Page 1: Granabmontering_eng

Granab Subfloor Systems 3000 and 7000 have been tested and certified by the SP Technical Research Institute of Sweden.

GRANAB SUBFLOOR SYSTEMS

INSTALLATION INSTRUCTIONS

Page 2: Granabmontering_eng

GRANAB manufactures subfloor systems for homes, offices,

schools and public buildings. The systems feature steel floor

girders with dampening elements for effective impact and

airborne sound insulation.

Granab subfloor systems are patented and type-approved

with respect to sound-dampening properties, dynamic loads

and strength. About 4 million m2 have been installed in various projects.

Granab's main office is in Vårgårda, Sweden with production facilities in

both Vårgårda and Lindköping.

Welcome to Granab AB

2 3

Bygg- och Miljöteknik Granab ABPhone: +46 (0) 322-66 76 50 Fax: +46 (0) 322-66 76 55

E-mail: [email protected] www.granab.se

Mailing address: P.O.Box 172 SE-447 24 Vårgårda Sweden

Street address: Verkstadsgatan 4 Vårgårda, Sweden

2 3

Page 3: Granabmontering_eng

Granab Subfloor System 3000 4

Granab Subfloor System 7000 5

Planning instructions 6

Alternative floor coverings 7

Planning 8 - 9

This is what you need 10 - 11

Installation, step by step 12 - 20

Ventilated subfloors 20

Tiled surfaces, bathrooms 21

Checklist 1 – 2 22 – 23

CONTENTS:

2 3 2 3

Design

Design

Installation tools, girder spacers, height adjustment, trimming girders, ergonomic tools

For various load conditions

Drawings, delivery optimisation and installationdrawings

Installer's inspection of Granab Subfloor Systems 3000/7000

Moisture, mould, radon

Chipboard & carpet, chipboard & parquet,floating parquet

Support blocks and dampening elements 12

Laying out girders 13

Height adjustment, frame girders 13

Attachment of frame girders 14

Height adjustment and attachment of other girders 14

Trimming and adjustment of adjustment screws 15

Recessing adjustment screws 15

Adjustment of adjustment screws 16

Recessing adjustment screws 17

Door openings, thresholds, cover mouldings 18

Installation for high levels, 250 – 420 mm 19

Installation of masonite beams, 420 – 1000 mm 19 Installation of skirting 19

Installation of plastic film on Granab girders in moist environments 20

Page 4: Granabmontering_eng

4 5

Granab Subfloor System 3000

400 60020 600 600 600 600 600 400

600

600

General installation drawing, Subfloor System 3000 – Residential

Construction heights: Flexible construction heights from 30 to 180 mm, excl. floor covering

With supplementary sheet between the girders

NB: The c/c distance between girders is determined by the choice of floor covering. For other premises, see the c/c distance between floor girders on page 6.

for adjustable heights 30-180 mm, excl. floor covering

Section with support block and dampening element, level adjustment screw and con-crete anchor

22-mm parquet, alternatively 22-mm chipboard & 15-mm parquet or carpet

26,5

4517 17

79

Max. height180 mm

MIn. height30 mm

Page 5: Granabmontering_eng

4 5

Granab Subfloor System 7000

400 600

600

600

20

600 600 600 600 600 400 20

General installation drawing, Subfloor System 7000 – Residential

Construction heights:Flexible construction heights from 70 to 420 mm, excl. floor coveringSpecial heights up to 1000 mm with masonite beams on girders (see page 19)

22-mm parquet, alternatively 22-mm chipboard & 15-mm parquet or carpet

for adjustable heights 70-420 mm, excl. floor covering

Special heights up to 1000 mm (see page 19)

NB: The c/c distance between girders is determined by the choice of floor covering. For other premises, see the c/c distance between floor girders on page 6.

Section with support block and dampening element, level adjustment screw and con-crete anchor

Adjustment heights

70-420 mm 45

40

Page 6: Granabmontering_eng

6 7

Planning instructions for various load conditions, Granab Subfloor Systems 3000 and 7000

1. Rooms in dwellings, hotels, hospital rooms and staff rooms, c/c distance, girders (sections), 600 mm.

2. Assembly rooms such as classrooms, rooms in child-care centres, lecture halls, office rooms, premises for restaurants, cafes and dining halls, c/c distance, girders (sections), 400 mm.

3. Open areas in libraries, spaces with fixed seating such as in churches, theatres and cinemas, c/c distance, gird-ers (sections), 400 mm.

4. Spaces without fixed seating in churches, concert halls, theatres, cinemas, museums, exhibition halls, retail are-as in department stores and shops, gyms, sports cen-tres, dancehalls, corridors in schools, etc., c/c distance girders (sections), 300 mm.

Recommended c/c distance between floor girders (sections) and support blocks, Systems 3000/7000:

System 7000

System 3000

Distance from wall, approx.

40 mm

1st – 2nd girders, 400 mm c/c distance between floor girders (sections), 600 mmc/c distance between

support blocks, 600 mm

Distance from wall, approx.

20 mm

1st – 2nd girders, 400 mm c/c distance between floor girders (sections), 600 mmc/c distance between

support blocks, 600 mm

Load capacityFor girder spacing for homes, c/c distance

600 mm = 4 tons/m2

The point load capacity and distributed load of various floor coverings installed on Granab systems are calculated according to the specifica-tions of the respective flooring manufacturers.

Page 7: Granabmontering_eng

6 7

Examples of alternative floor coverings

22-mm chipboard & 15-mm parquet

Follow the instructions for installation and laying from the respective chipboard and parquet manufacturers.

22-mm chipboard & carpet

Gluing/screwing chipboard

NB: Casco Superset no. 3879 or equivalent

NB: Use flooring paper as an interlayer between the chip-board and parquet.

22-mm parquet, floating or glued to the girders

Floating Gluing, parquet

NB: Casco Superset no. 3879 or equivalent

NB: Use intermediate strips of flooring paper.

Tiles

WC/Bathroom Entrance/Hall

Page 8: Granabmontering_eng

8 9

Packaged and labelled for each flat

HALL

KÖK/V-RUM CA 33 m2(V-RUM CA 23 m2)

BALKONG CA 6,5 m2

SOVRUM 1CA 12,5 m2

HALL

KÖK/V-RUM CA 33 m2(V-RUM CA 23 m2)

BALKONG CA 6,5 m2

HALL

KÖK/V-RUM CA 30 m2(V-RUM CA 20 m2)

BALKO

NG

CA 6,5

m2

KÖK/V-RUM CA 30 m2(V-RUM CA 20 m2)

SOVRUM 2 CA 12,5 m2

SOVRUM 1CA 11 m2

SOVRUM 2CA 8,5 m2

HALL

SOVRUM 3CA 11,5 m2

SOVRUM 1 CA 12,5 m2

SOVRUM 2 CA 9 m2

SOVRUM 1 CA 11,5 m2

KLK CA 3,5 m2

WC/DUSCHCA 5,5 m2

WC CA 1,5 m2

KLK CA 2,5 m2

KLK CA 1,5 m2

WC/DUSCHCA 5,5 m2

WC/DUSCHCA 5,5 m2

FRDCA 2 m2E

E

EE

BALKO

NG

CA 6,5

m2

WC/DUSCHCA 5,5 m2

BOX 172447 24 VARGARDA

Claes-Goran Andreasson

DATUMSIGNÄNDRINGEN AVSERANTBET

HANDLÄGGARERITAD AVUPPDRAG NR

ANSVARIGDATUM

BETNUMMERSKALA

GRANAB AB

KV.UGGLAN

VEIDEKKE SVERIGE

071116GRANAB S-7000

1:50(A1)

PLAN 2-5HUS 1

850

1220

1220

1500

1310

1500

1310

15202600

15202600

15202600

15202600

2030

360

16202600

2450

1620 2600

10802600

10802600

10802600

10802600

108026002000

108026002000

1360260026002600

1360260026002600

300

2520

1470

9603002370

1080

2600

7302600

1240

2090

2530

1460 2600 2600 2600

500

850750

950

500

2210

2210

2210

2210

2210

3002460

3002460

1570

2600

1930510

2600

450

1100

250 2600

320

440

500

850

850

500

2600

2600

2600

2600

2600

2820

2040310

2820

2690

500

850

3002360

3002360

3002360

3002360

3002360

3002360

3002360

1460

2600

8301630

1460

2600

300 2450

850

500

3002360

3002360

3002360

3002360

3002360

3002360

990

2600

5301970

990

2600

300 2450

310

13702600

13702600

13702600

13702600

2450

14602600

2120

1460 2600

11102600500

500

500

1230

11102600

11102600

11102600

11102600

11102600

11102600

11102600

11102600

11102600

1200 2600

340

2600

2600

8202600330

2280

1590

1120

850

950

1550

3002380

15102600

15102600

1410

1470

450

3002480

1700

300 2390

1550

380

1560

850

1430

520

650

1520

830

580

850

3002360

500

3002360

3002360

3002360

3002360

3002360

3002360

1320

2600

3002450

1320

2600

720 1770

850

850

500

2480

2480

2480

2480

2480

2480

1320

2600

2580

1320

2600

530 1880

500

500

500

15202600

760

310

950

2390 380

2600 2600

15202600

15202600

15202600

15202600

2340

1360260026002600

1360260026002600

10702600

10702600

10702600

10702600

10702600

10702600

1540

300

2380

360

2000

16202600

2450

760

6702600

1810

340 2600 2600

640

2600

300 2350 960

850

2340

2340

1070

2430

1070

2430

2160

2600

720

2350

2600

7202250

2250

2250

2250

2250

400

850

2250

3302250

2600

1320

2600

2600

1320

2460 300

2460 300

2460 300

2460 300

2460 300

2460 300

500

2460 300

850

2600950

2260

1600

1580

2010

2600 1460

2450

570

490

2600

2600

340

2600 1090

2600 1090

2600 1090

2600 1090

2600 1090

2600 1090

2600 1090

2600 1090

2600 1090

2600 650

2600 1370

2600 1370

2600 1370

2600 1370

500

500

500 31

0

1740

640

2350

1980

2290 300

380

1550

1810

2250

2600 1500

2600 1500

1460850

1520

950

1530

1320

490

740370

520

1430

850

GR 1:75

Planning, logistics efficiency

Delivery optimisationGranab systems are packed and delivered with pre-cut and dimension-adapted floor girders and factory-fitted support blocks and dampening elements. Each girder is labelled with a room name and length that matches the information on the installation drawing for each flat or other agreed-upon space subdivision. Granab systems are packaged in bundles on EUR pallets with a maximum length of either 2600 mm or 3800 mm.

Page 9: Granabmontering_eng

8 9

Girders are pre-cut to the correct lengths according to the drawing for each room unit.

Planning, logistics efficiency

Because Granab systems consist of non-organic materials and are not affected by moisture or temperature varia-tions, they can be delivered while the framework is still under construction. Granab girders can be produced with a maximum length of 2600 mm – the same length as for a bundle of plasterboard. The plasterboard for the walls can be moved in along with the wall girders, which are placed on stands above the Granab girder packages.

By lifting the materials into place during framework construction and erecting the interior walls above the Granab system, workflow is more efficient and costs for logistics are minimised.

Interior walls for finished Granab subfloorsWalls for flats or other subdivisions are first erected from floor to ceil-ing. It is advisable to erect interior walls within a flat or subdivision on finished Granab subflooring, including the chipboard.Erection of interior walls in this manner permits the chipboard to be installed quicker and entails less waste in that one is working with larger, continuous floor surfaces. Material consumption for the interior walls is lower and installation of both the Granab floor and interior walls goes significantly faster.

Intra-transport in conjunction with framework construction

6.9 m²

SOV1

40.7 m²

STUE/KJØKKEN

3.9 m²

WC10.3 m²

GANG

3.2 m²

SKAP/BOD

8.6 m²

BAD/OMKL.

8.4 m²

SOV36.6 m²

SOV2

11.8 m²

SOV17.4 m²

BAD/VASK/OMKL.7.8 m²

HALL

2.6 m²

SKAP

39.5 m²

STUE/KJØKKEN

6.6 m²

SOV2

4.5 m²

BOD

28.4 m²

STUE/KJØKKEN

4.7 m²

HALL

6.9 m²

SOV110.4 m²

SOV2

7.5 m²

BAD/VASK/OMKL.

4.1 m²

HALL

13.8 m²

GANG

11.3 m²

TERRASSE

10x21M

10x21M

10x21M

8.4 m²

SOV36.6 m²

SOV2

40.7 m²

STUE/KJØKKEN

6.9 m²

SOV1

8.6 m²

BAD/OMKL.

4.1 m²

HALL

10.3 m²

GANG

3.2 m²

SKAP/BOD

3.9 m²

WC

9.9 m²

TERRASSE

9.5 m²

TERRASSE

37.8 m²

STUE/KJØKKEN

6.6 m²

SOV2

11.8 m²

SOV17.4 m²

BAD/VASK/OMKL.

7.8 m²

HALL

2.6 m²

SKAP

21.1 m²

TRAPPEROM10x21M

10x21M

10x21M

10x21M

10x21M

8x21M

10x21M

10x21M

8x21M

8x21M

10x21M

10x21M

10x21M

8x21M

10x21M

10x21M

10x21M

10x21M

10x21M

10x21M

10x21M

10x21M

28x21M

9x21M 10x21M 9x21M

10x21M10x21M

10x21M

8x21M

28x21M

10x21M

10x21M

10x21M

10x21M

10x21M

8x21M

10x21M

10x21M

0.6 m²

EL-SKAP8

11

46

1

2

2

1

1

2

2

9 10

9

99

9

99

8

1 1

46

1

2

2

1

1

2

2

1

1

1

5

2

2

1111

11 11

11

1

1

1

5

2

2 11

4

1

1

1

1

5

6

2

2

26002600260026001980

2600

2600

10

2600

5302600 380

2500

2180

2310

300 2600 2470

1810

2600680

400

2420

2600 1010

2560

300

2600 2600 2600 2600 1910

2600 2600 2600 2600 1910

2600 2600 2600 2600 1910

2600 2600 2600 2600 1910

2600 2600 2600 2600 1910

2600 2600 2600 940

2600 2600 2600 940

2600 2600 2600 940

2600 2560 1320

2600 2000 2600 2400

2600 1400 2600 2400

2600 800 2600 2400

1170

2600

430

1170

2600

430

1100

1100

1100

1100

1100

950

950

26002600260026001980

2560

300 2600 870

2420

4102600820

1810

2600 2470

2560

2180

2570

2600 380

2600

530

2600

2600

2600 2600 2600 2600 1910

2600 2600 2600 2600 1910

2600 2600 2600 2600 1910

2600 2600 2600 2600 1910

2600 2600 2600 2600 1910

2600 2600 2600 940

2600 2600 2600 940

2600 2600 2600 940

1320 2600 2560

2600 2400 2600 2000

2600 2400 2600 1400

2600 2400 2600 800

2600440

1600

1880

1170

2600

430

1170

2600

430

1100

1100

1100

1100

1100

950

950

26001500

2440

300

2600430

2600

270

2530300

1720

1290

1280

26002600

390

2600 1970

18201680

2600

2600

1580

2540 300

2310

2460 300 2600 1430

2460 300 2600 1430

2460 300 2600 1430

2600 600 2600 1430

2600 950 1230

2600 2600 2140

2600 2600 1960

2600 2600 1960

2600 2600 1960

2600 2600 1960

2600 2600 1960

2600 2600 1960

2600 2600 1950

2600 2600 1950

2600 2600 1950

2120

920

2400

2600420

950

26001430

26002600410

400

1190

2600

2600

870

2600 2600 2600 1810

2600

1010

2460300

2600

400

2600 2600 340

2600 2600 1480

2600 2600 1480

2600 2600 1480

2600 2600 1480

2600 2600 2600 1740

2600 2600 2600 1740

2600 2600 2600 1740

2600 2600 2600 1740

2600 2600 2600 1740

2600 2600 2600 1740

26002600270

2530300

2510

300

2600430

2500

30026001500

2310

2400 300

2600

2600

1720

2600 2600 2020

2600

2600

390

1280

1220

1790

2600 1430 2460 300

2600 1430 2460 300

2600 1430 2460 300

2600 1430 2600 600

1230 2600 950

2600 2600 2140

2600 2600 1960

2600 2600 1960

2600 2600 1960

2600 2600 1960

2600 2600 1960

2600 2600 1960

2600 2600 1950

2600 2600 1950

2600 2600 1950

2330

2600350

26001410

950

2600880

2260

320 2600 690

2500

2600 820

2600 820

2600 820

2600 820

2600 820

2600 820

2600 820

2600 820

1550

1900

2600410

2600880

2520

2600 680 320

2270

2600 800

2600 820

2600 820

2600 820

2600 820

2600 820

2600 820

2600 820

1800

2440

660 410

1200

1880

560

560

1680

1680

1680

1680

1680

1680

2520300

2380

300 2520 300

2380

300

2410 300

2410 300

2410 300

2410 300

2410 300

2410 300

2410 300

2420 300

2420 300

2410300

2330

300 2410 300

2330

300

2600

2600

2600

2600

2600

2600

2600

2600

2600

2520300

2380

300 2520 300

2380

2410 300

2410 300

2410 300

2410 300

2410 300

2410 300

2410 300

2410 300

2410 300

300

1970

1890

1280

520

660

2440

1870

1870

1870

1870

1870

1870

560

560

BOX 172447 24 VARGARDA

Claes-Goran Andreasson

DATUMSIGNÄNDRINGEN AVSERANTBET

HANDLÄGGARERITAD AVUPPDRAG NR

ANSVARIGDATUM

BETNUMMERSKALA

GRANAB ABTERRASSE

TERRASSE

GVJ

KV.RONNVIKVEIEN

PLAN 1-4

GR 1:731:50(A1)

080214GRANAB S-7000

HUS C

Page 10: Granabmontering_eng

10 11

Accessories Girder spacers

Installation tools, Granab Subfloor Systems 3000 and 7000

Mandrel for recess-ing in predrilled holes

Mandrel for final fixation

Screwing tool for adjusting floor girder heightsFor screwdriversShort model: Cat. no. 8100 Long model: Cat. no. 8200

Screwing tool for manually adjusting floor girder heightsShort model: Cat. no. 8300 Long model: Cat. no. 8400

Mandrel for installation of con-crete anchors (1 of each included)Cat. no. 850 A Length 250 mm Cat. no. 850 B Length 500 mm Cat. no. 850 C Length 1000 mm

Drill bit for recessing adjustment screws in girdersCat. no. 8600

Concrete drill bits for concrete anchors.Cat. no. 8700, 250 mm, shortCat. no. 8800, 460 mm, long

Installation pipe for concrete anchorsCat. no. 8900

Cat. no. Tool9300 Girder spacing 300 mm9400 Girder spacing 400 mm9500 Girder spacing 500 mm9600 Girder spacing 600 mm

För isolerings-tjocklek A

70

20

Automatic screwdriver Chipboard flooring screws Insulation anchor, system 7000

Automatic screwdriver type HILTI, 4000 rpm unit. For chipboard flooring screws. Contact Granab.

Self-tapping screws for chip-board. Contact Granab.

Insulation thickness, A mm: 40, 80, 120 or as agreed.Cat. nos. 7040, 7080, 7120

Page 11: Granabmontering_eng

10 11

Insulation bracket System 7000

Ergonomics during installation

Level adjustment with laser levelling

Trimming girderswith compass saw

Insulation bracket System 3000

Screwing tool, longCat. no. 8200

Mandrel, long Cat. no. 850C

Installation pipe for concrete anchors Cat. no. 8900

System 3000 with built-in insulation bracket in the section for 25-mm insulation

All installation tasks can be carried out in comfortable working positions using the long screwing tool model, long mandrel model and installation pipe for concrete anchors. (Contact Granab.)

Insulation thickness, A mm: 40, 80, 120 or as agreed.Cat. nos. 7040, 7080, 7120

Page 12: Granabmontering_eng

12 13

Installation, step by stepGranab Subfloor Systems

Important general joints: NB: Always ensure that the flooring manufacturer's requirements are fulfilled regarding expansion joints, gaps against walls, etc.

Both prior to installation and after installation, all surfaces must be carefully cleaned. All adjustment screws must be carefully secured in the sub-floor with concrete anchors. If all adjustment screws are not properly secured, there is risk for creaking and unevenness in the floor covering after installation.

Adjustment screws must always be recessed into the floor girders so that the upper edges of the adjuster screws do not come in contact with the floor covering, which would cause “bridging” in the sound insulation.When installing chipboard or chipboard/parquet on the girders, it is very important that the chipboard or parquet is not in contact with walls. There must always be a gap of about 5 mm between the walls and chipboard/parquet so that the floor is able to move freely. This is necessary to ensure that the planned sound insulation is attained.

Furthermore, relative humidity in the room is very important to take into consideration when using wood-based flooring, both during and after laying. The manufacturer's instructions must be carefully followed.

Sections with support blocks and dampening elements, level adjustment screws and concrete anchors

System 3000 System 7000

1. Support block and dampening element

If blocks and dampening elements are not ordered factory-installed in the girders, these shall be fitted in the girders according to the general drawings on page 4, alternatively, page 5.

Carefully follow the points on the installer's checklist on pages 22–23.

Page 13: Granabmontering_eng

12 13

2. Laying out girders 3. Height adjustment, frame girders

The girders are laid out according to the general drawing on page 4, alternatively page 5, depending on the choice of system – 3000 or 7000 (residential).

For offices, schools and assembly rooms, see c/c dis-tance, girders, on page 6.

When using installation instructions prepared by Granab for specific projects, follow the specifications for girder locations on the layout drawing.

To facilitate installation and obtain the correct c/c spacing between the girders, use a Granab girder spacer.

Girder spacers are available in the following lengths: 300, 400, 500 and 600 mm. See page 10.

Height adjustment, first frame girders, using a laser. The height is adjusted to 10 mm lower than the final girder height. Begin with the adjustment screws that are to be fitted at each end and at the middle of the girder. The girders are adjusted upwards with the screwing tool in an electric drill. See page 10.

Page 14: Granabmontering_eng

14 15

4. Attachment of frame girders 5. Other girders

Begin by attaching the frame girders. Drill through the adjustment screw down into the base about 30 mm when using a 25-mm long concrete anchor (also available in 40-mm lengths). NB: Begin with three points of attachment (at the ends and middle of each girder).

Drop the concrete anchor through the screw.

Secure the concrete anchor using an installation mandrel, cat. no. 850. See page 10.

The frame girders are now in place, adjusted to 10 mm below the final girder height.

Follow the same attachment and height adjustment method for all other girders as used for the frame girders (10 mm lower than the final height with three points of attachment).

Page 15: Granabmontering_eng

14 15

6. Trimming and adjustment of adjustment screws

7. Recessing adjustment screws

Once all girders have been adjusted to 10 mm under the final height with three points of attachment in each girder, the girder screws must be trimmed even with the tops of the girders. Trim the screws using a chisel.

Once the screws at the three points of attachment in each girder have been trimmed, all girders are adjusted 10 mm upward to their final height.

NB: The reason for trimming the adjustment screws and for the girders being adjusted upward 10mm only after trimming is to prevent the upper edges of the adjustment screws from coming in contact with the overlying floor covering installed later. This pro-cedure ensures that they are recessed into the sec-tions. “Bridging” in the sound insulation would oth-erwise occur if the upper edges of the screws were in contact with the floor covering.

Page 16: Granabmontering_eng

16 17

8. Adjustment of adjustment screws

After the girders have been installed and adjusted upwards at their three points of attachment to the final, correct height, attachment of all other adjust-ment screws in the girder holes is begun; the blocks with the dampening elements are pre-fitted.

NB: The screws are threaded down into the respec-tive girders with the blocks so that there is about 10 mm remaining to the subfloor (see the figure at the upper right).

The screws are thereafter trimmed and threaded down towards the subfloor.

Approximately 10 mm of clearance between adjustment screw and subfloor

10 mm

Page 17: Granabmontering_eng

16 17

9. Recessing adjustment screws

Lastly, the screws are secured using the same method as previously described for the concrete anchors.

After all girders are properly secured to the subfloor and adjusted to their final height, all points of attach-ment must be checked to ensure that all screws are recessed into the girders.

On some projects, concrete anchors can be replaced with concrete screws, alternatively concrete nails, set in place using a bolt gun. (NB: Not recommended for prefab subfloors of the type HDF)Wood screws are used with wooden subfloors.

10. Alternative attachments

Carefully follow the points on the checklist for the installer's inspec-tion on pages 22–23.

NB: If any screw projects above a girder (so that it can come in contact with the subsequently laid floor cover-ing), it must be recessed. This is done using Granab's cutting drill bit for recessing adjustment screws, cat. no. 8600, that is included in the standard set of installation tools (see the accessories on page 10).

Lastly, check that all screws are properly secured to the subfloor.

Page 18: Granabmontering_eng

18 19

11. Door openings, thresholds, cover mouldings, System 3000

12. Door openings, thresholds, cover mouldings, System 7000

A board is placed on the girder flanges as a founda-tion for subsequent installation of a door threshold or cover moulding (NB: Not chipboard).

The girder is installed at the centre of the door opening so that the board has the same height difference as other girders. The board must be screwed and glued to the girder in the door open-ing. The board is used for subsequent installation of a threshold or cover moulding.

Page 19: Granabmontering_eng

18 19

13. Installation at high height

15. Installation of skirting

14. Installation at extra high height

For construction heights over 250 mm, the floor covering can be attached at the room corners for lateral stabilisation.

As standard, the level of the Granab Subfloor System 7000 can be adjusted up to 420 mm. If heights are preferred up to approximately 1000 mm, masonite beams are fitted to the Granab girders. Masonite beams are available in various heights and lengths.

Masonite beams are secured to Granab girders with Superset no. 3879 or equivalent and self-tapping screws. NB: Mounting screws may not come in contact with adjustment screws/blocks.

When attaching the skirting, it must be pressed hard down against the floor covering.

Page 20: Granabmontering_eng

20 21

16. Installation of plastic film on Granab girders in moist environments NB: The plastic film is installed above the girders – not directly on the concrete subfloor.

Installation, floating parquet

Masonite beam installationInstallation, floating 22-mm chipboard

Granab systems, including girders, are entirely non-organic and not affected by moist environments. By placing the plastic film over the girders, effective, long-lasting moisture protection is obtained against the floor layer above.

Granab systems, including girders, are entirely non-organic and not affected by moist environments. By placing the plastic film over the girders, effective moisture protection is obtained against the floor layer above.

Plastic film used in installation of masonite lightweight beams. NB: The plastic film is placed under the masonite beam.

Ventilated subfloors when moisture, mould or radon is present

Granab subfloor systems entail:

• Freeairflowbetweenfloorgirdersandbottomslab.

• Attachmenttomechanicalnegativepressureventi-lation equipment ensures good ventilation between the bottom slab and floor.

• Toprotectthefloorcoveringagainstmoisture,plas-tic film is laid above the galvanised steel girders, which in combination with mechanical negative pressure ventilation ensures an environment free from moisture.

• Granabsubfloorsystemsarealsousedinradondecontamination.

Order our ventilation pamphlet for more information.

Page 21: Granabmontering_eng

20 21

Granab systems are installed as subfloor systems for tiled areas in halls and wet rooms in various construction projects.

Granab systems – which consist entirely of non-organic materials – are not sensitive to moisture and at the same time, provide effective impact and airborne sound insulation.

The girders are installed with c/c spacing of 300 mm.

Example, remodelling: Granab subfloor system, c/c 300 mm, with 22-mm chipboard, sheet of non-organic material, moisture barrier, tiles

A: Chipboard flooring, 22 mm B: Sheet of non-organic material C: Floor levelling compound

C

B

A

Tiled surfaces

Bathrooms

C C BA

General drawing for tiled area

Page 22: Granabmontering_eng

22 23

CHECKLIST 1 – Installation, subfloor systemInstaller's inspection of Granab Subfloor System 3000/7000

Subfloor system installation

1. The installation surfaces for the subfloor system must be carefully swept and vacuumed so that no organic or other residual materials remain on the subfloor/floor surfaces.

2. All adjustment screws are threaded (recessed) into the floor gird-ers by at least 10 mm (after any trimming) so that no adjustment screws come in contact with the floor covering.

3. The heights of all floor girders are adjusted so that they are the same.

4. There is clearance of at least 10 mm between the floor sections and adjoining walls.

5. There is clearance of at least 5 mm after trimming the sections.

6. All adjustment hardware is secured to the subfloor.

7. Installations in and beneath the subfloor system have at least 5 mm of clearance to other components of the the subfloor system.

8. Installation of the subfloor system has been conducted according to the provided installation instructions.

Inspection (check off)

Company:

Installer:

Object: Flat no.:

Date Supervising installer

Page 23: Granabmontering_eng

22 23

CHECKLIST 2 – Installation, floor coveringInstaller's inspection of Granab Subfloor System 3000/7000

Installation, floor covering

1. Cleaning is to be carefully checked prior to installation of the floor covering so that no organic or other residual materials remain under the subfloor system.

2. NB: Trimming and other tasks involving the floor covering may not be conducted so as to cause contamination (such as with sawdust) of the cleaned floor surface.

3. There is clearance of at least 5 mm between the floor and adjoining walls.

4. Chipboard flooring: When attaching chipboard, no glue has come in contact with the adjustment hardware. The instructions from the manufacturer have been observed for the used flooring sheet.

NB: Ensure that the screws used to secure the chipboard do not extend into the underlying adjustment unit and dampening pad.

5. Parquet: Instructions from the manufacturer for the parquet used have been followed. Flooring paper has been used as an interlayer between the chipboard and parquet.

6. For construction heights above 250 mm, the chipboard sheets are attached at the room corners so as to attain lateral stability (see point 13 on page 19).

Inspection (check off)

Company:

Installer:

Object: Flat no.:

Date Supervising installer

Page 24: Granabmontering_eng

Bygg- och Miljöteknik Granab ABPhone: +46 (0) 322-66 76 50 Fax: +46 (0) 322-66 76 55

E-mail: [email protected] www.granab.se

Mailing address: P.O.Box 172 SE-447 24 Vårgårda Sweden

Street address: Verkstadsgatan 4 Vårgårda, Sweden