GOVERNMENT OF RAJASTHAN RURAL DEVELOPMENT & PANCHAYATI RAJ DEPARTMENT Watershed Development & Soil Conservation Department Rajasthan, Jaipur DETAILED PROJECT REPORT INTEGRATED WATERSHED MANAGEMENT PROGRAMME JAISALMER JSM/(IWMP) 22/10-11, BLOCK- SANKRA PROJECT IMPLEMENTING AGENCY ASSISTANT ENGINEER (W.D. & S.C.) PANCHAYAT SAMITI - SANKRA

Transcript of GOVERNMENT OF...

GOVERNMENT OF RAJASTHAN

RURAL DEVELOPMENT & PANCHAYATI RAJ DEPARTMENT Watershed Development & Soil Conservation Department

Rajasthan, Jaipur

DETAILED PROJECT REPORT

INTEGRATED WATERSHED MANAGEMENT PROGRAMME

JAISALMER JSM/(IWMP) 22/10-11,

BLOCK- SANKRA

PROJECT IMPLEMENTING AGENCY ASSISTANT ENGINEER

(W.D. & S.C.) PANCHAYAT SAMITI - SANKRA

DETAILED PROJECT REPORT

INTEGRATED WATERSHED MANAGEMENT PROGRAMME

JAISALMER JSM/(IWMP)22/10-11,

BLOCK- SANKRA

Salient Features of Project

No. of Gram Panchayat Covered 3

No. of Revenue Villages Covered 7

Total Project Area 7000

Total Project Cost 1050

Total Proposed/ Estimated Cost 1107.49

Total Cost Borned by Convergence 57.49

Expected Beneficiaries’s Contribution 47.48

Total Runoff Potential (Cum) 169880

Existing Runoff Storage (Cum) 54209

Proposed Runoff Storage/ Management (Cum) 43200

CHAPTER – I

INTRODUCTION

Location

Jaisalmer (IWMP-22), Balar Project is located in Sankra Block, of Jaisalmer District. The project area is between the latitudes 71° 48-71° 50' East & longitudes 26° 28'-26°30' North. It is at a distance of 55 km from its Block head quarters and 165 Km from the District head quarters of Jaisalmer. There are 7 nos. of habitations (Revenue Villages) in the Project area The other details of the project area are as below General features of watershed

S.No. Name of Project(as per GOI) Jaisalmer (IWMP)

a) Name of Catchment Jaisalmer(IWMP)22

b) Name of watershed area(local

name) Balar

c) Project Area 7324 ha

d) Net treatable Area 7000 ha

e) Cost of Project 1050 lac

f) Cost/hectare 0.15 lac

g) Year of Sanction 2010-11

h) Watershed Code Clusters

i) No. of Gram Panchayats in

project area 3

j) No. of villages in project area 7

k) Type of Project Desertic

l) Elevation (metres) 210 mtr wrt MSL

m) Slope range (%) 0-3%

Macro/micro Name of Gram

Panchayat

Name of Villages

Covered

Cluster 1. Balar 1. Balar

2. Roopsar bheel

3. khanpura

2. Bheekhorai jooni 1. Barsani

2. Goraliya

3.Swamijikidhani 1. kajoi

2. Swamijikidhani

The watershed falls in Agro climatic Zone I A, Arid western plain. The soil texture is Sandy

to Sandy Loam. The average rainfall is 170 mm. The temperatures in the area are in the range

between 45º C during summer and 15º C during winter. The major crops in the area are Bajara,

Guar, Moong, Moth, Til etc. Almost 75% land is under cultivation 15% land fallow, 10% land is

wasteland. There is no significant source of irrigation in project area only a few areas is double

cropped due to rain water harvesting (in-situ moisture conservation) by earthen structures like

KHADEEN and the area which is under field/contour Bunding executed in different programmes

implemented under watershed development & soil conservation programmes in preceding years.

Out of 973 Total Households 478 households are BPL (49.12% of Total households) 99

are landless households (10.77% of Total households) and 198 household are small and 149

marginal farmers (15%of Total household). Average land holding in the area is 5.51 ha. 99%

area of cultivable land is single cropped and 1.00% is double cropped. There is no significant

source of irrigation in project area only a few areas is double cropped due to rain water

harvesting (in-situ moisture conservation). The average annual rainfall (5 years) in the area is

170.00 mm. There are no Major streams in the Watershed area. The major festivals in the

villages of Project area are Deepawali, Holi, Akhsay-Tritiya, Rakhsabandhan, Dashehra,

Gangour etc. At present villages of Project area having 6491 population with Communities

like Jat, Rajput, Bishnoi, Devasi, Rao-Bhat, Meghwal, Bheel, Kumhar, Darji and Brahmin.

Climatic and Hydrological information

1. Average Annual Rainfall (mm)

2. Average Monthly rainfall (last ten years)

S.No. Month Rainfall(mm)

1 June 31.59

2 July 47.43

3 August 90.13

4 September 24.68

3. Maximum rainfall intensity (mm)

S.No. Duration Rainfall

intensity(mm)

1 15 minute duration 40 mm

2 30 minute duration 58 mm

3 60 minute duration 69 mm

4. Temperature (Degree C)

S.No. Season Max Min

1 Summer Season 49º C 32º C

2 Winter Season 26º C 4º C

3 Rainy Season 35º C 24º C

S.No. Year Average Annual

Rainfall(mm)

1 2010 361

2 2009 72

3 2008 112

4 2007 142

5 2006 501

6 2005 176

7 2004 42

8 2003 137

9 2002 31

10 2001 361

5. Potential Evaporation Transpiration (PET) (mm/day)

S.No. Season PET

1 Summer 3200 mm

2 Winter 2464 mm

3 Rainy 2784 mm

6. Runoff

1 Peak Rate (cum/hr) 95.25 Cum/per hour

2 Total run off volume of rainy

season (ha.m.) 50.76 ha-m

3 Time of return of maximum flood 5

years

10

years

In-

Year

Nil N

4 Periodicity of Drought in village

area

3 7

Other Development Schemes in the project area

S

.

N

o

Scheme

Name of

the

departme

nt

Key

interventions

under the

Scheme

Targeted

Beneficiar

ies

Provisions

Under

the Scheme

1 MAHANREGA

Rural

Dev. &

Panchayat

i Raj

Departmen

t

Providing

Employment

7846

83.41 lac

2 TFC - 23.50 lac

3 SFC - 16.75 lac

4 BRGF TSC -

29.50 lac

5 SGS IAY -

Details of infrastructure in the project areas

Parameters Status

1 No. of villages connected to the main road by an

all-weather road

7

2 No. of villages provided with electricity 7

3 No. of households without access to drinking water 0

4 No. of educational institutions : P S HS VI

Primary(P)/Secondary(S)/Higher Secondary(HS)/

vocational institution(VI) 17 4 0 0

5 No. of villages with access to Primary Health Centre 0

6 No. of villages with access to Veterinary Dispensary 0

7 No. of villages with access to Post Office 1

8 No. of villages with access to Banks 1

9 No. of villages with access to Markets/ mandis 0

10 No. of villages with access to Agro-industries 0

Total quantity of surplus milk 1230 ltr

11 No. of milk collection centres U S PA O

(e.g. Union(U)/ Society(S)/ Private agency(PA)/

others (O)) 0 0 0 3

12 No. of villages with access to Anganwadi Centre 7

13 Any other facilities with no. of villages (please

specify)

---

14 Nearest KVK Jaisalmer

15 cooperative society 1

16 NGOs 0 0 0 0

17 Credit institutions

(i) Bank 0

(ii) Cooperative Society 0

18 Agro Service Centre's 0

Institutional arrangements (SLNA, DWDU, PIA, WDT, WC, Secretary)

DWDU Details

S.No Particulars Details of DWDU

1 PM ,DWDU Sh. Bhagirath Bishnoi Project

Manager, IWMP, ZP, Jaisalmer

2 Address with contact no.,

website

PM DWDU District Jaisalmer, ZP

Jaisalmer

3 Telephone 02992-250712

4 Fax 02992-250712

5 E-mail [email protected]

PIA particulars

WDT Particulars:

S.No Particulars Details of PIA

1 Name of PIA Sh. Sukhvinder Singh Sondh

2 Designation Assistant Engineer

3 Address with contact

no., website

A.En. (IWMP) P.S. Sankra

4 Telephone 91 9001109240

5 E-mail [email protected]

S.

No

Name of WDT

member M/F Age

Qualificati

on

Experience

in

watershed

(Yrs)

Description

of

professiona

l training

Role/

Functio

n

1 Sh. Dilip kumar

basotiya

M 25 Diploma

Civil Engg.

1 Civil

Egineering

Enginee

r

2 Sh. Badri

Prasad

M 33 B.Sc.

Agriculture

- Agri.

Graduate

Agril.

Science

tist

3 Sh. Nihal Singh M 31 Diploma

(2Yr.

Animal

Hus.)

- Animal

Husbandry

Live

stock

Expert

4 Smt. Urmila

moyal

F 32 B.A.

(Sociology)

- Sociology social

Science

tist

Details of Watershed Committees (WC) Details of Watershed Committees (WC)

S.

No

.

Name of

WCs

Date

of

Gram

Sabh

a

for

WC

Date of

Registra

tion as

a

Society

(dd/mm/y

yyy

Designati

on Name

M/

F

SC/

ST/OB

C/

Gener

al

Landle

ss/

MF/SF/

BF

Name of

UG/SHG

Educational

qualification

2. BALAR 15-

01-

2013

-- President

Sh Maherdeen

khan/Tamachikhan M OBC BF UG Primary

Secretory Sh Deep

singh/Durjansingh M GEN MF UG Secondary

Member Sh Hanif khan/

Ancharkhan M OBC SF UG Litrerate

Member Sh Nijam khan/Mubinkhan M OBC BF UG Litrerate

Member Smt Khatu/Nijamkhan F OBC SF UG Litrerate

Member Sh Nag

singh/Bhanwarsingh M GEN MF UG Litrerate

Member Sh Agar

singh/Chandansingh M GEN BF UG Litrerate

Member Smt Suwa/Swaroop Lal F OBC MF UG Litrerate

Member Sh Multanaram/Phaladram M OBC MF UG Litrerate

Member Smt Anach

kawar/Ganpatsingh F GEN BF SHG Litrerate

Member Sh Aasu ram/Bhalaram M ST SF UG Litrerate

Member Smt Maya/Poonamaram F ST MF UG litrerate

Member Smt Badlee/Khevraram F SC BF SHG Litrerate

Member Smt Kisan puri/Sohanpuri F OBC SF SHG Litrerate

Member Sh Hayaat khan/Gulamkhan M OBC SF UG Litrerate

Member Sh Shukhwinder singh M

Details of Watershed Committees (WC)

S.

No

.

Name of

WCs

Date

of

Gram

Sabh

a

for

WC

Date of

Registra

tion as

a

Society

(dd/mm/y

yyy

Designati

on Name

M/

F

SC/

ST/OB

C/

Gener

al

Landle

ss/

MF/SF/

BF

Name of

UG/SHG

Education

al

qualifica

tion

3. Sawami

ji ki

dhani

30.11

.2012

-- President Sh Maha dan M OBC BF UG Primary

Secratory Sh Papu khan M obc SF UG Secondary

Member Sh Kalash dan M OBC BF Litrerate

Member Sh Catur dan M OBC BF UG Litrerate

Member Sh Kisna ram M sc SF UG Litrerate

Member Sh Durgh dan M OBC SF UG Litrerate

Member Sh Peerey khan F OBC BF UG Litrerate

Member Sh Jaita ram M OBC BF Litrerate

Member Smt Kamla F SC MF Litrerate

Member Sh hariyo F ST LS Litrerate

Member Sh Bachi F OBC MF Litrerate

Member Smt Hawa F SC MF Litrerate

Member Sh Kadar khan M OBC BF Litrerate

Member Sh Geeya F SF Litrerate

Member Sh Jatno F OBC SF Litrerate

Member Sh Shukhvinder

singh(AEN) M

Gram Panchayat Wise Details of Various User Groups Constituted for Development of Activities

Gram Panchayat: BALAR

User Group Contour Bunding S.No. Name/Fathers Name Village Postion

1 Hanif khan/achar khan Khanpura President

2 Murad Khan/ ali khan Khanpura Member

3 Sher khan/ tamache khan Khanpura Member

4 Jiyai /uliyas khan Khanpura Member

5 Bali /Tamachi khan Khanpura Member

User Group Tanka Water Harvestingh Structures

1 Nijam khan /mubeen khan Khanpura President

2 Bachhu khan /Lakhmeer khan Khanpura Member

3 Imarti /hanif khan Khanpura Member

4 Bali / umardeen Khanpura Member

5 Ishak khan/Raimal Khan Khanpura Member

User Group Pasture Development

1 Aasuram/Bhalaram Roopsar bheel President

2 Pamparam/Genaram Roopsar bheel Member

3 Chetanram/fusaram Roopsar bheel Member

4 Fuli/Umedaram Roopsar bheel Member

5 Fuli/Shivram Roopsar bheel Member

User Group Livestock Development

1 Agarsingh/chanansingh Balar President

2 Ganaram/Dularam Balar Member

3 BhakarSingh/Bawarsingh Balar Member

4 Bhawaridevi/Khiyaram Balar Member

5 Dagdee/Bagaram Balar Member

Gram Panchayat: Bheekhorai Jooni

User Group Contour Bunding S.No. Name/Fathers Name Village Postion

1 Mula ram/varda ram Barsani President

2 Mahesh dan/kaan dan Barsani Member

3 Dumiya/bihari ram Barsani Member

4 Heero/nimaj khan Barsani Member

5 Achla ram/partap ram Barsani Member

User Group Tanka Water Harvestingh Structures

1 Marua/bula ram Goraliya President

2 Multana ram/rana ram Goraliya Member

3 Paou ram/anupa ram Goraliya Member

4 Sabu khan/sadheek khan Goraliya Member

5 Meero/kana ram Goraliya Member

User Group Pasture Development

1 Malkoo/longe khan Goraliya President

2 Hareeo/himtha ram Goraliya Member

3 Ganga/geerdhari Goraliya Member

4 Surmo/rajey khan Goraliya Member

5 Samda/Narayan ram Goraliya Member

User Group Livestock Development

1 Puro/ramu khan Barsani President

2 Mula ram/bhikha ram Barsani Member

3 Chutraram/bhikha ram Barsani Member

4 Saghni/mula ram Goraliya Member

5 Amree/gulab navi Barsani Member

Gram Panchayat: Sawami ji ki dhani

User Group Contour Bunding S.No. Name/Fathers Name Village Postion

1 Cutar dan/Nag dan Kajoi Persident

2 Edee/Misare khan

Sawami ji ki

dhani Member

3 Eley khan/Madey khan

Sawami ji ki

dhani

Member

4 Varju devi/Mana ram Kajoi Member

5 Modu ram/Pata ram Kajoi Member

User Group Tanka Water Harvestingh Structures

1 Kisna ram/Kagha ram Kajoi Persident

2 Gordhan ram/Kartha ram Kajoi Member

3 Gaaro/Kusala ram

Sawami ji ki

dhani

Member

4 Kamha/Nagtha ram

Sawami ji ki

dhani

Member

5 Bhaware khan/Hamlu khan

Sawami ji ki

dhani

Member

User Group Pasture Development

1 Durgdan/Visandan Kajoi Persident

2 Hadudan/Kisan dan Kajoi Member

3 Leela/Gulaba ram Kajoi Member

4 Suaa/Sambhu nath

Sawami ji ki

dhani

Member

5 Moda ram/Tulsa ram

Sawami ji ki

dhani

Member

User Group Livestock Development

1 Kadar khan/Aajij khan

Sawami ji ki

dhani Persident

2 Rakha/Dhavad khan

Sawami ji ki

dhani Member

3 Sareefo/Peerey khan Kajoi Member

4 Modu ram/Badar ram Kajoi Member

5 Maghdan/Bikhdan Kajoi Member

Gram Panchayat wise/ Watershed Committee wise Details of Various Self

Help Groups

Gram Panchayat: Balar

Anach Kanwar SHG

S.No. Name/Fathers Name Village Postion 1 Anach Kanwar/Ganpat kanwar Balar President

2 Pavan kawar/dilip singh Balar Secretary

3 prem kanwar/Narsingh das Balar Treasurer

4 Bhawar kanwar/Bhom singh Balar Member

5 Sugan kanwar/Amar singh Balar Member

6 Bhawri/Karan singh Balar Member

7 Chanu kanwar/Champapuri Balar Member

8 Taro/Dhan puri Balar Member

9 Bhawar kanwar/Samer singh Balar Member

10 Meero/Depparam Balar Member

Luni Group SHG

1 Luni/Gorakhram Roopsar bheel President

2 Matiya/Kuslaram Roopsar bheel Secretary

3 Kasubhi/Rasaram Roopsar bheel Treasurer

4 Kaku/Kisnaram Roopsar bheel Member

5 Luni/Bheeraram Roopsar bheel Member

6 Santosh/Omparkash Roopsar bheel Member

7 Suji devi/Ambaram Roopsar bheel Member

8 Hariyo/Gajjaram Roopsar bheel Member

9 Kamla/Gordhanram Roopsar bheel Member

10 Hariyo/Bagharam Roopsar bheel Member

Marimo Group SHG

1 Marimo/nasir khan Khanpura President

2 Amari/nijam khan Khanpura Secretary

3 Dulo/maherdin khan Khanpura Treasurer

4 Jagisa/sher khan Khanpura Member

5 Tajimo/kabal khan Khanpura Member

6 Asiyat/dene khan Khanpura Member

7 Mati/dariya khan Khanpura Member

8 Dhai/mathal khan Khanpura Member

9 Raiso/hedar khan Khanpura Member

10 Amino/aldin khan Khanpura Member

Gram Panchayat: Bheekhorai Jooni

Bhawri Group SHG

S.No. Name/Fathers Name Village Postion 1 Bhawri/dhan ram Barsani President

2 Papu/Mula ram Barsani Secretary

3 Dhapu/dau ram Barsani Treasurer

4 Keku/seta ram Barsani Member

5 Deenea/jalu khan Barsani Member

6 Sawaibai/khanu khan Barsani Member

7 Patani/deenay khan Barsani Member

8 Suaa/kambha ram Barsani Member

9 Barju/mega ram Barsani Member

10 Baadlee/karna ram Barsani Member

Dhapu Group SHG

1 Dhapu/rau ram Goraliya President

2 Keko/cetan ram Goraliya Secretary

3 Sabhai/akbar khan Goraliya Treasurer

4 Satbai/talab khan Goraliya Member

5 Samda/issra ram Goraliya Member

6 Hareeyo/amba ram Goraliya Member

7 Papu/tiku ram Goraliya Member

8 Bheekhi/harkha ram Goraliya Member

9 Nimbu/durga ram Goraliya Member

10 Samda/Narayan ram Goraliya Member

Gram panchayat swami ji ki dhani

Ramdev SHG

1 Chirmi devi/babu ram Kajoi President

2 Bablu devi/amba ram Kajoi Secretary

3 Jamna devi/kamu ram Kajoi Treasurer

4 Santosh/poona ram Kajoi Member

5 Indro/gopa ram Kajoi Member

6 Muli/gevar ram Kajoi Member

7 Jamna/ bihari ram Kajoi Member

8 Kesi devi/kheta ram Kajoi Member

9 Kamla/Hema ram Kajoi Member

10 Aklo/ achala ram Kajoi Member

Durga Groups SHG

1 Nirma/Meesaree khan

Sawmi ji ki

dhani President

2 Madeena/Kadeay khan

Sawmi ji ki

dhani Secretary

3 Sakeena/Jameen khan

Sawmi ji ki

dhani Treasurer

4 Samu/Barkat khan

Sawmi ji ki

dhani Member

5 Jagee/Davad khan

Sawmi ji ki

dhani Member

6 Eadee/Meesarey khan

Sawmi ji ki

dhani Member

7 Dulee/Meesaree khan

Sawmi ji ki

dhani Member

8 Jubeeda/Umer khan

Sawmi ji ki

dhani Member

9 Sugra/Kader khan

Sawmi ji ki

dhani Member

10 Parsa/Yardeen khan

Sawmi ji ki

dhani Member

Problems and scope of improvement in the project area

The socio economic conditions of the house holds of the project area reveal that most

of the house holds are engaged in only farming activities which purely depend on the

Monsoonal rainfall. The rainfall in the project area is very less and very below to the state

average, again it occurs only in a limited period and restricted in a few storms. This further

limits the opportunity to cultivate and sow the crops in time and in diversified manner with

variety of crops. The options before the farmers in rain fed agriculture and given climatic

conditions are very limited. The risk appetite of farmers is very low as probability of good

rains and its distribution over a crop period is not regular as well as the economic conditions

of local farmers is also compromising. The quality of soil in most of the area is poor with a

limited organic matter and low nutritional contents. The top soil faces a lot of risk against

water and wind erosion. The texture of the soil is light by and large in entire area. The rills and

gullies are formed in private and community land at higher slopes initiating from hillocks. The

Monsoonal rainfall when occurs in limited storms with higher intensities it turns into runoff

and most of it go in waste after fulfilling the retentions of local depressions and some local

structures which are constructed by local community efforts and under different

developmental schemes. The area faces acute water shortage in summers. The quality of

ground water is not good and it cannot be used for agriculture, animal and human use.

The animal husbandry is the part of most of the household’s economy. Farmers are

rearing cattle, buffalo, goats, seeps, camels etc. but most of these animals are of local breeds

which are less productive and uneconomic as well it imposes increased biotic pressure on

natural resources of project area. The households are having some surplus milk production

but due to poor and unorganised marketing linkages it does not fetches rightful value. The

other opportunity of allied activities for the support of livelihood is almost absent. Most of

the household are engaged in employment given under NREGS but it does not suffice to lead

a satisfactory life conditions for entire family for the entire period of a year. In such a forcing

situation some people having skills in masonry works prefer to migrate into nearby towns to

have better earnings.

The socio economic conditions of the area can be improved through increased

production which can be achieved through expansion in cultivated area and productivity

enhancement. 403 ha land is arable wasteland and 450 ha is fallow can be brought under

cultivation with the interventions of the present project. The productivity of rain fed

agriculture can be improved with interventions of soil and water conservation activities with

improved moisture regime. The crops can be rescheduled imparting needful trainings to

farmers to adopt the proven technologies and package of practices. The cropping pattern as

enormous possibilities to improved to attain a fair increment in productivity.

There is no significant source of irrigation in project area, only a few areas are irrigated

and with efforts this can be increased to 5%. The productivity gap of major crops in the area

as compared with district and with areas in the same agro climatic zones indicate potential to

increase the productivity. The demonstration of improved package of practices, improved

varieties, increased irrigation facilities and soil conservation measures under the project can

bridge this gap. Due to small land holdings in the area focus of the project would be on

diversification in agriculture (horticulture, vegetables, green houses, Agro forestry, fodder

crops and diversification in Livelihoods (Agriculture, Animal husbandry, self employment)

4601 Qtl/year fodder scarcity can be met out through Pasture development and improving

seed varieties, putting more are under fodder cultivation, fodder treatment and value

addition to it, etc.

Improved animal Husbandry practices can increase the productivity of livestock. The

quality of animals can be improved by controlling population of stray animals adopting

castration of male animals those are of local breeds. Breed improvement can be achieved

through artificial inseminations, by distribution of bulls, rams of improved breed. The

scientific methods of milk collection, milk storage, value addition to its quality and with

assured marketing linkages can prove a promising livelihood support. The females of the area

can be organized through self help groups to promote the habits of saving, thrift and credit

can be pooled up through revolving funds. Such organizations to be sensitized on gender

issues, elimination of social evils, education and health etc.

Some innovative concepts like establishment of Grain Bank, Seed Bank, Fodder Bank,

Milk Co operatives, federation of SHG’s may add a surety to self sustained rural economy.

Increased and positive involvement of Panchayati Raj Institutions, Social Audits, techno-

economic monitoring will further ensure impetuosity in attaining expected outcomes.

CHAPTER – II

Socio economic Features, Problems and Scope

The project comprises of seven villages of three Gram Panchyats. The literacy level is

very low in general again it is very low amongst females. The traditional customs and

followings are persistent yet. The distribution of demography is scattered according to their

land holdings and resides in small habitations/ dhanis. Villages have less connectivity with the

market and other needful amenities. The evil of child marriages, consumption of liquor,

opium poppy and other such narcotic drugs is also observed during the household survey of

the project area. The productivity of the land, animal and household livelihood activities is

very low. To fetch the bread and butter for the family people are forced to migrate. Most of

the migration is of construction labourers to nearby towns.

The above problems can be minimized by putting the available natural resources to its

optimum capacity without damaging them to irreversible level. The interventions of IWMP

can take care of the lands and whatever moisture is available can be conserved to enhance

the rain fed agriculture productivity. The practice of animal husbandry can be used as

strength of the area with the use of breed improvement, improvement of animal health,

ensuring the quality fodder and feed. The animal produce, milk may be sold to nearby towns

with the improved supply chain and value addition to the produce on the theme of self help

groups or cooperatives. The institutional arrangements formed and to be formed in the

course of time during project period may improve the governance and the fair distribution of

usufructs.

Table 2.1 Population & Household Details:

Total Population

Male Female Total SC ST

3489 3002 6491 689 565

Household Details

BPL

household

L.

Less

Large

Farmer

Small

Farmer

M.

Farmer

Total

Household

SC

household

ST

household

478 99 49 198 149 973 106 89

Table 2.2 Development indicators

S.

No. Development Indicators State

Project

Area

1 Per capita income (Rs.) 30800 17000

2 Poverty ratio 0.22 0.19

3 Literacy (%) 60.4 53

4 Sex Ratio 926 835

5 infant mortality rate NA 6.2%

6 maternal mortality ratio NA 0.05%

The table indicates poor socio economic conditions as well as the health conditions.

The total geographical area of the project or cluster selected for the treatments is

7324 ha. Out of which some area has been treated under different schemes in preceding

years. Some area like Stony wastes, habitations, roads, local paths, water bodies etc. are not

available for treatments as well as some flat lands of slope 0-1% slope does not require any

treatments, hence kept aside from effective area of the project. The Gram Panchayat wise

details are as follows:

Table 2.3(A) Proposed Land Under Treatment

S. No. Gram

Panchayat

Gram Panchayat Wise Details of Area, in ha

Total Geo graphical

Area

Area Already Treated

Area not Available for

Teatment

Area not Requiring Treatment

Net Effective

Area 1 Balar 3624 40 60 24 3500

2 Bheekho

rai jooni 2100 35 65 0 2000

3. Swamiji ki

dhani 1600 25 55 20 1500

Total 7324 100 180 44 7000

Table 2.3(B) Land Use

Land Use Total area in Ha.

Private Panchayat Government Community Total

Agriculture Land 5900 0 634 0 6534

Temporary fallow 0 0 0 0 0

Permanent fallow 0 0 60 0 60

Cultivated Rain fed 5900 0 634 0 6534

Cultivated irrigated 0 0 0 0 0

Net Sown Area 5820 0 0 0 5820

Net Area sown more

than once 830 0 0 0 830

Forest Land 0 0 0 0 0

Waste Land 0 0 40 0 40

Pastures 0 0 640 0 640

Others 0 50 0 0 50

Total 5900 50 1424 0 7374

The project area has 5900 ha of cultivable wasteland 60 ha of fallow land (total 5960

ha) can be brought under cultivation if some irrigation source can be provided through

Construction of WHS like Khadin, Tanka, Farm ponds etc. Through demonstration of improved

& hybrid rain fed varieties of seeds for the crops of pulses, oil seeds, fodder, cereals etc.

Construction of WHS can also increase in area under Rabi crop in pedakast which is Negligible

at present.

659 ha. (0.09 % of the project area) is under wastelands and can be brought under

vegetative cover, with reasonable effort .Activities like Earthen check dams, Vegetative filter

strip, V-ditches, staggered trenches, WHS (Khadins), Afforestation of wastelands and Pasture

development will be taken up on these lands

Pasture development the land use table shows that there is 366 hectare pasture land

(0.050%) This emphasizes the need for taking up pastureland development works through

sowing of promising species of grasses and forestry plantation. The local habitat of grass like

dhaman or sewan which is very hardy and perennial in nature will be established which will

improve the availability of good fodder as well as it will work as a binding agent for soil

particles which in turn reduce the soil erosion.

Table 2.4 .a Agriculture and Horticulture status and fuel

availability.

Cropping Status

S

.

N

o

.

Seaso

n

Crop

sown

Rainfed Irrigated Total

Varie

ty

Area

(ha)

Produc

tion

(Ton)

Productiv

ity

(kg/ha)

Varie

ty

Area

(ha)

Produ

ction

(Ton)

Product

ivity

(kg/ha)

Area

(ha)

Produ

ction

(Ton)

1 Kharif Bajra

HHB

67 3840 13600 355 0 0 0 0 3840 1363

Moong K 851 365 222 608 0 0 0 0 365 222

Gaur

RBC

936 1615 823 510 0 0 0 0 1615 823

2 Rabi Musture

d 0 0 0 0 0 510 637 1250 510 637

Wheat 0 0 0 0 0 320 704 2200 320 704

Total 0 5820 1473 0 830 1341 6730 3749

Table 2.4.b Abstract of cropped Area (ha)

Area under Single crop 5820

Area under Double crop 830

Area under Multiple crop 0

The farmers are using indegenious & traditional varieties of Bajra, guar, moong,

month, Til. The varieties for bajra will be used those are developed by RSSC, NSC, CAZRI like

HSB 67, HSB 75, WCC 75 etc. The Moong of varieties like K 17, CAZRI-8, Moth of varieties like

JADIA, RMO 40, CAZRI etc, Sesame of latest varieties will be introduced with the advice of

WDT, resource persons and department of agriculture. The crop rotation and the cropping

pattern will be introduced like inter cropping, mixed cropping etc. to enhance the out come.

The crop rotation for this area under practice is as follows:

Bajra - Fallow Moong - Tarameera Moong - Fallow Fallow - Tarameera Til - Fallow Caster - Caster Moth - Fallow

The table 2.4.b shows that only 830 ha is (11.85%) is double cropped area and that is

also not on assured basis, it is only due to rain harvesting and moisture conservation

practices. Also the crop rotation shows that fallow lands are there. This indicates that there is

scope for change in crop rotation in fields where there are fallow lands through Soil and

Water conservation measures, crop demonstration and diversification in agriculture.

Soil and Water conservation measures besides putting fallow lands under cultivation

can change the area under single cropping to double as well as multiple cropping.

Table 2.4.c Productivity Gap Analysis (The table can also be given

in bar chart form)

Analysis of the above table indicate that besides national gap there is wide gap in

productivity within state and even within same agro climatic zones.

The reasons for this variation are:

Name of

the crop

Productivity kg/ha

India

Highest

Average in

Rajasthan

Highest

Average of Agro

climatic zone

District Project

Area

Bajara

Gaur

Moong

Mustared

--

--

886

1295

339

476

679

1203

500

600

750

1250

415

550

625

980

355

510

608

1120

Farmers are using traditional varieties of Bajra, guar, moong, month, Til whereas the

recommended varieties as mentioned above will definitely improve the productivity.

Lack of Availability of good quality seeds of desired crops and the availability of variety in

adequate quantities and the time for sowing to the farmers.

Availability of water for cultivation (11% is irrigated )

The productivity gap and reasons of it indicate potential to increase the productivity

through crop demonstration .Crop demonstrations would be carried out on improved crops/

varieties, improved agronomic practices. INM, IPM, Mixed cropping, distribution of fodder

seed mini kit. Demonstration of improved methods and economics of fodder crops cultivation

and also distribution foundation seeds of Forage Crops for further multiplication, introduction

of fodder crops in the existing crop rotations.

Table 2.5 Existing area under horticulture/Vegetables/Floriculture (ha)

Activity Area Species Varieties Recommended

varieties

Production

(Kg/Ha)

Horticulture --- --- --- --- ---

--- --- --- --- ---

--- --- --- --- ---

Vegetables --- --- --- --- ---

--- --- --- --- ---

--- --- --- --- ---

Floriculture --- --- --- --- ---

--- --- --- --- ---

--- --- --- --- ---

Medicinal

Plants --- --- --- --- ---

Table 2.6 Land holding Pattern in project area

Type of Farmer Total

House holds

Land holding (ha) irrigation source wise

Land holding (ha)Social group wise

Irrigated (source)

Rainfed Total Gen. SC ST OBC BPL

(i) Large farmer 49 0 3920 3920 1568 784 392 1175 1

(ii) Small farmer 198 0 1307 1307 521 261 130 392 3

(iii) Marginal farmer 149 0 980 980 392 196 98 293 1

(iv) Landless person 99 0 0 0 0 0 0 0 0

(V) No. of BPL households 478 0 327 327 130 65 32 98 2

Total 973 0 6534 6534 2611

1306

652 1958 7

30.50% land holdings belong to small and marginal farmers who own 30.50% of total

cultivated area. Horticulture/vegetables could be more Beneficial to Small and marginal

farmers as well as for large farmers with no irrigation facility. Horticulture/vegetables will be

promoted in a part of land with farm pond/Tanka construction.

The following activities will be more beneficial for small land holdings and for

diversification and income for large farmers

Horticulture plantation, Medicinal and Aromatic Crops, floriculture: As discussed earlier.

Horticulture/vegetables could be more economical to Small and marginal farmers with farm

pond/Tanka construction. The project area is planned to put some area adjacent to the water

tanka and RWHS under medicinal crops like Sonamukhi, Aloevera, Ashwagandha,

Asperagus etc.

Agro forestry plantation: To increase the income of farmers and to establish the shelter belt

plantation against wind velocity to protect the lands from erosion due to high wind velocities.

The limited financial provisions under project restrict to take up these activities. The

convergence with MNREGA or other line Departmental schemes will be sought to implement

it.

Setting of Vermi Compost Units: Keeping in view the side effect of residues of chemicals and

fertilizers on human health, the emphasis would be on cultivation of organic produce through

motivating farmers and providing assistance for production of organic input, vermi compost,

farm yard manure. The SHG would be motivated to adopt this activity for income generating

activity as well as for livelihood support.

Production and Distribution of Quality Seeds: There is need to ensure that good quality seed

is available for cultivators, for which adequate seed production would be initiated in

watershed areas with the assistance of private sector and agriculture Department with the

improved technologies and package of practices. The crop demonstration of different crops

suitable for the area and of promising outputs is proposed under development plan. The

convergence with Agriculture Department and Horticulture Mission is envisaged.

Sprinklers and Pipelines: For efficient water management practices, emphasis would be on

demonstration of Drip and sprinklers with adequate financial support and

convergence/private partnership.

Establishment of Nurseries: Most of the planting material is procured from other parts of the

District/ State. The procurement of planting material from distant places causes damage to

the planting material and often results in untimely supply. Hence nursery development

activity has been planned in area. The nursery will be raised through SHG with the support of

revolving fund of project as well as groups’s own resources.

Innovative hi-tech/ Cash Economy Oriented Activities: Innovative hi-tech/ cash crops/

activities/ projects like mushroom cultivation, floriculture, etc which are not in existence at

present, can be implemented by individual farmers / private partnerships as there is

enormous scope of mushroom dry or wet in the nearby tourist oriented hotels/ resorts. The

Activity is proposed through SHG with proper skill development through trainings at specified

centres.

Drip irrigation: Drip irrigation will be promoted in all horticulture plantations, vegetables and

in nurseries for rational use of irrigation to achieve higher yields and quality produce. Earthen

pot/ pitcher irrigation will also be practised at water tank based plantations.

Table 2.7 Livestock Status-animals/milk production/average yield.

S.

No

.

Descriptio

n of

animals

Populatio

n

in No.

Yield (milk/

mutton/

Wool)

Equ.

cow

units

Dry matter

requiremen

t per year

(7Kg per

animal.)

Total

require

ment

in M.T.

1 Cows

Indigenous 2355 3.5 ltr per day 2355 6017025 6017.025

Hybrid 85 5 ltr per day 85 217175 217.175

2 Buffaloes 35 6 ltr per day 35 89425 89.425

3 Goat 17832 1 ltr per day 8916 45560760 45560.76

4 Sheep 17332 1 to 1.5 per no. 8666 44283260 44283.26

5 Camel 132 --- 132 337260 337.26

6 Poultry 0 750 gm per bird 0 0 0 7 Piggery 0 0 0 0 0

Total 37771 20189 96504905 96504.91

In spite of the large number of livestock, production is less hence increase in

productivity across all species, is a major challenge. To reduce production of unproductive

cattle and to control the population of cattle, to improve the productivity by improving the

breeds by breeding management following activities will be taken up

Castration

Artificial insemination

Distribution of superior Breeding bulls for use in Cattle and Buffalo

Breeding & distribution of crossbred rams

Besides breed improvement other animal husbandry practices like better health, hygiene

and feeding practices can increase productivity of livestock. Hence Activities like Animal

health camps, Urea-Molasses treatment demonstration, demonstration of improved methods

of conservation and utilization of Forage crops are proposed. The Storage of fodder will be

managed with the use of compressed fodder bricks with nutritional value addition.

Table 2.8 Existing area under fodder (ha)

S.

No Item Unit Area/Quantity

1 Existing Cultivable

area under Fodder Ha 6534/45738

2 Production of Green

fodder Tonns/year 0

3 Production of Dry

fodder Tonns/ Year 6250/43750

4 Area under Pastures Ha 690/2415

5 Production of fodder Tonns/year 6250/43750

6 Existing area under

Fuel wood Ha 0

7 Supplementary feed Kgs/ day

8 Silage Pits No

9 Availability of fodder Quintals 91903

10 Deficiency/excess of

fodder

Quintals 4601

The above table shows there is fodder deficiency (Requirement is 96505 Qntl.and

availability 91903 Qntl.)

To minimize the large and expanding gap between feed and fodder resource availability

and demand there is need for

Increase in area under fodder crops

Increase in productivity of fodder crops

Development of pastures

And reduction in large number of livestock production through replacement by few but

productive animals

Table 2.9 Agriculture implements

Farm Mechanization and Seed Banks: As discussed earlier 30.50% land holdings belong to

small and marginal farmers. The cultivation of 30.50% of total cultivated area so owning of big

farm implements by individual farmers is not economical so SHG would be promoted to buy

farm implements and rent to farmer. The concept of fodder and Seed bank will be promoted

on institutional basis in the project so that resource poor people could be facilitated and

ensured timely and locally available seed and fodder material as per their need.

Table 2.10 NREGA Status-No. of Card Holder, activities taken so

far, employment status.

S.

no. Name of village

Total No

.of job

cards

Employment

Status

Activity taken up so

far

1 Roopsar(Bheel) 172 60

GravelRoad

Tradditationalwater

bodies,forest/pasture

enclosures etc.

2 Barsani 230 65

3 Balar 150 110

4 Goraliya 136 85

5 Swami ji ki

dhani 400 210

6 Kajoi 227 95

7 Khanpura 101 55

S.No Implements Nos.

1 Tractor 75

2 Sprayers-manual/ power 62

3 Cultivators/Harrows 21

4 Seed drill 56

5 Any Other 18

Table 2.11 Migration Details

Name of village

No. of

persons

migrating

No. of

days per

year of

migration

Major

reason(s)

for

migrating

Distance of

destination

of

migration

from the

village

(km)

Occupation

during

migration

Income

from such

occupation

(Rs. in

lakh)

Roopsar(Bheel) 20 182

Employment

& Business 120-1500

Employment

& Business 1-2 lac

Barsani 16 185

Balar 23 150

Goraliya 8 172

Swami ji ki

dhani 10 210

Kajoi 9 180

Khanpura 11 180

The migration can be checked by creation of employment opportunities, enhancing

farm level economy, increased the income of the people engaged in animal husbandry by

dairy, poultry, proper marketing and value addition to the produce (As discussed earlier) and

diversification in livelihoods. Well planned animal husbandry activities and dairying is

envisaged to be taken as main on farm income generating activity with convergence of other

departmental schemes. A scientific and temper proof milk collection unit and milk storage

unit (chilling Plant) is envisaged to be installed on SHG concept. The marketing linkages and

MOU with Governmental as well as non- Government sector dairying units in Jodhpur will be

ensured with intervention of District administration and allied Departments/ public sector

units.

The existing livelihoods of project Villages are given below

Table 2.12 (a)Major activities (On Farm)

Name of activity No. of

House holds

Average annual income

/per House hold (in lac)

Cultivators 524 0.52

Dairying 350 0.85

Poultry 0 0

Piggery 0 0

Landless Agri.

Labourers 78 0.42

Table 2.12(b)Major activities (Off Farm)

Name of activity Households/indivi

duals

Average annual income

/per House hold (in

lac)

Artisans 8 1.5

Carpenter 15 2.00

Blacksmith 3 0.80

Leather Craft 4 0.60

Porter 8 2.50

Mason 50 2.00

Others specify

(Cycle Repair

,STD,Craft etc)

15 1.20

The efforts for increase in income through off farm activities will be made under

livelihood component through assistance to SHG or individuals. Some home based activities

specially for women are being discussed in the meetings of SHG, the same will be supported

through revolving funds and loan from the banks against the savings/ credits of concerned

groups.

Table 2.13( a ) Status of Existing SHG

The table indicates existences of number of groups in the area also need to be strengthened through trainings and financial assistance

S.No Name of SHG Members Activity

involved

Monthly

income

Fund

available

Assistance

available

Source of

assistance

Training

received

1 Anach Kanwar SHG

10 Embriodery 1000 1.50 BANK LOAN Z.P.JAISALME

R

YES

2 Luni Group SHG

10 Embriodery

1000 1.75 BANK LOAN Z.P.JAISAL

MER YES

3 Marimo Group SHG

10 Embriodery

1000 1.25 BANK LOAN Z.P.JAISAL

MER YES

4 Bhawri Group SHG

10 Embriodery

1000 1.85 BANK LOAN Z.P.JAISAL

MER YES

5 Dhapu SHG

10 Embriodery

1000 1.65 BANK LOAN Z.P.JAISAL

MER YES

6 Ramdev SHG

10 Embriodery

1000 1.55 BANK LOAN Z.P.JAISAL

MER YES

7 Durga SHG

10 Embriodery

1000 1.60 BANK LOAN Z.P.JAISAL

MER YES

II. Technical Features

Table 2.14 Ground Water

S.No Source No.

Funct

ional

depth

Dry

Area

irrigat

ed

Water

availability(

days)

1 Dug wells 0 0 0 0 0

2 Shallow

tube wells 0 0 0 0 0

3 Pumping

Sets 0 0 0 0 0

4 Deep Tube

Wells 22 75 5 10 365

Total 22 5 10

Table 2.15 Availability of drinking water

S.

No

Name of

the

village

Drinking

water

requireme

nt

Ltrs/day

Present

availabi

lity of

drinking

water

Ltrs/day

No. of

drinkin

g water

sources

availab

le

No.

functio

nal

No.

requir

es

repair

No.

Defunc

t

1 Balar 10935 9260 4 4

2 Roopsar

bheel

10440 8070 3 3

3 khanpura 3969 2795 3 3

4 Barsani 7227 6925 3 3

5 Goraliya 5121 4827 2 2

6 Kajoi 4068 3792 1 1

7 Swamijiki

Dhani 16659 14550 2 2

Total 58419 50219 18 18

Table 2.16 Water Use efficiency

Name of major

crop

Area (Hectare)

through water

saving

devices(Drip/

Sprinklers)

through

water

conserving

agronomic

practices#

Any other

(pl.

specify)

Total

Mustard 40 135 --- ---

Zeera 2 25

Guar 4 1950

The tables above indicate need for judicious use of available Water.

Encouraging optimum use of water through installation of sprinklers/ drips on every

operational wells and other irrigation source.-

Table 2.17 Slope details.

S.No. Slope percentage Area in

hectares

1 0 to 3% 5000

2 3 to 8% 2000

3 8 to 25%

4 > 25%

As most of the area has slope less than 3%, construction of contour bunds can solve

the problem of water erosion in agriculture fields and protect washing of top soil and

manures/fertilisers. The area having less than 2% slope can be improved by adopting

scientific tillage practices, agronomical practices and vegetative barriers. The arable lands

having slope more than 2% to be treated by constructing earthen bunds, contour/ field

bunding fortified with vegetative hedges of perennial grasses and locally suited agro forestry

plants.

Table 2.18 Soil details

S.

No. Major Soil Classes

Area in

hectares

A Soil Depth

1 Sandy Loam 7000

2 Loam

B Soil Depth :

1 0.00 to 7.50 7000

2 7.50 to 45.00 ---

3 > 45.00 ---

C Soil fertility Status

Kg/ha Recomm.

N 60-80 90-100

P 25-35 30-40

K 15-20 25-45

Micronutrients 10-500 100-500

The analysis of table shows the need to improve and maintain soil fertility. Soil health

card to every farmer every crop season will be provided, which will include the

recommendation for Application of micro nutrient and fertilizers as per the crops those would

be taken on the field.

Table 2.19 Erosion details

Cause Type of erosion

Area

affected

(ha)

Run

off(mm/

year)

Average soil

loss (Tonnes/

ha/ year)

Water erosion

A Sheet 3000

B Rill 0

C Gully 0

Sub-Total 0

Wind erosion 4000

Total for project 7000 15-20

The need is:

To check land degradation

To reduce excessive biotic pressure by containing the number and controlling population

of livestock

To check cultivation on sloping lands without adequate precautions of soil and water

conservation measures

To discourage cultivation along susceptible nallah beds

To check Faulty agriculture techniques

To check Uncontrolled grazing and developed cattle tracks

To check Deforestation of steep slopes

To check erosive velocity of runoff, store Runoff, to arrest silt carried by runoff and to

recharge ground Water. Structures life Earthen check dams, gully plugs, Bank Stabilisation,

Loose stone check Dams, Gabions, Earthen embankment (Nadi) and Anicuts would be

taken up.

CHAPTER - III Proposed Development Plan

A) Preparatory phase activities, Capacity Building Trainings and EPA

The IEC activities like Group meetings, door to door campaign, slogans and wall

writings etc. are carried out in all the habitations. A series of meetings were conducted with

GP members, community and discussed about the implementation of IWMP programme. The

PRA exercises also conducted in each and every habitation involving all the stake holders.

User groups are also formed to ensure beneficiaries effective and active participation since

from beginning, planning and in execution so that the can use them on sustained basis and

can maintain even after the completion of project.

Grama Sabhas were conducted for approval of entry point activities, for selecting the

watershed committee and approval of DPR.

S.

No

Name of the Gram

Panchayat

Date on which Grama

Sabha approved EPA

1 Balar 20.12.11

2 Bheekhorai jooni 05.01.12

3 Swamijiki Dhani 05.12.11

Details of Entry Point Activities under taken:

S.

No.

Names

of

village

Amount

ear

marked

for EPA

Entry Point Activities

planned Esti

mated

cost

Exp.

Incur

red

Bal

Ance

Exp

ected

outcome

Act

ual

out

come

Solar

lights RWHS

Drinking

water

1 Balar 12.00 12 5 1 12.00 12 0.00 12

2 Roopsar

bheel 6.00 6 3 1

6.00 6 0.00

To solve

problem

of

lighting

and

drinking

water

6

3

khanpura 3.00 3 3 0

3.00 3 0.00 3

4 Barsani 9.00 9 8 0 9.00 9 0.00 9

5

Goraliya 3.00 3 3 0

3.00 3 0.00 3

6 Kajoi 3.00 3 3 0 3.00 3 0.00 3

7 Swamijiki

Dhani 6.00 6 5 0 6.00 6 0.00 6

The PRA exercise was carried out in all the villages on the dates shown below:

S.

No

Name of the

village/Habitation

Date on which PRA

conducted

1 Balar 05.01.12

2 Roopsar bheel 07.01.12

3 khanpura 08.01.12

4 Barsani 15.01.12

5 Goraliya 16.01.12

6 Kajoi 12.01.12

7 Swamijiki Dhani 15.12.12

Transact walk were carried out involving the community for Social mapping, Resource

mapping. Detailed discussions and deliberations with all the primary stakeholders were

carried out.

Socio-economic survey was carried out for six month period covering all the

households and primary data on demography, Land holdings, Employment status, Community

activities etc. was collected as mentioned in chapter 2.

State Remote Sensing Application centre jodhpur was assigned the work of preparing

various thematic layers using Cartosat-1 and LISS-3 imageries for Creation, development and

management of geo-spatial database depicting present conditions of land (terrain), water and

vegetation with respect to watershed under different ownerships at village level.

A) Capacity Building

The information and capacity building activities will be taken up as a major and

essential component of this project as per the common guidelines. A provision of 5% amount

of total project cost is proposed for these activities. Different stake holders in this project

implementation will be provided with appropriate trainings to enhance their skills,

knowledge, efficiency etc. Some national and state level organisations have been identified

by the SLNA to impart the trainings to officials of State, District and PIA level officials and

field functuaries. The project and village level stake holders will be trained at Regional and

District level Resourse organizations as approved by the SLNA as well as by the DWDU/PIA

with their available resourses and with help of resourcefull and eligible voluntary

organizations.

The information, education and communication (IEC) activities will also be carried out as per

the direction and content of project to dissiminate the project related information to fulfil

the project obejectives. An amount of Rs. 52.50 is provided for above I & CB activities.

State Remote Sensing Application Centre (SRSAC) Jodhpur was assigned the

work of preparing various thematic layers using Cartosat-1 and LISS-3 imageries for

Creation, development and management of geo-spatial database depicting present

conditions of land (terrain), water and vegetation with respect to watershed under

different ownerships at village level

Various thematic layers provided by SRSAC:

Delineation of Macro/Micro watershed boundaries.

Digitised Khasara maps of the villages falling in project area.

Network of Drainage lines, existing water bodies, falling in the project area.

Base maps (transport network, village/boundaries, and settlements).

Land Use / Land cover map.

Based on GIS thematic layers, Field visits , PRA and analysis of benchmark data (as

discussed in chapter 2) final Treatment plan on revenue map for implementation has been

framed. Thus each intervention identified has been marked on Geo referenced Khasra Map

with Contours as provided by the SRSAC Jodhpur. ( map enclosed in DPR as annexure ”A”)

B) Livelihood Action Plan (LAP):

An awareness programme has been undertaken at Gram Sabha for communication &

sensitization of the target beneficiaries. Livelihood Action Plan is a pre requisite for availing

the funds under the livelihood component. LAP has been prepared by the PIA in consultation

with WDT, WC & the members of SHG, SC/ST, women, landless/ assetless households. Details

of funds available & their utilisation are as under:

(i) Total project cost Rs. 1050.00 Lacs.

(ii) Funds available under livelihood component are 9% of total project cost, Rs. 94.50

Lacs.

(a) Seed money for SHGs as revolving fund, Rs. 56.70 Lacs.

- No. of SHG to be formed 230 Nos.

- No of persons (members) in SHGs 1610 Nos.

(b) Seed money for enterprising individuals, Rs. 9.45 Lacs

- No of persons identified as enterprising individuals 38 Nos.

The identification of enterperising individuals is in process and will be provided with

their intended trade and task’s required trainings and there after will be benefited with the

seed money as well as the admissible assistance/ loan from the project and provided with

credit linkages from banks also.

(c) Funds for Enterprising SHG/Federations of SHG

An amount of Rs. 28.35 lac has been envisaged and devised for enterprising self help groups

and federations of self help groups.

The funding for major livelihood activities will enable the enterprising SHGs/SHG

federation to avail a composite loan for undertaking major livelihood activities or to upscale

activities as recommended by the WC & approved by WCDC in consultation with line

departments.

Details of enterprising SHG/federation would be prepared in coming years after formation

of SHG federation or as the case may be.

C) Production Plan:

An awareness programme has been undertaken at Gram Sabha for communication &

sensitization of the target beneficiaries. Production System & micro enterprises Action Plan is

pre-requisite for availing the funds under the Production System & micro enterprises

component. Production plan has been prepared by the PIA in consultation with WDT, WC &

the members of Users Group. Details of funds available & their utilisation are as under:

(i) Total project cost Rs. 1050.00 Lacs.

(ii) Funds available under Production System & Micro enterprises component is 10% of

total project cost, Rs.105.00 Lacs.

The appropriate species of horticulture plants those are adaptable in arid climate of

Jaisalmer District like Date palm, Pomegranate, Lesua/ Gunda, Ber etc. will be Provided to

the interested beneficiaries in the coming years who are having some sort of irrigation

facilities or rain water harvesting systems. The water conservation devices like sprinklers,

drip irrigation system, pitcher irrigation etc. will also be promoted and implemented with the

convergence of Agriculture/ Horticulture Departments. The medicinal plants will also be

tried to propagate in available conditions with the technical interventions of project. The

promising varieties of different crops will be provided as crop demonstrations with

recommended package of practices to enhance the agriculture productivities. The vermi-

compost units will also be promoted amongst the interested beneficiaries to ensure its

replication at large to provide bio fertilizers. Individuals beneficiaries are being identified at

persent and will also be added in coming years of project period. The activity wise outlay has

been indicated in development plan.

(iii) Funds for Animal Husbandary activities have been provided Rs 16.30 lacs out of above

total provision of Rs 105.00 lac for production activities.

Awareness Programme

-Slogan Wall Painting,

-Scientific Animal Husbandry Practices; Seminars / Debates / Pamphlet distribution/ Stickers/ Chetana Rally

-Broadcasting / Telecasting Film Show

-Visit- intra/ inter/ out of State/ Abroad

-Fortnightly Meetings with Livestock keeper to discuss and decide all breedable females to be covered.

Creation of Disease Free Zone: Livestock’s health coverage

With the intervention of project it is envisaged to create the project area as a disease free zone with following activities

-Establishment of Pashudhan Seva Kendra (PSK) (Convergence with peer department)

-Deworming to reduce worm load and enhance disease resistance. (Convergence with peer department)

-Distribution of mineral mixture. (Convergence with peer department)

-Free of Cost Vaccination in IWMP area Livestock for H.S., B.Q., F.M.D., PPR, ETV and Sheep Pox.

-Ensure Hygenic measures to check Zonosis. (DAH/ IWMP)

Infertility Management

To ensure Livestock’s Productivity the population of stray animals will be controlled through castration and productivity of animals will be improved with the:

-Expansion of AI Coverage/ reduction in no.of infertile females.

-PCPD+ COMBAT INFERTILITY+ CAMPS INFERTILITY RLDB+ CAMPS INFERTILITY SC COMPONENT

-Breed Improvment: To ensure Livestock’s Productivity enhancement

-A.I. (Convergence with peer department)

-Incentive based Mass Castration at Door Step of Scrub Bulls to Check ND Recycling.

-Registration of bulls (Convergence with peer department)

-Bull / Buck Distribution for NS-.Gir, Murrah And Sirohi /Jamunapari Breed Bulls/ Bucks.

-Financial Incentive to the Inseminator for Calf Borns.

-Convergence with peer Department/DAH/Agriculture/ATMA/ Board/ Trust/ Goseva

-An Assistance to control Malnutrition: Protein Supplementation

-Feed & fodder production enhancement.

ANNUAL ACTION PLAN : PIA will prepare annual action plan in the month of January

indicating outgoing liabilities as well as new projects which they wish to take during next

financial years & will submit to PM(WCDC). These plans will be placed for approval at P.S.

(Standing Committee of Production and Agriculture) & Z.P. (Standing Committee of

Production) level every year. While preparing Annual Action Plan (AAP) if rates of labour or

material in DPR increases or decreases, the changed rates will be applicable for preparing AAP

& the effect of same can be met by converging the remaining works with other schemes.

Proposed Development Plan

Qty.Total

Cost

Cost

from

Project

Fund

Conver

gence

Fund

Bene

ficiary

Contri

bution

Qty.Total

Cost

Cost

from

Project

Fund

Conver

gence

Fund

Bene

ficiary

Contri

bution

Qty.Total

Cost

Cost

from

Project

Fund

Conver

gence

Fund

Bene

ficiary

Contri

bution

Qty.Total

Cost

Cost

from

Project

Fund

Conver

gence

Fund

Bene

ficiary

Contri

bution

Admn. 10% 30.00 30.00 0.00 0.00 52.50 52.50 0.00 0.00 22.50 22.50 0.00 0.00 0 105.00 105.00 0.00 0.00

Monitoring 1% 3.00 3.00 0.00 0.00 5.25 5.25 0.00 0.00 2.25 2.25 0.00 0.00 0 10.50 10.50 0.00 0.00

Evaluation 1% 3.00 3.00 0.00 0.00 5.25 5.25 0.00 0.00 2.25 2.25 0.00 0.00 0 10.50 10.50 0.00 0.00

EPA 4% 12.00 12.00 0.00 0.00 21.00 21.00 0.00 0.00 9.00 9.00 0.00 0.00 0 42.00 42.00 0.00 0.00

I&CB 5% 15.00 15.00 0.00 0.00 26.25 26.25 0.00 0.00 11.25 11.25 0.00 0.00 0 52.50 52.50 0.00 0.00

DPR 1% 3.00 3.00 0.00 0.00 5.25 5.25 0.00 0.00 2.25 2.25 0.00 0.00 0 10.50 10.50 0.00 0.00

Total (A) 22% 66.00 66.00 0.00 0.00 115.50 115.50 0.00 0.00 49.50 49.50 0.00 0.00 0.00 231.00 231.00 0.00 0.00

(B) Natural resource management (56%) 168.00 294.00 126.0 588.00

Conservation measures for arable land (private land)

Field Bunding ha 0.093 480 44.64 35.30 9.34 2.65 1200 111.60 88.57 23.03 6.64 340 31.62 19.80 11.82 1.49 2020 187.86 143.67 44.19 10.78

Earthen Structure 1 No. 1.2 10 12.00 12.00 0.00 0.90 15 18.00 18.00 0.00 1.35 10 12.00 12.00 0.00 0.90 35 42.00 42.00 0.00 3.15

Earthen Structure 2 No. 1.75 8 14.00 14.00 0.00 1.05 12 21.00 21.00 0.00 1.58 8 14.00 14.00 0.00 1.05 28 49.00 49.00 0.00 3.68

Earthen Structure 3 No. 2 4 8.00 8.00 0.00 0.60 10 20.00 20.00 0.00 1.50 5 10.00 10.00 0.00 0.75 19 38.00 38.00 0.00 2.85

Tanka 1 No. 0.62 20 12.40 12.40 0.00 0.93 30 18.60 18.60 0.00 1.40 18 11.16 11.16 0.00 0.84 68 42.16 42.16 0.00 3.16

Tanka 2 No. 0.7 20 14.00 14.00 0.00 1.05 30 21.00 21.00 0.00 1.58 18 12.60 12.60 0.00 0.95 68 47.60 47.60 0.00 3.57

Khadin No. Site wise 3 25.56 25.56 0.00 1.92 4 36.06 36.06 0.00 2.70 2 18.31 16.81 1.50 1.26 9 79.93 78.43 1.50 5.88

Conservation measures for non arable land

Pasture Development ha 0 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00

V-ditch ha 0.0192 80 1.54 1.54 0.00 0.00 40 0.77 0.77 0.00 0.00 85 1.63 1.63 0.00 0.00 205 3.94 3.94 0.00 0.00

Water Harvesting Structure No. 3 3 9.00 9.00 0.00 0.00 5 15.00 15.00 0.00 0.00 2 6.00 6.00 0.00 0.00 10 30.00 30.00 0.00 0.00

Afforestation ha 1.6 20 32.00 32.00 0.00 0.00 30 48.00 48.00 0.00 0.00 12 19.20 19.20 0.00 0.00 62 99.20 99.20 0.00 0.00

Tanka 3 No. 1.4 3 4.20 4.20 0.00 0.00 5 7.00 7.00 0.00 0.00 2 2.80 2.80 0.00 0.00 10 14.00 14.00 0.00 0.00

Drainage line treatment

MMS, Gabion No. 0 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00

LSCD No. 0 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00

WHS No. 0 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00

Gully Plugs (ECD) No. 0 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00

Ground water structure No. 0 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00

Total (B) 177.34 168.00 9.34 9.09 317.03 294.00 23.03 16.74 139.32 126.00 13.32 7.23 633.69 588.00 45.69 33.06

Production measures for arable land 30.00 52.50 22.50 105.00Arid Horticulture ha 1.2 5 6.00 3.25 2.75 0.49 15 18.00 12.00 6.00 1.80 4 4.80 3.80 1.00 0.57 24 28.80 19.05 9.75 2.86

Sprinklers & Drip irrigation ha 0.8 2 1.60 1.00 0.60 0.15 5 4.00 3.00 1.00 0.45 2 1.60 1.15 0.45 0.17 9 7.20 5.15 2.05 0.77

Vegetables No. 0.005 200 1.00 1.00 0.00 0.15 300 1.50 1.50 0.00 0.23 100 0.50 0.50 0.00 0.08 600 3.00 3.00 0.00 0.45

Medicinal plants No. 0.005 200 1.00 1.00 0.00 0.15 300 1.50 1.50 0.00 0.23 100 0.50 0.50 0.00 0.08 600 3.00 3.00 0.00 0.45

Vermi compost No. 0.1 50 5.00 5.00 0.00 0.75 80 8.00 8.00 0.00 1.20 20 2.00 2.00 0.00 0.30 150 15.00 15.00 0.00 2.25

Crop Demonstration No. 0.015 850 12.75 12.75 0.00 1.91 1000 15.00 15.00 0.00 2.25 450 6.75 6.75 0.00 1.01 2300 34.50 34.50 0.00 5.18

Micro Enterprise

Dairy No. 2.00 2.00 3.00 3.00 0.00 1.60 1.80 1.80 0.00 0.00 0 6.80 6.80 0.00 1.60

Poultry No. 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00

Animal camp/Breed improovement No. 2.00 2.00 4.00 4.00 0.00 0.16 0 3.50 3.50 0.00 0.00 0 9.50 9.50 0.00 0.16

Local Artisans/craft No. 1.00 1.00 1.80 1.80 0.00 0.40 1.50 1.50 0.00 0.10 0 4.30 4.30 0.00 0.50

Food Processing No. 1.00 1.00 2.70 2.70 0.00 0.20 1.00 1.00 0.00 0.00 0 4.70 4.70 0.00 0.20

Total (C) 33.35 30.00 3.35 3.60 59.50 52.50 7.00 8.51 23.95 22.50 1.45 2.31 116.80 105.00 11.80 14.42

(D) Livelihood Activities (9%) 27.00 27.00 47.25 47.25 0.00 0.00 20.25 20.25 0.00 0.00 0 94.50 94.50 0.00 0.00

Total (D) 27.00 27.00 0.00 0.00 47.25 47.25 0.00 0.00 20.25 20.25 0.00 0.00 94.50 94.50 0.00 0.00

(E) Consolidation 9.00 9.00 15.75 15.75 6.75 6.75 31.50 31.50 0.00 0.00

Total (E) 9.00 9.00 0.00 0.00 0.00 15.75 15.75 0.00 0.00 0.00 6.75 6.75 0.00 0.00 0.00 31.50 31.50 0.00 0.00

Grand Total 312.69 300.00 12.69 12.69 555.03 525.00 30.03 25.25 239.77 225.00 14.77 9.53 1107.49 1050.00 57.49 47.48

GP : Balar GP : Swami ji ki Dhani Total

(A) Preparatory phase activities capacity building training & EPA

(C) Production System and Micro Enterprise (10%)

Activity UnitUnit

Cost

GP : Bhikhodai

Activity Unit Qty.Unit

cost

Total

cost

Cost from

Project

Fund

Conver

gence

Fund

Beneficiary

Contribution

(A) Preparatory phase activities capacity building training & EPAAdmn. 10% 0 0 105.00 105.00 0.00 0.00Monitoring 1% 0 0 10.50 10.50 0.00 0.00Evaluation 1% 0 0 10.50 10.50 0.00 0.00EPA 4% 0 0 42.00 42.00 0.00 0.00I&CB 5% 0 0 52.50 52.50 0.00 0.00DPR 1% 0 0 10.50 10.50 0.00 0.00

Total (A) 231.00 231.00 0.00 0.00

(B) Natural resource management (56%)Conservation measures for arable land (private land)

Field Bunding ha 2020 0.093 187.86 143.67 44.19 10.78

Earthen Structure 1 No. 35 1.2 42.00 42.00 0.00 3.15

Earthen Structure 2 No. 28 1.75 49.00 49.00 0.00 3.68

Earthen Structure 3 No. 19 2 38.00 38.00 0.00 2.85Tanka 1 No. 68 0.62 42.16 42.16 0.00 3.16Tanka 2 No. 68 0.7 47.60 47.60 0.00 3.57Khadin No. 9 Site wise 79.93 78.43 1.50 5.88Conservation measures for non arable land

Pasture Development ha 0 0 0.00 0.00 0.00 0.00V-ditch ha 205 0.0192 3.94 3.94 0.00 0.00

Water Harvesting

StructureNo. 10 3 30.00 30.00 0.00 0.00

Afforestation ha 62 1.6 99.20 99.20 0.00 0.00Tanka 3 No. 10 1.4 14.00 14.00 0.00 0.00Draunage line treatment

MMS, Gaboin No. 0 0 0.00 0.00 0.00 0.00LSCD No. 0 0 0.00 0.00 0.00 0.00WHS No. 0 0 0.00 0.00 0.00 0.00

Gully Plugs (ECD) No. 0 0 0.00 0.00 0.00 0.00

Ground water structure No. 0 0 0.00 0.00 0.00 0.00Total (B) 633.69 588.00 45.69 33.06

(C) Production system and micro enterprise (10%)Production measures for arable land

Arid Horticulture ha 24 1.2 28.80 19.05 9.75 2.86

Sprinklers & Drip irrigation ha 9 0.8 7.20 5.15 2.05 0.77

Vegetables No. 600 0.005 3.00 3.00 0.00 0.45

Medicinal plants No. 600 0.005 3.00 3.00 0.00 0.45

Vermi compost No. 150 0.1 15.00 15.00 0.00 2.25

Crop Demonstration No. 2300 0.015 34.50 34.50 0.00 5.18Micro Enterprise

Dairy No. 0 0 6.80 6.80 0.00 1.60Poultry No. 0 0 0.00 0.00 0.00 0.00Animal camp/Breed improovementNo. 0 0 9.50 9.50 0.00 0.16Local Artisans/craft No. 0 0 4.30 4.30 0.00 0.50Food Processing No. 0 0 4.70 4.70 0.00 0.20

Total (C) 116.8 105 11.8 14.415

D.Livelihood Activities (9%) 0 0 94.50 94.50 0.00 0.00

Total (D) 94.50 94.50 0.00 0.00

(E) Consolidation 31.50 31.50 0.00 0.00

Total (E) 0 0 31.50 31.50 0.00 0.00Grand Total 1107.49 1050.00 57.49 47.48

CHAPTER-IV Activity wise Total Abstract of cost

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

Admn. 0 0 10% 105.00 31.50 21.00 10.50 10.50 10.50 10.50 10.50 0 105.000

Monitoring 0 0 1% 10.50 0.00 0.00 2.10 2.10 2.10 2.10 2.10 0 10.500

Evaluation 0 0 1% 10.50 0.00 0.00 0.00 2.10 0.00 3.15 5.25 0 10.500

EPA 0 0 4% 42.00 12.60 29.40 0.00 0.00 0.00 0.00 0.00 0 42.000

I & CB 0 0 5% 52.50 10.50 10.50 10.50 5.25 5.25 5.25 5.25 0 52.500

DPR 0 0 1% 10.50 3.15 4.20 0.00 0.00 3.15 0.00 0.00 0 10.500

Total (A) 231.00 57.750 65.100 23.100 19.950 21.000 21.000 23.10 0 231.000

Field Bunding ha 2020 0.093 143.67 300 28.73 800 50.28 300 28.73 450 28.73 170 7.18 2020 143.670

Earthen Structure 1 No. 35 1.2 42.00 8 8.40 12 14.70 7 8.40 7 8.40 1 2.10 35 42.000

Earthen Structure 2 No. 28 1.75 49.00 6 9.80 10 17.15 6 9.80 6 9.80 1 2.45 28 49.000

Earthen Structure 3 No. 19 2 38.00 4 7.60 7 13.30 4 7.60 4 7.60 1 1.90 19 38.000

Tanka 1 No. 68 0.62 42.16 15 8.43 24 14.76 14 8.43 14 8.43 2 2.11 68 42.160

Tanka 2 No. 68 0.7 47.60 15 9.52 24 16.66 14 9.52 14 9.52 2 2.38 68 47.600

Khadin No. 9 Site wise 78.43 1 15.69 3 27.45 2 15.69 2 15.69 1 3.92 9 78.430

Conservation measures for non arable land

Pasture Development ha 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.000

V-ditch ha 205 0.0192 3.94 41 0.79 72 1.38 41 0.79 41 0.79 10 0.20 205 3.936

Water Harvesting Structure No. 10 3 30.00 2 6.00 4 10.50 2 6.00 2 6.00 1 1.50 10 30.000

Afforestation ha 62 1.6 99.20 12 19.84 22 34.72 12 19.84 12 19.84 3 4.96 62 99.200

Tanka 3 No. 10 1.4 14.00 2 2.80 4 4.90 2 2.80 2 2.80 1 0.70 10 14.000

Drainage line treatment 0 0.000

MMS, Gabion No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.000

LSCD No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.000

WHS No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.000

Gully Plugs (ECD) No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.000

Ground water structure No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.000

Total (B) 588.00 406 117.599 980 205.799 403 117.599 553 117.599 192 29.400 2534 587.996

Arid Horticulture ha 24 1.2 19.05 5 3.81 8 6.67 5 3.81 5 3.81 1 0.95 24 19.050

Sprinklers & Drip irrigation ha 9 0.8 5.15 2 1.03 3 1.80 2 1.03 2 1.03 0 0.26 9 5.150

Vegetables No. 600 0.005 3.00 120 0.60 210 1.05 120 0.60 120 0.60 30 0.15 600 3.000

Medicinal plants No. 600 0.005 3.00 120 0.60 210 1.05 120 0.60 120 0.60 30 0.15 600 3.000

Vermi compost No. 150 0.1 15.00 30 3.00 53 5.25 30 3.00 30 3.00 8 0.75 150 15.000

Crop Demonstration No. 2300 0.015 34.50 460 6.90 805 12.08 460 6.90 460 6.90 115 1.73 2300 34.500

Micro Enterprise

Dairy No. 0 0 6.80 0 1.36 0 2.38 0 1.36 0 1.36 0 0.34 0 6.800

Poultry No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.000

Animal camp/Breed improovement No. 0 0 9.50 0 1.90 0 3.33 0 1.90 0 1.90 0 0.47 0 9.500

Local Artisans/craft No. 0 0 4.30 0 0.86 0 1.51 0 0.86 0 0.86 0 0.22 0 4.300

Food Processing No. 0 0 4.70 0 0.94 0 1.65 0 0.94 0 0.94 0 0.24 0 4.700

Total (C) 105.00 737 21.000 1289 36.750 737 21.000 737 21.000 184 5.250 3683 105.000

D.Livelihood Activities (9%) 0 0 94.50 0 18.90 0 33.08 0 18.90 0 18.90 0 4.72 0 94.500

Total (D) 94.50 0 18.900 0 33.075 0 18.900 0 18.900 0 4.725 0 94.500

(E) Consolidation 0 0 31.50 0 0.00 0 0.00 0 0.00 0 6.30 0 25.20 0 31.500

Grand Total 1050.00 57.750 65.100 1143 180.599 2269 295.57 1139 178.50 1289 184.80 376 87.67 6217 1049.996

Yearwise % Targets 5.500 6.200 17.200 28.150 17.000 17.600 8.350 100.000

Total Activity Unit Qty.

Unit

Cost

4th yearTotal

cost

1st year 2nd year 3rd yearANNUAL ACTION PLAN-(THROUGH PROJECT FUND)

(C) Production System and micro enterprise(19%)

(A) Preparatory phase activities capacity building trainings & EPA

Production measures for arable land

(B) Natural resource management (56%)

Conservation measures for arable land(private land)

5th year 6th year 7th year

1 3 4 5 6S.

No.

Unit of

measurement

Pre-project

Status

Expected Post-

project Status Remarks

1 Meters 75.00 74.50

2 No. 6 13

3 TDS 2,400 2,350

4 KLPD 50.21 57.45

5 Ha 830.00 1,000.00

6 Description 0.00 0.00

7

Ha 5,820.00 5,820.00

Ha 830.00 1,000.00

Ha 0.00 0.00

8 Ha 5,900.00 5,900.00

9

q/ha 3.55 4.50

q/ha 0.00 0.00

q/ha 0.00 0.00

q/ha 12.50 15.00

10

ton 1,363.20 1,728.00

ton 0.00 0.00

ton 0.00 0.00

ton 637.50 780.00

11 Ha 90.00 152.00

12 Ha 0.00 24.00

13 Ha 90.00 152.00

14 Ha 50.00 205.00

15 Q 91,903.00 95,500.00

16 Litres/day 2,660.00 3,200.00

17 No. 6 115

18 No. 14 38

19 Rs.in lac 0.17 0.28

20 No. 97 35

21 No. 0 12

CHAPTER – VI EXPECTED OUT COMES

2

Item

Status of water table (Depth to Ground water level)

Ground water structures repaired/ rejuvenated

Quality of drinking water

Availability of drinking water

Change in irrigated Area

Change in cropping/ land use pattern

Area under agricultural crop

Area under single crop

Area under double crop

Area under multiple crop

Change in cultivated Area

Yield of major crops of area

Yield of Bajra

Yield of Wheat

Yield of Gram

Milk production

Yield of Mustard

production of major crops of area

Production of Bajra

Production of Wheat

Production of Gram

Production of Mustard

SHGs Active

No. of enterprising individuals

Income

Migration

SHG Federations formed

Area under vegetation

Area under horticulture

Area under fuel

Area under Fodder

Fodder production

No. L B H Qty. Rate Amount

1 Dag belling, 5-10 cm deep LS Mtr 2 100 200 0.40 80.00

2 Jungle clearance, ordinary jungle 82 Sqm 1 100 3.45 345 1.30 448.50

3 Earth work for embankment in dry or

wet in layers of 15 cm, breaking of

clods, picking of grasses, pebbles etc.

& dressing in given profile including

1.5 mtr of lift & 50 mtr of lead, in

hard soil

119(b)

Cum 1 100

(0.45+5.

25)/2 1.2 342 84.00 28728.00

4 Sowing of grass seeds on ridges in 3

layers

114

Mtr 3 100 300 1.00 300.00

5 Supply of grass seeds (Dhaman/

Sewan/Stylo Hamata etc,)

LS

Kg 3 1 3 80.00 240.00

Sub Total 29796.50

Add: Contingencies @ 3% 893.90

Grand Total 30690

306.904Or Rate per mtr = say 310.00/mtr

OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA

Detailed & Abstract of Estimate for Field Bunding

S.

No.Item

Item

Ref.Unit

Details of Measurement

IWMP Estimate 1 1

Length 250 mtr

No. L B H Qty. Rate Amount

1 Dag belling, 5-10 cm deep LS Mtr 2 250 500 0.40 200.00

2 Jungle clearance, ordinary jungle 82 Sqm 1 250 7 1750 1.30 2275.00

3 Earth work for embankment in dry or

wet in layers of 15 cm, breaking of

clods, picking of grasses, pebbles etc.

& dressing in given profile including

1.5 mtr of lift & 50 mtr of lead, in

hard soil

119(b)

Cum 1 250 (1+7)/2 1.5 1500 84.00 126000.00

4 Sowing of grass seeds on ridges in 10

layers

114

Mtr 10 250 2500 1.00 2500.00

5 Supply of grass seeds (Dhaman/

Sewan/Stylo Hamata etc,)

LS

Kg 10 0.5 5 80.00 400.00

6 Pitiching 15-23 cm size hammer

dressed stones with all lifts and leads

including packing of stones in

required profile

124

Cum 1 20 10 0.2 40 910.00 36400.00

Sub Total 167775.00

Add: Contingencies @ 3% 5033.25

Grand Total 172808

Or say Rs. 175000.00

OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA

Detailed & Abstract of Estimate for Earthen Structure

S.

No.Item

Item

Ref.Unit

Details of Measurement

IWMP Estimate 1 2

Length 150 mtr

No. L B H Qty. Rate Amount

1 Dag belling, 5-10 cm deep LS Mtr 2 150 300 0.40 120.00

2 Jungle clearance, ordinary jungle 82 Sqm 1 150 7 1050 1.30 1365.00

3 Earth work for embankment in dry or

wet in layers of 15 cm, breaking of

clods, picking of grasses, pebbles etc.

& dressing in given profile including

1.5 mtr of lift & 50 mtr of lead, in

hard soil

119(b)

Cum 1 150 (1+7)/2 1.5 900 84.00 75600.00

4 Sowing of grass seeds on ridges in 10

layers

114

Mtr 10 150 1500 1.00 1500.00

5 Supply of grass seeds (Dhaman/

Sewan/Stylo Hamata etc,)

LS

Kg 10 0.5 5 80.00 400.00

6 Pitiching 15-23 cm size hammer

dressed stones with all lifts and leads

including packing of stones in

required profile

124

Cum 1 20 10 0.2 40 910.00 36400.00

Sub Total 115385.00

Add: Contingencies @ 3% 3461.55

Grand Total 118847

Or say Rs. 120000.00

OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA

Detailed & Abstract of Estimate for Earthen Structure

S.

No.Item

Item

Ref.Unit

Details of Measurement

IWMP Estimate 1 3

Length 300 mtr

No. L B H Qty. Rate Amount

1 Dag belling, 5-10 cm deep LS Mtr 2 300 600 0.40 240.00

2 Jungle clearance, ordinary jungle 82 Sqm 1 300 7 2100 1.30 2730.00

3 Earth work for embankment in dry or

wet in layers of 15 cm, breaking of

clods, picking of grasses, pebbles etc.

& dressing in given profile including

1.5 mtr of lift & 50 mtr of lead, in

hard soil

119(b)

Cum 1 300 (1+7)/2 1.5 1800 84.00 151200.00

4 Sowing of grass seeds on ridges in 10

layers

114

Mtr 10 300 3000 1.00 3000.00

5 Supply of grass seeds (Dhaman/

Sewan/Stylo Hamata etc,)

LS

Kg 10 0.5 5 80.00 400.00

6 Pitiching 15-23 cm size hammer

dressed stones with all lifts and leads

including packing of stones in

required profile

124

Cum 1 20 10 0.2 40 910.00 36400.00

Sub Total 193970.00

Add: Contingencies @ 3% 5819.10

Grand Total 199789

Or say Rs. 200000.00

OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA

Detailed & Abstract of Estimate for Earthen Structure

S.

No.Item

Item

Ref.Unit

Details of Measurement

IWMP Estimate 1 4

No. L B H Qty. Rate Amount

1 Dag belling, 5-10 cm deep LS Mtr 1 100 100 0.40 40.00

2 Jungle clearance, ordinary jungle 82 Sqm 1 100 3.45 345 1.30 448.50

3 Earth work for excavation in

foundation trenches in dry or moist

soil & back filling of soil in jhiri &

disposal of excavated of soil in

required profile including 1.5 mtr of

lift & 50 mtr of lead, in hard soil

2(b)

Cum ,1/2 100 0.9 0.45 20.25 81.00 1640.25

4 Sowing of grass seeds on ridges in 1

row

114

Mtr 1 100 100 1.00 100.00

5 Supply of grass seeds (Dhaman/

Sewan/Stylo Hamata etc,)

LS

Kg 1 1 1 80.00 80.00

Sub Total 2308.75

Add: Contingencies @ 3% 69.26

Grand Total 2378

Or per mtr. cost is Rs. 23.78 Say Rs. 24.00/mtr.

OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA

Detailed & Abstract of Estimate for V-ditch

S.

No.Item

Item

Ref.Unit

Details of Measurement

IWMP Estimate 1 5

Per ha.

No. L B H Qty. Rate Amount

1 Earth work for excavation in

foundation trenches in dry or moist

soil & back filling of soil in jhiri &

disposal of excavated of soil in

required profile including 1.5 mtr of

lift & 50 mtr of lead, in hard soil

2(b)

V-ditch/Contour Cum 20x1/2 100 0.6 0.3 180 81.00 14580.00

2 Digging of pits for foresty Plants of

the size 45 x 45 x 45 cm in hard soil

112(b)

No. 400 400 7.00 2800.00

3 Plantation of foresty plants in flat

lands

113(b)

No. 400 400 3.00 1200.00

4 Making of balls of grass seeds, FYM,

snad & clay in the ratio of 1:2:2

including beating & screening of

FYM & clay, cleaning of grass seeds

F/3-2

Per 6

Kg 6 60.00 60.00

5 Making of thawala in 50 cm dia in

semi circular pattern, in flat lands

117(b)

No. 400 400 1.70 680.00

6 Sowing of grass seeds on ridges in 1

row

114

Mtr 20 100 2000 1.00 2000.00

7 Watering of plants @ 15 ltr per plant

with available water, 20 watering per

year for 3 years pasture enclosure

3 x 20 x 400

115

No. 24000 24000 2.00 48000.00

8 Supply of potable water for watering

of plants by tractor mounted water

tanker with a lead upto 10 km

LS

Tanker 120 120 500.00 60000.00

9 Hoeing & weeding 15 cm deep & in

45 cm dia in semi circular pattern

twice a year

2 x 3 x 400

116

No. 2400 2400 1.00 2400.00

10 Application of insecticide and

fertilizers to plants excluding cost of

insecticide and fertilizers, twice a year

3 x 2 x 400

F/F-5

No. 2400 2400 0.28 672.00

OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA

Detailed & Abstract of Estimate for Silvi-Pasture Model

S.

No.Item

Item

Ref.Unit

Details of Measurement

IWMP Estimate 1 6

No. L B H Qty. Rate Amount

S.

No.Item

Item

Ref.Unit

Details of Measurement

11 Protection of plants from frost/loo

using grass or other localy availble

materials (by making a Jhonpa of 0.6

mtr dia of plant height and covering

the plant by it)

F/G-5

No. 400 400 3.56 1424.00

12 Supply of FYM/fertilizers &

insecticides

LS

No. 2400 2400 10.00 24000.00

13 Supply of grass seeds (Dhaman/

Sewan/Stylo Hamata etc,)

LS

Kg 6 80.00 480.00

14 Suppy of foresty plant including 20%

gap filling per year & taking into

considration the mortality of plants

during transportation & rehandling &

including of transportation from all

lead & lifts

400 + 80 + 40 + 20 + 50

LS

No. 590 590 10.00 5900.00

15 Provision for watch and ward for 3

years

3 x 12 x 30 man days for 10 ha area

minimum

LS

No. 1080 1080 135.00 14580.00

Sub Total 178776.00

16 Fencing : Provision for barbed wire

fencing with RCC posts as per

enclosed detailed estimate,

considering minimum area of encloser

10 ha. & average length of fencing is

125 mtr./ha.

As per

estimate

Mtr 125 125 1000.00 125000.00

Sub Total 125000.00

Total 303776.00

Add: Contingencies @ 3% 9113.28

Grand Total 312889

Say Rs. 310000.00/ha.

IWMP Estimate 1 7

Per ha.

No. L B H Qty. Rate Amount

1 Surveying of Proposed Area Ha 1 1 182.06 182.06

1 Earth work for excavation in

foundation trenches in dry or moist

soil & back filling of soil in jhiri &

disposal of excavated of soil in

required profile including 1.5 mtr of

lift & 50 mtr of lead, in hard soil

2(b)

V-ditch/Contour furrow at every 25

Mtr interval 4x1/2 100 0.6 0.3 36

Cum 36 81.00 2916.00

2 Digging of pits for foresty Plants of

the size 45 x 45 x 45 cm in hard soil

112(b)

No. 400 400 7.00 2800.00

3 Plantation of foresty plants in flat

lands

113(b)

No. 400 400 3.00 1200.00

4 Making of balls of grass seeds, FYM,

snad & clay in the ratio of 1:2:2

including beating & screening of

FYM & clay, cleaning of grass seeds

F/3-2

Per 6

Kg 6 60.00 60.00

5 Making of thawala in 50 cm dia in

semi circular pattern, in flat lands,

every year upto 3 years

117(b)

No. 1200 1200 1.70 2040.00

6 Sowing of grass seeds on ridges in 1

row

114

Mtr 20 100 2000 1.00 2000.00

7 Watering of plants @ 15 ltr per plant

with available water, 12 watering per

year for 3 years pasture enclosure

3 x 12 x 400

115

No. 14400 14400 2.00 28800.00

8 Supply of potable water for watering

of plants by tractor mounted water

tanker with a lead upto 10 km

LS

Tanker 50 50 500.00 25000.00

9 Hoeing & weeding 15 cm deep & in

45 cm dia in semi circular pattern

twice a year

2 x 3 x 400

116

No. 2400 2400 1.00 2400.00

OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA

Detailed & Abstract of Estimate for Silvi-Pasture Model

S.

No.Item

Item

Ref.Unit

Details of Measurement

IWMP Estimate 1 8

No. L B H Qty. Rate Amount

S.

No.Item

Item

Ref.Unit

Details of Measurement

10 Application of insecticide and

fertilizers to plants excluding cost of

insecticide and fertilizers, twice a year

3 x 2 x 400

F/F-5

No. 2400 2400 0.36 864.00

11 Protection of plants from frost/loo

using grass or other localy availble

materials (by making a Jhonpa of 0.6

mtr dia of plant height and covering

the plant by it)

F/G-5

No. 400 400 3.56 1424.00

12 Supply of FYM/fertilizers &

insecticides

LS

No. 2400 2400 10.00 24000.00

13 Supply of grass seeds (Dhaman/

Sewan/Stylo Hamata etc,)

LS

Kg 6 80.00 480.00

14 Suppy of foresty plant including 20%

gap filling per year & taking into

considration the mortality of plants

during transportation & rehandling &

including of transportation from all

lead & lifts

400 + 80 + 40 + 20 + 50

LS

No. 590 590 10.00 5900.00

15 Provision for watch and ward for 3

years

3 x 12 x 30 man days for 10 ha area

minimum

LS

No. 1080 1080 135.00 14580.00

Sub Total 114464.00

16 Fencing : Provision for barbed wire

fencing with RCC posts as per

enclosed detailed estimate,

considering minimum area of encloser

10 ha. & average length of fencing is

125 mtr./ha.

As per

estimate

Mtr 125 125 320.00 40000.00

Sub Total 40000.00

Total 154464.00

Add: Contingencies @ 3% 4633.92

Grand Total 159098

Say Rs. 160000.00/ha.

IWMP Estimate 1 9

Per 100 mtr

No. L B H Qty. Rate Amount

1 Earth work for excavation in

foundation trenches in dry or moist

soil & back filling of soil in jhiri &

disposal of excavated of soil in

required profile including 1.5 mtr of

lift & 50 mtr of lead, in hard soil. (Pits

for fixing Stone Patti posts, 5 mtr

interval))

2(b)

Cum 20 0.6 0.45 0.6 3.24 81.00 262.44

2 Supply of Stone Patties, 7' long Sqm 20 2.15 0.3 12.9 465.00 5998.50

20 7 1 0.25 35

Cum 0.991 204.00 202.15

4 P& F of Goat proof jali LS Mtr 1 100 100 100.00 10000.00

LS 5 100 500

Kg 82 90.00 7380.00

6 P& F of MS gate as per instruction of

Engineer incharge

LS

Kg 100 100 70.00 7000.00

Sub Total 30843.09

Add: Contingencies @ 3% 925.29

Grand Total 31768

Estimated cost is Rs. 320/mtr

UnitDetails of Measurement

Or say Rs. 32000.00

Carriage of stone patties, Avg. 40 Km

lead. (7'X1'X0.25')

Supply, Drawing & fixing of barbed

wire strands with binding wires and

clips, Barbed wire for fencing

including transportation, 5 Strands

3

5

OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA

Detailed & Abstract of Estimate for Barbed Wire Fencing with Stone Patti Posts

S.

No.Item

Item

Ref.

IWMP Estimate 1 10

Per 100 mtr

No. L B H Qty. Rate Amount

1 Earth work for excavation in

foundation trenches in dry or moist

soil & back filling of soil in jhiri &

disposal of excavated of soil in

required profile including 1.5 mtr of

lift & 50 mtr of lead, in hard soil

2(b)

Cum 53 0.45 0.45 0.6 6.44 81.00 521.60

2 PCC in 1:3:6 (1Cement :3 Course

Sand :6 Graded stone aggregate 20

mm nominal size for fixing of posts

102(b)

Cum 53 0.45 0.45 0.6 6.44 2229.00 14353.65

3 RCC in 1:2:4 for pre-casting of RCC

posts with curing etc.

37(a)

Cum 53 2.1 0.1 0.1 1.113 2960.00 3294.48

4 P&F centering & shuttering 45(a) Sqm 53 2.1 0.4 44.52 100.00 4452.00

5 P & F mild steel bars for

reinforcement, 01.5% of RCC

46

Kg 131.1 59.00 7732.29

6 Transporation of pre-casted RCC

posts

LS

No. 53 53 30.00 1590.00

7 Providing & drawing the barbed wire

through hooks provided in posts and

tightening the same and fixing with

the binding wire in 6 strands with

diagonally double bracing, each 10th

post & corner post to be reinforced

with slanted supports both way

LS

Mtr 100 100 650.00 65000.00

Sub Total 96944.01

Add: Contingencies @ 3% 2908.32

Grand Total 99852

Estimated cost is Rs. 1000/mtr

OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA

Or say Rs. 100000.00

Detailed & Abstract of Estimate for Barbed Wire Fencing with Precasted RCC Posts

S.

No.Item

Item

Ref.Unit

Details of Measurement

IWMP Estimate 1 11

Village: …………………………………….

Khasra No.: …………………………………. 20000 Ltr Capacity (Circular)

No. L B H Qty. Rate Amount

Earth work in excavation and disposal

of earth in given profile including 1.5

mtr of lift & 50 mtr of lead, in hard soil

119(b)

Water Tank 16.83

Inlets 2 1 1 1 2.00

18.83 81.00 1525.10

2 in disintegrated rocks and one aditional

lift

119©

Cum 16.83 139.00 2339.15

PCC in Foundation Providing and

laying cement concrete incduding

curring compection etc.complete in

specified grade excluding the cost of

centering and shuttering - All work up

to plinth level. 1:4:8 (1cement : 4

coarse sand : 8 graded stone aggregate

40 mm nominal size).

11(c)a

Water Tank 2.88

Inlets 2 1 1 0.3 0.60

Cum 3.48 1723.00 5996.04

Cement Concrete flooring in 1:2:4

using crusher broken aggregate of 12

mm size , 50 mm thick, in Bottom of

Tank

58(a)

5.93

at top of the Tanka 9.63

Inlets 2 1 1 2.00

Sqm 17.56 224.00 3933.44

Stone Masonry For Foundation

Random Rubble stone masonry for

foundation and plinth in cement sand

mortar above 30cm thick wall in:

cement mortar 1:6 (1cement : 6sand)

24(a)a

Water Tank 13.05

Inlets 2 2.4 0.3 3.25 4.68

Cum 17.73 1625.00 28811.25

6 P/L stone slab roofing in good quality

slabs including filling of joints in CM

1:4 complete

36

Sqm 9.61 933.00 8966.13

0.5x(∏/4x3.5x3.5x3.5)

1x(∏/4x2.75x2.75)

1x(∏/4x3.5x3.5)

0.5x(∏/4x3.5x3.5x3.5)

1

1x(∏/4x3.5x3.5x0.30)

5

1x∏x3.125x0.38x3.5

∏/4x3.5x3.5

3

4

OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA

Detailed & Abstract of Estimate for Water Tank

S.

No.Item

Item

Ref.Unit

Details of Measurement

IWMP Estimate 1 12

No. L B H Qty. Rate Amount

S.

No.Item

Item

Ref.Unit

Details of Measurement

Plaster in CM (1:4 ), 25 mm thick 67(a)

Inner Wall of Water tank 30.22

Outer walls of water Tank 6.59

Inlets 2 3 0.6 3.60

Sqm 40.41 163.00 6586.83

8 P/F Lid over Opening, Mesh in inlets,

Display boards etc.

LSNo. 1 1.00 2000.00 2000.00

Total 60157.95

Add: Contingencies @ 3% 1804.74

Grand Total 61963

JEn

IWMP …….

AEn

& PIA IWMP ……….

7

Say Rs. 0.62 lac

1x∏x2.75x3.5

1x∏x3.5x0.60

IWMP Estimate 1 13

Village: …………………………………….

Khasra No.: …………………………………. 22000 Ltr Capacity (Rect+Semi Circular)

No. L B H Qty. Rate Amount

Earth work in excavation and disposal

of earth in given profile including 1.5

mtr of lift & 50 mtr of lead, in hard soil

119(b)

Water Tank (Semi circular part) 10.05

Water Tank (Rectangular part) 8.00

Inlets 2 1 1 1 2.00

Cum 20.05 81.00 1623.89

in disintegrated rocks and one aditional

lift

119©

Water Tank (Semi circular part) 10.05

Water Tank (Rectangular part) 8.00

Cum 18.05 139.00 2508.67

PCC in Foundation Providing and

laying cement concrete incduding

curring compection etc.complete in

specified grade excluding the cost of

centering and shuttering - All work up

to plinth level. 1:4:8 (1cement : 4

coarse sand : 8 graded stone aggregate

40 mm nominal size).

11(c)a

Water Tank (Semi circular part) 2.41

Water Tank (Rectangular part) 1.92

Inlets 2 1 1 0.3 0.60

Cum 4.93 1723.00 8497.01

Cement Concrete flooring in 1:2:4

using crusher broken aggregate of 12

mm size , 50 mm thick, in Bottom of

58(a)

At bottom or floor

Water Tank (Semi circular part) 4.71

Water Tank (Rectangular part) 4.90

Inlets 2 1 1 0.3 0.60

at top of the Tanka

Water Tank (Semi circular part) 8.04

Water Tank (Rectangular part) 6.40

Sqm 24.65 224.00 5521.68

1x(2.00x3.2)

2

1x(2.0x3.2x0.30)

1x(∏/4x2.45x2.45)

1x(2.0x2.45)

1x(∏/4x3.2x3.2)

4

0.5x(2.0x3.2x2.5)

Unit

1

0.5x(∏/4x3.2x3.2x2.5)

OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA

Detailed & Abstract of Estimate for Water Tank

S.

No.Item

Item

Ref.

3

Details of Measurement

1x(∏/4x3.2x3.2x0.30)

0.5x(2.0x3.2x2.5)

0.5x(∏/4x3.2x3.2x2.5)

IWMP Estimate 1 14

No. L B H Qty. Rate AmountUnit

S.

No.Item

Item

Ref.

Details of Measurement

Stone Masonry For Foundation

Random Rubble stone masonry for

foundation and plinth in cement sand

mortar above 30cm thick wall in:

cement mortar 1:6 (1cement : 6sand)

24(a)a

Water Tank (Semi circular part) 8.07

Water Tank (Rectangular part) 3.64

Inlets 2 2.4 0.3 3.25 4.68

Cum 16.39 1625.00 26637.25

6 P/L stone slab roofing in good quality

slabs including filling of joints in CM

1:4 complete

36

Water Tank (Semi circular part) 8.04

Water Tank (Rectangular part) 6.40

Patti as lintel 1.92

Sqm 16.36 933.00 15262.39

Plaster in CM (1:4 ), 25 mm thick 67(a)

Inner Wall, semi circular 20.00

Inner Wall, Rectangular 10.40

Outer walls, semi circular 6.03

Outer walls, Rectangular 2.40

Inlets 2 3 0.6 3.60

Sqm 42.43 163.00 6916.19

8 P/F Lid over Opening, Mesh in inlets,

Display boards etc.

LSNo. 1 1.00 1000.00 1000.00

Total 67967.08

Add: Contingencies @ 3% 2039.01

Grand Total 70006

JEn

IWMP …….

7

1x∏x2.45x2.60

2x2.0x2.60

AEn

& PIA IWMP ……….

1x(∏/4x3.2x3.2)

1x(2.0x3.2)

2x3.2x0.30

1x∏x3.2x0.60

2x2.0x0.60

Say Rs. 0.70 lac

5

1x∏x2.825x0.35x2.60

2x2.0x0.35x2.60

IWMP Estimate 1 15

Village: …………………………………….

Khasra No.: …………………………………. 30000 Ltr Capacity (Circular)

No. L B H Qty. Rate Amount

Earth work in excavation and

disposal of earth in given

profile including 1.5 mtr of lift

& 50 mtr of lead, in hard soil

119(b)

Water Tank 23.75

Inlets 2 1 1 1 2.00

Peripheri wall 3.23

Cum 28.98 81.00 2347.56

2 in disintegrated rocks and one

aditional lift, Water Tank

119© Cum 23.75 139.00 3301.24

PCC in Foundation Providing

and laying cement concrete

incduding curring compection

etc.complete in specified grade

excluding the cost of centering

and shuttering - All work up to

plinth level. 1:4:8 (1cement : 4

coarse sand : 8 graded stone

aggregate 40 mm nominal

size).

11(c)a

Water Tank 2.13

Inlets 2 1 1 0.3 0.60

Peripheri wall 4.31

Cum 7.04 1723.00 12123.91

Cement Concrete flooring in

1:2:4 using crusher broken

aggregate of 12 mm size , 50

mm thick, in Bottom of Tank

58(a) 9.62

at top of the Tanka 14.18

Inlets 2 1 1 2.00

Copping over periphery wall 14.37

Sqm 40.16 224.00 8996.02

4 1x(∏/4x3.5x3.5)

1x(∏/4x4.25x4.25)

1x(∏x15.25x0.30)

1

0.5x(∏/4x4.25x4.25x3.35)

0.5x(∏/4x4.25x4.25x3.35)

3

1x(∏/4x15.25x0.6x0.45)

0.5x(∏/4x4.25x4.25x0.30)

1x(∏x15.25x0.6x0.15)

OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA

Detailed & Abstract of Estimate for Water Tank

S.

No.Item

Item

Ref.Unit

Details of Measurement

IWMP Estimate 1 16

No. L B H Qty. Rate Amount

S.

No.Item

Item

Ref.Unit

Details of Measurement

Stone Masonry For Foundation

Random Rubble stone

masonry for foundation and

plinth in cement sand mortar

above 30cm thick wall in:

cement mortar 1:6 (1cement :

6sand)

24(a)a

Water Tank 16.18

Inlets 2 2.4 0.3 3.25 4.68

Peripheri wall, first footing 6.46

Peripheri wall, second footing 14.37

Cum 41.69 1625.00 67750.72

6 P&F Stone lintels in mortar of

masonary, 15 cm thick.

Sqm 1 3 0.3 0.90 679.00 611.10

7 P/L stone slab roofing in good

quality slabs including filling

of joints in CM 1:4 complete

36 Sqm 14.18 933.00 13229.07

Plaster in CM (1:4 ), 25 mm

thick

67(a)

Inner Wall of Water tank 38.47

Outer walls of water Tank 8.01

Inlets 2 3 0.6 3.60

Sqm 50.07 163.00 8161.74

9 Flush or ruled pointing in

CM(1:3) over stone masonary

70 (a) Sqm 95.77 61.00 5841.97

10 Laying, watering and ramming

of available (excavated) quary

rubbish/ murrum for

preparation of catchment

85- 97

(d)

Cum 49.44 239.00 11816.79

11 P/F Lid over Opening, Mesh in

inlets, Display boards etc.

LS No. 1 1.00 2000.00 2000.00

Total 136180.10

Add: Contingencies @ 3% 4085.40

Grand Total 140266

8

1x∏x3.5x3.5

1x∏x4.25x0.60

Say Rs. 1.40 lac

JEn

IWMP …….

AEn

& PIA IWMP ……….

2x(∏x15.25x1.00)

1x(∏x9.675x10.85x0.15)

5

1x∏x3.875x0.38x3.5

∏/4x4.25x4.25

1x(∏x15.25x0.45x0.30)

1x(∏x15.25x0.30x1.00)

IWMP Estimate 1 17

Village: …………………………………….

Khasra No.: …………………………………. 40000 Ltr Capacity (Rect+Semi Circular)

No. L B H Qty. Rate Amount

Earth work in excavation and disposal

of earth in given profile including 1.5

mtr of lift & 50 mtr of lead, in hard soil

119(b)

Water Tank (Semi circular part) 15.39

Water Tank (Rectangular part) 15.40

Inlets 2 1 1 1 2.00

Cum 32.79 81.00 2655.67

in disintegrated rocks and one aditional

lift

119©

Water Tank (Semi circular part) 15.39

Water Tank (Rectangular part) 15.40

Cum 30.79 139.00 4279.25

PCC in Foundation Providing and

laying cement concrete incduding

curring compection etc.complete in

specified grade excluding the cost of

centering and shuttering - All work up

to plinth level. 1:4:8 (1cement : 4

coarse sand : 8 graded stone aggregate

40 mm nominal size).

11(c)a

Water Tank (Semi circular part) 2.88

Water Tank (Rectangular part) 2.89

Inlets 2 1 1 0.3 0.60

Cum 6.37 1723.00 10979.60

Cement Concrete flooring in 1:2:4

using crusher broken aggregate of 12

mm size , 50 mm thick, in Bottom of

58(a)

At bottom or floor

Water Tank (Semi circular part) 4.71

Water Tank (Rectangular part) 7.56

Inlets 2 1 1 0.3 0.60

at top of the Tanka

Water Tank (Semi circular part) 9.62

Water Tank (Rectangular part) 9.63

Sqm 32.12 224.00 7193.92

1x(2.75x3.5)

3

1x(∏/4x3.5x3.5x0.30)

1x(2.75x3.5x0.30)

4

1x(∏/4x2.75x2.75)

1x(2.75x2.75)

1x(∏/4x3.5x3.5)

1

0.5x(∏/4x3.5x3.5x3.2)

0.5x(2.75x3.5x3.2)

2

0.5x(∏/4x3.5x3.5x3.2)

0.5x(2.75x3.5x3.2)

OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA

Detailed & Abstract of Estimate for Water Tank

S.

No.Item

Item

Ref.Unit

Details of Measurement

IWMP Estimate 1 18

No. L B H Qty. Rate Amount

S.

No.Item

Item

Ref.Unit

Details of Measurement

Stone Masonry For Foundation

Random Rubble stone masonry for

foundation and plinth in cement sand

mortar above 30cm thick wall in:

cement mortar 1:6 (1cement : 6sand)

24(a)a

Water Tank (Semi circular part) 11.93

Water Tank (Rectangular part) 6.69

Inlets 2 2.4 0.3 3.25 4.68

Cum 23.30 1625.00 37862.50

6 P&F Stone lintels in mortar of

masonary, 15 cm thick.Sqm 2 3 0.3 1.80 679.00 1222.20

7 P/L stone slab roofing in good quality

slabs including filling of joints in CM

1:4 complete

36

Water Tank (Semi circular part) 8.04

Water Tank (Rectangular part) 8.80

Sqm 16.84 933.00 15710.23

Plaster in CM (1:4 ), 25 mm thick 67(a)

Inner Wall, semi circular 27.63

Inner Wall, Rectangular 17.60

Outer walls, semi circular 6.59

Outer walls, Rectangular 3.30

Inlets 2 3 0.6 3.60

Sqm 58.73 163.00 9572.34

8 P/F Lid over Opening, Mesh in inlets,

Display boards etc.

LSNo. 1 1.00 2000.00 2000.00

Total 91475.71

Add: Contingencies @ 3% 2744.27

Grand Total 94220

Say Rs. 0.94 lac

JEn

IWMP …….

AEn

& PIA IWMP ……….

1x(2.75x3.2)

7

1x∏x2.75x3.20

2x2.75x3.20

1x∏x3.50x0.60

2x2.75x0.60

5

1x∏x3.125x0.38x3.20

2x2.75x0.38x3.20

1x(∏/4x3.2x3.2)

IWMP Estimate 1 19

Hydro Geological Data

1. Area of Catchment, A 485.00 ha

2. Total Length of Run 1850.00 mtr

3. Total Fall/Relief of the Catchment 12.00 mtr

4. 1 Hr. Rainfall for 25 years Frequency 70.00 mm

5. Contour interval of Submergence area in m 0.30 mtr

6. Area of first contour in ha 0.50 ha

second Contour 0.80 ha

third contour 2.75 ha

fourth contour 4.25 ha

fifth contour 6.80 ha

sixth contour 0.00 ha

seventh contour 0.00 ha

7. Height at FTL 1.2 mtr

8. Yield of the Catchment, by Strange's Table

Factor Area Factor Area Factor Area

170 103.57 242.5 77.675 145.5 52.685 97 41527.88

Total expected Yield of Catchment = 4.15

9. Storage Capacity of the Khadin at FTL, by Symphson's formula

V= h/3 [(A1+An)+4(A2+A4+…+An-1)+2(A3+A5+….+An-2)]

V= Storage Volume of Khadin in ha-m

A= Area of the contours, ha

n= Total no. of contours

h= Contour interval, m

Volume V= 3.98 ha-m

By readjusting the height of Crest/ FTL to have app. Capacity, FTL= 1.2 Mtr

10. Top width of the bund= H/5+1.50

.= 1.74

or say 2.00 Mtr

11. Total Length of Bund corresponding to above height 1170.00 Mtr

12. Time of Concentration 45.62 minute

Village: ……………………

Khasra No.: ……………….

Design Khadin

Yield of the Catchment per hectare Area in Cum

Good Catchment Avg. Catchment Bad Catchment

Total

Monsoonal

Rainfall in

mm

Toatal

Yield

Cum

Khadin 1 1

13. Intensity of Rainfall Corresponding to Time of Concentration 90.00 mm/hour

14. Average Runoff Coefficent 0.25

15. Peak Rate of Runoff 30.31 m3/sec.

Hydraulic Design

1. Available Crest Length 40.00 mtr

2. Available impounding depth 1.20 mtr

3. Heigth above Crest to accommodate peak discharge 0.58 mtr

Structural Design

A. Fetch Length according to impounding at HFL 220.00 mtr

B. Free Board provided 0.31

C. Gross heigth of Structure 1.39 Say 2

1. Length of Headwall 40.00

2. Top width of Headwall 0.60

3. Bottom width of Headwall 1.00 Say 1

4. Height of Headwall 0.50

5. Length of Headwall Extention 2.39 Say 2.5

6. Top width of Headwall Extention 0.45

7. Bottom width of Headwall Extention 0.45

8. Height of Headwall Extention 1.39 Say 1.5

9. Length of Sidewall 3.22 Say 3.3

10. Top width of Sidewall 0.60

11. Bottom width of Sidewall 0.60

12. Height of Sidewall at head wall Ext. junction 1.39 Say 1.5

13. Length of Sidewall Extention 1.31 Say 1.5

14. Top width of Sidewall Extention 0.60

15. Bottom width of Sidewall Extention 0.60

16. Height of Sidewall Extention 0.87 Say 0.9

17. Length of Toewall 40.00

18. Width of Toewall 0.45

19. Hieght of Toewall 0.30

20. Width of Apron 3.22 Say 3.3

JEn

IWMP ………

AEn

& PIA IWMP ……….

Khadin 1 2

1.5

2

Chainage

No.

Chain

LengthNSL TBL Height

Bottom

Width

Top

Width

Cross

Section

Avg. Cross

SectionQty.

1 30 227.80 227.90 0.10 2.35 2.00 0.22

2 30 227.50 227.90 0.40 3.40 2.00 1.08 0.65 19.46

3 30 227.40 227.90 0.50 3.75 2.00 1.44 1.26 37.76

4 30 227.30 227.90 0.60 4.10 2.00 1.83 1.63 49.01

5 30 227.30 227.90 0.60 4.10 2.00 1.83 1.83 54.90

6 30 227.20 227.90 0.70 4.45 2.00 2.26 2.04 61.31

7 30 226.80 227.90 1.10 5.85 2.00 4.32 3.29 98.63

8 30 227.00 227.90 0.90 5.15 2.00 3.22 3.77 113.03

9 30 227.00 227.90 0.90 5.15 2.00 3.22 3.22 96.53

10 30 226.90 227.90 1.00 5.50 2.00 3.75 3.48 104.51

11 30 226.70 227.90 1.20 6.20 2.00 4.92 4.34 130.05

12 30 226.70 227.90 1.20 6.20 2.00 4.92 4.92 147.60

13 30 226.80 227.90 1.10 5.85 2.00 4.32 4.62 138.56

14 30 226.75 227.90 1.15 6.03 2.00 4.61 4.47 133.98

15 30 226.85 227.90 1.05 5.68 2.00 4.03 4.32 129.66

16 30 226.80 227.90 1.10 5.85 2.00 4.32 4.17 125.20

17 30 227.05 227.90 0.85 4.97 2.00 2.96 3.64 109.23

18 30 226.00 227.90 1.90 8.65 2.00 10.12 6.54 196.23

19 30 226.30 227.90 1.60 7.60 2.00 7.68 8.90 266.96

20 30 226.30 227.90 1.60 7.60 2.00 7.68 7.68 230.40

21 30 226.40 227.90 1.50 7.25 2.00 6.94 7.31 219.26

22 30 226.40 227.90 1.50 7.25 2.00 6.94 6.94 208.13

23 30 226.50 227.90 1.40 6.90 2.00 6.23 6.58 197.51

Earth work calculation for Earthen Bund of Khadin

Side slope, downstream side =

Side slope, upstream side =

Village: …………………

Khadin 1 3

Chainage

No.

Chain

LengthNSL TBL Height

Bottom

Width

Top

Width

Cross

Section

Avg. Cross

SectionQty.

24 30 226.40 227.90 1.50 7.25 2.00 6.94 6.58 197.51

25 30 226.80 227.90 1.10 5.85 2.00 4.32 5.63 168.83

26 30 226.80 227.90 1.10 5.85 2.00 4.32 4.32 129.52

27 30 226.90 227.90 1.00 5.50 2.00 3.75 4.03 121.01

28 30 226.90 227.90 1.00 5.50 2.00 3.75 3.75 112.50

29 30 227.00 227.90 0.90 5.15 2.00 3.22 3.48 104.51

30 30 227.10 227.90 0.80 4.80 2.00 2.72 2.97 89.06

31 30 227.10 227.90 0.80 4.80 2.00 2.72 2.72 81.60

32 30 227.20 227.90 0.70 4.45 2.00 2.26 2.49 74.66

33 30 227.25 227.90 0.65 4.28 2.00 2.04 2.15 64.45

34 30 227.30 227.90 0.60 4.10 2.00 1.83 1.93 58.04

35 30 227.35 227.90 0.55 3.93 2.00 1.63 1.73 51.89

36 30 227.30 227.90 0.60 4.10 2.00 1.83 1.73 51.89

37 30 227.30 227.90 0.60 4.10 2.00 1.83 1.83 54.90

38 30 227.40 227.90 0.50 3.75 2.00 1.44 1.63 49.01

39 30 227.50 227.90 0.40 3.40 2.00 1.08 1.26 37.76

40 0 0.00 0.00 2.00 2.00 0.00 0.54 0.00

Total 1170 27.55 208.625 4315.07

JEn

IWMP ……..

AEn

& PIA IWMP …………..

Khadin 1 4

No. L B H Qty. Rate Amount

1 Dag belling, 5-10 cm deep LS Mtr 2 1170 2340.00 0.40 936.00

2 Jungle clearance, ordinary jungle 82 Sqm 1 1170 5.35 6258.75 1.30 8136.38

3 Earth work for embankment in dry or

wet in layers of 15 cm, breaking of

clods, picking of grasses, pebbles etc.

& dressing in given profile including

1.5 mtr of lift & 50 mtr of lead, in

hard soil

119(b)

Cum 4315.07 84.00 362465.78

4 Sowing of grass seeds on ridges in 5

lines

114

Mtr 5 1130 5650.00 1.00 5650.00

5 Supply of grass seeds (Dhaman/

Sewan/Stylo Hamata etc,)

LS

Kg 10 1 10.00 80.00 800.00

6 Spreading of quarry rubbish which

have 40% of stone spals or kankar or

Murrum on bund surface including

supply, watering & ramming etc.

complete

85

Sqm 1 1170 1.27 0.1 149.00 279.00 41570.83

7 Dry stone pitching with 15-23 cm

long hammer dressed singel stone

including supply & all lead & lift, on

upstream side of bund

124

Cum 0.75 585 1.58 0.2 138.61 910.00 126133.52

Sub Total A 545692.50

Earth work for excavation in

foundation trenches in dry or moist

soil & back filling of soil in jhiri &

disposal of excavated of soil in

required profile including 1.5 mtr of

lift & 50 mtr of lead, in hard soil

2(b)

Head Wall 1 40 1.3 1 52.00Head Wall Extention 1 2.5 0.75 1 1.88

Side Wall 2 3.3 0.9 1 5.94Side wall extention/ Wing walls 2 1.5 0.9 1 2.70

Apron 1 40 3.3 0.45 59.40Toe wall/ Cut off wall 1 40 0.75 1 30.00

Cum 151.92 81.00 12305.12PCC in Foundation Providing and

laying cement concrete incduding

curring compection etc.complete in

specified grade excluding the cost of

centering and shuttering - All work up

to plinth level. 1:4:8 (1cement : 4

coarse sand : 8 graded stone aggregate

40 mm nominal size).

Less : Deduct for hand broken

aggregates used in place of crusher

broken

11(c)a

Head Wall 1 40 1.3 0.3 15.60Head Wall Extention 1 2.5 0.75 0.3 0.56

Side Wall 2 3.3 0.9 0.3 1.78Side wall extention/ Wing walls 2 1.5 0.9 0.3 0.81

Apron 1 40 3.3 0.3 39.60Toe wall/ Cut off wall 1 40 0.75 0.3 9.00

Cum 67.35 1723.00 116051.80

OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKARA

Detailed & Abstract of Estimate for Khadin

S.

No.Item

Item

Ref.

Waste Weir

Village: ……………………Khasra No.: ……………….

UnitDetails of Measurement

1

2

Earthen Bund

As per Earth

work Calculation chart

Khadin 1 5

No. L B H Qty. Rate Amount

S.

No.Item

Item

Ref.Unit

Details of Measurement

Stone Kharanja in CM (1:8) in soling

stones upto plinth including filling of

jhiri, curing etc

24(b)

Apron 1 40 3.3 0.15 19.80

Cum 19.80 1301.00 25759.80

Stone Masonry For Foundation

Random Rubble stone masonry for

foundation and plinth in cement sand

mortar above 30cm thick wall in:

cement mortar 1:6 (1cement : 6sand)

24(a)a

Head Wall 1 40 1 0.7 28.00

Head Wall Extention 1 2.5 0.45 0.7 0.79

Side Wall 2 3.3 0.9 0.7 4.16

Side wall extention/ Wing walls 2 1.5 0.9 0.7 1.89

Toe wall/ Cut off wall 1 40 0.75 0.7 21.00

Cum 55.84 1625.00 90732.69

Stone Masonry For Super structure in

Random Rubble stone masonry for

foundation and plinth in cement sand

mortar above 30cm thick wall in:

cement mortar 1:6 (1cement : 6sand)

24(a)a

+ 25

Head Wall 1 40 0.8 0.5 16.00

Head Wall Extention 1 2.5 0.45 1.50 1.69

Side Wall 2 3.3 0.6 1.2 4.75

Side wall extention/ Wing walls 2 1.5 0.6 0.9 1.62

Toe wall/ Cut off wall 1 40 0.45 0.3 5.40

Cum 29.46 1759.00 51819.26

Plaster in CM (1:4 ), 25 mm thick 67(a)

Head Wall 1 40 0.5 20.00

Head Wall Extention 2 2.5 1.50 7.50

Side Wall 4 3.3 1.2 15.84

Side wall extention/ Wing walls 4 1.5 0.9 5.40

Toe wall/ Cut off wall 2 40 0.3 24.00

1 40 0.45 18.00

Sqm 90.74 163.00 14790.62

Pointing in CM (1:3) flush or ruled 70(a)

Head Wall 1 40 0.64 25.61

Sqm 25.61 61.00 1562.36

Copping in CM (1:2:4) 50 mm thick 58(a)

Head Wall 1 40 0.6 24.00

Head Wall Extention 1 2.5 0.45 1.13

Side Wall 2 3.3 0.6 3.96

Side wall extention/ Wing walls 2 1.5 0.6 1.80

Sqm 30.89 224.00 6918.24

Sub Total B 319939.89

Total 865632.39

Add: Contingencies @ 3% 25968.97

Grand Total 891601

Say Rs. 8.91 lac

JEn

IWMP ………

AEn

& PIA IWMP ………

8

5

6

7

4

3

Khadin 1 6

Village: …………………………………..

Hydro Geological Data

1. Area of Catchment, A 480.00 ha

2. Total Length of Run 3600.00 mtr

3. Total Fall/Relief of the Catchment 45.00 mtr

4. 1 Hr. Rainfall for 25 years Frequency 70.00 mm

5. Contour interval of Submergence area in m 0.40 mtr

6. Area of first contour in ha 0.70 ha

second Contour 1.25 ha

third contour 2.00 ha

fourth contour 2.90 ha

fifth contour 3.85 ha

sixth contour 0.00 ha

seventh contour 0.00 ha

7. Height at FTL 2 mtr

8. Yield of the Catchment, by Strange's Table

Factor Area Factor Area Factor Area

170 103.57 240 77.675 144 52.685 96 41099.76

Total expected Yield of Catchment = 4.11

9. Storage Capacity of the Khadin at FTL, by Symphson's formula

V= h/3 [(A1+An)+4(A2+A4+…+An-1)+2(A3+A5+….+An-2)]

V= Storage Volume of Khadin in ha-m

A= Area of the contours, ha

n= Total no. of contours

h= Contour interval, m

Volume V= 3.87 ha-m

By readjusting the height of Crest/ FTL to have app. Capacity, FTL= 2 Mtr

10. Top width of the bund= H/5+1.50

.= 1.90

or say 2.00 Mtr

11. Total Length of Bund corresponding to above height 930.00 Mtr

Design Khadin

Yield of the Catchment per hectare Area in Cum

Good Catchment Avg. Catchment Bad Catchment

Total

Monsoonal

Rainfall in

mm

Toatal

Yield

Cum

Khasra No.: ……………………………..

Khadin 2 1

12. Time of Concentration 59.17 minute

13. Intensity of Rainfall Corresponding to Time of Concentration 95.00 mm/hour

14. Average Runoff Coefficent 0.25

15. Peak Rate of Runoff 31.67 m3/sec.

Hydraulic Design

1. Available Crest Length 40.00 mtr

2. Available impounding depth 2.00 mtr

3. Heigth of flood above Crest to accommodate peak discharge 0.60 mtr

Structural Design

A. Fetch Length according to impounding at HFL 300.00 mtr

B. Free Board provided 0.36

C. Gross heigth of Structure at waste weir 1.46 Say 1.5

1. Length of Headwall 40.00

2. Top width of Headwall 0.60

3. Bottom width of Headwall 1.00 Say 1

4. Height of Headwall 0.50

5. Length of Headwall Extention 2.46 Say 2.5

6. Top width of Headwall Extention 0.45

7. Bottom width of Headwall Extention 0.45

8. Height of Headwall Extention 1.46 Say 1.5

9. Length of Sidewall 2.05 Say 2.1

10. Top width of Sidewall 0.60

11. Bottom width of Sidewall 0.60

12. Height of Sidewall at head wall Ext. junction 1.46 Say 1.5

13. Length of Sidewall Extention 1.35 Say 1.5

14. Top width of Sidewall Extention 0.60

15. Bottom width of Sidewall Extention 0.60

16. Height of Sidewall Extention 0.90 Say 1

17. Length of Toewall 40.00

18. Width of Toewall 0.45

19. Hieght of Toewall 0.30

20. Width of Apron 2.05 Say 2.1

JEn

IWMP ……..

AEn

& PIA IWMP ……….

Khadin 2 2

Village: …………………………………

1.5

2

Chainage

No.

Chain

LengthNSL TBL Height

Bottom

Width

Top

Width

Cross

Section

Avg.

Cross

Section

Qty.

1 30 224.20 224.50 0.30 3.05 2.00 0.76

2 30 224.10 224.50 0.40 3.40 2.00 1.08 0.92 27.56

3 30 224.10 224.50 0.40 3.40 2.00 1.08 1.08 32.40

4 30 224.00 224.50 0.50 3.75 2.00 1.44 1.26 37.76

5 30 223.80 224.50 0.70 4.45 2.00 2.26 1.85 55.42

6 30 223.70 224.50 0.80 4.80 2.00 2.72 2.49 74.66

7 30 223.50 224.50 1.00 5.50 2.00 3.75 3.24 97.05

8 30 223.30 224.50 1.20 6.20 2.00 4.92 4.33 130.05

9 30 223.30 224.50 1.20 6.20 2.00 4.92 4.92 147.60

10 30 223.20 224.50 1.30 6.55 2.00 5.56 5.24 157.16

11 30 223.10 224.50 1.40 6.90 2.00 6.23 5.89 176.81

12 30 223.10 224.50 1.40 6.90 2.00 6.23 6.23 186.90

13 30 222.80 224.50 1.70 7.95 2.00 8.46 7.34 220.31

14 30 222.40 224.50 2.10 9.35 2.00 11.92 10.19 305.62

15 30 222.50 224.50 2.00 9.00 2.00 11.00 11.46 343.76

16 30 222.50 224.50 2.00 9.00 2.00 11.00 11.00 330.00

17 30 222.70 224.50 1.80 8.30 2.00 9.27 10.14 304.05

18 30 222.90 224.50 1.60 7.60 2.00 7.68 8.48 254.25

19 30 223.00 224.50 1.50 7.25 2.00 6.94 7.31 219.26

20 30 223.15 224.50 1.35 6.72 2.00 5.89 6.41 192.40

21 30 223.35 224.50 1.15 6.03 2.00 4.61 5.25 157.56

22 30 223.40 224.50 1.10 5.85 2.00 4.32 4.47 133.98

23 30 223.00 224.50 1.50 7.25 2.00 6.94 5.63 168.83

24 30 223.10 224.50 1.40 6.90 2.00 6.23 6.58 197.51

25 30 223.10 224.50 1.40 6.90 2.00 6.23 6.23 186.90

26 30 223.15 224.50 1.35 6.72 2.00 5.89 6.06 181.79

27 30 223.40 224.50 1.10 5.85 2.00 4.32 5.10 153.10

28 30 223.50 224.50 1.00 5.50 2.00 3.75 4.03 121.01

29 30 223.70 224.50 0.80 4.80 2.00 2.72 3.24 97.05

30 30 223.95 224.50 0.55 3.93 2.00 1.63 2.17 65.24

31 30 224.10 224.50 0.40 3.40 2.00 1.08 1.35 40.64

Total 930 25.80 189.4 4796.66

JEn

IWMP ……..

AEn

& PIA IWMP …….

Earth work calculation for Earthen Bund of Khadin

Side slope, downstream side =

Side slope, upstream side =

Khasra No.: ……………………………

Khadin 2 3

Village: ………………………………..

No. L B H Qty. Rate Amount

1 Dag belling, 5-10 cm deep LS Mtr 2 930 1860.00 0.40 744.00

2 Jungle clearance, ordinary jungle 82 Sqm 1 930 6 5580.00 1.30 7254.00

3 Earth work for embankment in dry or

wet in layers of 15 cm, breaking of

clods, picking of grasses, pebbles etc.

& dressing in given profile including

1.5 mtr of lift & 50 mtr of lead, in

hard soil

119(b)

Cum 4796.66 84.00 402919.65

4 Sowing of grass seeds on ridges in 5

lines

114

Mtr 5 890 4450.00 1.00 4450.00

5 Supply of grass seeds (Dhaman/

Sewan/Stylo Hamata etc,)

LS

Kg 10 1 10.00 80.00 800.00

6 Spreading of quarry rubbish which

have 40% of stone spals or kankar or

Murrum on bund surface including

supply, watering & ramming etc.

complete

85

Sqm 1 930 3.50 0.08 260.40 279.00 72651.60

7 Dry stone pitching with 15-23 cm

long hammer dressed singel stone

including supply & all lead & lift, on

upstream side of bund

124

Cum 0.75 232.5 1 0.2 34.88 910.00 31736.25

Sub Total A 520555.50

Earth work for excavation in

foundation trenches in dry or moist

soil & back filling of soil in jhiri &

disposal of excavated of soil in

required profile including 1.5 mtr of

lift & 50 mtr of lead, in hard soil

2(b)

Head Wall 1 40 1.3 1 52.00Head Wall Extention 1 2.5 0.75 1 1.88

Side Wall 2 2.1 0.9 1 3.78Side wall extention/ Wing walls 2 1.5 0.9 0.5 1.35

Apron 1 40 2.1 0.45 37.80Toe wall/ Cut off wall 1 40 0.75 0.5 15.00

Cum 111.81 81.00 9056.21

PCC in Foundation Providing and

laying cement concrete incduding

curring compection etc.complete in

specified grade excluding the cost of

centering and shuttering - All work up

to plinth level. 1:4:8 (1cement : 4

coarse sand : 8 graded stone aggregate

40 mm nominal size).

Less : Deduct for hand broken

aggregates used in place of crusher

broken

11(c)a

Head Wall 1 40 1.3 0.3 15.60Head Wall Extention 1 2.5 0.75 0.3 0.56

Side Wall 2 2.1 0.9 0.3 1.13Side wall extention/ Wing walls 2 1.5 0.9 0.3 0.81

Apron 1 40 2.1 0.3 25.20Toe wall/ Cut off wall 1 40 0.75 0.3 9.00

Cum 52.31 1723.00 90124.10

As per Earth work

Calculation chart

Waste Weir

Khasra No.: …………………………..

1

2

Earthen Bund

UnitDetails of Measurement

OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKARA

Detailed & Abstract of Estimate for Khadin

S.

No.Item

Item

Ref.

Khadin 2 4

No. L B H Qty. Rate AmountUnit

Details of MeasurementS.

No.Item

Item

Ref.

Stone Kharanja in CM (1:8) in soling

stones upto plinth including filling of

jhiri, curing etc

24(b)

Apron 1 40 2.1 0.15 12.60Cum 12.60 1301.00 16392.60

Stone Masonry For Foundation

Random Rubble stone masonry for

foundation and plinth in cement sand

mortar above 30cm thick wall in:

cement mortar 1:6 (1cement : 6sand)

24(a)a

Head Wall 1 40 1 0.7 28.00Head Wall Extention 1 2.5 0.45 0.7 0.79

Side Wall 2 2.1 0.9 0.7 2.65Side wall extention/ Wing walls 2 1.5 0.9 0.2 0.54

Toe wall/ Cut off wall 1 40 0.75 0.2 6.00Cum 37.97 1625.00 61706.94

Stone Masonry For Super structure in

Random Rubble stone masonry for

foundation and plinth in cement sand

mortar above 30cm thick wall in:

cement mortar 1:6 (1cement : 6sand)

24(a)a

+ 25

Head Wall 1 40 0.8 0.5 16.00

Head Wall Extention 1 2.5 0.45 1.50 1.69

Side Wall 2 2.1 0.6 1.25 3.15

Side wall extention/ Wing walls 2 1.5 0.6 1 1.80

Toe wall/ Cut off wall 1 40 0.45 0.3 5.40

Cum 28.04 1759.00 49317.96

Plaster in CM (1:4 ), 25 mm thick 67(a)

Head Wall 1 40 0.5 20.00

Head Wall Extention 2 2.5 1.50 7.50

Side Wall 4 2.1 1.25 10.50

Side wall extention/ Wing walls 4 1.5 1 6.00

Toe wall/ Cut off wall 2 40 0.3 24.00

1 40 0.45 18.00

Sqm 86.00 163.00 14018.00

Pointing in CM (1:3) flush or ruled 70(a)

Head Wall 1 40 0.64 25.61

Sqm 25.61 61.00 1562.36

Copping in CM (1:2:4) 50 mm thick 58(a)

Head Wall 1 40 0.6 24.00

Head Wall Extention 1 2.5 0.45 1.13

Side Wall 2 2.1 0.6 2.52

Side wall extention/ Wing walls 2 1.5 0.6 1.80

Sqm 29.45 224.00 6595.68

Sub Total B 248773.85

Total 769329.35

Add: Contingencies @ 3% 23079.88

Grand Total 792409

7

3

JEn

IWMP ………

AEn

& PIA IWMP ………..

8

5

6

4

Say Rs. 7.90 lac

Khadin 2 5

Village: ……………………………………..

Hydro Geological Data

1. Area of Catchment, A 670.00 ha

2. Total Length of Run 2150.00 mtr

3. Total Fall/Relief of the Catchment 6.50 mtr

4. 1 Hr. Rainfall for 25 years Frequency 70.00 mm

5. Contour interval of Submergence area in m 0.30 mtr

6. Area of first contour in ha 0.80 ha

second Contour 2.55 ha

third contour 3.80 ha

fourth contour 4.85 ha

fifth contour 6.75 ha

sixth contour 0.00 ha

seventh contour 0.00 ha

7. Height at FTL 2 mtr

8. Yield of the Catchment, by Strange's Table

Factor Area Factor Area Factor Area

170 103.57 335 77.675 201 52.685 134 57368.42

Total expected Yield of Catchment = 5.74

9. Storage Capacity of the Khadin at FTL, by Symphson's formula

V= h/3 [(A1+An)+4(A2+A4+…+An-1)+2(A3+A5+….+An-2)]

V= Storage Volume of Khadin in ha-m

A= Area of the contours, ha

n= Total no. of contours

h= Contour interval, m

Volume V= 5.15 ha-m

By readjusting the height of Crest/ FTL to have app. Capacity, FTL= 2 Mtr

10. Top width of the bund= H/5+1.50

.= 1.90

or say 2.00 Mtr

11. Total Length of Bund corresponding to above height 1260.00 Mtr

Khasra No.: ………………………………..

Design Khadin

Yield of the Catchment per hectare Area in Cum

Good Catchment Avg. Catchment Bad Catchment

Total

Monsoonal

Rainfall in

mm

Toatal

Yield

Cum

Khadin 3 1

12. Time of Concentration 68.71 minute

13. Intensity of Rainfall Corresponding to Time of Concentration 85.00 mm/hour

14. Average Runoff Coefficent 0.25

15. Peak Rate of Runoff 39.55 m3/sec.

Hydraulic Design

1. Available Crest Length 50.00 mtr

2. Available impounding depth 2.00 mtr

3. Heigth of flood above Crest to accommodate peak discharge 0.60 mtr

Structural Design

A. Fetch Length according to impounding at HFL 280.00 mtr

B. Free Board provided 0.35

C. Gross heigth of Structure at waste weir 1.25 Say 1.6

1. Length of Headwall 50.00

2. Top width of Headwall 0.60

3. Bottom width of Headwall 0.84 Say 1

4. Height of Headwall 0.30

5. Length of Headwall Extention 2.25 Say 2.3

6. Top width of Headwall Extention 0.45

7. Bottom width of Headwall Extention 0.45

8. Height of Headwall Extention 1.25 Say 1.3

9. Length of Sidewall 1.69 Say 2

10. Top width of Sidewall 0.60

11. Bottom width of Sidewall 0.60

12. Height of Sidewall at head wall Ext. junction 1.25 Say 1.3

13. Length of Sidewall Extention 1.35 Say 1.5

14. Top width of Sidewall Extention 0.60

15. Bottom width of Sidewall Extention 0.60

16. Height of Sidewall Extention 0.90 Say 1.3

17. Length of Toewall 50.00

18. Width of Toewall 0.45

19. Hieght of Toewall 0.30

20. Width of Apron 1.69 Say 1.7

JEn

IWMP ……..

AEn

& PIA IWMP ……..

Khadin 3 2

Village: …………………………………….

1.5

2

Chain

age

No.

Chain

Lengt

h

NSL TBL HeightBottom

Width

Top

Width

Cross

Section

Avg.

Cross

Section

Qty.

1 30 204.00 204.00 0.00 2.00 2.00 0.00 30

2 30 203.50 204.00 0.50 3.75 2.00 1.44 0.72 21.56 60

3 30 203.25 204.00 0.75 4.63 2.00 2.48 1.96 58.83 90

4 30 203.10 204.00 0.90 5.15 2.00 3.22 2.85 85.53 120

5 30 203.00 204.00 1.00 5.50 2.00 3.75 3.48 104.51 150

6 30 202.80 204.00 1.20 6.20 2.00 4.92 4.33 130.05 180

7 30 202.70 204.00 1.30 6.55 2.00 5.56 5.24 157.16 210

8 30 202.90 204.00 1.10 5.85 2.00 4.32 4.94 148.13 240

9 30 203.00 204.00 1.00 5.50 2.00 3.75 4.03 121.01 270

10 30 203.50 204.00 0.50 3.75 2.00 1.44 2.59 77.81 300

11 30 203.10 204.00 0.90 5.15 2.00 3.22 2.33 69.83 330

12 30 203.20 204.00 0.80 4.80 2.00 2.72 2.97 89.06 360

13 30 203.20 204.00 0.80 4.80 2.00 2.72 2.72 81.60 390

14 30 203.00 204.00 1.00 5.50 2.00 3.75 3.24 97.05 420

15 30 202.80 204.00 1.20 6.20 2.00 4.92 4.33 130.05 450

16 30 202.70 204.00 1.30 6.55 2.00 5.56 5.24 157.16 480

17 30 203.00 204.00 1.00 5.50 2.00 3.75 4.65 139.61 510

18 30 203.30 204.00 0.70 4.45 2.00 2.26 3.00 90.11 540

19 30 203.40 204.00 0.60 4.10 2.00 1.83 2.04 61.31 570

20 30 202.90 204.00 1.10 5.85 2.00 4.32 3.07 92.21 600

21 30 202.80 204.00 1.20 6.20 2.00 4.92 4.62 138.56 630

22 30 202.50 204.00 1.50 7.25 2.00 6.94 5.93 177.86 660

23 30 202.60 204.00 1.40 6.90 2.00 6.23 6.58 197.51 690

24 30 202.40 204.00 1.60 7.60 2.00 7.68 6.96 208.65 720

25 30 202.30 204.00 1.70 7.95 2.00 8.46 8.07 242.06 750

26 30 202.00 204.00 2.00 9.00 2.00 11.00 9.73 291.86 780

27 30 202.90 204.00 1.10 5.85 2.00 4.32 7.66 229.76 810

28 30 202.70 204.00 1.30 6.55 2.00 5.56 4.94 148.13 840

29 30 202.60 204.00 1.40 6.90 2.00 6.23 5.89 176.81 870

30 30 203.00 204.00 1.00 5.50 2.00 3.75 4.99 149.70 900

31 30 202.90 204.00 1.10 5.85 2.00 4.32 4.03 121.01 930

32 30 203.10 204.00 0.90 5.15 2.00 3.22 3.77 113.03 960

33 30 203.05 204.00 0.95 5.32 2.00 3.48 3.35 100.45 990

34 30 203.00 204.00 1.00 5.50 2.00 3.75 3.61 108.44 1020

Earth work calculation for Earthen Bund of Khadin

Side slope, downstream side =

Side slope, upstream side =

Khasra No.: …………………………………

Khadin 3 3

Chain

age

No.

Chain

Lengt

h

NSL TBL HeightBottom

Width

Top

Width

Cross

Section

Avg.

Cross

Section

Qty.

35 30 203.10 204.00 0.90 5.15 2.00 3.22 3.48 104.51 1050

36 30 203.20 204.00 0.80 4.80 2.00 2.72 2.97 89.06 1080

37 30 203.35 204.00 0.65 4.28 2.00 2.04 2.38 71.39 1110

38 30 203.20 204.00 0.80 4.80 2.00 2.72 2.38 71.39 1140

39 30 203.10 204.00 0.90 5.15 2.00 3.22 2.97 89.06 1170

40 30 203.50 204.00 0.50 3.75 2.00 1.44 2.33 69.83 1200

41 30 203.40 204.00 0.60 4.10 2.00 1.83 1.63 49.01 1230

42 30 204.00 204.00 0.00 2.00 2.00 0.00 0.91 27.45 1260

Total 1260 31.00 227.33 4888.14

JEn

IWMP

………..

AEn

& PIA IWMP ………….

Khadin 3 4

Village: …………………………….

No. L B H Qty. Rate Amount

1 Dag belling, 5-10 cm deep LS Mtr 2 1260 2520.00 0.40 1008.00

2 Jungle clearance, ordinary jungle 82 Sqm 1 1260 8.419444 10608.50 1.30 13791.05

3 Earth work for embankment in dry or wet in

layers of 15 cm, breaking of clods, picking of

grasses, pebbles etc. & dressing in given

profile including 1.5 mtr of lift & 50 mtr of

lead, in hard soil

119(b)

Cum 4888.14 84.00 410604.08

4 Sowing of grass seeds on ridges in 5 lines 114 Mtr 5 1210 6050.00 1.00 6050.00

5 Supply of grass seeds (Dhaman/ Sewan/Stylo

Hamata etc,)

LS

Kg 10 1 10.00 80.00 800.00

6 Spreading of quarry rubbish which have 40%

of stone spals or kankar or Murrum on bund

surface including supply, watering &

ramming etc. complete

85

Sqm 1 1260 2.07 0.08 208.64 279.00 58210.90

7 Dry stone pitching with 15-23 cm long

hammer dressed singel stone including

supply & all lead & lift, on upstream side of

bund

124

Cum 0.75 315 2.567337 0.2 121.31 910.00 110389.09

Sub Total A 600853.12

Earth work for excavation in foundation

trenches in dry or moist soil & back filling of

soil in jhiri & disposal of excavated of soil in

required profile including 1.5 mtr of lift & 50

mtr of lead, in hard soil

2(b)

Head Wall 1 50 1.14 0.75 42.75

Head Wall Extention 1 2.25 0.75 0.75 1.27

Side Wall 2 2 0.9 0.75 2.70

Side wall extention/ Wing walls 2 1.5 0.9 0.5 1.35

Apron 1 50 2 0.45 45.00

Toe wall/ Cut off wall 1 50 0.75 0.5 18.75

Cum 111.82 81.00 9057.07

PCC in Foundation Providing and laying

cement concrete incduding curring

compection etc.complete in specified grade

excluding the cost of centering and shuttering

- All work up to plinth level. 1:4:8 (1cement :

4 coarse sand : 8 graded stone aggregate 40

mm nominal size).

Less : Deduct for hand broken aggregates

used in place of crusher broken

11(c)a

Head Wall 1 50 1.14 0.3 17.10

Head Wall Extention 1 2.25 0.75 0.3 0.51

Side Wall 2 2 0.9 0.3 1.08

Side wall extention/ Wing walls 2 1.5 0.9 0.3 0.81

Apron 1 50 2 0.3 30.00

Toe wall/ Cut off wall 1 50 0.75 0.3 11.25

Cum 60.75 1723.00 104665.79

Stone Kharanja in CM (1:8) in soling stones

upto plinth including filling of jhiri, curing

etc

24(b)

Apron 1 50 2 0.15 15.00

Item

Ref.Unit

OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI-SANKRA

Detailed & Abstract of Estimate for Khadin

S.

No.Item

Khasra No.: ……………………….

Details of Measurement

Earthen Bund

1

2

As per Earth work Calculation

chart

Waste Weir

3

Khadin 3 5

No. L B H Qty. Rate Amount

Item

Ref.Unit

S.

No.Item

Details of Measurement

Cum 15.00 1301.00 19515.00

Stone Masonry For Foundation Random

Rubble stone masonry for foundation and

plinth in cement sand mortar above 30cm

thick wall in: cement mortar 1:6 (1cement :

6sand)

24(a)a

Head Wall 1 50 0.84 0.45 18.90

Head Wall Extention 1 2.25 0.45 0.45 0.46

Side Wall 2 2 0.9 0.45 1.62

Side wall extention/ Wing walls 2 1.5 0.9 0.2 0.54

Toe wall/ Cut off wall 1 50 0.75 0.2 7.50

Cum 29.02 1625.00 47150.39

Stone Masonry For Super structure in

Random Rubble stone masonry for

foundation and plinth in cement sand mortar

above 30cm thick wall in: cement mortar 1:6

(1cement : 6sand)

24(a)a

+ 25

Head Wall 1 50 0.72 0.3 10.80

Head Wall Extention 1 2.25 0.45 1.30 1.32

Side Wall 2 2 0.6 1.3 3.12

Side wall extention/ Wing walls 2 1.5 0.6 1.3 2.34

Toe wall/ Cut off wall 1 50 0.45 0.3 6.75

Cum 24.33 1759.00 42789.87

Plaster in CM (1:4 ), 25 mm thick 67(a)

Head Wall 1 50 0.3 15.00

Head Wall Extention 2 2.25 1.30 5.85

Side Wall 4 2 1.3 10.40

Side wall extention/ Wing walls 4 1.5 1.3 7.80

Toe wall/ Cut off wall 2 50 0.3 30.00

1 50 0.45 22.50

Sqm 91.55 163.00 14922.65

Pointing in CM (1:3) flush or ruled 70(a)

Head Wall 1 50 0.3842 19.21

Sqm 19.21 61.00 1171.77

Copping in CM (1:2:4) 50 mm thick 58(a)

Head Wall 1 50 0.6 30.00

Head Wall Extention 1 2.25 0.45 1.01

Side Wall 2 2 0.6 2.40

Side wall extention/ Wing walls 2 1.5 0.6 1.80

Sqm 35.21 224.00 7887.60

Sub Total B 247160.14

Total 848013.26

Add: Contingencies @ 3% 25440.40

Grand Total 873454

AEn

& PIA IWMP ………….

Say Rs. 8.75 lac

JEn

IWMP ……….

8

5

4

3

6

7

Khadin 3 6

Village: …………………………….

Hydro Geological Data

1. Area of Catchment, A 460.00 ha

2. Total Length of Run 2450.00 mtr

3. Total Fall/Relief of the Catchment 8.00 mtr

4. 1 Hr. Rainfall for 25 years Frequency 70.00 mm

5. Contour interval of Submergence area in m 0.30 mtr

6. Area of first contour in ha 0.74 ha

second Contour 1.85 ha

third contour 2.70 ha

fourth contour 3.80 ha

fifth contour 5.20 ha

sixth contour 0.00 ha

seventh contour 0.00 ha

7. Height at FTL 2 mtr

8. Yield of the Catchment, by Strange's Table

Factor Area Factor Area Factor Area

170 103.57 230 77.675 138 52.685 92 39387.27

Total expected Yield of Catchment = 3.94

9. Storage Capacity of the Khadin at FTL, by Symphson's formula

V= h/3 [(A1+An)+4(A2+A4+…+An-1)+2(A3+A5+….+An-2)]

V= Storage Volume of Khadin in ha-m

A= Area of the contours, ha

n= Total no. of contours

h= Contour interval, m

Volume V= 3.91 ha-m

By readjusting the height of Crest/ FTL to have app. Capacity, FTL= 2 Mtr

10. Top width of the bund= H/5+1.50

.= 1.90

or say 2.00 Mtr

11. Total Length of Bund corresponding to above height 1230.00 Mtr

12. Time of Concentration 73.76 minute

13. Intensity of Rainfall Corresponding to Time of Concentration 85.00 mm/hour

14. Average Runoff Coefficent 0.25

Khasra No.: …………………………

Design Khadin

Yield of the Catchment per hectare Area in Cum

Good Catchment Avg. Catchment Bad Catchment

Total

Monsoonal

Rainfall in

mm

Toatal

Yield

Cum

Khadin 4 1

15. Peak Rate of Runoff 27.15 m3/sec.

Hydraulic Design

1. Available Crest Length 40.00 mtr

2. Available impounding depth 2.00 mtr

3. Heigth of flood above Crest to accommodate peak discharge 0.54 mtr

Structural Design

A. Fetch Length according to impounding at HFL 280.00 mtr

B. Free Board provided 0.35

C. Gross heigth of Structure at waste weir 1.19 Say 1.2

1. Length of Headwall 40.00

2. Top width of Headwall 0.60

3. Bottom width of Headwall 0.84 Say 1

4. Height of Headwall 0.30

5. Length of Headwall Extention 2.19 Say 2.2

6. Top width of Headwall Extention 0.45

7. Bottom width of Headwall Extention 0.45

8. Height of Headwall Extention 1.19 Say 1.2

9. Length of Sidewall 1.64 Say 1.7

10. Top width of Sidewall 0.60

11. Bottom width of Sidewall 0.60

12. Height of Sidewall at head wall Ext. junction 1.19 Say 1.2

13. Length of Sidewall Extention 1.22 Say 1.5

14. Top width of Sidewall Extention 0.60

15. Bottom width of Sidewall Extention 0.60

16. Height of Sidewall Extention 0.81 Say 1

17. Length of Toewall 40.00

18. Width of Toewall 0.45

19. Hieght of Toewall 0.30

20. Width of Apron 1.64 Say 2.2

JEn

IWMP …….

AEn

& PIA IWMP ………

Khadin 4 2

Village: …………………………………..

1.5

2

Chainage

No.

Chain

LengthNSL TBL Height

Bottom

Width

Top

Width

Cross

Section

Avg.

Cross

Section

Qty.

1 30 212.00 212.00 0.00 2.00 2.00 0.00

2 30 211.50 212.00 0.50 3.75 2.00 1.44 0.72 21.56

3 30 211.35 212.00 0.65 4.28 2.00 2.04 1.74 52.15

4 30 211.30 212.00 0.70 4.45 2.00 2.26 2.15 64.45

5 30 211.25 212.00 0.75 4.63 2.00 2.48 2.37 71.13

6 30 211.20 212.00 0.80 4.80 2.00 2.72 2.60 78.07

7 30 211.30 212.00 0.70 4.45 2.00 2.26 2.49 74.66

8 30 211.30 212.00 0.70 4.45 2.00 2.26 2.26 67.72

9 30 211.30 212.00 0.70 4.45 2.00 2.26 2.26 67.72

10 30 211.20 212.00 0.80 4.80 2.00 2.72 2.49 74.66

11 30 211.20 212.00 0.80 4.80 2.00 2.72 2.72 81.60

12 30 211.15 212.00 0.85 4.97 2.00 2.96 2.84 85.27

13 30 211.15 212.00 0.85 4.97 2.00 2.96 2.96 88.93

14 30 211.10 212.00 0.90 5.15 2.00 3.22 3.09 92.73

15 30 210.90 212.00 1.10 5.85 2.00 4.32 3.77 113.03

16 30 210.80 212.00 1.20 6.20 2.00 4.92 4.62 138.56

17 30 210.75 212.00 1.25 6.38 2.00 5.23 5.08 152.32

18 30 210.70 212.00 1.30 6.55 2.00 5.56 5.40 161.88

19 30 210.70 212.00 1.30 6.55 2.00 5.56 5.56 166.73

20 30 210.70 212.00 1.30 6.55 2.00 5.56 5.56 166.73

21 30 210.50 212.00 1.50 7.25 2.00 6.94 6.25 187.43

22 30 210.20 212.00 1.80 8.30 2.00 9.27 8.10 243.11

23 30 210.10 212.00 1.90 8.65 2.00 10.12 9.69 290.81

24 30 210.00 212.00 2.00 9.00 2.00 11.00 10.56 316.76

25 30 210.00 212.00 2.00 9.00 2.00 11.00 11.00 330.00

26 30 210.20 212.00 1.80 8.30 2.00 9.27 10.14 304.05

27 30 210.30 212.00 1.70 7.95 2.00 8.46 8.86 265.91

28 30 210.25 212.00 1.75 8.13 2.00 8.86 8.66 259.75

29 30 210.30 212.00 1.70 7.95 2.00 8.46 8.66 259.75

30 30 210.40 212.00 1.60 7.60 2.00 7.68 8.07 242.06

31 30 210.10 212.00 1.90 8.65 2.00 10.12 8.90 266.96

32 30 210.40 212.00 1.60 7.60 2.00 7.68 8.90 266.96

33 30 210.35 212.00 1.65 7.78 2.00 8.06 7.87 236.17

34 30 210.30 212.00 1.70 7.95 2.00 8.46 8.26 247.83

35 30 210.20 212.00 1.80 8.30 2.00 9.27 8.86 265.91

36 30 210.50 212.00 1.50 7.25 2.00 6.94 8.10 243.11

Earth work calculation for Earthen Bund of Khadin

Side slope, downstream side =

Side slope, upstream side =

Khasra No.: ……………………………….

Khadin 4 3

Chainage

No.

Chain

LengthNSL TBL Height

Bottom

Width

Top

Width

Cross

Section

Avg.

Cross

Section

Qty.

37 30 210.80 212.00 1.20 6.20 2.00 4.92 5.93 177.86

38 30 211.10 212.00 0.90 5.15 2.00 3.22 4.07 122.06

39 30 211.30 212.00 0.70 4.45 2.00 2.26 2.74 82.12

40 30 211.50 212.00 0.50 3.75 2.00 1.44 1.85 55.42

41 30 212.00 212.00 0.00 2.00 2.00 0.00 0.72 21.56

Total 1230 40.40 251.225 6505.52

JEn

IWMP ………

AEn

& PIA IWMP ………..

Khadin 4 4

Village: …………………………………….

No. L B H Qty. Rate Amount

1 Dag belling, 5-10 cm deep LS Mtr 2 1230 2460.00 0.40 984.00

2 Jungle clearance, ordinary jungle 82 Sqm 1 1230 9.30 11444.69 1.30 14878.10

3 Earth work for embankment in dry or

wet in layers of 15 cm, breaking of

clods, picking of grasses, pebbles etc.

& dressing in given profile including

1.5 mtr of lift & 50 mtr of lead, in hard

soil

119(b)

Cum 6505.52 84.00 546463.58

4 Sowing of grass seeds on ridges in 5 114 Mtr 5 1190 5950.00 1.00 5950.00

5 Supply of grass seeds (Dhaman/

Sewan/Stylo Hamata etc,)

LS

Kg 10 1 10.00 80.00 800.00

6 Spreading of quarry rubbish which

have 40% of stone spals or kankar or

Murrum on bund surface including

supply, watering & ramming etc.

complete

85

Sqm 1 1230 2.70 0.08 265.43 279.00 74055.72

7 Dry stone pitching with 15-23 cm long

hammer dressed singel stone including

supply & all lead & lift, on upstream

side of bund

124

Cum 1 307.5 3.35 0.2 205.77 910.00 187248.83

Sub Total A 830380.22

Earth work for excavation in foundation

trenches in dry or moist soil & back

filling of soil in jhiri & disposal of

excavated of soil in required profile

including 1.5 mtr of lift & 50 mtr of

lead, in hard soil

2(b)

Head Wall 1 40 1.14 0.75 34.20Head Wall Extention 1 2.2 0.75 0.75 1.24

Side Wall 2 1.7 0.9 0.75 2.30Side wall extention/ Wing walls 2 1.5 0.9 0.5 1.35

Apron 1 40 1.7 0.45 30.60Toe wall/ Cut off wall 1 40 0.75 0.5 15.00

Cum 84.68 81.00 6859.28

1

OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKARA

Detailed & Abstract of Estimate for Khadin

S.

No.Item

Item

Ref.

Khasra No.: ………………………………….

As per Earth work

Calculation chart

Waste Weir

UnitDetails of Measurement

Earthen Bund

Khadin 4 5

No. L B H Qty. Rate Amount

S.

No.Item

Item

Ref.Unit

Details of Measurement

PCC in Foundation Providing and

laying cement concrete incduding

curring compection etc.complete in

specified grade excluding the cost of

centering and shuttering - All work up

to plinth level. 1:4:8 (1cement : 4

coarse sand : 8 graded stone aggregate

40 mm nominal size).

Less : Deduct for hand broken

11(c)a

Head Wall 1 40 1.14 0.3 13.68Head Wall Extention 1 2.2 0.75 0.3 0.50

Side Wall 2 1.7 0.9 0.3 0.92Side wall extention/ Wing walls 2 1.5 0.9 0.3 0.81

Apron 1 40 1.7 0.3 20.40Toe wall/ Cut off wall 1 40 0.75 0.3 9.00

Cum 45.30 1723.00 78057.07Stone Kharanja in CM (1:8) in soling

stones upto plinth including filling of

jhiri, curing etc

24(b)

Apron 1 40 1.7 0.15 10.20Cum 10.20 1301.00 13270.20

Stone Masonry For Foundation

Random Rubble stone masonry for

foundation and plinth in cement sand

mortar above 30cm thick wall in:

cement mortar 1:6 (1cement : 6sand)

24(a)a

Head Wall 1 40 0.84 0.45 15.12Head Wall Extention 1 2.2 0.45 0.45 0.45

Side Wall 2 1.7 0.9 0.45 1.38Side wall extention/ Wing walls 2 1.5 0.9 0.2 0.54

Toe wall/ Cut off wall 1 40 0.75 0.2 6.00Cum 23.48 1625.00 38159.06

Stone Masonry For Super structure in

Random Rubble stone masonry for

foundation and plinth in cement sand

mortar above 30cm thick wall in:

cement mortar 1:6 (1cement : 6sand)

24(a)a

+ 25

Head Wall 1 40 0.72 0.3 8.64

Head Wall Extention 1 2.2 0.45 1.20 1.19

Side Wall 2 1.7 0.6 1.1 2.24

Side wall extention/ Wing walls 2 1.5 0.6 1 1.80

Toe wall/ Cut off wall 1 40 0.45 0.3 5.40

Cum 19.27 1759.00 33899.45

5

2

3

4

Khadin 4 6

No. L B H Qty. Rate Amount

S.

No.Item

Item

Ref.Unit

Details of Measurement

Plaster in CM (1:4 ), 25 mm thick 67(a)

Head Wall 1 40 0.3 12.00

Head Wall Extention 2 2.2 1.20 5.28

Side Wall 4 1.7 1.1 7.48

Side wall extention/ Wing walls 4 1.5 1 6.00

Toe wall/ Cut off wall 2 40 0.3 24.00

1 40 0.45 18.00

Sqm 72.76 163.00 11859.88

Pointing in CM (1:3) flush or ruled 70(a)

Head Wall 1 40 0.384 15.37

Sqm 15.37 61.00 937.42

Copping in CM (1:2:4) 50 mm thick 58(a)

Head Wall 1 40 0.6 24.00

Head Wall Extention 1 2.2 0.45 0.99

Side Wall 2 1.7 0.6 2.04

Side wall extention/ Wing walls 2 1.5 0.6 1.80

Sqm 28.83 224.00 6457.92

Sub Total B 189500.28

Total 1019880.50

Add: Contingencies @ 3% 30596.42

Grand Total 1050477

6

Say Rs. 10.50 lac

8

JEn

IWMP …….

AEn

& PIA IWMP ……….

7

Khadin 4 7

Village: ………………………………

Hydro Geological Data

1. Area of Catchment, A 530.00 ha

2. Total Length of Run 1750.00 mtr

3. Total Fall/Relief of the Catchment 8.00 mtr

4. 1 Hr. Rainfall for 25 years Frequency 70.00 mm

5. Contour interval of Submergence area in m 0.30 mtr

6. Area of first contour in ha 0.70 ha

second Contour 1.90 ha

third contour 2.85 ha

fourth contour 4.80 ha

fifth contour 5.90 ha

sixth contour 0.00 ha

seventh contour 0.00 ha

7. Height at FTL 2 mtr

8. Yield of the Catchment, by Strange's Table

Factor Area Factor Area Factor Area

170 103.57 265 77.675 159 52.685 106 45380.99

Total expected Yield of Catchment = 4.54

9. Storage Capacity of the Khadin at FTL, by Symphson's formula

V= h/3 [(A1+An)+4(A2+A4+…+An-1)+2(A3+A5+….+An-2)]

V= Storage Volume of Khadin in ha-m

A= Area of the contours, ha

n= Total no. of contours

h= Contour interval, m

Volume V= 4.50 ha-m

By readjusting the height of Crest/ FTL to have app. Capacity, FTL= 2 Mtr

10. Top width of the bund= H/5+1.50

.= 1.90

or say 2.00 Mtr

11. Total Length of Bund corresponding to above height 1080.00 Mtr

12. Time of Concentration 50.01 minute

Design Khadin

Yield of the Catchment per hectare Area in Cum

Good Catchment Avg. Catchment Bad Catchment

Total

Monsoonal

Rainfall in

mm

Toatal

Yield

Cum

Khasra No.: …………………………

Khadin 5 1

13. Intensity of Rainfall Corresponding to Time of Concentration 85.00 mm/hour

14. Average Runoff Coefficent 0.25

15. Peak Rate of Runoff 31.28 m3/sec.

Hydraulic Design

1. Available Crest Length 40.00 mtr

2. Available impounding depth 2.00 mtr

3. Heigth of flood above Crest to accommodate peak discharge 0.59 mtr

Structural Design

A. Fetch Length according to impounding at HFL 280.00 mtr

B. Free Board provided 0.35

C. Gross heigth of Structure at waste weir 1.25 Say 1.5

1. Length of Headwall 40.00

2. Top width of Headwall 0.60

3. Bottom width of Headwall 0.84 Say 1

4. Height of Headwall 0.30

5. Length of Headwall Extention 2.25 Say 2.3

6. Top width of Headwall Extention 0.45

7. Bottom width of Headwall Extention 0.45

8. Height of Headwall Extention 1.25 Say 1.5

9. Length of Sidewall 1.68 Say 1.7

10. Top width of Sidewall 0.60

11. Bottom width of Sidewall 0.60

12. Height of Sidewall at head wall Ext. junction 1.25 Say 1.5

13. Length of Sidewall Extention 1.34 Say 1.5

14. Top width of Sidewall Extention 0.60

15. Bottom width of Sidewall Extention 0.60

16. Height of Sidewall Extention 0.89 Say 1

17. Length of Toewall 40.00

18. Width of Toewall 0.45

19. Hieght of Toewall 0.30

20. Width of Apron 1.68 Say 1.7

JEn

IWMP ………

AEn

& PIA IWMP ……..

Khadin 5 2

Village: …………………………….

1.5

2

Chain

age

No.

Chain

Lengt

h

NSL TBL HeightBottom

Width

Top

Width

Cross

Section

Avg.

Cross

Section

Qty.

1 30 210.50 210.50 0.00 2.00 2.00 0.00 0.00 0.00

2 30 209.90 210.50 0.60 4.10 2.00 1.83 0.91 27.45

3 30 209.80 210.50 0.70 4.45 2.00 2.26 2.04 61.31

4 30 209.80 210.50 0.70 4.45 2.00 2.26 2.26 67.72

5 30 209.70 210.50 0.80 4.80 2.00 2.72 2.49 74.66

6 30 209.60 210.50 0.90 5.15 2.00 3.22 2.97 89.06

7 30 209.50 210.50 1.00 5.50 2.00 3.75 3.48 104.51

8 30 209.90 210.50 0.60 4.10 2.00 1.83 2.79 83.70

9 30 209.80 210.50 0.70 4.45 2.00 2.26 2.04 61.31

10 30 209.75 210.50 0.75 4.63 2.00 2.48 2.37 71.13

11 30 209.50 210.50 1.00 5.50 2.00 3.75 3.12 93.52

12 30 209.50 210.50 1.00 5.50 2.00 3.75 3.75 112.50

13 30 209.20 210.50 1.30 6.55 2.00 5.56 4.65 139.61

14 30 209.10 210.50 1.40 6.90 2.00 6.23 5.89 176.81

15 30 209.00 210.50 1.50 7.25 2.00 6.94 6.58 197.51

16 30 208.90 210.50 1.60 7.60 2.00 7.68 7.31 219.26

17 30 208.80 210.50 1.70 7.95 2.00 8.46 8.07 242.06

18 30 208.70 210.50 1.80 8.30 2.00 9.27 8.86 265.91

19 30 208.50 210.50 2.00 9.00 2.00 11.00 10.14 304.05

20 30 208.60 210.50 1.90 8.65 2.00 10.12 10.56 316.76

21 30 208.50 210.50 2.00 9.00 2.00 11.00 10.56 316.76

22 30 208.80 210.50 1.70 7.95 2.00 8.46 9.73 291.86

Earth work calculation for Earthen Bund of Khadin

Side slope, downstream side =

Side slope, upstream side =

Khasra No.: ………………………..

Khadin 5 3

Chain

age

No.

Chain

Lengt

h

NSL TBL HeightBottom

Width

Top

Width

Cross

Section

Avg.

Cross

Section

Qty.

23 30 208.75 210.50 1.75 8.13 2.00 8.86 8.66 259.75

24 30 208.80 210.50 1.70 7.95 2.00 8.46 8.66 259.75

25 30 209.00 210.50 1.50 7.25 2.00 6.94 7.70 230.92

26 30 209.20 210.50 1.30 6.55 2.00 5.56 6.25 187.43

27 30 209.25 210.50 1.25 6.38 2.00 5.23 5.40 161.88

28 30 209.30 210.50 1.20 6.20 2.00 4.92 5.08 152.32

29 30 209.40 210.50 1.10 5.85 2.00 4.32 4.62 138.56

30 30 209.50 210.50 1.00 5.50 2.00 3.75 4.03 121.01

31 30 209.60 210.50 0.90 5.15 2.00 3.22 3.48 104.51

32 30 209.65 210.50 0.85 4.97 2.00 2.96 3.09 92.73

33 30 209.90 210.50 0.60 4.10 2.00 1.83 2.40 71.92

34 30 209.90 210.50 0.60 4.10 2.00 1.83 1.83 54.90

35 30 209.90 210.50 0.60 4.10 2.00 1.83 1.83 54.90

36 30 209.90 210.50 0.60 4.10 2.00 1.83 1.83 54.90

Total 1080 35.90 214.1 5262.97

JEn

IWMP

…………….

AEn

& PIA IWMP …………….

Khadin 5 4

Village: …………………………………………

No. L B H Qty. Rate Amount

1 Dag belling, 5-10 cm deep LS Mtr 2 1080 2160.00 0.40 864.00

2 Jungle clearance, ordinary jungle 82 Sqm 1 1080 9.73 10510.36 1.30 13663.47

3 Earth work for embankment in dry or wet

in layers of 15 cm, breaking of clods,

picking of grasses, pebbles etc. & dressing

in given profile including 1.5 mtr of lift &

50 mtr of lead, in hard soil

119(b)

Cum 5262.97 84.00 442089.90

4 Sowing of grass seeds on ridges in 5 lines 114 Mtr 5 1040 5200.00 1.00 5200.00

5 Supply of grass seeds (Dhaman/

Sewan/Stylo Hamata etc,)

LS

Kg 10 1 10.00 80.00 800.00

6 Spreading of quarry rubbish which have

40% of stone spals or kankar or Murrum

on bund surface including supply,

watering & ramming etc. complete

85

Sqm 1 1080 2.94 0.08 254.17 279.00 70913.90

7 Dry stone pitching with 15-23 cm long

hammer dressed singel stone including

supply & all lead & lift, on upstream side

of bund

124

Cum 1 270 3.65 0.2 197.04 910.00 179304.80

Sub Total A 712836.08

Earth work for excavation in foundation

trenches in dry or moist soil & back filling

of soil in jhiri & disposal of excavated of

soil in required profile including 1.5 mtr

of lift & 50 mtr of lead, in hard soil

2(b)

Head Wall 1 40 1.14 0.75 34.20Head Wall Extention 1 2.3 0.75 0.75 1.29

Side Wall 2 1.7 0.9 0.75 2.30Side wall extention/ Wing walls 2 1.5 0.9 0.5 1.35

Apron 1 40 1.7 0.45 30.60Toe wall/ Cut off wall 1 40 0.75 0.5 15.00

Cum 84.74 81.00 6863.84PCC in Foundation Providing and laying

cement concrete incduding curring

compection etc.complete in specified

grade excluding the cost of centering and

shuttering - All work up to plinth level.

1:4:8 (1cement : 4 coarse sand : 8 graded

stone aggregate 40 mm nominal size).

Less : Deduct for hand broken aggregates

used in place of crusher broken

11(c)a

Head Wall 1 40 1.14 0.3 13.68Head Wall Extention 1 2.3 0.75 0.3 0.52

Side Wall 2 1.7 0.9 0.3 0.92Side wall extention/ Wing walls 2 1.5 0.9 0.3 0.81

Apron 1 40 1.7 0.3 20.40Toe wall/ Cut off wall 1 40 0.75 0.3 9.00

Cum 45.33 1723.00 78095.84

Details of Measurement

Earthen Bund

Item

Ref.Unit

1

2

As per Earth work

Calculation chart

Waste Weir

Khasra No.: ………………………………….

OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKARA

Detailed & Abstract of Estimate for Khadin

S.

No.Item

Khadin 5 5

No. L B H Qty. Rate Amount

Details of MeasurementItem

Ref.Unit

S.

No.Item

Stone Kharanja in CM (1:8) in soling

stones upto plinth including filling of jhiri,

curing etc

24(b)

Apron 1 40 1.7 0.15 10.20

Cum 10.20 1301.00 13270.20

Stone Masonry For Foundation Random

Rubble stone masonry for foundation and

plinth in cement sand mortar above 30cm

thick wall in: cement mortar 1:6 (1cement

: 6sand)

24(a)a

Head Wall 1 40 0.84 0.45 15.12

Head Wall Extention 1 2.3 0.45 0.45 0.47

Side Wall 2 1.7 0.9 0.45 1.38

Side wall extention/ Wing walls 2 1.5 0.9 0.2 0.54

Toe wall/ Cut off wall 1 40 0.75 0.2 6.00

Cum 23.50 1625.00 38191.97

Stone Masonry For Super structure in

Random Rubble stone masonry for

foundation and plinth in cement sand

mortar above 30cm thick wall in: cement

mortar 1:6 (1cement : 6sand)

24(a)a

+ 25

Head Wall 1 40 0.72 0.3 8.64

Head Wall Extention 1 2.3 0.45 1.50 1.55

Side Wall 2 1.7 0.6 1.25 2.55

Side wall extention/ Wing walls 2 1.5 0.6 1 1.80

Toe wall/ Cut off wall 1 40 0.45 0.3 5.40

Cum 19.94 1759.00 35078.86

Plaster in CM (1:4 ), 25 mm thick 67(a)

Head Wall 1 40 0.3 12.00

Head Wall Extention 2 2.3 1.50 6.90

Side Wall 4 1.7 1.25 8.50

Side wall extention/ Wing walls 4 1.5 1 6.00

Toe wall/ Cut off wall 2 40 0.3 24.00

1 40 0.45 18.00

Sqm 75.40 163.00 12290.20

Pointing in CM (1:3) flush or ruled 70(a)

Head Wall 1 40 0.38 15.37

Sqm 15.37 61.00 937.42

Copping in CM (1:2:4) 50 mm thick 58(a)

Head Wall 1 40 0.6 24.00

Head Wall Extention 1 2.3 0.45 1.04

Side Wall 2 1.7 0.6 2.04

Side wall extention/ Wing walls 2 1.5 0.6 1.80

Sqm 28.88 224.00 6468.00

Sub Total B 191196.32

Total 904032.40

Add: Contingencies @ 3% 27120.97

Grand Total 931153

JEn

IWMP…………..

AEn

& PIA IWMP …………….

4

3

6

7

Say Rs. 9.40 lac

8

5

Khadin 5 6