Greater Yamhill Disscussion Slides for PSP SAG...Yamhill PSP History uDecision made in 2006 to...
Transcript of Greater Yamhill Disscussion Slides for PSP SAG...Yamhill PSP History uDecision made in 2006 to...
Discussion Slides for Greater Yamhill
PSP
SAG Meeting
ODA HQ Office
January 16th 2020
Yamhill PSP Historyu Decision made in 2006 to initiate a PSP in the Yamhill
u WF Palmer Creek on DEQ “303(d)” list of impaired waters for chlorpyrifos based on USGS monitoring
u Watershed council and SWCD expressed strong interest
u Diverse agriculture and some small urban centers
u Monitoring began in 2007 throughout the sub-basin u As many as 8 locations monitored in early years
u Regular outreach and communications activitiesu OSU Integrated Plant Protection Center and Extension
workshops on IPM and pesticide risk reduction
u Watershed council membership meetings and WF Palmer events in Dayton
u Pesticide dealers/crop consulted and included in meetings
Yamhill PSP – Current Approach and Status
Currently there are two areas of focus within the Greater YamhillPesticide Stewardship Partnership
v Palmer Creek Sub-Watershedv Cozine Creek Sub-Watershed
The shift to these sub-watersheds began in to focus attention on smaller more intensively utilized areas which had demonstrated the greatest consistent impact from pesticides
A review of several years of historical data has indicated onlyminimal to no sustained reductions in pesticide concentrations in These sub-watersheds
Pesticide loading analysis has revealed additional data that mayhelp in further explaining why improvement has been lacking
34 pesticide ingredients or degradates detectedwith 9 exceeding a benchmark at least once
Yamhill PSP Monitoring Plans
u Beginning in 2020 monitoring will be scaled back by approximately 50% in the Yamhillu WF Palmer Creek:
u Webfoot Bridge (furthest downstream) = 1x per month
u SE Palmer Creek Rd and SE Lafayette Hwy = 3x in spring
u Cozine Creek:
u Middle Cozine = 1x per month
u Lower Cozine = 1x per month
u Steam discharge measurements will increase on Cozine Creek to better characterize hydrology and further loading analysis
PSP Areas of Interest Greater Yamhill
0
5
10
15
20
25
30
35
W.F.Palmer Ck @ SELafayette
W.F. Palmer Ck @ SE PalmerCk Rd
W.F. Palmer Ck @ WebfootBr.
Estimated Total Pesticide Loading (2018)Po
unds
per
Year
3764
0 3763
9
3423
2
0
2
4
6
8
10
12
14
16
18
Herbicide Metabolite Fungicide Insecticide
Estimated Total Pesticide Loading by Type (2018)
W.F.Palmer Ck @ SE Lafayette W.F. Palmer Ck @ SE Palmer Ck RdW.F. Palmer Ck @ Webfoot Br.
Pounds
per
Year
PSP Areas of Interest Mid-Coast Planning PartnershipGreater Yamhill
4.5
4.6
4.7
Middle Cozine Lower Cozine
Estimated Total Pesticide Loading (2018)
3423
5
3423
4
Pounds
per
Year
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
Herbicide Metabolite Fungicide Insecticide
Estimated Total Pesticide Loading by Type (2018)
Middle Cozine Lower Conzine
Pounds
per
Year