - multiculturalism; stimulating exchanging and making the EP more AIESECer; pipeline to OC (TMP and TLP).

-Duration and Structure:For Host and Buddy - GCDPo exchange length (6-12 weeks)For OC - OC length until the delivery of the event

-Recomendations: GCDPo team (EP Manager or Match Manager) is the responsible for these activities tracking.EP shall not blur its basics obligations as an exchange student (Match timeline, applications for vacancies, event participation for EPs)

Page 6: Green Cluster Summit - GCDPo @BAZI

EP Self ManagementEPs proactives become EP Managers;

-Objectives:Accelerating MA, ensuring interaction with @ and providing a Leadership Role;

-Why is it important to AIESEC:Because of the leadership positions generated by this project, we guarantee a higher rate of reintegration and we can increase the EP exchange experience alignement.

-Duration and StructureThe EP will assume the leadership position to make other EPs MA quicker, so the job could last until the EP Manager departure or until the last EP MA.

- RecommendationsThe EP can only become EP Manager after becoming officially MA (to be matched in the system and exchanging ANs), to ensure your RE and its members.

Page 7: Green Cluster Summit - GCDPo @BAZI

Induction + ConferenceInduction + Conference

Global Citizen Discovery Days

Page 8: Green Cluster Summit - GCDPo @BAZI

Most common problemsof the EPs

Page 9: Green Cluster Summit - GCDPo @BAZI

How can we solve this?

Page 10: Green Cluster Summit - GCDPo @BAZI

What is expected

Page 11: Green Cluster Summit - GCDPo @BAZI

In this wiki you will find

Page 12: Green Cluster Summit - GCDPo @BAZI
Page 13: Green Cluster Summit - GCDPo @BAZI
Page 14: Green Cluster Summit - GCDPo @BAZI
Page 15: Green Cluster Summit - GCDPo @BAZI
Page 16: Green Cluster Summit - GCDPo @BAZI
Page 17: Green Cluster Summit - GCDPo @BAZI
Page 18: Green Cluster Summit - GCDPo @BAZI
Page 19: Green Cluster Summit - GCDPo @BAZI
Page 20: Green Cluster Summit - GCDPo @BAZI
Page 21: Green Cluster Summit - GCDPo @BAZI
Page 22: Green Cluster Summit - GCDPo @BAZI
Page 23: Green Cluster Summit - GCDPo @BAZI
Page 24: Green Cluster Summit - GCDPo @BAZI
Page 25: Green Cluster Summit - GCDPo @BAZI

Timeline

Page 26: Green Cluster Summit - GCDPo @BAZI

Integration Event

Page 27: Green Cluster Summit - GCDPo @BAZI

Tips for the event

Page 28: Green Cluster Summit - GCDPo @BAZI

Tips for the event

Page 29: Green Cluster Summit - GCDPo @BAZI

Reintegration event

Page 30: Green Cluster Summit - GCDPo @BAZI

Tips for the event

*3 hours of event (maximum)

Page 31: Green Cluster Summit - GCDPo @BAZI

Operational Plan

Page 32: Green Cluster Summit - GCDPo @BAZI

Flow and follow-up standard Flow and follow-up standard processesprocesses

Page 33: Green Cluster Summit - GCDPo @BAZI

1. Micro Management

• 1.1 – Operation Planning for GCDPo processes

Page 34: Green Cluster Summit - GCDPo @BAZI

• 1.2 – Minimuns and maximuns

Contact Raise Match Realize

Page 35: Green Cluster Summit - GCDPo @BAZI

2. Standard auditing process

Page 36: Green Cluster Summit - GCDPo @BAZI

3. Making EPs [email protected] e-mail

- Start using ONLY EP’s @aiesec.net e-mail as soon as he is on MyAIESEC.net

- Encourage the EPs to apply for TNs using the @aiesec.net e-mail, emphasizing the benefits and the importance of this action

Attention points: • Teach the EP how to sync his personal e-mail with his @aiesec.net e-mail• Don’t forget to update the e-mail in the contact spreadsheet