SN Section A - Highlights of Power Sector Page

1 Electricity Generation for Aug 2016 (BU) 1

2 Generating Capacity Addition for Aug 2016 (MW) 2

3 List of Projects Commissioned in Aug 2016 3

4 All India Installed Capacity (MW) Region-wise as on 31082016 3

5 All India Installed Capacity (MW) Sector-wise as on 31082016 4

6 Transmission Lines Added during Aug 2016 (Ckms) 5

7 Transformation Capacity Addition during Aug 2016 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Aug 2016 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Aug 2016 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31082016

13 Average cost of Power amp Average Realisation

14 All India per capita consumption of Electricity (KWh)

15 All India Coal consumption for Power Generation (MT)

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Aug 2016 13

3 Installed Capacity in various Regions including their shares 14-19

1 Programme and Achievements of Transmission Lines in Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

1 Programme and Achievements of Sub-Stations in Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

1 Electricity Generation (MU) Targets and Achievements for 2015-16 22

1 Power Supply Position (Provisional) for Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since 2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA upto Aug 2016

1 Rate of sale of power for the year 2013-2014 33-41

Section H - Rate of sale of power for the year 2013-2014

Executive Summary for the Month of Aug 2016

32

11

20

21

31

Section B - Capacity Addition

Section C - Transmission Lines

Section D - Sub Stations

Section E - Electricity Generation

Section F - Power supply position

Contents

Section G - Growth of Power Sector

SN Contents Page

1 Electricity Generation for Aug 2016 (BU) 1

2 Generating Capacity Addition for Aug 2016 (MW) 2

3 List of Projects Commissioned in Aug 2016 3

4 All India Installed Capacity (MW) Region-wise as on 31082016 3

5 All India Installed Capacity (MW) Sector-wise as on 31082016 4

6 Transmission Lines Added during Aug 2016 (Ckms) 5

7 Transformation Capacity Addition during Aug 2016 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Aug 2016 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Aug 2016 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31082016

13 Average cost of Power amp Average Realisation

14 All India per capita consumption of Electricity (KWh)

15 All India Coal consumption for Power Generation (MT)

Section A - Highlights of Power Sector

11

Achievement

Aug-16

Thermal 72929

Hydro 17737

Nuclear 3515

Bhutan Import 1080

All India 95261 015

Type

Thermal

Hydro

Nuclear

Bhutan Import

All India

1

Electricity Generation During April 2015 to Aug 2015 amp April 2016 to Aug 2016 (BU)

17779

3273

Targets

373096 403856

15873

824

79677

Change

wrt 2015

95120

07060992

101204

Apr 15 - Aug 15 Apr 16 - Aug 16

67659

16269

Change

-243

306 -561

63652

569486441460266

3242

-592

2834

1 Electricity Generation for Aug 2016 (BU)

Aug-16Type

Achievement

Aug-15

17548

73515

95120

95261

95000

95050

95100

95150

95200

95250

95300

BU

Aug 15 Aug 16

460266486441

0000

100000

200000

300000

400000

500000

600000

BU

Apr 15 to Aug 15 Apr 16 to Aug 16

Achievement Targets Achievement

Aug-15

Thermal 871 910 3255 NA

Hydro 0 80 80 NA

Nuclear 0 0 0 NA

All India 871 990 4055 NA

Apr 15 - Aug 15 Apr 16 - Aug 16 Change

Thermal 3921 29485 -25

Hydro 730 185 -75

Nuclear 0 0 NA

All India 4651 31335 -33

2

2 Generating Capacity Addition for Aug 2016 (MW)

Generating Capacity Addition during April 15 to Aug 15 amp April 16 to Aug16 (MW)

Change wrt 2015TypeAug-16

871

4055

0

100

200

300

400

500

600

700

800

900

1000

1 Aug15 Aug 16

4651

31335

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

1Apr 15 to Aug 15 Apr 16 to Aug 16

(i) Thermal

Agartala Gas Based PP St-1 255 MW commissioned on 23082016

(ii) Hydro

(iii) Nuclear

NIL

Nuclear Hydro RES Grand Total

Region Coal Gas Diesel Total

Northern 4586450 555626 000 5142076 162000 1831178 878504 8013758

Western 7275301 1120341 000 8395642 184000 744750 1561300 10885691

Southern 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

Eastern 3062287 10000 000 3072287 000 436912 51939 3561138

North-East 31000 172380 3600 206980 000 124200 26372 357552

Islands 000 000 4005 4005 000 000 1110 5115

ALL INDIA 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

Note Captive Genaration is not included in the total 3

Thermal

3 List of Projects Commissioned During Aug 2016

Teesta low dame stage IV U-4 40 MW Commissioned on 11082016

Lower Jurala U-5 40 MW commissioned on 20082016

4 All India Installed Capacity (MW) Region-wise as on 31082016

Nawapara U-1 300 MW commissioned on 14082016

21256890

578000

4296843 4423692

30555425

40726

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 30555425

Sector

Coal Gas Diesel Total

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

All India 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

State 10194593

Private 12729606

Central 7631226

RES

5 All India Installed Capacity (MW) Sector-wise as on 31082016

4

Grand TotalTHERMAL

Nuclear Hydro

State 10194593 33

Private 12729606 42

Central 7631226 25

All India Installed Capacity(MW) as on 31-08-2016 (Sector-Wise)

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

5

9117

0

Apr 15 - Aug 15

1583

4340

3318

9241

4134

0 0

6 Transmission Lines Added during Aug 2016 (Ckms)

2835

1480

3051

669

2455

2148

Transmission Lines Added during Apr 15 to Aug 15 amp Apr 16 to Aug16 (Ckms)

Aug-16

0

Aug-15

0

Apr 16 - Aug 16

0

1190

596

181

1390

0 0

9117

9241

9000

9050

9100

9150

9200

9250

9300

ck

ms

Apr 15 to Aug15 Apr 16 to Aug16

2455

3051

0

500

1000

1500

2000

2500

3000

3500

1

ckm

s

Aug 15 Aug 16

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

1760

1500

7 Transformation Capacity Addition During Aug 2016 (MVA)

4760

0

1500

945

1110

0 1500

3940

8540

0

Aug-15 Aug-16

April 15 to Aug 15 April 16 to Aug 16

3555

0

0

0 1500

All India Transformation Capacity Addition during Apr 15 to Aug 15 amp Apr

16 to Aug 16 (MVA)

27435

0

9000

10835

6100

24480

12000

3555

4760

0500

100015002000250030003500400045005000

MV

A

Transformation Capacity Addition during Aug 2016

Aug 15 Aug16

24480

27435

24000

1

MV

A

Apr 15 to Aug 15 Apr 16 to Aug 16

Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug 16

Northern 32831 31913 31055 31481 -54 -14

Western 27625 27283 27556 27277 -02 00

Southern 24488 26487 23995 26473 -20 -01

Eastern 11187 11230 11132 11221 -05 -01

North Eastern 1297 1461 1221 1421 -59 -28

All India 97428 98374 94959 97873 -25 -05

Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug16

Northern 54474 50917 50230 48541 -78 -47

Western 42024 40122 41781 39903 -06 -05

Southern 37136 41168 35892 40526 -33 -16

Eastern 17363 18334 17149 18219 -12 -06

North Eastern 2437 2435 2283 2387 -63 -20

All India 149492 151719 146124 148347 -23 -22

7

Region

Power (MW)

8 Power Supply Position (Energy amp Peak) in Aug 2016

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region Deficit ()

Deficit ()

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand

Aug 15 0 0 0 0 339 0 0 3943 75

Aug 16 0 0 0 0 359 0 0 924 75

p

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa

Aug 15 128 31 7 124 0 0 37

Aug 16 21 0 0 13 0 0 2

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Aug 15 0 14 564 151 106 1 0

Aug 16 3 14 76 3 6 3 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions

0 0 0 0

35

9

0 0

92

4

75

0 0 0 0

33

9

0 0

39

43

75

0400800

120016002000240028003200360040004400

Ch

and

iga

rh

De

lhi

Ha

rya

na

HP

Jamp

K

Pun

jab

Ra

jasth

an

UP

Utr

akh

an

d

MW

Northern States (MW)Aug 16 Aug 15

21

0 0

13

0 0 2

128

31

7

124

0 0

37

0

20

40

60

80

100

120

140

Cha

ttis

garh

Gu

jara

t

MP

Mahara

shtr

a

Dam

an amp

Diu

Dad

ar

Na

gar

Haveli G

oa

MW

Western States (MW)Aug 16 Aug 15

3 14 7

6

3 6 3 00 14

564

151

106

1

0

1000

AP

Tele

nga

na

Karn

ata

ka

Kera

la

Tam

il N

ad

u

Pud

uch

err

y

La

ksh

yad

ee

p

MW

Southern States (MW) Aug16 Aug 15

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Aug 15 160 30 25 18 42 0 8

Aug 16 0 100 0 0 19 0 8

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Aug 15 1 82 2 0 1 1 1

Aug 16 8 28 0 0 2 1 0

9

0

100

0 0

19

0 8

160

30

25

18

42

0 8

020406080

100120140160180

Bih

ar

DV

C

Jh

ark

ha

nd

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

N I

sla

nd

MW

Eastern States (MW)Aug 16 Aug15

8

28

0 0 2 1 01

82

2 0 1 1 10

102030405060708090

Aru

na

ch

al

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

ga

lan

d

Tri

pu

ra

MW

North-Eastern States (MW) Aug 16 Aug 15

Sector Aug 15 Aug 16

Central 6925 6620

State 4965 4009

Private 5633 5117

ALL INDIA 5810 5203

Month 2015-16 2016-17

April 6205 6783

May 6416 6224June 5943 6087

July 5836 5400

August 5810 5203

September 6363

October 6686

November 6034

December 6175

January 6320

February 6495

March 6389

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Aug 2016

69

25

49

65

56

33

58

10

662

0

400

9

511

7

520

3

00010002000300040005000600070008000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016

+Aug15 Aug16

62

05

64

16

59

43

58

36

58

10

63

63

66

86

60

34

61

75

63

20

64

95

63

89

67

83

62

24

60

87

54

00

52

03

0

20

40

60

80

April

May

Jun

e

July

Augu

st

Septe

mber

Octo

ber

Nove

mb

er

Dece

mb

er

Jan

uary

Febru

ary

Marc

hAll India PLF Month-wise

2015-16 2016-17

2010-11 2011-12 2012-13 2013-15 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumersP Provisional

Total Number of Villages

597464

Pump sets

Energised as on

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

NotIncludin

g Subsidiy

booked

Only

Agriculture

2013-14 400 175

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Provisional

11

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should

be obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the

village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA

is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data

As such each monthly report of Village electrification of CEA is independent of the earlier published

reports

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31072016

Villiages Electrified (Nos) as on 310816

9810589068

Villages electrified

15 All India Coal consumption for Power Generation (MT)

515

14 All India per capita consumption of Electricity ( KWh)

Realization(paiseunit)

20550647

Pump sets Energised as on 31-08-16

cost of supply (paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer mat not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1266360 1932910 5113550 8312820

Hydro 258402 81700 59500 399602

Nuclear 100000 000 000 100000

Total 1624762 2014610 5173050 8812422

Acievement 6206 12972 11048 9953

1 Capacity Addtion Targets and Achievements in the 12th Plan

12

Achievement of Capacity Addition during the Current Plan upto Aug 2016

Achievements upto Aug 2016 during the 12th Plan

723

400

0

108

970

0

53

000

0

831

282

0

39

960

2

10

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 8812422 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 27305 0 255 0 255 255

State 3910 910 0 1820 750 -1070

Pvt 6800 0 300 3650 2173 -1477

Total 134405 910 3255 5470 29485 -25215

Central 490 0 40 0 80 80

State 395 80 40 205 105 -100

Pvt 829 0 0 0 0 0

Total 1714 80 80 205 185 -20

Nuclear Central 1500 0 0 0 0 0

Central 47205 0 655 0 1055 1055

State 4305 990 40 2025 855 -1170

Pvt 7629 0 300 3650 2173 -1477

Total 166545 990 4055 5675 31335 -25415

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Aug 2016

Thermal

2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016

Aug-16 April 16 - Aug 16Schemes Sector

Target

2016-17

91

0

80

0

99

0

32

55

80

0

40

55

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during Aug 2016 Target

Achievement

54

70

20

5

0

56

75

29

49

18

5

0

31

34

0

1000

2000

3000

4000

5000

6000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2016-17 Target

Achievement

Coal Gas Diesel Total

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Sub Total 31000 172380 3600 206980 000 124200 26372 357552

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1110 5115

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30062016 is given below (in MW)

430427 2715140 780534 4423692

1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and

New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)

and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh

14

4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 31082016)

(UTILITIES)

RegionOwnership

Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Northern

Region

Western Region

Southern

Region

Eastern Region

North Eastern

Region

Islands

ALL INDIA

Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

486083 11508

2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016

3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 44550 10800 000 55350 000 000 3987 59337

Central 442137 20761 000 462898 12208 76264 000 551370

Sub-Total 500187 211601 000 711788 12208 76264 3987 804247

State 272000 15000 000 287000 000 88451 5930 381381

Private 216550 000 000 216550 000 000 7489 224039

Central 120203 53529 000 173732 10916 61013 000 245661

Sub-Total 608753 68529 000 677282 10916 149464 13419 851081

State 000 000 000 000 000 45860 25611 71471

Private 000 000 000 000 000 174800 53790 228590

Central 15202 6188 000 21390 3408 128894 000 153692

Sub-Total 15202 6188 000 21390 3408 349554 79401 453753

State 000 17500 000 17500 000 123000 10653 151153

Private 000 000 000 000 000 000 5100 5100

Central 32932 12914 000 45846 7700 104435 000 157981

Sub-Total 32932 30414 000 63346 7700 227435 15753 314234

State 263000 15000 000 278000 000 223023 12780 513803

Private 501400 000 000 501400 000 000 72955 574355

Central 66088 26392 000 92480 20804 92165 000 205449

Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607

State 519000 60380 000 579380 000 98796 2385 680561

Private 319600 000 000 319600 000 000 540135 859735

Central 101472 22123 000 123595 57300 74153 000 255048

Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344

State 592300 000 000 592300 000 52410 2510 647220

Private 634600 000 000 634600 000 000 101850 736450

Central 290995 54997 000 345992 33572 166065 000 545629

Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299

State 000 000 000 000 000 125215 6287 131502

Private 9900 22500 000 32400 000 73000 26361 131761

Central 30050 6935 000 36985 2228 46924 000 86137

Sub-Total 39950 29435 000 69385 2228 245139 32648 349400

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 681 681

Central 3254 1532 000 4786 884 6274 000 11944

Sub-Total 3254 1532 000 4786 884 6274 681 12625

97719 29035 000 126754 12980 70436 000 210170

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

Uttrakhnad

Chandigarh

Central - Unallocated

Total (Northern

Region)

Rajasthan

Punjab

Haryana

Himachal

Pradesh

Jammu amp

Kashmir

Uttar

Pradesh

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

State Ownership

Sector

Modewise breakup

Grand TotalThermal

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Nuclear

Delhi

Hydro

(Renewable)

RES

(MNRE)

15

(As on 31082016)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 000 4800

Central 33860 000 000 33860 2580 000 000 36440

Sub-Total 33860 4800 000 38660 2580 000 005 41245

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 400 400

Central 4338 420 000 4758 738 000 000 5496

Sub-Total 4338 420 000 4758 738 000 400 5896

State 522000 232182 000 754182 000 77200 800 832182

Private 864200 406000 000 1270200 000 000 529272 1799472

Central 288862 42427 000 331289 55932 000 000 387221

Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875

State 408000 000 000 408000 000 170366 8396 586762

Private 538900 000 000 538900 000 000 312007 850907

Central 249005 25718 000 274723 27324 152000 000 454047

Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716

State 328000 000 000 328000 000 12000 1105 341105

Private 1089800 000 000 1089800 000 000 43863 1133663

Central 157454 000 000 157454 4752 000 000 162206

Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974

State 1055000 67200 000 1122200 000 288484 20813 1431497

Private 1179600 56800 000 1236400 000 44700 644639 1925739

Central 371226 262393 000 633619 69014 000 000 702633

Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 5422 2710 000 8132 846 000 000 8978

Sub-Total 5422 2710 000 8132 846 000 000 8978

179635 19691 000 199326 22814 000 000 222140

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

16

Daman amp Diu

Gujarat

Central - Unallocated

Total (Western

Region)

Madhya

Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Goa

State Ownership

Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

Coal Gas Diesel Total

State 308591 23540 000 332131 000 175887 8950 516968

Private 299000 307411 1697 608108 000 000 291171 899279

Central 147330 000 000 147330 12716 000 000 160046

Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294

State 480659 000 000 480659 000 217566 000 698225

Private 27000 157089 1983 186072 000 000 89529 275601

Central 172188 000 000 172188 14862 000 000 187050

Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876

State 422000 000 12792 434792 000 359980 15533 810305

Private 206000 000 10650 216650 000 000 496005 712655

Central 162846 000 000 162846 47586 000 000 210432

Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392

State 000 000 15996 15996 000 188150 13892 218038

Private 000 17400 000 17400 000 000 11655 29055

Central 103869 35958 000 139827 22860 000 000 162687

Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780

State 477000 52408 000 529408 000 218220 12270 759898

Private 295000 50310 41166 386476 000 000 965460 1351936

Central 415510 000 000 415510 98650 000 000 514160

Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10017 000 000 10017 000 000 000 10017

Sub-Total 10017 000 000 10017 000 000 000 10017

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 003 003

Central 24932 000 000 24932 5278 000 000 30210

Sub-Total 24932 3250 000 28182 5278 000 003 33463

152308 000 000 152308 30048 000 000 182356

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

17

Total (Southern

Region)

NLC

Central - Unallocated

Karnataka

Kerala

Tamil Nadu

Thermal

NuclearHydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

State Ownership

Sector

Modewise breakup

Grand Total

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Andhra Pradesh

Telangana

Puducherry

(As on 31082016)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 000 000 000 000 000 000 8852 8852

Central 253124 000 000 253124 000 12943 000 266067

Sub-Total 274124 000 000 274124 000 12943 15922 302989

State 119000 000 000 119000 000 13000 405 132405

Private 90000 000 000 90000 000 000 1619 91619

Central 31493 000 000 31493 000 7093 000 38586

Sub-Total 240493 000 000 240493 000 20093 2024 262610

State 572000 10000 000 582000 000 97700 9195 688895

Private 178138 000 000 178138 000 000 4432 182570

Central 92245 000 000 92245 000 43130 000 135375

Sub-Total 842383 10000 000 852383 000 140830 13627 1006840

State 000 000 000 000 000 000 000 000

Private 105000 000 000 105000 000 000 000 105000

Central 721066 000 000 721066 000 19326 000 740392

Sub-Total 826066 000 000 826066 000 19326 000 845392

State 42000 000 000 42000 000 206192 630 248822

Private 500000 000 000 500000 000 000 14525 514525

Central 168304 000 000 168304 000 10501 000 178805

Sub-Total 710304 000 000 710304 000 216693 15155 942152

State 000 000 000 000 000 000 5211 5211

Private 000 000 000 000 000 19500 000 19500

Central 9210 000 000 9210 000 7527 000 16737

Sub-Total 9210 000 000 9210 000 27027 5211 41448

159707 000 000 159707 000 000 000 159707

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138

18

Central - Unallocated

Total (Eastern

Region)

Jharkhand

West Bengal

DVC

Odisha

Sikkim

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Bihar

(As on 31082016)

Coal Gas Diesel Total

State 6000 27620 000 33620 000 10000 3001 46621

Private 000 2450 000 2450 000 000 410 2860

Central 12700 43560 000 56260 000 32972 000 89232

Sub-Total 18700 73630 000 92330 000 42972 3411 138713

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 027 027

Central 1235 4683 000 5918 000 9757 000 15675

Sub-Total 1235 4683 000 5918 000 9757 10488 26163

State 000 000 000 000 000 28200 3103 31303

Private 000 000 000 000 000 000 000 000

Central 1770 10979 000 12749 000 7458 000 20207

Sub-Total 1770 10979 000 12749 000 35658 3103 51510

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 1870 33896 000 35766 000 6237 000 42003

Sub-Total 1870 50846 000 52716 000 6237 2101 61054

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 000

Central 1570 7161 000 8731 000 8098 000 16829

Sub-Total 1570 7161 3600 12331 000 8098 545 20974

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 1070 4891 000 5961 000 5332 000 11293

Sub-Total 1070 4891 000 5961 000 5332 3067 14360

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 010 010

Central 1035 4054 000 5089 000 3431 000 8520

Sub-Total 1035 4054 000 5089 000 3431 3657 12177

3750 16136 000 19886 000 12715 000 32601

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Grand Total 31000 172380 3600 206980 000 124200 26372 357552

(As on 31082016)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 510 510

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1035 5040

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1110 5115

19

NuclearHydro

(Renewable)

RES

(MNRE)

Modewise breakup

Andaman amp

Nicobar

lakshadweep

Total (Islands)

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

SectorGrand Total

Thermal

Arunachal

Pradesh

Meghalaya

Tripura

Manipur

Nagaland

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

RES

(MNRE)

Assam

Mizoram

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

SN Contents Page

1Programme and Achievements of Transmission Lines in Aug 2016 and during April

2016 to Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

Section C - Transmission Lines

20

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 2: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

SN Section A - Highlights of Power Sector Page

1 Electricity Generation for Aug 2016 (BU) 1

2 Generating Capacity Addition for Aug 2016 (MW) 2

3 List of Projects Commissioned in Aug 2016 3

4 All India Installed Capacity (MW) Region-wise as on 31082016 3

5 All India Installed Capacity (MW) Sector-wise as on 31082016 4

6 Transmission Lines Added during Aug 2016 (Ckms) 5

7 Transformation Capacity Addition during Aug 2016 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Aug 2016 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Aug 2016 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31082016

13 Average cost of Power amp Average Realisation

14 All India per capita consumption of Electricity (KWh)

15 All India Coal consumption for Power Generation (MT)

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Aug 2016 13

3 Installed Capacity in various Regions including their shares 14-19

1 Programme and Achievements of Transmission Lines in Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

1 Programme and Achievements of Sub-Stations in Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

1 Electricity Generation (MU) Targets and Achievements for 2015-16 22

1 Power Supply Position (Provisional) for Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since 2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA upto Aug 2016

1 Rate of sale of power for the year 2013-2014 33-41

Section H - Rate of sale of power for the year 2013-2014

Executive Summary for the Month of Aug 2016

32

11

20

21

31

Section B - Capacity Addition

Section C - Transmission Lines

Section D - Sub Stations

Section E - Electricity Generation

Section F - Power supply position

Contents

Section G - Growth of Power Sector

SN Contents Page

1 Electricity Generation for Aug 2016 (BU) 1

2 Generating Capacity Addition for Aug 2016 (MW) 2

3 List of Projects Commissioned in Aug 2016 3

4 All India Installed Capacity (MW) Region-wise as on 31082016 3

5 All India Installed Capacity (MW) Sector-wise as on 31082016 4

6 Transmission Lines Added during Aug 2016 (Ckms) 5

7 Transformation Capacity Addition during Aug 2016 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Aug 2016 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Aug 2016 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31082016

13 Average cost of Power amp Average Realisation

14 All India per capita consumption of Electricity (KWh)

15 All India Coal consumption for Power Generation (MT)

Section A - Highlights of Power Sector

11

Achievement

Aug-16

Thermal 72929

Hydro 17737

Nuclear 3515

Bhutan Import 1080

All India 95261 015

Type

Thermal

Hydro

Nuclear

Bhutan Import

All India

1

Electricity Generation During April 2015 to Aug 2015 amp April 2016 to Aug 2016 (BU)

17779

3273

Targets

373096 403856

15873

824

79677

Change

wrt 2015

95120

07060992

101204

Apr 15 - Aug 15 Apr 16 - Aug 16

67659

16269

Change

-243

306 -561

63652

569486441460266

3242

-592

2834

1 Electricity Generation for Aug 2016 (BU)

Aug-16Type

Achievement

Aug-15

17548

73515

95120

95261

95000

95050

95100

95150

95200

95250

95300

BU

Aug 15 Aug 16

460266486441

0000

100000

200000

300000

400000

500000

600000

BU

Apr 15 to Aug 15 Apr 16 to Aug 16

Achievement Targets Achievement

Aug-15

Thermal 871 910 3255 NA

Hydro 0 80 80 NA

Nuclear 0 0 0 NA

All India 871 990 4055 NA

Apr 15 - Aug 15 Apr 16 - Aug 16 Change

Thermal 3921 29485 -25

Hydro 730 185 -75

Nuclear 0 0 NA

All India 4651 31335 -33

2

2 Generating Capacity Addition for Aug 2016 (MW)

Generating Capacity Addition during April 15 to Aug 15 amp April 16 to Aug16 (MW)

Change wrt 2015TypeAug-16

871

4055

0

100

200

300

400

500

600

700

800

900

1000

1 Aug15 Aug 16

4651

31335

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

1Apr 15 to Aug 15 Apr 16 to Aug 16

(i) Thermal

Agartala Gas Based PP St-1 255 MW commissioned on 23082016

(ii) Hydro

(iii) Nuclear

NIL

Nuclear Hydro RES Grand Total

Region Coal Gas Diesel Total

Northern 4586450 555626 000 5142076 162000 1831178 878504 8013758

Western 7275301 1120341 000 8395642 184000 744750 1561300 10885691

Southern 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

Eastern 3062287 10000 000 3072287 000 436912 51939 3561138

North-East 31000 172380 3600 206980 000 124200 26372 357552

Islands 000 000 4005 4005 000 000 1110 5115

ALL INDIA 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

Note Captive Genaration is not included in the total 3

Thermal

3 List of Projects Commissioned During Aug 2016

Teesta low dame stage IV U-4 40 MW Commissioned on 11082016

Lower Jurala U-5 40 MW commissioned on 20082016

4 All India Installed Capacity (MW) Region-wise as on 31082016

Nawapara U-1 300 MW commissioned on 14082016

21256890

578000

4296843 4423692

30555425

40726

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 30555425

Sector

Coal Gas Diesel Total

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

All India 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

State 10194593

Private 12729606

Central 7631226

RES

5 All India Installed Capacity (MW) Sector-wise as on 31082016

4

Grand TotalTHERMAL

Nuclear Hydro

State 10194593 33

Private 12729606 42

Central 7631226 25

All India Installed Capacity(MW) as on 31-08-2016 (Sector-Wise)

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

5

9117

0

Apr 15 - Aug 15

1583

4340

3318

9241

4134

0 0

6 Transmission Lines Added during Aug 2016 (Ckms)

2835

1480

3051

669

2455

2148

Transmission Lines Added during Apr 15 to Aug 15 amp Apr 16 to Aug16 (Ckms)

Aug-16

0

Aug-15

0

Apr 16 - Aug 16

0

1190

596

181

1390

0 0

9117

9241

9000

9050

9100

9150

9200

9250

9300

ck

ms

Apr 15 to Aug15 Apr 16 to Aug16

2455

3051

0

500

1000

1500

2000

2500

3000

3500

1

ckm

s

Aug 15 Aug 16

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

1760

1500

7 Transformation Capacity Addition During Aug 2016 (MVA)

4760

0

1500

945

1110

0 1500

3940

8540

0

Aug-15 Aug-16

April 15 to Aug 15 April 16 to Aug 16

3555

0

0

0 1500

All India Transformation Capacity Addition during Apr 15 to Aug 15 amp Apr

16 to Aug 16 (MVA)

27435

0

9000

10835

6100

24480

12000

3555

4760

0500

100015002000250030003500400045005000

MV

A

Transformation Capacity Addition during Aug 2016

Aug 15 Aug16

24480

27435

24000

1

MV

A

Apr 15 to Aug 15 Apr 16 to Aug 16

Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug 16

Northern 32831 31913 31055 31481 -54 -14

Western 27625 27283 27556 27277 -02 00

Southern 24488 26487 23995 26473 -20 -01

Eastern 11187 11230 11132 11221 -05 -01

North Eastern 1297 1461 1221 1421 -59 -28

All India 97428 98374 94959 97873 -25 -05

Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug16

Northern 54474 50917 50230 48541 -78 -47

Western 42024 40122 41781 39903 -06 -05

Southern 37136 41168 35892 40526 -33 -16

Eastern 17363 18334 17149 18219 -12 -06

North Eastern 2437 2435 2283 2387 -63 -20

All India 149492 151719 146124 148347 -23 -22

7

Region

Power (MW)

8 Power Supply Position (Energy amp Peak) in Aug 2016

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region Deficit ()

Deficit ()

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand

Aug 15 0 0 0 0 339 0 0 3943 75

Aug 16 0 0 0 0 359 0 0 924 75

p

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa

Aug 15 128 31 7 124 0 0 37

Aug 16 21 0 0 13 0 0 2

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Aug 15 0 14 564 151 106 1 0

Aug 16 3 14 76 3 6 3 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions

0 0 0 0

35

9

0 0

92

4

75

0 0 0 0

33

9

0 0

39

43

75

0400800

120016002000240028003200360040004400

Ch

and

iga

rh

De

lhi

Ha

rya

na

HP

Jamp

K

Pun

jab

Ra

jasth

an

UP

Utr

akh

an

d

MW

Northern States (MW)Aug 16 Aug 15

21

0 0

13

0 0 2

128

31

7

124

0 0

37

0

20

40

60

80

100

120

140

Cha

ttis

garh

Gu

jara

t

MP

Mahara

shtr

a

Dam

an amp

Diu

Dad

ar

Na

gar

Haveli G

oa

MW

Western States (MW)Aug 16 Aug 15

3 14 7

6

3 6 3 00 14

564

151

106

1

0

1000

AP

Tele

nga

na

Karn

ata

ka

Kera

la

Tam

il N

ad

u

Pud

uch

err

y

La

ksh

yad

ee

p

MW

Southern States (MW) Aug16 Aug 15

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Aug 15 160 30 25 18 42 0 8

Aug 16 0 100 0 0 19 0 8

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Aug 15 1 82 2 0 1 1 1

Aug 16 8 28 0 0 2 1 0

9

0

100

0 0

19

0 8

160

30

25

18

42

0 8

020406080

100120140160180

Bih

ar

DV

C

Jh

ark

ha

nd

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

N I

sla

nd

MW

Eastern States (MW)Aug 16 Aug15

8

28

0 0 2 1 01

82

2 0 1 1 10

102030405060708090

Aru

na

ch

al

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

ga

lan

d

Tri

pu

ra

MW

North-Eastern States (MW) Aug 16 Aug 15

Sector Aug 15 Aug 16

Central 6925 6620

State 4965 4009

Private 5633 5117

ALL INDIA 5810 5203

Month 2015-16 2016-17

April 6205 6783

May 6416 6224June 5943 6087

July 5836 5400

August 5810 5203

September 6363

October 6686

November 6034

December 6175

January 6320

February 6495

March 6389

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Aug 2016

69

25

49

65

56

33

58

10

662

0

400

9

511

7

520

3

00010002000300040005000600070008000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016

+Aug15 Aug16

62

05

64

16

59

43

58

36

58

10

63

63

66

86

60

34

61

75

63

20

64

95

63

89

67

83

62

24

60

87

54

00

52

03

0

20

40

60

80

April

May

Jun

e

July

Augu

st

Septe

mber

Octo

ber

Nove

mb

er

Dece

mb

er

Jan

uary

Febru

ary

Marc

hAll India PLF Month-wise

2015-16 2016-17

2010-11 2011-12 2012-13 2013-15 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumersP Provisional

Total Number of Villages

597464

Pump sets

Energised as on

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

NotIncludin

g Subsidiy

booked

Only

Agriculture

2013-14 400 175

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Provisional

11

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should

be obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the

village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA

is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data

As such each monthly report of Village electrification of CEA is independent of the earlier published

reports

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31072016

Villiages Electrified (Nos) as on 310816

9810589068

Villages electrified

15 All India Coal consumption for Power Generation (MT)

515

14 All India per capita consumption of Electricity ( KWh)

Realization(paiseunit)

20550647

Pump sets Energised as on 31-08-16

cost of supply (paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer mat not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1266360 1932910 5113550 8312820

Hydro 258402 81700 59500 399602

Nuclear 100000 000 000 100000

Total 1624762 2014610 5173050 8812422

Acievement 6206 12972 11048 9953

1 Capacity Addtion Targets and Achievements in the 12th Plan

12

Achievement of Capacity Addition during the Current Plan upto Aug 2016

Achievements upto Aug 2016 during the 12th Plan

723

400

0

108

970

0

53

000

0

831

282

0

39

960

2

10

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 8812422 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 27305 0 255 0 255 255

State 3910 910 0 1820 750 -1070

Pvt 6800 0 300 3650 2173 -1477

Total 134405 910 3255 5470 29485 -25215

Central 490 0 40 0 80 80

State 395 80 40 205 105 -100

Pvt 829 0 0 0 0 0

Total 1714 80 80 205 185 -20

Nuclear Central 1500 0 0 0 0 0

Central 47205 0 655 0 1055 1055

State 4305 990 40 2025 855 -1170

Pvt 7629 0 300 3650 2173 -1477

Total 166545 990 4055 5675 31335 -25415

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Aug 2016

Thermal

2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016

Aug-16 April 16 - Aug 16Schemes Sector

Target

2016-17

91

0

80

0

99

0

32

55

80

0

40

55

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during Aug 2016 Target

Achievement

54

70

20

5

0

56

75

29

49

18

5

0

31

34

0

1000

2000

3000

4000

5000

6000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2016-17 Target

Achievement

Coal Gas Diesel Total

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Sub Total 31000 172380 3600 206980 000 124200 26372 357552

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1110 5115

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30062016 is given below (in MW)

430427 2715140 780534 4423692

1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and

New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)

and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh

14

4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 31082016)

(UTILITIES)

RegionOwnership

Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Northern

Region

Western Region

Southern

Region

Eastern Region

North Eastern

Region

Islands

ALL INDIA

Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

486083 11508

2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016

3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 44550 10800 000 55350 000 000 3987 59337

Central 442137 20761 000 462898 12208 76264 000 551370

Sub-Total 500187 211601 000 711788 12208 76264 3987 804247

State 272000 15000 000 287000 000 88451 5930 381381

Private 216550 000 000 216550 000 000 7489 224039

Central 120203 53529 000 173732 10916 61013 000 245661

Sub-Total 608753 68529 000 677282 10916 149464 13419 851081

State 000 000 000 000 000 45860 25611 71471

Private 000 000 000 000 000 174800 53790 228590

Central 15202 6188 000 21390 3408 128894 000 153692

Sub-Total 15202 6188 000 21390 3408 349554 79401 453753

State 000 17500 000 17500 000 123000 10653 151153

Private 000 000 000 000 000 000 5100 5100

Central 32932 12914 000 45846 7700 104435 000 157981

Sub-Total 32932 30414 000 63346 7700 227435 15753 314234

State 263000 15000 000 278000 000 223023 12780 513803

Private 501400 000 000 501400 000 000 72955 574355

Central 66088 26392 000 92480 20804 92165 000 205449

Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607

State 519000 60380 000 579380 000 98796 2385 680561

Private 319600 000 000 319600 000 000 540135 859735

Central 101472 22123 000 123595 57300 74153 000 255048

Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344

State 592300 000 000 592300 000 52410 2510 647220

Private 634600 000 000 634600 000 000 101850 736450

Central 290995 54997 000 345992 33572 166065 000 545629

Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299

State 000 000 000 000 000 125215 6287 131502

Private 9900 22500 000 32400 000 73000 26361 131761

Central 30050 6935 000 36985 2228 46924 000 86137

Sub-Total 39950 29435 000 69385 2228 245139 32648 349400

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 681 681

Central 3254 1532 000 4786 884 6274 000 11944

Sub-Total 3254 1532 000 4786 884 6274 681 12625

97719 29035 000 126754 12980 70436 000 210170

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

Uttrakhnad

Chandigarh

Central - Unallocated

Total (Northern

Region)

Rajasthan

Punjab

Haryana

Himachal

Pradesh

Jammu amp

Kashmir

Uttar

Pradesh

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

State Ownership

Sector

Modewise breakup

Grand TotalThermal

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Nuclear

Delhi

Hydro

(Renewable)

RES

(MNRE)

15

(As on 31082016)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 000 4800

Central 33860 000 000 33860 2580 000 000 36440

Sub-Total 33860 4800 000 38660 2580 000 005 41245

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 400 400

Central 4338 420 000 4758 738 000 000 5496

Sub-Total 4338 420 000 4758 738 000 400 5896

State 522000 232182 000 754182 000 77200 800 832182

Private 864200 406000 000 1270200 000 000 529272 1799472

Central 288862 42427 000 331289 55932 000 000 387221

Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875

State 408000 000 000 408000 000 170366 8396 586762

Private 538900 000 000 538900 000 000 312007 850907

Central 249005 25718 000 274723 27324 152000 000 454047

Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716

State 328000 000 000 328000 000 12000 1105 341105

Private 1089800 000 000 1089800 000 000 43863 1133663

Central 157454 000 000 157454 4752 000 000 162206

Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974

State 1055000 67200 000 1122200 000 288484 20813 1431497

Private 1179600 56800 000 1236400 000 44700 644639 1925739

Central 371226 262393 000 633619 69014 000 000 702633

Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 5422 2710 000 8132 846 000 000 8978

Sub-Total 5422 2710 000 8132 846 000 000 8978

179635 19691 000 199326 22814 000 000 222140

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

16

Daman amp Diu

Gujarat

Central - Unallocated

Total (Western

Region)

Madhya

Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Goa

State Ownership

Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

Coal Gas Diesel Total

State 308591 23540 000 332131 000 175887 8950 516968

Private 299000 307411 1697 608108 000 000 291171 899279

Central 147330 000 000 147330 12716 000 000 160046

Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294

State 480659 000 000 480659 000 217566 000 698225

Private 27000 157089 1983 186072 000 000 89529 275601

Central 172188 000 000 172188 14862 000 000 187050

Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876

State 422000 000 12792 434792 000 359980 15533 810305

Private 206000 000 10650 216650 000 000 496005 712655

Central 162846 000 000 162846 47586 000 000 210432

Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392

State 000 000 15996 15996 000 188150 13892 218038

Private 000 17400 000 17400 000 000 11655 29055

Central 103869 35958 000 139827 22860 000 000 162687

Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780

State 477000 52408 000 529408 000 218220 12270 759898

Private 295000 50310 41166 386476 000 000 965460 1351936

Central 415510 000 000 415510 98650 000 000 514160

Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10017 000 000 10017 000 000 000 10017

Sub-Total 10017 000 000 10017 000 000 000 10017

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 003 003

Central 24932 000 000 24932 5278 000 000 30210

Sub-Total 24932 3250 000 28182 5278 000 003 33463

152308 000 000 152308 30048 000 000 182356

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

17

Total (Southern

Region)

NLC

Central - Unallocated

Karnataka

Kerala

Tamil Nadu

Thermal

NuclearHydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

State Ownership

Sector

Modewise breakup

Grand Total

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Andhra Pradesh

Telangana

Puducherry

(As on 31082016)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 000 000 000 000 000 000 8852 8852

Central 253124 000 000 253124 000 12943 000 266067

Sub-Total 274124 000 000 274124 000 12943 15922 302989

State 119000 000 000 119000 000 13000 405 132405

Private 90000 000 000 90000 000 000 1619 91619

Central 31493 000 000 31493 000 7093 000 38586

Sub-Total 240493 000 000 240493 000 20093 2024 262610

State 572000 10000 000 582000 000 97700 9195 688895

Private 178138 000 000 178138 000 000 4432 182570

Central 92245 000 000 92245 000 43130 000 135375

Sub-Total 842383 10000 000 852383 000 140830 13627 1006840

State 000 000 000 000 000 000 000 000

Private 105000 000 000 105000 000 000 000 105000

Central 721066 000 000 721066 000 19326 000 740392

Sub-Total 826066 000 000 826066 000 19326 000 845392

State 42000 000 000 42000 000 206192 630 248822

Private 500000 000 000 500000 000 000 14525 514525

Central 168304 000 000 168304 000 10501 000 178805

Sub-Total 710304 000 000 710304 000 216693 15155 942152

State 000 000 000 000 000 000 5211 5211

Private 000 000 000 000 000 19500 000 19500

Central 9210 000 000 9210 000 7527 000 16737

Sub-Total 9210 000 000 9210 000 27027 5211 41448

159707 000 000 159707 000 000 000 159707

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138

18

Central - Unallocated

Total (Eastern

Region)

Jharkhand

West Bengal

DVC

Odisha

Sikkim

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Bihar

(As on 31082016)

Coal Gas Diesel Total

State 6000 27620 000 33620 000 10000 3001 46621

Private 000 2450 000 2450 000 000 410 2860

Central 12700 43560 000 56260 000 32972 000 89232

Sub-Total 18700 73630 000 92330 000 42972 3411 138713

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 027 027

Central 1235 4683 000 5918 000 9757 000 15675

Sub-Total 1235 4683 000 5918 000 9757 10488 26163

State 000 000 000 000 000 28200 3103 31303

Private 000 000 000 000 000 000 000 000

Central 1770 10979 000 12749 000 7458 000 20207

Sub-Total 1770 10979 000 12749 000 35658 3103 51510

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 1870 33896 000 35766 000 6237 000 42003

Sub-Total 1870 50846 000 52716 000 6237 2101 61054

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 000

Central 1570 7161 000 8731 000 8098 000 16829

Sub-Total 1570 7161 3600 12331 000 8098 545 20974

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 1070 4891 000 5961 000 5332 000 11293

Sub-Total 1070 4891 000 5961 000 5332 3067 14360

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 010 010

Central 1035 4054 000 5089 000 3431 000 8520

Sub-Total 1035 4054 000 5089 000 3431 3657 12177

3750 16136 000 19886 000 12715 000 32601

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Grand Total 31000 172380 3600 206980 000 124200 26372 357552

(As on 31082016)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 510 510

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1035 5040

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1110 5115

19

NuclearHydro

(Renewable)

RES

(MNRE)

Modewise breakup

Andaman amp

Nicobar

lakshadweep

Total (Islands)

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

SectorGrand Total

Thermal

Arunachal

Pradesh

Meghalaya

Tripura

Manipur

Nagaland

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

RES

(MNRE)

Assam

Mizoram

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

SN Contents Page

1Programme and Achievements of Transmission Lines in Aug 2016 and during April

2016 to Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

Section C - Transmission Lines

20

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 3: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

SN Contents Page

1 Electricity Generation for Aug 2016 (BU) 1

2 Generating Capacity Addition for Aug 2016 (MW) 2

3 List of Projects Commissioned in Aug 2016 3

4 All India Installed Capacity (MW) Region-wise as on 31082016 3

5 All India Installed Capacity (MW) Sector-wise as on 31082016 4

6 Transmission Lines Added during Aug 2016 (Ckms) 5

7 Transformation Capacity Addition during Aug 2016 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Aug 2016 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Aug 2016 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31082016

13 Average cost of Power amp Average Realisation

14 All India per capita consumption of Electricity (KWh)

15 All India Coal consumption for Power Generation (MT)

Section A - Highlights of Power Sector

11

Achievement

Aug-16

Thermal 72929

Hydro 17737

Nuclear 3515

Bhutan Import 1080

All India 95261 015

Type

Thermal

Hydro

Nuclear

Bhutan Import

All India

1

Electricity Generation During April 2015 to Aug 2015 amp April 2016 to Aug 2016 (BU)

17779

3273

Targets

373096 403856

15873

824

79677

Change

wrt 2015

95120

07060992

101204

Apr 15 - Aug 15 Apr 16 - Aug 16

67659

16269

Change

-243

306 -561

63652

569486441460266

3242

-592

2834

1 Electricity Generation for Aug 2016 (BU)

Aug-16Type

Achievement

Aug-15

17548

73515

95120

95261

95000

95050

95100

95150

95200

95250

95300

BU

Aug 15 Aug 16

460266486441

0000

100000

200000

300000

400000

500000

600000

BU

Apr 15 to Aug 15 Apr 16 to Aug 16

Achievement Targets Achievement

Aug-15

Thermal 871 910 3255 NA

Hydro 0 80 80 NA

Nuclear 0 0 0 NA

All India 871 990 4055 NA

Apr 15 - Aug 15 Apr 16 - Aug 16 Change

Thermal 3921 29485 -25

Hydro 730 185 -75

Nuclear 0 0 NA

All India 4651 31335 -33

2

2 Generating Capacity Addition for Aug 2016 (MW)

Generating Capacity Addition during April 15 to Aug 15 amp April 16 to Aug16 (MW)

Change wrt 2015TypeAug-16

871

4055

0

100

200

300

400

500

600

700

800

900

1000

1 Aug15 Aug 16

4651

31335

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

1Apr 15 to Aug 15 Apr 16 to Aug 16

(i) Thermal

Agartala Gas Based PP St-1 255 MW commissioned on 23082016

(ii) Hydro

(iii) Nuclear

NIL

Nuclear Hydro RES Grand Total

Region Coal Gas Diesel Total

Northern 4586450 555626 000 5142076 162000 1831178 878504 8013758

Western 7275301 1120341 000 8395642 184000 744750 1561300 10885691

Southern 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

Eastern 3062287 10000 000 3072287 000 436912 51939 3561138

North-East 31000 172380 3600 206980 000 124200 26372 357552

Islands 000 000 4005 4005 000 000 1110 5115

ALL INDIA 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

Note Captive Genaration is not included in the total 3

Thermal

3 List of Projects Commissioned During Aug 2016

Teesta low dame stage IV U-4 40 MW Commissioned on 11082016

Lower Jurala U-5 40 MW commissioned on 20082016

4 All India Installed Capacity (MW) Region-wise as on 31082016

Nawapara U-1 300 MW commissioned on 14082016

21256890

578000

4296843 4423692

30555425

40726

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 30555425

Sector

Coal Gas Diesel Total

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

All India 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

State 10194593

Private 12729606

Central 7631226

RES

5 All India Installed Capacity (MW) Sector-wise as on 31082016

4

Grand TotalTHERMAL

Nuclear Hydro

State 10194593 33

Private 12729606 42

Central 7631226 25

All India Installed Capacity(MW) as on 31-08-2016 (Sector-Wise)

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

5

9117

0

Apr 15 - Aug 15

1583

4340

3318

9241

4134

0 0

6 Transmission Lines Added during Aug 2016 (Ckms)

2835

1480

3051

669

2455

2148

Transmission Lines Added during Apr 15 to Aug 15 amp Apr 16 to Aug16 (Ckms)

Aug-16

0

Aug-15

0

Apr 16 - Aug 16

0

1190

596

181

1390

0 0

9117

9241

9000

9050

9100

9150

9200

9250

9300

ck

ms

Apr 15 to Aug15 Apr 16 to Aug16

2455

3051

0

500

1000

1500

2000

2500

3000

3500

1

ckm

s

Aug 15 Aug 16

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

1760

1500

7 Transformation Capacity Addition During Aug 2016 (MVA)

4760

0

1500

945

1110

0 1500

3940

8540

0

Aug-15 Aug-16

April 15 to Aug 15 April 16 to Aug 16

3555

0

0

0 1500

All India Transformation Capacity Addition during Apr 15 to Aug 15 amp Apr

16 to Aug 16 (MVA)

27435

0

9000

10835

6100

24480

12000

3555

4760

0500

100015002000250030003500400045005000

MV

A

Transformation Capacity Addition during Aug 2016

Aug 15 Aug16

24480

27435

24000

1

MV

A

Apr 15 to Aug 15 Apr 16 to Aug 16

Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug 16

Northern 32831 31913 31055 31481 -54 -14

Western 27625 27283 27556 27277 -02 00

Southern 24488 26487 23995 26473 -20 -01

Eastern 11187 11230 11132 11221 -05 -01

North Eastern 1297 1461 1221 1421 -59 -28

All India 97428 98374 94959 97873 -25 -05

Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug16

Northern 54474 50917 50230 48541 -78 -47

Western 42024 40122 41781 39903 -06 -05

Southern 37136 41168 35892 40526 -33 -16

Eastern 17363 18334 17149 18219 -12 -06

North Eastern 2437 2435 2283 2387 -63 -20

All India 149492 151719 146124 148347 -23 -22

7

Region

Power (MW)

8 Power Supply Position (Energy amp Peak) in Aug 2016

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region Deficit ()

Deficit ()

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand

Aug 15 0 0 0 0 339 0 0 3943 75

Aug 16 0 0 0 0 359 0 0 924 75

p

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa

Aug 15 128 31 7 124 0 0 37

Aug 16 21 0 0 13 0 0 2

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Aug 15 0 14 564 151 106 1 0

Aug 16 3 14 76 3 6 3 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions

0 0 0 0

35

9

0 0

92

4

75

0 0 0 0

33

9

0 0

39

43

75

0400800

120016002000240028003200360040004400

Ch

and

iga

rh

De

lhi

Ha

rya

na

HP

Jamp

K

Pun

jab

Ra

jasth

an

UP

Utr

akh

an

d

MW

Northern States (MW)Aug 16 Aug 15

21

0 0

13

0 0 2

128

31

7

124

0 0

37

0

20

40

60

80

100

120

140

Cha

ttis

garh

Gu

jara

t

MP

Mahara

shtr

a

Dam

an amp

Diu

Dad

ar

Na

gar

Haveli G

oa

MW

Western States (MW)Aug 16 Aug 15

3 14 7

6

3 6 3 00 14

564

151

106

1

0

1000

AP

Tele

nga

na

Karn

ata

ka

Kera

la

Tam

il N

ad

u

Pud

uch

err

y

La

ksh

yad

ee

p

MW

Southern States (MW) Aug16 Aug 15

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Aug 15 160 30 25 18 42 0 8

Aug 16 0 100 0 0 19 0 8

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Aug 15 1 82 2 0 1 1 1

Aug 16 8 28 0 0 2 1 0

9

0

100

0 0

19

0 8

160

30

25

18

42

0 8

020406080

100120140160180

Bih

ar

DV

C

Jh

ark

ha

nd

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

N I

sla

nd

MW

Eastern States (MW)Aug 16 Aug15

8

28

0 0 2 1 01

82

2 0 1 1 10

102030405060708090

Aru

na

ch

al

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

ga

lan

d

Tri

pu

ra

MW

North-Eastern States (MW) Aug 16 Aug 15

Sector Aug 15 Aug 16

Central 6925 6620

State 4965 4009

Private 5633 5117

ALL INDIA 5810 5203

Month 2015-16 2016-17

April 6205 6783

May 6416 6224June 5943 6087

July 5836 5400

August 5810 5203

September 6363

October 6686

November 6034

December 6175

January 6320

February 6495

March 6389

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Aug 2016

69

25

49

65

56

33

58

10

662

0

400

9

511

7

520

3

00010002000300040005000600070008000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016

+Aug15 Aug16

62

05

64

16

59

43

58

36

58

10

63

63

66

86

60

34

61

75

63

20

64

95

63

89

67

83

62

24

60

87

54

00

52

03

0

20

40

60

80

April

May

Jun

e

July

Augu

st

Septe

mber

Octo

ber

Nove

mb

er

Dece

mb

er

Jan

uary

Febru

ary

Marc

hAll India PLF Month-wise

2015-16 2016-17

2010-11 2011-12 2012-13 2013-15 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumersP Provisional

Total Number of Villages

597464

Pump sets

Energised as on

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

NotIncludin

g Subsidiy

booked

Only

Agriculture

2013-14 400 175

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Provisional

11

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should

be obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the

village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA

is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data

As such each monthly report of Village electrification of CEA is independent of the earlier published

reports

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31072016

Villiages Electrified (Nos) as on 310816

9810589068

Villages electrified

15 All India Coal consumption for Power Generation (MT)

515

14 All India per capita consumption of Electricity ( KWh)

Realization(paiseunit)

20550647

Pump sets Energised as on 31-08-16

cost of supply (paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer mat not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1266360 1932910 5113550 8312820

Hydro 258402 81700 59500 399602

Nuclear 100000 000 000 100000

Total 1624762 2014610 5173050 8812422

Acievement 6206 12972 11048 9953

1 Capacity Addtion Targets and Achievements in the 12th Plan

12

Achievement of Capacity Addition during the Current Plan upto Aug 2016

Achievements upto Aug 2016 during the 12th Plan

723

400

0

108

970

0

53

000

0

831

282

0

39

960

2

10

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 8812422 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 27305 0 255 0 255 255

State 3910 910 0 1820 750 -1070

Pvt 6800 0 300 3650 2173 -1477

Total 134405 910 3255 5470 29485 -25215

Central 490 0 40 0 80 80

State 395 80 40 205 105 -100

Pvt 829 0 0 0 0 0

Total 1714 80 80 205 185 -20

Nuclear Central 1500 0 0 0 0 0

Central 47205 0 655 0 1055 1055

State 4305 990 40 2025 855 -1170

Pvt 7629 0 300 3650 2173 -1477

Total 166545 990 4055 5675 31335 -25415

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Aug 2016

Thermal

2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016

Aug-16 April 16 - Aug 16Schemes Sector

Target

2016-17

91

0

80

0

99

0

32

55

80

0

40

55

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during Aug 2016 Target

Achievement

54

70

20

5

0

56

75

29

49

18

5

0

31

34

0

1000

2000

3000

4000

5000

6000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2016-17 Target

Achievement

Coal Gas Diesel Total

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Sub Total 31000 172380 3600 206980 000 124200 26372 357552

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1110 5115

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30062016 is given below (in MW)

430427 2715140 780534 4423692

1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and

New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)

and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh

14

4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 31082016)

(UTILITIES)

RegionOwnership

Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Northern

Region

Western Region

Southern

Region

Eastern Region

North Eastern

Region

Islands

ALL INDIA

Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

486083 11508

2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016

3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 44550 10800 000 55350 000 000 3987 59337

Central 442137 20761 000 462898 12208 76264 000 551370

Sub-Total 500187 211601 000 711788 12208 76264 3987 804247

State 272000 15000 000 287000 000 88451 5930 381381

Private 216550 000 000 216550 000 000 7489 224039

Central 120203 53529 000 173732 10916 61013 000 245661

Sub-Total 608753 68529 000 677282 10916 149464 13419 851081

State 000 000 000 000 000 45860 25611 71471

Private 000 000 000 000 000 174800 53790 228590

Central 15202 6188 000 21390 3408 128894 000 153692

Sub-Total 15202 6188 000 21390 3408 349554 79401 453753

State 000 17500 000 17500 000 123000 10653 151153

Private 000 000 000 000 000 000 5100 5100

Central 32932 12914 000 45846 7700 104435 000 157981

Sub-Total 32932 30414 000 63346 7700 227435 15753 314234

State 263000 15000 000 278000 000 223023 12780 513803

Private 501400 000 000 501400 000 000 72955 574355

Central 66088 26392 000 92480 20804 92165 000 205449

Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607

State 519000 60380 000 579380 000 98796 2385 680561

Private 319600 000 000 319600 000 000 540135 859735

Central 101472 22123 000 123595 57300 74153 000 255048

Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344

State 592300 000 000 592300 000 52410 2510 647220

Private 634600 000 000 634600 000 000 101850 736450

Central 290995 54997 000 345992 33572 166065 000 545629

Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299

State 000 000 000 000 000 125215 6287 131502

Private 9900 22500 000 32400 000 73000 26361 131761

Central 30050 6935 000 36985 2228 46924 000 86137

Sub-Total 39950 29435 000 69385 2228 245139 32648 349400

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 681 681

Central 3254 1532 000 4786 884 6274 000 11944

Sub-Total 3254 1532 000 4786 884 6274 681 12625

97719 29035 000 126754 12980 70436 000 210170

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

Uttrakhnad

Chandigarh

Central - Unallocated

Total (Northern

Region)

Rajasthan

Punjab

Haryana

Himachal

Pradesh

Jammu amp

Kashmir

Uttar

Pradesh

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

State Ownership

Sector

Modewise breakup

Grand TotalThermal

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Nuclear

Delhi

Hydro

(Renewable)

RES

(MNRE)

15

(As on 31082016)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 000 4800

Central 33860 000 000 33860 2580 000 000 36440

Sub-Total 33860 4800 000 38660 2580 000 005 41245

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 400 400

Central 4338 420 000 4758 738 000 000 5496

Sub-Total 4338 420 000 4758 738 000 400 5896

State 522000 232182 000 754182 000 77200 800 832182

Private 864200 406000 000 1270200 000 000 529272 1799472

Central 288862 42427 000 331289 55932 000 000 387221

Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875

State 408000 000 000 408000 000 170366 8396 586762

Private 538900 000 000 538900 000 000 312007 850907

Central 249005 25718 000 274723 27324 152000 000 454047

Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716

State 328000 000 000 328000 000 12000 1105 341105

Private 1089800 000 000 1089800 000 000 43863 1133663

Central 157454 000 000 157454 4752 000 000 162206

Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974

State 1055000 67200 000 1122200 000 288484 20813 1431497

Private 1179600 56800 000 1236400 000 44700 644639 1925739

Central 371226 262393 000 633619 69014 000 000 702633

Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 5422 2710 000 8132 846 000 000 8978

Sub-Total 5422 2710 000 8132 846 000 000 8978

179635 19691 000 199326 22814 000 000 222140

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

16

Daman amp Diu

Gujarat

Central - Unallocated

Total (Western

Region)

Madhya

Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Goa

State Ownership

Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

Coal Gas Diesel Total

State 308591 23540 000 332131 000 175887 8950 516968

Private 299000 307411 1697 608108 000 000 291171 899279

Central 147330 000 000 147330 12716 000 000 160046

Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294

State 480659 000 000 480659 000 217566 000 698225

Private 27000 157089 1983 186072 000 000 89529 275601

Central 172188 000 000 172188 14862 000 000 187050

Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876

State 422000 000 12792 434792 000 359980 15533 810305

Private 206000 000 10650 216650 000 000 496005 712655

Central 162846 000 000 162846 47586 000 000 210432

Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392

State 000 000 15996 15996 000 188150 13892 218038

Private 000 17400 000 17400 000 000 11655 29055

Central 103869 35958 000 139827 22860 000 000 162687

Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780

State 477000 52408 000 529408 000 218220 12270 759898

Private 295000 50310 41166 386476 000 000 965460 1351936

Central 415510 000 000 415510 98650 000 000 514160

Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10017 000 000 10017 000 000 000 10017

Sub-Total 10017 000 000 10017 000 000 000 10017

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 003 003

Central 24932 000 000 24932 5278 000 000 30210

Sub-Total 24932 3250 000 28182 5278 000 003 33463

152308 000 000 152308 30048 000 000 182356

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

17

Total (Southern

Region)

NLC

Central - Unallocated

Karnataka

Kerala

Tamil Nadu

Thermal

NuclearHydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

State Ownership

Sector

Modewise breakup

Grand Total

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Andhra Pradesh

Telangana

Puducherry

(As on 31082016)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 000 000 000 000 000 000 8852 8852

Central 253124 000 000 253124 000 12943 000 266067

Sub-Total 274124 000 000 274124 000 12943 15922 302989

State 119000 000 000 119000 000 13000 405 132405

Private 90000 000 000 90000 000 000 1619 91619

Central 31493 000 000 31493 000 7093 000 38586

Sub-Total 240493 000 000 240493 000 20093 2024 262610

State 572000 10000 000 582000 000 97700 9195 688895

Private 178138 000 000 178138 000 000 4432 182570

Central 92245 000 000 92245 000 43130 000 135375

Sub-Total 842383 10000 000 852383 000 140830 13627 1006840

State 000 000 000 000 000 000 000 000

Private 105000 000 000 105000 000 000 000 105000

Central 721066 000 000 721066 000 19326 000 740392

Sub-Total 826066 000 000 826066 000 19326 000 845392

State 42000 000 000 42000 000 206192 630 248822

Private 500000 000 000 500000 000 000 14525 514525

Central 168304 000 000 168304 000 10501 000 178805

Sub-Total 710304 000 000 710304 000 216693 15155 942152

State 000 000 000 000 000 000 5211 5211

Private 000 000 000 000 000 19500 000 19500

Central 9210 000 000 9210 000 7527 000 16737

Sub-Total 9210 000 000 9210 000 27027 5211 41448

159707 000 000 159707 000 000 000 159707

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138

18

Central - Unallocated

Total (Eastern

Region)

Jharkhand

West Bengal

DVC

Odisha

Sikkim

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Bihar

(As on 31082016)

Coal Gas Diesel Total

State 6000 27620 000 33620 000 10000 3001 46621

Private 000 2450 000 2450 000 000 410 2860

Central 12700 43560 000 56260 000 32972 000 89232

Sub-Total 18700 73630 000 92330 000 42972 3411 138713

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 027 027

Central 1235 4683 000 5918 000 9757 000 15675

Sub-Total 1235 4683 000 5918 000 9757 10488 26163

State 000 000 000 000 000 28200 3103 31303

Private 000 000 000 000 000 000 000 000

Central 1770 10979 000 12749 000 7458 000 20207

Sub-Total 1770 10979 000 12749 000 35658 3103 51510

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 1870 33896 000 35766 000 6237 000 42003

Sub-Total 1870 50846 000 52716 000 6237 2101 61054

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 000

Central 1570 7161 000 8731 000 8098 000 16829

Sub-Total 1570 7161 3600 12331 000 8098 545 20974

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 1070 4891 000 5961 000 5332 000 11293

Sub-Total 1070 4891 000 5961 000 5332 3067 14360

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 010 010

Central 1035 4054 000 5089 000 3431 000 8520

Sub-Total 1035 4054 000 5089 000 3431 3657 12177

3750 16136 000 19886 000 12715 000 32601

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Grand Total 31000 172380 3600 206980 000 124200 26372 357552

(As on 31082016)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 510 510

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1035 5040

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1110 5115

19

NuclearHydro

(Renewable)

RES

(MNRE)

Modewise breakup

Andaman amp

Nicobar

lakshadweep

Total (Islands)

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

SectorGrand Total

Thermal

Arunachal

Pradesh

Meghalaya

Tripura

Manipur

Nagaland

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

RES

(MNRE)

Assam

Mizoram

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

SN Contents Page

1Programme and Achievements of Transmission Lines in Aug 2016 and during April

2016 to Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

Section C - Transmission Lines

20

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 4: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

Achievement

Aug-16

Thermal 72929

Hydro 17737

Nuclear 3515

Bhutan Import 1080

All India 95261 015

Type

Thermal

Hydro

Nuclear

Bhutan Import

All India

1

Electricity Generation During April 2015 to Aug 2015 amp April 2016 to Aug 2016 (BU)

17779

3273

Targets

373096 403856

15873

824

79677

Change

wrt 2015

95120

07060992

101204

Apr 15 - Aug 15 Apr 16 - Aug 16

67659

16269

Change

-243

306 -561

63652

569486441460266

3242

-592

2834

1 Electricity Generation for Aug 2016 (BU)

Aug-16Type

Achievement

Aug-15

17548

73515

95120

95261

95000

95050

95100

95150

95200

95250

95300

BU

Aug 15 Aug 16

460266486441

0000

100000

200000

300000

400000

500000

600000

BU

Apr 15 to Aug 15 Apr 16 to Aug 16

Achievement Targets Achievement

Aug-15

Thermal 871 910 3255 NA

Hydro 0 80 80 NA

Nuclear 0 0 0 NA

All India 871 990 4055 NA

Apr 15 - Aug 15 Apr 16 - Aug 16 Change

Thermal 3921 29485 -25

Hydro 730 185 -75

Nuclear 0 0 NA

All India 4651 31335 -33

2

2 Generating Capacity Addition for Aug 2016 (MW)

Generating Capacity Addition during April 15 to Aug 15 amp April 16 to Aug16 (MW)

Change wrt 2015TypeAug-16

871

4055

0

100

200

300

400

500

600

700

800

900

1000

1 Aug15 Aug 16

4651

31335

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

1Apr 15 to Aug 15 Apr 16 to Aug 16

(i) Thermal

Agartala Gas Based PP St-1 255 MW commissioned on 23082016

(ii) Hydro

(iii) Nuclear

NIL

Nuclear Hydro RES Grand Total

Region Coal Gas Diesel Total

Northern 4586450 555626 000 5142076 162000 1831178 878504 8013758

Western 7275301 1120341 000 8395642 184000 744750 1561300 10885691

Southern 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

Eastern 3062287 10000 000 3072287 000 436912 51939 3561138

North-East 31000 172380 3600 206980 000 124200 26372 357552

Islands 000 000 4005 4005 000 000 1110 5115

ALL INDIA 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

Note Captive Genaration is not included in the total 3

Thermal

3 List of Projects Commissioned During Aug 2016

Teesta low dame stage IV U-4 40 MW Commissioned on 11082016

Lower Jurala U-5 40 MW commissioned on 20082016

4 All India Installed Capacity (MW) Region-wise as on 31082016

Nawapara U-1 300 MW commissioned on 14082016

21256890

578000

4296843 4423692

30555425

40726

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 30555425

Sector

Coal Gas Diesel Total

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

All India 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

State 10194593

Private 12729606

Central 7631226

RES

5 All India Installed Capacity (MW) Sector-wise as on 31082016

4

Grand TotalTHERMAL

Nuclear Hydro

State 10194593 33

Private 12729606 42

Central 7631226 25

All India Installed Capacity(MW) as on 31-08-2016 (Sector-Wise)

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

5

9117

0

Apr 15 - Aug 15

1583

4340

3318

9241

4134

0 0

6 Transmission Lines Added during Aug 2016 (Ckms)

2835

1480

3051

669

2455

2148

Transmission Lines Added during Apr 15 to Aug 15 amp Apr 16 to Aug16 (Ckms)

Aug-16

0

Aug-15

0

Apr 16 - Aug 16

0

1190

596

181

1390

0 0

9117

9241

9000

9050

9100

9150

9200

9250

9300

ck

ms

Apr 15 to Aug15 Apr 16 to Aug16

2455

3051

0

500

1000

1500

2000

2500

3000

3500

1

ckm

s

Aug 15 Aug 16

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

1760

1500

7 Transformation Capacity Addition During Aug 2016 (MVA)

4760

0

1500

945

1110

0 1500

3940

8540

0

Aug-15 Aug-16

April 15 to Aug 15 April 16 to Aug 16

3555

0

0

0 1500

All India Transformation Capacity Addition during Apr 15 to Aug 15 amp Apr

16 to Aug 16 (MVA)

27435

0

9000

10835

6100

24480

12000

3555

4760

0500

100015002000250030003500400045005000

MV

A

Transformation Capacity Addition during Aug 2016

Aug 15 Aug16

24480

27435

24000

1

MV

A

Apr 15 to Aug 15 Apr 16 to Aug 16

Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug 16

Northern 32831 31913 31055 31481 -54 -14

Western 27625 27283 27556 27277 -02 00

Southern 24488 26487 23995 26473 -20 -01

Eastern 11187 11230 11132 11221 -05 -01

North Eastern 1297 1461 1221 1421 -59 -28

All India 97428 98374 94959 97873 -25 -05

Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug16

Northern 54474 50917 50230 48541 -78 -47

Western 42024 40122 41781 39903 -06 -05

Southern 37136 41168 35892 40526 -33 -16

Eastern 17363 18334 17149 18219 -12 -06

North Eastern 2437 2435 2283 2387 -63 -20

All India 149492 151719 146124 148347 -23 -22

7

Region

Power (MW)

8 Power Supply Position (Energy amp Peak) in Aug 2016

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region Deficit ()

Deficit ()

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand

Aug 15 0 0 0 0 339 0 0 3943 75

Aug 16 0 0 0 0 359 0 0 924 75

p

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa

Aug 15 128 31 7 124 0 0 37

Aug 16 21 0 0 13 0 0 2

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Aug 15 0 14 564 151 106 1 0

Aug 16 3 14 76 3 6 3 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions

0 0 0 0

35

9

0 0

92

4

75

0 0 0 0

33

9

0 0

39

43

75

0400800

120016002000240028003200360040004400

Ch

and

iga

rh

De

lhi

Ha

rya

na

HP

Jamp

K

Pun

jab

Ra

jasth

an

UP

Utr

akh

an

d

MW

Northern States (MW)Aug 16 Aug 15

21

0 0

13

0 0 2

128

31

7

124

0 0

37

0

20

40

60

80

100

120

140

Cha

ttis

garh

Gu

jara

t

MP

Mahara

shtr

a

Dam

an amp

Diu

Dad

ar

Na

gar

Haveli G

oa

MW

Western States (MW)Aug 16 Aug 15

3 14 7

6

3 6 3 00 14

564

151

106

1

0

1000

AP

Tele

nga

na

Karn

ata

ka

Kera

la

Tam

il N

ad

u

Pud

uch

err

y

La

ksh

yad

ee

p

MW

Southern States (MW) Aug16 Aug 15

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Aug 15 160 30 25 18 42 0 8

Aug 16 0 100 0 0 19 0 8

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Aug 15 1 82 2 0 1 1 1

Aug 16 8 28 0 0 2 1 0

9

0

100

0 0

19

0 8

160

30

25

18

42

0 8

020406080

100120140160180

Bih

ar

DV

C

Jh

ark

ha

nd

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

N I

sla

nd

MW

Eastern States (MW)Aug 16 Aug15

8

28

0 0 2 1 01

82

2 0 1 1 10

102030405060708090

Aru

na

ch

al

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

ga

lan

d

Tri

pu

ra

MW

North-Eastern States (MW) Aug 16 Aug 15

Sector Aug 15 Aug 16

Central 6925 6620

State 4965 4009

Private 5633 5117

ALL INDIA 5810 5203

Month 2015-16 2016-17

April 6205 6783

May 6416 6224June 5943 6087

July 5836 5400

August 5810 5203

September 6363

October 6686

November 6034

December 6175

January 6320

February 6495

March 6389

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Aug 2016

69

25

49

65

56

33

58

10

662

0

400

9

511

7

520

3

00010002000300040005000600070008000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016

+Aug15 Aug16

62

05

64

16

59

43

58

36

58

10

63

63

66

86

60

34

61

75

63

20

64

95

63

89

67

83

62

24

60

87

54

00

52

03

0

20

40

60

80

April

May

Jun

e

July

Augu

st

Septe

mber

Octo

ber

Nove

mb

er

Dece

mb

er

Jan

uary

Febru

ary

Marc

hAll India PLF Month-wise

2015-16 2016-17

2010-11 2011-12 2012-13 2013-15 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumersP Provisional

Total Number of Villages

597464

Pump sets

Energised as on

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

NotIncludin

g Subsidiy

booked

Only

Agriculture

2013-14 400 175

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Provisional

11

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should

be obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the

village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA

is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data

As such each monthly report of Village electrification of CEA is independent of the earlier published

reports

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31072016

Villiages Electrified (Nos) as on 310816

9810589068

Villages electrified

15 All India Coal consumption for Power Generation (MT)

515

14 All India per capita consumption of Electricity ( KWh)

Realization(paiseunit)

20550647

Pump sets Energised as on 31-08-16

cost of supply (paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer mat not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1266360 1932910 5113550 8312820

Hydro 258402 81700 59500 399602

Nuclear 100000 000 000 100000

Total 1624762 2014610 5173050 8812422

Acievement 6206 12972 11048 9953

1 Capacity Addtion Targets and Achievements in the 12th Plan

12

Achievement of Capacity Addition during the Current Plan upto Aug 2016

Achievements upto Aug 2016 during the 12th Plan

723

400

0

108

970

0

53

000

0

831

282

0

39

960

2

10

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 8812422 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 27305 0 255 0 255 255

State 3910 910 0 1820 750 -1070

Pvt 6800 0 300 3650 2173 -1477

Total 134405 910 3255 5470 29485 -25215

Central 490 0 40 0 80 80

State 395 80 40 205 105 -100

Pvt 829 0 0 0 0 0

Total 1714 80 80 205 185 -20

Nuclear Central 1500 0 0 0 0 0

Central 47205 0 655 0 1055 1055

State 4305 990 40 2025 855 -1170

Pvt 7629 0 300 3650 2173 -1477

Total 166545 990 4055 5675 31335 -25415

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Aug 2016

Thermal

2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016

Aug-16 April 16 - Aug 16Schemes Sector

Target

2016-17

91

0

80

0

99

0

32

55

80

0

40

55

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during Aug 2016 Target

Achievement

54

70

20

5

0

56

75

29

49

18

5

0

31

34

0

1000

2000

3000

4000

5000

6000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2016-17 Target

Achievement

Coal Gas Diesel Total

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Sub Total 31000 172380 3600 206980 000 124200 26372 357552

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1110 5115

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30062016 is given below (in MW)

430427 2715140 780534 4423692

1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and

New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)

and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh

14

4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 31082016)

(UTILITIES)

RegionOwnership

Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Northern

Region

Western Region

Southern

Region

Eastern Region

North Eastern

Region

Islands

ALL INDIA

Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

486083 11508

2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016

3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 44550 10800 000 55350 000 000 3987 59337

Central 442137 20761 000 462898 12208 76264 000 551370

Sub-Total 500187 211601 000 711788 12208 76264 3987 804247

State 272000 15000 000 287000 000 88451 5930 381381

Private 216550 000 000 216550 000 000 7489 224039

Central 120203 53529 000 173732 10916 61013 000 245661

Sub-Total 608753 68529 000 677282 10916 149464 13419 851081

State 000 000 000 000 000 45860 25611 71471

Private 000 000 000 000 000 174800 53790 228590

Central 15202 6188 000 21390 3408 128894 000 153692

Sub-Total 15202 6188 000 21390 3408 349554 79401 453753

State 000 17500 000 17500 000 123000 10653 151153

Private 000 000 000 000 000 000 5100 5100

Central 32932 12914 000 45846 7700 104435 000 157981

Sub-Total 32932 30414 000 63346 7700 227435 15753 314234

State 263000 15000 000 278000 000 223023 12780 513803

Private 501400 000 000 501400 000 000 72955 574355

Central 66088 26392 000 92480 20804 92165 000 205449

Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607

State 519000 60380 000 579380 000 98796 2385 680561

Private 319600 000 000 319600 000 000 540135 859735

Central 101472 22123 000 123595 57300 74153 000 255048

Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344

State 592300 000 000 592300 000 52410 2510 647220

Private 634600 000 000 634600 000 000 101850 736450

Central 290995 54997 000 345992 33572 166065 000 545629

Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299

State 000 000 000 000 000 125215 6287 131502

Private 9900 22500 000 32400 000 73000 26361 131761

Central 30050 6935 000 36985 2228 46924 000 86137

Sub-Total 39950 29435 000 69385 2228 245139 32648 349400

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 681 681

Central 3254 1532 000 4786 884 6274 000 11944

Sub-Total 3254 1532 000 4786 884 6274 681 12625

97719 29035 000 126754 12980 70436 000 210170

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

Uttrakhnad

Chandigarh

Central - Unallocated

Total (Northern

Region)

Rajasthan

Punjab

Haryana

Himachal

Pradesh

Jammu amp

Kashmir

Uttar

Pradesh

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

State Ownership

Sector

Modewise breakup

Grand TotalThermal

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Nuclear

Delhi

Hydro

(Renewable)

RES

(MNRE)

15

(As on 31082016)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 000 4800

Central 33860 000 000 33860 2580 000 000 36440

Sub-Total 33860 4800 000 38660 2580 000 005 41245

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 400 400

Central 4338 420 000 4758 738 000 000 5496

Sub-Total 4338 420 000 4758 738 000 400 5896

State 522000 232182 000 754182 000 77200 800 832182

Private 864200 406000 000 1270200 000 000 529272 1799472

Central 288862 42427 000 331289 55932 000 000 387221

Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875

State 408000 000 000 408000 000 170366 8396 586762

Private 538900 000 000 538900 000 000 312007 850907

Central 249005 25718 000 274723 27324 152000 000 454047

Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716

State 328000 000 000 328000 000 12000 1105 341105

Private 1089800 000 000 1089800 000 000 43863 1133663

Central 157454 000 000 157454 4752 000 000 162206

Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974

State 1055000 67200 000 1122200 000 288484 20813 1431497

Private 1179600 56800 000 1236400 000 44700 644639 1925739

Central 371226 262393 000 633619 69014 000 000 702633

Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 5422 2710 000 8132 846 000 000 8978

Sub-Total 5422 2710 000 8132 846 000 000 8978

179635 19691 000 199326 22814 000 000 222140

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

16

Daman amp Diu

Gujarat

Central - Unallocated

Total (Western

Region)

Madhya

Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Goa

State Ownership

Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

Coal Gas Diesel Total

State 308591 23540 000 332131 000 175887 8950 516968

Private 299000 307411 1697 608108 000 000 291171 899279

Central 147330 000 000 147330 12716 000 000 160046

Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294

State 480659 000 000 480659 000 217566 000 698225

Private 27000 157089 1983 186072 000 000 89529 275601

Central 172188 000 000 172188 14862 000 000 187050

Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876

State 422000 000 12792 434792 000 359980 15533 810305

Private 206000 000 10650 216650 000 000 496005 712655

Central 162846 000 000 162846 47586 000 000 210432

Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392

State 000 000 15996 15996 000 188150 13892 218038

Private 000 17400 000 17400 000 000 11655 29055

Central 103869 35958 000 139827 22860 000 000 162687

Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780

State 477000 52408 000 529408 000 218220 12270 759898

Private 295000 50310 41166 386476 000 000 965460 1351936

Central 415510 000 000 415510 98650 000 000 514160

Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10017 000 000 10017 000 000 000 10017

Sub-Total 10017 000 000 10017 000 000 000 10017

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 003 003

Central 24932 000 000 24932 5278 000 000 30210

Sub-Total 24932 3250 000 28182 5278 000 003 33463

152308 000 000 152308 30048 000 000 182356

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

17

Total (Southern

Region)

NLC

Central - Unallocated

Karnataka

Kerala

Tamil Nadu

Thermal

NuclearHydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

State Ownership

Sector

Modewise breakup

Grand Total

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Andhra Pradesh

Telangana

Puducherry

(As on 31082016)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 000 000 000 000 000 000 8852 8852

Central 253124 000 000 253124 000 12943 000 266067

Sub-Total 274124 000 000 274124 000 12943 15922 302989

State 119000 000 000 119000 000 13000 405 132405

Private 90000 000 000 90000 000 000 1619 91619

Central 31493 000 000 31493 000 7093 000 38586

Sub-Total 240493 000 000 240493 000 20093 2024 262610

State 572000 10000 000 582000 000 97700 9195 688895

Private 178138 000 000 178138 000 000 4432 182570

Central 92245 000 000 92245 000 43130 000 135375

Sub-Total 842383 10000 000 852383 000 140830 13627 1006840

State 000 000 000 000 000 000 000 000

Private 105000 000 000 105000 000 000 000 105000

Central 721066 000 000 721066 000 19326 000 740392

Sub-Total 826066 000 000 826066 000 19326 000 845392

State 42000 000 000 42000 000 206192 630 248822

Private 500000 000 000 500000 000 000 14525 514525

Central 168304 000 000 168304 000 10501 000 178805

Sub-Total 710304 000 000 710304 000 216693 15155 942152

State 000 000 000 000 000 000 5211 5211

Private 000 000 000 000 000 19500 000 19500

Central 9210 000 000 9210 000 7527 000 16737

Sub-Total 9210 000 000 9210 000 27027 5211 41448

159707 000 000 159707 000 000 000 159707

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138

18

Central - Unallocated

Total (Eastern

Region)

Jharkhand

West Bengal

DVC

Odisha

Sikkim

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Bihar

(As on 31082016)

Coal Gas Diesel Total

State 6000 27620 000 33620 000 10000 3001 46621

Private 000 2450 000 2450 000 000 410 2860

Central 12700 43560 000 56260 000 32972 000 89232

Sub-Total 18700 73630 000 92330 000 42972 3411 138713

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 027 027

Central 1235 4683 000 5918 000 9757 000 15675

Sub-Total 1235 4683 000 5918 000 9757 10488 26163

State 000 000 000 000 000 28200 3103 31303

Private 000 000 000 000 000 000 000 000

Central 1770 10979 000 12749 000 7458 000 20207

Sub-Total 1770 10979 000 12749 000 35658 3103 51510

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 1870 33896 000 35766 000 6237 000 42003

Sub-Total 1870 50846 000 52716 000 6237 2101 61054

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 000

Central 1570 7161 000 8731 000 8098 000 16829

Sub-Total 1570 7161 3600 12331 000 8098 545 20974

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 1070 4891 000 5961 000 5332 000 11293

Sub-Total 1070 4891 000 5961 000 5332 3067 14360

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 010 010

Central 1035 4054 000 5089 000 3431 000 8520

Sub-Total 1035 4054 000 5089 000 3431 3657 12177

3750 16136 000 19886 000 12715 000 32601

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Grand Total 31000 172380 3600 206980 000 124200 26372 357552

(As on 31082016)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 510 510

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1035 5040

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1110 5115

19

NuclearHydro

(Renewable)

RES

(MNRE)

Modewise breakup

Andaman amp

Nicobar

lakshadweep

Total (Islands)

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

SectorGrand Total

Thermal

Arunachal

Pradesh

Meghalaya

Tripura

Manipur

Nagaland

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

RES

(MNRE)

Assam

Mizoram

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

SN Contents Page

1Programme and Achievements of Transmission Lines in Aug 2016 and during April

2016 to Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

Section C - Transmission Lines

20

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 5: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

Achievement Targets Achievement

Aug-15

Thermal 871 910 3255 NA

Hydro 0 80 80 NA

Nuclear 0 0 0 NA

All India 871 990 4055 NA

Apr 15 - Aug 15 Apr 16 - Aug 16 Change

Thermal 3921 29485 -25

Hydro 730 185 -75

Nuclear 0 0 NA

All India 4651 31335 -33

2

2 Generating Capacity Addition for Aug 2016 (MW)

Generating Capacity Addition during April 15 to Aug 15 amp April 16 to Aug16 (MW)

Change wrt 2015TypeAug-16

871

4055

0

100

200

300

400

500

600

700

800

900

1000

1 Aug15 Aug 16

4651

31335

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

1Apr 15 to Aug 15 Apr 16 to Aug 16

(i) Thermal

Agartala Gas Based PP St-1 255 MW commissioned on 23082016

(ii) Hydro

(iii) Nuclear

NIL

Nuclear Hydro RES Grand Total

Region Coal Gas Diesel Total

Northern 4586450 555626 000 5142076 162000 1831178 878504 8013758

Western 7275301 1120341 000 8395642 184000 744750 1561300 10885691

Southern 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

Eastern 3062287 10000 000 3072287 000 436912 51939 3561138

North-East 31000 172380 3600 206980 000 124200 26372 357552

Islands 000 000 4005 4005 000 000 1110 5115

ALL INDIA 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

Note Captive Genaration is not included in the total 3

Thermal

3 List of Projects Commissioned During Aug 2016

Teesta low dame stage IV U-4 40 MW Commissioned on 11082016

Lower Jurala U-5 40 MW commissioned on 20082016

4 All India Installed Capacity (MW) Region-wise as on 31082016

Nawapara U-1 300 MW commissioned on 14082016

21256890

578000

4296843 4423692

30555425

40726

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 30555425

Sector

Coal Gas Diesel Total

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

All India 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

State 10194593

Private 12729606

Central 7631226

RES

5 All India Installed Capacity (MW) Sector-wise as on 31082016

4

Grand TotalTHERMAL

Nuclear Hydro

State 10194593 33

Private 12729606 42

Central 7631226 25

All India Installed Capacity(MW) as on 31-08-2016 (Sector-Wise)

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

5

9117

0

Apr 15 - Aug 15

1583

4340

3318

9241

4134

0 0

6 Transmission Lines Added during Aug 2016 (Ckms)

2835

1480

3051

669

2455

2148

Transmission Lines Added during Apr 15 to Aug 15 amp Apr 16 to Aug16 (Ckms)

Aug-16

0

Aug-15

0

Apr 16 - Aug 16

0

1190

596

181

1390

0 0

9117

9241

9000

9050

9100

9150

9200

9250

9300

ck

ms

Apr 15 to Aug15 Apr 16 to Aug16

2455

3051

0

500

1000

1500

2000

2500

3000

3500

1

ckm

s

Aug 15 Aug 16

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

1760

1500

7 Transformation Capacity Addition During Aug 2016 (MVA)

4760

0

1500

945

1110

0 1500

3940

8540

0

Aug-15 Aug-16

April 15 to Aug 15 April 16 to Aug 16

3555

0

0

0 1500

All India Transformation Capacity Addition during Apr 15 to Aug 15 amp Apr

16 to Aug 16 (MVA)

27435

0

9000

10835

6100

24480

12000

3555

4760

0500

100015002000250030003500400045005000

MV

A

Transformation Capacity Addition during Aug 2016

Aug 15 Aug16

24480

27435

24000

1

MV

A

Apr 15 to Aug 15 Apr 16 to Aug 16

Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug 16

Northern 32831 31913 31055 31481 -54 -14

Western 27625 27283 27556 27277 -02 00

Southern 24488 26487 23995 26473 -20 -01

Eastern 11187 11230 11132 11221 -05 -01

North Eastern 1297 1461 1221 1421 -59 -28

All India 97428 98374 94959 97873 -25 -05

Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug16

Northern 54474 50917 50230 48541 -78 -47

Western 42024 40122 41781 39903 -06 -05

Southern 37136 41168 35892 40526 -33 -16

Eastern 17363 18334 17149 18219 -12 -06

North Eastern 2437 2435 2283 2387 -63 -20

All India 149492 151719 146124 148347 -23 -22

7

Region

Power (MW)

8 Power Supply Position (Energy amp Peak) in Aug 2016

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region Deficit ()

Deficit ()

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand

Aug 15 0 0 0 0 339 0 0 3943 75

Aug 16 0 0 0 0 359 0 0 924 75

p

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa

Aug 15 128 31 7 124 0 0 37

Aug 16 21 0 0 13 0 0 2

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Aug 15 0 14 564 151 106 1 0

Aug 16 3 14 76 3 6 3 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions

0 0 0 0

35

9

0 0

92

4

75

0 0 0 0

33

9

0 0

39

43

75

0400800

120016002000240028003200360040004400

Ch

and

iga

rh

De

lhi

Ha

rya

na

HP

Jamp

K

Pun

jab

Ra

jasth

an

UP

Utr

akh

an

d

MW

Northern States (MW)Aug 16 Aug 15

21

0 0

13

0 0 2

128

31

7

124

0 0

37

0

20

40

60

80

100

120

140

Cha

ttis

garh

Gu

jara

t

MP

Mahara

shtr

a

Dam

an amp

Diu

Dad

ar

Na

gar

Haveli G

oa

MW

Western States (MW)Aug 16 Aug 15

3 14 7

6

3 6 3 00 14

564

151

106

1

0

1000

AP

Tele

nga

na

Karn

ata

ka

Kera

la

Tam

il N

ad

u

Pud

uch

err

y

La

ksh

yad

ee

p

MW

Southern States (MW) Aug16 Aug 15

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Aug 15 160 30 25 18 42 0 8

Aug 16 0 100 0 0 19 0 8

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Aug 15 1 82 2 0 1 1 1

Aug 16 8 28 0 0 2 1 0

9

0

100

0 0

19

0 8

160

30

25

18

42

0 8

020406080

100120140160180

Bih

ar

DV

C

Jh

ark

ha

nd

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

N I

sla

nd

MW

Eastern States (MW)Aug 16 Aug15

8

28

0 0 2 1 01

82

2 0 1 1 10

102030405060708090

Aru

na

ch

al

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

ga

lan

d

Tri

pu

ra

MW

North-Eastern States (MW) Aug 16 Aug 15

Sector Aug 15 Aug 16

Central 6925 6620

State 4965 4009

Private 5633 5117

ALL INDIA 5810 5203

Month 2015-16 2016-17

April 6205 6783

May 6416 6224June 5943 6087

July 5836 5400

August 5810 5203

September 6363

October 6686

November 6034

December 6175

January 6320

February 6495

March 6389

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Aug 2016

69

25

49

65

56

33

58

10

662

0

400

9

511

7

520

3

00010002000300040005000600070008000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016

+Aug15 Aug16

62

05

64

16

59

43

58

36

58

10

63

63

66

86

60

34

61

75

63

20

64

95

63

89

67

83

62

24

60

87

54

00

52

03

0

20

40

60

80

April

May

Jun

e

July

Augu

st

Septe

mber

Octo

ber

Nove

mb

er

Dece

mb

er

Jan

uary

Febru

ary

Marc

hAll India PLF Month-wise

2015-16 2016-17

2010-11 2011-12 2012-13 2013-15 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumersP Provisional

Total Number of Villages

597464

Pump sets

Energised as on

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

NotIncludin

g Subsidiy

booked

Only

Agriculture

2013-14 400 175

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Provisional

11

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should

be obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the

village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA

is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data

As such each monthly report of Village electrification of CEA is independent of the earlier published

reports

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31072016

Villiages Electrified (Nos) as on 310816

9810589068

Villages electrified

15 All India Coal consumption for Power Generation (MT)

515

14 All India per capita consumption of Electricity ( KWh)

Realization(paiseunit)

20550647

Pump sets Energised as on 31-08-16

cost of supply (paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer mat not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1266360 1932910 5113550 8312820

Hydro 258402 81700 59500 399602

Nuclear 100000 000 000 100000

Total 1624762 2014610 5173050 8812422

Acievement 6206 12972 11048 9953

1 Capacity Addtion Targets and Achievements in the 12th Plan

12

Achievement of Capacity Addition during the Current Plan upto Aug 2016

Achievements upto Aug 2016 during the 12th Plan

723

400

0

108

970

0

53

000

0

831

282

0

39

960

2

10

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 8812422 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 27305 0 255 0 255 255

State 3910 910 0 1820 750 -1070

Pvt 6800 0 300 3650 2173 -1477

Total 134405 910 3255 5470 29485 -25215

Central 490 0 40 0 80 80

State 395 80 40 205 105 -100

Pvt 829 0 0 0 0 0

Total 1714 80 80 205 185 -20

Nuclear Central 1500 0 0 0 0 0

Central 47205 0 655 0 1055 1055

State 4305 990 40 2025 855 -1170

Pvt 7629 0 300 3650 2173 -1477

Total 166545 990 4055 5675 31335 -25415

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Aug 2016

Thermal

2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016

Aug-16 April 16 - Aug 16Schemes Sector

Target

2016-17

91

0

80

0

99

0

32

55

80

0

40

55

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during Aug 2016 Target

Achievement

54

70

20

5

0

56

75

29

49

18

5

0

31

34

0

1000

2000

3000

4000

5000

6000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2016-17 Target

Achievement

Coal Gas Diesel Total

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Sub Total 31000 172380 3600 206980 000 124200 26372 357552

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1110 5115

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30062016 is given below (in MW)

430427 2715140 780534 4423692

1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and

New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)

and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh

14

4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 31082016)

(UTILITIES)

RegionOwnership

Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Northern

Region

Western Region

Southern

Region

Eastern Region

North Eastern

Region

Islands

ALL INDIA

Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

486083 11508

2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016

3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 44550 10800 000 55350 000 000 3987 59337

Central 442137 20761 000 462898 12208 76264 000 551370

Sub-Total 500187 211601 000 711788 12208 76264 3987 804247

State 272000 15000 000 287000 000 88451 5930 381381

Private 216550 000 000 216550 000 000 7489 224039

Central 120203 53529 000 173732 10916 61013 000 245661

Sub-Total 608753 68529 000 677282 10916 149464 13419 851081

State 000 000 000 000 000 45860 25611 71471

Private 000 000 000 000 000 174800 53790 228590

Central 15202 6188 000 21390 3408 128894 000 153692

Sub-Total 15202 6188 000 21390 3408 349554 79401 453753

State 000 17500 000 17500 000 123000 10653 151153

Private 000 000 000 000 000 000 5100 5100

Central 32932 12914 000 45846 7700 104435 000 157981

Sub-Total 32932 30414 000 63346 7700 227435 15753 314234

State 263000 15000 000 278000 000 223023 12780 513803

Private 501400 000 000 501400 000 000 72955 574355

Central 66088 26392 000 92480 20804 92165 000 205449

Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607

State 519000 60380 000 579380 000 98796 2385 680561

Private 319600 000 000 319600 000 000 540135 859735

Central 101472 22123 000 123595 57300 74153 000 255048

Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344

State 592300 000 000 592300 000 52410 2510 647220

Private 634600 000 000 634600 000 000 101850 736450

Central 290995 54997 000 345992 33572 166065 000 545629

Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299

State 000 000 000 000 000 125215 6287 131502

Private 9900 22500 000 32400 000 73000 26361 131761

Central 30050 6935 000 36985 2228 46924 000 86137

Sub-Total 39950 29435 000 69385 2228 245139 32648 349400

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 681 681

Central 3254 1532 000 4786 884 6274 000 11944

Sub-Total 3254 1532 000 4786 884 6274 681 12625

97719 29035 000 126754 12980 70436 000 210170

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

Uttrakhnad

Chandigarh

Central - Unallocated

Total (Northern

Region)

Rajasthan

Punjab

Haryana

Himachal

Pradesh

Jammu amp

Kashmir

Uttar

Pradesh

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

State Ownership

Sector

Modewise breakup

Grand TotalThermal

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Nuclear

Delhi

Hydro

(Renewable)

RES

(MNRE)

15

(As on 31082016)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 000 4800

Central 33860 000 000 33860 2580 000 000 36440

Sub-Total 33860 4800 000 38660 2580 000 005 41245

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 400 400

Central 4338 420 000 4758 738 000 000 5496

Sub-Total 4338 420 000 4758 738 000 400 5896

State 522000 232182 000 754182 000 77200 800 832182

Private 864200 406000 000 1270200 000 000 529272 1799472

Central 288862 42427 000 331289 55932 000 000 387221

Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875

State 408000 000 000 408000 000 170366 8396 586762

Private 538900 000 000 538900 000 000 312007 850907

Central 249005 25718 000 274723 27324 152000 000 454047

Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716

State 328000 000 000 328000 000 12000 1105 341105

Private 1089800 000 000 1089800 000 000 43863 1133663

Central 157454 000 000 157454 4752 000 000 162206

Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974

State 1055000 67200 000 1122200 000 288484 20813 1431497

Private 1179600 56800 000 1236400 000 44700 644639 1925739

Central 371226 262393 000 633619 69014 000 000 702633

Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 5422 2710 000 8132 846 000 000 8978

Sub-Total 5422 2710 000 8132 846 000 000 8978

179635 19691 000 199326 22814 000 000 222140

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

16

Daman amp Diu

Gujarat

Central - Unallocated

Total (Western

Region)

Madhya

Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Goa

State Ownership

Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

Coal Gas Diesel Total

State 308591 23540 000 332131 000 175887 8950 516968

Private 299000 307411 1697 608108 000 000 291171 899279

Central 147330 000 000 147330 12716 000 000 160046

Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294

State 480659 000 000 480659 000 217566 000 698225

Private 27000 157089 1983 186072 000 000 89529 275601

Central 172188 000 000 172188 14862 000 000 187050

Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876

State 422000 000 12792 434792 000 359980 15533 810305

Private 206000 000 10650 216650 000 000 496005 712655

Central 162846 000 000 162846 47586 000 000 210432

Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392

State 000 000 15996 15996 000 188150 13892 218038

Private 000 17400 000 17400 000 000 11655 29055

Central 103869 35958 000 139827 22860 000 000 162687

Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780

State 477000 52408 000 529408 000 218220 12270 759898

Private 295000 50310 41166 386476 000 000 965460 1351936

Central 415510 000 000 415510 98650 000 000 514160

Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10017 000 000 10017 000 000 000 10017

Sub-Total 10017 000 000 10017 000 000 000 10017

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 003 003

Central 24932 000 000 24932 5278 000 000 30210

Sub-Total 24932 3250 000 28182 5278 000 003 33463

152308 000 000 152308 30048 000 000 182356

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

17

Total (Southern

Region)

NLC

Central - Unallocated

Karnataka

Kerala

Tamil Nadu

Thermal

NuclearHydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

State Ownership

Sector

Modewise breakup

Grand Total

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Andhra Pradesh

Telangana

Puducherry

(As on 31082016)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 000 000 000 000 000 000 8852 8852

Central 253124 000 000 253124 000 12943 000 266067

Sub-Total 274124 000 000 274124 000 12943 15922 302989

State 119000 000 000 119000 000 13000 405 132405

Private 90000 000 000 90000 000 000 1619 91619

Central 31493 000 000 31493 000 7093 000 38586

Sub-Total 240493 000 000 240493 000 20093 2024 262610

State 572000 10000 000 582000 000 97700 9195 688895

Private 178138 000 000 178138 000 000 4432 182570

Central 92245 000 000 92245 000 43130 000 135375

Sub-Total 842383 10000 000 852383 000 140830 13627 1006840

State 000 000 000 000 000 000 000 000

Private 105000 000 000 105000 000 000 000 105000

Central 721066 000 000 721066 000 19326 000 740392

Sub-Total 826066 000 000 826066 000 19326 000 845392

State 42000 000 000 42000 000 206192 630 248822

Private 500000 000 000 500000 000 000 14525 514525

Central 168304 000 000 168304 000 10501 000 178805

Sub-Total 710304 000 000 710304 000 216693 15155 942152

State 000 000 000 000 000 000 5211 5211

Private 000 000 000 000 000 19500 000 19500

Central 9210 000 000 9210 000 7527 000 16737

Sub-Total 9210 000 000 9210 000 27027 5211 41448

159707 000 000 159707 000 000 000 159707

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138

18

Central - Unallocated

Total (Eastern

Region)

Jharkhand

West Bengal

DVC

Odisha

Sikkim

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Bihar

(As on 31082016)

Coal Gas Diesel Total

State 6000 27620 000 33620 000 10000 3001 46621

Private 000 2450 000 2450 000 000 410 2860

Central 12700 43560 000 56260 000 32972 000 89232

Sub-Total 18700 73630 000 92330 000 42972 3411 138713

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 027 027

Central 1235 4683 000 5918 000 9757 000 15675

Sub-Total 1235 4683 000 5918 000 9757 10488 26163

State 000 000 000 000 000 28200 3103 31303

Private 000 000 000 000 000 000 000 000

Central 1770 10979 000 12749 000 7458 000 20207

Sub-Total 1770 10979 000 12749 000 35658 3103 51510

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 1870 33896 000 35766 000 6237 000 42003

Sub-Total 1870 50846 000 52716 000 6237 2101 61054

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 000

Central 1570 7161 000 8731 000 8098 000 16829

Sub-Total 1570 7161 3600 12331 000 8098 545 20974

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 1070 4891 000 5961 000 5332 000 11293

Sub-Total 1070 4891 000 5961 000 5332 3067 14360

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 010 010

Central 1035 4054 000 5089 000 3431 000 8520

Sub-Total 1035 4054 000 5089 000 3431 3657 12177

3750 16136 000 19886 000 12715 000 32601

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Grand Total 31000 172380 3600 206980 000 124200 26372 357552

(As on 31082016)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 510 510

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1035 5040

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1110 5115

19

NuclearHydro

(Renewable)

RES

(MNRE)

Modewise breakup

Andaman amp

Nicobar

lakshadweep

Total (Islands)

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

SectorGrand Total

Thermal

Arunachal

Pradesh

Meghalaya

Tripura

Manipur

Nagaland

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

RES

(MNRE)

Assam

Mizoram

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

SN Contents Page

1Programme and Achievements of Transmission Lines in Aug 2016 and during April

2016 to Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

Section C - Transmission Lines

20

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 6: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

(i) Thermal

Agartala Gas Based PP St-1 255 MW commissioned on 23082016

(ii) Hydro

(iii) Nuclear

NIL

Nuclear Hydro RES Grand Total

Region Coal Gas Diesel Total

Northern 4586450 555626 000 5142076 162000 1831178 878504 8013758

Western 7275301 1120341 000 8395642 184000 744750 1561300 10885691

Southern 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

Eastern 3062287 10000 000 3072287 000 436912 51939 3561138

North-East 31000 172380 3600 206980 000 124200 26372 357552

Islands 000 000 4005 4005 000 000 1110 5115

ALL INDIA 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

Note Captive Genaration is not included in the total 3

Thermal

3 List of Projects Commissioned During Aug 2016

Teesta low dame stage IV U-4 40 MW Commissioned on 11082016

Lower Jurala U-5 40 MW commissioned on 20082016

4 All India Installed Capacity (MW) Region-wise as on 31082016

Nawapara U-1 300 MW commissioned on 14082016

21256890

578000

4296843 4423692

30555425

40726

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 30555425

Sector

Coal Gas Diesel Total

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

All India 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

State 10194593

Private 12729606

Central 7631226

RES

5 All India Installed Capacity (MW) Sector-wise as on 31082016

4

Grand TotalTHERMAL

Nuclear Hydro

State 10194593 33

Private 12729606 42

Central 7631226 25

All India Installed Capacity(MW) as on 31-08-2016 (Sector-Wise)

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

5

9117

0

Apr 15 - Aug 15

1583

4340

3318

9241

4134

0 0

6 Transmission Lines Added during Aug 2016 (Ckms)

2835

1480

3051

669

2455

2148

Transmission Lines Added during Apr 15 to Aug 15 amp Apr 16 to Aug16 (Ckms)

Aug-16

0

Aug-15

0

Apr 16 - Aug 16

0

1190

596

181

1390

0 0

9117

9241

9000

9050

9100

9150

9200

9250

9300

ck

ms

Apr 15 to Aug15 Apr 16 to Aug16

2455

3051

0

500

1000

1500

2000

2500

3000

3500

1

ckm

s

Aug 15 Aug 16

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

1760

1500

7 Transformation Capacity Addition During Aug 2016 (MVA)

4760

0

1500

945

1110

0 1500

3940

8540

0

Aug-15 Aug-16

April 15 to Aug 15 April 16 to Aug 16

3555

0

0

0 1500

All India Transformation Capacity Addition during Apr 15 to Aug 15 amp Apr

16 to Aug 16 (MVA)

27435

0

9000

10835

6100

24480

12000

3555

4760

0500

100015002000250030003500400045005000

MV

A

Transformation Capacity Addition during Aug 2016

Aug 15 Aug16

24480

27435

24000

1

MV

A

Apr 15 to Aug 15 Apr 16 to Aug 16

Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug 16

Northern 32831 31913 31055 31481 -54 -14

Western 27625 27283 27556 27277 -02 00

Southern 24488 26487 23995 26473 -20 -01

Eastern 11187 11230 11132 11221 -05 -01

North Eastern 1297 1461 1221 1421 -59 -28

All India 97428 98374 94959 97873 -25 -05

Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug16

Northern 54474 50917 50230 48541 -78 -47

Western 42024 40122 41781 39903 -06 -05

Southern 37136 41168 35892 40526 -33 -16

Eastern 17363 18334 17149 18219 -12 -06

North Eastern 2437 2435 2283 2387 -63 -20

All India 149492 151719 146124 148347 -23 -22

7

Region

Power (MW)

8 Power Supply Position (Energy amp Peak) in Aug 2016

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region Deficit ()

Deficit ()

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand

Aug 15 0 0 0 0 339 0 0 3943 75

Aug 16 0 0 0 0 359 0 0 924 75

p

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa

Aug 15 128 31 7 124 0 0 37

Aug 16 21 0 0 13 0 0 2

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Aug 15 0 14 564 151 106 1 0

Aug 16 3 14 76 3 6 3 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions

0 0 0 0

35

9

0 0

92

4

75

0 0 0 0

33

9

0 0

39

43

75

0400800

120016002000240028003200360040004400

Ch

and

iga

rh

De

lhi

Ha

rya

na

HP

Jamp

K

Pun

jab

Ra

jasth

an

UP

Utr

akh

an

d

MW

Northern States (MW)Aug 16 Aug 15

21

0 0

13

0 0 2

128

31

7

124

0 0

37

0

20

40

60

80

100

120

140

Cha

ttis

garh

Gu

jara

t

MP

Mahara

shtr

a

Dam

an amp

Diu

Dad

ar

Na

gar

Haveli G

oa

MW

Western States (MW)Aug 16 Aug 15

3 14 7

6

3 6 3 00 14

564

151

106

1

0

1000

AP

Tele

nga

na

Karn

ata

ka

Kera

la

Tam

il N

ad

u

Pud

uch

err

y

La

ksh

yad

ee

p

MW

Southern States (MW) Aug16 Aug 15

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Aug 15 160 30 25 18 42 0 8

Aug 16 0 100 0 0 19 0 8

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Aug 15 1 82 2 0 1 1 1

Aug 16 8 28 0 0 2 1 0

9

0

100

0 0

19

0 8

160

30

25

18

42

0 8

020406080

100120140160180

Bih

ar

DV

C

Jh

ark

ha

nd

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

N I

sla

nd

MW

Eastern States (MW)Aug 16 Aug15

8

28

0 0 2 1 01

82

2 0 1 1 10

102030405060708090

Aru

na

ch

al

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

ga

lan

d

Tri

pu

ra

MW

North-Eastern States (MW) Aug 16 Aug 15

Sector Aug 15 Aug 16

Central 6925 6620

State 4965 4009

Private 5633 5117

ALL INDIA 5810 5203

Month 2015-16 2016-17

April 6205 6783

May 6416 6224June 5943 6087

July 5836 5400

August 5810 5203

September 6363

October 6686

November 6034

December 6175

January 6320

February 6495

March 6389

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Aug 2016

69

25

49

65

56

33

58

10

662

0

400

9

511

7

520

3

00010002000300040005000600070008000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016

+Aug15 Aug16

62

05

64

16

59

43

58

36

58

10

63

63

66

86

60

34

61

75

63

20

64

95

63

89

67

83

62

24

60

87

54

00

52

03

0

20

40

60

80

April

May

Jun

e

July

Augu

st

Septe

mber

Octo

ber

Nove

mb

er

Dece

mb

er

Jan

uary

Febru

ary

Marc

hAll India PLF Month-wise

2015-16 2016-17

2010-11 2011-12 2012-13 2013-15 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumersP Provisional

Total Number of Villages

597464

Pump sets

Energised as on

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

NotIncludin

g Subsidiy

booked

Only

Agriculture

2013-14 400 175

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Provisional

11

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should

be obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the

village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA

is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data

As such each monthly report of Village electrification of CEA is independent of the earlier published

reports

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31072016

Villiages Electrified (Nos) as on 310816

9810589068

Villages electrified

15 All India Coal consumption for Power Generation (MT)

515

14 All India per capita consumption of Electricity ( KWh)

Realization(paiseunit)

20550647

Pump sets Energised as on 31-08-16

cost of supply (paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer mat not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1266360 1932910 5113550 8312820

Hydro 258402 81700 59500 399602

Nuclear 100000 000 000 100000

Total 1624762 2014610 5173050 8812422

Acievement 6206 12972 11048 9953

1 Capacity Addtion Targets and Achievements in the 12th Plan

12

Achievement of Capacity Addition during the Current Plan upto Aug 2016

Achievements upto Aug 2016 during the 12th Plan

723

400

0

108

970

0

53

000

0

831

282

0

39

960

2

10

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 8812422 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 27305 0 255 0 255 255

State 3910 910 0 1820 750 -1070

Pvt 6800 0 300 3650 2173 -1477

Total 134405 910 3255 5470 29485 -25215

Central 490 0 40 0 80 80

State 395 80 40 205 105 -100

Pvt 829 0 0 0 0 0

Total 1714 80 80 205 185 -20

Nuclear Central 1500 0 0 0 0 0

Central 47205 0 655 0 1055 1055

State 4305 990 40 2025 855 -1170

Pvt 7629 0 300 3650 2173 -1477

Total 166545 990 4055 5675 31335 -25415

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Aug 2016

Thermal

2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016

Aug-16 April 16 - Aug 16Schemes Sector

Target

2016-17

91

0

80

0

99

0

32

55

80

0

40

55

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during Aug 2016 Target

Achievement

54

70

20

5

0

56

75

29

49

18

5

0

31

34

0

1000

2000

3000

4000

5000

6000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2016-17 Target

Achievement

Coal Gas Diesel Total

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Sub Total 31000 172380 3600 206980 000 124200 26372 357552

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1110 5115

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30062016 is given below (in MW)

430427 2715140 780534 4423692

1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and

New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)

and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh

14

4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 31082016)

(UTILITIES)

RegionOwnership

Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Northern

Region

Western Region

Southern

Region

Eastern Region

North Eastern

Region

Islands

ALL INDIA

Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

486083 11508

2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016

3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 44550 10800 000 55350 000 000 3987 59337

Central 442137 20761 000 462898 12208 76264 000 551370

Sub-Total 500187 211601 000 711788 12208 76264 3987 804247

State 272000 15000 000 287000 000 88451 5930 381381

Private 216550 000 000 216550 000 000 7489 224039

Central 120203 53529 000 173732 10916 61013 000 245661

Sub-Total 608753 68529 000 677282 10916 149464 13419 851081

State 000 000 000 000 000 45860 25611 71471

Private 000 000 000 000 000 174800 53790 228590

Central 15202 6188 000 21390 3408 128894 000 153692

Sub-Total 15202 6188 000 21390 3408 349554 79401 453753

State 000 17500 000 17500 000 123000 10653 151153

Private 000 000 000 000 000 000 5100 5100

Central 32932 12914 000 45846 7700 104435 000 157981

Sub-Total 32932 30414 000 63346 7700 227435 15753 314234

State 263000 15000 000 278000 000 223023 12780 513803

Private 501400 000 000 501400 000 000 72955 574355

Central 66088 26392 000 92480 20804 92165 000 205449

Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607

State 519000 60380 000 579380 000 98796 2385 680561

Private 319600 000 000 319600 000 000 540135 859735

Central 101472 22123 000 123595 57300 74153 000 255048

Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344

State 592300 000 000 592300 000 52410 2510 647220

Private 634600 000 000 634600 000 000 101850 736450

Central 290995 54997 000 345992 33572 166065 000 545629

Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299

State 000 000 000 000 000 125215 6287 131502

Private 9900 22500 000 32400 000 73000 26361 131761

Central 30050 6935 000 36985 2228 46924 000 86137

Sub-Total 39950 29435 000 69385 2228 245139 32648 349400

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 681 681

Central 3254 1532 000 4786 884 6274 000 11944

Sub-Total 3254 1532 000 4786 884 6274 681 12625

97719 29035 000 126754 12980 70436 000 210170

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

Uttrakhnad

Chandigarh

Central - Unallocated

Total (Northern

Region)

Rajasthan

Punjab

Haryana

Himachal

Pradesh

Jammu amp

Kashmir

Uttar

Pradesh

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

State Ownership

Sector

Modewise breakup

Grand TotalThermal

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Nuclear

Delhi

Hydro

(Renewable)

RES

(MNRE)

15

(As on 31082016)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 000 4800

Central 33860 000 000 33860 2580 000 000 36440

Sub-Total 33860 4800 000 38660 2580 000 005 41245

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 400 400

Central 4338 420 000 4758 738 000 000 5496

Sub-Total 4338 420 000 4758 738 000 400 5896

State 522000 232182 000 754182 000 77200 800 832182

Private 864200 406000 000 1270200 000 000 529272 1799472

Central 288862 42427 000 331289 55932 000 000 387221

Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875

State 408000 000 000 408000 000 170366 8396 586762

Private 538900 000 000 538900 000 000 312007 850907

Central 249005 25718 000 274723 27324 152000 000 454047

Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716

State 328000 000 000 328000 000 12000 1105 341105

Private 1089800 000 000 1089800 000 000 43863 1133663

Central 157454 000 000 157454 4752 000 000 162206

Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974

State 1055000 67200 000 1122200 000 288484 20813 1431497

Private 1179600 56800 000 1236400 000 44700 644639 1925739

Central 371226 262393 000 633619 69014 000 000 702633

Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 5422 2710 000 8132 846 000 000 8978

Sub-Total 5422 2710 000 8132 846 000 000 8978

179635 19691 000 199326 22814 000 000 222140

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

16

Daman amp Diu

Gujarat

Central - Unallocated

Total (Western

Region)

Madhya

Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Goa

State Ownership

Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

Coal Gas Diesel Total

State 308591 23540 000 332131 000 175887 8950 516968

Private 299000 307411 1697 608108 000 000 291171 899279

Central 147330 000 000 147330 12716 000 000 160046

Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294

State 480659 000 000 480659 000 217566 000 698225

Private 27000 157089 1983 186072 000 000 89529 275601

Central 172188 000 000 172188 14862 000 000 187050

Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876

State 422000 000 12792 434792 000 359980 15533 810305

Private 206000 000 10650 216650 000 000 496005 712655

Central 162846 000 000 162846 47586 000 000 210432

Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392

State 000 000 15996 15996 000 188150 13892 218038

Private 000 17400 000 17400 000 000 11655 29055

Central 103869 35958 000 139827 22860 000 000 162687

Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780

State 477000 52408 000 529408 000 218220 12270 759898

Private 295000 50310 41166 386476 000 000 965460 1351936

Central 415510 000 000 415510 98650 000 000 514160

Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10017 000 000 10017 000 000 000 10017

Sub-Total 10017 000 000 10017 000 000 000 10017

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 003 003

Central 24932 000 000 24932 5278 000 000 30210

Sub-Total 24932 3250 000 28182 5278 000 003 33463

152308 000 000 152308 30048 000 000 182356

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

17

Total (Southern

Region)

NLC

Central - Unallocated

Karnataka

Kerala

Tamil Nadu

Thermal

NuclearHydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

State Ownership

Sector

Modewise breakup

Grand Total

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Andhra Pradesh

Telangana

Puducherry

(As on 31082016)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 000 000 000 000 000 000 8852 8852

Central 253124 000 000 253124 000 12943 000 266067

Sub-Total 274124 000 000 274124 000 12943 15922 302989

State 119000 000 000 119000 000 13000 405 132405

Private 90000 000 000 90000 000 000 1619 91619

Central 31493 000 000 31493 000 7093 000 38586

Sub-Total 240493 000 000 240493 000 20093 2024 262610

State 572000 10000 000 582000 000 97700 9195 688895

Private 178138 000 000 178138 000 000 4432 182570

Central 92245 000 000 92245 000 43130 000 135375

Sub-Total 842383 10000 000 852383 000 140830 13627 1006840

State 000 000 000 000 000 000 000 000

Private 105000 000 000 105000 000 000 000 105000

Central 721066 000 000 721066 000 19326 000 740392

Sub-Total 826066 000 000 826066 000 19326 000 845392

State 42000 000 000 42000 000 206192 630 248822

Private 500000 000 000 500000 000 000 14525 514525

Central 168304 000 000 168304 000 10501 000 178805

Sub-Total 710304 000 000 710304 000 216693 15155 942152

State 000 000 000 000 000 000 5211 5211

Private 000 000 000 000 000 19500 000 19500

Central 9210 000 000 9210 000 7527 000 16737

Sub-Total 9210 000 000 9210 000 27027 5211 41448

159707 000 000 159707 000 000 000 159707

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138

18

Central - Unallocated

Total (Eastern

Region)

Jharkhand

West Bengal

DVC

Odisha

Sikkim

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Bihar

(As on 31082016)

Coal Gas Diesel Total

State 6000 27620 000 33620 000 10000 3001 46621

Private 000 2450 000 2450 000 000 410 2860

Central 12700 43560 000 56260 000 32972 000 89232

Sub-Total 18700 73630 000 92330 000 42972 3411 138713

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 027 027

Central 1235 4683 000 5918 000 9757 000 15675

Sub-Total 1235 4683 000 5918 000 9757 10488 26163

State 000 000 000 000 000 28200 3103 31303

Private 000 000 000 000 000 000 000 000

Central 1770 10979 000 12749 000 7458 000 20207

Sub-Total 1770 10979 000 12749 000 35658 3103 51510

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 1870 33896 000 35766 000 6237 000 42003

Sub-Total 1870 50846 000 52716 000 6237 2101 61054

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 000

Central 1570 7161 000 8731 000 8098 000 16829

Sub-Total 1570 7161 3600 12331 000 8098 545 20974

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 1070 4891 000 5961 000 5332 000 11293

Sub-Total 1070 4891 000 5961 000 5332 3067 14360

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 010 010

Central 1035 4054 000 5089 000 3431 000 8520

Sub-Total 1035 4054 000 5089 000 3431 3657 12177

3750 16136 000 19886 000 12715 000 32601

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Grand Total 31000 172380 3600 206980 000 124200 26372 357552

(As on 31082016)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 510 510

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1035 5040

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1110 5115

19

NuclearHydro

(Renewable)

RES

(MNRE)

Modewise breakup

Andaman amp

Nicobar

lakshadweep

Total (Islands)

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

SectorGrand Total

Thermal

Arunachal

Pradesh

Meghalaya

Tripura

Manipur

Nagaland

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

RES

(MNRE)

Assam

Mizoram

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

SN Contents Page

1Programme and Achievements of Transmission Lines in Aug 2016 and during April

2016 to Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

Section C - Transmission Lines

20

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 7: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

Sector

Coal Gas Diesel Total

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

All India 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

State 10194593

Private 12729606

Central 7631226

RES

5 All India Installed Capacity (MW) Sector-wise as on 31082016

4

Grand TotalTHERMAL

Nuclear Hydro

State 10194593 33

Private 12729606 42

Central 7631226 25

All India Installed Capacity(MW) as on 31-08-2016 (Sector-Wise)

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

5

9117

0

Apr 15 - Aug 15

1583

4340

3318

9241

4134

0 0

6 Transmission Lines Added during Aug 2016 (Ckms)

2835

1480

3051

669

2455

2148

Transmission Lines Added during Apr 15 to Aug 15 amp Apr 16 to Aug16 (Ckms)

Aug-16

0

Aug-15

0

Apr 16 - Aug 16

0

1190

596

181

1390

0 0

9117

9241

9000

9050

9100

9150

9200

9250

9300

ck

ms

Apr 15 to Aug15 Apr 16 to Aug16

2455

3051

0

500

1000

1500

2000

2500

3000

3500

1

ckm

s

Aug 15 Aug 16

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

1760

1500

7 Transformation Capacity Addition During Aug 2016 (MVA)

4760

0

1500

945

1110

0 1500

3940

8540

0

Aug-15 Aug-16

April 15 to Aug 15 April 16 to Aug 16

3555

0

0

0 1500

All India Transformation Capacity Addition during Apr 15 to Aug 15 amp Apr

16 to Aug 16 (MVA)

27435

0

9000

10835

6100

24480

12000

3555

4760

0500

100015002000250030003500400045005000

MV

A

Transformation Capacity Addition during Aug 2016

Aug 15 Aug16

24480

27435

24000

1

MV

A

Apr 15 to Aug 15 Apr 16 to Aug 16

Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug 16

Northern 32831 31913 31055 31481 -54 -14

Western 27625 27283 27556 27277 -02 00

Southern 24488 26487 23995 26473 -20 -01

Eastern 11187 11230 11132 11221 -05 -01

North Eastern 1297 1461 1221 1421 -59 -28

All India 97428 98374 94959 97873 -25 -05

Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug16

Northern 54474 50917 50230 48541 -78 -47

Western 42024 40122 41781 39903 -06 -05

Southern 37136 41168 35892 40526 -33 -16

Eastern 17363 18334 17149 18219 -12 -06

North Eastern 2437 2435 2283 2387 -63 -20

All India 149492 151719 146124 148347 -23 -22

7

Region

Power (MW)

8 Power Supply Position (Energy amp Peak) in Aug 2016

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region Deficit ()

Deficit ()

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand

Aug 15 0 0 0 0 339 0 0 3943 75

Aug 16 0 0 0 0 359 0 0 924 75

p

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa

Aug 15 128 31 7 124 0 0 37

Aug 16 21 0 0 13 0 0 2

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Aug 15 0 14 564 151 106 1 0

Aug 16 3 14 76 3 6 3 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions

0 0 0 0

35

9

0 0

92

4

75

0 0 0 0

33

9

0 0

39

43

75

0400800

120016002000240028003200360040004400

Ch

and

iga

rh

De

lhi

Ha

rya

na

HP

Jamp

K

Pun

jab

Ra

jasth

an

UP

Utr

akh

an

d

MW

Northern States (MW)Aug 16 Aug 15

21

0 0

13

0 0 2

128

31

7

124

0 0

37

0

20

40

60

80

100

120

140

Cha

ttis

garh

Gu

jara

t

MP

Mahara

shtr

a

Dam

an amp

Diu

Dad

ar

Na

gar

Haveli G

oa

MW

Western States (MW)Aug 16 Aug 15

3 14 7

6

3 6 3 00 14

564

151

106

1

0

1000

AP

Tele

nga

na

Karn

ata

ka

Kera

la

Tam

il N

ad

u

Pud

uch

err

y

La

ksh

yad

ee

p

MW

Southern States (MW) Aug16 Aug 15

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Aug 15 160 30 25 18 42 0 8

Aug 16 0 100 0 0 19 0 8

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Aug 15 1 82 2 0 1 1 1

Aug 16 8 28 0 0 2 1 0

9

0

100

0 0

19

0 8

160

30

25

18

42

0 8

020406080

100120140160180

Bih

ar

DV

C

Jh

ark

ha

nd

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

N I

sla

nd

MW

Eastern States (MW)Aug 16 Aug15

8

28

0 0 2 1 01

82

2 0 1 1 10

102030405060708090

Aru

na

ch

al

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

ga

lan

d

Tri

pu

ra

MW

North-Eastern States (MW) Aug 16 Aug 15

Sector Aug 15 Aug 16

Central 6925 6620

State 4965 4009

Private 5633 5117

ALL INDIA 5810 5203

Month 2015-16 2016-17

April 6205 6783

May 6416 6224June 5943 6087

July 5836 5400

August 5810 5203

September 6363

October 6686

November 6034

December 6175

January 6320

February 6495

March 6389

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Aug 2016

69

25

49

65

56

33

58

10

662

0

400

9

511

7

520

3

00010002000300040005000600070008000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016

+Aug15 Aug16

62

05

64

16

59

43

58

36

58

10

63

63

66

86

60

34

61

75

63

20

64

95

63

89

67

83

62

24

60

87

54

00

52

03

0

20

40

60

80

April

May

Jun

e

July

Augu

st

Septe

mber

Octo

ber

Nove

mb

er

Dece

mb

er

Jan

uary

Febru

ary

Marc

hAll India PLF Month-wise

2015-16 2016-17

2010-11 2011-12 2012-13 2013-15 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumersP Provisional

Total Number of Villages

597464

Pump sets

Energised as on

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

NotIncludin

g Subsidiy

booked

Only

Agriculture

2013-14 400 175

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Provisional

11

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should

be obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the

village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA

is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data

As such each monthly report of Village electrification of CEA is independent of the earlier published

reports

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31072016

Villiages Electrified (Nos) as on 310816

9810589068

Villages electrified

15 All India Coal consumption for Power Generation (MT)

515

14 All India per capita consumption of Electricity ( KWh)

Realization(paiseunit)

20550647

Pump sets Energised as on 31-08-16

cost of supply (paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer mat not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1266360 1932910 5113550 8312820

Hydro 258402 81700 59500 399602

Nuclear 100000 000 000 100000

Total 1624762 2014610 5173050 8812422

Acievement 6206 12972 11048 9953

1 Capacity Addtion Targets and Achievements in the 12th Plan

12

Achievement of Capacity Addition during the Current Plan upto Aug 2016

Achievements upto Aug 2016 during the 12th Plan

723

400

0

108

970

0

53

000

0

831

282

0

39

960

2

10

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 8812422 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 27305 0 255 0 255 255

State 3910 910 0 1820 750 -1070

Pvt 6800 0 300 3650 2173 -1477

Total 134405 910 3255 5470 29485 -25215

Central 490 0 40 0 80 80

State 395 80 40 205 105 -100

Pvt 829 0 0 0 0 0

Total 1714 80 80 205 185 -20

Nuclear Central 1500 0 0 0 0 0

Central 47205 0 655 0 1055 1055

State 4305 990 40 2025 855 -1170

Pvt 7629 0 300 3650 2173 -1477

Total 166545 990 4055 5675 31335 -25415

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Aug 2016

Thermal

2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016

Aug-16 April 16 - Aug 16Schemes Sector

Target

2016-17

91

0

80

0

99

0

32

55

80

0

40

55

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during Aug 2016 Target

Achievement

54

70

20

5

0

56

75

29

49

18

5

0

31

34

0

1000

2000

3000

4000

5000

6000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2016-17 Target

Achievement

Coal Gas Diesel Total

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Sub Total 31000 172380 3600 206980 000 124200 26372 357552

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1110 5115

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30062016 is given below (in MW)

430427 2715140 780534 4423692

1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and

New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)

and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh

14

4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 31082016)

(UTILITIES)

RegionOwnership

Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Northern

Region

Western Region

Southern

Region

Eastern Region

North Eastern

Region

Islands

ALL INDIA

Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

486083 11508

2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016

3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 44550 10800 000 55350 000 000 3987 59337

Central 442137 20761 000 462898 12208 76264 000 551370

Sub-Total 500187 211601 000 711788 12208 76264 3987 804247

State 272000 15000 000 287000 000 88451 5930 381381

Private 216550 000 000 216550 000 000 7489 224039

Central 120203 53529 000 173732 10916 61013 000 245661

Sub-Total 608753 68529 000 677282 10916 149464 13419 851081

State 000 000 000 000 000 45860 25611 71471

Private 000 000 000 000 000 174800 53790 228590

Central 15202 6188 000 21390 3408 128894 000 153692

Sub-Total 15202 6188 000 21390 3408 349554 79401 453753

State 000 17500 000 17500 000 123000 10653 151153

Private 000 000 000 000 000 000 5100 5100

Central 32932 12914 000 45846 7700 104435 000 157981

Sub-Total 32932 30414 000 63346 7700 227435 15753 314234

State 263000 15000 000 278000 000 223023 12780 513803

Private 501400 000 000 501400 000 000 72955 574355

Central 66088 26392 000 92480 20804 92165 000 205449

Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607

State 519000 60380 000 579380 000 98796 2385 680561

Private 319600 000 000 319600 000 000 540135 859735

Central 101472 22123 000 123595 57300 74153 000 255048

Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344

State 592300 000 000 592300 000 52410 2510 647220

Private 634600 000 000 634600 000 000 101850 736450

Central 290995 54997 000 345992 33572 166065 000 545629

Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299

State 000 000 000 000 000 125215 6287 131502

Private 9900 22500 000 32400 000 73000 26361 131761

Central 30050 6935 000 36985 2228 46924 000 86137

Sub-Total 39950 29435 000 69385 2228 245139 32648 349400

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 681 681

Central 3254 1532 000 4786 884 6274 000 11944

Sub-Total 3254 1532 000 4786 884 6274 681 12625

97719 29035 000 126754 12980 70436 000 210170

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

Uttrakhnad

Chandigarh

Central - Unallocated

Total (Northern

Region)

Rajasthan

Punjab

Haryana

Himachal

Pradesh

Jammu amp

Kashmir

Uttar

Pradesh

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

State Ownership

Sector

Modewise breakup

Grand TotalThermal

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Nuclear

Delhi

Hydro

(Renewable)

RES

(MNRE)

15

(As on 31082016)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 000 4800

Central 33860 000 000 33860 2580 000 000 36440

Sub-Total 33860 4800 000 38660 2580 000 005 41245

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 400 400

Central 4338 420 000 4758 738 000 000 5496

Sub-Total 4338 420 000 4758 738 000 400 5896

State 522000 232182 000 754182 000 77200 800 832182

Private 864200 406000 000 1270200 000 000 529272 1799472

Central 288862 42427 000 331289 55932 000 000 387221

Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875

State 408000 000 000 408000 000 170366 8396 586762

Private 538900 000 000 538900 000 000 312007 850907

Central 249005 25718 000 274723 27324 152000 000 454047

Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716

State 328000 000 000 328000 000 12000 1105 341105

Private 1089800 000 000 1089800 000 000 43863 1133663

Central 157454 000 000 157454 4752 000 000 162206

Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974

State 1055000 67200 000 1122200 000 288484 20813 1431497

Private 1179600 56800 000 1236400 000 44700 644639 1925739

Central 371226 262393 000 633619 69014 000 000 702633

Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 5422 2710 000 8132 846 000 000 8978

Sub-Total 5422 2710 000 8132 846 000 000 8978

179635 19691 000 199326 22814 000 000 222140

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

16

Daman amp Diu

Gujarat

Central - Unallocated

Total (Western

Region)

Madhya

Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Goa

State Ownership

Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

Coal Gas Diesel Total

State 308591 23540 000 332131 000 175887 8950 516968

Private 299000 307411 1697 608108 000 000 291171 899279

Central 147330 000 000 147330 12716 000 000 160046

Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294

State 480659 000 000 480659 000 217566 000 698225

Private 27000 157089 1983 186072 000 000 89529 275601

Central 172188 000 000 172188 14862 000 000 187050

Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876

State 422000 000 12792 434792 000 359980 15533 810305

Private 206000 000 10650 216650 000 000 496005 712655

Central 162846 000 000 162846 47586 000 000 210432

Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392

State 000 000 15996 15996 000 188150 13892 218038

Private 000 17400 000 17400 000 000 11655 29055

Central 103869 35958 000 139827 22860 000 000 162687

Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780

State 477000 52408 000 529408 000 218220 12270 759898

Private 295000 50310 41166 386476 000 000 965460 1351936

Central 415510 000 000 415510 98650 000 000 514160

Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10017 000 000 10017 000 000 000 10017

Sub-Total 10017 000 000 10017 000 000 000 10017

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 003 003

Central 24932 000 000 24932 5278 000 000 30210

Sub-Total 24932 3250 000 28182 5278 000 003 33463

152308 000 000 152308 30048 000 000 182356

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

17

Total (Southern

Region)

NLC

Central - Unallocated

Karnataka

Kerala

Tamil Nadu

Thermal

NuclearHydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

State Ownership

Sector

Modewise breakup

Grand Total

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Andhra Pradesh

Telangana

Puducherry

(As on 31082016)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 000 000 000 000 000 000 8852 8852

Central 253124 000 000 253124 000 12943 000 266067

Sub-Total 274124 000 000 274124 000 12943 15922 302989

State 119000 000 000 119000 000 13000 405 132405

Private 90000 000 000 90000 000 000 1619 91619

Central 31493 000 000 31493 000 7093 000 38586

Sub-Total 240493 000 000 240493 000 20093 2024 262610

State 572000 10000 000 582000 000 97700 9195 688895

Private 178138 000 000 178138 000 000 4432 182570

Central 92245 000 000 92245 000 43130 000 135375

Sub-Total 842383 10000 000 852383 000 140830 13627 1006840

State 000 000 000 000 000 000 000 000

Private 105000 000 000 105000 000 000 000 105000

Central 721066 000 000 721066 000 19326 000 740392

Sub-Total 826066 000 000 826066 000 19326 000 845392

State 42000 000 000 42000 000 206192 630 248822

Private 500000 000 000 500000 000 000 14525 514525

Central 168304 000 000 168304 000 10501 000 178805

Sub-Total 710304 000 000 710304 000 216693 15155 942152

State 000 000 000 000 000 000 5211 5211

Private 000 000 000 000 000 19500 000 19500

Central 9210 000 000 9210 000 7527 000 16737

Sub-Total 9210 000 000 9210 000 27027 5211 41448

159707 000 000 159707 000 000 000 159707

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138

18

Central - Unallocated

Total (Eastern

Region)

Jharkhand

West Bengal

DVC

Odisha

Sikkim

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Bihar

(As on 31082016)

Coal Gas Diesel Total

State 6000 27620 000 33620 000 10000 3001 46621

Private 000 2450 000 2450 000 000 410 2860

Central 12700 43560 000 56260 000 32972 000 89232

Sub-Total 18700 73630 000 92330 000 42972 3411 138713

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 027 027

Central 1235 4683 000 5918 000 9757 000 15675

Sub-Total 1235 4683 000 5918 000 9757 10488 26163

State 000 000 000 000 000 28200 3103 31303

Private 000 000 000 000 000 000 000 000

Central 1770 10979 000 12749 000 7458 000 20207

Sub-Total 1770 10979 000 12749 000 35658 3103 51510

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 1870 33896 000 35766 000 6237 000 42003

Sub-Total 1870 50846 000 52716 000 6237 2101 61054

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 000

Central 1570 7161 000 8731 000 8098 000 16829

Sub-Total 1570 7161 3600 12331 000 8098 545 20974

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 1070 4891 000 5961 000 5332 000 11293

Sub-Total 1070 4891 000 5961 000 5332 3067 14360

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 010 010

Central 1035 4054 000 5089 000 3431 000 8520

Sub-Total 1035 4054 000 5089 000 3431 3657 12177

3750 16136 000 19886 000 12715 000 32601

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Grand Total 31000 172380 3600 206980 000 124200 26372 357552

(As on 31082016)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 510 510

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1035 5040

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1110 5115

19

NuclearHydro

(Renewable)

RES

(MNRE)

Modewise breakup

Andaman amp

Nicobar

lakshadweep

Total (Islands)

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

SectorGrand Total

Thermal

Arunachal

Pradesh

Meghalaya

Tripura

Manipur

Nagaland

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

RES

(MNRE)

Assam

Mizoram

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

SN Contents Page

1Programme and Achievements of Transmission Lines in Aug 2016 and during April

2016 to Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

Section C - Transmission Lines

20

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 8: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

5

9117

0

Apr 15 - Aug 15

1583

4340

3318

9241

4134

0 0

6 Transmission Lines Added during Aug 2016 (Ckms)

2835

1480

3051

669

2455

2148

Transmission Lines Added during Apr 15 to Aug 15 amp Apr 16 to Aug16 (Ckms)

Aug-16

0

Aug-15

0

Apr 16 - Aug 16

0

1190

596

181

1390

0 0

9117

9241

9000

9050

9100

9150

9200

9250

9300

ck

ms

Apr 15 to Aug15 Apr 16 to Aug16

2455

3051

0

500

1000

1500

2000

2500

3000

3500

1

ckm

s

Aug 15 Aug 16

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

1760

1500

7 Transformation Capacity Addition During Aug 2016 (MVA)

4760

0

1500

945

1110

0 1500

3940

8540

0

Aug-15 Aug-16

April 15 to Aug 15 April 16 to Aug 16

3555

0

0

0 1500

All India Transformation Capacity Addition during Apr 15 to Aug 15 amp Apr

16 to Aug 16 (MVA)

27435

0

9000

10835

6100

24480

12000

3555

4760

0500

100015002000250030003500400045005000

MV

A

Transformation Capacity Addition during Aug 2016

Aug 15 Aug16

24480

27435

24000

1

MV

A

Apr 15 to Aug 15 Apr 16 to Aug 16

Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug 16

Northern 32831 31913 31055 31481 -54 -14

Western 27625 27283 27556 27277 -02 00

Southern 24488 26487 23995 26473 -20 -01

Eastern 11187 11230 11132 11221 -05 -01

North Eastern 1297 1461 1221 1421 -59 -28

All India 97428 98374 94959 97873 -25 -05

Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug16

Northern 54474 50917 50230 48541 -78 -47

Western 42024 40122 41781 39903 -06 -05

Southern 37136 41168 35892 40526 -33 -16

Eastern 17363 18334 17149 18219 -12 -06

North Eastern 2437 2435 2283 2387 -63 -20

All India 149492 151719 146124 148347 -23 -22

7

Region

Power (MW)

8 Power Supply Position (Energy amp Peak) in Aug 2016

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region Deficit ()

Deficit ()

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand

Aug 15 0 0 0 0 339 0 0 3943 75

Aug 16 0 0 0 0 359 0 0 924 75

p

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa

Aug 15 128 31 7 124 0 0 37

Aug 16 21 0 0 13 0 0 2

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Aug 15 0 14 564 151 106 1 0

Aug 16 3 14 76 3 6 3 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions

0 0 0 0

35

9

0 0

92

4

75

0 0 0 0

33

9

0 0

39

43

75

0400800

120016002000240028003200360040004400

Ch

and

iga

rh

De

lhi

Ha

rya

na

HP

Jamp

K

Pun

jab

Ra

jasth

an

UP

Utr

akh

an

d

MW

Northern States (MW)Aug 16 Aug 15

21

0 0

13

0 0 2

128

31

7

124

0 0

37

0

20

40

60

80

100

120

140

Cha

ttis

garh

Gu

jara

t

MP

Mahara

shtr

a

Dam

an amp

Diu

Dad

ar

Na

gar

Haveli G

oa

MW

Western States (MW)Aug 16 Aug 15

3 14 7

6

3 6 3 00 14

564

151

106

1

0

1000

AP

Tele

nga

na

Karn

ata

ka

Kera

la

Tam

il N

ad

u

Pud

uch

err

y

La

ksh

yad

ee

p

MW

Southern States (MW) Aug16 Aug 15

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Aug 15 160 30 25 18 42 0 8

Aug 16 0 100 0 0 19 0 8

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Aug 15 1 82 2 0 1 1 1

Aug 16 8 28 0 0 2 1 0

9

0

100

0 0

19

0 8

160

30

25

18

42

0 8

020406080

100120140160180

Bih

ar

DV

C

Jh

ark

ha

nd

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

N I

sla

nd

MW

Eastern States (MW)Aug 16 Aug15

8

28

0 0 2 1 01

82

2 0 1 1 10

102030405060708090

Aru

na

ch

al

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

ga

lan

d

Tri

pu

ra

MW

North-Eastern States (MW) Aug 16 Aug 15

Sector Aug 15 Aug 16

Central 6925 6620

State 4965 4009

Private 5633 5117

ALL INDIA 5810 5203

Month 2015-16 2016-17

April 6205 6783

May 6416 6224June 5943 6087

July 5836 5400

August 5810 5203

September 6363

October 6686

November 6034

December 6175

January 6320

February 6495

March 6389

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Aug 2016

69

25

49

65

56

33

58

10

662

0

400

9

511

7

520

3

00010002000300040005000600070008000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016

+Aug15 Aug16

62

05

64

16

59

43

58

36

58

10

63

63

66

86

60

34

61

75

63

20

64

95

63

89

67

83

62

24

60

87

54

00

52

03

0

20

40

60

80

April

May

Jun

e

July

Augu

st

Septe

mber

Octo

ber

Nove

mb

er

Dece

mb

er

Jan

uary

Febru

ary

Marc

hAll India PLF Month-wise

2015-16 2016-17

2010-11 2011-12 2012-13 2013-15 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumersP Provisional

Total Number of Villages

597464

Pump sets

Energised as on

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

NotIncludin

g Subsidiy

booked

Only

Agriculture

2013-14 400 175

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Provisional

11

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should

be obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the

village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA

is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data

As such each monthly report of Village electrification of CEA is independent of the earlier published

reports

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31072016

Villiages Electrified (Nos) as on 310816

9810589068

Villages electrified

15 All India Coal consumption for Power Generation (MT)

515

14 All India per capita consumption of Electricity ( KWh)

Realization(paiseunit)

20550647

Pump sets Energised as on 31-08-16

cost of supply (paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer mat not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1266360 1932910 5113550 8312820

Hydro 258402 81700 59500 399602

Nuclear 100000 000 000 100000

Total 1624762 2014610 5173050 8812422

Acievement 6206 12972 11048 9953

1 Capacity Addtion Targets and Achievements in the 12th Plan

12

Achievement of Capacity Addition during the Current Plan upto Aug 2016

Achievements upto Aug 2016 during the 12th Plan

723

400

0

108

970

0

53

000

0

831

282

0

39

960

2

10

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 8812422 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 27305 0 255 0 255 255

State 3910 910 0 1820 750 -1070

Pvt 6800 0 300 3650 2173 -1477

Total 134405 910 3255 5470 29485 -25215

Central 490 0 40 0 80 80

State 395 80 40 205 105 -100

Pvt 829 0 0 0 0 0

Total 1714 80 80 205 185 -20

Nuclear Central 1500 0 0 0 0 0

Central 47205 0 655 0 1055 1055

State 4305 990 40 2025 855 -1170

Pvt 7629 0 300 3650 2173 -1477

Total 166545 990 4055 5675 31335 -25415

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Aug 2016

Thermal

2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016

Aug-16 April 16 - Aug 16Schemes Sector

Target

2016-17

91

0

80

0

99

0

32

55

80

0

40

55

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during Aug 2016 Target

Achievement

54

70

20

5

0

56

75

29

49

18

5

0

31

34

0

1000

2000

3000

4000

5000

6000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2016-17 Target

Achievement

Coal Gas Diesel Total

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Sub Total 31000 172380 3600 206980 000 124200 26372 357552

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1110 5115

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30062016 is given below (in MW)

430427 2715140 780534 4423692

1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and

New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)

and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh

14

4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 31082016)

(UTILITIES)

RegionOwnership

Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Northern

Region

Western Region

Southern

Region

Eastern Region

North Eastern

Region

Islands

ALL INDIA

Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

486083 11508

2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016

3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 44550 10800 000 55350 000 000 3987 59337

Central 442137 20761 000 462898 12208 76264 000 551370

Sub-Total 500187 211601 000 711788 12208 76264 3987 804247

State 272000 15000 000 287000 000 88451 5930 381381

Private 216550 000 000 216550 000 000 7489 224039

Central 120203 53529 000 173732 10916 61013 000 245661

Sub-Total 608753 68529 000 677282 10916 149464 13419 851081

State 000 000 000 000 000 45860 25611 71471

Private 000 000 000 000 000 174800 53790 228590

Central 15202 6188 000 21390 3408 128894 000 153692

Sub-Total 15202 6188 000 21390 3408 349554 79401 453753

State 000 17500 000 17500 000 123000 10653 151153

Private 000 000 000 000 000 000 5100 5100

Central 32932 12914 000 45846 7700 104435 000 157981

Sub-Total 32932 30414 000 63346 7700 227435 15753 314234

State 263000 15000 000 278000 000 223023 12780 513803

Private 501400 000 000 501400 000 000 72955 574355

Central 66088 26392 000 92480 20804 92165 000 205449

Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607

State 519000 60380 000 579380 000 98796 2385 680561

Private 319600 000 000 319600 000 000 540135 859735

Central 101472 22123 000 123595 57300 74153 000 255048

Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344

State 592300 000 000 592300 000 52410 2510 647220

Private 634600 000 000 634600 000 000 101850 736450

Central 290995 54997 000 345992 33572 166065 000 545629

Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299

State 000 000 000 000 000 125215 6287 131502

Private 9900 22500 000 32400 000 73000 26361 131761

Central 30050 6935 000 36985 2228 46924 000 86137

Sub-Total 39950 29435 000 69385 2228 245139 32648 349400

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 681 681

Central 3254 1532 000 4786 884 6274 000 11944

Sub-Total 3254 1532 000 4786 884 6274 681 12625

97719 29035 000 126754 12980 70436 000 210170

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

Uttrakhnad

Chandigarh

Central - Unallocated

Total (Northern

Region)

Rajasthan

Punjab

Haryana

Himachal

Pradesh

Jammu amp

Kashmir

Uttar

Pradesh

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

State Ownership

Sector

Modewise breakup

Grand TotalThermal

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Nuclear

Delhi

Hydro

(Renewable)

RES

(MNRE)

15

(As on 31082016)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 000 4800

Central 33860 000 000 33860 2580 000 000 36440

Sub-Total 33860 4800 000 38660 2580 000 005 41245

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 400 400

Central 4338 420 000 4758 738 000 000 5496

Sub-Total 4338 420 000 4758 738 000 400 5896

State 522000 232182 000 754182 000 77200 800 832182

Private 864200 406000 000 1270200 000 000 529272 1799472

Central 288862 42427 000 331289 55932 000 000 387221

Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875

State 408000 000 000 408000 000 170366 8396 586762

Private 538900 000 000 538900 000 000 312007 850907

Central 249005 25718 000 274723 27324 152000 000 454047

Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716

State 328000 000 000 328000 000 12000 1105 341105

Private 1089800 000 000 1089800 000 000 43863 1133663

Central 157454 000 000 157454 4752 000 000 162206

Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974

State 1055000 67200 000 1122200 000 288484 20813 1431497

Private 1179600 56800 000 1236400 000 44700 644639 1925739

Central 371226 262393 000 633619 69014 000 000 702633

Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 5422 2710 000 8132 846 000 000 8978

Sub-Total 5422 2710 000 8132 846 000 000 8978

179635 19691 000 199326 22814 000 000 222140

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

16

Daman amp Diu

Gujarat

Central - Unallocated

Total (Western

Region)

Madhya

Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Goa

State Ownership

Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

Coal Gas Diesel Total

State 308591 23540 000 332131 000 175887 8950 516968

Private 299000 307411 1697 608108 000 000 291171 899279

Central 147330 000 000 147330 12716 000 000 160046

Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294

State 480659 000 000 480659 000 217566 000 698225

Private 27000 157089 1983 186072 000 000 89529 275601

Central 172188 000 000 172188 14862 000 000 187050

Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876

State 422000 000 12792 434792 000 359980 15533 810305

Private 206000 000 10650 216650 000 000 496005 712655

Central 162846 000 000 162846 47586 000 000 210432

Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392

State 000 000 15996 15996 000 188150 13892 218038

Private 000 17400 000 17400 000 000 11655 29055

Central 103869 35958 000 139827 22860 000 000 162687

Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780

State 477000 52408 000 529408 000 218220 12270 759898

Private 295000 50310 41166 386476 000 000 965460 1351936

Central 415510 000 000 415510 98650 000 000 514160

Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10017 000 000 10017 000 000 000 10017

Sub-Total 10017 000 000 10017 000 000 000 10017

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 003 003

Central 24932 000 000 24932 5278 000 000 30210

Sub-Total 24932 3250 000 28182 5278 000 003 33463

152308 000 000 152308 30048 000 000 182356

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

17

Total (Southern

Region)

NLC

Central - Unallocated

Karnataka

Kerala

Tamil Nadu

Thermal

NuclearHydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

State Ownership

Sector

Modewise breakup

Grand Total

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Andhra Pradesh

Telangana

Puducherry

(As on 31082016)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 000 000 000 000 000 000 8852 8852

Central 253124 000 000 253124 000 12943 000 266067

Sub-Total 274124 000 000 274124 000 12943 15922 302989

State 119000 000 000 119000 000 13000 405 132405

Private 90000 000 000 90000 000 000 1619 91619

Central 31493 000 000 31493 000 7093 000 38586

Sub-Total 240493 000 000 240493 000 20093 2024 262610

State 572000 10000 000 582000 000 97700 9195 688895

Private 178138 000 000 178138 000 000 4432 182570

Central 92245 000 000 92245 000 43130 000 135375

Sub-Total 842383 10000 000 852383 000 140830 13627 1006840

State 000 000 000 000 000 000 000 000

Private 105000 000 000 105000 000 000 000 105000

Central 721066 000 000 721066 000 19326 000 740392

Sub-Total 826066 000 000 826066 000 19326 000 845392

State 42000 000 000 42000 000 206192 630 248822

Private 500000 000 000 500000 000 000 14525 514525

Central 168304 000 000 168304 000 10501 000 178805

Sub-Total 710304 000 000 710304 000 216693 15155 942152

State 000 000 000 000 000 000 5211 5211

Private 000 000 000 000 000 19500 000 19500

Central 9210 000 000 9210 000 7527 000 16737

Sub-Total 9210 000 000 9210 000 27027 5211 41448

159707 000 000 159707 000 000 000 159707

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138

18

Central - Unallocated

Total (Eastern

Region)

Jharkhand

West Bengal

DVC

Odisha

Sikkim

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Bihar

(As on 31082016)

Coal Gas Diesel Total

State 6000 27620 000 33620 000 10000 3001 46621

Private 000 2450 000 2450 000 000 410 2860

Central 12700 43560 000 56260 000 32972 000 89232

Sub-Total 18700 73630 000 92330 000 42972 3411 138713

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 027 027

Central 1235 4683 000 5918 000 9757 000 15675

Sub-Total 1235 4683 000 5918 000 9757 10488 26163

State 000 000 000 000 000 28200 3103 31303

Private 000 000 000 000 000 000 000 000

Central 1770 10979 000 12749 000 7458 000 20207

Sub-Total 1770 10979 000 12749 000 35658 3103 51510

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 1870 33896 000 35766 000 6237 000 42003

Sub-Total 1870 50846 000 52716 000 6237 2101 61054

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 000

Central 1570 7161 000 8731 000 8098 000 16829

Sub-Total 1570 7161 3600 12331 000 8098 545 20974

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 1070 4891 000 5961 000 5332 000 11293

Sub-Total 1070 4891 000 5961 000 5332 3067 14360

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 010 010

Central 1035 4054 000 5089 000 3431 000 8520

Sub-Total 1035 4054 000 5089 000 3431 3657 12177

3750 16136 000 19886 000 12715 000 32601

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Grand Total 31000 172380 3600 206980 000 124200 26372 357552

(As on 31082016)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 510 510

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1035 5040

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1110 5115

19

NuclearHydro

(Renewable)

RES

(MNRE)

Modewise breakup

Andaman amp

Nicobar

lakshadweep

Total (Islands)

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

SectorGrand Total

Thermal

Arunachal

Pradesh

Meghalaya

Tripura

Manipur

Nagaland

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

RES

(MNRE)

Assam

Mizoram

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

SN Contents Page

1Programme and Achievements of Transmission Lines in Aug 2016 and during April

2016 to Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

Section C - Transmission Lines

20

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 9: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

1760

1500

7 Transformation Capacity Addition During Aug 2016 (MVA)

4760

0

1500

945

1110

0 1500

3940

8540

0

Aug-15 Aug-16

April 15 to Aug 15 April 16 to Aug 16

3555

0

0

0 1500

All India Transformation Capacity Addition during Apr 15 to Aug 15 amp Apr

16 to Aug 16 (MVA)

27435

0

9000

10835

6100

24480

12000

3555

4760

0500

100015002000250030003500400045005000

MV

A

Transformation Capacity Addition during Aug 2016

Aug 15 Aug16

24480

27435

24000

1

MV

A

Apr 15 to Aug 15 Apr 16 to Aug 16

Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug 16

Northern 32831 31913 31055 31481 -54 -14

Western 27625 27283 27556 27277 -02 00

Southern 24488 26487 23995 26473 -20 -01

Eastern 11187 11230 11132 11221 -05 -01

North Eastern 1297 1461 1221 1421 -59 -28

All India 97428 98374 94959 97873 -25 -05

Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug16

Northern 54474 50917 50230 48541 -78 -47

Western 42024 40122 41781 39903 -06 -05

Southern 37136 41168 35892 40526 -33 -16

Eastern 17363 18334 17149 18219 -12 -06

North Eastern 2437 2435 2283 2387 -63 -20

All India 149492 151719 146124 148347 -23 -22

7

Region

Power (MW)

8 Power Supply Position (Energy amp Peak) in Aug 2016

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region Deficit ()

Deficit ()

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand

Aug 15 0 0 0 0 339 0 0 3943 75

Aug 16 0 0 0 0 359 0 0 924 75

p

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa

Aug 15 128 31 7 124 0 0 37

Aug 16 21 0 0 13 0 0 2

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Aug 15 0 14 564 151 106 1 0

Aug 16 3 14 76 3 6 3 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions

0 0 0 0

35

9

0 0

92

4

75

0 0 0 0

33

9

0 0

39

43

75

0400800

120016002000240028003200360040004400

Ch

and

iga

rh

De

lhi

Ha

rya

na

HP

Jamp

K

Pun

jab

Ra

jasth

an

UP

Utr

akh

an

d

MW

Northern States (MW)Aug 16 Aug 15

21

0 0

13

0 0 2

128

31

7

124

0 0

37

0

20

40

60

80

100

120

140

Cha

ttis

garh

Gu

jara

t

MP

Mahara

shtr

a

Dam

an amp

Diu

Dad

ar

Na

gar

Haveli G

oa

MW

Western States (MW)Aug 16 Aug 15

3 14 7

6

3 6 3 00 14

564

151

106

1

0

1000

AP

Tele

nga

na

Karn

ata

ka

Kera

la

Tam

il N

ad

u

Pud

uch

err

y

La

ksh

yad

ee

p

MW

Southern States (MW) Aug16 Aug 15

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Aug 15 160 30 25 18 42 0 8

Aug 16 0 100 0 0 19 0 8

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Aug 15 1 82 2 0 1 1 1

Aug 16 8 28 0 0 2 1 0

9

0

100

0 0

19

0 8

160

30

25

18

42

0 8

020406080

100120140160180

Bih

ar

DV

C

Jh

ark

ha

nd

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

N I

sla

nd

MW

Eastern States (MW)Aug 16 Aug15

8

28

0 0 2 1 01

82

2 0 1 1 10

102030405060708090

Aru

na

ch

al

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

ga

lan

d

Tri

pu

ra

MW

North-Eastern States (MW) Aug 16 Aug 15

Sector Aug 15 Aug 16

Central 6925 6620

State 4965 4009

Private 5633 5117

ALL INDIA 5810 5203

Month 2015-16 2016-17

April 6205 6783

May 6416 6224June 5943 6087

July 5836 5400

August 5810 5203

September 6363

October 6686

November 6034

December 6175

January 6320

February 6495

March 6389

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Aug 2016

69

25

49

65

56

33

58

10

662

0

400

9

511

7

520

3

00010002000300040005000600070008000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016

+Aug15 Aug16

62

05

64

16

59

43

58

36

58

10

63

63

66

86

60

34

61

75

63

20

64

95

63

89

67

83

62

24

60

87

54

00

52

03

0

20

40

60

80

April

May

Jun

e

July

Augu

st

Septe

mber

Octo

ber

Nove

mb

er

Dece

mb

er

Jan

uary

Febru

ary

Marc

hAll India PLF Month-wise

2015-16 2016-17

2010-11 2011-12 2012-13 2013-15 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumersP Provisional

Total Number of Villages

597464

Pump sets

Energised as on

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

NotIncludin

g Subsidiy

booked

Only

Agriculture

2013-14 400 175

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Provisional

11

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should

be obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the

village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA

is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data

As such each monthly report of Village electrification of CEA is independent of the earlier published

reports

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31072016

Villiages Electrified (Nos) as on 310816

9810589068

Villages electrified

15 All India Coal consumption for Power Generation (MT)

515

14 All India per capita consumption of Electricity ( KWh)

Realization(paiseunit)

20550647

Pump sets Energised as on 31-08-16

cost of supply (paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer mat not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1266360 1932910 5113550 8312820

Hydro 258402 81700 59500 399602

Nuclear 100000 000 000 100000

Total 1624762 2014610 5173050 8812422

Acievement 6206 12972 11048 9953

1 Capacity Addtion Targets and Achievements in the 12th Plan

12

Achievement of Capacity Addition during the Current Plan upto Aug 2016

Achievements upto Aug 2016 during the 12th Plan

723

400

0

108

970

0

53

000

0

831

282

0

39

960

2

10

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 8812422 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 27305 0 255 0 255 255

State 3910 910 0 1820 750 -1070

Pvt 6800 0 300 3650 2173 -1477

Total 134405 910 3255 5470 29485 -25215

Central 490 0 40 0 80 80

State 395 80 40 205 105 -100

Pvt 829 0 0 0 0 0

Total 1714 80 80 205 185 -20

Nuclear Central 1500 0 0 0 0 0

Central 47205 0 655 0 1055 1055

State 4305 990 40 2025 855 -1170

Pvt 7629 0 300 3650 2173 -1477

Total 166545 990 4055 5675 31335 -25415

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Aug 2016

Thermal

2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016

Aug-16 April 16 - Aug 16Schemes Sector

Target

2016-17

91

0

80

0

99

0

32

55

80

0

40

55

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during Aug 2016 Target

Achievement

54

70

20

5

0

56

75

29

49

18

5

0

31

34

0

1000

2000

3000

4000

5000

6000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2016-17 Target

Achievement

Coal Gas Diesel Total

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Sub Total 31000 172380 3600 206980 000 124200 26372 357552

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1110 5115

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30062016 is given below (in MW)

430427 2715140 780534 4423692

1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and

New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)

and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh

14

4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 31082016)

(UTILITIES)

RegionOwnership

Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Northern

Region

Western Region

Southern

Region

Eastern Region

North Eastern

Region

Islands

ALL INDIA

Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

486083 11508

2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016

3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 44550 10800 000 55350 000 000 3987 59337

Central 442137 20761 000 462898 12208 76264 000 551370

Sub-Total 500187 211601 000 711788 12208 76264 3987 804247

State 272000 15000 000 287000 000 88451 5930 381381

Private 216550 000 000 216550 000 000 7489 224039

Central 120203 53529 000 173732 10916 61013 000 245661

Sub-Total 608753 68529 000 677282 10916 149464 13419 851081

State 000 000 000 000 000 45860 25611 71471

Private 000 000 000 000 000 174800 53790 228590

Central 15202 6188 000 21390 3408 128894 000 153692

Sub-Total 15202 6188 000 21390 3408 349554 79401 453753

State 000 17500 000 17500 000 123000 10653 151153

Private 000 000 000 000 000 000 5100 5100

Central 32932 12914 000 45846 7700 104435 000 157981

Sub-Total 32932 30414 000 63346 7700 227435 15753 314234

State 263000 15000 000 278000 000 223023 12780 513803

Private 501400 000 000 501400 000 000 72955 574355

Central 66088 26392 000 92480 20804 92165 000 205449

Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607

State 519000 60380 000 579380 000 98796 2385 680561

Private 319600 000 000 319600 000 000 540135 859735

Central 101472 22123 000 123595 57300 74153 000 255048

Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344

State 592300 000 000 592300 000 52410 2510 647220

Private 634600 000 000 634600 000 000 101850 736450

Central 290995 54997 000 345992 33572 166065 000 545629

Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299

State 000 000 000 000 000 125215 6287 131502

Private 9900 22500 000 32400 000 73000 26361 131761

Central 30050 6935 000 36985 2228 46924 000 86137

Sub-Total 39950 29435 000 69385 2228 245139 32648 349400

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 681 681

Central 3254 1532 000 4786 884 6274 000 11944

Sub-Total 3254 1532 000 4786 884 6274 681 12625

97719 29035 000 126754 12980 70436 000 210170

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

Uttrakhnad

Chandigarh

Central - Unallocated

Total (Northern

Region)

Rajasthan

Punjab

Haryana

Himachal

Pradesh

Jammu amp

Kashmir

Uttar

Pradesh

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

State Ownership

Sector

Modewise breakup

Grand TotalThermal

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Nuclear

Delhi

Hydro

(Renewable)

RES

(MNRE)

15

(As on 31082016)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 000 4800

Central 33860 000 000 33860 2580 000 000 36440

Sub-Total 33860 4800 000 38660 2580 000 005 41245

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 400 400

Central 4338 420 000 4758 738 000 000 5496

Sub-Total 4338 420 000 4758 738 000 400 5896

State 522000 232182 000 754182 000 77200 800 832182

Private 864200 406000 000 1270200 000 000 529272 1799472

Central 288862 42427 000 331289 55932 000 000 387221

Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875

State 408000 000 000 408000 000 170366 8396 586762

Private 538900 000 000 538900 000 000 312007 850907

Central 249005 25718 000 274723 27324 152000 000 454047

Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716

State 328000 000 000 328000 000 12000 1105 341105

Private 1089800 000 000 1089800 000 000 43863 1133663

Central 157454 000 000 157454 4752 000 000 162206

Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974

State 1055000 67200 000 1122200 000 288484 20813 1431497

Private 1179600 56800 000 1236400 000 44700 644639 1925739

Central 371226 262393 000 633619 69014 000 000 702633

Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 5422 2710 000 8132 846 000 000 8978

Sub-Total 5422 2710 000 8132 846 000 000 8978

179635 19691 000 199326 22814 000 000 222140

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

16

Daman amp Diu

Gujarat

Central - Unallocated

Total (Western

Region)

Madhya

Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Goa

State Ownership

Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

Coal Gas Diesel Total

State 308591 23540 000 332131 000 175887 8950 516968

Private 299000 307411 1697 608108 000 000 291171 899279

Central 147330 000 000 147330 12716 000 000 160046

Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294

State 480659 000 000 480659 000 217566 000 698225

Private 27000 157089 1983 186072 000 000 89529 275601

Central 172188 000 000 172188 14862 000 000 187050

Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876

State 422000 000 12792 434792 000 359980 15533 810305

Private 206000 000 10650 216650 000 000 496005 712655

Central 162846 000 000 162846 47586 000 000 210432

Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392

State 000 000 15996 15996 000 188150 13892 218038

Private 000 17400 000 17400 000 000 11655 29055

Central 103869 35958 000 139827 22860 000 000 162687

Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780

State 477000 52408 000 529408 000 218220 12270 759898

Private 295000 50310 41166 386476 000 000 965460 1351936

Central 415510 000 000 415510 98650 000 000 514160

Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10017 000 000 10017 000 000 000 10017

Sub-Total 10017 000 000 10017 000 000 000 10017

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 003 003

Central 24932 000 000 24932 5278 000 000 30210

Sub-Total 24932 3250 000 28182 5278 000 003 33463

152308 000 000 152308 30048 000 000 182356

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

17

Total (Southern

Region)

NLC

Central - Unallocated

Karnataka

Kerala

Tamil Nadu

Thermal

NuclearHydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

State Ownership

Sector

Modewise breakup

Grand Total

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Andhra Pradesh

Telangana

Puducherry

(As on 31082016)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 000 000 000 000 000 000 8852 8852

Central 253124 000 000 253124 000 12943 000 266067

Sub-Total 274124 000 000 274124 000 12943 15922 302989

State 119000 000 000 119000 000 13000 405 132405

Private 90000 000 000 90000 000 000 1619 91619

Central 31493 000 000 31493 000 7093 000 38586

Sub-Total 240493 000 000 240493 000 20093 2024 262610

State 572000 10000 000 582000 000 97700 9195 688895

Private 178138 000 000 178138 000 000 4432 182570

Central 92245 000 000 92245 000 43130 000 135375

Sub-Total 842383 10000 000 852383 000 140830 13627 1006840

State 000 000 000 000 000 000 000 000

Private 105000 000 000 105000 000 000 000 105000

Central 721066 000 000 721066 000 19326 000 740392

Sub-Total 826066 000 000 826066 000 19326 000 845392

State 42000 000 000 42000 000 206192 630 248822

Private 500000 000 000 500000 000 000 14525 514525

Central 168304 000 000 168304 000 10501 000 178805

Sub-Total 710304 000 000 710304 000 216693 15155 942152

State 000 000 000 000 000 000 5211 5211

Private 000 000 000 000 000 19500 000 19500

Central 9210 000 000 9210 000 7527 000 16737

Sub-Total 9210 000 000 9210 000 27027 5211 41448

159707 000 000 159707 000 000 000 159707

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138

18

Central - Unallocated

Total (Eastern

Region)

Jharkhand

West Bengal

DVC

Odisha

Sikkim

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Bihar

(As on 31082016)

Coal Gas Diesel Total

State 6000 27620 000 33620 000 10000 3001 46621

Private 000 2450 000 2450 000 000 410 2860

Central 12700 43560 000 56260 000 32972 000 89232

Sub-Total 18700 73630 000 92330 000 42972 3411 138713

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 027 027

Central 1235 4683 000 5918 000 9757 000 15675

Sub-Total 1235 4683 000 5918 000 9757 10488 26163

State 000 000 000 000 000 28200 3103 31303

Private 000 000 000 000 000 000 000 000

Central 1770 10979 000 12749 000 7458 000 20207

Sub-Total 1770 10979 000 12749 000 35658 3103 51510

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 1870 33896 000 35766 000 6237 000 42003

Sub-Total 1870 50846 000 52716 000 6237 2101 61054

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 000

Central 1570 7161 000 8731 000 8098 000 16829

Sub-Total 1570 7161 3600 12331 000 8098 545 20974

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 1070 4891 000 5961 000 5332 000 11293

Sub-Total 1070 4891 000 5961 000 5332 3067 14360

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 010 010

Central 1035 4054 000 5089 000 3431 000 8520

Sub-Total 1035 4054 000 5089 000 3431 3657 12177

3750 16136 000 19886 000 12715 000 32601

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Grand Total 31000 172380 3600 206980 000 124200 26372 357552

(As on 31082016)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 510 510

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1035 5040

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1110 5115

19

NuclearHydro

(Renewable)

RES

(MNRE)

Modewise breakup

Andaman amp

Nicobar

lakshadweep

Total (Islands)

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

SectorGrand Total

Thermal

Arunachal

Pradesh

Meghalaya

Tripura

Manipur

Nagaland

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

RES

(MNRE)

Assam

Mizoram

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

SN Contents Page

1Programme and Achievements of Transmission Lines in Aug 2016 and during April

2016 to Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

Section C - Transmission Lines

20

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 10: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug 16

Northern 32831 31913 31055 31481 -54 -14

Western 27625 27283 27556 27277 -02 00

Southern 24488 26487 23995 26473 -20 -01

Eastern 11187 11230 11132 11221 -05 -01

North Eastern 1297 1461 1221 1421 -59 -28

All India 97428 98374 94959 97873 -25 -05

Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug16

Northern 54474 50917 50230 48541 -78 -47

Western 42024 40122 41781 39903 -06 -05

Southern 37136 41168 35892 40526 -33 -16

Eastern 17363 18334 17149 18219 -12 -06

North Eastern 2437 2435 2283 2387 -63 -20

All India 149492 151719 146124 148347 -23 -22

7

Region

Power (MW)

8 Power Supply Position (Energy amp Peak) in Aug 2016

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region Deficit ()

Deficit ()

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand

Aug 15 0 0 0 0 339 0 0 3943 75

Aug 16 0 0 0 0 359 0 0 924 75

p

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa

Aug 15 128 31 7 124 0 0 37

Aug 16 21 0 0 13 0 0 2

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Aug 15 0 14 564 151 106 1 0

Aug 16 3 14 76 3 6 3 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions

0 0 0 0

35

9

0 0

92

4

75

0 0 0 0

33

9

0 0

39

43

75

0400800

120016002000240028003200360040004400

Ch

and

iga

rh

De

lhi

Ha

rya

na

HP

Jamp

K

Pun

jab

Ra

jasth

an

UP

Utr

akh

an

d

MW

Northern States (MW)Aug 16 Aug 15

21

0 0

13

0 0 2

128

31

7

124

0 0

37

0

20

40

60

80

100

120

140

Cha

ttis

garh

Gu

jara

t

MP

Mahara

shtr

a

Dam

an amp

Diu

Dad

ar

Na

gar

Haveli G

oa

MW

Western States (MW)Aug 16 Aug 15

3 14 7

6

3 6 3 00 14

564

151

106

1

0

1000

AP

Tele

nga

na

Karn

ata

ka

Kera

la

Tam

il N

ad

u

Pud

uch

err

y

La

ksh

yad

ee

p

MW

Southern States (MW) Aug16 Aug 15

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Aug 15 160 30 25 18 42 0 8

Aug 16 0 100 0 0 19 0 8

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Aug 15 1 82 2 0 1 1 1

Aug 16 8 28 0 0 2 1 0

9

0

100

0 0

19

0 8

160

30

25

18

42

0 8

020406080

100120140160180

Bih

ar

DV

C

Jh

ark

ha

nd

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

N I

sla

nd

MW

Eastern States (MW)Aug 16 Aug15

8

28

0 0 2 1 01

82

2 0 1 1 10

102030405060708090

Aru

na

ch

al

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

ga

lan

d

Tri

pu

ra

MW

North-Eastern States (MW) Aug 16 Aug 15

Sector Aug 15 Aug 16

Central 6925 6620

State 4965 4009

Private 5633 5117

ALL INDIA 5810 5203

Month 2015-16 2016-17

April 6205 6783

May 6416 6224June 5943 6087

July 5836 5400

August 5810 5203

September 6363

October 6686

November 6034

December 6175

January 6320

February 6495

March 6389

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Aug 2016

69

25

49

65

56

33

58

10

662

0

400

9

511

7

520

3

00010002000300040005000600070008000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016

+Aug15 Aug16

62

05

64

16

59

43

58

36

58

10

63

63

66

86

60

34

61

75

63

20

64

95

63

89

67

83

62

24

60

87

54

00

52

03

0

20

40

60

80

April

May

Jun

e

July

Augu

st

Septe

mber

Octo

ber

Nove

mb

er

Dece

mb

er

Jan

uary

Febru

ary

Marc

hAll India PLF Month-wise

2015-16 2016-17

2010-11 2011-12 2012-13 2013-15 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumersP Provisional

Total Number of Villages

597464

Pump sets

Energised as on

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

NotIncludin

g Subsidiy

booked

Only

Agriculture

2013-14 400 175

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Provisional

11

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should

be obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the

village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA

is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data

As such each monthly report of Village electrification of CEA is independent of the earlier published

reports

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31072016

Villiages Electrified (Nos) as on 310816

9810589068

Villages electrified

15 All India Coal consumption for Power Generation (MT)

515

14 All India per capita consumption of Electricity ( KWh)

Realization(paiseunit)

20550647

Pump sets Energised as on 31-08-16

cost of supply (paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer mat not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1266360 1932910 5113550 8312820

Hydro 258402 81700 59500 399602

Nuclear 100000 000 000 100000

Total 1624762 2014610 5173050 8812422

Acievement 6206 12972 11048 9953

1 Capacity Addtion Targets and Achievements in the 12th Plan

12

Achievement of Capacity Addition during the Current Plan upto Aug 2016

Achievements upto Aug 2016 during the 12th Plan

723

400

0

108

970

0

53

000

0

831

282

0

39

960

2

10

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 8812422 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 27305 0 255 0 255 255

State 3910 910 0 1820 750 -1070

Pvt 6800 0 300 3650 2173 -1477

Total 134405 910 3255 5470 29485 -25215

Central 490 0 40 0 80 80

State 395 80 40 205 105 -100

Pvt 829 0 0 0 0 0

Total 1714 80 80 205 185 -20

Nuclear Central 1500 0 0 0 0 0

Central 47205 0 655 0 1055 1055

State 4305 990 40 2025 855 -1170

Pvt 7629 0 300 3650 2173 -1477

Total 166545 990 4055 5675 31335 -25415

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Aug 2016

Thermal

2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016

Aug-16 April 16 - Aug 16Schemes Sector

Target

2016-17

91

0

80

0

99

0

32

55

80

0

40

55

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during Aug 2016 Target

Achievement

54

70

20

5

0

56

75

29

49

18

5

0

31

34

0

1000

2000

3000

4000

5000

6000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2016-17 Target

Achievement

Coal Gas Diesel Total

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Sub Total 31000 172380 3600 206980 000 124200 26372 357552

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1110 5115

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30062016 is given below (in MW)

430427 2715140 780534 4423692

1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and

New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)

and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh

14

4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 31082016)

(UTILITIES)

RegionOwnership

Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Northern

Region

Western Region

Southern

Region

Eastern Region

North Eastern

Region

Islands

ALL INDIA

Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

486083 11508

2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016

3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 44550 10800 000 55350 000 000 3987 59337

Central 442137 20761 000 462898 12208 76264 000 551370

Sub-Total 500187 211601 000 711788 12208 76264 3987 804247

State 272000 15000 000 287000 000 88451 5930 381381

Private 216550 000 000 216550 000 000 7489 224039

Central 120203 53529 000 173732 10916 61013 000 245661

Sub-Total 608753 68529 000 677282 10916 149464 13419 851081

State 000 000 000 000 000 45860 25611 71471

Private 000 000 000 000 000 174800 53790 228590

Central 15202 6188 000 21390 3408 128894 000 153692

Sub-Total 15202 6188 000 21390 3408 349554 79401 453753

State 000 17500 000 17500 000 123000 10653 151153

Private 000 000 000 000 000 000 5100 5100

Central 32932 12914 000 45846 7700 104435 000 157981

Sub-Total 32932 30414 000 63346 7700 227435 15753 314234

State 263000 15000 000 278000 000 223023 12780 513803

Private 501400 000 000 501400 000 000 72955 574355

Central 66088 26392 000 92480 20804 92165 000 205449

Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607

State 519000 60380 000 579380 000 98796 2385 680561

Private 319600 000 000 319600 000 000 540135 859735

Central 101472 22123 000 123595 57300 74153 000 255048

Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344

State 592300 000 000 592300 000 52410 2510 647220

Private 634600 000 000 634600 000 000 101850 736450

Central 290995 54997 000 345992 33572 166065 000 545629

Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299

State 000 000 000 000 000 125215 6287 131502

Private 9900 22500 000 32400 000 73000 26361 131761

Central 30050 6935 000 36985 2228 46924 000 86137

Sub-Total 39950 29435 000 69385 2228 245139 32648 349400

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 681 681

Central 3254 1532 000 4786 884 6274 000 11944

Sub-Total 3254 1532 000 4786 884 6274 681 12625

97719 29035 000 126754 12980 70436 000 210170

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

Uttrakhnad

Chandigarh

Central - Unallocated

Total (Northern

Region)

Rajasthan

Punjab

Haryana

Himachal

Pradesh

Jammu amp

Kashmir

Uttar

Pradesh

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

State Ownership

Sector

Modewise breakup

Grand TotalThermal

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Nuclear

Delhi

Hydro

(Renewable)

RES

(MNRE)

15

(As on 31082016)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 000 4800

Central 33860 000 000 33860 2580 000 000 36440

Sub-Total 33860 4800 000 38660 2580 000 005 41245

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 400 400

Central 4338 420 000 4758 738 000 000 5496

Sub-Total 4338 420 000 4758 738 000 400 5896

State 522000 232182 000 754182 000 77200 800 832182

Private 864200 406000 000 1270200 000 000 529272 1799472

Central 288862 42427 000 331289 55932 000 000 387221

Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875

State 408000 000 000 408000 000 170366 8396 586762

Private 538900 000 000 538900 000 000 312007 850907

Central 249005 25718 000 274723 27324 152000 000 454047

Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716

State 328000 000 000 328000 000 12000 1105 341105

Private 1089800 000 000 1089800 000 000 43863 1133663

Central 157454 000 000 157454 4752 000 000 162206

Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974

State 1055000 67200 000 1122200 000 288484 20813 1431497

Private 1179600 56800 000 1236400 000 44700 644639 1925739

Central 371226 262393 000 633619 69014 000 000 702633

Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 5422 2710 000 8132 846 000 000 8978

Sub-Total 5422 2710 000 8132 846 000 000 8978

179635 19691 000 199326 22814 000 000 222140

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

16

Daman amp Diu

Gujarat

Central - Unallocated

Total (Western

Region)

Madhya

Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Goa

State Ownership

Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

Coal Gas Diesel Total

State 308591 23540 000 332131 000 175887 8950 516968

Private 299000 307411 1697 608108 000 000 291171 899279

Central 147330 000 000 147330 12716 000 000 160046

Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294

State 480659 000 000 480659 000 217566 000 698225

Private 27000 157089 1983 186072 000 000 89529 275601

Central 172188 000 000 172188 14862 000 000 187050

Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876

State 422000 000 12792 434792 000 359980 15533 810305

Private 206000 000 10650 216650 000 000 496005 712655

Central 162846 000 000 162846 47586 000 000 210432

Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392

State 000 000 15996 15996 000 188150 13892 218038

Private 000 17400 000 17400 000 000 11655 29055

Central 103869 35958 000 139827 22860 000 000 162687

Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780

State 477000 52408 000 529408 000 218220 12270 759898

Private 295000 50310 41166 386476 000 000 965460 1351936

Central 415510 000 000 415510 98650 000 000 514160

Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10017 000 000 10017 000 000 000 10017

Sub-Total 10017 000 000 10017 000 000 000 10017

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 003 003

Central 24932 000 000 24932 5278 000 000 30210

Sub-Total 24932 3250 000 28182 5278 000 003 33463

152308 000 000 152308 30048 000 000 182356

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

17

Total (Southern

Region)

NLC

Central - Unallocated

Karnataka

Kerala

Tamil Nadu

Thermal

NuclearHydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

State Ownership

Sector

Modewise breakup

Grand Total

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Andhra Pradesh

Telangana

Puducherry

(As on 31082016)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 000 000 000 000 000 000 8852 8852

Central 253124 000 000 253124 000 12943 000 266067

Sub-Total 274124 000 000 274124 000 12943 15922 302989

State 119000 000 000 119000 000 13000 405 132405

Private 90000 000 000 90000 000 000 1619 91619

Central 31493 000 000 31493 000 7093 000 38586

Sub-Total 240493 000 000 240493 000 20093 2024 262610

State 572000 10000 000 582000 000 97700 9195 688895

Private 178138 000 000 178138 000 000 4432 182570

Central 92245 000 000 92245 000 43130 000 135375

Sub-Total 842383 10000 000 852383 000 140830 13627 1006840

State 000 000 000 000 000 000 000 000

Private 105000 000 000 105000 000 000 000 105000

Central 721066 000 000 721066 000 19326 000 740392

Sub-Total 826066 000 000 826066 000 19326 000 845392

State 42000 000 000 42000 000 206192 630 248822

Private 500000 000 000 500000 000 000 14525 514525

Central 168304 000 000 168304 000 10501 000 178805

Sub-Total 710304 000 000 710304 000 216693 15155 942152

State 000 000 000 000 000 000 5211 5211

Private 000 000 000 000 000 19500 000 19500

Central 9210 000 000 9210 000 7527 000 16737

Sub-Total 9210 000 000 9210 000 27027 5211 41448

159707 000 000 159707 000 000 000 159707

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138

18

Central - Unallocated

Total (Eastern

Region)

Jharkhand

West Bengal

DVC

Odisha

Sikkim

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Bihar

(As on 31082016)

Coal Gas Diesel Total

State 6000 27620 000 33620 000 10000 3001 46621

Private 000 2450 000 2450 000 000 410 2860

Central 12700 43560 000 56260 000 32972 000 89232

Sub-Total 18700 73630 000 92330 000 42972 3411 138713

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 027 027

Central 1235 4683 000 5918 000 9757 000 15675

Sub-Total 1235 4683 000 5918 000 9757 10488 26163

State 000 000 000 000 000 28200 3103 31303

Private 000 000 000 000 000 000 000 000

Central 1770 10979 000 12749 000 7458 000 20207

Sub-Total 1770 10979 000 12749 000 35658 3103 51510

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 1870 33896 000 35766 000 6237 000 42003

Sub-Total 1870 50846 000 52716 000 6237 2101 61054

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 000

Central 1570 7161 000 8731 000 8098 000 16829

Sub-Total 1570 7161 3600 12331 000 8098 545 20974

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 1070 4891 000 5961 000 5332 000 11293

Sub-Total 1070 4891 000 5961 000 5332 3067 14360

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 010 010

Central 1035 4054 000 5089 000 3431 000 8520

Sub-Total 1035 4054 000 5089 000 3431 3657 12177

3750 16136 000 19886 000 12715 000 32601

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Grand Total 31000 172380 3600 206980 000 124200 26372 357552

(As on 31082016)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 510 510

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1035 5040

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1110 5115

19

NuclearHydro

(Renewable)

RES

(MNRE)

Modewise breakup

Andaman amp

Nicobar

lakshadweep

Total (Islands)

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

SectorGrand Total

Thermal

Arunachal

Pradesh

Meghalaya

Tripura

Manipur

Nagaland

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

RES

(MNRE)

Assam

Mizoram

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

SN Contents Page

1Programme and Achievements of Transmission Lines in Aug 2016 and during April

2016 to Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

Section C - Transmission Lines

20

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 11: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand

Aug 15 0 0 0 0 339 0 0 3943 75

Aug 16 0 0 0 0 359 0 0 924 75

p

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa

Aug 15 128 31 7 124 0 0 37

Aug 16 21 0 0 13 0 0 2

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Aug 15 0 14 564 151 106 1 0

Aug 16 3 14 76 3 6 3 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions

0 0 0 0

35

9

0 0

92

4

75

0 0 0 0

33

9

0 0

39

43

75

0400800

120016002000240028003200360040004400

Ch

and

iga

rh

De

lhi

Ha

rya

na

HP

Jamp

K

Pun

jab

Ra

jasth

an

UP

Utr

akh

an

d

MW

Northern States (MW)Aug 16 Aug 15

21

0 0

13

0 0 2

128

31

7

124

0 0

37

0

20

40

60

80

100

120

140

Cha

ttis

garh

Gu

jara

t

MP

Mahara

shtr

a

Dam

an amp

Diu

Dad

ar

Na

gar

Haveli G

oa

MW

Western States (MW)Aug 16 Aug 15

3 14 7

6

3 6 3 00 14

564

151

106

1

0

1000

AP

Tele

nga

na

Karn

ata

ka

Kera

la

Tam

il N

ad

u

Pud

uch

err

y

La

ksh

yad

ee

p

MW

Southern States (MW) Aug16 Aug 15

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Aug 15 160 30 25 18 42 0 8

Aug 16 0 100 0 0 19 0 8

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Aug 15 1 82 2 0 1 1 1

Aug 16 8 28 0 0 2 1 0

9

0

100

0 0

19

0 8

160

30

25

18

42

0 8

020406080

100120140160180

Bih

ar

DV

C

Jh

ark

ha

nd

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

N I

sla

nd

MW

Eastern States (MW)Aug 16 Aug15

8

28

0 0 2 1 01

82

2 0 1 1 10

102030405060708090

Aru

na

ch

al

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

ga

lan

d

Tri

pu

ra

MW

North-Eastern States (MW) Aug 16 Aug 15

Sector Aug 15 Aug 16

Central 6925 6620

State 4965 4009

Private 5633 5117

ALL INDIA 5810 5203

Month 2015-16 2016-17

April 6205 6783

May 6416 6224June 5943 6087

July 5836 5400

August 5810 5203

September 6363

October 6686

November 6034

December 6175

January 6320

February 6495

March 6389

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Aug 2016

69

25

49

65

56

33

58

10

662

0

400

9

511

7

520

3

00010002000300040005000600070008000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016

+Aug15 Aug16

62

05

64

16

59

43

58

36

58

10

63

63

66

86

60

34

61

75

63

20

64

95

63

89

67

83

62

24

60

87

54

00

52

03

0

20

40

60

80

April

May

Jun

e

July

Augu

st

Septe

mber

Octo

ber

Nove

mb

er

Dece

mb

er

Jan

uary

Febru

ary

Marc

hAll India PLF Month-wise

2015-16 2016-17

2010-11 2011-12 2012-13 2013-15 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumersP Provisional

Total Number of Villages

597464

Pump sets

Energised as on

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

NotIncludin

g Subsidiy

booked

Only

Agriculture

2013-14 400 175

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Provisional

11

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should

be obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the

village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA

is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data

As such each monthly report of Village electrification of CEA is independent of the earlier published

reports

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31072016

Villiages Electrified (Nos) as on 310816

9810589068

Villages electrified

15 All India Coal consumption for Power Generation (MT)

515

14 All India per capita consumption of Electricity ( KWh)

Realization(paiseunit)

20550647

Pump sets Energised as on 31-08-16

cost of supply (paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer mat not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1266360 1932910 5113550 8312820

Hydro 258402 81700 59500 399602

Nuclear 100000 000 000 100000

Total 1624762 2014610 5173050 8812422

Acievement 6206 12972 11048 9953

1 Capacity Addtion Targets and Achievements in the 12th Plan

12

Achievement of Capacity Addition during the Current Plan upto Aug 2016

Achievements upto Aug 2016 during the 12th Plan

723

400

0

108

970

0

53

000

0

831

282

0

39

960

2

10

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 8812422 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 27305 0 255 0 255 255

State 3910 910 0 1820 750 -1070

Pvt 6800 0 300 3650 2173 -1477

Total 134405 910 3255 5470 29485 -25215

Central 490 0 40 0 80 80

State 395 80 40 205 105 -100

Pvt 829 0 0 0 0 0

Total 1714 80 80 205 185 -20

Nuclear Central 1500 0 0 0 0 0

Central 47205 0 655 0 1055 1055

State 4305 990 40 2025 855 -1170

Pvt 7629 0 300 3650 2173 -1477

Total 166545 990 4055 5675 31335 -25415

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Aug 2016

Thermal

2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016

Aug-16 April 16 - Aug 16Schemes Sector

Target

2016-17

91

0

80

0

99

0

32

55

80

0

40

55

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during Aug 2016 Target

Achievement

54

70

20

5

0

56

75

29

49

18

5

0

31

34

0

1000

2000

3000

4000

5000

6000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2016-17 Target

Achievement

Coal Gas Diesel Total

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Sub Total 31000 172380 3600 206980 000 124200 26372 357552

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1110 5115

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30062016 is given below (in MW)

430427 2715140 780534 4423692

1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and

New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)

and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh

14

4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 31082016)

(UTILITIES)

RegionOwnership

Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Northern

Region

Western Region

Southern

Region

Eastern Region

North Eastern

Region

Islands

ALL INDIA

Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

486083 11508

2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016

3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 44550 10800 000 55350 000 000 3987 59337

Central 442137 20761 000 462898 12208 76264 000 551370

Sub-Total 500187 211601 000 711788 12208 76264 3987 804247

State 272000 15000 000 287000 000 88451 5930 381381

Private 216550 000 000 216550 000 000 7489 224039

Central 120203 53529 000 173732 10916 61013 000 245661

Sub-Total 608753 68529 000 677282 10916 149464 13419 851081

State 000 000 000 000 000 45860 25611 71471

Private 000 000 000 000 000 174800 53790 228590

Central 15202 6188 000 21390 3408 128894 000 153692

Sub-Total 15202 6188 000 21390 3408 349554 79401 453753

State 000 17500 000 17500 000 123000 10653 151153

Private 000 000 000 000 000 000 5100 5100

Central 32932 12914 000 45846 7700 104435 000 157981

Sub-Total 32932 30414 000 63346 7700 227435 15753 314234

State 263000 15000 000 278000 000 223023 12780 513803

Private 501400 000 000 501400 000 000 72955 574355

Central 66088 26392 000 92480 20804 92165 000 205449

Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607

State 519000 60380 000 579380 000 98796 2385 680561

Private 319600 000 000 319600 000 000 540135 859735

Central 101472 22123 000 123595 57300 74153 000 255048

Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344

State 592300 000 000 592300 000 52410 2510 647220

Private 634600 000 000 634600 000 000 101850 736450

Central 290995 54997 000 345992 33572 166065 000 545629

Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299

State 000 000 000 000 000 125215 6287 131502

Private 9900 22500 000 32400 000 73000 26361 131761

Central 30050 6935 000 36985 2228 46924 000 86137

Sub-Total 39950 29435 000 69385 2228 245139 32648 349400

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 681 681

Central 3254 1532 000 4786 884 6274 000 11944

Sub-Total 3254 1532 000 4786 884 6274 681 12625

97719 29035 000 126754 12980 70436 000 210170

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

Uttrakhnad

Chandigarh

Central - Unallocated

Total (Northern

Region)

Rajasthan

Punjab

Haryana

Himachal

Pradesh

Jammu amp

Kashmir

Uttar

Pradesh

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

State Ownership

Sector

Modewise breakup

Grand TotalThermal

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Nuclear

Delhi

Hydro

(Renewable)

RES

(MNRE)

15

(As on 31082016)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 000 4800

Central 33860 000 000 33860 2580 000 000 36440

Sub-Total 33860 4800 000 38660 2580 000 005 41245

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 400 400

Central 4338 420 000 4758 738 000 000 5496

Sub-Total 4338 420 000 4758 738 000 400 5896

State 522000 232182 000 754182 000 77200 800 832182

Private 864200 406000 000 1270200 000 000 529272 1799472

Central 288862 42427 000 331289 55932 000 000 387221

Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875

State 408000 000 000 408000 000 170366 8396 586762

Private 538900 000 000 538900 000 000 312007 850907

Central 249005 25718 000 274723 27324 152000 000 454047

Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716

State 328000 000 000 328000 000 12000 1105 341105

Private 1089800 000 000 1089800 000 000 43863 1133663

Central 157454 000 000 157454 4752 000 000 162206

Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974

State 1055000 67200 000 1122200 000 288484 20813 1431497

Private 1179600 56800 000 1236400 000 44700 644639 1925739

Central 371226 262393 000 633619 69014 000 000 702633

Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 5422 2710 000 8132 846 000 000 8978

Sub-Total 5422 2710 000 8132 846 000 000 8978

179635 19691 000 199326 22814 000 000 222140

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

16

Daman amp Diu

Gujarat

Central - Unallocated

Total (Western

Region)

Madhya

Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Goa

State Ownership

Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

Coal Gas Diesel Total

State 308591 23540 000 332131 000 175887 8950 516968

Private 299000 307411 1697 608108 000 000 291171 899279

Central 147330 000 000 147330 12716 000 000 160046

Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294

State 480659 000 000 480659 000 217566 000 698225

Private 27000 157089 1983 186072 000 000 89529 275601

Central 172188 000 000 172188 14862 000 000 187050

Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876

State 422000 000 12792 434792 000 359980 15533 810305

Private 206000 000 10650 216650 000 000 496005 712655

Central 162846 000 000 162846 47586 000 000 210432

Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392

State 000 000 15996 15996 000 188150 13892 218038

Private 000 17400 000 17400 000 000 11655 29055

Central 103869 35958 000 139827 22860 000 000 162687

Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780

State 477000 52408 000 529408 000 218220 12270 759898

Private 295000 50310 41166 386476 000 000 965460 1351936

Central 415510 000 000 415510 98650 000 000 514160

Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10017 000 000 10017 000 000 000 10017

Sub-Total 10017 000 000 10017 000 000 000 10017

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 003 003

Central 24932 000 000 24932 5278 000 000 30210

Sub-Total 24932 3250 000 28182 5278 000 003 33463

152308 000 000 152308 30048 000 000 182356

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

17

Total (Southern

Region)

NLC

Central - Unallocated

Karnataka

Kerala

Tamil Nadu

Thermal

NuclearHydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

State Ownership

Sector

Modewise breakup

Grand Total

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Andhra Pradesh

Telangana

Puducherry

(As on 31082016)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 000 000 000 000 000 000 8852 8852

Central 253124 000 000 253124 000 12943 000 266067

Sub-Total 274124 000 000 274124 000 12943 15922 302989

State 119000 000 000 119000 000 13000 405 132405

Private 90000 000 000 90000 000 000 1619 91619

Central 31493 000 000 31493 000 7093 000 38586

Sub-Total 240493 000 000 240493 000 20093 2024 262610

State 572000 10000 000 582000 000 97700 9195 688895

Private 178138 000 000 178138 000 000 4432 182570

Central 92245 000 000 92245 000 43130 000 135375

Sub-Total 842383 10000 000 852383 000 140830 13627 1006840

State 000 000 000 000 000 000 000 000

Private 105000 000 000 105000 000 000 000 105000

Central 721066 000 000 721066 000 19326 000 740392

Sub-Total 826066 000 000 826066 000 19326 000 845392

State 42000 000 000 42000 000 206192 630 248822

Private 500000 000 000 500000 000 000 14525 514525

Central 168304 000 000 168304 000 10501 000 178805

Sub-Total 710304 000 000 710304 000 216693 15155 942152

State 000 000 000 000 000 000 5211 5211

Private 000 000 000 000 000 19500 000 19500

Central 9210 000 000 9210 000 7527 000 16737

Sub-Total 9210 000 000 9210 000 27027 5211 41448

159707 000 000 159707 000 000 000 159707

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138

18

Central - Unallocated

Total (Eastern

Region)

Jharkhand

West Bengal

DVC

Odisha

Sikkim

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Bihar

(As on 31082016)

Coal Gas Diesel Total

State 6000 27620 000 33620 000 10000 3001 46621

Private 000 2450 000 2450 000 000 410 2860

Central 12700 43560 000 56260 000 32972 000 89232

Sub-Total 18700 73630 000 92330 000 42972 3411 138713

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 027 027

Central 1235 4683 000 5918 000 9757 000 15675

Sub-Total 1235 4683 000 5918 000 9757 10488 26163

State 000 000 000 000 000 28200 3103 31303

Private 000 000 000 000 000 000 000 000

Central 1770 10979 000 12749 000 7458 000 20207

Sub-Total 1770 10979 000 12749 000 35658 3103 51510

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 1870 33896 000 35766 000 6237 000 42003

Sub-Total 1870 50846 000 52716 000 6237 2101 61054

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 000

Central 1570 7161 000 8731 000 8098 000 16829

Sub-Total 1570 7161 3600 12331 000 8098 545 20974

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 1070 4891 000 5961 000 5332 000 11293

Sub-Total 1070 4891 000 5961 000 5332 3067 14360

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 010 010

Central 1035 4054 000 5089 000 3431 000 8520

Sub-Total 1035 4054 000 5089 000 3431 3657 12177

3750 16136 000 19886 000 12715 000 32601

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Grand Total 31000 172380 3600 206980 000 124200 26372 357552

(As on 31082016)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 510 510

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1035 5040

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1110 5115

19

NuclearHydro

(Renewable)

RES

(MNRE)

Modewise breakup

Andaman amp

Nicobar

lakshadweep

Total (Islands)

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

SectorGrand Total

Thermal

Arunachal

Pradesh

Meghalaya

Tripura

Manipur

Nagaland

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

RES

(MNRE)

Assam

Mizoram

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

SN Contents Page

1Programme and Achievements of Transmission Lines in Aug 2016 and during April

2016 to Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

Section C - Transmission Lines

20

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 12: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Aug 15 160 30 25 18 42 0 8

Aug 16 0 100 0 0 19 0 8

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Aug 15 1 82 2 0 1 1 1

Aug 16 8 28 0 0 2 1 0

9

0

100

0 0

19

0 8

160

30

25

18

42

0 8

020406080

100120140160180

Bih

ar

DV

C

Jh

ark

ha

nd

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

N I

sla

nd

MW

Eastern States (MW)Aug 16 Aug15

8

28

0 0 2 1 01

82

2 0 1 1 10

102030405060708090

Aru

na

ch

al

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

ga

lan

d

Tri

pu

ra

MW

North-Eastern States (MW) Aug 16 Aug 15

Sector Aug 15 Aug 16

Central 6925 6620

State 4965 4009

Private 5633 5117

ALL INDIA 5810 5203

Month 2015-16 2016-17

April 6205 6783

May 6416 6224June 5943 6087

July 5836 5400

August 5810 5203

September 6363

October 6686

November 6034

December 6175

January 6320

February 6495

March 6389

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Aug 2016

69

25

49

65

56

33

58

10

662

0

400

9

511

7

520

3

00010002000300040005000600070008000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016

+Aug15 Aug16

62

05

64

16

59

43

58

36

58

10

63

63

66

86

60

34

61

75

63

20

64

95

63

89

67

83

62

24

60

87

54

00

52

03

0

20

40

60

80

April

May

Jun

e

July

Augu

st

Septe

mber

Octo

ber

Nove

mb

er

Dece

mb

er

Jan

uary

Febru

ary

Marc

hAll India PLF Month-wise

2015-16 2016-17

2010-11 2011-12 2012-13 2013-15 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumersP Provisional

Total Number of Villages

597464

Pump sets

Energised as on

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

NotIncludin

g Subsidiy

booked

Only

Agriculture

2013-14 400 175

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Provisional

11

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should

be obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the

village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA

is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data

As such each monthly report of Village electrification of CEA is independent of the earlier published

reports

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31072016

Villiages Electrified (Nos) as on 310816

9810589068

Villages electrified

15 All India Coal consumption for Power Generation (MT)

515

14 All India per capita consumption of Electricity ( KWh)

Realization(paiseunit)

20550647

Pump sets Energised as on 31-08-16

cost of supply (paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer mat not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1266360 1932910 5113550 8312820

Hydro 258402 81700 59500 399602

Nuclear 100000 000 000 100000

Total 1624762 2014610 5173050 8812422

Acievement 6206 12972 11048 9953

1 Capacity Addtion Targets and Achievements in the 12th Plan

12

Achievement of Capacity Addition during the Current Plan upto Aug 2016

Achievements upto Aug 2016 during the 12th Plan

723

400

0

108

970

0

53

000

0

831

282

0

39

960

2

10

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 8812422 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 27305 0 255 0 255 255

State 3910 910 0 1820 750 -1070

Pvt 6800 0 300 3650 2173 -1477

Total 134405 910 3255 5470 29485 -25215

Central 490 0 40 0 80 80

State 395 80 40 205 105 -100

Pvt 829 0 0 0 0 0

Total 1714 80 80 205 185 -20

Nuclear Central 1500 0 0 0 0 0

Central 47205 0 655 0 1055 1055

State 4305 990 40 2025 855 -1170

Pvt 7629 0 300 3650 2173 -1477

Total 166545 990 4055 5675 31335 -25415

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Aug 2016

Thermal

2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016

Aug-16 April 16 - Aug 16Schemes Sector

Target

2016-17

91

0

80

0

99

0

32

55

80

0

40

55

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during Aug 2016 Target

Achievement

54

70

20

5

0

56

75

29

49

18

5

0

31

34

0

1000

2000

3000

4000

5000

6000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2016-17 Target

Achievement

Coal Gas Diesel Total

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Sub Total 31000 172380 3600 206980 000 124200 26372 357552

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1110 5115

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30062016 is given below (in MW)

430427 2715140 780534 4423692

1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and

New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)

and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh

14

4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 31082016)

(UTILITIES)

RegionOwnership

Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Northern

Region

Western Region

Southern

Region

Eastern Region

North Eastern

Region

Islands

ALL INDIA

Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

486083 11508

2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016

3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 44550 10800 000 55350 000 000 3987 59337

Central 442137 20761 000 462898 12208 76264 000 551370

Sub-Total 500187 211601 000 711788 12208 76264 3987 804247

State 272000 15000 000 287000 000 88451 5930 381381

Private 216550 000 000 216550 000 000 7489 224039

Central 120203 53529 000 173732 10916 61013 000 245661

Sub-Total 608753 68529 000 677282 10916 149464 13419 851081

State 000 000 000 000 000 45860 25611 71471

Private 000 000 000 000 000 174800 53790 228590

Central 15202 6188 000 21390 3408 128894 000 153692

Sub-Total 15202 6188 000 21390 3408 349554 79401 453753

State 000 17500 000 17500 000 123000 10653 151153

Private 000 000 000 000 000 000 5100 5100

Central 32932 12914 000 45846 7700 104435 000 157981

Sub-Total 32932 30414 000 63346 7700 227435 15753 314234

State 263000 15000 000 278000 000 223023 12780 513803

Private 501400 000 000 501400 000 000 72955 574355

Central 66088 26392 000 92480 20804 92165 000 205449

Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607

State 519000 60380 000 579380 000 98796 2385 680561

Private 319600 000 000 319600 000 000 540135 859735

Central 101472 22123 000 123595 57300 74153 000 255048

Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344

State 592300 000 000 592300 000 52410 2510 647220

Private 634600 000 000 634600 000 000 101850 736450

Central 290995 54997 000 345992 33572 166065 000 545629

Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299

State 000 000 000 000 000 125215 6287 131502

Private 9900 22500 000 32400 000 73000 26361 131761

Central 30050 6935 000 36985 2228 46924 000 86137

Sub-Total 39950 29435 000 69385 2228 245139 32648 349400

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 681 681

Central 3254 1532 000 4786 884 6274 000 11944

Sub-Total 3254 1532 000 4786 884 6274 681 12625

97719 29035 000 126754 12980 70436 000 210170

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

Uttrakhnad

Chandigarh

Central - Unallocated

Total (Northern

Region)

Rajasthan

Punjab

Haryana

Himachal

Pradesh

Jammu amp

Kashmir

Uttar

Pradesh

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

State Ownership

Sector

Modewise breakup

Grand TotalThermal

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Nuclear

Delhi

Hydro

(Renewable)

RES

(MNRE)

15

(As on 31082016)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 000 4800

Central 33860 000 000 33860 2580 000 000 36440

Sub-Total 33860 4800 000 38660 2580 000 005 41245

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 400 400

Central 4338 420 000 4758 738 000 000 5496

Sub-Total 4338 420 000 4758 738 000 400 5896

State 522000 232182 000 754182 000 77200 800 832182

Private 864200 406000 000 1270200 000 000 529272 1799472

Central 288862 42427 000 331289 55932 000 000 387221

Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875

State 408000 000 000 408000 000 170366 8396 586762

Private 538900 000 000 538900 000 000 312007 850907

Central 249005 25718 000 274723 27324 152000 000 454047

Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716

State 328000 000 000 328000 000 12000 1105 341105

Private 1089800 000 000 1089800 000 000 43863 1133663

Central 157454 000 000 157454 4752 000 000 162206

Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974

State 1055000 67200 000 1122200 000 288484 20813 1431497

Private 1179600 56800 000 1236400 000 44700 644639 1925739

Central 371226 262393 000 633619 69014 000 000 702633

Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 5422 2710 000 8132 846 000 000 8978

Sub-Total 5422 2710 000 8132 846 000 000 8978

179635 19691 000 199326 22814 000 000 222140

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

16

Daman amp Diu

Gujarat

Central - Unallocated

Total (Western

Region)

Madhya

Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Goa

State Ownership

Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

Coal Gas Diesel Total

State 308591 23540 000 332131 000 175887 8950 516968

Private 299000 307411 1697 608108 000 000 291171 899279

Central 147330 000 000 147330 12716 000 000 160046

Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294

State 480659 000 000 480659 000 217566 000 698225

Private 27000 157089 1983 186072 000 000 89529 275601

Central 172188 000 000 172188 14862 000 000 187050

Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876

State 422000 000 12792 434792 000 359980 15533 810305

Private 206000 000 10650 216650 000 000 496005 712655

Central 162846 000 000 162846 47586 000 000 210432

Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392

State 000 000 15996 15996 000 188150 13892 218038

Private 000 17400 000 17400 000 000 11655 29055

Central 103869 35958 000 139827 22860 000 000 162687

Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780

State 477000 52408 000 529408 000 218220 12270 759898

Private 295000 50310 41166 386476 000 000 965460 1351936

Central 415510 000 000 415510 98650 000 000 514160

Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10017 000 000 10017 000 000 000 10017

Sub-Total 10017 000 000 10017 000 000 000 10017

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 003 003

Central 24932 000 000 24932 5278 000 000 30210

Sub-Total 24932 3250 000 28182 5278 000 003 33463

152308 000 000 152308 30048 000 000 182356

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

17

Total (Southern

Region)

NLC

Central - Unallocated

Karnataka

Kerala

Tamil Nadu

Thermal

NuclearHydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

State Ownership

Sector

Modewise breakup

Grand Total

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Andhra Pradesh

Telangana

Puducherry

(As on 31082016)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 000 000 000 000 000 000 8852 8852

Central 253124 000 000 253124 000 12943 000 266067

Sub-Total 274124 000 000 274124 000 12943 15922 302989

State 119000 000 000 119000 000 13000 405 132405

Private 90000 000 000 90000 000 000 1619 91619

Central 31493 000 000 31493 000 7093 000 38586

Sub-Total 240493 000 000 240493 000 20093 2024 262610

State 572000 10000 000 582000 000 97700 9195 688895

Private 178138 000 000 178138 000 000 4432 182570

Central 92245 000 000 92245 000 43130 000 135375

Sub-Total 842383 10000 000 852383 000 140830 13627 1006840

State 000 000 000 000 000 000 000 000

Private 105000 000 000 105000 000 000 000 105000

Central 721066 000 000 721066 000 19326 000 740392

Sub-Total 826066 000 000 826066 000 19326 000 845392

State 42000 000 000 42000 000 206192 630 248822

Private 500000 000 000 500000 000 000 14525 514525

Central 168304 000 000 168304 000 10501 000 178805

Sub-Total 710304 000 000 710304 000 216693 15155 942152

State 000 000 000 000 000 000 5211 5211

Private 000 000 000 000 000 19500 000 19500

Central 9210 000 000 9210 000 7527 000 16737

Sub-Total 9210 000 000 9210 000 27027 5211 41448

159707 000 000 159707 000 000 000 159707

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138

18

Central - Unallocated

Total (Eastern

Region)

Jharkhand

West Bengal

DVC

Odisha

Sikkim

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Bihar

(As on 31082016)

Coal Gas Diesel Total

State 6000 27620 000 33620 000 10000 3001 46621

Private 000 2450 000 2450 000 000 410 2860

Central 12700 43560 000 56260 000 32972 000 89232

Sub-Total 18700 73630 000 92330 000 42972 3411 138713

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 027 027

Central 1235 4683 000 5918 000 9757 000 15675

Sub-Total 1235 4683 000 5918 000 9757 10488 26163

State 000 000 000 000 000 28200 3103 31303

Private 000 000 000 000 000 000 000 000

Central 1770 10979 000 12749 000 7458 000 20207

Sub-Total 1770 10979 000 12749 000 35658 3103 51510

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 1870 33896 000 35766 000 6237 000 42003

Sub-Total 1870 50846 000 52716 000 6237 2101 61054

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 000

Central 1570 7161 000 8731 000 8098 000 16829

Sub-Total 1570 7161 3600 12331 000 8098 545 20974

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 1070 4891 000 5961 000 5332 000 11293

Sub-Total 1070 4891 000 5961 000 5332 3067 14360

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 010 010

Central 1035 4054 000 5089 000 3431 000 8520

Sub-Total 1035 4054 000 5089 000 3431 3657 12177

3750 16136 000 19886 000 12715 000 32601

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Grand Total 31000 172380 3600 206980 000 124200 26372 357552

(As on 31082016)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 510 510

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1035 5040

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1110 5115

19

NuclearHydro

(Renewable)

RES

(MNRE)

Modewise breakup

Andaman amp

Nicobar

lakshadweep

Total (Islands)

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

SectorGrand Total

Thermal

Arunachal

Pradesh

Meghalaya

Tripura

Manipur

Nagaland

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

RES

(MNRE)

Assam

Mizoram

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

SN Contents Page

1Programme and Achievements of Transmission Lines in Aug 2016 and during April

2016 to Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

Section C - Transmission Lines

20

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 13: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

Sector Aug 15 Aug 16

Central 6925 6620

State 4965 4009

Private 5633 5117

ALL INDIA 5810 5203

Month 2015-16 2016-17

April 6205 6783

May 6416 6224June 5943 6087

July 5836 5400

August 5810 5203

September 6363

October 6686

November 6034

December 6175

January 6320

February 6495

March 6389

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Aug 2016

69

25

49

65

56

33

58

10

662

0

400

9

511

7

520

3

00010002000300040005000600070008000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016

+Aug15 Aug16

62

05

64

16

59

43

58

36

58

10

63

63

66

86

60

34

61

75

63

20

64

95

63

89

67

83

62

24

60

87

54

00

52

03

0

20

40

60

80

April

May

Jun

e

July

Augu

st

Septe

mber

Octo

ber

Nove

mb

er

Dece

mb

er

Jan

uary

Febru

ary

Marc

hAll India PLF Month-wise

2015-16 2016-17

2010-11 2011-12 2012-13 2013-15 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumersP Provisional

Total Number of Villages

597464

Pump sets

Energised as on

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

NotIncludin

g Subsidiy

booked

Only

Agriculture

2013-14 400 175

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Provisional

11

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should

be obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the

village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA

is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data

As such each monthly report of Village electrification of CEA is independent of the earlier published

reports

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31072016

Villiages Electrified (Nos) as on 310816

9810589068

Villages electrified

15 All India Coal consumption for Power Generation (MT)

515

14 All India per capita consumption of Electricity ( KWh)

Realization(paiseunit)

20550647

Pump sets Energised as on 31-08-16

cost of supply (paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer mat not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1266360 1932910 5113550 8312820

Hydro 258402 81700 59500 399602

Nuclear 100000 000 000 100000

Total 1624762 2014610 5173050 8812422

Acievement 6206 12972 11048 9953

1 Capacity Addtion Targets and Achievements in the 12th Plan

12

Achievement of Capacity Addition during the Current Plan upto Aug 2016

Achievements upto Aug 2016 during the 12th Plan

723

400

0

108

970

0

53

000

0

831

282

0

39

960

2

10

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 8812422 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 27305 0 255 0 255 255

State 3910 910 0 1820 750 -1070

Pvt 6800 0 300 3650 2173 -1477

Total 134405 910 3255 5470 29485 -25215

Central 490 0 40 0 80 80

State 395 80 40 205 105 -100

Pvt 829 0 0 0 0 0

Total 1714 80 80 205 185 -20

Nuclear Central 1500 0 0 0 0 0

Central 47205 0 655 0 1055 1055

State 4305 990 40 2025 855 -1170

Pvt 7629 0 300 3650 2173 -1477

Total 166545 990 4055 5675 31335 -25415

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Aug 2016

Thermal

2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016

Aug-16 April 16 - Aug 16Schemes Sector

Target

2016-17

91

0

80

0

99

0

32

55

80

0

40

55

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during Aug 2016 Target

Achievement

54

70

20

5

0

56

75

29

49

18

5

0

31

34

0

1000

2000

3000

4000

5000

6000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2016-17 Target

Achievement

Coal Gas Diesel Total

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Sub Total 31000 172380 3600 206980 000 124200 26372 357552

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1110 5115

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30062016 is given below (in MW)

430427 2715140 780534 4423692

1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and

New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)

and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh

14

4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 31082016)

(UTILITIES)

RegionOwnership

Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Northern

Region

Western Region

Southern

Region

Eastern Region

North Eastern

Region

Islands

ALL INDIA

Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

486083 11508

2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016

3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 44550 10800 000 55350 000 000 3987 59337

Central 442137 20761 000 462898 12208 76264 000 551370

Sub-Total 500187 211601 000 711788 12208 76264 3987 804247

State 272000 15000 000 287000 000 88451 5930 381381

Private 216550 000 000 216550 000 000 7489 224039

Central 120203 53529 000 173732 10916 61013 000 245661

Sub-Total 608753 68529 000 677282 10916 149464 13419 851081

State 000 000 000 000 000 45860 25611 71471

Private 000 000 000 000 000 174800 53790 228590

Central 15202 6188 000 21390 3408 128894 000 153692

Sub-Total 15202 6188 000 21390 3408 349554 79401 453753

State 000 17500 000 17500 000 123000 10653 151153

Private 000 000 000 000 000 000 5100 5100

Central 32932 12914 000 45846 7700 104435 000 157981

Sub-Total 32932 30414 000 63346 7700 227435 15753 314234

State 263000 15000 000 278000 000 223023 12780 513803

Private 501400 000 000 501400 000 000 72955 574355

Central 66088 26392 000 92480 20804 92165 000 205449

Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607

State 519000 60380 000 579380 000 98796 2385 680561

Private 319600 000 000 319600 000 000 540135 859735

Central 101472 22123 000 123595 57300 74153 000 255048

Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344

State 592300 000 000 592300 000 52410 2510 647220

Private 634600 000 000 634600 000 000 101850 736450

Central 290995 54997 000 345992 33572 166065 000 545629

Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299

State 000 000 000 000 000 125215 6287 131502

Private 9900 22500 000 32400 000 73000 26361 131761

Central 30050 6935 000 36985 2228 46924 000 86137

Sub-Total 39950 29435 000 69385 2228 245139 32648 349400

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 681 681

Central 3254 1532 000 4786 884 6274 000 11944

Sub-Total 3254 1532 000 4786 884 6274 681 12625

97719 29035 000 126754 12980 70436 000 210170

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

Uttrakhnad

Chandigarh

Central - Unallocated

Total (Northern

Region)

Rajasthan

Punjab

Haryana

Himachal

Pradesh

Jammu amp

Kashmir

Uttar

Pradesh

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

State Ownership

Sector

Modewise breakup

Grand TotalThermal

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Nuclear

Delhi

Hydro

(Renewable)

RES

(MNRE)

15

(As on 31082016)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 000 4800

Central 33860 000 000 33860 2580 000 000 36440

Sub-Total 33860 4800 000 38660 2580 000 005 41245

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 400 400

Central 4338 420 000 4758 738 000 000 5496

Sub-Total 4338 420 000 4758 738 000 400 5896

State 522000 232182 000 754182 000 77200 800 832182

Private 864200 406000 000 1270200 000 000 529272 1799472

Central 288862 42427 000 331289 55932 000 000 387221

Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875

State 408000 000 000 408000 000 170366 8396 586762

Private 538900 000 000 538900 000 000 312007 850907

Central 249005 25718 000 274723 27324 152000 000 454047

Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716

State 328000 000 000 328000 000 12000 1105 341105

Private 1089800 000 000 1089800 000 000 43863 1133663

Central 157454 000 000 157454 4752 000 000 162206

Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974

State 1055000 67200 000 1122200 000 288484 20813 1431497

Private 1179600 56800 000 1236400 000 44700 644639 1925739

Central 371226 262393 000 633619 69014 000 000 702633

Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 5422 2710 000 8132 846 000 000 8978

Sub-Total 5422 2710 000 8132 846 000 000 8978

179635 19691 000 199326 22814 000 000 222140

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

16

Daman amp Diu

Gujarat

Central - Unallocated

Total (Western

Region)

Madhya

Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Goa

State Ownership

Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

Coal Gas Diesel Total

State 308591 23540 000 332131 000 175887 8950 516968

Private 299000 307411 1697 608108 000 000 291171 899279

Central 147330 000 000 147330 12716 000 000 160046

Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294

State 480659 000 000 480659 000 217566 000 698225

Private 27000 157089 1983 186072 000 000 89529 275601

Central 172188 000 000 172188 14862 000 000 187050

Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876

State 422000 000 12792 434792 000 359980 15533 810305

Private 206000 000 10650 216650 000 000 496005 712655

Central 162846 000 000 162846 47586 000 000 210432

Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392

State 000 000 15996 15996 000 188150 13892 218038

Private 000 17400 000 17400 000 000 11655 29055

Central 103869 35958 000 139827 22860 000 000 162687

Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780

State 477000 52408 000 529408 000 218220 12270 759898

Private 295000 50310 41166 386476 000 000 965460 1351936

Central 415510 000 000 415510 98650 000 000 514160

Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10017 000 000 10017 000 000 000 10017

Sub-Total 10017 000 000 10017 000 000 000 10017

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 003 003

Central 24932 000 000 24932 5278 000 000 30210

Sub-Total 24932 3250 000 28182 5278 000 003 33463

152308 000 000 152308 30048 000 000 182356

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

17

Total (Southern

Region)

NLC

Central - Unallocated

Karnataka

Kerala

Tamil Nadu

Thermal

NuclearHydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

State Ownership

Sector

Modewise breakup

Grand Total

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Andhra Pradesh

Telangana

Puducherry

(As on 31082016)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 000 000 000 000 000 000 8852 8852

Central 253124 000 000 253124 000 12943 000 266067

Sub-Total 274124 000 000 274124 000 12943 15922 302989

State 119000 000 000 119000 000 13000 405 132405

Private 90000 000 000 90000 000 000 1619 91619

Central 31493 000 000 31493 000 7093 000 38586

Sub-Total 240493 000 000 240493 000 20093 2024 262610

State 572000 10000 000 582000 000 97700 9195 688895

Private 178138 000 000 178138 000 000 4432 182570

Central 92245 000 000 92245 000 43130 000 135375

Sub-Total 842383 10000 000 852383 000 140830 13627 1006840

State 000 000 000 000 000 000 000 000

Private 105000 000 000 105000 000 000 000 105000

Central 721066 000 000 721066 000 19326 000 740392

Sub-Total 826066 000 000 826066 000 19326 000 845392

State 42000 000 000 42000 000 206192 630 248822

Private 500000 000 000 500000 000 000 14525 514525

Central 168304 000 000 168304 000 10501 000 178805

Sub-Total 710304 000 000 710304 000 216693 15155 942152

State 000 000 000 000 000 000 5211 5211

Private 000 000 000 000 000 19500 000 19500

Central 9210 000 000 9210 000 7527 000 16737

Sub-Total 9210 000 000 9210 000 27027 5211 41448

159707 000 000 159707 000 000 000 159707

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138

18

Central - Unallocated

Total (Eastern

Region)

Jharkhand

West Bengal

DVC

Odisha

Sikkim

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Bihar

(As on 31082016)

Coal Gas Diesel Total

State 6000 27620 000 33620 000 10000 3001 46621

Private 000 2450 000 2450 000 000 410 2860

Central 12700 43560 000 56260 000 32972 000 89232

Sub-Total 18700 73630 000 92330 000 42972 3411 138713

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 027 027

Central 1235 4683 000 5918 000 9757 000 15675

Sub-Total 1235 4683 000 5918 000 9757 10488 26163

State 000 000 000 000 000 28200 3103 31303

Private 000 000 000 000 000 000 000 000

Central 1770 10979 000 12749 000 7458 000 20207

Sub-Total 1770 10979 000 12749 000 35658 3103 51510

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 1870 33896 000 35766 000 6237 000 42003

Sub-Total 1870 50846 000 52716 000 6237 2101 61054

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 000

Central 1570 7161 000 8731 000 8098 000 16829

Sub-Total 1570 7161 3600 12331 000 8098 545 20974

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 1070 4891 000 5961 000 5332 000 11293

Sub-Total 1070 4891 000 5961 000 5332 3067 14360

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 010 010

Central 1035 4054 000 5089 000 3431 000 8520

Sub-Total 1035 4054 000 5089 000 3431 3657 12177

3750 16136 000 19886 000 12715 000 32601

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Grand Total 31000 172380 3600 206980 000 124200 26372 357552

(As on 31082016)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 510 510

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1035 5040

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1110 5115

19

NuclearHydro

(Renewable)

RES

(MNRE)

Modewise breakup

Andaman amp

Nicobar

lakshadweep

Total (Islands)

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

SectorGrand Total

Thermal

Arunachal

Pradesh

Meghalaya

Tripura

Manipur

Nagaland

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

RES

(MNRE)

Assam

Mizoram

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

SN Contents Page

1Programme and Achievements of Transmission Lines in Aug 2016 and during April

2016 to Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

Section C - Transmission Lines

20

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 14: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

2010-11 2011-12 2012-13 2013-15 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumersP Provisional

Total Number of Villages

597464

Pump sets

Energised as on

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

NotIncludin

g Subsidiy

booked

Only

Agriculture

2013-14 400 175

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Provisional

11

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should

be obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the

village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA

is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data

As such each monthly report of Village electrification of CEA is independent of the earlier published

reports

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31072016

Villiages Electrified (Nos) as on 310816

9810589068

Villages electrified

15 All India Coal consumption for Power Generation (MT)

515

14 All India per capita consumption of Electricity ( KWh)

Realization(paiseunit)

20550647

Pump sets Energised as on 31-08-16

cost of supply (paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer mat not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1266360 1932910 5113550 8312820

Hydro 258402 81700 59500 399602

Nuclear 100000 000 000 100000

Total 1624762 2014610 5173050 8812422

Acievement 6206 12972 11048 9953

1 Capacity Addtion Targets and Achievements in the 12th Plan

12

Achievement of Capacity Addition during the Current Plan upto Aug 2016

Achievements upto Aug 2016 during the 12th Plan

723

400

0

108

970

0

53

000

0

831

282

0

39

960

2

10

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 8812422 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 27305 0 255 0 255 255

State 3910 910 0 1820 750 -1070

Pvt 6800 0 300 3650 2173 -1477

Total 134405 910 3255 5470 29485 -25215

Central 490 0 40 0 80 80

State 395 80 40 205 105 -100

Pvt 829 0 0 0 0 0

Total 1714 80 80 205 185 -20

Nuclear Central 1500 0 0 0 0 0

Central 47205 0 655 0 1055 1055

State 4305 990 40 2025 855 -1170

Pvt 7629 0 300 3650 2173 -1477

Total 166545 990 4055 5675 31335 -25415

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Aug 2016

Thermal

2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016

Aug-16 April 16 - Aug 16Schemes Sector

Target

2016-17

91

0

80

0

99

0

32

55

80

0

40

55

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during Aug 2016 Target

Achievement

54

70

20

5

0

56

75

29

49

18

5

0

31

34

0

1000

2000

3000

4000

5000

6000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2016-17 Target

Achievement

Coal Gas Diesel Total

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Sub Total 31000 172380 3600 206980 000 124200 26372 357552

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1110 5115

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30062016 is given below (in MW)

430427 2715140 780534 4423692

1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and

New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)

and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh

14

4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 31082016)

(UTILITIES)

RegionOwnership

Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Northern

Region

Western Region

Southern

Region

Eastern Region

North Eastern

Region

Islands

ALL INDIA

Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

486083 11508

2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016

3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 44550 10800 000 55350 000 000 3987 59337

Central 442137 20761 000 462898 12208 76264 000 551370

Sub-Total 500187 211601 000 711788 12208 76264 3987 804247

State 272000 15000 000 287000 000 88451 5930 381381

Private 216550 000 000 216550 000 000 7489 224039

Central 120203 53529 000 173732 10916 61013 000 245661

Sub-Total 608753 68529 000 677282 10916 149464 13419 851081

State 000 000 000 000 000 45860 25611 71471

Private 000 000 000 000 000 174800 53790 228590

Central 15202 6188 000 21390 3408 128894 000 153692

Sub-Total 15202 6188 000 21390 3408 349554 79401 453753

State 000 17500 000 17500 000 123000 10653 151153

Private 000 000 000 000 000 000 5100 5100

Central 32932 12914 000 45846 7700 104435 000 157981

Sub-Total 32932 30414 000 63346 7700 227435 15753 314234

State 263000 15000 000 278000 000 223023 12780 513803

Private 501400 000 000 501400 000 000 72955 574355

Central 66088 26392 000 92480 20804 92165 000 205449

Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607

State 519000 60380 000 579380 000 98796 2385 680561

Private 319600 000 000 319600 000 000 540135 859735

Central 101472 22123 000 123595 57300 74153 000 255048

Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344

State 592300 000 000 592300 000 52410 2510 647220

Private 634600 000 000 634600 000 000 101850 736450

Central 290995 54997 000 345992 33572 166065 000 545629

Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299

State 000 000 000 000 000 125215 6287 131502

Private 9900 22500 000 32400 000 73000 26361 131761

Central 30050 6935 000 36985 2228 46924 000 86137

Sub-Total 39950 29435 000 69385 2228 245139 32648 349400

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 681 681

Central 3254 1532 000 4786 884 6274 000 11944

Sub-Total 3254 1532 000 4786 884 6274 681 12625

97719 29035 000 126754 12980 70436 000 210170

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

Uttrakhnad

Chandigarh

Central - Unallocated

Total (Northern

Region)

Rajasthan

Punjab

Haryana

Himachal

Pradesh

Jammu amp

Kashmir

Uttar

Pradesh

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

State Ownership

Sector

Modewise breakup

Grand TotalThermal

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Nuclear

Delhi

Hydro

(Renewable)

RES

(MNRE)

15

(As on 31082016)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 000 4800

Central 33860 000 000 33860 2580 000 000 36440

Sub-Total 33860 4800 000 38660 2580 000 005 41245

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 400 400

Central 4338 420 000 4758 738 000 000 5496

Sub-Total 4338 420 000 4758 738 000 400 5896

State 522000 232182 000 754182 000 77200 800 832182

Private 864200 406000 000 1270200 000 000 529272 1799472

Central 288862 42427 000 331289 55932 000 000 387221

Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875

State 408000 000 000 408000 000 170366 8396 586762

Private 538900 000 000 538900 000 000 312007 850907

Central 249005 25718 000 274723 27324 152000 000 454047

Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716

State 328000 000 000 328000 000 12000 1105 341105

Private 1089800 000 000 1089800 000 000 43863 1133663

Central 157454 000 000 157454 4752 000 000 162206

Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974

State 1055000 67200 000 1122200 000 288484 20813 1431497

Private 1179600 56800 000 1236400 000 44700 644639 1925739

Central 371226 262393 000 633619 69014 000 000 702633

Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 5422 2710 000 8132 846 000 000 8978

Sub-Total 5422 2710 000 8132 846 000 000 8978

179635 19691 000 199326 22814 000 000 222140

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

16

Daman amp Diu

Gujarat

Central - Unallocated

Total (Western

Region)

Madhya

Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Goa

State Ownership

Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

Coal Gas Diesel Total

State 308591 23540 000 332131 000 175887 8950 516968

Private 299000 307411 1697 608108 000 000 291171 899279

Central 147330 000 000 147330 12716 000 000 160046

Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294

State 480659 000 000 480659 000 217566 000 698225

Private 27000 157089 1983 186072 000 000 89529 275601

Central 172188 000 000 172188 14862 000 000 187050

Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876

State 422000 000 12792 434792 000 359980 15533 810305

Private 206000 000 10650 216650 000 000 496005 712655

Central 162846 000 000 162846 47586 000 000 210432

Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392

State 000 000 15996 15996 000 188150 13892 218038

Private 000 17400 000 17400 000 000 11655 29055

Central 103869 35958 000 139827 22860 000 000 162687

Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780

State 477000 52408 000 529408 000 218220 12270 759898

Private 295000 50310 41166 386476 000 000 965460 1351936

Central 415510 000 000 415510 98650 000 000 514160

Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10017 000 000 10017 000 000 000 10017

Sub-Total 10017 000 000 10017 000 000 000 10017

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 003 003

Central 24932 000 000 24932 5278 000 000 30210

Sub-Total 24932 3250 000 28182 5278 000 003 33463

152308 000 000 152308 30048 000 000 182356

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

17

Total (Southern

Region)

NLC

Central - Unallocated

Karnataka

Kerala

Tamil Nadu

Thermal

NuclearHydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

State Ownership

Sector

Modewise breakup

Grand Total

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Andhra Pradesh

Telangana

Puducherry

(As on 31082016)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 000 000 000 000 000 000 8852 8852

Central 253124 000 000 253124 000 12943 000 266067

Sub-Total 274124 000 000 274124 000 12943 15922 302989

State 119000 000 000 119000 000 13000 405 132405

Private 90000 000 000 90000 000 000 1619 91619

Central 31493 000 000 31493 000 7093 000 38586

Sub-Total 240493 000 000 240493 000 20093 2024 262610

State 572000 10000 000 582000 000 97700 9195 688895

Private 178138 000 000 178138 000 000 4432 182570

Central 92245 000 000 92245 000 43130 000 135375

Sub-Total 842383 10000 000 852383 000 140830 13627 1006840

State 000 000 000 000 000 000 000 000

Private 105000 000 000 105000 000 000 000 105000

Central 721066 000 000 721066 000 19326 000 740392

Sub-Total 826066 000 000 826066 000 19326 000 845392

State 42000 000 000 42000 000 206192 630 248822

Private 500000 000 000 500000 000 000 14525 514525

Central 168304 000 000 168304 000 10501 000 178805

Sub-Total 710304 000 000 710304 000 216693 15155 942152

State 000 000 000 000 000 000 5211 5211

Private 000 000 000 000 000 19500 000 19500

Central 9210 000 000 9210 000 7527 000 16737

Sub-Total 9210 000 000 9210 000 27027 5211 41448

159707 000 000 159707 000 000 000 159707

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138

18

Central - Unallocated

Total (Eastern

Region)

Jharkhand

West Bengal

DVC

Odisha

Sikkim

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Bihar

(As on 31082016)

Coal Gas Diesel Total

State 6000 27620 000 33620 000 10000 3001 46621

Private 000 2450 000 2450 000 000 410 2860

Central 12700 43560 000 56260 000 32972 000 89232

Sub-Total 18700 73630 000 92330 000 42972 3411 138713

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 027 027

Central 1235 4683 000 5918 000 9757 000 15675

Sub-Total 1235 4683 000 5918 000 9757 10488 26163

State 000 000 000 000 000 28200 3103 31303

Private 000 000 000 000 000 000 000 000

Central 1770 10979 000 12749 000 7458 000 20207

Sub-Total 1770 10979 000 12749 000 35658 3103 51510

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 1870 33896 000 35766 000 6237 000 42003

Sub-Total 1870 50846 000 52716 000 6237 2101 61054

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 000

Central 1570 7161 000 8731 000 8098 000 16829

Sub-Total 1570 7161 3600 12331 000 8098 545 20974

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 1070 4891 000 5961 000 5332 000 11293

Sub-Total 1070 4891 000 5961 000 5332 3067 14360

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 010 010

Central 1035 4054 000 5089 000 3431 000 8520

Sub-Total 1035 4054 000 5089 000 3431 3657 12177

3750 16136 000 19886 000 12715 000 32601

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Grand Total 31000 172380 3600 206980 000 124200 26372 357552

(As on 31082016)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 510 510

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1035 5040

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1110 5115

19

NuclearHydro

(Renewable)

RES

(MNRE)

Modewise breakup

Andaman amp

Nicobar

lakshadweep

Total (Islands)

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

SectorGrand Total

Thermal

Arunachal

Pradesh

Meghalaya

Tripura

Manipur

Nagaland

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

RES

(MNRE)

Assam

Mizoram

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

SN Contents Page

1Programme and Achievements of Transmission Lines in Aug 2016 and during April

2016 to Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

Section C - Transmission Lines

20

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 15: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1266360 1932910 5113550 8312820

Hydro 258402 81700 59500 399602

Nuclear 100000 000 000 100000

Total 1624762 2014610 5173050 8812422

Acievement 6206 12972 11048 9953

1 Capacity Addtion Targets and Achievements in the 12th Plan

12

Achievement of Capacity Addition during the Current Plan upto Aug 2016

Achievements upto Aug 2016 during the 12th Plan

723

400

0

108

970

0

53

000

0

831

282

0

39

960

2

10

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 8812422 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 27305 0 255 0 255 255

State 3910 910 0 1820 750 -1070

Pvt 6800 0 300 3650 2173 -1477

Total 134405 910 3255 5470 29485 -25215

Central 490 0 40 0 80 80

State 395 80 40 205 105 -100

Pvt 829 0 0 0 0 0

Total 1714 80 80 205 185 -20

Nuclear Central 1500 0 0 0 0 0

Central 47205 0 655 0 1055 1055

State 4305 990 40 2025 855 -1170

Pvt 7629 0 300 3650 2173 -1477

Total 166545 990 4055 5675 31335 -25415

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Aug 2016

Thermal

2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016

Aug-16 April 16 - Aug 16Schemes Sector

Target

2016-17

91

0

80

0

99

0

32

55

80

0

40

55

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during Aug 2016 Target

Achievement

54

70

20

5

0

56

75

29

49

18

5

0

31

34

0

1000

2000

3000

4000

5000

6000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2016-17 Target

Achievement

Coal Gas Diesel Total

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Sub Total 31000 172380 3600 206980 000 124200 26372 357552

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1110 5115

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30062016 is given below (in MW)

430427 2715140 780534 4423692

1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and

New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)

and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh

14

4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 31082016)

(UTILITIES)

RegionOwnership

Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Northern

Region

Western Region

Southern

Region

Eastern Region

North Eastern

Region

Islands

ALL INDIA

Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

486083 11508

2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016

3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 44550 10800 000 55350 000 000 3987 59337

Central 442137 20761 000 462898 12208 76264 000 551370

Sub-Total 500187 211601 000 711788 12208 76264 3987 804247

State 272000 15000 000 287000 000 88451 5930 381381

Private 216550 000 000 216550 000 000 7489 224039

Central 120203 53529 000 173732 10916 61013 000 245661

Sub-Total 608753 68529 000 677282 10916 149464 13419 851081

State 000 000 000 000 000 45860 25611 71471

Private 000 000 000 000 000 174800 53790 228590

Central 15202 6188 000 21390 3408 128894 000 153692

Sub-Total 15202 6188 000 21390 3408 349554 79401 453753

State 000 17500 000 17500 000 123000 10653 151153

Private 000 000 000 000 000 000 5100 5100

Central 32932 12914 000 45846 7700 104435 000 157981

Sub-Total 32932 30414 000 63346 7700 227435 15753 314234

State 263000 15000 000 278000 000 223023 12780 513803

Private 501400 000 000 501400 000 000 72955 574355

Central 66088 26392 000 92480 20804 92165 000 205449

Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607

State 519000 60380 000 579380 000 98796 2385 680561

Private 319600 000 000 319600 000 000 540135 859735

Central 101472 22123 000 123595 57300 74153 000 255048

Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344

State 592300 000 000 592300 000 52410 2510 647220

Private 634600 000 000 634600 000 000 101850 736450

Central 290995 54997 000 345992 33572 166065 000 545629

Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299

State 000 000 000 000 000 125215 6287 131502

Private 9900 22500 000 32400 000 73000 26361 131761

Central 30050 6935 000 36985 2228 46924 000 86137

Sub-Total 39950 29435 000 69385 2228 245139 32648 349400

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 681 681

Central 3254 1532 000 4786 884 6274 000 11944

Sub-Total 3254 1532 000 4786 884 6274 681 12625

97719 29035 000 126754 12980 70436 000 210170

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

Uttrakhnad

Chandigarh

Central - Unallocated

Total (Northern

Region)

Rajasthan

Punjab

Haryana

Himachal

Pradesh

Jammu amp

Kashmir

Uttar

Pradesh

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

State Ownership

Sector

Modewise breakup

Grand TotalThermal

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Nuclear

Delhi

Hydro

(Renewable)

RES

(MNRE)

15

(As on 31082016)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 000 4800

Central 33860 000 000 33860 2580 000 000 36440

Sub-Total 33860 4800 000 38660 2580 000 005 41245

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 400 400

Central 4338 420 000 4758 738 000 000 5496

Sub-Total 4338 420 000 4758 738 000 400 5896

State 522000 232182 000 754182 000 77200 800 832182

Private 864200 406000 000 1270200 000 000 529272 1799472

Central 288862 42427 000 331289 55932 000 000 387221

Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875

State 408000 000 000 408000 000 170366 8396 586762

Private 538900 000 000 538900 000 000 312007 850907

Central 249005 25718 000 274723 27324 152000 000 454047

Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716

State 328000 000 000 328000 000 12000 1105 341105

Private 1089800 000 000 1089800 000 000 43863 1133663

Central 157454 000 000 157454 4752 000 000 162206

Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974

State 1055000 67200 000 1122200 000 288484 20813 1431497

Private 1179600 56800 000 1236400 000 44700 644639 1925739

Central 371226 262393 000 633619 69014 000 000 702633

Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 5422 2710 000 8132 846 000 000 8978

Sub-Total 5422 2710 000 8132 846 000 000 8978

179635 19691 000 199326 22814 000 000 222140

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

16

Daman amp Diu

Gujarat

Central - Unallocated

Total (Western

Region)

Madhya

Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Goa

State Ownership

Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

Coal Gas Diesel Total

State 308591 23540 000 332131 000 175887 8950 516968

Private 299000 307411 1697 608108 000 000 291171 899279

Central 147330 000 000 147330 12716 000 000 160046

Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294

State 480659 000 000 480659 000 217566 000 698225

Private 27000 157089 1983 186072 000 000 89529 275601

Central 172188 000 000 172188 14862 000 000 187050

Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876

State 422000 000 12792 434792 000 359980 15533 810305

Private 206000 000 10650 216650 000 000 496005 712655

Central 162846 000 000 162846 47586 000 000 210432

Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392

State 000 000 15996 15996 000 188150 13892 218038

Private 000 17400 000 17400 000 000 11655 29055

Central 103869 35958 000 139827 22860 000 000 162687

Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780

State 477000 52408 000 529408 000 218220 12270 759898

Private 295000 50310 41166 386476 000 000 965460 1351936

Central 415510 000 000 415510 98650 000 000 514160

Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10017 000 000 10017 000 000 000 10017

Sub-Total 10017 000 000 10017 000 000 000 10017

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 003 003

Central 24932 000 000 24932 5278 000 000 30210

Sub-Total 24932 3250 000 28182 5278 000 003 33463

152308 000 000 152308 30048 000 000 182356

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

17

Total (Southern

Region)

NLC

Central - Unallocated

Karnataka

Kerala

Tamil Nadu

Thermal

NuclearHydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

State Ownership

Sector

Modewise breakup

Grand Total

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Andhra Pradesh

Telangana

Puducherry

(As on 31082016)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 000 000 000 000 000 000 8852 8852

Central 253124 000 000 253124 000 12943 000 266067

Sub-Total 274124 000 000 274124 000 12943 15922 302989

State 119000 000 000 119000 000 13000 405 132405

Private 90000 000 000 90000 000 000 1619 91619

Central 31493 000 000 31493 000 7093 000 38586

Sub-Total 240493 000 000 240493 000 20093 2024 262610

State 572000 10000 000 582000 000 97700 9195 688895

Private 178138 000 000 178138 000 000 4432 182570

Central 92245 000 000 92245 000 43130 000 135375

Sub-Total 842383 10000 000 852383 000 140830 13627 1006840

State 000 000 000 000 000 000 000 000

Private 105000 000 000 105000 000 000 000 105000

Central 721066 000 000 721066 000 19326 000 740392

Sub-Total 826066 000 000 826066 000 19326 000 845392

State 42000 000 000 42000 000 206192 630 248822

Private 500000 000 000 500000 000 000 14525 514525

Central 168304 000 000 168304 000 10501 000 178805

Sub-Total 710304 000 000 710304 000 216693 15155 942152

State 000 000 000 000 000 000 5211 5211

Private 000 000 000 000 000 19500 000 19500

Central 9210 000 000 9210 000 7527 000 16737

Sub-Total 9210 000 000 9210 000 27027 5211 41448

159707 000 000 159707 000 000 000 159707

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138

18

Central - Unallocated

Total (Eastern

Region)

Jharkhand

West Bengal

DVC

Odisha

Sikkim

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Bihar

(As on 31082016)

Coal Gas Diesel Total

State 6000 27620 000 33620 000 10000 3001 46621

Private 000 2450 000 2450 000 000 410 2860

Central 12700 43560 000 56260 000 32972 000 89232

Sub-Total 18700 73630 000 92330 000 42972 3411 138713

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 027 027

Central 1235 4683 000 5918 000 9757 000 15675

Sub-Total 1235 4683 000 5918 000 9757 10488 26163

State 000 000 000 000 000 28200 3103 31303

Private 000 000 000 000 000 000 000 000

Central 1770 10979 000 12749 000 7458 000 20207

Sub-Total 1770 10979 000 12749 000 35658 3103 51510

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 1870 33896 000 35766 000 6237 000 42003

Sub-Total 1870 50846 000 52716 000 6237 2101 61054

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 000

Central 1570 7161 000 8731 000 8098 000 16829

Sub-Total 1570 7161 3600 12331 000 8098 545 20974

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 1070 4891 000 5961 000 5332 000 11293

Sub-Total 1070 4891 000 5961 000 5332 3067 14360

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 010 010

Central 1035 4054 000 5089 000 3431 000 8520

Sub-Total 1035 4054 000 5089 000 3431 3657 12177

3750 16136 000 19886 000 12715 000 32601

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Grand Total 31000 172380 3600 206980 000 124200 26372 357552

(As on 31082016)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 510 510

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1035 5040

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1110 5115

19

NuclearHydro

(Renewable)

RES

(MNRE)

Modewise breakup

Andaman amp

Nicobar

lakshadweep

Total (Islands)

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

SectorGrand Total

Thermal

Arunachal

Pradesh

Meghalaya

Tripura

Manipur

Nagaland

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

RES

(MNRE)

Assam

Mizoram

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

SN Contents Page

1Programme and Achievements of Transmission Lines in Aug 2016 and during April

2016 to Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

Section C - Transmission Lines

20

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 16: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1266360 1932910 5113550 8312820

Hydro 258402 81700 59500 399602

Nuclear 100000 000 000 100000

Total 1624762 2014610 5173050 8812422

Acievement 6206 12972 11048 9953

1 Capacity Addtion Targets and Achievements in the 12th Plan

12

Achievement of Capacity Addition during the Current Plan upto Aug 2016

Achievements upto Aug 2016 during the 12th Plan

723

400

0

108

970

0

53

000

0

831

282

0

39

960

2

10

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 8812422 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 27305 0 255 0 255 255

State 3910 910 0 1820 750 -1070

Pvt 6800 0 300 3650 2173 -1477

Total 134405 910 3255 5470 29485 -25215

Central 490 0 40 0 80 80

State 395 80 40 205 105 -100

Pvt 829 0 0 0 0 0

Total 1714 80 80 205 185 -20

Nuclear Central 1500 0 0 0 0 0

Central 47205 0 655 0 1055 1055

State 4305 990 40 2025 855 -1170

Pvt 7629 0 300 3650 2173 -1477

Total 166545 990 4055 5675 31335 -25415

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Aug 2016

Thermal

2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016

Aug-16 April 16 - Aug 16Schemes Sector

Target

2016-17

91

0

80

0

99

0

32

55

80

0

40

55

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during Aug 2016 Target

Achievement

54

70

20

5

0

56

75

29

49

18

5

0

31

34

0

1000

2000

3000

4000

5000

6000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2016-17 Target

Achievement

Coal Gas Diesel Total

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Sub Total 31000 172380 3600 206980 000 124200 26372 357552

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1110 5115

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30062016 is given below (in MW)

430427 2715140 780534 4423692

1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and

New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)

and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh

14

4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 31082016)

(UTILITIES)

RegionOwnership

Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Northern

Region

Western Region

Southern

Region

Eastern Region

North Eastern

Region

Islands

ALL INDIA

Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

486083 11508

2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016

3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 44550 10800 000 55350 000 000 3987 59337

Central 442137 20761 000 462898 12208 76264 000 551370

Sub-Total 500187 211601 000 711788 12208 76264 3987 804247

State 272000 15000 000 287000 000 88451 5930 381381

Private 216550 000 000 216550 000 000 7489 224039

Central 120203 53529 000 173732 10916 61013 000 245661

Sub-Total 608753 68529 000 677282 10916 149464 13419 851081

State 000 000 000 000 000 45860 25611 71471

Private 000 000 000 000 000 174800 53790 228590

Central 15202 6188 000 21390 3408 128894 000 153692

Sub-Total 15202 6188 000 21390 3408 349554 79401 453753

State 000 17500 000 17500 000 123000 10653 151153

Private 000 000 000 000 000 000 5100 5100

Central 32932 12914 000 45846 7700 104435 000 157981

Sub-Total 32932 30414 000 63346 7700 227435 15753 314234

State 263000 15000 000 278000 000 223023 12780 513803

Private 501400 000 000 501400 000 000 72955 574355

Central 66088 26392 000 92480 20804 92165 000 205449

Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607

State 519000 60380 000 579380 000 98796 2385 680561

Private 319600 000 000 319600 000 000 540135 859735

Central 101472 22123 000 123595 57300 74153 000 255048

Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344

State 592300 000 000 592300 000 52410 2510 647220

Private 634600 000 000 634600 000 000 101850 736450

Central 290995 54997 000 345992 33572 166065 000 545629

Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299

State 000 000 000 000 000 125215 6287 131502

Private 9900 22500 000 32400 000 73000 26361 131761

Central 30050 6935 000 36985 2228 46924 000 86137

Sub-Total 39950 29435 000 69385 2228 245139 32648 349400

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 681 681

Central 3254 1532 000 4786 884 6274 000 11944

Sub-Total 3254 1532 000 4786 884 6274 681 12625

97719 29035 000 126754 12980 70436 000 210170

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

Uttrakhnad

Chandigarh

Central - Unallocated

Total (Northern

Region)

Rajasthan

Punjab

Haryana

Himachal

Pradesh

Jammu amp

Kashmir

Uttar

Pradesh

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

State Ownership

Sector

Modewise breakup

Grand TotalThermal

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Nuclear

Delhi

Hydro

(Renewable)

RES

(MNRE)

15

(As on 31082016)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 000 4800

Central 33860 000 000 33860 2580 000 000 36440

Sub-Total 33860 4800 000 38660 2580 000 005 41245

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 400 400

Central 4338 420 000 4758 738 000 000 5496

Sub-Total 4338 420 000 4758 738 000 400 5896

State 522000 232182 000 754182 000 77200 800 832182

Private 864200 406000 000 1270200 000 000 529272 1799472

Central 288862 42427 000 331289 55932 000 000 387221

Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875

State 408000 000 000 408000 000 170366 8396 586762

Private 538900 000 000 538900 000 000 312007 850907

Central 249005 25718 000 274723 27324 152000 000 454047

Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716

State 328000 000 000 328000 000 12000 1105 341105

Private 1089800 000 000 1089800 000 000 43863 1133663

Central 157454 000 000 157454 4752 000 000 162206

Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974

State 1055000 67200 000 1122200 000 288484 20813 1431497

Private 1179600 56800 000 1236400 000 44700 644639 1925739

Central 371226 262393 000 633619 69014 000 000 702633

Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 5422 2710 000 8132 846 000 000 8978

Sub-Total 5422 2710 000 8132 846 000 000 8978

179635 19691 000 199326 22814 000 000 222140

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

16

Daman amp Diu

Gujarat

Central - Unallocated

Total (Western

Region)

Madhya

Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Goa

State Ownership

Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

Coal Gas Diesel Total

State 308591 23540 000 332131 000 175887 8950 516968

Private 299000 307411 1697 608108 000 000 291171 899279

Central 147330 000 000 147330 12716 000 000 160046

Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294

State 480659 000 000 480659 000 217566 000 698225

Private 27000 157089 1983 186072 000 000 89529 275601

Central 172188 000 000 172188 14862 000 000 187050

Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876

State 422000 000 12792 434792 000 359980 15533 810305

Private 206000 000 10650 216650 000 000 496005 712655

Central 162846 000 000 162846 47586 000 000 210432

Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392

State 000 000 15996 15996 000 188150 13892 218038

Private 000 17400 000 17400 000 000 11655 29055

Central 103869 35958 000 139827 22860 000 000 162687

Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780

State 477000 52408 000 529408 000 218220 12270 759898

Private 295000 50310 41166 386476 000 000 965460 1351936

Central 415510 000 000 415510 98650 000 000 514160

Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10017 000 000 10017 000 000 000 10017

Sub-Total 10017 000 000 10017 000 000 000 10017

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 003 003

Central 24932 000 000 24932 5278 000 000 30210

Sub-Total 24932 3250 000 28182 5278 000 003 33463

152308 000 000 152308 30048 000 000 182356

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

17

Total (Southern

Region)

NLC

Central - Unallocated

Karnataka

Kerala

Tamil Nadu

Thermal

NuclearHydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

State Ownership

Sector

Modewise breakup

Grand Total

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Andhra Pradesh

Telangana

Puducherry

(As on 31082016)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 000 000 000 000 000 000 8852 8852

Central 253124 000 000 253124 000 12943 000 266067

Sub-Total 274124 000 000 274124 000 12943 15922 302989

State 119000 000 000 119000 000 13000 405 132405

Private 90000 000 000 90000 000 000 1619 91619

Central 31493 000 000 31493 000 7093 000 38586

Sub-Total 240493 000 000 240493 000 20093 2024 262610

State 572000 10000 000 582000 000 97700 9195 688895

Private 178138 000 000 178138 000 000 4432 182570

Central 92245 000 000 92245 000 43130 000 135375

Sub-Total 842383 10000 000 852383 000 140830 13627 1006840

State 000 000 000 000 000 000 000 000

Private 105000 000 000 105000 000 000 000 105000

Central 721066 000 000 721066 000 19326 000 740392

Sub-Total 826066 000 000 826066 000 19326 000 845392

State 42000 000 000 42000 000 206192 630 248822

Private 500000 000 000 500000 000 000 14525 514525

Central 168304 000 000 168304 000 10501 000 178805

Sub-Total 710304 000 000 710304 000 216693 15155 942152

State 000 000 000 000 000 000 5211 5211

Private 000 000 000 000 000 19500 000 19500

Central 9210 000 000 9210 000 7527 000 16737

Sub-Total 9210 000 000 9210 000 27027 5211 41448

159707 000 000 159707 000 000 000 159707

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138

18

Central - Unallocated

Total (Eastern

Region)

Jharkhand

West Bengal

DVC

Odisha

Sikkim

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Bihar

(As on 31082016)

Coal Gas Diesel Total

State 6000 27620 000 33620 000 10000 3001 46621

Private 000 2450 000 2450 000 000 410 2860

Central 12700 43560 000 56260 000 32972 000 89232

Sub-Total 18700 73630 000 92330 000 42972 3411 138713

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 027 027

Central 1235 4683 000 5918 000 9757 000 15675

Sub-Total 1235 4683 000 5918 000 9757 10488 26163

State 000 000 000 000 000 28200 3103 31303

Private 000 000 000 000 000 000 000 000

Central 1770 10979 000 12749 000 7458 000 20207

Sub-Total 1770 10979 000 12749 000 35658 3103 51510

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 1870 33896 000 35766 000 6237 000 42003

Sub-Total 1870 50846 000 52716 000 6237 2101 61054

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 000

Central 1570 7161 000 8731 000 8098 000 16829

Sub-Total 1570 7161 3600 12331 000 8098 545 20974

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 1070 4891 000 5961 000 5332 000 11293

Sub-Total 1070 4891 000 5961 000 5332 3067 14360

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 010 010

Central 1035 4054 000 5089 000 3431 000 8520

Sub-Total 1035 4054 000 5089 000 3431 3657 12177

3750 16136 000 19886 000 12715 000 32601

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Grand Total 31000 172380 3600 206980 000 124200 26372 357552

(As on 31082016)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 510 510

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1035 5040

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1110 5115

19

NuclearHydro

(Renewable)

RES

(MNRE)

Modewise breakup

Andaman amp

Nicobar

lakshadweep

Total (Islands)

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

SectorGrand Total

Thermal

Arunachal

Pradesh

Meghalaya

Tripura

Manipur

Nagaland

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

RES

(MNRE)

Assam

Mizoram

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

SN Contents Page

1Programme and Achievements of Transmission Lines in Aug 2016 and during April

2016 to Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

Section C - Transmission Lines

20

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 17: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 27305 0 255 0 255 255

State 3910 910 0 1820 750 -1070

Pvt 6800 0 300 3650 2173 -1477

Total 134405 910 3255 5470 29485 -25215

Central 490 0 40 0 80 80

State 395 80 40 205 105 -100

Pvt 829 0 0 0 0 0

Total 1714 80 80 205 185 -20

Nuclear Central 1500 0 0 0 0 0

Central 47205 0 655 0 1055 1055

State 4305 990 40 2025 855 -1170

Pvt 7629 0 300 3650 2173 -1477

Total 166545 990 4055 5675 31335 -25415

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Aug 2016

Thermal

2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016

Aug-16 April 16 - Aug 16Schemes Sector

Target

2016-17

91

0

80

0

99

0

32

55

80

0

40

55

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during Aug 2016 Target

Achievement

54

70

20

5

0

56

75

29

49

18

5

0

31

34

0

1000

2000

3000

4000

5000

6000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2016-17 Target

Achievement

Coal Gas Diesel Total

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Sub Total 31000 172380 3600 206980 000 124200 26372 357552

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1110 5115

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30062016 is given below (in MW)

430427 2715140 780534 4423692

1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and

New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)

and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh

14

4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 31082016)

(UTILITIES)

RegionOwnership

Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Northern

Region

Western Region

Southern

Region

Eastern Region

North Eastern

Region

Islands

ALL INDIA

Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

486083 11508

2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016

3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 44550 10800 000 55350 000 000 3987 59337

Central 442137 20761 000 462898 12208 76264 000 551370

Sub-Total 500187 211601 000 711788 12208 76264 3987 804247

State 272000 15000 000 287000 000 88451 5930 381381

Private 216550 000 000 216550 000 000 7489 224039

Central 120203 53529 000 173732 10916 61013 000 245661

Sub-Total 608753 68529 000 677282 10916 149464 13419 851081

State 000 000 000 000 000 45860 25611 71471

Private 000 000 000 000 000 174800 53790 228590

Central 15202 6188 000 21390 3408 128894 000 153692

Sub-Total 15202 6188 000 21390 3408 349554 79401 453753

State 000 17500 000 17500 000 123000 10653 151153

Private 000 000 000 000 000 000 5100 5100

Central 32932 12914 000 45846 7700 104435 000 157981

Sub-Total 32932 30414 000 63346 7700 227435 15753 314234

State 263000 15000 000 278000 000 223023 12780 513803

Private 501400 000 000 501400 000 000 72955 574355

Central 66088 26392 000 92480 20804 92165 000 205449

Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607

State 519000 60380 000 579380 000 98796 2385 680561

Private 319600 000 000 319600 000 000 540135 859735

Central 101472 22123 000 123595 57300 74153 000 255048

Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344

State 592300 000 000 592300 000 52410 2510 647220

Private 634600 000 000 634600 000 000 101850 736450

Central 290995 54997 000 345992 33572 166065 000 545629

Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299

State 000 000 000 000 000 125215 6287 131502

Private 9900 22500 000 32400 000 73000 26361 131761

Central 30050 6935 000 36985 2228 46924 000 86137

Sub-Total 39950 29435 000 69385 2228 245139 32648 349400

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 681 681

Central 3254 1532 000 4786 884 6274 000 11944

Sub-Total 3254 1532 000 4786 884 6274 681 12625

97719 29035 000 126754 12980 70436 000 210170

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

Uttrakhnad

Chandigarh

Central - Unallocated

Total (Northern

Region)

Rajasthan

Punjab

Haryana

Himachal

Pradesh

Jammu amp

Kashmir

Uttar

Pradesh

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

State Ownership

Sector

Modewise breakup

Grand TotalThermal

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Nuclear

Delhi

Hydro

(Renewable)

RES

(MNRE)

15

(As on 31082016)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 000 4800

Central 33860 000 000 33860 2580 000 000 36440

Sub-Total 33860 4800 000 38660 2580 000 005 41245

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 400 400

Central 4338 420 000 4758 738 000 000 5496

Sub-Total 4338 420 000 4758 738 000 400 5896

State 522000 232182 000 754182 000 77200 800 832182

Private 864200 406000 000 1270200 000 000 529272 1799472

Central 288862 42427 000 331289 55932 000 000 387221

Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875

State 408000 000 000 408000 000 170366 8396 586762

Private 538900 000 000 538900 000 000 312007 850907

Central 249005 25718 000 274723 27324 152000 000 454047

Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716

State 328000 000 000 328000 000 12000 1105 341105

Private 1089800 000 000 1089800 000 000 43863 1133663

Central 157454 000 000 157454 4752 000 000 162206

Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974

State 1055000 67200 000 1122200 000 288484 20813 1431497

Private 1179600 56800 000 1236400 000 44700 644639 1925739

Central 371226 262393 000 633619 69014 000 000 702633

Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 5422 2710 000 8132 846 000 000 8978

Sub-Total 5422 2710 000 8132 846 000 000 8978

179635 19691 000 199326 22814 000 000 222140

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

16

Daman amp Diu

Gujarat

Central - Unallocated

Total (Western

Region)

Madhya

Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Goa

State Ownership

Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

Coal Gas Diesel Total

State 308591 23540 000 332131 000 175887 8950 516968

Private 299000 307411 1697 608108 000 000 291171 899279

Central 147330 000 000 147330 12716 000 000 160046

Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294

State 480659 000 000 480659 000 217566 000 698225

Private 27000 157089 1983 186072 000 000 89529 275601

Central 172188 000 000 172188 14862 000 000 187050

Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876

State 422000 000 12792 434792 000 359980 15533 810305

Private 206000 000 10650 216650 000 000 496005 712655

Central 162846 000 000 162846 47586 000 000 210432

Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392

State 000 000 15996 15996 000 188150 13892 218038

Private 000 17400 000 17400 000 000 11655 29055

Central 103869 35958 000 139827 22860 000 000 162687

Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780

State 477000 52408 000 529408 000 218220 12270 759898

Private 295000 50310 41166 386476 000 000 965460 1351936

Central 415510 000 000 415510 98650 000 000 514160

Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10017 000 000 10017 000 000 000 10017

Sub-Total 10017 000 000 10017 000 000 000 10017

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 003 003

Central 24932 000 000 24932 5278 000 000 30210

Sub-Total 24932 3250 000 28182 5278 000 003 33463

152308 000 000 152308 30048 000 000 182356

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

17

Total (Southern

Region)

NLC

Central - Unallocated

Karnataka

Kerala

Tamil Nadu

Thermal

NuclearHydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

State Ownership

Sector

Modewise breakup

Grand Total

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Andhra Pradesh

Telangana

Puducherry

(As on 31082016)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 000 000 000 000 000 000 8852 8852

Central 253124 000 000 253124 000 12943 000 266067

Sub-Total 274124 000 000 274124 000 12943 15922 302989

State 119000 000 000 119000 000 13000 405 132405

Private 90000 000 000 90000 000 000 1619 91619

Central 31493 000 000 31493 000 7093 000 38586

Sub-Total 240493 000 000 240493 000 20093 2024 262610

State 572000 10000 000 582000 000 97700 9195 688895

Private 178138 000 000 178138 000 000 4432 182570

Central 92245 000 000 92245 000 43130 000 135375

Sub-Total 842383 10000 000 852383 000 140830 13627 1006840

State 000 000 000 000 000 000 000 000

Private 105000 000 000 105000 000 000 000 105000

Central 721066 000 000 721066 000 19326 000 740392

Sub-Total 826066 000 000 826066 000 19326 000 845392

State 42000 000 000 42000 000 206192 630 248822

Private 500000 000 000 500000 000 000 14525 514525

Central 168304 000 000 168304 000 10501 000 178805

Sub-Total 710304 000 000 710304 000 216693 15155 942152

State 000 000 000 000 000 000 5211 5211

Private 000 000 000 000 000 19500 000 19500

Central 9210 000 000 9210 000 7527 000 16737

Sub-Total 9210 000 000 9210 000 27027 5211 41448

159707 000 000 159707 000 000 000 159707

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138

18

Central - Unallocated

Total (Eastern

Region)

Jharkhand

West Bengal

DVC

Odisha

Sikkim

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Bihar

(As on 31082016)

Coal Gas Diesel Total

State 6000 27620 000 33620 000 10000 3001 46621

Private 000 2450 000 2450 000 000 410 2860

Central 12700 43560 000 56260 000 32972 000 89232

Sub-Total 18700 73630 000 92330 000 42972 3411 138713

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 027 027

Central 1235 4683 000 5918 000 9757 000 15675

Sub-Total 1235 4683 000 5918 000 9757 10488 26163

State 000 000 000 000 000 28200 3103 31303

Private 000 000 000 000 000 000 000 000

Central 1770 10979 000 12749 000 7458 000 20207

Sub-Total 1770 10979 000 12749 000 35658 3103 51510

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 1870 33896 000 35766 000 6237 000 42003

Sub-Total 1870 50846 000 52716 000 6237 2101 61054

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 000

Central 1570 7161 000 8731 000 8098 000 16829

Sub-Total 1570 7161 3600 12331 000 8098 545 20974

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 1070 4891 000 5961 000 5332 000 11293

Sub-Total 1070 4891 000 5961 000 5332 3067 14360

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 010 010

Central 1035 4054 000 5089 000 3431 000 8520

Sub-Total 1035 4054 000 5089 000 3431 3657 12177

3750 16136 000 19886 000 12715 000 32601

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Grand Total 31000 172380 3600 206980 000 124200 26372 357552

(As on 31082016)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 510 510

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1035 5040

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1110 5115

19

NuclearHydro

(Renewable)

RES

(MNRE)

Modewise breakup

Andaman amp

Nicobar

lakshadweep

Total (Islands)

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

SectorGrand Total

Thermal

Arunachal

Pradesh

Meghalaya

Tripura

Manipur

Nagaland

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

RES

(MNRE)

Assam

Mizoram

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

SN Contents Page

1Programme and Achievements of Transmission Lines in Aug 2016 and during April

2016 to Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

Section C - Transmission Lines

20

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 18: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

Coal Gas Diesel Total

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Sub Total 31000 172380 3600 206980 000 124200 26372 357552

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1110 5115

State 6421050 721070 36393 7178513 000 2819700 196380 10194593

Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606

Central 5139000 749083 000 5888083 578000 1165143 000 7631226

Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30062016 is given below (in MW)

430427 2715140 780534 4423692

1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and

New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)

and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh

14

4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 31082016)

(UTILITIES)

RegionOwnership

Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Northern

Region

Western Region

Southern

Region

Eastern Region

North Eastern

Region

Islands

ALL INDIA

Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

CapacityBM PowerCogen Waste to Energy

486083 11508

2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016

3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 44550 10800 000 55350 000 000 3987 59337

Central 442137 20761 000 462898 12208 76264 000 551370

Sub-Total 500187 211601 000 711788 12208 76264 3987 804247

State 272000 15000 000 287000 000 88451 5930 381381

Private 216550 000 000 216550 000 000 7489 224039

Central 120203 53529 000 173732 10916 61013 000 245661

Sub-Total 608753 68529 000 677282 10916 149464 13419 851081

State 000 000 000 000 000 45860 25611 71471

Private 000 000 000 000 000 174800 53790 228590

Central 15202 6188 000 21390 3408 128894 000 153692

Sub-Total 15202 6188 000 21390 3408 349554 79401 453753

State 000 17500 000 17500 000 123000 10653 151153

Private 000 000 000 000 000 000 5100 5100

Central 32932 12914 000 45846 7700 104435 000 157981

Sub-Total 32932 30414 000 63346 7700 227435 15753 314234

State 263000 15000 000 278000 000 223023 12780 513803

Private 501400 000 000 501400 000 000 72955 574355

Central 66088 26392 000 92480 20804 92165 000 205449

Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607

State 519000 60380 000 579380 000 98796 2385 680561

Private 319600 000 000 319600 000 000 540135 859735

Central 101472 22123 000 123595 57300 74153 000 255048

Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344

State 592300 000 000 592300 000 52410 2510 647220

Private 634600 000 000 634600 000 000 101850 736450

Central 290995 54997 000 345992 33572 166065 000 545629

Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299

State 000 000 000 000 000 125215 6287 131502

Private 9900 22500 000 32400 000 73000 26361 131761

Central 30050 6935 000 36985 2228 46924 000 86137

Sub-Total 39950 29435 000 69385 2228 245139 32648 349400

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 681 681

Central 3254 1532 000 4786 884 6274 000 11944

Sub-Total 3254 1532 000 4786 884 6274 681 12625

97719 29035 000 126754 12980 70436 000 210170

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

Uttrakhnad

Chandigarh

Central - Unallocated

Total (Northern

Region)

Rajasthan

Punjab

Haryana

Himachal

Pradesh

Jammu amp

Kashmir

Uttar

Pradesh

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

State Ownership

Sector

Modewise breakup

Grand TotalThermal

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Nuclear

Delhi

Hydro

(Renewable)

RES

(MNRE)

15

(As on 31082016)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 000 4800

Central 33860 000 000 33860 2580 000 000 36440

Sub-Total 33860 4800 000 38660 2580 000 005 41245

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 400 400

Central 4338 420 000 4758 738 000 000 5496

Sub-Total 4338 420 000 4758 738 000 400 5896

State 522000 232182 000 754182 000 77200 800 832182

Private 864200 406000 000 1270200 000 000 529272 1799472

Central 288862 42427 000 331289 55932 000 000 387221

Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875

State 408000 000 000 408000 000 170366 8396 586762

Private 538900 000 000 538900 000 000 312007 850907

Central 249005 25718 000 274723 27324 152000 000 454047

Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716

State 328000 000 000 328000 000 12000 1105 341105

Private 1089800 000 000 1089800 000 000 43863 1133663

Central 157454 000 000 157454 4752 000 000 162206

Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974

State 1055000 67200 000 1122200 000 288484 20813 1431497

Private 1179600 56800 000 1236400 000 44700 644639 1925739

Central 371226 262393 000 633619 69014 000 000 702633

Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 5422 2710 000 8132 846 000 000 8978

Sub-Total 5422 2710 000 8132 846 000 000 8978

179635 19691 000 199326 22814 000 000 222140

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

16

Daman amp Diu

Gujarat

Central - Unallocated

Total (Western

Region)

Madhya

Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Goa

State Ownership

Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

Coal Gas Diesel Total

State 308591 23540 000 332131 000 175887 8950 516968

Private 299000 307411 1697 608108 000 000 291171 899279

Central 147330 000 000 147330 12716 000 000 160046

Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294

State 480659 000 000 480659 000 217566 000 698225

Private 27000 157089 1983 186072 000 000 89529 275601

Central 172188 000 000 172188 14862 000 000 187050

Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876

State 422000 000 12792 434792 000 359980 15533 810305

Private 206000 000 10650 216650 000 000 496005 712655

Central 162846 000 000 162846 47586 000 000 210432

Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392

State 000 000 15996 15996 000 188150 13892 218038

Private 000 17400 000 17400 000 000 11655 29055

Central 103869 35958 000 139827 22860 000 000 162687

Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780

State 477000 52408 000 529408 000 218220 12270 759898

Private 295000 50310 41166 386476 000 000 965460 1351936

Central 415510 000 000 415510 98650 000 000 514160

Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10017 000 000 10017 000 000 000 10017

Sub-Total 10017 000 000 10017 000 000 000 10017

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 003 003

Central 24932 000 000 24932 5278 000 000 30210

Sub-Total 24932 3250 000 28182 5278 000 003 33463

152308 000 000 152308 30048 000 000 182356

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

17

Total (Southern

Region)

NLC

Central - Unallocated

Karnataka

Kerala

Tamil Nadu

Thermal

NuclearHydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

State Ownership

Sector

Modewise breakup

Grand Total

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Andhra Pradesh

Telangana

Puducherry

(As on 31082016)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 000 000 000 000 000 000 8852 8852

Central 253124 000 000 253124 000 12943 000 266067

Sub-Total 274124 000 000 274124 000 12943 15922 302989

State 119000 000 000 119000 000 13000 405 132405

Private 90000 000 000 90000 000 000 1619 91619

Central 31493 000 000 31493 000 7093 000 38586

Sub-Total 240493 000 000 240493 000 20093 2024 262610

State 572000 10000 000 582000 000 97700 9195 688895

Private 178138 000 000 178138 000 000 4432 182570

Central 92245 000 000 92245 000 43130 000 135375

Sub-Total 842383 10000 000 852383 000 140830 13627 1006840

State 000 000 000 000 000 000 000 000

Private 105000 000 000 105000 000 000 000 105000

Central 721066 000 000 721066 000 19326 000 740392

Sub-Total 826066 000 000 826066 000 19326 000 845392

State 42000 000 000 42000 000 206192 630 248822

Private 500000 000 000 500000 000 000 14525 514525

Central 168304 000 000 168304 000 10501 000 178805

Sub-Total 710304 000 000 710304 000 216693 15155 942152

State 000 000 000 000 000 000 5211 5211

Private 000 000 000 000 000 19500 000 19500

Central 9210 000 000 9210 000 7527 000 16737

Sub-Total 9210 000 000 9210 000 27027 5211 41448

159707 000 000 159707 000 000 000 159707

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138

18

Central - Unallocated

Total (Eastern

Region)

Jharkhand

West Bengal

DVC

Odisha

Sikkim

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Bihar

(As on 31082016)

Coal Gas Diesel Total

State 6000 27620 000 33620 000 10000 3001 46621

Private 000 2450 000 2450 000 000 410 2860

Central 12700 43560 000 56260 000 32972 000 89232

Sub-Total 18700 73630 000 92330 000 42972 3411 138713

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 027 027

Central 1235 4683 000 5918 000 9757 000 15675

Sub-Total 1235 4683 000 5918 000 9757 10488 26163

State 000 000 000 000 000 28200 3103 31303

Private 000 000 000 000 000 000 000 000

Central 1770 10979 000 12749 000 7458 000 20207

Sub-Total 1770 10979 000 12749 000 35658 3103 51510

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 1870 33896 000 35766 000 6237 000 42003

Sub-Total 1870 50846 000 52716 000 6237 2101 61054

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 000

Central 1570 7161 000 8731 000 8098 000 16829

Sub-Total 1570 7161 3600 12331 000 8098 545 20974

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 1070 4891 000 5961 000 5332 000 11293

Sub-Total 1070 4891 000 5961 000 5332 3067 14360

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 010 010

Central 1035 4054 000 5089 000 3431 000 8520

Sub-Total 1035 4054 000 5089 000 3431 3657 12177

3750 16136 000 19886 000 12715 000 32601

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Grand Total 31000 172380 3600 206980 000 124200 26372 357552

(As on 31082016)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 510 510

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1035 5040

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1110 5115

19

NuclearHydro

(Renewable)

RES

(MNRE)

Modewise breakup

Andaman amp

Nicobar

lakshadweep

Total (Islands)

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

SectorGrand Total

Thermal

Arunachal

Pradesh

Meghalaya

Tripura

Manipur

Nagaland

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

RES

(MNRE)

Assam

Mizoram

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

SN Contents Page

1Programme and Achievements of Transmission Lines in Aug 2016 and during April

2016 to Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

Section C - Transmission Lines

20

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 19: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 44550 10800 000 55350 000 000 3987 59337

Central 442137 20761 000 462898 12208 76264 000 551370

Sub-Total 500187 211601 000 711788 12208 76264 3987 804247

State 272000 15000 000 287000 000 88451 5930 381381

Private 216550 000 000 216550 000 000 7489 224039

Central 120203 53529 000 173732 10916 61013 000 245661

Sub-Total 608753 68529 000 677282 10916 149464 13419 851081

State 000 000 000 000 000 45860 25611 71471

Private 000 000 000 000 000 174800 53790 228590

Central 15202 6188 000 21390 3408 128894 000 153692

Sub-Total 15202 6188 000 21390 3408 349554 79401 453753

State 000 17500 000 17500 000 123000 10653 151153

Private 000 000 000 000 000 000 5100 5100

Central 32932 12914 000 45846 7700 104435 000 157981

Sub-Total 32932 30414 000 63346 7700 227435 15753 314234

State 263000 15000 000 278000 000 223023 12780 513803

Private 501400 000 000 501400 000 000 72955 574355

Central 66088 26392 000 92480 20804 92165 000 205449

Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607

State 519000 60380 000 579380 000 98796 2385 680561

Private 319600 000 000 319600 000 000 540135 859735

Central 101472 22123 000 123595 57300 74153 000 255048

Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344

State 592300 000 000 592300 000 52410 2510 647220

Private 634600 000 000 634600 000 000 101850 736450

Central 290995 54997 000 345992 33572 166065 000 545629

Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299

State 000 000 000 000 000 125215 6287 131502

Private 9900 22500 000 32400 000 73000 26361 131761

Central 30050 6935 000 36985 2228 46924 000 86137

Sub-Total 39950 29435 000 69385 2228 245139 32648 349400

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 681 681

Central 3254 1532 000 4786 884 6274 000 11944

Sub-Total 3254 1532 000 4786 884 6274 681 12625

97719 29035 000 126754 12980 70436 000 210170

State 1659800 287920 000 1947720 000 756755 66156 2770631

Private 1726600 33300 000 1759900 000 247800 812348 2820048

Central 1200050 234406 000 1434456 162000 826623 000 2423079

Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758

Uttrakhnad

Chandigarh

Central - Unallocated

Total (Northern

Region)

Rajasthan

Punjab

Haryana

Himachal

Pradesh

Jammu amp

Kashmir

Uttar

Pradesh

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

State Ownership

Sector

Modewise breakup

Grand TotalThermal

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Nuclear

Delhi

Hydro

(Renewable)

RES

(MNRE)

15

(As on 31082016)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 000 4800

Central 33860 000 000 33860 2580 000 000 36440

Sub-Total 33860 4800 000 38660 2580 000 005 41245

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 400 400

Central 4338 420 000 4758 738 000 000 5496

Sub-Total 4338 420 000 4758 738 000 400 5896

State 522000 232182 000 754182 000 77200 800 832182

Private 864200 406000 000 1270200 000 000 529272 1799472

Central 288862 42427 000 331289 55932 000 000 387221

Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875

State 408000 000 000 408000 000 170366 8396 586762

Private 538900 000 000 538900 000 000 312007 850907

Central 249005 25718 000 274723 27324 152000 000 454047

Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716

State 328000 000 000 328000 000 12000 1105 341105

Private 1089800 000 000 1089800 000 000 43863 1133663

Central 157454 000 000 157454 4752 000 000 162206

Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974

State 1055000 67200 000 1122200 000 288484 20813 1431497

Private 1179600 56800 000 1236400 000 44700 644639 1925739

Central 371226 262393 000 633619 69014 000 000 702633

Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 5422 2710 000 8132 846 000 000 8978

Sub-Total 5422 2710 000 8132 846 000 000 8978

179635 19691 000 199326 22814 000 000 222140

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

16

Daman amp Diu

Gujarat

Central - Unallocated

Total (Western

Region)

Madhya

Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Goa

State Ownership

Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

Coal Gas Diesel Total

State 308591 23540 000 332131 000 175887 8950 516968

Private 299000 307411 1697 608108 000 000 291171 899279

Central 147330 000 000 147330 12716 000 000 160046

Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294

State 480659 000 000 480659 000 217566 000 698225

Private 27000 157089 1983 186072 000 000 89529 275601

Central 172188 000 000 172188 14862 000 000 187050

Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876

State 422000 000 12792 434792 000 359980 15533 810305

Private 206000 000 10650 216650 000 000 496005 712655

Central 162846 000 000 162846 47586 000 000 210432

Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392

State 000 000 15996 15996 000 188150 13892 218038

Private 000 17400 000 17400 000 000 11655 29055

Central 103869 35958 000 139827 22860 000 000 162687

Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780

State 477000 52408 000 529408 000 218220 12270 759898

Private 295000 50310 41166 386476 000 000 965460 1351936

Central 415510 000 000 415510 98650 000 000 514160

Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10017 000 000 10017 000 000 000 10017

Sub-Total 10017 000 000 10017 000 000 000 10017

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 003 003

Central 24932 000 000 24932 5278 000 000 30210

Sub-Total 24932 3250 000 28182 5278 000 003 33463

152308 000 000 152308 30048 000 000 182356

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

17

Total (Southern

Region)

NLC

Central - Unallocated

Karnataka

Kerala

Tamil Nadu

Thermal

NuclearHydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

State Ownership

Sector

Modewise breakup

Grand Total

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Andhra Pradesh

Telangana

Puducherry

(As on 31082016)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 000 000 000 000 000 000 8852 8852

Central 253124 000 000 253124 000 12943 000 266067

Sub-Total 274124 000 000 274124 000 12943 15922 302989

State 119000 000 000 119000 000 13000 405 132405

Private 90000 000 000 90000 000 000 1619 91619

Central 31493 000 000 31493 000 7093 000 38586

Sub-Total 240493 000 000 240493 000 20093 2024 262610

State 572000 10000 000 582000 000 97700 9195 688895

Private 178138 000 000 178138 000 000 4432 182570

Central 92245 000 000 92245 000 43130 000 135375

Sub-Total 842383 10000 000 852383 000 140830 13627 1006840

State 000 000 000 000 000 000 000 000

Private 105000 000 000 105000 000 000 000 105000

Central 721066 000 000 721066 000 19326 000 740392

Sub-Total 826066 000 000 826066 000 19326 000 845392

State 42000 000 000 42000 000 206192 630 248822

Private 500000 000 000 500000 000 000 14525 514525

Central 168304 000 000 168304 000 10501 000 178805

Sub-Total 710304 000 000 710304 000 216693 15155 942152

State 000 000 000 000 000 000 5211 5211

Private 000 000 000 000 000 19500 000 19500

Central 9210 000 000 9210 000 7527 000 16737

Sub-Total 9210 000 000 9210 000 27027 5211 41448

159707 000 000 159707 000 000 000 159707

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138

18

Central - Unallocated

Total (Eastern

Region)

Jharkhand

West Bengal

DVC

Odisha

Sikkim

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Bihar

(As on 31082016)

Coal Gas Diesel Total

State 6000 27620 000 33620 000 10000 3001 46621

Private 000 2450 000 2450 000 000 410 2860

Central 12700 43560 000 56260 000 32972 000 89232

Sub-Total 18700 73630 000 92330 000 42972 3411 138713

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 027 027

Central 1235 4683 000 5918 000 9757 000 15675

Sub-Total 1235 4683 000 5918 000 9757 10488 26163

State 000 000 000 000 000 28200 3103 31303

Private 000 000 000 000 000 000 000 000

Central 1770 10979 000 12749 000 7458 000 20207

Sub-Total 1770 10979 000 12749 000 35658 3103 51510

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 1870 33896 000 35766 000 6237 000 42003

Sub-Total 1870 50846 000 52716 000 6237 2101 61054

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 000

Central 1570 7161 000 8731 000 8098 000 16829

Sub-Total 1570 7161 3600 12331 000 8098 545 20974

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 1070 4891 000 5961 000 5332 000 11293

Sub-Total 1070 4891 000 5961 000 5332 3067 14360

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 010 010

Central 1035 4054 000 5089 000 3431 000 8520

Sub-Total 1035 4054 000 5089 000 3431 3657 12177

3750 16136 000 19886 000 12715 000 32601

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Grand Total 31000 172380 3600 206980 000 124200 26372 357552

(As on 31082016)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 510 510

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1035 5040

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1110 5115

19

NuclearHydro

(Renewable)

RES

(MNRE)

Modewise breakup

Andaman amp

Nicobar

lakshadweep

Total (Islands)

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

SectorGrand Total

Thermal

Arunachal

Pradesh

Meghalaya

Tripura

Manipur

Nagaland

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

RES

(MNRE)

Assam

Mizoram

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

SN Contents Page

1Programme and Achievements of Transmission Lines in Aug 2016 and during April

2016 to Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

Section C - Transmission Lines

20

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 20: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

15

(As on 31082016)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 000 4800

Central 33860 000 000 33860 2580 000 000 36440

Sub-Total 33860 4800 000 38660 2580 000 005 41245

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 400 400

Central 4338 420 000 4758 738 000 000 5496

Sub-Total 4338 420 000 4758 738 000 400 5896

State 522000 232182 000 754182 000 77200 800 832182

Private 864200 406000 000 1270200 000 000 529272 1799472

Central 288862 42427 000 331289 55932 000 000 387221

Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875

State 408000 000 000 408000 000 170366 8396 586762

Private 538900 000 000 538900 000 000 312007 850907

Central 249005 25718 000 274723 27324 152000 000 454047

Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716

State 328000 000 000 328000 000 12000 1105 341105

Private 1089800 000 000 1089800 000 000 43863 1133663

Central 157454 000 000 157454 4752 000 000 162206

Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974

State 1055000 67200 000 1122200 000 288484 20813 1431497

Private 1179600 56800 000 1236400 000 44700 644639 1925739

Central 371226 262393 000 633619 69014 000 000 702633

Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 5422 2710 000 8132 846 000 000 8978

Sub-Total 5422 2710 000 8132 846 000 000 8978

179635 19691 000 199326 22814 000 000 222140

State 2313000 299382 000 2612382 000 548050 31119 3191551

Private 3672500 467600 000 4140100 000 44700 1530181 5714981

Central 1289801 353359 000 1643160 184000 152000 000 1979160

Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691

16

Daman amp Diu

Gujarat

Central - Unallocated

Total (Western

Region)

Madhya

Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Grand TotalThermal RES

(MNRE)Nuclear

Hydro

(Renewable)

Goa

State Ownership

Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31082016)

Coal Gas Diesel Total

State 308591 23540 000 332131 000 175887 8950 516968

Private 299000 307411 1697 608108 000 000 291171 899279

Central 147330 000 000 147330 12716 000 000 160046

Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294

State 480659 000 000 480659 000 217566 000 698225

Private 27000 157089 1983 186072 000 000 89529 275601

Central 172188 000 000 172188 14862 000 000 187050

Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876

State 422000 000 12792 434792 000 359980 15533 810305

Private 206000 000 10650 216650 000 000 496005 712655

Central 162846 000 000 162846 47586 000 000 210432

Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392

State 000 000 15996 15996 000 188150 13892 218038

Private 000 17400 000 17400 000 000 11655 29055

Central 103869 35958 000 139827 22860 000 000 162687

Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780

State 477000 52408 000 529408 000 218220 12270 759898

Private 295000 50310 41166 386476 000 000 965460 1351936

Central 415510 000 000 415510 98650 000 000 514160

Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10017 000 000 10017 000 000 000 10017

Sub-Total 10017 000 000 10017 000 000 000 10017

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 003 003

Central 24932 000 000 24932 5278 000 000 30210

Sub-Total 24932 3250 000 28182 5278 000 003 33463

152308 000 000 152308 30048 000 000 182356

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

17

Total (Southern

Region)

NLC

Central - Unallocated

Karnataka

Kerala

Tamil Nadu

Thermal

NuclearHydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

State Ownership

Sector

Modewise breakup

Grand Total

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Andhra Pradesh

Telangana

Puducherry

(As on 31082016)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 000 000 000 000 000 000 8852 8852

Central 253124 000 000 253124 000 12943 000 266067

Sub-Total 274124 000 000 274124 000 12943 15922 302989

State 119000 000 000 119000 000 13000 405 132405

Private 90000 000 000 90000 000 000 1619 91619

Central 31493 000 000 31493 000 7093 000 38586

Sub-Total 240493 000 000 240493 000 20093 2024 262610

State 572000 10000 000 582000 000 97700 9195 688895

Private 178138 000 000 178138 000 000 4432 182570

Central 92245 000 000 92245 000 43130 000 135375

Sub-Total 842383 10000 000 852383 000 140830 13627 1006840

State 000 000 000 000 000 000 000 000

Private 105000 000 000 105000 000 000 000 105000

Central 721066 000 000 721066 000 19326 000 740392

Sub-Total 826066 000 000 826066 000 19326 000 845392

State 42000 000 000 42000 000 206192 630 248822

Private 500000 000 000 500000 000 000 14525 514525

Central 168304 000 000 168304 000 10501 000 178805

Sub-Total 710304 000 000 710304 000 216693 15155 942152

State 000 000 000 000 000 000 5211 5211

Private 000 000 000 000 000 19500 000 19500

Central 9210 000 000 9210 000 7527 000 16737

Sub-Total 9210 000 000 9210 000 27027 5211 41448

159707 000 000 159707 000 000 000 159707

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138

18

Central - Unallocated

Total (Eastern

Region)

Jharkhand

West Bengal

DVC

Odisha

Sikkim

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Bihar

(As on 31082016)

Coal Gas Diesel Total

State 6000 27620 000 33620 000 10000 3001 46621

Private 000 2450 000 2450 000 000 410 2860

Central 12700 43560 000 56260 000 32972 000 89232

Sub-Total 18700 73630 000 92330 000 42972 3411 138713

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 027 027

Central 1235 4683 000 5918 000 9757 000 15675

Sub-Total 1235 4683 000 5918 000 9757 10488 26163

State 000 000 000 000 000 28200 3103 31303

Private 000 000 000 000 000 000 000 000

Central 1770 10979 000 12749 000 7458 000 20207

Sub-Total 1770 10979 000 12749 000 35658 3103 51510

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 1870 33896 000 35766 000 6237 000 42003

Sub-Total 1870 50846 000 52716 000 6237 2101 61054

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 000

Central 1570 7161 000 8731 000 8098 000 16829

Sub-Total 1570 7161 3600 12331 000 8098 545 20974

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 1070 4891 000 5961 000 5332 000 11293

Sub-Total 1070 4891 000 5961 000 5332 3067 14360

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 010 010

Central 1035 4054 000 5089 000 3431 000 8520

Sub-Total 1035 4054 000 5089 000 3431 3657 12177

3750 16136 000 19886 000 12715 000 32601

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Grand Total 31000 172380 3600 206980 000 124200 26372 357552

(As on 31082016)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 510 510

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1035 5040

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1110 5115

19

NuclearHydro

(Renewable)

RES

(MNRE)

Modewise breakup

Andaman amp

Nicobar

lakshadweep

Total (Islands)

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

SectorGrand Total

Thermal

Arunachal

Pradesh

Meghalaya

Tripura

Manipur

Nagaland

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

RES

(MNRE)

Assam

Mizoram

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

SN Contents Page

1Programme and Achievements of Transmission Lines in Aug 2016 and during April

2016 to Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

Section C - Transmission Lines

20

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 21: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

(As on 31082016)

Coal Gas Diesel Total

State 308591 23540 000 332131 000 175887 8950 516968

Private 299000 307411 1697 608108 000 000 291171 899279

Central 147330 000 000 147330 12716 000 000 160046

Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294

State 480659 000 000 480659 000 217566 000 698225

Private 27000 157089 1983 186072 000 000 89529 275601

Central 172188 000 000 172188 14862 000 000 187050

Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876

State 422000 000 12792 434792 000 359980 15533 810305

Private 206000 000 10650 216650 000 000 496005 712655

Central 162846 000 000 162846 47586 000 000 210432

Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392

State 000 000 15996 15996 000 188150 13892 218038

Private 000 17400 000 17400 000 000 11655 29055

Central 103869 35958 000 139827 22860 000 000 162687

Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780

State 477000 52408 000 529408 000 218220 12270 759898

Private 295000 50310 41166 386476 000 000 965460 1351936

Central 415510 000 000 415510 98650 000 000 514160

Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10017 000 000 10017 000 000 000 10017

Sub-Total 10017 000 000 10017 000 000 000 10017

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 003 003

Central 24932 000 000 24932 5278 000 000 30210

Sub-Total 24932 3250 000 28182 5278 000 003 33463

152308 000 000 152308 30048 000 000 182356

State 1688250 79198 28788 1796236 000 1159803 50645 3006684

Private 827000 532210 55496 1414706 000 000 1853823 3268529

Central 1189000 35958 000 1224958 232000 000 000 1456958

Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171

17

Total (Southern

Region)

NLC

Central - Unallocated

Karnataka

Kerala

Tamil Nadu

Thermal

NuclearHydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

State Ownership

Sector

Modewise breakup

Grand Total

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Andhra Pradesh

Telangana

Puducherry

(As on 31082016)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 000 000 000 000 000 000 8852 8852

Central 253124 000 000 253124 000 12943 000 266067

Sub-Total 274124 000 000 274124 000 12943 15922 302989

State 119000 000 000 119000 000 13000 405 132405

Private 90000 000 000 90000 000 000 1619 91619

Central 31493 000 000 31493 000 7093 000 38586

Sub-Total 240493 000 000 240493 000 20093 2024 262610

State 572000 10000 000 582000 000 97700 9195 688895

Private 178138 000 000 178138 000 000 4432 182570

Central 92245 000 000 92245 000 43130 000 135375

Sub-Total 842383 10000 000 852383 000 140830 13627 1006840

State 000 000 000 000 000 000 000 000

Private 105000 000 000 105000 000 000 000 105000

Central 721066 000 000 721066 000 19326 000 740392

Sub-Total 826066 000 000 826066 000 19326 000 845392

State 42000 000 000 42000 000 206192 630 248822

Private 500000 000 000 500000 000 000 14525 514525

Central 168304 000 000 168304 000 10501 000 178805

Sub-Total 710304 000 000 710304 000 216693 15155 942152

State 000 000 000 000 000 000 5211 5211

Private 000 000 000 000 000 19500 000 19500

Central 9210 000 000 9210 000 7527 000 16737

Sub-Total 9210 000 000 9210 000 27027 5211 41448

159707 000 000 159707 000 000 000 159707

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138

18

Central - Unallocated

Total (Eastern

Region)

Jharkhand

West Bengal

DVC

Odisha

Sikkim

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Bihar

(As on 31082016)

Coal Gas Diesel Total

State 6000 27620 000 33620 000 10000 3001 46621

Private 000 2450 000 2450 000 000 410 2860

Central 12700 43560 000 56260 000 32972 000 89232

Sub-Total 18700 73630 000 92330 000 42972 3411 138713

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 027 027

Central 1235 4683 000 5918 000 9757 000 15675

Sub-Total 1235 4683 000 5918 000 9757 10488 26163

State 000 000 000 000 000 28200 3103 31303

Private 000 000 000 000 000 000 000 000

Central 1770 10979 000 12749 000 7458 000 20207

Sub-Total 1770 10979 000 12749 000 35658 3103 51510

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 1870 33896 000 35766 000 6237 000 42003

Sub-Total 1870 50846 000 52716 000 6237 2101 61054

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 000

Central 1570 7161 000 8731 000 8098 000 16829

Sub-Total 1570 7161 3600 12331 000 8098 545 20974

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 1070 4891 000 5961 000 5332 000 11293

Sub-Total 1070 4891 000 5961 000 5332 3067 14360

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 010 010

Central 1035 4054 000 5089 000 3431 000 8520

Sub-Total 1035 4054 000 5089 000 3431 3657 12177

3750 16136 000 19886 000 12715 000 32601

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Grand Total 31000 172380 3600 206980 000 124200 26372 357552

(As on 31082016)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 510 510

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1035 5040

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1110 5115

19

NuclearHydro

(Renewable)

RES

(MNRE)

Modewise breakup

Andaman amp

Nicobar

lakshadweep

Total (Islands)

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

SectorGrand Total

Thermal

Arunachal

Pradesh

Meghalaya

Tripura

Manipur

Nagaland

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

RES

(MNRE)

Assam

Mizoram

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

SN Contents Page

1Programme and Achievements of Transmission Lines in Aug 2016 and during April

2016 to Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

Section C - Transmission Lines

20

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 22: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

(As on 31082016)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 000 000 000 000 000 000 8852 8852

Central 253124 000 000 253124 000 12943 000 266067

Sub-Total 274124 000 000 274124 000 12943 15922 302989

State 119000 000 000 119000 000 13000 405 132405

Private 90000 000 000 90000 000 000 1619 91619

Central 31493 000 000 31493 000 7093 000 38586

Sub-Total 240493 000 000 240493 000 20093 2024 262610

State 572000 10000 000 582000 000 97700 9195 688895

Private 178138 000 000 178138 000 000 4432 182570

Central 92245 000 000 92245 000 43130 000 135375

Sub-Total 842383 10000 000 852383 000 140830 13627 1006840

State 000 000 000 000 000 000 000 000

Private 105000 000 000 105000 000 000 000 105000

Central 721066 000 000 721066 000 19326 000 740392

Sub-Total 826066 000 000 826066 000 19326 000 845392

State 42000 000 000 42000 000 206192 630 248822

Private 500000 000 000 500000 000 000 14525 514525

Central 168304 000 000 168304 000 10501 000 178805

Sub-Total 710304 000 000 710304 000 216693 15155 942152

State 000 000 000 000 000 000 5211 5211

Private 000 000 000 000 000 19500 000 19500

Central 9210 000 000 9210 000 7527 000 16737

Sub-Total 9210 000 000 9210 000 27027 5211 41448

159707 000 000 159707 000 000 000 159707

State 754000 10000 000 764000 000 316892 22511 1103403

Private 873138 000 000 873138 000 19500 29428 922066

Central 1435149 000 000 1435149 000 100520 000 1535669

Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138

18

Central - Unallocated

Total (Eastern

Region)

Jharkhand

West Bengal

DVC

Odisha

Sikkim

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Bihar

(As on 31082016)

Coal Gas Diesel Total

State 6000 27620 000 33620 000 10000 3001 46621

Private 000 2450 000 2450 000 000 410 2860

Central 12700 43560 000 56260 000 32972 000 89232

Sub-Total 18700 73630 000 92330 000 42972 3411 138713

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 027 027

Central 1235 4683 000 5918 000 9757 000 15675

Sub-Total 1235 4683 000 5918 000 9757 10488 26163

State 000 000 000 000 000 28200 3103 31303

Private 000 000 000 000 000 000 000 000

Central 1770 10979 000 12749 000 7458 000 20207

Sub-Total 1770 10979 000 12749 000 35658 3103 51510

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 1870 33896 000 35766 000 6237 000 42003

Sub-Total 1870 50846 000 52716 000 6237 2101 61054

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 000

Central 1570 7161 000 8731 000 8098 000 16829

Sub-Total 1570 7161 3600 12331 000 8098 545 20974

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 1070 4891 000 5961 000 5332 000 11293

Sub-Total 1070 4891 000 5961 000 5332 3067 14360

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 010 010

Central 1035 4054 000 5089 000 3431 000 8520

Sub-Total 1035 4054 000 5089 000 3431 3657 12177

3750 16136 000 19886 000 12715 000 32601

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Grand Total 31000 172380 3600 206980 000 124200 26372 357552

(As on 31082016)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 510 510

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1035 5040

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1110 5115

19

NuclearHydro

(Renewable)

RES

(MNRE)

Modewise breakup

Andaman amp

Nicobar

lakshadweep

Total (Islands)

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

SectorGrand Total

Thermal

Arunachal

Pradesh

Meghalaya

Tripura

Manipur

Nagaland

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

RES

(MNRE)

Assam

Mizoram

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

SN Contents Page

1Programme and Achievements of Transmission Lines in Aug 2016 and during April

2016 to Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

Section C - Transmission Lines

20

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 23: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

(As on 31082016)

Coal Gas Diesel Total

State 6000 27620 000 33620 000 10000 3001 46621

Private 000 2450 000 2450 000 000 410 2860

Central 12700 43560 000 56260 000 32972 000 89232

Sub-Total 18700 73630 000 92330 000 42972 3411 138713

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 027 027

Central 1235 4683 000 5918 000 9757 000 15675

Sub-Total 1235 4683 000 5918 000 9757 10488 26163

State 000 000 000 000 000 28200 3103 31303

Private 000 000 000 000 000 000 000 000

Central 1770 10979 000 12749 000 7458 000 20207

Sub-Total 1770 10979 000 12749 000 35658 3103 51510

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 1870 33896 000 35766 000 6237 000 42003

Sub-Total 1870 50846 000 52716 000 6237 2101 61054

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 000

Central 1570 7161 000 8731 000 8098 000 16829

Sub-Total 1570 7161 3600 12331 000 8098 545 20974

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 1070 4891 000 5961 000 5332 000 11293

Sub-Total 1070 4891 000 5961 000 5332 3067 14360

State 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 010 010

Central 1035 4054 000 5089 000 3431 000 8520

Sub-Total 1035 4054 000 5089 000 3431 3657 12177

3750 16136 000 19886 000 12715 000 32601

State 6000 44570 3600 54170 000 38200 25425 117795

Private 000 2450 000 2450 000 000 947 3397

Central 25000 125360 000 150360 000 86000 000 236360

Grand Total 31000 172380 3600 206980 000 124200 26372 357552

(As on 31082016)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 510 510

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1035 5040

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 585 585

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1110 5115

19

NuclearHydro

(Renewable)

RES

(MNRE)

Modewise breakup

Andaman amp

Nicobar

lakshadweep

Total (Islands)

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

SectorGrand Total

Thermal

Arunachal

Pradesh

Meghalaya

Tripura

Manipur

Nagaland

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership

Sector

Modewise breakup

Grand TotalThermalNuclear

Hydro

(Renewable)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

RES

(MNRE)

Assam

Mizoram

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

SN Contents Page

1Programme and Achievements of Transmission Lines in Aug 2016 and during April

2016 to Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

Section C - Transmission Lines

20

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 24: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

SN Contents Page

1Programme and Achievements of Transmission Lines in Aug 2016 and during April

2016 to Aug 2016

2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016

Section C - Transmission Lines

20

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 25: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

Programme

2016-17 Programme Achievement Programme Achievement

Central Sector 2597 0 0 2573 0

State Sector 0 0 0 0 0

Total 2597 0 0 2573 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3123 552 0 3123 1391

State Sector 750 416 0 750 0

JVPrivate Sector 1313 0 181 1133 192

Total 5186 968 181 5006 1583

Central Sector 3953 50 744 1980 1681

State Sector 5799 1163 364 2976 1297

JVPrivate Sector 762 0 282 366 1362

Total 10514 1213 1390 5322 4340

Central Sector 78 0 0 0 28

State Sector 5009 548 1480 2010 3290

JVPrivate Sector 0 0 0 0 0

Total 5087 548 1480 2010 3318

Grand Total 23384 2729 3051 14911 9241

Voltage Level

(kV)

Name of the

Transmission LineType

Executing

Agency

Line Length

(CKM)

400 Betul - khandwa (Quad) line DC PGCIL 338

400 Khanwada - Indore line DC PGCIL 344

400 Meja- Allahabad line DC PGCIL 56

400 Sasaram-Allahbad line DC PGCIL 6

PVTSector

765 Mainpuri- Greater Noida SC WUPPTCL 181

400 Cuddalore- Naggapattinam DC IPTCL 95

400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2

400 Madhugiri- Bidadi DC KTCL 185

400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124

400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240

220 Bajakhana- Bagha Purana DC PSTCL 71

220 Boisar II- Borivali MC MSETCL 331

220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14

220 Chatrail- Ramgarh DC RVPNL 90

220 Chittorgarh- Sawa DC RVPNL 53

220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92

220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60

220 Kasor- herang (DFCC) line DC GETCO 39

220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10

220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14

220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30

220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68

220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62

220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6

220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21

220 Lucknow PG (400) - Kursi Road DC UPPTCL 30

220 Palwal (Meghpur) - Meerpur DC HVPNL 53

220 Parigi- Kosigi line DC TSTRANSCO 40

220 Roza- Dohna DC UPPTCL 216

220 Visavadar -Timbdi DC GETCO 180

20

CENTRAL Sector

STATE Sector

1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Aug16Aug 16

(Figs in ckms)

Voltage Level

Sector

400 kV

220kV

2 List of Transmission Line CommissionedReady for commissioning During Aug 2016

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 26: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to

Aug 2016

2 List of Sub Stations commissionedready for commisssioning during Aug 2016

Section D - Sub Stations

21

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 27: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

Programme

2016-17 Programme Achievement Achievement

Central Sector 1500 0 1500 1500

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 1500 0 1500 1500

Central Sector 10500 3000 0 6000

State Sector 1500 0 0 1500

JVPrivate Sector 2000 0 0 1500

Total 14000 3000 0 9000

Central Sector 9890 0 500 5315

State Sector 13015 1945 1260 3520

JVPrivate Sector 2000 0 0 2000

Total 24905 1945 1760 10835

Central Sector 0 0 0 0

State Sector 4783 360 1500 6100

JVPrivate Sector 0 0 0 0

Total 4783 360 1500 6100

Grand Total 45188 5305 4760 27435

Name of

Sub-StationType

Capacity Added

(MWMVA)

Biswanath Chariyali amp Agra HVDC terminal

(Pole-II)800 1500

400 Somanahalli SS 400200 500

Karamadai SS 400230 945

Kasor(Aug) 40022033 315

Echur (Purisai) (JICA) SS 230110 200

Abohar (Addl) 22066 100

Agthala (Aug) 22066 100

220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160

220 Barahua SS 220132 UPPTCL 100

220 Chhatral (Aug) 22066 GETCO 100

220 Kansari (Aug) 22066 GETCO 60

220 Kim (Aug) 22066 GETCO 100

220 Mehsana (Aug) 220132 GETCO 50

220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100

220 Mota (Aug) 22066 GETCO 110

220 Puri (Samangara) ICT- II 220132 OPTCL 160

220 Rajkot (Nyara)(Aug) 22066 GETCO 60

220 Salejada(Aug) 22066 GETCO 100

21

1500

0

5780

4000

220 kV

(Fig in MVA)

Voltage Level

Sector

Apr 16 - Aug 16

Programme

2000

765 kV

Aug-16

CENTRAL SECTOR

28160

12500

1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016

plusmn 800 kV HVDC

11780

1500

0

2000

0

GETCO

PSTCL

9000

1500

400 kV

800

400

STATE SECTOR

2380

0

2380

Voltage Level

(kV)Executing Agency

PGCIL

2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016

GETCO

400

TANTRANSCO

TANTRANSCO

PGCIL

220

220

230

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 28: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 29: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

Programme Achievement Ach Programme Achievement Ach

Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183

State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385

PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274

PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953

Total 99900000 7967700 7292896 9153 40551800 40385638 9959

Central Sector 5340000 710800 875949 12323 2937300 3320674 11305

State Sector 6719900 830600 677869 8161 2840500 2224873 7833

PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231

PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809

Total 13400000 1754800 1773747 10108 6587700 6365175 9662

Central Sector 4000000 327300 351454 10738 1671200 1587349 9498

Total 4000000 327300 351454 10738 1671200 1587349 9498

Bhutan Import 500000 70600 108028 15301 236800 306034 12924

Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300

State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100

Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246

Total 117800000 10120400 9526125 9413 49047500 48644196 9918

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jul-16 Jul-15 Upto July-16 Upto July-15

955429 887151 2967887 2465693

22

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Aug 16

1 Electricity Generation (MU) Targets and Achievememts for 2016-17

All India Energy Generation During April 2016 to Aug 2016 (MU)

Target

(2016-17)

April 16 to Aug 16Sector

405518

65877

16712

490475

403856

63652

15873

486442

0

100000

200000

300000

400000

500000

600000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 30: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23

2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24

3 Power Supply Position (Revised) for July 2016 25

4 Peak Demand and Peak Met (Revised) for July 2016 26

5 Notified Power cuts Restrictions on Industries during Aug 2016 27

6 Power Supply to Agricultural Sector during Aug 2016 28

Section F - Power supply position

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 31: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00

िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01

हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00

िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07

ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185

पजाब Punjab 6269 6269 0 00 26979 26979 0 00

राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05

गजरात Gujarat 7759 7759 0 00 44404 44404 0 00

म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00

महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01

दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00

गोवा Goa 412 412 0 00 2094 2092 -2 -01

पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01

आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02

तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00

कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09

करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02

तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00

पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0

दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02

िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16

दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06

झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03

ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00

पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03

िसlt=म Sikkim 41 41 0 00 191 191 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250

पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06

अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25

असम Assam 971 939 -32 -33 4007 3810 -197 -49

मिणपर Manipur 60 58 -2 -35 294 279 -15 -51

मघालय Meghalaya 138 138 0 00 679 679 0 00

िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25

नागालड Nagaland 69 67 -1 -19 302 295 -7 -23

िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39

सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)

अल2016 - अग2016 April2016 to August2016

23

Surplus Deficit (-)

राampState

Surplus Deficit (-)

अग 2016 August2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 32: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00

िदी Delhi 5707 5707 0 00 6342 6261 -81 -13

हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152

पजाब Punjab 11228 11228 0 00 11408 11408 0 00

राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06

गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04

महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00

गोवा Goa 493 491 -2 -03 497 496 -1 -03

पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09

आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00

तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02

कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43

करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00

पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16

िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00

झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00

ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00

पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54

असम Assam 1661 1633 -28 -17 1661 1633 -28 -17

मिणपर Manipur 145 145 0 00 152 151 -1 -07

मघालय Meghalaya 296 296 0 00 311 311 0 00

िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00

नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08

िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05

सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

24

अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)

आकड़ मगा वाट नट Figures in MW net

अल2016 - अग$2016 April2016 to August2016

Surplus Deficit (-)Surplus Deficit (-)

राStateअग$ 2016 August2016

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 33: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

आकड़ िमिलयन यिनट नट Figures in MU net

आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)

णाली System Requirement Availability Requirement Availability

Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00

िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01

हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00

िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07

ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182

पजाब Punjab 6598 6598 0 00 20710 20710 0 00

राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05

गजरात Gujarat 8353 8353 0 00 36645 36645 0 00

म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00

महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01

दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00

दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00

गोवा Goa 411 411 0 00 1682 1680 -2 -01

पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01

आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02

तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00

कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11

करल Kerala 1883 1883 0 00 8202 8183 -19 -02

तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00

पडचरी Puducherry 227 227 0 00 907 906 -1 -01

ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0

दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03

िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20

दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07

झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03

ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00

पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04

िसlt=म Sikkim 34 34 0 00 150 150 0 00

अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250

पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07

अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27

असम Assam 815 779 -36 -44 3036 2871 -165 -54

मिणपर Manipur 63 58 -5 -80 234 221 -13 -56

मघालय Meghalaya 149 149 0 00 541 541 0 00

िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25

नागालड Nagaland 65 64 -1 -20 233 228 -5 -21

िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42

सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)

अल2016 - जलाई2016 April2016 to July2016

25

Surplus Deficit (-)

राState

Surplus Deficit (-)

जलाई 2016 July2016

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 34: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)

णाली System Peak Demand Peak Met Peak Demand Peak Met

Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00

िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13

हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00

िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00

ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152

पजाब Punjab 11408 11408 0 00 11408 11408 0 00

राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06

गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01

म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04

महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02

दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00

दादर व नगर हवली Dadra amp Nagar

Haveli745 745 0 00 781 781 0 00

गोवा Goa 456 456 0 00 497 496 -1 -03

पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09

आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28

तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06

कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43

करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33

तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00

पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07

ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0

दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07

िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21

दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00

झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00

ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00

पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03

िसम Sikkim 97 97 0 00 112 112 0 00

अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20

पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02

अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14

असम Assam 1591 1547 -44 -28 1591 1547 -44 -28

मिणपर Manipur 141 141 0 00 152 151 -1 -07

मघालय Meghalaya 292 292 0 00 311 311 0 00

िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00

नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08

िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05

सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

26

Surplus Deficit (-)

अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)

आकड़ मगा वाट नट Figures in MW net

जलाई 2016 July2016

Surplus Deficit (-)

राampStateअल2016 - जलाई2016 April2016 to July2016

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 35: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi NIL NIL

हरयाणा Haryana NIL NIL

िहमाचल दश Himachal Pradesh NIL NIL

ज कीर Jammu amp Kashmir

पजाब Punjab NIL NIL

राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries

पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL

गजरात Gujarat

म दश Madhya Pradesh NIL NIL

महारा$ Maharashtra NIL NIL

गोवा Goa NIL NIL

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

27

अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016

Nil

Nil

Nil

All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they

have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their

recess timings staggered

Nil

Nil

Nil

No Notified Cuts

No Notified Cuts

No Notified Cuts

No Notified Cuts

Data not received

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 36: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

रा State Regionउरीउरीउरीउरी Northern Region

चडीगढ़ Chandigarh

िदी Delhi

हरयाणा Haryana

िहमाचल दश Himachal Pradesh

ज कीर Jammu amp Kashmir

पजाब Punjab

राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand

पिमी Western Regionछीसगढ़ Chhattisgarh

गजरात Gujarat

म दश Madhya Pradesh

महारा$ Maharashtra

गोवा Goa

दिणी Southern Region

आ( दश Andhra Pradesh

तलगाना Telangana

कना)टक Karnataka

करल Kerala

तिमल नाड Tamil Nadu

पडचरी Puducherry No Restrictions

पव Eastern Region

िबहार Bihar

झारख- Jharkhand

ओिडशा Odisha

पिम बगाल West Bengal

28

अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016

Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)

There is no agricultural load in Delhi

Three Phase Supply 1154 hrsday (Average)

HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector

Three Phase Supply 18 hrsday

Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)

औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply

About 18 hrs

About 20 hrs

Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)

Three Phase Supply 09 hrsday

Three Phase Supply(Mixed) 2304 hrs day (Average)

Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply

during rest of 16 hours Jyotigram Yojana 24 hrs

Data not received

24 hrs

Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday

Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)

Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)

Three Phase Supply 07 hrsday

No restriction

About 23 hrs

No Restrictions

Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 37: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 30

2 Growth of Transmission Sector since 6th Plan 31

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Section G - Growth of Power Sector

32

33

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 38: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW

Coal Gas Diesel Nuclear Hydro Res Total

18659288 2505713 918892 578000 429684 4423692 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31082016 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 30555425 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 39: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

31082016

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 25828 32250

400 ckm 6029 19824 36142 49378 75722 106819 151470 144819

220 ckm 46005 59631 79600 96993 114629 135980 160556 170980

Total ckm 52034 79455 115742 147531 192535 248049 337854 348049

HVDC ckm 0 0 1634 4738 5872 9432 12938 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921

765 MVA 0 0 0 0 0 25000 150000 174000

400 MVA 9330 21580 40865 60380 92942 151027 220302 196027

220 MVA 37291 53742 84177 116363 156497 223774 299582 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801

HVDC MW 0 0 0 5200 8200 9750 16500 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301

Inter-regional

transmission

Capacity

MW 14050 27750 59550 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 40: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Provisional

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

Source- PFC Reports on the performance of State Power Utilities

31

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

957

7335

7786

91441

8188

88363

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 41: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

1

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

7 Status of Hydro Schemes Cleared by the CEA in Aug 2016

Name of Scheme

2093

5743

9769

Cumu upto End of 10th Plan

311060

316074

010407 to 310308

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan

2002-03

13409

2626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064

367244

1218

2780

1997-98

1998-99

1999-00

2000-01

297594

010408 to 310309

010409 to 310310

010410 to 310311

10th Plan

3207

482864

12632

1576036

44517

2005-06

2006-07 22594

2003-04

2004-05

651095

2781

3884

15455554

2314176

322968

331020

397343

611750

412667

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

652913

74575 296361511th PlanCumu upto End of 11th Plan

589068 20550647

557439

Nil

Cummulative as on 31082016

8629

3726

46708

18423975

499150

557976

840909

010411 to 310312

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 42: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

SN Contents Page

1 Rate of sale of power for the year 2013-2014 33-41

RATE OF SALE OF POWER FOR THE YEAR 2013-2014

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 43: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Net Gen

(Mkwh)

Rate of Sale of Power

as approved by

CERCSERC

(PaiseKwh) iii=( i+ii)

NORTHERN REGION

CENTRAL SECTOR

BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763

DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992

PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400

CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660

PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060

CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560

DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580

SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980

URI HPS NHPC LTD HYDRO-HYDRO 251600 16100

URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520

SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280

ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000

AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700

BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700

DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100

FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600

RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500

RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400

RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500

SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100

TANDA TPS NTPC LTD THERMAL-COAL 314024 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500

NARORA APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR236268 24856

RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-

NUCLEAR836174 34339

NJHPS SJVNL HYDRO-HYDRO 713153 28740

TEHRI HPP THDC HYDRO-HYDRO 402152 46200

KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800

NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL

PLANT HPGCL HYDRO-HYDRO 20291 11100

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100

GUMMA HPSEB HYDRO-HYDRO 000 27100

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600

P-33

RATE OF SALE OF POWER FOR THE YEAR 2013-14

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 44: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900

BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400

CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830

PPS-I PPCL THERMAL-COAL 235911 31410

PPS-III PPCL THERMAL-GAS 61732 42590

LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300

GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200

BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000

KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000

CHENANI I JampKPDD HYDRO-HYDRO 7831 7100

CHENANI II JampKPDD HYDRO-HYDRO 679 9400

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700

SEWA-III JampKPDD HYDRO-HYDRO 488 19400

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700

HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100

SUMOOR JampKPDD HYDRO-HYDRO 008 33200

BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800

IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100

PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000

MARPACHOO JampKPDD HYDRO-HYDRO 088 46900

HAFTAL JampKPDD HYDRO-HYDRO 129 45400

BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600

STAKNA JampKPDD HYDRO-HYDRO 011 4000

GNDTPLANT BATHINDA PUNJAB STATE POWER COR

LTDTHERMAL-COAL 145289 51000

GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR

LTDTHERMAL-COAL 734046 51000

GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR

LTDTHERMAL-COAL 611743 51000

SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 35122 51000

UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 36163 51000

ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 73439 51000

MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 124674 51000

RANJIT SAGAR Dam(RSD) SHAPUR

KANDI

PUNJAB STATE POWER COR

LTDHYDRO-HYDRO 157060 51000

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240

SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125

CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707

RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368

DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611

MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800

GIRAL -II RRVUNL THERMAL-COAL 16128 30500

KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500

OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300

RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA

BHOLA)UPJVNL HYDRO-HYDRO 1926 21300

P-34

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 45: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586

ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697

OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640

OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911

PANKI TPS UPRVUNL THERMAL-COAL 62700 43434

PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652

PRIVATE SECTOR

INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER

PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180

BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200

VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300

KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500

MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992

MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107

RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540

RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000

ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306

GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100

KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300

KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200

KORBA III NTPC LTD THERMAL-COAL 361664 25800

SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400

SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500

MOUDA i NTPC LTD THERMAL-COAL 71866 46000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-

NUCLEAR337293 23731

TARAPUR 1 amp 2 NPCIL NUCLEAR-

NUCLEAR196830 9679

TARAPUR 3 amp 4 NPCIL NUCLEAR-

NUCLEAR699895 28511

RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008

STATE SECTOR

KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496

P-35

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 46: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850

GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650

BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880

MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010

SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120

DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285

DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275

KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736

SIKKA TPS GSECL THERMAL-COAL 52514 64562

UKAI 1-5 GSECL THERMAL-COAL 324942 34959

UKAI TPS 6 GSECL THERMAL-COAL 124316 37645

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987

WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361

KADANA HPS GSECL HYDRO-HYDRO 40661 14139

UKAI HPS GSECL HYDRO-HYDRO 83428 2860

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600

BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100

BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700

JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900

PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000

RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700

AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000

SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700

SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400

SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700

BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700

KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900

KORADI TPS MSPGCL THERMAL-COAL 215200 40300

NASIK TPS MSPGCL THERMAL-COAL 377700 42400

PARLI TPS MSPGCL THERMAL-COAL 369100 35600

PARAS MSPGCL THERMAL-COAL 266700 33200

URAN CCPP MSPGCL THERMAL-GAS 365700 27000

KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600

VAITARANA MSPGCL HYDRO-HYDRO 26000 7900

YELDARI MSPGCL HYDRO-HYDRO 2400 27000

BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500

PANSHET MSPGCL HYDRO-HYDRO 9300 15900

BHIRA MSPGCL HYDRO-HYDRO 9600 5800

TILLARI MSPGCL HYDRO-HYDRO 14400 5800

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500

SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500

PRIVATE SECTOR

BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764

P-36

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 47: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200

WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN

SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190

GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL

STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692

SURAT LIG POWER PPANT (SSPP

STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342

AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-COAL 2197200 24094

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100

LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700

BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV

LTD THERMAL-COAL 331861 39772

4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800

4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500

RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000

TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500

SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743

NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429

NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500

SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100

SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800

KAIGA 123 amp 4 NPCILNUCLEAR-

NUCLEAR593317 30196

MADRAS APS 1 amp 2 NPCILNUCLEAR-

NUCLEAR189800 20539

STATE SECTOR

APGAS POWER CORPORN

LTD(VIJJESWARAM - I)

ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260

APGAS POWER CORPORN

LTD(VIJJESWARAM -II)

ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600

RAYALASEEMA THERMAL POWER

PROJECT-I

APGENCO THERMAL-COAL 230795 35600

RAYALASEEMA THERMAL POWER

PROJECT-II

APGENCO THERMAL-COAL 275620 35600

RAYALASEEMA THERMAL POWER

PROJECT-III

APGENCO THERMAL-COAL 128300 35600

KOTHAGUDEM THERMAL POWER

STATION (OampM)

APGENCO THERMAL-COAL 380420 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-V)

APGENCO THERMAL-COAL 323854 35600

KOTHAGUDEM THERMAL POWER

STATION (KTPS-VI)

APGENCO THERMAL-COAL 324071 35600

RAMAGUNDEM THERMAL POWER

STATION

APGENCO THERMAL-COAL 40072 35600

KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600

SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600

SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600

NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600

UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600

LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600

DONKARAYI APGENCO HYDRO-HYDRO 11533 35600

P-37

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 48: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600

POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600

SINGUR APGENCO HYDRO-HYDRO 429 35600

NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600

PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600

CHETTIPETA APGENCO HYDRO-HYDRO 265 35600

MUCHKUND APGENCO HYDRO-HYDRO 31072 35600

TUNGABHADRA HES amp HAMPI PH (AP

Share)

APGENCO HYDRO-HYDRO 15306 35600

PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600

BELLARY TPS KPCL THERMAL-COAL 564935 40103

RAICHUR TPS KPCL THERMAL-COAL 880141 39881

YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206

ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569

BHADRA HPS KPCL HYDRO-HYDRO 6154 25111

GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645

GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392

KADRA HPS KPCL HYDRO-HYDRO 35179 14451

KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940

SUPA HPS KPCL HYDRO-HYDRO 46303 4940

KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133

LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436

MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494

SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053

VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093

MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093

SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053

IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800

IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800

KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800

KALLADA HPS KSEB HYDRO-HYDRO 6734 46800

KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800

MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800

PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800

PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800

PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800

SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800

SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800

SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800

BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800

KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800

MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900

KAVARATTI Ω

LAKSHADEEP THERMAL-DIESEL 983 286900

AMINI Ω

LAKSHADEEP THERMAL-DIESEL 464 286900

ANDROTT Ω

LAKSHADEEP THERMAL-DIESEL 628 286900

KALPENI Ω

LAKSHADEEP THERMAL-DIESEL 316 286900

AGATTI Ω

LAKSHADEEP THERMAL-DIESEL 491 286900

KADMAT Ω

LAKSHADEEP THERMAL-DIESEL 376 286900

KILTAN Ω

LAKSHADEEP THERMAL-DIESEL 250 286900

CHETLET Ω

LAKSHADEEP THERMAL-DIESEL 153 286900

BITRA Ω

LAKSHADEEP THERMAL-DIESEL 022 286900

BANGARAM Ω

LAKSHADEEP THERMAL-DIESEL 005 286900

KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120

ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852

METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852

NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852

TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852

P-38

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 49: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852

PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852

BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852

PRIVATE SECTOR

LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000

BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR

ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600

GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700

SBU 2 JSW(JINDAL) ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500

LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 139963 000

LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER

LTD THERMAL-GAS 000 000

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700

PPN POWER PPN POWER POWER THERMAL-GAS 145600 000

RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600

SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367

KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400

UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724

P-39

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 50: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426

VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200

EASTERN REGION

CENTRAL SECTOR

BOKARO `B` TPS DVC THERMAL-COAL 152029 41900

CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900

DURGAPUR TPS DVC THERMAL-COAL 167885 43278

DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278

MEJIA TPS DVC THERMAL-COAL 1195338 43278

KODERMA TPS DVC THERMAL-COAL 139150 41900

MAITHON HPS DVC HYDRO-HYDRO 9757 43278

PANCHET HPS DVC HYDRO-HYDRO 12650 41900

TILLAYA HPS DVC HYDRO-HYDRO 456 41900

RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040

TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380

TLDP - III NHPC LTD HYDRO-HYDRO 18900 000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600

FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800

KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600

KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500

TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900

TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500

TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140

STATE SECTOR

ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-

DIESEL+H+SOLAR27499 185900

Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000

EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900

PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332

SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535

MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080

IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940

J P H Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100

RIMBI - I Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100

MEYONGCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100

RIMBI - II Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100

KALEZ Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100

RABOMCHU Ω

GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100

D P H (GANGTOK DG) Ω

GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100

TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349

BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822

SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822

SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115

P-40

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H
Page 51: Government Of India Ministry of Power Central Electricity ...cea.nic.in/reports/monthly/executivesummary/2016/exe_summary-08.pdfMinistry of Power Central Electricity Authority New

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100

DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400

RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000

GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000

HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600

MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840

AGARTALA GT NEEPCO THERMAL-GAS 64165 37138

ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221

DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546

KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505

RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800

LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400

LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300

SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900

TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900

LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900

BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494

ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494

Note

P-41

LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects

Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data

Ω COD = ROSP(Concerned Utilities not given ROSOP)

  • Cover pg
  • Contents
  • SecA
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • SecB
  • B1
  • B2
  • B3
  • SecC
  • C
  • SecD
  • D
  • SecE
  • E
  • SecF
  • F1
  • F2
  • F3
  • F4
  • F5
  • F6
  • SecG
  • G1
  • G2
  • G3
  • G4
  • SecH
  • H