Grand Army Plaza - New York › html › dot › › downloads › pdf › gap2011-ppt.pdf · Grand...

10
Summer 2011 Grand Army Plaza Enhancements Commissioner Janette Sadik-Khan New York City Department of Transportation Presented to CB 6 April 21, 2011

Transcript of Grand Army Plaza - New York › html › dot › › downloads › pdf › gap2011-ppt.pdf · Grand...

Page 1: Grand Army Plaza - New York › html › dot › › downloads › pdf › gap2011-ppt.pdf · Grand Army Plaza Enhancements Commissioner Janette Sadik -Khan New York City Department

Summer2011

Grand Army Plaza Enhancements

Commissioner Janette Sadik-Khan New York City Department of TransportationPresented to CB 6 April 21, 2011

Page 2: Grand Army Plaza - New York › html › dot › › downloads › pdf › gap2011-ppt.pdf · Grand Army Plaza Enhancements Commissioner Janette Sadik -Khan New York City Department

GAP Full Plan

Shorter pedestrian crossings

Separated vehicle movement

Enhanced plaza space

Bicycle connections

Page 3: Grand Army Plaza - New York › html › dot › › downloads › pdf › gap2011-ppt.pdf · Grand Army Plaza Enhancements Commissioner Janette Sadik -Khan New York City Department

GAP North – Improvements

Remove unnecessary thru lanes,

shift Bus Only lane

Short/direct pedestrian

connections

Four improved landscaped

islands/sidewalks

Existing

Page 4: Grand Army Plaza - New York › html › dot › › downloads › pdf › gap2011-ppt.pdf · Grand Army Plaza Enhancements Commissioner Janette Sadik -Khan New York City Department

Ring Improvements

New signal + barrier

separates conflicting

movements

Traffic calming

Existing

Page 5: Grand Army Plaza - New York › html › dot › › downloads › pdf › gap2011-ppt.pdf · Grand Army Plaza Enhancements Commissioner Janette Sadik -Khan New York City Department

Landscaped islands

Five new crosswalks

Enhanced public space

Fills gap in bicycle network

GAP South Improvements Existing

Page 6: Grand Army Plaza - New York › html › dot › › downloads › pdf › gap2011-ppt.pdf · Grand Army Plaza Enhancements Commissioner Janette Sadik -Khan New York City Department

Implementation Schedule

• Mill & repave –night work only• Install markings• Install plaza treatment

• Concrete night and day work• One traffic diversion

• Concrete - night work only (9PM-7AM)• No traffic diversions

JUNE JULY AUGUST

Major work done between 4th of July and Labor Day when there is less traffic

Page 7: Grand Army Plaza - New York › html › dot › › downloads › pdf › gap2011-ppt.pdf · Grand Army Plaza Enhancements Commissioner Janette Sadik -Khan New York City Department

4

JuneConcrete Islands

• All night work • Islands 1 & 2 start simultaneously• Islands 3 & 4 started as 1 & 2 are completed

1

2

3

Page 8: Grand Army Plaza - New York › html › dot › › downloads › pdf › gap2011-ppt.pdf · Grand Army Plaza Enhancements Commissioner Janette Sadik -Khan New York City Department

July

7

6

8Concrete Islands

• Day crew added for island 5• Night crews continue on all islands

Temporary diversion around construction of island 5

5

Signal• Signal installed for “loop”• Becomes operational end of July

Page 9: Grand Army Plaza - New York › html › dot › › downloads › pdf › gap2011-ppt.pdf · Grand Army Plaza Enhancements Commissioner Janette Sadik -Khan New York City Department

August

Repave RoadsNight work only

Install Plaza Treatment

•Crushed gravel surfacing

•Granite blocks

Install New Markings

Page 10: Grand Army Plaza - New York › html › dot › › downloads › pdf › gap2011-ppt.pdf · Grand Army Plaza Enhancements Commissioner Janette Sadik -Khan New York City Department

Thank You

www.nyc.gov/dot