GPB-CBU Rebuild - Draft 11

70
Ericsson KSA RBS3202/3101/3206/3106 GPB/CBU REBUILD/REPLACEMENT PROCEDURE 1 (70) Prepared (also subject responsible if other) No. Prepared by Senior Engineer Fawad Sarwar - BO Access Approved Checked Date Rev Reference Wael Al Daqqa 02-02-2011 1.1 RBS3202/3101 & 3206/3106 GPB/CBU Rebuild/Replacement Procedure Table Contents Abstract ....................................................................................................................... 3 Application ................................................................................................................... 3 Table Contents ............................................................................................................ 1 Introduction.................................................................................................................. 3 1. Prerequisites ........................................................................................................... 3 1.1 Tools .................................................................................................................. 3 1.2 Software............................................................................................................. 4 2. Initial Software Load ................................................................................................ 4 2.1 Reload in Backup Mode ..................................................................................... 4 2.2 Format Hard Disk ............................................................................................... 6 2.3 Set and Verify RBS IP Address in Hyper-terminal ............................................. 6 2.4 Set RBS Password ............................................................................................ 9 2.5 Download Software from Thin Client to RBS ....................................................10 2.6 Reload RBS3202/3101 .....................................................................................11 3. Preparing RBS for CV to be delivered from OSS-RC for RBS3202/3101 ..............16 3.1 Cabinet Equipment Configuration .....................................................................17 3.2 O&M Access Configuration ...............................................................................24 3.3 Site Equipment Configuration ...........................................................................33 4. Preparing RBS for CV to be delivered from OSS-RC for RBS3206/3106 ..............42 4.1 Cabinet Equipment Configuration .....................................................................43 4.2 O&M Access Configuration ...............................................................................48 4.3 Site Equipment Configuration ...........................................................................57

description

CBU

Transcript of GPB-CBU Rebuild - Draft 11

Page 1: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REBUILD/REPLACEMENT PROCEDURE

1 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar - BO Access Approved Checked Date Rev Reference

Wael Al Daqqa 02-02-2011 1.1

RBS3202/3101 & 3206/3106 GPB/CBU Rebuild/Replacement Procedure

Table Contents

Abstract ....................................................................................................................... 3

Application................................................................................................................... 3

Table Contents ............................................................................................................ 1

Introduction.................................................................................................................. 3

1. Prerequisites ........................................................................................................... 3

1.1 Tools .................................................................................................................. 3

1.2 Software............................................................................................................. 4

2. Initial Software Load................................................................................................ 4

2.1 Reload in Backup Mode..................................................................................... 4

2.2 Format Hard Disk............................................................................................... 6

2.3 Set and Verify RBS IP Address in Hyper-terminal ............................................. 6

2.4 Set RBS Password ............................................................................................ 9

2.5 Download Software from Thin Client to RBS ....................................................10

2.6 Reload RBS3202/3101 .....................................................................................11

3. Preparing RBS for CV to be delivered from OSS-RC for RBS3202/3101 ..............16

3.1 Cabinet Equipment Configuration .....................................................................17

3.2 O&M Access Configuration...............................................................................24

3.3 Site Equipment Configuration ...........................................................................33

4. Preparing RBS for CV to be delivered from OSS-RC for RBS3206/3106 ..............42

4.1 Cabinet Equipment Configuration .....................................................................43

4.2 O&M Access Configuration...............................................................................48

4.3 Site Equipment Configuration ...........................................................................57

Page 2: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REBUILD/REPLACEMENT PROCEDURE

2 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar - BO Access Approved Checked Date Rev Reference

Wael Al Daqqa 02-02-2011 1.1

5. Running MO scripts 5.1 Running scripts for ATM RAN RBSs 5.2 Running scripts for IP RAN RBSs 6. Running order for scripts 7. Difference between ATM and IP RAN scripts 8. Kget Dumps 9. Template ATM RBS Scripts 10. Template IP RBS Scripts

End

Page 3: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REBUILD/REPLACEMENT PROCEDURE

3 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar - BO Access Approved Checked Date Rev Reference

Wael Al Daqqa 02-02-2011 1.1

Abstract This document describes the procedure for Radio Base Station (RBS) RBS3202, RBS3101 and RBS3206 and RBS3106 GPB/CBU replacement after a failure has occurred or to upgrade software packages or CBU/GPB has hardware fault. Same procedure is used when new sites are rebuilt and integrated to 3G Radio Access Network. The procedures involved detailed and step by step guide to rebuild a RBS using Element Manager Wizards along with 2 ‘XML’ and 2 ‘MO scripts’

Application The scope of this document is limited to NFM field personnel performing emergency repair activities on Radio Base Station or rebuilding/recovering and/or upgrading the RBS package software for an existing or new RBS as a single network element. All technicians/engineers working on Ericsson products or systems must have the necessary training and competence required to perform their work correctly.

Introduction

This document describes in-depth procedure to re-build/replace an existing or new GPB/CBU board in a RBS 3202/3101 and 3206/3106. The primary interface used to perform operations on the RBS is an Ericsson Graphical User Interface (GUI) tool; RBS Element Management Application and Support (EMAS). This runs locally on the RBS. The procedure is conducted primarily from a site laptop, using as a thin client towards the RBS over Ethernet. The serial connection is used primarily to perform the initial IP configuration of the RBS. Stand alone integration requires both the loading of configuration scripts and use of the RBS Element Manager Configuration wizard.

1. Prerequisites

1.1 Tools a. Thin Client Laptop with:

i. Windows Vista ii. Internet Explorer 7.0 or higher (or equivalent web browser i.e. Firefox)

Page 4: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REBUILD/REPLACEMENT PROCEDURE

4 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar - BO Access Approved Checked Date Rev Reference

Wael Al Daqqa 02-02-2011 1.1

iii. WinSCP FTP or Total Commander or similar Windows FTP tool iv. Java plug-in JRE 1.6.0_6 v. Tera Term, Hyperterm, Putty or a similar terminal application vi. Putty for Moshell or Cygwin

b. Torque Screws – T9 c. USB to Serial connector d. Cables

i. Ethernet cross-connect cable ii. RBS Serial cable iii. RBS connection cable RPM 513 1736/01500 iv. RS232 to RJ45 connector

1.2 Software

Before attending site for a CBU/GPB re-build/replace, ensure that you have downloaded the latest version of the basic package software as well as the site specific scripts. This will ensure that the rebuild procedure will be completed correctly. The latest version of software is located in OSS under this directory var/opt/ericsson/nms_smo_srv/smo_file_store/Delivery and will be updated as new releases become available. Ensure that the correct version of Basic Package software is downloaded as there are 2 versions depending whether the node is a RBS3101/3202 series or RBS3106/3206 series, i.e. GPB or CBU main processor installed. You also need to have the O&M.xml file; the site IP address and subnet mask as a minimum for ATM RBS and VLAN and sync info for IP RAN RBS.

2. Initial Software Load

2.1 Reload in Backup Mode

Disable your Symantec Endpoint Protection on your Ericsson laptop. Connect to the RBS over a serial connection and start a terminal application of your choice i.e. Hyper-Terminal. For a RBS3101/3202 the serial port is the ‘A’

Page 5: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REBUILD/REPLACEMENT PROCEDURE

5 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar - BO Access Approved Checked Date Rev Reference

Wael Al Daqqa 02-02-2011 1.1

port (lowest port) on the GPB; for a RBS3106/3206 the serial port is the “Test” port on the CBU.

RBS3101/3202

RBS3106/3206 Hyper-terminal should be configured with the following settings: COM1, 9600 bps, 8 Data bits, 1 Stop bit, No parity, no flow control (as shown below).

To ensure effective formatting of the hard disc, the RBS must be in ‘backup’ mode. Force the RBS into backup mode: $ reload --

Page 6: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

6 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

2.2 Format Hard Disk Format /d and /c2 partitions (when in backup mode the /c disc is listed as /c2). Answer yes when prompted for confirmation: $ formathd /d

$ formathd /c2 Then reload the RBS into backup mode:

$ reload --

2.3 Set and Verify RBS IP Address in Hyper-terminal

1. After formatting the hard disk on the GPB/CBU, the IP configuration of the RBS must be set in order to reach the node using the FTP program and the RBS Element Manager.

2. The IP configuration consists of an IP address and a subnet mask. 3. Set the IP address to be the same as the final RBS IP address, as

contained in the scripts and IP network plan. This will avoid any further reconfiguration of the Thin Client.

4. Use Hyper-Terminal to set the IP configuration. 5. The subnet mask is - 255.255.255.240

$ ifconfig leØ <RBS IP address> netmask 255.2 55.255.240

e.g $ ifconfig leØ 10.178.105.241 subnet mask 255.255.255.240

Important Note: - Please verify that subnet mask and IP settings in Hyper-Terminal and also check scripts. Note that ‘broadcast’ is set automatically.

$ ifconfig

Page 7: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

7 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Verifying IP Configuration on Thin client

1. Verify that the IP configuration for the Thin Client is correct and that the node can be reached using the Ethernet interface. Connect your Ethernet crossover cable to the ‘B’ or ‘D’ port (where applicable) on the GPB (RBS3101/3202) or the Ethernet port on the CBU (RBS3106/3206) as shown in figure.

2. However, before you can do this you must setup your laptop LAN configuration to ensure you will be able to communicate with the node.

3. Select: Start, settings, network and dial-up connections and local area connections.

Page 8: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

8 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

4. Select: Properties

5. Select: Internet protocols (TCP/IP v4)

6. Configure your laptop with an IP address one higher that the RBS address and

the Default gateway to the exact RBS IP address.

7.

8. Ensure that you can now ping the sites IP address via LAN/Ethernet connection.

9. Select: Start, Run

10. Type ‘cmd’ and Select: OK

$ ping <RBS IP address>

Page 9: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

9 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

NOTE:

1. The ping should be successful with 4 packets sent and 4 packets received as shown above.

2. If you have lost any packets or if the ping times out, check connection cable and your laptops LAN settings

2.4 Set RBS Password A password must be set after formatting the hard disc in order to use the FTP program. The user and password used for this instruction is ‘rbs and rbs’ respectively. Using Hyper-Terminal, enter the following command: $ passwd Type the new password twice when prompted Enter new password : <passwd> i.e rbs Re-enter new password: <passwd> i.e. rbs

Page 10: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

10 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

2.5 Download Software from Thin Client to RBS

The software is downloaded via the Ethernet link from the thin client to the RBS using FTP. Open up a FTP session as shown below using either ‘WinSCP’ or ‘Total commander’ or any other FTP software of your choice.

Configure as follows:

• Host name: Site IP address • Port Number: 21

Page 11: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

11 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

• Username: rbs • Password: rbs • File protocol: FTP

1. FTP basic package on right hand side to right directory. 2. Ensure you are in the root directory of the RBS (as shown). 3. You can do this by placing a “/” symbol in the remote location, which

will enable visibility of both the ‘/d’ and ‘/c2’ drives 4. Open your Laptop local drive and folder containing the unzipped

version of the latest software, again ensuring that the correct version is selected for the Node’s specific processor.

5. With WinSCP or Total Commander software, drag and drop files from

LHS column to RHS column (root directory). 6. The FTP should take approx 4-5 mins. Data will begin to be transferred

so do not interrupt or break connection during this process.

2.6 Reload RBS3202/3101

Page 12: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

12 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Re-open your Hyper-terminal connection. And type; $ reload This will force the GPB/CBU to reload with the newly installed software and thin client terminal-EMAS. The following screen will appear. Note that the GPB/CBU will load twice with basic C.V.

Page 13: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

13 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Output for a GPB RBS3101/3202

Page 14: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

14 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Output for a CBU RBS3106/3206 Please note:

Page 15: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

15 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

1. After this reload, the terminal will hang at the second last line in the

figure above ‘Login Server Ready’. You must press enter and then you will be prompted with ‘username:’

2. As yet, there is no way to check that all the programmes have been

installed in P7 as there was in P6, as the $pglist command sometimes does not work in P7.

However you may check to see that the Basic CV is loaded. Re-open Hyper-Terminal type; $ cv ls

Page 16: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

16 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

3. Preparing RBS for CV to be delivered from OSS-RC for RBS3202/3101 Tools required to remove GPB = T9. Connect to the RBS through EMAS.

Page 17: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

17 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

3.1 Cabinet Equipment Configuration Select: Tools, Cabinet Equipment Configuration.

Select: next

Page 18: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

18 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Always leave the “Use configuration file” box unchecked due to auto configuration feature of EMAS.

Page 19: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

19 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: next

Check:

• RBS Type • No. carriers • Output power

Then, select: next.

Page 20: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

20 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Check to ensure the correct type of Exchange Terminal card in the RBS; in this case ET-MC1. It also wouldn’t hurt to ensure the slot position but for all RBS types (i.e. 3202/3101/3206/3106) ETMC1 will be installed in slot 2. Then, select: next.

Page 21: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

21 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

For the RBS3202/3206 you never check this power box; but for the RBS3101/3106 since they are outdoor units and you need to check the PSU numbers and then enter accordingly. Then, select: next.

Page 22: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

22 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Ignore ‘Default router’. Then, select: next.

Here you do not need to restart the RBS because the boards individually restart as you proceed through the wizard process. This can be done after you load the O&M Access Configuration in the next section. Then, select: No.

Page 23: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

23 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

This will take 3-4 minutes. Then select: Ok. Exit from EMAS here.

Page 24: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

24 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

3.2 O&M Access Configuration Select: Tools, O&M Access Configuration.

Then, select: next.

Page 25: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

25 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Here you need to check the ‘Use configuration file’ option and then select browse. The go to the directory where you stored you Site Specific scripts and select i.e. ‘01—GRI994_3RR05_oam_ima_access’.xml file. Then, select: next.

This will take 2-3 minutes. Then, select: next.

Page 26: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

26 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

From herein, check the fields for any obvious anomalies but if the O&M access .xml site specific script above is correct, then the wizard will be reading the data from this and these fields should be correct. Then, select: next.

Page 27: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

27 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: next.

Select: next.

Page 28: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

28 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: next.

Select: next.

Page 29: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

29 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: next.

Select: next.

Page 30: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

30 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: next.

Select: next.

Page 31: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

31 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: Finish.

This will take 4-5 minutes. Select: Ok.

Page 32: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

32 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

After loading O&M file, GTAC/MTAC/BO Access has to load the licence before you can proceed. You should also have alarms cleared from Tx. Then close EMAS and re-open it.

Page 33: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

33 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

3.3 Site Equipment Configuration Select: Tools, Site Equipment Configuration.

Select: next.

Page 34: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

34 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: next.

Here again you need to check the ‘Use configuration file’ option and then select browse. The go to the directory where you stored you Site Specific scripts and select i.e. ‘02—GRI994_3RR05_site_equipment’.xml file. Then, select: next.

Page 35: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

35 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: next.

Again, from herein, check the fields for any obvious anomalies but if the site equipment xml site specific script above is correct, then the wizard will be reading the data from this file and these fields should be correct. Select: next.

Page 36: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

36 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: next.

Select: next.

Page 37: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

37 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: next.

Select: next.

Page 38: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

38 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: next.

Select: next.

Page 39: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

39 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: next.

Select: next.

Page 40: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

40 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: Finish.

Double Check whether HS is configured. Check through following steps.

• Open a MOshell session • Log into the site

Type the command ‘lt txdeb’, Then select y.

Page 41: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

41 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Check to see if the HS is configured.

Page 42: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

42 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

4. Preparing RBS for CV to be delivered from OSS-RC for RBS3206/3106 Tools required to remove CBU = T9. Connect to the RBS through EMAS.

Page 43: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

43 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

4.1 Cabinet Equipment Configuration Select: Tools, Cabinet Equipment Configuration.

Page 44: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

44 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: next.

Always leave the “Use configuration file” box unchecked due to auto configuration feature of EMAS.

Page 45: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

45 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Always leave the “Use configuration file” box unchecked due to auto configuration feature of EMAS.

Select: next.

Page 46: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

46 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Check and correct if necessary. The Radio building block configuration may be different depending on whether 1 or 2 FA’s are installed. It is also dependant on the hardware installed and TX/ RX diversity configuration. Refer to attachment below for correct configurations or call Utran.

Hardware Configuration Data

Select: next.

Page 47: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

47 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Leave blank if there is no ET MC 1 card in an RBS3106/3206 or select accordingly if ETMC1 is also installed along with CBU for more number of E1s. Select: next.

Page 48: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

48 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: next.

Select: Finish.

4.2 O&M Access Configuration Select: Tools, O&M Access Configuration.

Page 49: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

49 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Then, select: next.

Page 50: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

50 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Here you need to check the ‘Use configuration file’ option and then select browse. The go to the directory where you stored you Site Specific scripts and select i.e. ‘01_GRI994_3RR05_oam_ima_access’.xml file. Then, select: next.

Page 51: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

51 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

This will take 2-3 minutes. Then, select: next.

From herein, check the fields for any obvious anomalies but if the o&m access xml site specific script above is correct, then the wizard will be reading the data from this and these fields should be correct. Then, select: next.

Page 52: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

52 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: next.

Select: next.

Page 53: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

53 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: next.

Select: next.

Page 54: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

54 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: next.

Select: next.

Page 55: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

55 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: next.

Select: next.

Page 56: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

56 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: Finish.

This will take 4-5 minutes. Select: Ok. The close EMAS and re-open it.

Page 57: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

57 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

4.3 Site Equipment Configuration

Select: Tools, Site Equipment Configuration.

Select: next.

Select: next.

Page 58: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

58 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Here again you need to check the ‘Use configuration file’ option and then select browse. The go to the directory where you stored you Site Specific scripts and select i.e. ‘02—GRI994_3RR05_site_equipment’.xml file. Then, select: next.

Select: next.

Page 59: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

59 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Again, from herein, check the fields for any obvious anomalies but if the site equipment xml site specific script above is correct, then the wizard will be reading the data from this and these fields should be correct. Select: next.

Select: next.

Page 60: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

60 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: next.

Select: next.

Page 61: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

61 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: next.

Select: next.

Page 62: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

62 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: next.

Select: next.

Page 63: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

63 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: next.

Select: Finish.

Page 64: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

64 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Select: Ok.

Then ring UTRAN to configure HS. Once they ring you back to inform you that they have configured the HS, then;

• Open a MOshell session • Log into the site • Type the command ‘lt txdeb’

Page 65: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

65 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Then select y.

Check to see if the HS is configured.

Page 66: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

66 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

5 - Running MO scripts 5.1 – Running Scripts for ATM RAN RBSs

5.1.1 – Iub MO scripts - ATM RAN sites After license is installed properly for ATM RAN site, 3rd script i.e. 03_GRI994_3RR05_iub_script.mo will be executed. Just type ‘trun’ from your moshell browser to run this script 5.1.2 – Parameter changes

After successful completion of 3rd script, 4th script i.e. ‘04_GRI994_3RR05_Parameter_changes.mo’ will be executed. Type ‘trun’ from moshell browser to run the script.

5.2 – Running Scripts for IP RAN RBSs

5.2.1 – Iub MO scripts - IP RAN sites After license is installed properly for ATM RAN site, 3rd script i.e. 03_GRI994_3RR05_iub_script.mo will be executed. Just type ‘trun’ from your moshell browser to run this script 5.2.2 – Parameter changes

After successful completion of 3rd script, 4th script i.e. ‘04_GRI994_3RR05_Parameter_changes.mo’ will be executed. Type ‘trun’ from moshell browser to run the script.

6 - Running order for scripts

Please note that the wizards and scripts will be implemented in following order for both IP and TAM RAN sites.

a) Cabinet wizard b) 01_GRI994_3RR05_oam_script.xml c) 02_GRI994_3RR05_Site_Equipment.xml d) RBS License installation e) 03_GRI994_3RR05_iub_script.mo f) 04_GRI994_3RR05_Parameter_changes.mo

Page 67: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

67 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

Any issues with these scripts please escalate to GTAC/MTAC support.

7 - Difference between ATM and IP RAN scripts

1. Also please be advised that O&M and Iub script for IP RAN sites will be different from ATM RAN sites as there is no existence of E1s in case of IP RAN sites due to IP/Ethernet, hence MOs ‘Vcltp, Vpltp, Vpctp, ATM traffic descriptors, AAL2/AAL5s’ do not exist either in O&M or Iub script instead VLANs’ configuration exist on Ethernet switch port for ETMFX11 cards 2. Also the synchronization reference MOs are different in both cases as in case of ATM, RBS will draw its sync/clock from E1s. In case of IP, RNC will act as NTP server and RBS will be NTP client, having at least one sync reference towards RNC. In general, RBS will have 2 sync references ‘Primary and Secondary’ pointing to 2 different ETMFX12 cards in RNC, which will act as NTP servers for that RBS.

8 – Kget Dumps A dump of all RBS MOs has been taken for each RBS on the network except few which had connectivity issues at the time of dump. A copy of dump will be provided to NFM to consult and extract following information to plug in relevant values in the script for that particular RBS and scripts are now ready to run.

1. O&M IP addresses 2. IPATM link 1 & 2 IP addresses 3. IP routing table information 4. NTP server addresses 5. No of E1s 6. DNS and DHSP server 7. Sync priority 8. Local Time Zone 9. O&M and traffic VLAN information 10. Traffic descriptors for Vpltp, Vcltp MOs

Page 68: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

68 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

9 – Template ATM RBS Scripts Please remember that O&M and Site equipment scripts are XML files. They can be edited using XML editor; otherwise they may not work correctly. Iub and Parameter change scripts are MO scripts and need to be run from a Command line interface using Moshell, AMOS or Cygwin. For any issues with executing these scripts, please escalate to GTAC/MTAC for further assistance. ATM RBSs GNJ501 (3xE1s, Single Carrier) GRI994 (6xE1s, 2nd Carrier) GAK011 (8xE1s, 2nd Carrier) Note: Refer to email for scripts

Page 69: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

69 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

10 - Template IP RBS Scripts Please remember that O&M and Site equipment scripts are XML files. They can be edited using XML editor; otherwise they may not work correctly. Iub and Parameter change scripts are MO scripts and need to be run from a Command line interface using Moshell, AMOS or Cygwin. For any issues with executing these scripts, please escalate to GTAC/MTAC for further assistance. Note: Refer to email for scripts

Page 70: GPB-CBU Rebuild - Draft 11

Ericsson KSA

RBS3202/3101/3206/3106 GPB/CBU REPLACEMENT PROCEDURE FOR P7

70 (70)

Prepared (also subject responsible if other) No.

Prepared by Senior Engineer Fawad Sarwar Approved Checked Date Rev Reference

Checked –Wael Al Daqa 04-02-2010 1.1

End of Document