GOVERNMENT OF BALOCHISTAN
PLANNING & DEVELOPMENT DEPARTMENT
PUBLIC SECTOR
DEVELOPMENT PROGRAMME
2019-20
(ORIGINAL)
![Page 2: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/2.jpg)
Table of Contents
S.No. Sector Page No.
1. Agriculture……………………………………………………………………… 2
2. Livestock………………………………………………………………………… 8
3. Forestry………………………………………………………………………….. 11
4. Fisheries…………………………………………………………………………. 13
5. Food……………………………………………………………………………….. 15
6. Population welfare………………………………………………………….. 16
7. Industries………………………………………………………………………... 18
8. Minerals………………………………………………………………………….. 21
9. Manpower………………………………………………………………………. 23
10. Sports……………………………………………………………………………… 25
11. Culture……………………………………………………………………………. 30
12. Tourism…………………………………………………………………………... 33
13. PP&H………………………………………………………………………………. 36
14. Communication………………………………………………………………. 46
15. Water……………………………………………………………………………… 86
16. Information Technology…………………………………………………... 105
17. Education. ………………………………………………………………………. 107
18. Health……………………………………………………………………………... 133
19. Public Health Engineering……………………………………………….. 144
20. Social Welfare…………………………………………………………………. 183
21. Environment…………………………………………………………………… 188
22. Local Government ………………………………………………………….. 189
23. Women Development……………………………………………………… 198
24. Urban Planning and Development……………………………………. 200
25. Power…………………………………………………………………………….. 206
26. Other Schemes………………………………………………………………… 212
27. List of Schemes to be reassessed for Socio-Economic Viability 2-32
![Page 3: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/3.jpg)
PREFACE Agro-pastoral economy of Balochistan, periodically affected by spells of droughts, has shrunk livelihood opportunities. Resultantly, poverty has increased in Balochistan. Growing population, insufficient financial resources, and limited presence of private sector, calls for launching program for employment generation and sustainable economic development. Despite all geographical, financial & economical constraints, the government resolves to create enabling environment for investment and private sector development. The new Government is embarking on a series of necessary reforms to restore fiscal health, promote economic growth and pursue socioeconomic programmes as well as pro-growth, pro-jobs and pro-poor developmental agenda aimed to enhance wellbeing of the people. In contrast to PSDP 2018-19 where total numbers of schemes were 4728 and total size was Rs. 88.249 billion including Foreign Project Assistance (Rs. 11.089 billion) and total throw forward was 288.921 billion, the incumbent government has reduced the total number of schemes to 2649 with enhanced allocation, targeted intervention and less throw forward. The Government is undertaking multiple institutional initiatives to improve allocation and spending efficiency under a more transparent financial structure, which can bring promising results in terms of investment promotion, job creations and livelihood. Meanwhile, the P&D Department has been tasked to balance out the Government’s fiscal spending with short term & medium term targets inline with Sustainable Development Goals (SDGs). With the help of above intervention the government is very much hopeful that its sincere efforts will bring prosperous results for the populace of Balochistan and setting the right direction towards the best practices of public investment management.
(Abdul Rehman Buzdar) Additional Chief Secretary (DEV)
Government of Balochistan
![Page 4: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/4.jpg)
PSDP Abstract - Sectorwise
14 COMMUNICATION 7601.857 26.361 7628.218 165 16982.532 0.000 16982.532 416 24584.389 26.361 24610.750 581 22.76%
15 WATER 3140.459 351.000 3491.459 75 4961.243 645.000 5606.243 181 8101.702 996.000 9097.702 256 8.41%
16 INFORMATION TECH: 1427.787 0.000 1427.787 11 440.000 0.000 440.000 5 1867.787 0.000 1867.787 16 1.73%
11 CULTURE 70.987 0.000 70.987 3 372.000 0.000 372.000 14 442.987 0.000 442.987 17 0.41%
24 URBAN PLANNING & DEVELOPMENT
670.000 0.000 670.000 7 2992.600 0.000 2992.600 63 3662.600 0.000 3662.600 70 3.39%
13 P.P.&H. 2110.072 817.000 2927.072 71 2637.931 200.000 2837.931 40 4748.003 1017.000 5765.003 111 5.33%
17 EDUCATION 6719.849 1251.000 7970.849 103 4707.607 0.000 4707.607 181 11427.456 1251.000 12678.456 284 11.73%
21 ENVIRONMENT 0.000 0.000 0.000 0 100.000 0.000 100.000 1 100.000 0.000 100.000 1 0.09%
22 LOCAL GOVT: 151.430 0.000 151.430 10 2012.739 0.000 2012.739 104 2164.169 0.000 2164.169 114 2.00%
23 WOMEN DEVELOPMENT 20.000 0.000 20.000 1 220.000 0.000 220.000 4 240.000 0.000 240.000 5 0.22%
18 HEALTH 4178.193 878.800 5056.993 51 2894.900 250.000 3144.900 62 7073.093 1128.800 8201.893 113 7.59%
19 PUBLIC HEALTH ENG: 2711.590 369.600 3081.190 58 9132.677 0.000 9132.677 516 11844.267 369.600 12213.867 574 11.30%
20 SOCIAL WELFARE 78.358 0.000 78.358 7 1504.500 50.000 1554.500 27 1582.858 50.000 1632.858 34 1.51%
1 AGRICULTURE 2162.458 0.000 2162.458 21 1335.830 20.000 1355.830 18 3498.288 20.000 3518.288 39 3.25%
2 LIVESTOCK 157.582 0.000 157.582 7 564.430 0.000 564.430 15 722.012 0.000 722.012 22 0.67%
3 FORESTRY 252.964 0.000 252.964 14 475.000 0.000 475.000 6 727.964 0.000 727.964 20 0.67%
12 TOURISM 8.000 0.000 8.000 1 310.000 0.000 310.000 5 318.000 0.000 318.000 6 0.29%
26 OTHER SCHEMES 4339.797 2552.690 6892.487 12 5800.000 50.000 5850.000 4 10139.797 2602.690 12742.487 16 11.79%
25 POWER 117.880 0.000 117.880 10 2491.455 0.000 2491.455 69 2609.335 0.000 2609.335 79 2.41%
4 FISHERIES 423.906 0.000 423.906 10 415.000 0.000 415.000 4 838.906 0.000 838.906 14 0.78%
8 MINERALS 123.548 0.000 123.548 5 100.000 0.000 100.000 2 223.548 0.000 223.548 7 0.21%
9 MANPOWER 109.000 0.000 109.000 2 200.000 0.000 200.000 4 309.000 0.000 309.000 6 0.29%
10 SPORTS 304.146 0.000 304.146 16 1890.935 0.000 1890.935 40 2195.081 0.000 2195.081 56 2.03%
5 FOOD 0.000 0.000 0.000 0 70.000 100.000 170.000 2 70.000 100.000 170.000 2 0.16%
6 POP: WEL: 100.000 0.000 100.000 1 100.000 0.000 100.000 1 200.000 0.000 200.000 2 0.18%
7 INDUSTRIES 275.950 0.000 275.950 4 586.200 0.000 586.200 12 862.150 0.000 862.150 16 0.80%
Total 37255.813 6246.451 43502.264 665 63297.579 1315.000 64612.579 1796 100553.392
7561.451 108114.843 2461
2019 - 20 OriginalAllocation Ongoing Schemes Ongoing Allocation New Schemes New Allocation Total Total % Total
S N Chapter GOB FPA Total Schemes GOB FPA Total Schemes GOB FPA Total Schemes
![Page 5: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/5.jpg)
Public Sector Development Programme (Sectorwise)
1 of 214
2019 - 20 Original
![Page 6: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/6.jpg)
Public Sector Development Programme (Sectorwise)
2 of 214
10 Z2016.0059ProvincialApproved
SUSTAINABLE LAND MANAGMEMENT PROGRAM (PHASE II).
200.000211.171
411.171 15.00016.525
31.525 7% 10.0000.000
0.000 10.000 10% 175.000194.646
9 Z2015.0711Quetta
Approved
STRENGTHENING OF AGRICULTURE TRAINING INSTITUTE SARIAB QUETTA.
500.0000.000
500.000 376.9840.000
376.984 75% 123.0160.000
0.000 123.016 100% 0.0000.000
8 Z2015.0709ProvincialApproved
REHABILITATION OF RESEARCH INFRASTRUCTURE.
500.0000.000
500.000 180.0000.000
180.000 36% 50.0000.000
0.000 50.000 46% 270.0000.000
7 Z2015.0706ProvincialApproved
INTRODUCTION OF LOW WATER REQUIRED CROPS.
200.0000.000
200.000 95.0000.000
95.000 47% 105.0000.000
0.000 105.000 100% 0.0000.000
6 Z2015.0705ProvincialApproved
REHABILITATION OF GOVT: AGRICULTURE FARMS.
288.4600.000
288.460 84.6500.000
84.650 29% 50.0000.000
0.000 50.000 46% 153.8100.000
5 Z2015.0703Kachhi
Approved
KACHHI CANAL COMMAND AREA DEVELOPMENT.
1658.4740.000
1658.474 786.6250.000
786.625 47% 400.0000.000
0.000 400.000 71% 471.8490.000
4 Z2013.0072Quetta
Approved
UPGRADATION OF AGRICULTURE COLLEGE QUETTA INTO AGRICULTURE UNIVERSITY BALOCHISTAN AT QUETTA.
4589.3970.000
4589.397 2373.5620.000
2373.562 51% 400.0000.000
0.000 400.000 60% 1815.8350.000
3 Z2011.0445Panjgur
Approved
CONTS:/ESTABLISHMENT OF AGRICULTURE COLLEGE AT UNION COUNCIL TUSP, DIST. PANJGUR.
74.2670.000
74.267 20.0000.000
20.000 26% 54.2670.000
0.000 54.267 100% 0.0000.000
2 Z2008.0016Zhob
Approved
SABAKZAI DAM COMMAND AREA DEVELOPMENT PROJECT (PHASE-II) (PHASE-1 EXP. 119.519 MILLION).
309.4190.000
309.419 235.5000.000
235.500 76% 73.9190.000
0.000 73.919 100% 0.0000.000
1 Z2008.0015Kech
Approved
MIRANI DAM COMMAND AREA DEVELOPMENT PROJECT (PHASE-II) (PHASE-I EXP. 105 MILLION).
677.4120.000
677.412 346.0000.000
346.000 51% 200.0000.000
0.000 200.000 80% 131.4120.000
211.171 16.525 0.000 194.646
Agricultural Extension(10 Ongoing Projects) GoB/FPA Sub-Total
8997.429 9208.600 4513.321 4529.846 1466.202 0.000 1466.202 3017.906
Subsector: Agricultural Extension
Sector: Agriculture
Chapter: AGRICULTURE
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 7: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/7.jpg)
Public Sector Development Programme (Sectorwise)
3 of 214
24 Z2019.1957Provincial
CPapproved
NATIONAL PROGRMMR FOR IMP: OF WATER COURSES & WATER STORAGE TANKS PHASE-II (BALOCHISTAN COMPONENT) 5 YEARS.
18380.258
0.000
18380.258
0.0000.000
0.000 0% 200.0000.000
0.000 200.000 1% 18180.2580.000
23 Z2019.1927Chagai
CPapproved
CONST: OF COLD STORAGE AT AMEENABAD
25.0000.000
25.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 60% 10.0000.000
22 Z2019.1777Zhob
CPapproved
PROD: ENH: THR: CONST: OF WATER STORAGE TANKS, INSTALLATION OF PVC PIPELINE, LINKING OF WATERCOURSE KILLI MUSAZAI.
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
21 Z2019.1620Qilla
SaifullahCPapproved
AGR WTR RES DEV:PRG IN KILLI ZNGIWAL, KHANKI LORLAL, SHINA KHORA, JHRGAT, ZFR AFGHANI M.BAGH RABAT KAREZ K.SAIF:
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
20 Z2019.1436Provincial
CPapproved
ON FARM WATER MGT & EFFICIENCY ENHANCEMENT PROGRAM (70/30 GOB/FARMER SHARING).
1000.0000.000
1000.000 0.0000.000
0.000 0% 300.0000.000
0.000 300.000 30% 700.0000.000
19 Z2019.1360Provincial
CPapproved
BALOCHISTAN GREEN TRACTOR PROGRAMME
500.0000.000
500.000 0.0000.000
0.000 0% 250.0000.000
0.000 250.000 50% 250.0000.000
18 Z2019.1088Provincial
CPapproved
PROMOTION OF TUNNEL FARMING.
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
17 Z2019.0495Quetta
CPapproved
TUNNEL FOR AGRI: VEGETABLE PRODUCTION AT BALELI, KILLI SUFI, AGHBARG, PANJPAI, SHEIKHMANDA & CHASHMA
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
16 Z2019.0428Panjgur
CPapproved
CONSTRUCTION/ADDITIONAL WORKS OF AGRICULTURE COLLEGE AT PANJGUR
276.0000.000
276.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 18% 226.0000.000
15 Z2019.0038Provincial
CPapproved
COMMAND AREA DEVELOPMENT KACHHI KANAL PHASE-I PART-B.
925.0000.000
925.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 10% 825.0000.000
14 Z2019.0034Provincial
CPapproved
PROMOTION & DEVELOPMENT OF PISTACHIO IN BALOCHISTAN.
40.0000.000
40.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 50% 20.0000.000
13 Z2019.0031Provincial
CPapproved
PROMOTION & DEVELOPMENT OF SAFFRON CULTIVATION.
50.0000.000
50.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 20% 40.0000.000
12 Z2019.0030Provincial
CPapproved
PROMOTION & DEVELOPMENT OF OLIVE CROP IN BALOCHISTAN
200.0000.000
200.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 25% 150.0000.000
11 Z2019.0022Provincial
CPapproved
ENHANCING AGRICULTURE PRODUCATION USING EFFICIENT IRRGATION SYSTEM(TA).
8.11142.226
50.337 0.0000.000
0.000 0% 5.00020.000
0.000 25.000 49% 3.11122.226
Agricultural Extension(14 New Projects) GoB/FPA Sub-Total
21494.369
21536.595
0.000 0.000 1080.000 0.000 1100.000 20414.369
42.226 0.000 20.000 22.226
Subsector: Agricultural Extension
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Chapter: AGRICULTURE
Sector: Agriculture
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Agricultural Extension 30491.79 30745.19 4513.321 4529.846 2546.202 0.000 2566.202 23432.275
2019 - 20 Original
![Page 8: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/8.jpg)
Public Sector Development Programme (Sectorwise)
4 of 214
Sub-Sector Total (FPA) 253.397 16.525 20.000 216.872
2019 - 20 Original
![Page 9: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/9.jpg)
Public Sector Development Programme (Sectorwise)
5 of 214
34 Z2017.0011ProvincialApproved
INTRODUCTION OF CUT FLOWER INDUSTRY IN BALOCHISTAN.
36.8800.000
36.880 25.0000.000
25.000 67% 11.8800.000
0.000 11.880 100% 0.0000.000
33 Z2017.0009ProvincialApproved
ESTABLISHMENT OF STONE FRUIT NURSERIES IN BALOCHISTAN
6.2000.000
6.200 5.0350.000
5.035 81% 1.1650.000
0.000 1.165 100% 0.0000.000
32 Z2017.0008ProvincialApproved
ESTABLISHMENT OF ALMOND AND POMEGRANATE NURSERY IN BALOCHISTAN.
6.6100.000
6.610 5.1930.000
5.193 78% 1.4170.000
0.000 1.417 100% 0.0000.000
31 Z2017.0006ProvincialApproved
TEST:&DEV:OF AGRO:TECH: FOR ENH:OF OIL SEED CROPS GROUND NUT, S.FLOWER & BRASSICA THR: DRO:TOLE: CROP PROD: IN BALN:.
30.0000.000
30.000 15.0000.000
15.000 50% 15.0000.000
0.000 15.000 100% 0.0000.000
30 Z2017.0005ProvincialApproved
IMP: THE ECO: CONDITIONS OF FARMING COMMUNITIES THROUGH PROTECTED CULTIVATION & CERTIFIED VEGETABLE SEED PRODUCTION.
28.5000.000
28.500 22.0000.000
22.000 77% 6.5000.000
0.000 6.500 100% 0.0000.000
29 Z2017.0004ProvincialApproved
OIL EXTRACATION MACHINES FOR OLIVE AND FRUIT KHUZDAR, NALL AND MUSAKHAIL.
35.0000.000
35.000 20.0000.000
20.000 57% 15.0000.000
0.000 15.000 100% 0.0000.000
28 Z2015.0712ProvincialApproved
WORKSHOPS AT KALAT, MUSAKHAIL AND JAFFARABAD.
100.0000.000
100.000 27.4000.000
27.400 27% 72.6000.000
0.000 72.600 100% 0.0000.000
27 Z2014.0850ProvincialApproved
PROJECT FOR TISSUE CULTURE (RESEARCH INNOVATION).
50.6580.000
50.658 34.4960.000
34.496 68% 16.1620.000
0.000 16.162 100% 0.0000.000
26 Z2013.0024ProvincialApproved
INTENSIFYING HORTICULTURAL DEVELOPMENT BY IMPROVEMENT OF CROP PRODUCTIVITY.
77.7330.000
77.733 71.2010.000
71.201 91% 6.5320.000
0.000 6.532 100% 0.0000.000
25 Z2013.0020ProvincialApproved
PRODUCTION ENHANCEMENT OF FIELD CROPS THROUGH RESEARCH INNOVATIONS IN BALOCHISTAN.
363.2500.000
363.250 125.0050.000
125.005 34% 50.0000.000
0.000 50.000 48% 188.2450.000
0.000 0.000 0.000 0.000
Agricultural Research(10 Ongoing Projects) GoB/FPA Sub-Total
734.831 734.831 350.330 350.330 196.256 0.000 196.256 188.245
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Agricultural Research
Chapter: AGRICULTURE
Sector: Agriculture
Ongoing
2019 - 20 Original
![Page 10: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/10.jpg)
Public Sector Development Programme (Sectorwise)
6 of 214
38 Z2019.1961Provincial
CPapproved
NATIONAL AGRICULTURE EMERGNCY INCREASE PRODUCTIVITY & PROFITIBLITY OF SUGAR CANE (PROVINCIAL SHARE)
14.7100.000
14.710 0.0000.000
0.000 0% 7.6500.000
0.000 7.650 52% 7.0600.000
37 Z2019.1960Provincial
CPapproved
NATIONAL AGRICULTURE EMERGNCY INCREASE PRODUCTIVITY & PROFITIBLITY OF RICE.(PROVINCIAL SHARE)
370.9540.000
370.954 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 26% 270.9540.000
36 Z2019.1959Provincial
CPapproved
NATIONAL OIL SEED ENHANCMENT PROGRAMME.(PROVINCIAL SHARE)
579.6270.000
579.627 0.0000.000
0.000 0% 98.1800.000
0.000 98.180 16% 481.4470.000
35 Z2019.0037Quetta
CPapproved
CONST: OF B/WALL & INST: OF TUBE WELL AT DIR: OF AGRI: RESEARCH VEGETABLE SEED PRODUCTION AT SARIAB, QUETTA.
80.0000.000
80.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 62% 30.0000.000
0.000 0.000 0.000 0.000
Agricultural Research(4 New Projects) GoB/FPA Sub-Total
1045.291 1045.291 0.000 0.000 255.830 0.000 255.830 789.461
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Subsector: Agricultural Research
Chapter: AGRICULTURE
Sector: Agriculture
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Agricultural Research(14 Projects) Total
1780.122 1780.122 350.330 350.330 452.086 0.000 452.086 977.706
2019 - 20 Original
![Page 11: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/11.jpg)
Public Sector Development Programme (Sectorwise)
7 of 214
39 Z2013.0019ProvincialApproved
PROVISION OF 200 BULL DOZERS FOR LAND DEVELOPMENT WORK IN BALOCHISTAN .
5279.9000.000
5279.900 2241.6970.000
2241.697 42% 500.0000.000
0.000 500.000 51% 2538.2030.000
0.000 0.000 0.000 0.000
Agricultural Engineering(1 Ongoing Projects) GoB/FPA Sub-Total
5279.900 5279.900 2241.697 2241.697 500.000 0.000 500.000 2538.203
Subsector: Agricultural Engineering
Ongoing
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Chapter: AGRICULTURE
Sector: Agriculture
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Agricultural Engineering(1 Projects) Total
5279.900 5279.900 2241.697 2241.697 500.000 0.000 500.000 2538.203
Sector: AGRICULTURE(39 Projects)
37551.820
37805.217
7105.348 7121.873 3498.288 0.000 3518.288 26948.184
Sector Total (FPA) 253.397 16.525 20.000 216.872
2019 - 20 Original
![Page 12: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/12.jpg)
Public Sector Development Programme (Sectorwise)
8 of 214
46 Z2017.1705Pishin
Approved
CONST: OF LIVESTOCK HOSPITAL FOR EXTENSION OF THQ, KHANOZAI.
139.2130.000
139.213 70.0000.000
70.000 50% 20.0000.000
0.000 20.000 64% 49.2130.000
45 Z2017.1379ProvincialApproved
PROV: OF VETERINARY EQUIP:, INSTRUMENTS AND APPARATUS TO ALL CVHS IN THE PROVINCE.
100.0000.000
100.000 50.0000.000
50.000 50% 25.0000.000
0.000 25.000 75% 25.0000.000
44 Z2016.1174ProvincialApproved
FIGHT AGAINST CONGO VIRUS. 215.4300.000
215.430 35.0000.000
35.000 16% 20.0000.000
0.000 20.000 25% 160.4300.000
43 Z2016.0547NasirabadApproved
ESTABLISHMENT OF CATTLE FARM AT GOTH HAJI TAJ MUHAMMAD LEHRI, THESIL TAMBOO.
7.5000.000
7.500 4.0000.000
4.000 53% 3.5000.000
0.000 3.500 100% 0.0000.000
42 Z2015.0890Washuk
Approved
ESTABLISHMENT OF CAMEL RESEARCH CUM CAMEL MILK PROCESSING UNIT AT WASHUK.
50.0000.000
50.000 35.0000.000
35.000 70% 15.0000.000
0.000 15.000 100% 0.0000.000
41 Z2015.0888Musa KhailApproved
ESTABLISHMENT OF CAMEL RESEARCH CUM CAMEL MILK PROCESSING UNIT AT MUSAKHAIL.
50.0000.000
50.000 5.0000.000
5.000 10% 45.0000.000
0.000 45.000 100% 0.0000.000
40 Z2013.0124ProvincialApproved
COMPLETION OF IN COMPLETE SCHEMES (CONST: OF VETERINARY HOSPITALS PROJECT).
500.0000.000
500.000 470.9180.000
470.918 94% 29.0820.000
0.000 29.082 100% 0.0000.000
Livestock(7 Ongoing Projects) GoB/FPA Sub-Total
1062.143 1062.143 669.918 669.918 157.582 0.000 157.582 234.643
0.000 0.000 0.000 0.000
Subsector: Livestock
Sector: Agriculture
Chapter: LIVESTOCK
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 13: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/13.jpg)
Public Sector Development Programme (Sectorwise)
9 of 214
61 Z2019.2087Musa Khail
CPapproved
COSNT: OF BUILDINGS FOR VETERIANRY DISPENSARY AT KILLA BURG PUSHT & NOOR HASAN BUZDAR MUNIRABAD DIST: MUSAKHAIL
15.0000.000
15.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 80% 3.0000.000
60 Z2019.1964Provincial
CPapproved
BACKYARD RURAL POULTRY BALOCHISTAN (PROVINCIAL SHARE)
289.6410.000
289.641 0.0000.000
0.000 0% 96.3400.000
0.000 96.340 33% 193.3010.000
59 Z2019.1962Provincial
CPapproved
KID/LAMB FATTENING IN BALOCHISTAN(PM-INITIATIVE) (PROVINCIAL SHARE)
505.2290.000
505.229 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 9% 455.2290.000
58 Z2019.1937Qilla
AbdullahCPapproved
CONST: OF ADDITIONAL INFRA: IN VETERINARY DISPENSERIES AT KILLI PIRALIZAI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
57 Z2019.0793Quetta
CPapproved
IMPROVEMENT OF QUETTA DAIRY FARM AT BREWERY ROAD.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
56 Z2019.0326Loralai
CPapproved
VIETANARY HOSPITAL KILLI MARA KHURD MUZAMIL.
10.3400.000
10.340 0.0000.000
0.000 0% 10.3400.000
0.000 10.340 100% 0.0000.000
55 Z2019.0070Provincial
CPapproved
KID / LAMB (SHEEP & GOAT) FATTENING PROGRAM IN BALOCHISTAN. JOINT VENTURE (PPP MODE)
150.0000.000
150.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 33% 100.0000.000
54 Z2019.0069Quetta
CPapproved
STRENGTHENING OF DISEASE INVESTIGATION LABORATORY AT QUETTA
35.3500.000
35.350 0.0000.000
0.000 0% 20.2000.000
0.000 20.200 57% 15.1500.000
53 Z2019.0068Quetta
CPapproved
STRENGTHENING OF SEMEN PRODUCTION UNIT QUETTA
35.8400.000
35.840 0.0000.000
0.000 0% 12.1200.000
0.000 12.120 33% 23.7200.000
52 Z2019.0067Quetta
CPapproved
STRENGTHENING OF EMBRYO TRANSFER TECHNOLOGY LABORATORY AT QUETTA
35.3500.000
35.350 0.0000.000
0.000 0% 18.1800.000
0.000 18.180 51% 17.1700.000
51 Z2019.0066Provincial
CPapproved
ESTABLISHMENT OF DISEASE INVESTIGATION LAB AT DIVISIONAL HEADQUARTERS CVHS
99.3800.000
99.380 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 49.3800.000
50 Z2019.0065Nasirabad
CPapproved
ESTABLISHMENT OF SEMEN PRODUCTION UNIT FOR CATTLE AT DERA MURAD JAMALI
79.5900.000
79.590 0.0000.000
0.000 0% 25.2500.000
0.000 25.250 31% 54.3400.000
49 Z2019.0062Quetta
CPapproved
HIDE & SKIN MARKET & IMPROVEMENT OF SLAUGHTER HOUSE AT EASTERN BYPASS QUETTA.
100.0000.000
100.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 50.0000.000
48 Z2019.0061Provincial
CPapproved
ESTABLISHMENT OF MODEL LIVESTOCK MARKET AT RAKHNI (PILOT PROJECT)
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
47 Z2019.0060Provincial
CPapproved
ESTABLISHMENT OF ANIMAL QUARANTINE CENTER AT GWADAR, TAFTAN, ZHOB AND KILLA ABDULLAH
250.0000.000
250.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 40% 150.0000.000
Livestock(15 New Projects) GoB/FPA Sub-Total
1675.720 1675.720 0.000 0.000 564.430 0.000 564.430 1111.290
Sector: Agriculture
Chapter: LIVESTOCK
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
New
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Livestock
2019 - 20 Original
![Page 14: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/14.jpg)
Public Sector Development Programme (Sectorwise)
10 of 214
0.000 0.000 0.000 0.000
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Livestock(22 Projects) Total
2737.863 2737.863 669.918 669.918 722.012 0.000 722.012 1345.933
Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: LIVESTOCK(22 Projects)
2737.863 2737.863 669.918 669.918 722.012 0.000 722.012 1345.933
2019 - 20 Original
![Page 15: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/15.jpg)
Public Sector Development Programme (Sectorwise)
11 of 214
75 Z2017.1719Kalat
Approved
CONSTRUCTION OF FOREST PARK IN KHALIQABAD DIST. KALAT.
54.6000.000
54.600 13.7640.000
13.764 25% 14.6000.000
0.000 14.600 51% 26.2360.000
74 Z2017.1511Qilla
SaifullahApproved
SOIL & WATER CONSERVATION IN BAYYANA BAKHTIAR MORAZAI, QILLA SAIFULLAH.
40.0000.000
40.000 30.0000.000
30.000 75% 10.0000.000
0.000 10.000 100% 0.0000.000
73 Z2017.1390ProvincialApproved
ESTABLISHMENT OF FOREST MGT INFORMATION SYSTEM.
50.0000.000
50.000 30.0000.000
30.000 60% 20.0000.000
0.000 20.000 100% 0.0000.000
72 Z2017.0021Quetta
Approved
UPLIFTING/ REHABILITATION OF MIAGHNUDI RECREATIONAL PARK QUETTA.
15.0000.000
15.000 13.1000.000
13.100 87% 1.9000.000
0.000 1.900 100% 0.0000.000
71 Z2017.0018ProvincialApproved
STRENGTH: OF NETWORK OF PROT: AREAS IN BALOCHISTAN FOR BIODIVERSITY CONSERVATION, EDUCATION AND SCIENTIFIC RESEARCH.
250.0000.000
250.000 23.3080.000
23.308 9% 50.0000.000
0.000 50.000 29% 176.6920.000
70 Z2015.0896Ziarat
Approved
ESTABLISHMENT OF NATIONAL PARK AT ZIARAT.
100.0000.000
100.000 50.9800.000
50.980 50% 20.0000.000
0.000 20.000 70% 29.0200.000
69 Z2015.0437Shaheed
Sikandarabad
Approved
CONST: OF WILD LIFE FARM FOR WILD ANIMALS AT ANJEERA TEHSIL SURAB.
18.3000.000
18.300 14.5000.000
14.500 79% 3.8000.000
0.000 3.800 100% 0.0000.000
68 Z2014.0054ProvincialApproved
RE-VEGETATION AND RESTORATION OF RANGELAND.
150.0000.000
150.000 93.7320.000
93.732 62% 20.0000.000
0.000 20.000 75% 36.2680.000
67 Z2014.0037ProvincialApproved
CONSERVATION OF FORESTS. 50.0000.000
50.000 43.7800.000
43.780 87% 6.2200.000
0.000 6.220 100% 0.0000.000
66 Z2014.0017ProvincialApproved
ESTABLISHMENT OF NURSERY FOR CHILGOZA, WALNUTS, PISTACHIO & SHINA.
100.0000.000
100.000 81.1100.000
81.110 81% 18.8900.000
0.000 18.890 100% 0.0000.000
65 Z2014.0016ProvincialApproved
ESTABLISHMENT OF NURSERY FOR JUNIPER AT HARBOI KALAT, ZIARAT, ZARGHOON AREA, TOBA ACHAKZAI PARAKHI.
50.0000.000
50.000 42.0790.000
42.079 84% 7.9210.000
0.000 7.921 100% 0.0000.000
64 Z2013.0028ProvincialApproved
DESERT:CONT:&ENH: OF VEGETATIVE COVER THRO: S-DUNE STAB: PLANT: IN NUSHKI, CHAGHAI, KHARAN, Q.ABDULLAH, KSF & WASHUK.
71.6000.000
71.600 63.3120.000
63.312 88% 8.2880.000
0.000 8.288 100% 0.0000.000
63 Z2012.0749ProvincialApproved
MULTI-SECTORAL PROJECT FOR CONSERVATION OF JUNIPER FOREST (DEVOLVED).
493.1660.000
493.166 185.1650.000
185.165 37% 50.0000.000
0.000 50.000 47% 258.0010.000
62 Z2011.0233Ziarat
Approved
ESTABLISHMENT OF FOREST SCHOOL.
176.0770.000
176.077 154.7320.000
154.732 87% 21.3450.000
0.000 21.345 100% 0.0000.000
0.000 0.000 0.000 0.000
Forestry(14 Ongoing Projects) GoB/FPA Sub-Total
1618.743 1618.743 839.562 839.562 252.964 0.000 252.964 526.217
Subsector: Forestry
Sector: Agriculture
Chapter: FORESTRY
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 16: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/16.jpg)
Public Sector Development Programme (Sectorwise)
12 of 214
81 Z2019.1956Provincial
CPapproved
TEN BILLION TREES TSUNAMI PROJECT UP-SCALLING OF GREEN PAKISTAN PROG: (REVIVAL OF WILD LIFE RESOURCES)(PROV:34% SHARE)
3483.0000.000
3483.000 0.0000.000
0.000 0% 200.0000.000
0.000 200.000 5% 3283.0000.000
80 Z2019.1411Quetta
CPapproved
IMPROVEMENT OF PARK FACILITIES AT MIAN GUNDI QUETTA
100.0000.000
100.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 50.0000.000
79 Z2019.1372Provincial
CPapproved
ESTABLISHMENT / DEVELOPMENT OF CHILGOZA NURSERY.
50.0000.000
50.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 50% 25.0000.000
78 Z2019.0752Provincial
CPapproved
GREEN PAKISTAN PROGRAMME-REVIVAL OF WILDLIFE RESOURCES IN PAK-BALOCHISTAN COMPONENT (PROV:SHARE 34%)
1184.2200.000
1184.220 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 8% 1084.2200.000
77 Z2019.0058Provincial
CPapproved
CONSERVATION OF FOREST & WILD LIFE IN COMMUNITIES PROTECTED FOREST AND WILD LIFE AREAS THROUGH SOCIAL SERVICES & OTHERS
100.0000.000
100.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 50.0000.000
76 Z2019.0056Ziarat
CPapproved
DEVELOPMENT OF REMAINING INFRASTRUCTURE & OTHER REQUIREMENTS OF FOREST INSTITUTE AT KALA CHEENA ZIARAT
100.0000.000
100.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 50.0000.000
0.000 0.000 0.000 0.000
Forestry(6 New Projects) GoB/FPA Sub-Total
5017.220 5017.220 0.000 0.000 475.000 0.000 475.000 4542.220
Sector: Agriculture
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Subsector: Forestry
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Chapter: FORESTRY
New
Forestry(20 Projects) Total
6635.963 6635.963 839.562 839.562 727.964 0.000 727.964 5068.437
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: FORESTRY(20 Projects)
6635.963 6635.963 839.562 839.562 727.964 0.000 727.964 5068.437
2019 - 20 Original
![Page 17: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/17.jpg)
Public Sector Development Programme (Sectorwise)
13 of 214
91 Z2018.3750Quetta
Approved
ESTABLISHMENT OF FULL FLEDGE DIRECTORATE GENERAL OF FISHERIES IN QUETTA.
100.0000.000
100.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 20% 80.0000.000
90 Z2017.0016ProvincialApproved
PROVISION OF MISSING FACILITES AT VARIOUS FISH HATCHERIES IN BALOCHISTAN.
50.0000.000
50.000 35.0000.000
35.000 70% 15.0000.000
0.000 15.000 100% 0.0000.000
89 Z2015.0793Gwadar
Approved
INTRODUCTION OF ARTIFICIAL REEFS ALONGWITH BALOCHISTAN COAST AT JIWANI.
49.4390.000
49.439 26.0000.000
26.000 52% 23.4390.000
0.000 23.439 100% 0.0000.000
88 Z2015.0792Bela
Approved
ESTABLISHMENT OF FISH HATCHERY AT HUB DAM.
68.4350.000
68.435 21.9680.000
21.968 32% 46.4670.000
0.000 46.467 100% 0.0000.000
87 Z2013.0029ProvincialApproved
CONSTRUCTION OF 08 BOAT REPAIRING WORKSHOPS AT COASTAL BELT DISTRICTS OF BALOCHISTAN.
247.1490.000
247.149 121.0000.000
121.000 48% 10.0000.000
0.000 10.000 53% 116.1490.000
86 Z2012.0747Gwadar
Approved
DEVELOPMENT OF FISHERIES TRAINING CENTER GWADAR (DEVOLVED).
361.1540.000
361.154 193.5540.000
193.554 53% 100.0000.000
0.000 100.000 81% 67.6000.000
85 Z2011.0615Gwadar
Approved
COMPL: OF B.C.D.A COMPLEX AT GWADAR (BCDA).
73.2840.000
73.284 35.0000.000
35.000 47% 1.0000.000
0.000 1.000 49% 37.2840.000
84 Z2010.0319Gwadar
Approved
REHABILITATION OF PASNI HARBOUR (JAPAN COUNTER VALUE FUND).
655.000800.000
1455.000 46.847316.000
362.847 24% 100.0000.000
0.000 100.000 31% 508.153484.000
83 Z2009.0298Gwadar
Approved
CONST:OF FISH LAND. JETTY & ALLIED HARBOUR FACI: AT W.BAY GAWADAR AT PISHUKAN (E.COST 1684.451 80% FED. 20% GOB) (GDA).
336.8900.000
336.890 299.3900.000
299.390 88% 37.5000.000
0.000 37.500 100% 0.0000.000
82 Z2001.0440Gwadar
Approved
ESTABLISHMENT OF FISH PROCESSING PLANT AT PASNI (BDA).
269.2400.000
269.240 198.7400.000
198.740 73% 70.5000.000
0.000 70.500 100% 0.0000.000
Fisheries(10 Ongoing Projects) GoB/FPA Sub-Total
2210.591 3010.591 977.499 1293.499 423.906 0.000 423.906 809.186
800.000 316.000 0.000 484.000
Subsector: Fisheries
Sector: Agriculture
Chapter: FISHERIES
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
2019 - 20 Original
![Page 18: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/18.jpg)
Public Sector Development Programme (Sectorwise)
14 of 214
95 Z2019.2027Gwadar
CPapproved
BALOCHISTAN GREEN BOAT PROJECTS
500.0000.000
500.000 0.0000.000
0.000 0% 250.0000.000
0.000 250.000 50% 250.0000.000
94 Z2019.1402Quetta
CPapproved
MASTER PLANING OF BALOCHISTAN COASTLINE
150.0000.000
150.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 33% 100.0000.000
93 Z2019.1344Provincial
CPapproved
PLANTATION OF CILICORNIA (SALT LONG LOVING EDIBLE PLANTS) ALONG BALOCHISTAN COSTAL
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
92 Z2019.0059Provincial
CPapproved
FEASIBILITY STUDY FOR AUTHORIZED FISH LANDING SITES WITH ONSHORE FACILITIES ALONG BALOCHISTAN COAST
200.0000.000
200.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 50% 100.0000.000
Fisheries(4 New Projects) GoB/FPA Sub-Total
865.000 865.000 0.000 0.000 415.000 0.000 415.000 450.000
0.000 0.000 0.000 0.000
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Sector: Agriculture
Chapter: FISHERIES
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Fisheries
Fisheries(14 Projects) Total
3075.591 3875.591 977.499 1293.499 838.906 0.000 838.906 1259.186
Sub-Sector Total (FPA) 800.000 316.000 0.000 484.000
Sector: FISHERIES(14 Projects)
3075.591 3875.591 977.499 1293.499 838.906 0.000 838.906 1259.186
Sector Total (FPA) 800.000 316.000 0.000 484.000
2019 - 20 Original
![Page 19: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/19.jpg)
Public Sector Development Programme (Sectorwise)
15 of 214
97 Z2019.0089Quetta
CPapproved
CONST: OF OFFICE BUILDING FOR BALOCHISTAN FOOD AUTHORITY DIRECTORATE GENERAL AT SPINNY ROAD.
100.0000.000
100.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 50.0000.000
96 Z2019.0019Provincial
CPapproved
IMP: OF RANGELANDS FOR FOOD SECURITY & LIVELIHOODS IMP: IN SULEIMAN RANG, BALOCHISTAN.
127.000382.000
509.000 0.0000.000
0.000 0% 20.000100.000
0.000 120.000 23% 107.000282.000
382.000 0.000 100.000 282.000
Food(2 New Projects) GoB/FPA Sub-Total
227.000 609.000 0.000 0.000 70.000 0.000 170.000 157.000
Sector: Agriculture
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Chapter: FOOD
New
Subsector: Food
Sub-Sector Total (FPA) 382.000 0.000 100.000 282.000
Food(2 Projects) Total
227.000 609.000 0.000 0.000 70.000 0.000 170.000 157.000
Sector: FOOD(2 Projects)
227.000 609.000 0.000 0.000 70.000 0.000 170.000 157.000
Sector Total (FPA) 382.000 0.000 100.000 282.000
2019 - 20 Original
![Page 20: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/20.jpg)
Public Sector Development Programme (Sectorwise)
16 of 214
98 Z2017.0132ProvincialApproved
POPULATION WELFARE PROGRAM.
875.0000.000
875.000 185.3000.000
185.300 21% 100.0000.000
0.000 100.000 32% 589.7000.000
0.000 0.000 0.000 0.000
Population Planning(1 Ongoing Projects) GoB/FPA Sub-Total
875.000 875.000 185.300 185.300 100.000 0.000 100.000 589.700
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Ongoing
Subsector: Population Planning
Chapter: POP: WEL:
Sector: Other Schemes
2019 - 20 Original
![Page 21: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/21.jpg)
Public Sector Development Programme (Sectorwise)
17 of 214
99 Z2019.0101Provincial
CPapproved
POPULATION WELFARE DEVELOPMENT PROGRAM.
500.0000.000
500.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 20% 400.0000.000
0.000 0.000 0.000 0.000
Population Planning(1 New Projects) GoB/FPA Sub-Total
500.000 500.000 0.000 0.000 100.000 0.000 100.000 400.000
Subsector: Population Planning
New
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Chapter: POP: WEL:
Sector: Other Schemes
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Population Planning(2 Projects) Total
1375.000 1375.000 185.300 185.300 200.000 0.000 200.000 989.700
Sector: POP: WEL:(2 Projects)
1375.000 1375.000 185.300 185.300 200.000 0.000 200.000 989.700
Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 22: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/22.jpg)
Public Sector Development Programme (Sectorwise)
18 of 214
103 Z2014.0074ProvincialApproved
MINI INDUSTRIAL ESTATE AT KHUZDAR,TURBAT & CHAMAN.
500.0000.000
500.000 372.5000.000
372.500 74% 127.0000.000
0.000 127.000 99% 0.5000.000
102 Z2011.0281Qilla
SaifullahApproved
ESTABLISHMENT OF MINI INDUSTRIAL ESTATE AT MUSLIM BAGH.
185.4190.000
185.419 19.4430.000
19.443 10% 90.0000.000
0.000 90.000 59% 75.9760.000
101 Z2010.0995ProvincialApproved
CONST: & ESTABLISHMENT OF CUTTING, TAILRING, DESIGNING CENTRE BUILDING AT TURBAT, DUKI & MASTUNG.
106.2180.000
106.218 43.4460.000
43.446 40% 30.0000.000
0.000 30.000 69% 32.7720.000
100 Z2010.0994Kech
Approved
CONST: OF DIVISIONAL INDUSTRIAL OFFICE BUILDING & REST HOUSE AT TURBAT.
48.4500.000
48.450 19.5000.000
19.500 40% 28.9500.000
0.000 28.950 100% 0.0000.000
0.000 0.000 0.000 0.000
Industries(4 Ongoing Projects) GoB/FPA Sub-Total
840.087 840.087 454.889 454.889 275.950 0.000 275.950 109.248
Subsector: Industries
Sector: Industries & Commerce
Chapter: INDUSTRIES
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 23: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/23.jpg)
Public Sector Development Programme (Sectorwise)
19 of 214
113 Z2019.1460Panjgur
CPapproved
LOCAL EMBROIDERY & WOMEN BUS: CENTERS IN PANJGOOR LORALAI BARKHAN AND HANDICRAFT DEV: CENTER AT UMAR KOT JAFFARABAD
62.0000.000
62.000 0.0000.000
0.000 0% 62.0000.000
0.000 62.000 100% 0.0000.000
112 Z2019.1325Bela
CPapproved
FEASABILITY FOR SPEICIAL ECONOMIC ZONE GADDANI
100.0000.000
100.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 50.0000.000
111 Z2019.1320Provincial
CPapproved
CONSTRUCTION OF WOOD BOAT BUILDING INDUSTRY AT LASBELLA, GADDANI AND GWADAR
200.0000.000
200.000 0.0000.000
0.000 0% 70.0000.000
0.000 70.000 35% 130.0000.000
110 Z2019.0564Quetta
CPapproved
REHABILITATION/ EXPENSION OF EMBRIODERY/ CUTTING & TAILORING CENTRE, BLOCK 2 HAZARA TOWN, QUETTA.
25.0000.000
25.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 60% 10.0000.000
109 Z2019.0398Jaffarabad
CPapproved
CONST: OF HANDICRAFT DEVELOPMENT CENTRE AT UMAR KOT TEHSIL JHATPAT DIST. JAFFARABAD.
16.0000.000
16.000 0.0000.000
0.000 0% 16.0000.000
0.000 16.000 100% 0.0000.000
108 Z2019.0055Jaffarabad
CPapproved
PROVISION OF INFRASTRUCTURE FACILITIES AT INDUSTRIAL ESTATE DERA MURAD JAMALI.
354.8000.000
354.800 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 14% 304.8000.000
107 Z2019.0048Provincial
CPapproved
REMAINING COMPONENTS OF INFRASTRUCTURE FACILITIES MINI INDUSTRIAL ESTATE AT KHUZDAR, TURBAT & CHAMAN.
675.0300.000
675.030 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 14% 575.0300.000
106 Z2019.0043Bela
CPapproved
RAVAMPING OF INDUSTRIAL ESTATE AT EASTERN BYPASS QUETTA PHASE-I.
194.0000.000
194.000 0.0000.000
0.000 0% 58.2000.000
0.000 58.200 30% 135.8000.000
105 Z2019.0041Provincial
CPapproved
ESRTABLISHMENT OF MARBAL CITY AT LORALAI, DALBANDIN & KHUZDAR.
300.0000.000
300.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 33% 200.0000.000
104 Z2019.0040Provincial
CPapproved
ESTAB: OF COMMERCIAL MARKETS AT 9 PLACES ALONG PAK-IRAN & PAK-AFGHAN BORDER.
25.0000.000
25.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 100% 0.0000.000
Industries(10 New Projects) GoB/FPA Sub-Total
1951.830 1951.830 0.000 0.000 546.200 0.000 546.200 1405.630
0.000 0.000 0.000 0.000
Subsector: Industries
Sector: Industries & Commerce
Chapter: INDUSTRIES
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Industries(14 Projects) Total
2791.917 2791.917 454.889 454.889 822.150 0.000 822.150 1514.878
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 24: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/24.jpg)
Public Sector Development Programme (Sectorwise)
20 of 214
115 Z2019.0335Quetta
CPapproved
REHABILITATION OF CARPET CENTRE MARI ABAD, QUETTA.
40.0000.000
40.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 50% 20.0000.000
114 Z2019.0334Quetta
CPapproved
REHABILITATION OF CARPET CENTRE, ALAMDAR ROAD, QUETTA.
40.0000.000
40.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 50% 20.0000.000
Small Scale Industries(2 New Projects) GoB/FPA Sub-Total
80.000 80.000 0.000 0.000 40.000 0.000 40.000 40.000
0.000 0.000 0.000 0.000
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Small Scale Industries
Sector: Industries & Commerce
Chapter: INDUSTRIES
Small Scale Industries(2 Projects) Total
80.000 80.000 0.000 0.000 40.000 0.000 40.000 40.000
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: INDUSTRIES(16 Projects)
2871.917 2871.917 454.889 454.889 862.150 0.000 862.150 1554.878
2019 - 20 Original
![Page 25: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/25.jpg)
Public Sector Development Programme (Sectorwise)
21 of 214
120 Z2018.2975Sibi
Approved
CONST: OF CHECK POST AT SIBI. 10.0000.000
10.000 5.0000.000
5.000 50% 5.0000.000
0.000 5.000 100% 0.0000.000
119 Z2018.2657ProvincialApproved
CONST: OF NEW MINERAL CHECK POST AT NOSHKI, PISHIN, LORALAI, MASTUNG.
50.0000.000
50.000 12.5000.000
12.500 25% 25.0000.000
0.000 25.000 75% 12.5000.000
118 Z2018.2653ProvincialApproved
INSTALLATION OF DIGITAL WEIGTHBRIDGES AT HANNA, DEGARI, SIBI, RAKHNI, ZHOB, HUB & LUNG LAHORE.
70.0000.000
70.000 20.0000.000
20.000 28% 30.0000.000
0.000 30.000 71% 20.0000.000
117 Z2018.0880Bela
Approved
ESTABLISHMENT OF CHECKPOST AT RING ROAD & HUB BYPASS.
50.0000.000
50.000 12.5000.000
12.500 25% 25.0000.000
0.000 25.000 75% 12.5000.000
116 Z2014.0055ProvincialApproved
ESTABLISHMENT OF MINES TRAINING & RESCUE CENTRE AT MUSLIM BAGH, KHUZDAR, SOORANJ, MACH & SHAHRAGH.
149.5750.000
149.575 111.0270.000
111.027 74% 38.5480.000
0.000 38.548 100% 0.0000.000
Minerals(5 Ongoing Projects) GoB/FPA Sub-Total
329.575 329.575 161.027 161.027 123.548 0.000 123.548 45.000
0.000 0.000 0.000 0.000
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Subsector: Minerals
Chapter: MINERALS
Sector: Industries & Commerce
2019 - 20 Original
![Page 26: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/26.jpg)
Public Sector Development Programme (Sectorwise)
22 of 214
122 Z2019.0074Khuzdar
CPapproved
B/T ROAD FROM AARI PIR TO SAROONA TEHSIL OF DISTRICT KHUZDAR 30 KMS (MINES)
350.0000.000
350.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 14% 300.0000.000
121 Z2019.0049Provincial
CPapproved
INST/ STRENG: AUTOMATION OF ROYALTY REGIME IN MINING SECTOR ,INSTAL: OF WEIGH MACHINES & BRIDGES & EST OF CHECK POST.
150.0000.000
150.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 33% 100.0000.000
Minerals(2 New Projects) GoB/FPA Sub-Total
500.000 500.000 0.000 0.000 100.000 0.000 100.000 400.000
0.000 0.000 0.000 0.000
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Minerals
Sector: Industries & Commerce
Chapter: MINERALS
Minerals(7 Projects) Total
829.575 829.575 161.027 161.027 223.548 0.000 223.548 445.000
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: MINERALS(7 Projects)
829.575 829.575 161.027 161.027 223.548 0.000 223.548 445.000
2019 - 20 Original
![Page 27: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/27.jpg)
Public Sector Development Programme (Sectorwise)
23 of 214
124 Z2016.1165Kharan
Approved
ESTABLISHMENT OF TTC FOR MALE & FEMALE KHARAN.
59.4420.000
59.442 23.0000.000
23.000 38% 9.0000.000
0.000 9.000 53% 27.4420.000
123 Z2013.0013ProvincialApproved
SKILL DEVELOPMENT PROGRAMME THROUGH BTEVTA.
1200.0000.000
1200.000 378.3630.000
378.363 31% 100.0000.000
0.000 100.000 39% 721.6370.000
Labour & Manpower(2 Ongoing Projects) GoB/FPA Sub-Total
1259.442 1259.442 401.363 401.363 109.000 0.000 109.000 749.079
0.000 0.000 0.000 0.000
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Subsector: Labour & Manpower
Chapter: MANPOWER
Sector: Labour & Manpower
2019 - 20 Original
![Page 28: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/28.jpg)
Public Sector Development Programme (Sectorwise)
24 of 214
128 Z2019.1330Sohbatpur
CPapproved
CONSTRUCTION OF REMAINING CIVIL WORK/BUILDING OF VOCATIONAL TRAINING CENTRE, SOHBATPUR.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
127 Z2019.0148Quetta
CPapproved
ESTABLISHMENT OF BALOCHISTAN TECHNICAL EDUCATION & VOCATIONAL TRAINING AUTHORITY (BTEVTA) HEADQUARTER QUETTA.
200.0000.000
200.000 0.0000.000
0.000 0% 70.0000.000
0.000 70.000 35% 130.0000.000
126 Z2019.0146Provincial
CPapproved
CHILD LABOUR SURVEY IN BALOCHISTAN (124.232 GOB. 86.626 UNICEF).
124.2320.000
124.232 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 40% 74.2320.000
125 Z2019.0145Bela
CPapproved
REHABILITATION / RENOVATION & UP GRADATION OF THE EXISTING BUILDING FOR TTC HUB TO CENTRE OF EXCELLENCE.
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
Labour & Manpower(4 New Projects) GoB/FPA Sub-Total
404.232 404.232 0.000 0.000 200.000 0.000 200.000 204.232
0.000 0.000 0.000 0.000
New
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Subsector: Labour & Manpower
Chapter: MANPOWER
Sector: Labour & Manpower
Labour & Manpower(6 Projects) Total
1663.674 1663.674 401.363 401.363 309.000 0.000 309.000 953.311
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: MANPOWER(6 Projects)
1663.674 1663.674 401.363 401.363 309.000 0.000 309.000 953.311
2019 - 20 Original
![Page 29: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/29.jpg)
Public Sector Development Programme (Sectorwise)
25 of 214
143 Z2017.0702Quetta
Approved
CONSTRUCTION OF FUTSAL GROUND AT SPORTS COMPLEX USMANABAD PB-03.
18.5000.000
18.500 5.5000.000
5.500 29% 13.0000.000
0.000 13.000 100% 0.0000.000
142 Z2017.0308Quetta
Approved
CONST: OF SPORTS COMPLEX, SWIMMING, POOL, CRICKET ACADMEY & SERVANT QUARTER AT MAJOR M. ALI SHAHEED ROAD.
60.0000.000
60.000 20.0000.000
20.000 33% 10.0000.000
0.000 10.000 50% 30.0000.000
141 Z2016.1168Quetta
Approved
33RD NATIONAL GAMES AT QUETTA.
715.8600.000
715.860 621.2210.000
621.221 86% 94.6390.000
0.000 94.639 100% 0.0000.000
140 Z2016.1104Harnai
Approved
CONST: OF SPORTS COMPLEX, HARNAI.
98.0260.000
98.026 17.9300.000
17.930 18% 15.0000.000
0.000 15.000 33% 65.0960.000
139 Z2016.0189Quetta
Approved
LAYING OF ARTIFICIAL TURF FOR HOCKEY GROUND PB-II.
47.0000.000
47.000 37.0000.000
37.000 78% 10.0000.000
0.000 10.000 100% 0.0000.000
138 Z2016.0055Quetta
Approved
CONST: OF REMAINING WORKS FOR SQUASH CLUB (INTERNATIONAL STANDARD).
22.0000.000
22.000 6.7180.000
6.718 30% 15.2820.000
0.000 15.282 100% 0.0000.000
137 Z2015.1251Qilla
SaifullahApproved
CONST: OF SPORTS COMPLEX PHASE-III AT MUSLIM BAGH DIST: QILLA SAIFULLAH.
32.2000.000
32.200 12.2000.000
12.200 37% 20.0000.000
0.000 20.000 100% 0.0000.000
136 Z2015.0701Quetta
Approved
SPORTS COMPLEX AT NOORZAI COLONY YASEEN MUHALLAH QUETTA.
50.0000.000
50.000 0.2000.000
0.200 0% 30.0000.000
0.000 30.000 60% 19.8000.000
135 Z2015.0697ProvincialApproved
CONSTRUCTION OF FUTSAL (IN DOOR FOOTBALL HALL) IN DISTRICT QUETTA (02 NOS), CHAMAN, GWADAR & NUSHKI.
93.4720.000
93.472 81.2320.000
81.232 86% 12.2400.000
0.000 12.240 100% 0.0000.000
134 Z2015.0501Quetta
Approved
CONST: OF SPORTS COMPLEX FOR QUETTA CITY PB-II.
63.0000.000
63.000 38.1500.000
38.150 60% 24.8500.000
0.000 24.850 100% 0.0000.000
133 Z2015.0178Ziarat
Approved
CONST: / EXTENSION OF ZIARAT GROUND & CONST: OF SANJAVI SPORTS GROUND.
13.0000.000
13.000 6.0000.000
6.000 46% 7.0000.000
0.000 7.000 100% 0.0000.000
132 Z2014.0053Kalat
Approved
SPORTS COMPLEX AT KHALIQ ABAD MANGOCHER.
49.0290.000
49.029 39.0290.000
39.029 79% 10.0000.000
0.000 10.000 100% 0.0000.000
131 Z2013.0046Quetta
Approved
CONST: OF F.PATH, MEDIAN, B/W, T/W ROOM,FIX: OF T.TILES, B.RING, W.WORK & SUPP: OF SP:ITEMS FOR AYUB STADIUM.
84.6830.000
84.683 80.6830.000
80.683 95% 4.0000.000
0.000 4.000 100% 0.0000.000
130 Z2012.0753Sibi
Approved
LYING OF SYNTHETIC HOCKEY TURF AT SIBI (DEVOLVED).
65.1680.000
65.168 41.6480.000
41.648 63% 23.5200.000
0.000 23.520 100% 0.0000.000
129 Z2009.0032Quetta
Approved
CONSTRUCTION OF INDOOR SPORTS COMPLEX AT HAZARA TOWN.
50.0000.000
50.000 45.3850.000
45.385 90% 4.6150.000
0.000 4.615 100% 0.0000.000
Sports -(15 Ongoing Projects) GoB/FPA Sub-Total
1461.938 1461.938 1052.896 1052.896 294.146 0.000 294.146 114.896
0.000 0.000 0.000 0.000
Subsector: Sports -
Sector: Sports
Chapter: SPORTS
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 30: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/30.jpg)
Public Sector Development Programme (Sectorwise)
26 of 214
159 Z2019.0406Pishin
CPapproved
CONST: OF FOOT BALL FITS GROUND TEHSIL NANA SAIB, TEHSIL BERSHOR &TOBA KAKARI AND BOSTAN.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
158 Z2019.0399Jaffarabad
CPapproved
CONST: OF SPORTS GROUND GBHS ROJHAN JAMALI WITH ASTRO TURF & LIGHTS.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
157 Z2019.0239Qilla
SaifullahCPapproved
CONSTR5UCTION OF FOOTBALL STADIUM HAMEED KULAK KAKOZAI.
60.0000.000
60.000 0.0000.000
0.000 0% 60.0000.000
0.000 60.000 100% 0.0000.000
156 Z2019.0160Chagai
CPapproved
CONST: OF SHAHEED ASFAND FOOTBALL STADIUM AMINABAD, DALBANDIN, DISTRICT CHAGAI.
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
155 Z2019.0149Chagai
CPapproved
CONST: OF SHAHEED ASFAND CRICKET STADIUM TAFTAN, DISTRICT CHAGAI.
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
154 Z2019.0114Quetta
CPapproved
ESTABLISHMENT OF FUTSAL GROUND FOR WOMEN GIRLS COLLEGE SATELLITE TOWN QUETTA.
22.5000.000
22.500 0.0000.000
0.000 0% 22.5000.000
0.000 22.500 100% 0.0000.000
153 Z2019.0113Quetta
CPapproved
ESTABLISHMENT OF FUTSAL GROUND SHAHBAZ TOWN QUETTA.
22.5000.000
22.500 0.0000.000
0.000 0% 22.5000.000
0.000 22.500 100% 0.0000.000
152 Z2019.0111Quetta
CPapproved
ESTABLISHMENT OF FUTSAL GROUND FOR WOMEN AT GIRLS HIGH SCHOOL JINNAH TOWN, QUETTA.
22.5000.000
22.500 0.0000.000
0.000 0% 22.5000.000
0.000 22.500 100% 0.0000.000
151 Z2019.0110Quetta
CPapproved
ESTABLISHMENT OF FUTSAL STADIUM FOR WOMEN AT GIRLS DEGREE COLLEGE QUETTA CANTT.
22.5000.000
22.500 0.0000.000
0.000 0% 22.5000.000
0.000 22.500 100% 0.0000.000
150 Z2019.0108Bela
CPapproved
CONST: OF PAVILION, B/WALL & SITTING STEPS AT JAM MIR GHULAM QADIR FOOTBALL STADIUM HUB.
24.4900.000
24.490 0.0000.000
0.000 0% 24.4900.000
0.000 24.490 100% 0.0000.000
149 Z2019.0107Quetta
CPapproved
REMAINING WORK OF HOCKEY GROUND AYUB STADIUM QUETTA.
79.4000.000
79.400 0.0000.000
0.000 0% 79.4000.000
0.000 79.400 100% 0.0000.000
148 Z2019.0105Quetta
CPapproved
UPGRADATION OF FOOTBALL STADIUM SARIYAB QUETTA.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
147 Z2019.0103Quetta
CPapproved
ESTABLISHMENT OF SPORTS COMPLEX AT DISTRICT HEADQUARTERS (PHASE I)
3000.0000.000
3000.000 0.0000.000
0.000 0% 200.0000.000
0.000 200.000 6% 2800.0000.000
146 Z2019.0102Quetta
CPapproved
ESTABLISHMENT OF FUTSAL GROUND FOR WOMEN AT SBKWU QUETTA.
22.5000.000
22.500 0.0000.000
0.000 0% 22.5000.000
0.000 22.500 100% 0.0000.000
145 Z2019.0076Chagai
CPapproved
CONSTRUCTION OF CHAGAI CRICKET STADIUM CHAGAI CITY, DISTRICT CHAGAI.
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
144 Z2019.0075Chagai
CPapproved
CONSTRUCTION OF SHAHEED ASFAND CRICKET STADIUM CHEATER, DISTRICT CHAGAI.
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
Subsector: Sports -
Sector: Sports
Chapter: SPORTS
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 31: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/31.jpg)
Public Sector Development Programme (Sectorwise)
27 of 214
174 Z2019.1570Quetta
CPapproved
F.SAL GRDS(SPINY RD,WOMEN/P,SARIAB RD)&CONS:OF SPORTS COMPLEXES(ONE AIRPORT RD,TWO SARIAB RD)&REH:FB.GRD S.TWON(QTA PKG)
494.0450.000
494.045 0.0000.000
0.000 0% 494.0450.000
0.000 494.045 100% 0.0000.000
173 Z2019.1379Qilla
AbdullahCPapproved
CONST: OF STEDIUM AT KILLI BADWAN.
60.0000.000
60.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 50% 30.0000.000
172 Z2019.1378Qilla
AbdullahCPapproved
CONST: FUT-SALL AT KILLI AHMED KHAN GULISTAN.
30.5000.000
30.500 0.0000.000
0.000 0% 30.5000.000
0.000 30.500 100% 0.0000.000
171 Z2019.1240Gwadar
CPapproved
CONSTRUCTION OF CRICKET GROUND IN PANWAN JIWANI
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
170 Z2019.1239Gwadar
CPapproved
CONSTRUCTION OF FOOTBALL STADIUM FOR DAY AND NIGHT MATCH IN PASNI
70.0000.000
70.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 35% 45.0000.000
169 Z2019.1169Ziarat
CPapproved
CONSTRUCTION OF SPORTS STADIUM TEHSIL SINJAVI
60.0000.000
60.000 0.0000.000
0.000 0% 60.0000.000
0.000 60.000 100% 0.0000.000
168 Z2019.1086Kalat
CPapproved
REMAIN: WORK OF F/BALL STAD:AT KILLI HAJI BHADUR KHAN KHALIQ ABAD , FOOTBALL STAD:AT KILLI KORKI KHALIQ ABAD, KALAT
14.0000.000
14.000 0.0000.000
0.000 0% 14.0000.000
0.000 14.000 100% 0.0000.000
167 Z2019.1085Kalat
CPapproved
REMAINING WORK OF CRICKET STADIUM AT SHAHEED MIR ZAIB LANGOVE BAZAR & BRINCHINA KHALIQ ABAD DIST. KALAT
14.0000.000
14.000 0.0000.000
0.000 0% 14.0000.000
0.000 14.000 100% 0.0000.000
166 Z2019.1084Kalat
CPapproved
CONST: OF FOOTBALL STADIUM AT SHEKHERI DISTRICT KALAT.
15.9000.000
15.900 0.0000.000
0.000 0% 15.9000.000
0.000 15.900 100% 0.0000.000
165 Z2019.1083Kalat
CPapproved
CONST: OF FOOTBALL STADIUM AT MOHAMMAD TAWA DIST. KALAT.
15.9000.000
15.900 0.0000.000
0.000 0% 15.9000.000
0.000 15.900 100% 0.0000.000
164 Z2019.1082Kalat
CPapproved
CONST: OF FOOTBALL STADIUM AT KAPOTO DISTRICT KALAT.
15.9000.000
15.900 0.0000.000
0.000 0% 15.9000.000
0.000 15.900 100% 0.0000.000
163 Z2019.1081Kalat
CPapproved
CONST: OF FOOTBALL STADIUM AT GAZG DISTRICT KALAT.
15.9000.000
15.900 0.0000.000
0.000 0% 15.9000.000
0.000 15.900 100% 0.0000.000
162 Z2019.1080Kalat
CPapproved
CONST: OF FOOTBALL STADIUM AT NEEMRGH DIST. KALAT.
15.9000.000
15.900 0.0000.000
0.000 0% 15.9000.000
0.000 15.900 100% 0.0000.000
161 Z2019.0537Kech
CPapproved
CONSTRUCTION OF FOOTBALL STADIUM AT TUMP CITY PB-48 DISTRICT KECH
80.0000.000
80.000 0.0000.000
0.000 0% 80.0000.000
0.000 80.000 100% 0.0000.000
160 Z2019.0497Quetta
CPapproved
CONST.OF 5 NO FUTSAL GROUND AT KILLI MULAZAI, PRAGHA,BALELI, NOHSAR, M.IRFAN BAZAI,CH:ACHOZAI & S.AURENGZAIB SUMALANI
50.5000.000
50.500 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 39% 30.5000.000
Subsector: Sports -
Sector: Sports
Chapter: SPORTS
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 32: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/32.jpg)
Public Sector Development Programme (Sectorwise)
28 of 214
183 Z2019.2092Khuzdar
CPapproved
CONST: OF MISSING FACILITIES AT QUID-E-AZAM MOHD ALI JINNAH SPORTS COMPLEX.
26.0000.000
26.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 57% 11.0000.000
182 Z2019.2091Khuzdar
CPapproved
CONST: OF SPORTS COMPLEX AT GONGAV FEROZABAD.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
181 Z2019.2067Pishin
CPapproved
CONST: OF KHANOZAI STADIUM. 40.0000.000
40.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 100% 0.0000.000
180 Z2019.2030Pishin
CPapproved
CONSTRUCTION OF KHANOZAI STADIUM
40.0000.000
40.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 50% 20.0000.000
179 Z2019.1918Provincial
CPapproved
BALOCHISTAN YOUTH SUPPORT PROGRAM.
500.0000.000
500.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 20% 400.0000.000
178 Z2019.1856Kharan
CPapproved
CONST OF CIRCKET STADIUM KHARAN
65.0000.000
65.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 38% 40.0000.000
177 Z2019.1839Quetta
CPapproved
CONST: OF FUTSAL GROUND AT KILLI SOHRAB KHAN, QAMBRANI QUETTA.
27.5000.000
27.500 0.0000.000
0.000 0% 27.5000.000
0.000 27.500 100% 0.0000.000
176 Z2019.1598Nushki
CPapproved
CONST: OF INDDOR SPORTS COMPLEX AT DISTRICT NUSHKI.
60.0000.000
60.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 50% 30.0000.000
175 Z2019.1584Provincial
CPapproved
ESTAB: OF FUTSAL STADIUM IN EACH MUNICIPAL CORPORATION (5) & MUNICIPAL COMMITTEE (56) OF BALOCHISTAN (TOTAL 56).
1372.5000.000
1372.500 0.0000.000
0.000 0% 200.0000.000
0.000 200.000 14% 1172.5000.000
Sports -(40 New Projects) GoB/FPA Sub-Total
6509.935 6509.935 0.000 0.000 1890.935 0.000 1890.935 4619.000
0.000 0.000 0.000 0.000
Sector: Sports
Chapter: SPORTS
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Sports -
Sports -(55 Projects) Total
7971.873 7971.873 1052.896 1052.896 2185.081 0.000 2185.081 4733.896
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 33: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/33.jpg)
Public Sector Development Programme (Sectorwise)
29 of 214
184 Z2012.0748Gwadar
Approved
CONST: OF YOUTH DEVELOPMENT CENTER AT GWADAR (DEVOLVED).
39.9300.000
39.930 17.6500.000
17.650 44% 10.0000.000
0.000 10.000 69% 12.2800.000
0.000 0.000 0.000 0.000
Youth Affairs(1 Ongoing Projects) GoB/FPA Sub-Total
39.930 39.930 17.650 17.650 10.000 0.000 10.000 12.280
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Sector: Sports, Culture, Tourism & Youth Affairs
Subsector: Youth Affairs
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Ongoing
Chapter: SPORTS
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Youth Affairs(1 Projects) Total
39.930 39.930 17.650 17.650 10.000 0.000 10.000 12.280
Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: SPORTS(56 Projects)
8011.803 8011.803 1070.546 1070.546 2195.081 0.000 2195.081 4746.176
2019 - 20 Original
![Page 34: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/34.jpg)
Public Sector Development Programme (Sectorwise)
30 of 214
195 Z2019.1426Provincial
CPapproved
STRENGHTNING, PROVISION AND EQUIPPING LIBRARIES OF BALOCHISTAN.
60.0000.000
60.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 50% 30.0000.000
194 Z2019.1241Kech
CPapproved
CONST: OF PUBLIC LIBRARIES AT BIT, DANDAR & SHAHRAK DISTRICT KECH.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
193 Z2019.1045Panjgur
CPapproved
CONSTRUCTION OF PUBLIC LIBRARY MIR ABDUL MAJEED BIZENJO AT SAEED ABAD KEEL COR PANJGUR.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
192 Z2019.1034Harnai
CPapproved
CONST: OF PUBLIC LIBRARY AT DIST. HARNAI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
191 Z2019.0353Jaffarabad
CPapproved
CONST: OF NEW LIBRARY MIR JAFFAR KHAN JAMALI AT OLD TEHSIL BUILDING OFFICE USTA MUHAMMAD
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
190 Z2019.0128Sibi
CPapproved
PROVISION OF MISSING FACILITIES TO THE SIBI JIRGA HALL MUSEUM AT SIBI.
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
189 Z2019.0125Zhob
CPapproved
RESTORATION & REHABILITATION OF ZHOB (FORT SANDEMEN)
85.0000.000
85.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 58% 35.0000.000
188 Z2019.0119Quetta
CPapproved
CONST: OF LIBRARY AT BREWERY & AIRPORT ROAD, QUETTA.
150.0000.000
150.000 0.0000.000
0.000 0% 75.0000.000
0.000 75.000 50% 75.0000.000
187 Z2019.0039Provincial
CPapproved
CONST: OF REST HOUSE CONSISTING OF 20 ROOMS WITH FACILITIES AT TAFTAN THROUGH PPP MODE.
100.0000.000
100.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 50.0000.000
186 Z2019.0035Provincial
CPapproved
PRESERV: & MAINT: OF ARCHAEOLOGICAL SITES OF MEHRGARH, CHAKAR FORT, SHAHI TUMP, MIRI QALAT (KECH) CHOWK: GRAVEYARDS ETC.
200.0000.000
200.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 25% 150.0000.000
185 Z2019.0024Provincial
CPapproved
MAPPING AND DEVELOPMENT OF OF GIS BASED DATA OF ARCHEOLOGICAL SITES BALOCHISTAN.
18.0000.000
18.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 55% 8.0000.000
Culture(11 New Projects) GoB/FPA Sub-Total
690.000 690.000 0.000 0.000 342.000 0.000 342.000 348.000
0.000 0.000 0.000 0.000
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Subsector: Culture
Sector: Culture
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Chapter: CULTURE
New
Culture(11 Projects) Total
690.000 690.000 0.000 0.000 342.000 0.000 342.000 348.000
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 35: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/35.jpg)
Public Sector Development Programme (Sectorwise)
31 of 214
198 Z2018.3036Quetta
Approved
CONST: OF LIBRARY BUILDING AT SARIAB ROAD QUETTA.
50.0000.000
50.000 25.0000.000
25.000 50% 25.0000.000
0.000 25.000 100% 0.0000.000
197 Z2016.1012Gwadar
Approved
CONST: OF LIBRARY AT DISTRICT GWADAR.
10.0000.000
10.000 4.0130.000
4.013 40% 5.9870.000
0.000 5.987 100% 0.0000.000
196 Z2014.0080Kech
Approved
CONST: OF KECH CULTURAL COMPLEX AT TURBAT.
249.1100.000
249.110 130.0000.000
130.000 52% 40.0000.000
0.000 40.000 68% 79.1100.000
0.000 0.000 0.000 0.000
Culture(3 Ongoing Projects) GoB/FPA Sub-Total
309.110 309.110 159.013 159.013 70.987 0.000 70.987 79.110
Ongoing
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Subsector: Culture
Chapter: CULTURE
Sector: Sports, Culture, Tourism & Youth Affairs
2019 - 20 Original
![Page 36: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/36.jpg)
Public Sector Development Programme (Sectorwise)
32 of 214
201 Z2019.1624Kech
CPapproved
CONST: OF PUBLIC LIBRARY AT NASIRABAD KECH.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
200 Z2019.0977Gwadar
CPapproved
STENGETHING OF LIABRARIES IN SYED GANJ DEGITAL, PISHUKHAN,JIWANI , PASNI ,ORMARRA AND SURBUNDAR GWADAR
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
199 Z2019.0539Kech
CPapproved
CONSTRUCTION OF PUBLIC LIBRARY AT TUMP PB-48 DISTRICT KECH
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
0.000 0.000 0.000 0.000
Culture(3 New Projects) GoB/FPA Sub-Total
30.000 30.000 0.000 0.000 30.000 0.000 30.000 0.000
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
New
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Chapter: CULTURE
Sector: Sports, Culture, Tourism & Youth Affairs
Subsector: Culture
Culture(6 Projects) Total
339.110 339.110 159.013 159.013 100.987 0.000 100.987 79.110
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: CULTURE(17 Projects)
1029.110 1029.110 159.013 159.013 442.987 0.000 442.987 427.110
Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 37: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/37.jpg)
Public Sector Development Programme (Sectorwise)
33 of 214
204 Z2019.1465Provincial
CPapproved
DEV: OF ECOTOURISM&CONST TOURIST RESORT WITH ALLIED FACILITES AT KUNDMALIR GADANI,RASMALAN,ORMARA,HUD, JIWANI&KALMAT
1000.0000.000
1000.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 10% 900.0000.000
203 Z2019.1437Bela
CPapproved
MASTER PLANNING FOR THE DEVELOPMENT OF MAI PHIR VALLEY AS MAJOR TOURIST SITE.
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
202 Z2019.1434Quetta
CPapproved
MASTER PLANNING FOR THE DEVELOPMENT OF SHAHBAN VALLEY AS MAJOR TOURIST SITE.
100.0000.000
100.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 50.0000.000
0.000 0.000 0.000 0.000
Tourism -(3 New Projects) GoB/FPA Sub-Total
1150.000 1150.000 0.000 0.000 200.000 0.000 200.000 950.000
Sector: Tourism & Youth Affairs
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Chapter: TOURISM
New
Subsector: Tourism -
Tourism -(3 Projects) Total
1150.000 1150.000 0.000 0.000 200.000 0.000 200.000 950.000
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 38: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/38.jpg)
Public Sector Development Programme (Sectorwise)
34 of 214
205 Z2016.1092Bela
Approved
DEV: OF TOURISM RESORT AT KUND MALIR.
100.0000.000
100.000 92.0000.000
92.000 92% 8.0000.000
0.000 8.000 100% 0.0000.000
Tourism(1 Ongoing Projects) GoB/FPA Sub-Total
100.000 100.000 92.000 92.000 8.000 0.000 8.000 0.000
0.000 0.000 0.000 0.000
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Ongoing
Subsector: Tourism
Chapter: TOURISM
Sector: Sports, Culture, Tourism & Youth Affairs
2019 - 20 Original
![Page 39: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/39.jpg)
Public Sector Development Programme (Sectorwise)
35 of 214
207 Z2019.0121Provincial
CPapproved
FEASIBILITY STUDIES FOR THE PROMOTION OF TOURISM IN BALOCHISTAN.
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
206 Z2019.0116Ziarat
CPapproved
EXTENSION OF TOURSIM REST HOUSE AT ZIARAT THROUGH PPP MODE.
60.0000.000
60.000 0.0000.000
0.000 0% 60.0000.000
0.000 60.000 100% 0.0000.000
Tourism(2 New Projects) GoB/FPA Sub-Total
110.000 110.000 0.000 0.000 110.000 0.000 110.000 0.000
0.000 0.000 0.000 0.000
Subsector: Tourism
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Chapter: TOURISM
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Sector: Sports, Culture, Tourism & Youth Affairs
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Tourism(3 Projects) Total
210.000 210.000 92.000 92.000 118.000 0.000 118.000 0.000
Sector: TOURISM(6 Projects)
1360.000 1360.000 92.000 92.000 318.000 0.000 318.000 950.000
Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 40: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/40.jpg)
Public Sector Development Programme (Sectorwise)
36 of 214
223 Z2014.0078Zhob
Approved
CONST: OF NEW BUS/TRUCK ADDA, VEGETABLE/FRUIT MARKET SQUARE & POLICE STATION AT ZHOB.
502.9800.000
502.980 265.2000.000
265.200 52% 100.0000.000
0.000 100.000 72% 137.7800.000
222 Z2014.0077Kalat
Approved
SUB DIVISIONAL HEADQUARTER COMPLEX AT KHALIQ ABAD MANGOCHAR.
224.1720.000
224.172 97.0000.000
97.000 43% 20.0000.000
0.000 20.000 52% 107.1720.000
221 Z2014.0076Qilla
AbdullahApproved
CONST: OF DISTRICT COMPLEX AT CHAMAN, (BDA).
113.8340.000
113.834 32.0000.000
32.000 28% 10.0000.000
0.000 10.000 36% 71.8340.000
220 Z2014.0041Quetta
Approved
LEVIES TRAINING CENTER QUETTA.
500.0000.000
500.000 447.1580.000
447.158 89% 52.8420.000
0.000 52.842 100% 0.0000.000
219 Z2013.0253Qilla
AbdullahApproved
UPLIFTING OF CHAMAN TOWN (09 COMPONENTS).
1824.9380.000
1824.938 907.2000.000
907.200 49% 40.0000.000
0.000 40.000 51% 877.7380.000
218 Z2013.0148ProvincialApproved
CONST: OF RESIDENTIAL/ NON RESIDENTIAL BUILDINGS FOR NEWLY CREATED DISTRICTS.
172.7140.000
172.714 33.5750.000
33.575 19% 40.0000.000
0.000 40.000 42% 99.1390.000
217 Z2013.0143Quetta
Approved
CONST: OF MPA LODGES AT QUETTA.
764.4120.000
764.412 625.5500.000
625.550 81% 40.0000.000
0.000 40.000 87% 98.8620.000
216 Z2013.0142Outside
BalochistanApproved
EXTENSION OF BALOCHISTAN HOUSE ISLAMABAD.
100.0000.000
100.000 10.0000.000
10.000 10% 10.0000.000
0.000 10.000 20% 80.0000.000
215 Z2013.0108Ziarat
Approved
CONSTRUCTION OF JUDICIARY COMPLEX AT ZIARAT.
116.9130.000
116.913 76.0000.000
76.000 65% 20.0000.000
0.000 20.000 82% 20.9130.000
214 Z2013.0014Quetta
Approved
CONSTRUCTION OF PARKING PLAZA AT CIRCULAR ROAD QUETTA .
1044.3100.000
1044.310 781.1000.000
781.100 74% 263.2100.000
0.000 263.210 100% 0.0000.000
213 Z2012.0806Qilla
SaifullahApproved
JUDICIARY COMPLEX KILLA SAIFULLAH.
194.9000.000
194.900 184.3360.000
184.336 94% 10.5640.000
0.000 10.564 100% 0.0000.000
212 Z2012.0804Kech
Approved
CIRCUIT BENCH AT TURBAT. 554.0000.000
554.000 105.0000.000
105.000 18% 40.0000.000
0.000 40.000 26% 409.0000.000
211 Z2011.0801MastungApproved
CONST: OF TEHSIL COMPLEX BUILDING AT KIRDGAP DIST. MASTUNG.
418.7200.000
418.720 330.5000.000
330.500 78% 20.0000.000
0.000 20.000 83% 68.2200.000
210 Z2006.0069Musa KhailApproved
CONSTRUCTION OF OFFICIAL RESIDENCIES AT DIST. HQ MUSAKHAIL.
215.8960.000
215.896 209.2710.000
209.271 96% 6.6250.000
0.000 6.625 100% 0.0000.000
209 Z2006.0068Shirani
Approved
CONST: OF SHIRANI TOWN FOR NEWLY CREATED DISTRICT SHIRANI (TH: COMM:).
2709.1460.000
2709.146 903.6510.000
903.651 33% 40.0000.000
0.000 40.000 34% 1765.4950.000
208 Z2005.0849Gwadar
Approved
CONSTRUCTION OF RESDENTIAL/NON-RESIDENTIAL ACCOMMODATION FOR JUDICIARY DEPARTMENT GWADAR.
408.9770.000
408.977 295.1610.000
295.161 72% 20.0000.000
0.000 20.000 77% 93.8160.000
Subsector: Physical Planning & Housing
Sector: Physical Planning & Housing
Chapter: P.P.&H.
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 41: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/41.jpg)
Public Sector Development Programme (Sectorwise)
37 of 214
239 Z2016.1124Duki
Approved
CONST: OF TRANSPORT ADDA AT DUKI.
100.0000.000
100.000 70.0000.000
70.000 70% 5.0000.000
0.000 5.000 75% 25.0000.000
238 Z2016.1121Quetta
Approved
CONST: OF ADDITIONAL & RAISING OF BOUNDARY WALL/ WATCH TOWER AND DEVELOPMENT OF LAWN AT CM CAMP OFFICE HANNA.
349.4640.000
349.464 258.9000.000
258.900 74% 90.5640.000
0.000 90.564 100% 0.0000.000
237 Z2016.1028Quetta
Approved
EXT: OF C.M SECRETARIAT & CM ANNEXE AT QUETTA.
686.1610.000
686.161 555.4000.000
555.400 80% 130.7610.000
0.000 130.761 100% 0.0000.000
236 Z2015.1359Kalat
Approved
CONSTRUCTION OF REST HOUSE AT KHALIQABAD MANGOCHAR, DIST. KALAT.
59.7300.000
59.730 54.1130.000
54.113 90% 5.6170.000
0.000 5.617 100% 0.0000.000
235 Z2015.1358Kalat
Approved
CONSTRUCTION OF BUS ADDA AT KHALIQABAD, DIST. KALAT.
235.4360.000
235.436 118.0000.000
118.000 50% 20.0000.000
0.000 20.000 58% 97.4360.000
234 Z2015.1346Dera BugtiApproved
DEVELOPMENT PACKAGE FOR SUI / DERA BUGTI.
500.0000.000
500.000 25.8750.000
25.875 5% 100.0000.000
0.000 100.000 25% 374.1250.000
233 Z2015.1298Quetta
Approved
CONST:OF MIR SIKANDAR JAN ZEHRI SHAHEED AUDITORIUM AT QUETTA CANTT: DISTIRCT QUETTA.
291.1260.000
291.126 240.0000.000
240.000 82% 51.1260.000
0.000 51.126 100% 0.0000.000
232 Z2015.1250Quetta
Approved
STRENGTHENING OF P&D DEPARTMENT & COMPUTER CELL (PROVIDING & FIXING OF LATEST SOFTWARE'S).
220.0000.000
220.000 49.3500.000
49.350 22% 50.0000.000
0.000 50.000 45% 120.6500.000
231 Z2015.0812Quetta
Approved
ROOF TREATMENT HIGH COURT BUILDING QUETTA.
17.1310.000
17.131 7.0000.000
7.000 40% 10.1310.000
0.000 10.131 100% 0.0000.000
230 Z2015.0807Harnai
Approved
CONSTRUCTION OF JUDICIAL COMPLEX & RESIDENTIAL BUILDING AT HARNAI.
50.0000.000
50.000 45.0000.000
45.000 90% 5.0000.000
0.000 5.000 100% 0.0000.000
229 Z2015.0790ProvincialApproved
RESCUE 1122 (04 SUB STATIONS) (PDMA).
400.0000.000
400.000 192.0000.000
192.000 48% 50.0000.000
0.000 50.000 60% 158.0000.000
228 Z2015.0781Quetta
Approved
HOUSING SCHEME FOR S&GAD OFFICERS AND EMPLOYEES .
500.0000.000
500.000 360.2000.000
360.200 72% 10.0000.000
0.000 10.000 74% 129.8000.000
227 Z2015.0778Quetta
Approved
CONSTRUCTION OF CAFETERIA WITH ALLIED FACILITIES (APPROVED).
110.0000.000
110.000 85.0000.000
85.000 77% 25.0000.000
0.000 25.000 100% 0.0000.000
226 Z2014.0792ProvincialApproved
CONST: OF DISTRICT ACCOUNTS OFFICES/RESIDENCES IN DISTRICTS.
200.0000.000
200.000 149.5860.000
149.586 74% 50.4140.000
0.000 50.414 100% 0.0000.000
225 Z2014.0591Quetta
Approved
CONST: OF HOUSING SCHEME FOR P&D OFFICERS AT QUETTA.
381.9800.000
381.980 295.0000.000
295.000 77% 30.0000.000
0.000 30.000 85% 56.9800.000
224 Z2014.0079Quetta
Approved
ESTAB: OF SUPREME COURT BRANCH REGISTRY AT QUETTA.
431.9400.000
431.940 370.4500.000
370.450 85% 61.4900.000
0.000 61.490 100% 0.0000.000
Subsector: Physical Planning & Housing
Sector: Physical Planning & Housing
Chapter: P.P.&H.
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 42: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/42.jpg)
Public Sector Development Programme (Sectorwise)
38 of 214
254 Z2017.1575Nushki
Approved
EXTENSION OF JUDICIAL COMPLEX NOSHKI.
80.0000.000
80.000 55.0000.000
55.000 68% 25.0000.000
0.000 25.000 100% 0.0000.000
253 Z2017.1572Shaheed
Sikandarabad
Approved
CONSTRUCTION OF JUDICIAL COMPLEX, AT SURAB.
62.9970.000
62.997 30.0000.000
30.000 47% 15.0000.000
0.000 15.000 71% 17.9970.000
252 Z2017.1568ProvincialApproved
CONST: OF 1 COURT ROOM IN THE PREMISES OF SESSION COURT DUKI & CONST: OF JUDICIAL COMPLEX AT KAREZAT DIST. PISHIN.
58.2750.000
58.275 46.2750.000
46.275 79% 12.0000.000
0.000 12.000 100% 0.0000.000
251 Z2017.1566Chagai
Approved
CONST: OF JUDICIAL COMPLEX AT DALBANDIN DISTRICT CHAGAI.
82.7350.000
82.735 60.0000.000
60.000 72% 22.7350.000
0.000 22.735 100% 0.0000.000
250 Z2017.1565JaffarabadApproved
CONSTRUCTION OF COURT COMPLEX, AT USTA MUHAMMAD.
95.6820.000
95.682 77.4410.000
77.441 80% 18.2410.000
0.000 18.241 100% 0.0000.000
249 Z2017.1562Quetta
Approved
EXT:OF JUDICIAL COMPLEX, KHARAN RESIDENTIAL ACCOMMODATION AT D&S JUDGE, KHARAN.
80.0000.000
80.000 50.3680.000
50.368 62% 29.6320.000
0.000 29.632 100% 0.0000.000
248 Z2017.1485Quetta
Approved
BALOCHISTAN SECRETARIAT EMPLOYES HOUSING SCHEME AT NUSAR. AGHBARG.
700.0000.000
700.000 490.2000.000
490.200 70% 1.0000.000
0.000 1.000 70% 208.8000.000
247 Z2017.1213Loralai
Approved
CONST: OF NASARABAD NALA TEHSIL BORI, MEKHTAR DIST. LORALAI.
10.0000.000
10.000 8.0000.000
8.000 80% 2.0000.000
0.000 2.000 100% 0.0000.000
246 Z2017.0943Kohlu
Approved
CONSTRUCTION OF CIRCUIT HOUSE KAHAN, DISTRICT KOHLU.
100.0000.000
100.000 50.0000.000
50.000 50% 5.0000.000
0.000 5.000 55% 45.0000.000
245 Z2017.0461Kalat
Approved
REMAINING WORK OF KHALIQABAD PRESS CLUB.
9.9050.000
9.905 4.9050.000
4.905 49% 5.0000.000
0.000 5.000 100% 0.0000.000
244 Z2017.0371Kachhi
Approved
CONST: OF COMMUNITY HALL FOR MACH BALANARI DHADAR ETC B & R DISTRICT KACHHI.
30.0000.000
30.000 23.0000.000
23.000 76% 7.0000.000
0.000 7.000 100% 0.0000.000
243 Z2016.1192Quetta
Approved
CONST: OF HELICOPTER HANGER FOR GOVT: OF BALOCHISTAN AT QUETTA INTERNATIONAL AIRPORT, QUETTA.
558.0930.000
558.093 427.5750.000
427.575 76% 50.0000.000
0.000 50.000 85% 80.5180.000
242 Z2016.1178Kohlu
Approved
LIEUTENANT MIR JAHANGIR SHAHEED REST HOUSE AND COMMUNITY HALL AT KOHLU.
11.7900.000
11.790 8.0000.000
8.000 67% 3.7900.000
0.000 3.790 100% 0.0000.000
241 Z2016.1169Outside
BalochistanApproved
CONSTRUCTION OF BOUNDARY WALL OF BALOCHISTAN HOUSE ISLAMABAD.
114.0000.000
114.000 94.0000.000
94.000 82% 20.0000.000
0.000 20.000 100% 0.0000.000
240 Z2016.1166Quetta
Approved
CONST: OF COMMITTEE ROOMS & OFFICES OF CHAIRMAN STANDING COMMITTEES & ITS STAFF AT BALOCHISTAN ASSEMBLY QUETTA.
711.8670.000
711.867 102.0000.000
102.000 14% 100.0000.000
0.000 100.000 28% 509.8670.000
Subsector: Physical Planning & Housing
Sector: Physical Planning & Housing
Chapter: P.P.&H.
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 43: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/43.jpg)
Public Sector Development Programme (Sectorwise)
39 of 214
257 Z2018.0812Awaran
Approved
RECONSTRUCTION OF PERMANENT HOUSES IN AWARAN, BALOCHISTAN.
0.1002500.000
2500.100 0.000717.000
717.000 28% 0.100817.000
0.000 817.100 61% 0.000966.000
256 Z2017.1594Loralai
Approved
LEVIES LINE AT DIST: LORALAI. 50.0000.000
50.000 22.5000.000
22.500 45% 27.5000.000
0.000 27.500 100% 0.0000.000
255 Z2017.1592Dera BugtiApproved
LEVIES LINE AT DIST: DERA BUGTI.
50.0000.000
50.000 10.0000.000
10.000 20% 40.0000.000
0.000 40.000 100% 0.0000.000
2500.000 717.000 817.000 966.000
Physical Planning & Housing(50 Ongoing Projects) GoB/FPA Sub-Total
17204.324
19704.324
9737.840 10454.840 1812.342 0.000 2629.342 5654.142
Subsector: Physical Planning & Housing
Sector: Physical Planning & Housing
Chapter: P.P.&H.
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 44: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/44.jpg)
Public Sector Development Programme (Sectorwise)
40 of 214
272 Z2019.1095Shaheed
Sikandarabad
CPapproved
EXT: BUILDING & CONSTR. OF QUARTER (GRADE 11-14) CIVIL DISPENSARY KILLI BITAGOO DASHT-E- GORAN DIST. SHAHEED S. ABAD
10.9000.000
10.900 0.0000.000
0.000 0% 10.9000.000
0.000 10.900 100% 0.0000.000
271 Z2019.1091Shaheed
Sikandarabad
CPapproved
EXT. OF BUILDING & CONSTR. OF QUARTER (GRADE 11 -14) CIVIL DISPENSARY KILLI MOLI MEHARABAD DIST. SHAHEED SKINDARABAD
10.9000.000
10.900 0.0000.000
0.000 0% 10.9000.000
0.000 10.900 100% 0.0000.000
270 Z2019.0723Kachhi
CPapproved
CONST: OF BAB-E-MIR CHAKAR RIND.
5.0000.000
5.000 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 100% 0.0000.000
269 Z2019.0645Sibi
CPapproved
CONST: OF WATCH TOWERS 12 NOS & B/WALL ON JUDGES HOUSE OF REST HOUSE AT BALOCHISTAN HIGH COURT CIRCUIT BENCH.
16.3200.000
16.320 0.0000.000
0.000 0% 16.3200.000
0.000 16.320 100% 0.0000.000
268 Z2019.0644Kachhi
CPapproved
CONST: OF JUDICIAL COMPLEX & RESIDENTIAL ACCOMODATION AT BHAG.
50.7650.000
50.765 0.0000.000
0.000 0% 20.7650.000
0.000 20.765 40% 30.0000.000
267 Z2019.0643Jhal Magsi
CPapproved
CONST: OF JUDICIAL COMPLEX & RESIDENTIAL ACCOMODATION AT GANDAWA.
112.9690.000
112.969 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 26% 82.9690.000
266 Z2019.0642Washuk
CPapproved
CONST: OF COURT BUILDING & RESIDENTIAL ACCOMODATION AT BASIMA.
99.5100.000
99.510 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 30% 69.5100.000
265 Z2019.0640Kech
CPapproved
CONST OF 04 FLATS FOR SESSION DIVISION AT TURBAT.
104.2180.000
104.218 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 28% 74.2180.000
264 Z2019.0639Panjgur
CPapproved
EXTENTION OF 02 NO COURT ROOMS & CONST: OF RESIDENTIAL FLATS DISTRICT JUDICIARY PANJGUR.
62.7500.000
62.750 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 31% 42.7500.000
263 Z2019.0637Jaffarabad
CPapproved
CONST: OF BANGLOW GRADE 18-19 AND RESIDENCE FLATS COURT COMPLEX AT USTA MUHAMMAD.
69.7300.000
69.730 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 28% 49.7300.000
262 Z2019.0636Nushki
CPapproved
CONST: OF COURT & RESIDENCE FLATS BUILDINGS DISTRICT JUDICIARY SESSION DIVISION NUSHKI 04 NO FLATS.
28.5000.000
28.500 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 52% 13.5000.000
261 Z2019.0634Chagai
CPapproved
CONST: OF 3 RESIDENCE FLATS FOR DISTRICT JUDICIARY AT CHAGHAI.
31.9550.000
31.955 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 46% 16.9550.000
260 Z2019.0633Kachhi
CPapproved
EXTENSION OF JUDICIAL COMPLEX AT MACH.
28.1820.000
28.182 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 35% 18.1820.000
259 Z2019.0632Quetta
CPapproved
CONST: OF SERVANT QUARTERS IN BANGLOW NO. 55-A & 55 INSCOMB ROAD.
5.5020.000
5.502 0.0000.000
0.000 0% 5.5020.000
0.000 5.502 100% 0.0000.000
258 Z2019.0417Panjgur
CPapproved
CONSTRUCTION OF DISTRICT COMPLEX AT PANJGUR
238.8000.000
238.800 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 41% 138.8000.000
Subsector: Physical Planning & Housing
Sector: Physical Planning & Housing
Chapter: P.P.&H.
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 45: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/45.jpg)
Public Sector Development Programme (Sectorwise)
41 of 214
286 Z2019.2023Quetta
CPapproved
CONST: OF MEDIA ACADEMY BUILDING AT ADALAT ROAD QUETTA.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
285 Z2019.1923Provincial
CPapproved
ESTABLISHMENT OF RECLAMATION & PROBATION OFFICES AT TURBAT, KHUZDAR & LORALAI.
250.0000.000
250.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 20% 200.0000.000
284 Z2019.1896Quetta
CPapproved
RESID: FLATS FOR POOR, DEPRIVED, SHELTER LESS PEOPLE. ORPHAN: & DESER: GOVT; EMPLOYEE, ALAMDAR ROAD (SHUHADA VICTIMS).
350.0000.000
350.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 14% 300.0000.000
283 Z2019.1675Provincial
CPapproved
STRENG:OF M&E WING P&DD H/Q & DIV: OFFICES PROV: LOGISTIC & CONST:OF OFFICES & RES:FOR THE DIRECTOR DEVE:IN 7 DIVISION.
700.0000.000
700.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 14% 600.0000.000
282 Z2019.1597Nushki
CPapproved
CONST: OF B&R ANNEXE AT DISTRICT NUSHKI.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
281 Z2019.1582Kech
CPapproved
IMPROVEMENT & DEVLEOPMENT OF INFRASTRUCTUE OF BULEDA TOWN.
1000.0000.000
1000.000 0.0000.000
0.000 0% 250.0000.000
0.000 250.000 25% 750.0000.000
280 Z2019.1414Provincial
CPapproved
REHABILITATION OF PUBLIC INSTITUTIONS DAMAGED BY NATURAL DISASTERS.
1000.0000.000
1000.000 0.0000.000
0.000 0% 500.0000.000
0.000 500.000 50% 500.0000.000
279 Z2019.1390Provincial
CPapproved
FEASIBILITY STUDY FOR BALOCHISTAN HOUSE COLONY AND OFFICERS ISLAMABAD RESIDENCES IN BALOCHISTAN HOUSE.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
278 Z2019.1389Provincial
CPapproved
SPEAKER AND DEPUTY SPEAKER HOUSES.
75.0000.000
75.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 33% 50.0000.000
277 Z2019.1388Provincial
CPapproved
CONSULTANCY BUILDING HIGH RISE BUILDING ON LAND BALOCHISTAN HOUSE KARACHI ITS USAGE FOR COMMERCIAL RENTAL PURPOSE.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
276 Z2019.1257Kohlu
CPapproved
CONST: OF REST HOUSE SHAMSABAD FOR C&W DEPTT KHOLU
30.0000.000
30.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 33% 20.0000.000
275 Z2019.1255Kohlu
CPapproved
CONSTRUCTION OF OFFICERS CLUB DISTT KOHLU
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
274 Z2019.1254Kohlu
CPapproved
CONST: OF SHOHDA-E-MARWAR COMPLEX DISTT KOHLU
60.0000.000
60.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 33% 40.0000.000
273 Z2019.1098Shaheed
Sikandarabad
CPapproved
EXT. OF BUILDING & CONSTR. OF QUARTER (GRADE 11-14) CIVIL DISPENSARY KILLI TOBA GIDDER DIST. SHAHEED SIKANDERABAD
10.9000.000
10.900 0.0000.000
0.000 0% 10.9000.000
0.000 10.900 100% 0.0000.000
0.000 0.000 0.000 0.000
Physical Planning & Housing(29 New Projects) GoB/FPA Sub-Total
4466.901 4466.901 0.000 0.000 1470.287 0.000 1470.287 2996.614
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Physical Planning & Housing
Chapter: P.P.&H.
Sector: Physical Planning & Housing
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
2019 - 20 Original
![Page 46: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/46.jpg)
Public Sector Development Programme (Sectorwise)
42 of 214
Physical Planning & Housing(79 Projects) Total
21671.225
24171.225
9737.840 10454.840 3282.629 0.000 4099.629 8650.756
Sub-Sector Total (FPA) 2500.000 717.000 817.000 966.000
2019 - 20 Original
![Page 47: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/47.jpg)
Public Sector Development Programme (Sectorwise)
43 of 214
302 Z2017.1012ProvincialApproved
RAISING OF BALOCHISTAN CONSTABULARY.
500.0000.000
500.000 0.0000.000
0.000 0% 2.0000.000
0.000 2.000 0% 498.0000.000
301 Z2017.0124Quetta
Approved
CONST: OF WAREHOUSE / MAL KHANA / MUHAFIZ KHANA / RECORD ROOM AT KUCHLAK FOR SADDAR & CITY DIV: QUETTA.
50.0000.000
50.000 25.0000.000
25.000 50% 15.0000.000
0.000 15.000 80% 10.0000.000
300 Z2017.0118Quetta
Approved
CONSTRUCTION OF POLICE STATION KILLI UMER NEAR CHILTAN HOUSING SCHEME QUETTA.
80.0000.000
80.000 50.0000.000
50.000 62% 15.0000.000
0.000 15.000 81% 15.0000.000
299 Z2017.0117Quetta
Approved
CONSTRUCTION OF POLICE STATION NEW KUCHLAK QUETTA.
50.0000.000
50.000 30.0000.000
30.000 60% 15.0000.000
0.000 15.000 90% 5.0000.000
298 Z2017.0116Quetta
Approved
CONSTRUCTION OF POLICE STATION JINNAH TOWN QUETTA.
50.0000.000
50.000 30.0000.000
30.000 60% 15.0000.000
0.000 15.000 90% 5.0000.000
297 Z2017.0115Quetta
Approved
CONSTRUCTION OF POLICE STATION AT WAHDAT COLONY RAILWAY LAND JOINT ROAD QUETTA.
70.0000.000
70.000 28.0000.000
28.000 40% 15.0000.000
0.000 15.000 61% 27.0000.000
296 Z2017.0114Quetta
Approved
CONSTRUCTION OF POLICE STATION BAKRA MANDI EASTERN BYPASS INDUSTRIAL ZONE SARIAB ROAD QUETTA.
70.0000.000
70.000 30.0000.000
30.000 42% 5.0000.000
0.000 5.000 50% 35.0000.000
295 Z2017.0113Quetta
Approved
CONSTRUCTION OF WOMEN POLICE STATION AT CIVIL LINE NEAR WHYTE ROAD QUETTA.
50.0000.000
50.000 40.0000.000
40.000 80% 10.0000.000
0.000 10.000 100% 0.0000.000
294 Z2017.0112Quetta
Approved
CONSTRUCTION OF POLICE STATION CIVIL LINE NEAR WHYTE ROAD QUETTA.
136.9700.000
136.970 80.0000.000
80.000 58% 20.0000.000
0.000 20.000 73% 36.9700.000
293 Z2015.1148Qilla
AbdullahApproved
CONST: OF BUILDINGS OF LEVIES THANA/CHOWKIES IN VARIOUS DIST. KILLA ABDULLAH, (BDA).
56.1000.000
56.100 51.0000.000
51.000 90% 5.1000.000
0.000 5.100 100% 0.0000.000
292 Z2015.0820Harnai
Approved
POLICE LINE HARNAI, DPO OFFICE/ RESIDENCE.
96.0000.000
96.000 56.0330.000
56.033 58% 15.0000.000
0.000 15.000 73% 24.9670.000
291 Z2014.0964ProvincialApproved
REHABILITAION OF PATWAR KHANAS & REVENUE OFFICES IN BALOCHISTAN.
300.0000.000
300.000 257.8000.000
257.800 85% 42.2000.000
0.000 42.200 100% 0.0000.000
290 Z2014.0956Kech
Approved
CONST: OF POLICE STATION AT MAND/ TUMP/ BULEDA & TURBAT.
40.0000.000
40.000 21.6000.000
21.600 54% 4.0000.000
0.000 4.000 64% 14.4000.000
289 Z2014.0940Loralai
Approved
CONST: OF BARRACKS/OFFICE B/WALL & QUARTER GUARD AT POLICE LINE LORALAI.
40.0000.000
40.000 35.0000.000
35.000 87% 5.0000.000
0.000 5.000 100% 0.0000.000
288 Z2014.0889Quetta
Approved
CONST: OF B/WALL & WATCH TOWER IN POLICE LINE QUETTA
20.0000.000
20.000 15.0000.000
15.000 75% 5.0000.000
0.000 5.000 100% 0.0000.000
287 Z2014.0068ProvincialApproved
CONVERS:OF 'B' AREA INTO 'A' AREA PROJECT (APP: REMAIN: WORKS+CONST: OF NEW STATION AT ANJERA ZEHRI CROSS) (DEVOLVED).
320.4800.000
320.480 83.0000.000
83.000 25% 10.0000.000
0.000 10.000 29% 227.4800.000
Subsector: L.E.A.S/G.A Buildings
Sector: Physical Planning & Housing
Chapter: P.P.&H.
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 48: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/48.jpg)
Public Sector Development Programme (Sectorwise)
44 of 214
307 Z2018.2944Quetta
Approved
ACQUISITION OF LAND OF 05 POLICE STATIONS AND 11 POLICE POSTS.
649.3480.000
649.348 100.0000.000
100.000 15% 50.0000.000
0.000 50.000 23% 499.3480.000
306 Z2018.2936Quetta
Approved
CONST: OF 10 POLICE POSTS FOR PHASE-II.
114.4300.000
114.430 40.0000.000
40.000 34% 14.4300.000
0.000 14.430 47% 60.0000.000
305 Z2017.1605Kharan
Approved
INFRASTRUCTURE AND RESIDENCES FOR TEHSILDAR AND LEVIES SAR KHARAN.
80.0000.000
80.000 30.0000.000
30.000 37% 15.0000.000
0.000 15.000 56% 35.0000.000
304 Z2017.1598Kalat
Approved
LEVIES LINE AT DIST: KALAT. 50.0000.000
50.000 12.5000.000
12.500 25% 10.0000.000
0.000 10.000 45% 27.5000.000
303 Z2017.1597Shirani
Approved
LEVIES LINE AT DIST: SHERANI. 50.0000.000
50.000 12.5000.000
12.500 25% 10.0000.000
0.000 10.000 45% 27.5000.000
0.000 0.000 0.000 0.000
L.E.A.S/G.A Buildings(21 Ongoing Projects) GoB/FPA Sub-Total
2873.328 2873.328 1027.433 1027.433 297.730 0.000 297.730 1548.165
Subsector: L.E.A.S/G.A Buildings
Sector: Physical Planning & Housing
Chapter: P.P.&H.
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 49: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/49.jpg)
Public Sector Development Programme (Sectorwise)
45 of 214
318 Z2019.1087Kalat
CPapproved
COMPLETION OF REMAINING WORK OF 04 LEVIES THANNA IN KHALIQ ABAD, DISTRICT, KALAT
7.6440.000
7.644 0.0000.000
0.000 0% 7.6440.000
0.000 7.644 100% 0.0000.000
317 Z2019.1008Harnai
CPapproved
CONST: OF LEVIS THANA AT 22 MIL AND SHINA SHELA , DISTRICT HARNAI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
316 Z2019.0947Shaheed
Sikandarabad
CPapproved
CONST: OF SP COMPLEX ADMN: OFFICERS (POLICE LINE)RESI: ACCOMO: IN DISTRICT SHAHEED SIKANDERABAD
252.7500.000
252.750 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 19% 202.7500.000
315 Z2019.0944Quetta
CPapproved
CONST: OF B/WALL, BARBED WIRE, CCTV CAMERAS, WALK THROUGH GATE FOR SECURITY OF CHURCHES IN QUETTA
150.0000.000
150.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 66% 50.0000.000
314 Z2019.0943Quetta
CPapproved
CONST: OF RESI: FLATS 17-18, 15-16 & 5-14 AT OLD LAND OF PS CRIME BRANCH QUETTA CANTT
180.0000.000
180.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 27% 130.0000.000
313 Z2019.0942Quetta
CPapproved
CONSTRUCTION OF ATF HQRS; QUETTA
436.0800.000
436.080 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 22% 336.0800.000
312 Z2019.0941Quetta
CPapproved
CONST: OF RCC WALL(BOMB PROOF)PARKING, W/TOWER, SECURITY EQUIPMENTS ETC AT CPO COMPLEX
128.8120.000
128.812 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 77% 28.8120.000
311 Z2019.0127Loralai
CPapproved
COMPLETION OF DISTRICT JAIL AT LORALAI.
250.0000.000
250.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 20% 200.0000.000
310 Z2019.0124Provincial
CPapproved
UP GRADATION OF EXISTING LEVIES LINES/ POSTS.
400.0000.000
400.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 25% 300.0000.000
309 Z2019.0123Provincial
CPapproved
COMPLETION OF INCOMPLETE THANA UNDER CBA PROJECT
600.0000.000
600.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 16% 500.0000.000
308 Z2019.0007Provincial
CPapproved
ENFORCEMENT OF RULE OF LAW IN BALOCHISTAN.
500.0002000.000
2500.000 0.0000.000
0.000 0% 500.000200.000
0.000 700.000 28% 0.0001800.000
2000.000 0.000 200.000 1800.000
L.E.A.S/G.A Buildings(11 New Projects) GoB/FPA Sub-Total
2915.286 4915.286 0.000 0.000 1167.644 0.000 1367.644 1747.642
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Chapter: P.P.&H.
Sector: Physical Planning & Housing
Subsector: L.E.A.S/G.A Buildings
L.E.A.S/G.A Buildings(32 Projects) Total
5788.614 7788.614 1027.433 1027.433 1465.374 0.000 1665.374 3295.807
Sub-Sector Total (FPA) 2000.000 0.000 200.000 1800.000
Sector Total (FPA) 4500.000 717.000 1017.000 2766.000
Sector: P.P.&H.(111 Projects)
27459.839
31959.839
10765.273
11482.273 4748.003 0.000 5765.003 11946.563
2019 - 20 Original
![Page 50: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/50.jpg)
Public Sector Development Programme (Sectorwise)
46 of 214
334 Z2009.0332Bela
Approved
CONSTRUCTION OF B/T ROADS IN UNION COUNCILS OF TEHSIL LAKHRA 67.8 KM.
305.3250.000
305.325 294.9090.000
294.909 96% 10.4160.000
0.000 10.416 100% 0.0000.000
333 Z2009.0331Bela
Approved
CONSTRUCTION OF B/T ROADS IN UNION COUNCILS OF TEHSIL UTHAL 125.32 KM.
458.9120.000
458.912 448.6800.000
448.680 97% 10.2320.000
0.000 10.232 100% 0.0000.000
332 Z2009.0318Gwadar
Approved
CONSTT. OF B/T ROAD TAK VILLAGE TO COASTAL HIGHWAY 11.30 KM (OMANI GRANT)
0.100151.586
151.686 0.000133.360
133.360 87% 0.10016.800
0.000 16.900 99% 0.0001.426
331 Z2009.0317Gwadar
Approved
CONSTT. OF B/T TO RAOD CHIP RIKANI 15 KM (OMANI GRANT)
0.100167.081
167.181 0.000157.520
157.520 94% 0.1009.561
0.000 9.661 100% 0.0000.000
330 Z2009.0079MastungApproved
CONST:/B/T OF KILLI NAWAB RAISANI, SYEDAN, FAIZABAD TO AGHBARG AREA ROADS 180 KM DIST. MASTUNG.
763.1590.000
763.159 624.8780.000
624.878 81% 70.0000.000
0.000 70.000 91% 68.2810.000
329 Z2008.0021Quetta
Approved
CONST:/EXTENSION OF (DUEL CARRIAGE WAY) BLACK TOPPED ROAD OLD MASTUNG ROAD FROM CGS LINK TO MIAN GHUNDI QUETTA 3.6 KM.
328.5040.000
328.504 311.5040.000
311.504 94% 17.0000.000
0.000 17.000 100% 0.0000.000
328 Z2005.0419Kech
Approved
CONST:/IMPROVEMENT OF TURBAT BULEDA ROAD (NEW ALIGNMENT) 19.120 KM
1487.3690.000
1487.369 1049.0650.000
1049.065 70% 250.0000.000
0.000 250.000 87% 188.3040.000
327 Z2005.0308Musa KhailApproved
CONST OF 0.00 TO 22.00 KM BLACK TOPPED ROAD FROM CHAPPER MARGHANI TO TAP KUDEZAI DIST: MUSA KHAIL.
174.7160.000
174.716 138.9500.000
138.950 79% 10.0000.000
0.000 10.000 85% 25.7660.000
326 Z2004.0939Bela
Approved
CONSTRUCTION OF B/T ROADS UNION COUNCILS OF TEHSIL BELA 87.9 KM.
392.6390.000
392.639 378.8480.000
378.848 96% 13.7910.000
0.000 13.791 100% 0.0000.000
325 Z2004.0764Qilla
SaifullahApproved
CONST: OF ALI KHAIL ALO ZAI AKHTAR ZAI AREA ROADS 88 KM.
470.4450.000
470.445 460.4450.000
460.445 97% 10.0000.000
0.000 10.000 100% 0.0000.000
324 Z2004.0763Qilla
SaifullahApproved
CONST: OF GAWAL ISMAIL ZAI HAIDER ZAI GHOUNERI ETC ROADS 104 KM.
555.3850.000
555.385 410.7750.000
410.775 73% 40.0000.000
0.000 40.000 81% 104.6100.000
323 Z2004.0729Pishin
Approved
CONST OF B/T ROAD KUTH MUHAMMAD SHAH, SABORA, INJAINI, KILLA HAJI KHAN ROAD 46 KM.
362.9180.000
362.918 328.2580.000
328.258 90% 34.6600.000
0.000 34.660 100% 0.0000.000
322 Z2004.0578Zhob
Approved
CONST OF B/T ROAD FROM MAKHRANAI TO SADDOZAI BABR AND GHARDABABAR ZHOB 51 KM.
449.0600.000
449.060 375.5450.000
375.545 83% 20.0000.000
0.000 20.000 88% 53.5150.000
321 Z2004.0459NasirabadApproved
CONTRUCTION OF 20 KM ROAD R.D.60 MAGSI SHAIKH VIA ABDUL GHAFOOR LEHRI TO GHULAM RASOOL LEHRI.
151.1760.000
151.176 143.4100.000
143.410 94% 7.7660.000
0.000 7.766 100% 0.0000.000
320 Z2003.0080Zhob
Approved
CONST:/BLACK TOPPING OF ROAD ZHOB-QAMAR DIN KAREZ FROM 0 TO 66.775 KM, I/C 16 KM LINK ROAD.
442.5240.000
442.524 424.9970.000
424.997 96% 0.1000.000
0.000 0.100 96% 17.4270.000
319 Z2003.0079Zhob
Approved
CONST:/BLACK TOPPING OF ZHOB MURGHA KIBZAI ROAD 94.5 KM.
516.0840.000
516.084 414.2450.000
414.245 80% 50.0000.000
0.000 50.000 89% 51.8390.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 51: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/51.jpg)
Public Sector Development Programme (Sectorwise)
47 of 214
349 Z2013.0140Kech
Approved
CONST: OF B/T ROAD GOKDAN TURBAT BAZAR, KECH.
369.2210.000
369.221 268.5340.000
268.534 72% 20.0000.000
0.000 20.000 78% 80.6870.000
348 Z2013.0052Harnai
Approved
CONSTRUCTION OF 20 KM BLACK TOP ROAD FROM PMDC COAL MINES SHAHRAG TO NAKAS VIA HAZAR DUM ROAD, HARNAI.
206.8270.000
206.827 141.5780.000
141.578 68% 40.0000.000
0.000 40.000 87% 25.2490.000
347 Z2012.0873Zhob
Approved
CONST: OF 10.00 KM B/T ROAD FROM LOWARGA TO QUETTA ZHOB ROAD (REMAINING PROTION) AT DIST. ZHOB.
89.6710.000
89.671 79.6710.000
79.671 88% 10.0000.000
0.000 10.000 100% 0.0000.000
346 Z2012.0802Quetta
Approved
CONT: OF KUCHLAK BYPASS, QUETTA 5 KM.
994.3530.000
994.353 952.5000.000
952.500 95% 41.8530.000
0.000 41.853 100% 0.0000.000
345 Z2012.0782Panjgur
Approved
CONST: OF BRIDGE ON RAKSHAN KAUR TASP TO ESSEI 625 Rft DISTRICT PANJGUR.
70.0000.000
70.000 50.0000.000
50.000 71% 20.0000.000
0.000 20.000 100% 0.0000.000
344 Z2012.0475Harnai
Approved
B/T ROAD ZARDALO BRIDGE VIA KAMAL KACH KHOST HARNAI.
57.7030.000
57.703 40.3400.000
40.340 69% 17.3630.000
0.000 17.363 100% 0.0000.000
343 Z2011.0864MastungApproved
CONST:/WIDENING OF 58 KM VARIOUS ROADS IN PANJPAI AREA.
491.8930.000
491.893 324.5870.000
324.587 65% 50.0000.000
0.000 50.000 76% 117.3060.000
342 Z2011.0659Khuzdar
Approved
CONST: /BLACK TOPPING OF NALL HARAMBO ROAD DIST. KHUZDAR 30.875 KM.
603.8080.000
603.808 596.7380.000
596.738 98% 7.0700.000
0.000 7.070 100% 0.0000.000
341 Z2011.0644Panjgur
Approved
CONSTRUCTION OF BLACK TOPPING OF 35.34 KM ROADS AND PROTECTIN WALLS IN VARIOUS UNION COUNCILS OF DISTRICT PANJGUR.
120.0000.000
120.000 110.0000.000
110.000 91% 10.0000.000
0.000 10.000 100% 0.0000.000
340 Z2011.0480Qilla
SaifullahApproved
CONTS: OF B/T ROAD BANDAT PATOZAI BANDAT PAISANZAI 75.9 KM.
405.9270.000
405.927 264.5030.000
264.503 65% 30.0000.000
0.000 30.000 72% 111.4240.000
339 Z2010.0967Washuk
Approved
CONST: OF B/T ROAD FROM WASHUK TO PLANTAK 0 TO 70 KM DIST. WASHUK.
784.8040.000
784.804 702.6800.000
702.680 89% 30.0000.000
0.000 30.000 93% 52.1240.000
338 Z2010.0964MastungApproved
CONST: OF B/T ROAD FROM N-40 KHALQ SARPARAH TO MANGI VIA KIRDGAP & KADKOOCHA 40 KM DIST. MASTUNG
192.0000.000
192.000 167.0000.000
167.000 86% 10.0000.000
0.000 10.000 92% 15.0000.000
337 Z2010.0905Duki
Approved
CUT:/BLASTING OF RD FROM NANA SAHIB ZIARAT RD DUKI TO SHABOZAI N-70 D.G.KHAN ROAD VIA SALEZAI PONGA,LORALAI (PHASE-II).
667.5680.000
667.568 623.6560.000
623.656 93% 15.0000.000
0.000 15.000 95% 28.9120.000
336 Z2010.0341Zhob
Approved
CONSTRUCTION OF ZHOB-QAMAR DIN ROAD (REMAINING PORTION) 48.5 TO 76.5 KM.
350.3640.000
350.364 325.3640.000
325.364 92% 10.0000.000
0.000 10.000 95% 15.0000.000
335 Z2009.0374Kech
Approved
REHABILITATION /CONSTRUCTION OF BLACK TOPPING OF ZUBAIDA JALAL ROAD 111 KM (VARIOUS POSITION) DISTRICT KECH.
637.1500.000
637.150 385.6950.000
385.695 60% 60.0000.000
0.000 60.000 69% 191.4550.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 52: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/52.jpg)
Public Sector Development Programme (Sectorwise)
48 of 214
365 Z2015.0735Barkhan
Approved
REHABILITATION OF RAKHNI BARKHAN ROAD (RAKHNI TO KODI) & RAKHNI TO BIBARTAK BARKHAN.
170.0000.000
170.000 120.0000.000
120.000 70% 20.0000.000
0.000 20.000 82% 30.0000.000
364 Z2015.0727Quetta
Approved
WIDENING OF SUMUNGLI ROAD FROM ZARGHOON ROAD TO MERCK CHOWK VIA KOYLA PHATAK.
2027.9910.000
2027.991 1595.8000.000
1595.800 78% 150.0000.000
0.000 150.000 86% 282.1910.000
363 Z2015.0276Washuk
Approved
CONST: OF B/T ROAD IN NEW JANGIAN WASHUK.
22.5000.000
22.500 17.7100.000
17.710 78% 4.7900.000
0.000 4.790 100% 0.0000.000
362 Z2014.1127Gwadar
Approved
COSNT: OF 19.5 KM B/T ROAD GUNZ SHORE TO PISHUKAN GWADAR.
164.7800.000
164.780 144.7800.000
144.780 87% 20.0000.000
0.000 20.000 100% 0.0000.000
361 Z2014.1110Duki
Approved
CONST: OF VARIOUS ROADS, STREETS & SEWERAGE SYSTEM IN VARIOUS UC OF DUKI.
414.4800.000
414.480 242.8950.000
242.895 58% 50.0000.000
0.000 50.000 70% 121.5850.000
360 Z2014.0803JaffarabadApproved
CONST: OF INTERNAL ROADS & SEWERAGE SYSTEM DERA ALLAH YAR (JHAT PHAT) DIST. JAFFARABAD.
49.7420.000
49.742 44.8420.000
44.842 90% 4.9000.000
0.000 4.900 100% 0.0000.000
359 Z2014.0694Ziarat
Approved
CONST: OF B/T ROAD CULVERTS AT AHMADOON AGHBARG BALA CHUNGI AND SANJAWI BYPASS ROAD, DIST. ZIARAT.
78.6570.000
78.657 52.7240.000
52.724 67% 20.0000.000
0.000 20.000 92% 5.9330.000
358 Z2014.0454NasirabadApproved
CONST: OF B/T ROADS/PCC STREETS AT MIR HUSSAIN ETC. D.M.JAMALI.(17KM)
111.9300.000
111.930 97.0000.000
97.000 86% 14.9300.000
0.000 14.930 100% 0.0000.000
357 Z2014.0251Qilla
AbdullahApproved
IMPROVEMENT / WIDENING OF ROAD FROM NHA TO ZARA BAND TO TABINA CROSS DIST: QILLA ABDULLAH.
337.4600.000
337.460 217.4600.000
217.460 64% 30.0000.000
0.000 30.000 73% 90.0000.000
356 Z2014.0250Qilla
AbdullahApproved
CONST: OF B/T ROAD FROM JILGA TO ZEMUL TEHSIL DOBANDI ( 30KM)
350.0000.000
350.000 64.6040.000
64.604 18% 70.0000.000
0.000 70.000 38% 215.3960.000
355 Z2014.0087Quetta
Approved
DUAL CARRIAGE WAY EASTERN BY-PASS QUETTA.
686.9820.000
686.982 335.7800.000
335.780 48% 50.0000.000
0.000 50.000 56% 301.2020.000
354 Z2014.0048Duki
Approved
CONST: OF BYPASS FORM DUKI MINES AREA TO LORALAI.
156.2100.000
156.210 96.5430.000
96.543 61% 5.0000.000
0.000 5.000 65% 54.6670.000
353 Z2014.0039ProvincialApproved
REHABILITATION OF ROAD FROM SANJAVI TO LORALAI.
100.0000.000
100.000 80.0000.000
80.000 80% 20.0000.000
0.000 20.000 100% 0.0000.000
352 Z2014.0038Ziarat
Approved
REHABILITATION/ RE-CARPETING OF ZIARAT TOWN ROAD.
99.9400.000
99.940 79.9400.000
79.940 79% 20.0000.000
0.000 20.000 100% 0.0000.000
351 Z2013.0350ProvincialApproved
CONST:/UP-GRADATION OF DURGAI-SHABOZAI (N-70) TO TUNSA SHARIF ROAD (N-55) (GOP SHARE 60% & GOB SHARE 40%).
1918.3600.000
1918.360 1248.7600.000
1248.760 65% 500.0000.000
0.000 500.000 91% 169.6000.000
350 Z2013.0349ProvincialApproved
CONST: OF B/T ROAD MASTUNG, BOLAN & QUETTA (GOP SHARE 2 BILLION).
1864.0000.000
1864.000 1437.3600.000
1437.360 77% 200.0000.000
0.000 200.000 87% 226.6400.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 53: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/53.jpg)
Public Sector Development Programme (Sectorwise)
49 of 214
381 Z2015.1391ProvincialApproved
CONST: OF BRIDGE AT JAN BERI ON PAT FEEDER CANAL.
47.5000.000
47.500 7.5000.000
7.500 15% 20.0000.000
0.000 20.000 57% 20.0000.000
380 Z2015.1390Khuzdar
Approved
CONST:/WIDENING OF ROAD FORM N-25 TO ZAHARI DISTRICT KHUZDAR.
611.5220.000
611.522 591.5200.000
591.520 96% 20.0020.000
0.000 20.002 100% 0.0000.000
379 Z2015.1299Bela
Approved
CONST:/REALIGNMENT OF ROAD LEADING TO BYCO OIL REFINERY INCLUDING BRIDGE.
230.0000.000
230.000 62.9280.000
62.928 27% 70.0000.000
0.000 70.000 57% 97.0720.000
378 Z2015.1280Panjgur
Approved
CONST: OF B/T ROAD MD EARTH WORK FROM MAIN HIGHWAY PANJGUR TO PAROOM.
300.0000.000
300.000 281.6200.000
281.620 93% 5.0000.000
0.000 5.000 95% 13.3800.000
377 Z2015.1279Washuk
Approved
COSNT: OF B/T ROAD FROM JHALWAR TO SIACHANG DIST: WASHUK.
300.0000.000
300.000 140.0000.000
140.000 46% 20.0000.000
0.000 20.000 53% 140.0000.000
376 Z2015.1277Kalat
Approved
CONST: OF B/T ROAD KHALIQABAD TOWN.
229.8570.000
229.857 115.0000.000
115.000 50% 20.0000.000
0.000 20.000 58% 94.8570.000
375 Z2015.1275Zhob
Approved
COSNT: OF B/T RAOD KHARWANDI TO SHINGHAR VIA OMZA.
196.7280.000
196.728 182.3990.000
182.399 92% 14.3290.000
0.000 14.329 100% 0.0000.000
374 Z2015.1274Harnai
Approved
COSNT: OF BRIDGE HARNAI SPIN TANGI ROAD.
148.5450.000
148.545 140.8000.000
140.800 94% 7.7450.000
0.000 7.745 100% 0.0000.000
373 Z2015.1245Quetta
Approved
CONST: OF B/T ROAD AGHBARG TO PANJPAI DIST: QUETTA.
20.0000.000
20.000 18.0000.000
18.000 90% 2.0000.000
0.000 2.000 100% 0.0000.000
372 Z2015.1032Harnai
Approved
CONST: OF HARNAI SANJAVI ROAD, HARNAI.
161.9420.000
161.942 100.0000.000
100.000 61% 21.9420.000
0.000 21.942 75% 40.0000.000
371 Z2015.0763Awaran
Approved
CONSTRUCTION OF B/T ROAD AWARAN TO TEER TAJ.
80.0000.000
80.000 70.0000.000
70.000 87% 10.0000.000
0.000 10.000 100% 0.0000.000
370 Z2015.0762Harnai
Approved
CONSTRUCTION OF BRIDGE AT OMBO NADI & LAGHAR NADI DISTRICT HARNAI.
179.5120.000
179.512 166.8500.000
166.850 92% 12.6620.000
0.000 12.662 100% 0.0000.000
369 Z2015.0758Zhob
Approved
CONSTRUCTION / REHABILITATION OF ROAD QAMARDIN KAREZ ZHOB.
100.0000.000
100.000 90.0000.000
90.000 90% 10.0000.000
0.000 10.000 100% 0.0000.000
368 Z2015.0754JaffarabadApproved
CONST: OF B/T ROAD USTA MOHD HEAD BAGH TO GANDAKHA ROAD TO GOTH MEHR BAKSH LEHRI TO GOTH HAJI HAZAR KHAN LEHRI.
109.1540.000
109.154 99.1540.000
99.154 90% 10.0000.000
0.000 10.000 100% 0.0000.000
367 Z2015.0743Dera BugtiApproved
CONSTRUCTION OF B/T ROAD I/C STRUCTURE WORK FROM RD-238 TO GOPAT BRIDGE DERA BUGTI (10 KM).
98.0580.000
98.058 88.0580.000
88.058 89% 10.0000.000
0.000 10.000 100% 0.0000.000
366 Z2015.0740Harnai
Approved
CONSTRUCTION OF B/T ROAD HARNAI ROAD, CHAPPER RIFT TO ZARGHOON GAR HARNAI.
160.0000.000
160.000 110.0000.000
110.000 68% 15.0000.000
0.000 15.000 78% 35.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 54: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/54.jpg)
Public Sector Development Programme (Sectorwise)
50 of 214
396 Z2016.1119Qilla
AbdullahApproved
CONST: OF B/T ROAD FROM SARBAISH ROAD FRAKHIE VIA GARANGIE VIA TORKHAN VIA AGHBARG VIA MULAZAI ETC.
461.9650.000
461.965 90.2000.000
90.200 19% 60.0000.000
0.000 60.000 32% 311.7650.000
395 Z2016.1110Quetta
Approved
CONST:OF ROADS FROM MAHMOOD ABAD BRIDGE TO TAKHTANI BYEPASS ROAD QUETTA.
55.5000.000
55.500 47.5000.000
47.500 85% 8.0000.000
0.000 8.000 100% 0.0000.000
394 Z2016.1103Pishin
Approved
COSNT: TO YAROO TO PISHIN ROAD VIA AKALZAI,LARAMAN, KILLI BATAZAI CROSS.
444.8210.000
444.821 255.2400.000
255.240 57% 30.0000.000
0.000 30.000 64% 159.5810.000
393 Z2016.1101Pishin
Approved
CONST: OF SHANGHARY,KAKAZAI & KARBALA ROAD DIST: PISHIN.
170.0000.000
170.000 140.0000.000
140.000 82% 15.0000.000
0.000 15.000 91% 15.0000.000
392 Z2016.1098NasirabadApproved
CONST: OF B/T ROAD AT DIST: NASEERABAD PB-29.
300.0000.000
300.000 169.8080.000
169.808 56% 40.0000.000
0.000 40.000 69% 90.1920.000
391 Z2016.1044Qilla
AbdullahApproved
CONST: OF B.T ROAD LANDI KAREZ (CHAMAN MASTER PLAN SITE) TO MAIN NHA CHAMAN DIST: KILLA ABDULLAH (LENGTH 3 KM).
84.0000.000
84.000 76.0000.000
76.000 90% 8.0000.000
0.000 8.000 100% 0.0000.000
390 Z2016.0990Harnai
Approved
CONST: OF B/T ROAD IN SHAHRAGH DISTIRCT HARNAI.
30.0000.000
30.000 26.0000.000
26.000 86% 4.0000.000
0.000 4.000 100% 0.0000.000
389 Z2016.0815Dera BugtiApproved
CONST:OF B/T ROAD FROM SUI DERA BUGTI ROAD TO GANDOI, DISTRICT DERA BUGTI (DBDP).
70.0000.000
70.000 59.2000.000
59.200 84% 10.8000.000
0.000 10.800 100% 0.0000.000
388 Z2016.0802Bela
Approved
CONST: OF HUB BYPASS ROAD DIST. LASELLA (LENGTH 9.60 KM).
643.0990.000
643.099 355.3000.000
355.300 55% 287.7990.000
0.000 287.799 100% 0.0000.000
387 Z2016.0745Zhob
Approved
CONST: OF ROAD CUTTING FILLING WIDENING ETC AT THE ABDULLAHZAI, KIBZAI, HURAMZAI, SHERANI, HARIFAL, BABAR ETC.
49.7640.000
49.764 25.8040.000
25.804 51% 13.9600.000
0.000 13.960 79% 10.0000.000
386 Z2016.0484Washuk
Approved
CUTTING IMPROVEMENT OF ROAD FROM LUNDO TO GRASHA ROAD, WASHUK (LENGTH 2.5 KM).
15.0000.000
15.000 7.0000.000
7.000 46% 8.0000.000
0.000 8.000 100% 0.0000.000
385 Z2016.0350Kachhi
Approved
CONST: OF B/T ROAD & CULVERTS IN VILLAGES OF TEHISIL BHAG DIST: KACHI
45.0000.000
45.000 40.0500.000
40.050 89% 4.9500.000
0.000 4.950 100% 0.0000.000
384 Z2016.0289Bela
Approved
B/T ROADS IN UTHAL,BELA,LAKHRA ETC IN LASBELA DISTRICT.
30.0000.000
30.000 26.4450.000
26.445 88% 3.5550.000
0.000 3.555 100% 0.0000.000
383 Z2016.0013Chagai
Approved
REH:/WID: OF BAB-E-CHAGAI LINK ROAD FROM BYPASS NA-40 TO DALBANDAIN CITY.
30.0000.000
30.000 23.5100.000
23.510 78% 6.4900.000
0.000 6.490 100% 0.0000.000
382 Z2015.1393Quetta
Approved
RE:CARP: OF SHAHRA GULISTAN, CONST: OF PUMP HOUSE, SUP: & INST: OF SOLAR ENERGY ST: LIGHTS AT VARIOUS ROAD OF QTA CANTT.
93.0680.000
93.068 53.0680.000
53.068 57% 15.0000.000
0.000 15.000 73% 25.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 55: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/55.jpg)
Public Sector Development Programme (Sectorwise)
51 of 214
412 Z2017.1251Khuzdar
Approved
CONST: OF B/T ROAD GWANI GRESHA NAL PB-34 KHUZDAR-II.
80.0000.000
80.000 50.0000.000
50.000 62% 15.0000.000
0.000 15.000 81% 15.0000.000
411 Z2017.1208Khuzdar
Approved
CONST: OF LINK ROAD FOR TEHSIL KARKH.
120.0000.000
120.000 114.2400.000
114.240 95% 5.7600.000
0.000 5.760 100% 0.0000.000
410 Z2017.1159Khuzdar
Approved
CONST: OF B/T ROAD FROM CHEEL GRESHA TO GWANI GRESHA TEHSIL NAAL.
100.0000.000
100.000 60.2000.000
60.200 60% 15.8000.000
0.000 15.800 76% 24.0000.000
409 Z2017.1127Harnai
Approved
CONST: OF B/T ROAD KALEI GHWAZA, KILLA GHURMI, HARNAI CITY, ETC.
100.0000.000
100.000 70.2000.000
70.200 70% 10.8000.000
0.000 10.800 81% 19.0000.000
408 Z2017.1006Kachhi
Approved
CONSTRUCTION OF SHORAN TO BHAG ROAD.
80.0000.000
80.000 60.0000.000
60.000 75% 20.0000.000
0.000 20.000 100% 0.0000.000
407 Z2017.0987Kech
Approved
CONSTRUCTION OF B/T ROAD FROM GWAK TO SORO MAND SORO TO BULLO, BULLO TO BULLOO, BULLO TO JATHJO.
29.9900.000
29.990 22.9900.000
22.990 76% 7.0000.000
0.000 7.000 100% 0.0000.000
406 Z2017.0986Quetta
Approved
CONST OF ROAD AT WESTREN BYPASS NEAR PAKISTAN FLOOR MILL
58.0000.000
58.000 28.0000.000
28.000 48% 5.0000.000
0.000 5.000 56% 25.0000.000
405 Z2017.0935Duki
Approved
CNSTRUCTION OF DUKI BYPASS PHASE-II.
100.0000.000
100.000 85.0000.000
85.000 85% 15.0000.000
0.000 15.000 100% 0.0000.000
404 Z2017.0933JaffarabadApproved
CONSTRUCTION OF SEWERAGE SYSTEM OF USTA MUHAMMAD TOWN.
100.0000.000
100.000 68.2000.000
68.200 68% 11.8000.000
0.000 11.800 80% 20.0000.000
403 Z2017.0735Kachhi
Approved
CONST: OF ROAD IN JALAL ABAD BHAG, MACH, SHORAN TO BHAG & PCC STREETS DHADAR & RINDALI.
48.0000.000
48.000 38.0000.000
38.000 79% 10.0000.000
0.000 10.000 100% 0.0000.000
402 Z2017.0493Kohlu
Approved
CONST: OF BLACK TOP ROADS IN DISTRICT KOHLU.
40.0000.000
40.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 50% 20.0000.000
401 Z2017.0379SohbatpurApproved
REH: / RECON: OF B/T ROAD HAIR DIN TO RIND ALI, SOHBAT PUR MAIN ROAD TO NOOR PUR, CHATTAN PATTI TO ABDUL HAMEED, ETC.
89.6000.000
89.600 72.3990.000
72.399 80% 17.2010.000
0.000 17.201 100% 0.0000.000
400 Z2016.1173Khuzdar
Approved
CONST: OF ROAD FROM MABAT FAQIR TO SHAH NORANAI 4 KM DIST: KHUZDAR.
69.9760.000
69.976 29.9760.000
29.976 42% 20.0000.000
0.000 20.000 71% 20.0000.000
399 Z2016.1172Quetta
Approved
CONST: OF 2X BRIDGES & PEDESTRIAN BRIDGE WITH B/W & PATHWAYS AT GRAMMER SCHOOL, QUETTA.
61.5400.000
61.540 39.5400.000
39.540 64% 10.0000.000
0.000 10.000 80% 12.0000.000
398 Z2016.1122Qilla
AbdullahApproved
COSNT: OF B/T ROAD FROM PANJPAI GAZABAND TO GULISTAN (60 KM).
624.8120.000
624.812 328.2400.000
328.240 52% 10.0000.000
0.000 10.000 54% 286.5720.000
397 Z2016.1120Qilla
AbdullahApproved
CONST: OF CUTTTING B/T ROAD FROM FARAKHIE VIA BUNYADI KUCH ADOOZAI VIA KHADAR VIA TAKARI VIA TO QADANI MALAZAI(35KM)
521.6500.000
521.650 350.2000.000
350.200 67% 25.0000.000
0.000 25.000 71% 146.4500.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 56: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/56.jpg)
Public Sector Development Programme (Sectorwise)
52 of 214
428 Z2017.1477Nushki
Approved
CONST/REIMPROVEMENT/RECARPETING OF JAMALDNI TO HAZAR JUFT BAAT.
100.0000.000
100.000 40.0000.000
40.000 40% 35.0000.000
0.000 35.000 75% 25.0000.000
427 Z2017.1475Chagai
Approved
CONST: OF ROAD FROM CHAGAI CITY TO POSTI.
199.0150.000
199.015 90.0000.000
90.000 45% 70.0000.000
0.000 70.000 80% 39.0150.000
426 Z2017.1474Chagai
Approved
COSNT: OF B/T ROAD N-40 AMEEN ABAD TO CHAGAI ROAD.
200.0000.000
200.000 120.0000.000
120.000 60% 80.0000.000
0.000 80.000 100% 0.0000.000
425 Z2017.1472MastungApproved
CONST: OF B/T ROAD FORM N-65 MADRASSA DASHT TO ASIM ABAD 12 KM.
100.0000.000
100.000 75.0000.000
75.000 75% 10.0000.000
0.000 10.000 85% 15.0000.000
424 Z2017.1436Gwadar
Approved
CONSTRUCTION OF ROAD FROM COASTAL HIGHWAY KALAG & SARDASHT (GWADAR)
59.2410.000
59.241 30.0000.000
30.000 50% 10.2410.000
0.000 10.241 67% 19.0000.000
423 Z2017.1434Kohlu
Approved
CONST: OF B/T TALENGO UPWARD TO KAHAN DIST. KOHLU.
100.0000.000
100.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 50.0000.000
422 Z2017.1433Kachhi
Approved
CONST: OF SANI SHORAN ROAD. 99.9520.000
99.952 60.0000.000
60.000 60% 39.9520.000
0.000 39.952 100% 0.0000.000
421 Z2017.1427Qilla
SaifullahApproved
CONT: OF B/T ROAD KILLI TORDAMAN SULTANZAI & VRIOUS KILLIES RAGHA SULTANZAI MUSLIM BAGH.
250.0000.000
250.000 80.0000.000
80.000 32% 0.1000.000
0.000 0.100 32% 169.9000.000
420 Z2017.1414Panjgur
Approved
REPAIR / MAINTENANCE WORK ON PANJGOOR-SORDO-SARIKORAN ROAD.
30.0000.000
30.000 15.0000.000
15.000 50% 15.0000.000
0.000 15.000 100% 0.0000.000
419 Z2017.1412Chagai
Approved
CONST: OF DALBANDAIN- GIRDI JUNGLE- CHAGHAI ZARRO ROAD.
194.5800.000
194.580 90.0000.000
90.000 46% 50.0000.000
0.000 50.000 71% 54.5800.000
418 Z2017.1407ProvincialApproved
REHAB OF RD - SUI TO JANI BERI (25 KM).
86.6780.000
86.678 60.0000.000
60.000 69% 26.6780.000
0.000 26.678 100% 0.0000.000
417 Z2017.1324Dera BugtiApproved
CONST: OF B/T ROAD AT TEHSIL DERA BUGTI, DISTRICT DERA BUGTI.
62.0000.000
62.000 58.4630.000
58.463 94% 3.5370.000
0.000 3.537 100% 0.0000.000
416 Z2017.1323Dera BugtiApproved
CONST: OF ROAD MATT KURD TO BHAL ROAD DERA BUGTI.
30.0000.000
30.000 25.1500.000
25.150 83% 4.8500.000
0.000 4.850 100% 0.0000.000
415 Z2017.1322Dera BugtiApproved
CONST: OF B/T ROAD AT TEHSIL SUI DIST: DERA BUGTI.
173.5000.000
173.500 142.2970.000
142.297 82% 16.0030.000
0.000 16.003 91% 15.2000.000
414 Z2017.1318Dera BugtiApproved
CONST: OF BLACK TOP ROAD AT TEHSIL PHELAWAGH, DIST: DERA BUGTI.
110.5000.000
110.500 89.6710.000
89.671 81% 20.8290.000
0.000 20.829 100% 0.0000.000
413 Z2017.1281Kalat
Approved
CONST: OF B/T RAOD AT ABDULLAH MANDOST KHALIQABAD.
40.4550.000
40.455 33.1900.000
33.190 82% 7.2650.000
0.000 7.265 100% 0.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 57: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/57.jpg)
Public Sector Development Programme (Sectorwise)
53 of 214
444 Z2018.4261Bela
Approved
IMP/REH: & WIDENING OF ROAD FROM HINGOL RIVER BRIDGE TO HINGLAJ MATHA MANDAR.
92.6800.000
92.680 10.0000.000
10.000 10% 82.6800.000
0.000 82.680 100% 0.0000.000
443 Z2018.2863Quetta
Approved
WIDENING OF EXISTING ROAD FROM PANI TAQSEEM CHOWK TO KACH MORH ROAD.
216.5080.000
216.508 140.0000.000
140.000 64% 76.5080.000
0.000 76.508 100% 0.0000.000
442 Z2018.2826ProvincialApproved
SANAN-AB-E-GUM CONNECTING ROAD BETWEEN SIBI AND DISTRICT KACHHI (50:50 SHARE).
1150.0000.000
1150.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 8% 1050.0000.000
441 Z2017.1665Awaran
Approved
CONST: OF ROAD FROM NAG-DURESKI - AWARAN.
250.0000.000
250.000 119.6920.000
119.692 47% 50.0000.000
0.000 50.000 67% 80.3080.000
440 Z2017.1657Kachhi
Approved
LINK ROAD MEHSAR TO MUD SHARBAT ROAD 2.50 KM.
17.6100.000
17.610 11.0000.000
11.000 62% 6.6100.000
0.000 6.610 100% 0.0000.000
439 Z2017.1640Harnai
Approved
CONST: OF ROAD FROM HARNAI TO SANGAN.
300.0000.000
300.000 120.0000.000
120.000 40% 60.0000.000
0.000 60.000 60% 120.0000.000
438 Z2017.1626Quetta
Approved
REHABI: OF ROAD & SEWARAGE LINE,SIDE DRAINS, TUFF TILES, STREET LIGHTS SHIFTING OF POLES MULLA KHAIL MUHALLAH.
36.6300.000
36.630 26.9300.000
26.930 73% 9.7000.000
0.000 9.700 100% 0.0000.000
437 Z2017.1611Pishin
Approved
CONST: OF B/T ROAD AT VARIOUS KILLI ROAD AROUND KHANOZAI & BALOOZAI AREA.
50.0000.000
50.000 40.0000.000
40.000 80% 10.0000.000
0.000 10.000 100% 0.0000.000
436 Z2017.1610Musa KhailApproved
CONST: OF B/T ROAD KILLI MALIK NAZEREE KHAN ZAM SHAMOOZAI MUSA KHAIL.
40.0000.000
40.000 36.5000.000
36.500 91% 3.5000.000
0.000 3.500 100% 0.0000.000
435 Z2017.1608Musa KhailApproved
CONST: OF PCC ROADS FROM DERVAZA TO LUNDAI DRUG TOWN MUSA KHAIL.
20.0000.000
20.000 12.8750.000
12.875 64% 7.1250.000
0.000 7.125 100% 0.0000.000
434 Z2017.1604Musa KhailApproved
CONST: OF B/T ROAD FROM TAP KHUDAIZAI, KILLI REMZAN TO KILLI MUHAMMAD ZAI MUSAKHAIL.
99.9540.000
99.954 60.0000.000
60.000 60% 39.9540.000
0.000 39.954 100% 0.0000.000
433 Z2017.1573Shirani
Approved
CONST: OF B/T ROAD FROM N-50 KILLI PERWEZAN TO MANGALZAI SHERANI (10 KM).
60.0000.000
60.000 58.0000.000
58.000 96% 2.0000.000
0.000 2.000 100% 0.0000.000
432 Z2017.1558Qilla
AbdullahApproved
CONST: OF B/T ROAD FROM SALAD THANA TO TOBA CHINAR (10 KM).
90.0000.000
90.000 20.0000.000
20.000 22% 50.0000.000
0.000 50.000 77% 20.0000.000
431 Z2017.1551Qilla
AbdullahApproved
CONST: OF B/T ROAD QILLA ABDULLAH KHAN DIST: QILLA ABDULLAH.
30.0000.000
30.000 10.1990.000
10.199 34% 19.8010.000
0.000 19.801 100% 0.0000.000
430 Z2017.1506Harnai
Approved
CONST: OF B/T ROAD FROM TUKKA CROSS TO TUKKA BABU HARANI (7.5 KM).
38.0000.000
38.000 20.0000.000
20.000 52% 18.0000.000
0.000 18.000 100% 0.0000.000
429 Z2017.1478Chagai
Approved
CONST: OF B/T ROAD CHAHATAN TO JUNDI KOHAMA.
522.9000.000
522.900 140.0000.000
140.000 26% 90.0000.000
0.000 90.000 43% 292.9000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 58: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/58.jpg)
Public Sector Development Programme (Sectorwise)
54 of 214
445 Z2018.4264Quetta
Approved
RECARPETING OF VARIOUS ROADS & STREETS AT QUETTA CANTT.
100.1560.000
100.156 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 49% 50.1560.000
318.667 290.880 26.361 1.426
Roads(127 Ongoing Projects) GoB/FPA Sub-Total
34121.699
34440.366
23623.659
23914.539 4212.999 0.000 4239.360 6285.041
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 59: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/59.jpg)
Public Sector Development Programme (Sectorwise)
55 of 214
461 Z2019.0291Bela
CPapproved
REH: OF HUB DUREJI ROAD DISTRICT BELA ( 23.55 KM).
49.9600.000
49.960 0.0000.000
0.000 0% 49.9600.000
0.000 49.960 100% 0.0000.000
460 Z2019.0289Bela
CPapproved
CONST: REH: OF B/T ROAD FROM N-25 TO PEER KUS DISTRICT (LENGTH 9.6 KM)
69.4700.000
69.470 0.0000.000
0.000 0% 69.4700.000
0.000 69.470 100% 0.0000.000
459 Z2019.0287Bela
CPapproved
CONST: /REH: OF B/T ROAD FROM N-25 TO UMAID ALI MOTAK DISTRICT BELA (LENGTH 3 KM).
11.4300.000
11.430 0.0000.000
0.000 0% 11.4300.000
0.000 11.430 100% 0.0000.000
458 Z2019.0272Dera Bugti
CPapproved
CONST: OF B/T ROAD I/C STR: WORK FROM PIRKOH CITY TO AIRPORT (1 KM) & CONST: OF B/TOP ROAD KILLI DR. MISKEEF (0.6 KM).
13.5000.000
13.500 0.0000.000
0.000 0% 13.5000.000
0.000 13.500 100% 0.0000.000
457 Z2019.0271Dera Bugti
CPapproved
CONST: OF B/T ROAD FROM PROHO WADH TO TRATO DISTRICT DERA BUGTI (4KM).
32.0000.000
32.000 0.0000.000
0.000 0% 32.0000.000
0.000 32.000 100% 0.0000.000
456 Z2019.0270Dera Bugti
CPapproved
REH:/WID:/IMPR:OF DERA BUGTI SUI ROAD.
60.0000.000
60.000 0.0000.000
0.000 0% 60.0000.000
0.000 60.000 100% 0.0000.000
455 Z2019.0227Washuk
CPapproved
CONSTRUCTION OF B/T ROAD TEHSIL MASHKIL BAZAR WASHUK 7 KM.
60.0000.000
60.000 0.0000.000
0.000 0% 60.0000.000
0.000 60.000 100% 0.0000.000
454 Z2019.0213Qilla
AbdullahCPapproved
CONSTRUCTION OF ROAD 1.5 KM KILLI MOLVI ATTAULLAH.
11.2500.000
11.250 0.0000.000
0.000 0% 11.2500.000
0.000 11.250 100% 0.0000.000
453 Z2019.0212Qilla
AbdullahCPapproved
CONSTRUCTION OF ROAD 02 KM FROM MAKHAL CHOWK TO MAKHAL ARAMBI.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
452 Z2019.0211Qilla
AbdullahCPapproved
CONSTRUCTION OF BOX CULVERT AT MAJAK BADIZAI, IMRANZAI HABIBZAI, KUTUB PIRALIZAI.
19.5000.000
19.500 0.0000.000
0.000 0% 19.5000.000
0.000 19.500 100% 0.0000.000
451 Z2019.0210Qilla
AbdullahCPapproved
CONSTRUCTION OF ROAD 2.5 KM KILLI JUNGLE PIRALIZAI.
18.7500.000
18.750 0.0000.000
0.000 0% 18.7500.000
0.000 18.750 100% 0.0000.000
450 Z2019.0079Chagai
CPapproved
CONST: OF B/T ROAD SAINDAK BYPASS AT TAFTAN, CHAGAI.
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
449 Z2019.0078Chagai
CPapproved
CONST: OF B/T ROAD KILLIES NAIK MUHAMMAD, HAJI A.REHMAN, HAJI ALI AKBAR, SAKHI PIR M, MUHAMMAD KARIM DAD CHAGAI CITY.
21.0000.000
21.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 47% 11.0000.000
448 Z2019.0077Chagai
CPapproved
B/T ROAD ALONG WITH SIDE DRAIN IN KILLIES QASIM KHAN, HASHIM K., R. BUX, SORGIL, FASIAL COL: ADJOINING AREAS DALBANDIN
80.0000.000
80.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 50% 40.0000.000
447 Z2019.0027Kohlu
CPapproved
CONST: OF B/T TALENGO UPWARD TO KAHAN DIST. KOHLU.
100.0000.000
100.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 30% 70.0000.000
446 Z2019.0026Kohlu
CPapproved
CONST: OF BLACK TOP ROADS IN DISTRICT KOHLU.
40.0000.000
40.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 50% 20.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 60: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/60.jpg)
Public Sector Development Programme (Sectorwise)
56 of 214
477 Z2019.0386Jaffarabad
CPapproved
CONST. OF 1.25 KM B/T ROAD FROM JAMALI PETROL PUMP TO ZAMAN BUGTI STREET.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
476 Z2019.0385Jaffarabad
CPapproved
CONST. OF 1.25 KM B/T ROAD FROM SIM SHAKH TO SUBHAN MAGSI STREET.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
475 Z2019.0345Kharan
CPapproved
KHARAN CITY ROADS/SEWERAGE.
200.0000.000
200.000 0.0000.000
0.000 0% 200.0000.000
0.000 200.000 100% 0.0000.000
474 Z2019.0344Quetta
CPapproved
REH: OF B/T ROAD OF KILLIBARIOW
17.0000.000
17.000 0.0000.000
0.000 0% 17.0000.000
0.000 17.000 100% 0.0000.000
473 Z2019.0343Quetta
CPapproved
REH: OF B/T ROAD OF BLOOM STAR STREET
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
472 Z2019.0341Quetta
CPapproved
REH: OF B/T ROAD OF KILLIMENGAL ABAD
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
471 Z2019.0340Quetta
CPapproved
REH: OF B/T ROAD OF KILLIKAMALO
18.0000.000
18.000 0.0000.000
0.000 0% 18.0000.000
0.000 18.000 100% 0.0000.000
470 Z2019.0339Quetta
CPapproved
CONST: OF B/T ROAD OF KILLIZARREN
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
469 Z2019.0338Quetta
CPapproved
CONST: OF B/T ROAD OF KILLIRASALDAR
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
468 Z2019.0333Quetta
CPapproved
BLACK TOPPING OF ROAD FROM MEEZAN CHOWK, ALAMDAR ROAD TO HAZARA GRAVEYARD.
25.0000.000
25.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 40% 15.0000.000
467 Z2019.0310Duki
CPapproved
CONST: OF B/T ROAD MAIN NIMAKI ROAD VIA SARDAR JUNGLE TO HAFIZ LUNI.
47.3500.000
47.350 0.0000.000
0.000 0% 47.3500.000
0.000 47.350 100% 0.0000.000
466 Z2019.0309Duki
CPapproved
CONSTRUCTION OF BRIDGE AT ANAMBAR RIVER WITH APPROACH TO TALAO.
110.0000.000
110.000 0.0000.000
0.000 0% 110.0000.000
0.000 110.000 100% 0.0000.000
465 Z2019.0297Bela
CPapproved
CONST: OF B/T ROAD NAYA ABAD TO UMAID ABAD TEHSIL DUREJI (12. KM).
132.4140.000
132.414 0.0000.000
0.000 0% 132.4140.000
0.000 132.414 100% 0.0000.000
464 Z2019.0295Bela
CPapproved
CONSTRUCTION OF BRIDGE ON NALA DAROO HOTEL HUB.
40.0000.000
40.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 100% 0.0000.000
463 Z2019.0294Bela
CPapproved
CONSTRUCTION OF B/T ROAD FROM MARRI CHOWK TO HITE.
25.0000.000
25.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 100% 0.0000.000
462 Z2019.0293Bela
CPapproved
CONST: OF B/T ROAD ARIPIR, TEHSIL DUREJI (4 KM).
40.0000.000
40.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 100% 0.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 61: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/61.jpg)
Public Sector Development Programme (Sectorwise)
57 of 214
493 Z2019.0412Panjgur
CPapproved
CONST: OF DUAL CARRIAGE WAY FROM AIRPORT TO GRAMKAN CROSS & ALLAH 0 AKBAR CHOWK WITH MEDIAN & FOOTPATH TRACK (7KM)
358.3970.000
358.397 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 27% 258.3970.000
492 Z2019.0403Pishin
CPapproved
CONST: OF B/T ROAD KILLI GHEIZH KHASRO TO TOR KANI TOBA KAKARI BARSHORE PISHIN.
25.0000.000
25.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 100% 0.0000.000
491 Z2019.0402Pishin
CPapproved
CONST: OF 01 KM B/T ROAD SIDE DRAINS & FOOTPATH BARSHORE BAZAR PISHIN.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
490 Z2019.0401Pishin
CPapproved
CONST: OF B/T ROAD KILLI NILLEE MALAKHAIL & POTI NASARAN TEHSIL BOSTAN PISHIN.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
489 Z2019.0400Pishin
CPapproved
CONST: OF B/T ROAD AND CUTTING "CHILTANAK TO MANDOZAI" TEHSIL BARSHORE PISHIN.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
488 Z2019.0397Jaffarabad
CPapproved
CONST. OF 4 KM B/T ROAD VILLAGE ALI MURAD JATTAK BARI SHAKH.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
487 Z2019.0396Jaffarabad
CPapproved
CONST. OF 2 KM B/T ROAD FROM ROJHAN JAMALI TO VILLAGE MIR MOHAMMAD ASIF JAMALI.
16.0000.000
16.000 0.0000.000
0.000 0% 16.0000.000
0.000 16.000 100% 0.0000.000
486 Z2019.0395Jaffarabad
CPapproved
CONST. OF 2 KM B/T ROAD BAGRA KHAN RIND GOTH SHER MOHAMMAD RIND.
16.0000.000
16.000 0.0000.000
0.000 0% 16.0000.000
0.000 16.000 100% 0.0000.000
485 Z2019.0394Jaffarabad
CPapproved
CONST. OF 2 KM B/T ROAD FROM IMDAD HUSSAIN VILLAGE MOHAMMAD SAFAR UMRANI CATTLE FARM.
16.0000.000
16.000 0.0000.000
0.000 0% 16.0000.000
0.000 16.000 100% 0.0000.000
484 Z2019.0393Jaffarabad
CPapproved
CONST. OF 2 KM B/T ROAD VILLAGE ALI HASSAN JAMALI BARI SHAKH.
16.0000.000
16.000 0.0000.000
0.000 0% 16.0000.000
0.000 16.000 100% 0.0000.000
483 Z2019.0392Jaffarabad
CPapproved
CONST. OF 5 KM B/T ROAD FROM QAIDI SHAKH TO GOTH RAWAT KHAN MENGAL.
40.0000.000
40.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 100% 0.0000.000
482 Z2019.0391Jaffarabad
CPapproved
CONST. OF 1.25 KM B/T ROAD FROM NOOR MOHAMMAD & BANGULZAI VILLAGE.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
481 Z2019.0390Jaffarabad
CPapproved
CONST. OF 2 KM B/T ROAD IN ROJHAN JAMALI.
16.0000.000
16.000 0.0000.000
0.000 0% 16.0000.000
0.000 16.000 100% 0.0000.000
480 Z2019.0389Nasirabad
CPapproved
CONST. OF 2.5KM B/T ROAD FROM USTA MOHAMMAD ROAD TO ROSHAN KHAN JAMALI.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
479 Z2019.0388Jaffarabad
CPapproved
CONST. OF B/T ROAD FROM ROJHAN JAMALI TO UMAR KOT WITH SIM SHAKH BRIDGE + 2 CULVERTS.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
478 Z2019.0387Jaffarabad
CPapproved
CONST. OF 1 KM B/T ROAD JATOI COLONY, LASHARI COLONY, GHULAM HUSSAIN GOLA (KARAM SHAH), KHOKHAR COLONY D.ALLAH YAR
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 62: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/62.jpg)
Public Sector Development Programme (Sectorwise)
58 of 214
508 Z2019.0530Sibi
CPapproved
"CONSTRUCTION /WIDENING OF SIBI LUNI ROAD (FROM SATMMARLA TO LUNI VILLAGE) (LENGTH 8.00 KM)"
77.1400.000
77.140 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 51% 37.1400.000
507 Z2019.0514Quetta
CPapproved
B/T ROAD OF KUCHLAK, KILLI HAJI ABDUL HALEEM KUCHLAK BAZAR, CHASHMA ACHOZAI & SHEIKH MANDA IN PB-24 ETC
50.0000.000
50.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 40% 30.0000.000
506 Z2019.0512Quetta
CPapproved
B/T ROAD OF ROADS OF PANJPAI, KILLI STATION, KILLI BARAT, KILLI ESSA KHELAN, KILLI ATOZAI PB-24 ETC
40.0000.000
40.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 100% 0.0000.000
505 Z2019.0510Quetta
CPapproved
B/T ROAD OF KUCHLAK, BALELI, KILLI KATHEER, NOHSAR, AGHBARG, KILLI MEHTARZAI, SAMUNGLI IN PB-24 ETC
70.0000.000
70.000 0.0000.000
0.000 0% 70.0000.000
0.000 70.000 100% 0.0000.000
504 Z2019.0483Zhob
CPapproved
CONST: INTRL ROADS KAKAR TWN (ST:MLVISALEH AKHNDZADA MAD: QABRISTAN MAD:BUKHARI MAINA KHNDZADA TWN RZQ) 3KM
32.5000.000
32.500 0.0000.000
0.000 0% 32.5000.000
0.000 32.500 100% 0.0000.000
503 Z2019.0480Quetta
CPapproved
CONSTRUCTION OF B/T ROAD FROM JINNAH TOWN TO KILLI JUMA KHAN.
10.4800.000
10.480 0.0000.000
0.000 0% 10.4800.000
0.000 10.480 100% 0.0000.000
502 Z2019.0474Zhob
CPapproved
CONST:OF LINK ROAD WANAI TO ADEMZAI, HURRAMZAI TO WALMA DISTRICT ZHOB (LENGTH 4 KM).
38.0000.000
38.000 0.0000.000
0.000 0% 38.0000.000
0.000 38.000 100% 0.0000.000
501 Z2019.0471Zhob
CPapproved
CONST: OF STONE MASSONARY 8X10 SIPHON IN LANDIYAN BABAR, DISTRICT ZHOB
13.5000.000
13.500 0.0000.000
0.000 0% 13.5000.000
0.000 13.500 100% 0.0000.000
500 Z2019.0470Zhob
CPapproved
CONSTRUCTION OF STREET NO.1 TO 6 IN KAKAR TOWN ZHOB 2.80 KM
29.0000.000
29.000 0.0000.000
0.000 0% 29.0000.000
0.000 29.000 100% 0.0000.000
499 Z2019.0437Zhob
CPapproved
CONST: OF B/T ROAD ZHOB BAZAR FROM KAKAR TOWN TO GANJ MOH:,FROM PANI TAQSEEM TO KHAROTABAD & ISLAMYAR MOH: ZHOB 14 KM.
100.0000.000
100.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 100% 0.0000.000
498 Z2019.0432Kech
CPapproved
CONST: OF BLACK TOP ROAD FROM PHATAN-E-KAHOOR TO DANUK DISTRICT KECH (2.00 KM)
21.9700.000
21.970 0.0000.000
0.000 0% 21.9700.000
0.000 21.970 100% 0.0000.000
497 Z2019.0423Panjgur
CPapproved
CONSRUCTION OF DUAL CARRIAGEWAY WITH FOOTPATH AND MEDIAN FROM ALLAH 0 AKBAR CHOWK TO KALAM CHOWK DISTRICT PANJGUR
60.0000.000
60.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 50% 30.0000.000
496 Z2019.0421Panjgur
CPapproved
EXTENSION OF BRIDGE AT RAKSHAN KAUR TASP TO ESSAI 500 RFT WITH APPROACHES AND CONNECTING ROAD
300.0000.000
300.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 16% 250.0000.000
495 Z2019.0415Panjgur
CPapproved
CONSTRUCTION OF DUAL CARRIAGEWAY WITH MEDIAN AND FOOTPATH TRACK FROM AZMAT CHOWK TO TASP DISTRICT PANJGUR
300.0000.000
300.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 33% 200.0000.000
494 Z2019.0413Panjgur
CPapproved
CONSTRUCTION OF DUAL CARRIAGE WAY WITH MEDIAN AND FOOTPATH TRACK FROM DC OFFICE TO SORDO DISTRICT PANJGUR
60.0000.000
60.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 50% 30.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 63: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/63.jpg)
Public Sector Development Programme (Sectorwise)
59 of 214
523 Z2019.0576Nasirabad
CPapproved
CONST: OF BT ROAD FROM RANJHAN HARA TO MUHAMMAD YOUSAF MENGAL RABI SHAKH VIA ABDUL GHANI SASOLI MUHAMMAD ASLAM PIRKANI
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
522 Z2019.0575Nasirabad
CPapproved
CONST:/REPAIRING OF BT ROAD FROM N65 TO MIRAN BAKHSH CHINJNI VIA GOTH GHULAM HUSSAIN ZEHRI, SOBHA KHAN JAMALI
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
521 Z2019.0574Nasirabad
CPapproved
CONST:/REPAIRING OF B/T ROAD FROM NHA TO HAJI KHAN CHOWK VIA DILWASH LOR, ABDUL SAMAD, FAREED UL HAQ AT TEHSIL D.M.J
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
520 Z2019.0572Kech
CPapproved
CONSTRUCTION OF B/T ROAD FROM MAND MAIN ROAD TO KHAIR ABAD KECH
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
519 Z2019.0571Kech
CPapproved
CONSTRUCTION OF B/T ROAD FROM MAND MAIN ROAD TO NASIR ABAD KECH
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
518 Z2019.0570Kech
CPapproved
CONSTRUCTION OF B/T ROAD TURBAT MAND MAIN ROAD TO BALICHA KECH
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
517 Z2019.0569Kech
CPapproved
CONSTRUCTION OF B/T ROAD FROM MAND MAIN ROAD TO TUMP CITY (12 KM) KECH
100.0000.000
100.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 100% 0.0000.000
516 Z2019.0546Quetta
CPapproved
CONSTRUCTION OF ROADS & DRAINAGE LINES AT KILLI KIRANI, AMIN ABAD, KILLI KIAZAI, QILLA M. HASNI, QUETTA.
50.0000.000
50.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 40% 30.0000.000
515 Z2019.0545Quetta
CPapproved
CONSTRUCTION OF ROADS AT KHILJI ABAD, PASHTOON BAGH, QUETTA.
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
514 Z2019.0544Quetta
CPapproved
BLACK TOP ROADS AT BLOCK-I II & III, A-ONE CITY MAIN ROAD, KHALIQ ABAD, ALI TOWN, RAILWAY GHOUSING SOCIETY.
65.0000.000
65.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 46% 35.0000.000
513 Z2019.0543Quetta
CPapproved
CONSTRUCTION OF BRIDGE AND SEWERAGE SYSTEM AT HAZARA TOWN, QUETTA.
25.0000.000
25.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 60% 10.0000.000
512 Z2019.0542Quetta
CPapproved
CONST OF ROADS, AT NEW HAZARA TOWN, IQBAL ABAD, SHOUKAT STOP, GENERAL MUSA ROAD, MUHALLA BAGH, MUNAWAR COLONY.
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
511 Z2019.0536Sibi
CPapproved
CONSTRUCTION OF BT ROAD FROM MAIN LEHRI ROAD TO KHAIRWAH TEHSIL LEHRI DISTRICT SIBI
70.0000.000
70.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 71% 20.0000.000
510 Z2019.0534Sibi
CPapproved
CONSTRUCTION OF BT ROAD AND LAYING OF TUFF TILES ON STREETS AT BAKHTIARABAD DOMKI TEHSIL LEHRI
19.0000.000
19.000 0.0000.000
0.000 0% 19.0000.000
0.000 19.000 100% 0.0000.000
509 Z2019.0532Sibi
CPapproved
CONST: OF BT ROAD, TUFF TILES , PCC STREETS & SIDE DRAINS AT LEHRI TOWN AND SURROUNDING VILLAGES DISTRICT SIBI
45.0000.000
45.000 0.0000.000
0.000 0% 45.0000.000
0.000 45.000 100% 0.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 64: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/64.jpg)
Public Sector Development Programme (Sectorwise)
60 of 214
538 Z2019.0608Jaffarabad
CPapproved
CONST: OF B/T ROAD FROM MAIN MEHRAB PUR TO VILLAGE HAIRBAIR JAMALI 1 KM.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
537 Z2019.0606Jaffarabad
CPapproved
RECOND:/WIDENING OF B/T FROM USTA MUHAMMAD MIR WAH ROAD FROM FAROOQ ABAD TO VIA SHAHI CHOWICI (4.5 KM)
40.0000.000
40.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 100% 0.0000.000
536 Z2019.0605Musa Khail
CPapproved
CONST: OF B/T ROAD MAIN KINGRI ROAD TO KILLI MOHSINABAD TEHSIL KINGRI MUSAKHAIL (3 KM).
34.5000.000
34.500 0.0000.000
0.000 0% 34.5000.000
0.000 34.500 100% 0.0000.000
535 Z2019.0603Musa Khail
CPapproved
CONST: OF B/T ROAD RARASHAM TOWN AREA MUSAKHAIL (4 KM).
38.0000.000
38.000 0.0000.000
0.000 0% 38.0000.000
0.000 38.000 100% 0.0000.000
534 Z2019.0601Musa Khail
CPapproved
CONST: OF B/T ROAD DRUG TOWN TEHSIL DRUG MUSAKHAIL (4 KM).
38.0000.000
38.000 0.0000.000
0.000 0% 38.0000.000
0.000 38.000 100% 0.0000.000
533 Z2019.0600Jaffarabad
CPapproved
RECONDITION OF B/T FROM USTA MUHAMMAD TO SAIFULLAH SHAKH (8KM)
45.0000.000
45.000 0.0000.000
0.000 0% 45.0000.000
0.000 45.000 100% 0.0000.000
532 Z2019.0599Musa Khail
CPapproved
CONST: OF B/T ROAD FROM TEHSIL TOISAR TO U/C WAH HASSANZAI CHAPPER ESSOTE AREA MUSAKHAIL (5 KM).
47.5000.000
47.500 0.0000.000
0.000 0% 47.5000.000
0.000 47.500 100% 0.0000.000
531 Z2019.0597Musa Khail
CPapproved
CONST: OF B/T ROAD DARGHI TOWN MUSAKHAIL (LENGTH 6.00 KM).
54.0000.000
54.000 0.0000.000
0.000 0% 54.0000.000
0.000 54.000 100% 0.0000.000
530 Z2019.0584Nasirabad
CPapproved
CONST: OF B/T ROAD FROM MANJHOSHOR TO TEHSIL LANDI VIA AZIZ PARAK, SHAH ALI, MIR WAH BURRA TEHSIL TAMBOO
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
529 Z2019.0583Nasirabad
CPapproved
CONST: OF B/T ROAD FROM ABDUL QADIR MARRI TO GOLA WAH TEHSIL TAMBOO
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
528 Z2019.0582Nasirabad
CPapproved
CONST:OF B/T RD BALAN SHAKH TO VILLAGE SHAIR M.NICHARI VIA VILLAGE SHAH NAWAZ, SUMALANI &VILLAGE JATTAK TEHSIL TAMBOO
40.0000.000
40.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 100% 0.0000.000
527 Z2019.0581Nasirabad
CPapproved
CONSTRUCTION OF B/T ROAD FROM MANJHOO SHORI TO MAGSI SHAKH RD-58 VIA RD 10/20/40/50 TEHSIL TAMBOO
70.0000.000
70.000 0.0000.000
0.000 0% 70.0000.000
0.000 70.000 100% 0.0000.000
526 Z2019.0579Nasirabad
CPapproved
CONSTRUCTION OF BT ROAD FROM BAIDAR PUL TO KHUDA BAKHSH KHOSA VIA HAJI SOHBAT KHOSA, SIKANDAR KHOSA D. M JAMALI
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
525 Z2019.0578Nasirabad
CPapproved
CONSTRUCTION OF BT ROAD FROM MANJHOO SHORI TO CHINA PUL PAT FEEDER VIAL GUL JAN TEHSIL TAMBOO
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
524 Z2019.0577Nasirabad
CPapproved
CONSTRUCTION OF BT ROADFROM PAT FEEDER CANAL TO WAHID BAKHSH ABDUL RAUF, FAZAL JATT, TEHSIL TAMBOO
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 65: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/65.jpg)
Public Sector Development Programme (Sectorwise)
61 of 214
553 Z2019.0718Kachhi
CPapproved
WIDENING AND REHABILITATION OF DHADAR TO NAGHARI ROAD.
80.0000.000
80.000 0.0000.000
0.000 0% 80.0000.000
0.000 80.000 100% 0.0000.000
552 Z2019.0709Jhal Magsi
CPapproved
CONST: OF B/T ROAD OF MAIN ROAD TO VILLAGE ASLA MAGSI (2.5 KM).
28.0000.000
28.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 53% 13.0000.000
551 Z2019.0701Jhal Magsi
CPapproved
CONST: OF B/T ROAD GANDAWA TO GAJAN ROAD (10 KM).
100.0000.000
100.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 100% 0.0000.000
550 Z2019.0700Jhal Magsi
CPapproved
WIDENING & RECONDITIONING OF B/T ROAD FROM M-08 SAIFABAD TO KHEER THAR CANAL (RD-265)LENGTH 16.30 KM.
380.4050.000
380.405 0.0000.000
0.000 0% 237.4050.000
0.000 237.405 62% 143.0000.000
549 Z2019.0691Quetta
CPapproved
B/T ROADS,SEWARAGE, SIDE DRAINS LAYING T/TILES, FIXING OF S/LIGHTS & S/GATES AT U/C NO.1 TO 8, PB-28
125.0000.000
125.000 0.0000.000
0.000 0% 125.0000.000
0.000 125.000 100% 0.0000.000
548 Z2019.0690Quetta
CPapproved
B/TOP ROADS, SEWERAGE, SIDE DRAINS, LAYING T/TILES, FIXING OF S/LIGHTS F/SHADES & S/GATES U/C 25,26,38,39, 40&48 PB-28
130.0000.000
130.000 0.0000.000
0.000 0% 130.0000.000
0.000 130.000 100% 0.0000.000
547 Z2019.0689Quetta
CPapproved
B/T ROADS, SEW,S/DRAIN,LAYING T/TILES,FIXING S/LIGHTS,F/SHADES,B/WALL,UNDER G/TANK & S/GATES AT WARD 2 TO 4 QTA CANTT.
80.0000.000
80.000 0.0000.000
0.000 0% 80.0000.000
0.000 80.000 100% 0.0000.000
546 Z2019.0660Quetta
CPapproved
REH:/CONST: OF B/T ROAD 1.00 KM WITH AT MALIK SALAH-UD-DIN STREET & SARPARAH STREET KILLI SUBZAL PB-30 SARIAB QUETTA.
10.3000.000
10.300 0.0000.000
0.000 0% 10.3000.000
0.000 10.300 100% 0.0000.000
545 Z2019.0655Quetta
CPapproved
REH:/CONST: OF B/T ROAD 1.00 KM KILLI LORE KAREZ JATTAK ABAD
10.5000.000
10.500 0.0000.000
0.000 0% 10.5000.000
0.000 10.500 100% 0.0000.000
544 Z2019.0654Quetta
CPapproved
REH:/CONST: OF 1.50 KM B/T ROAD MAIN SHAFI COLONY,NAIK MOHD STREET & DUR MUHAMMAD STREET.
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
543 Z2019.0653Quetta
CPapproved
REH:/CONST: OF B/T ROAD 1.50 KM KILLI HAQABAD STREETS & RAZA STREET QUETTA.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
542 Z2019.0652Quetta
CPapproved
REH:/CONST: OF B/T ROAD 1.50 KM FROM BASHIR CHOWK TO LEHRI CHOWK VIA KILLI GEO PB-30.
10.1000.000
10.100 0.0000.000
0.000 0% 10.1000.000
0.000 10.100 100% 0.0000.000
541 Z2019.0651Quetta
CPapproved
REH:/CONST: OF 1.50 KM B/T ROAD KILLI SHAOZAI STREETS, MALIK JAN KHAN IBRAHIMZAI .PB-30
10.5000.000
10.500 0.0000.000
0.000 0% 10.5000.000
0.000 10.500 100% 0.0000.000
540 Z2019.0650Quetta
CPapproved
REH:/CONST: OF B/T ROAD 1.75 KM WAPDA GRID STATION KILLI BANGULZAI, BIBI ZIARAT STREET SARIAB ROAD PB-30 QUETTA.
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
539 Z2019.0611Jaffarabad
CPapproved
RECONDITION/WIDENING FROM USTA MUHAMMAD ROAD VIA JAFFARABAD TO BAGH HEAD (10 KM)
55.0000.000
55.000 0.0000.000
0.000 0% 55.0000.000
0.000 55.000 100% 0.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 66: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/66.jpg)
Public Sector Development Programme (Sectorwise)
62 of 214
569 Z2019.0768Loralai
CPapproved
CONST: OF B/T ROAD FROM N-70 TO MUSLIM TOWN DISTRICT LORALAI (LENGTH 5.00 KM)
40.0000.000
40.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 100% 0.0000.000
568 Z2019.0767Loralai
CPapproved
CONST: OF B/T ROAD FROM N-70 TO CHAPLI NASARAN DISTRICT LORALAI (LENGTH 2.00 KM)
16.0000.000
16.000 0.0000.000
0.000 0% 16.0000.000
0.000 16.000 100% 0.0000.000
567 Z2019.0766Loralai
CPapproved
CONST: OF B/T ROAD FROM BYPASS LORALAI TO MAHOOL SHEIKHAN DISTRICT LORALAI (LENGTH 3.00 KM)
32.0000.000
32.000 0.0000.000
0.000 0% 32.0000.000
0.000 32.000 100% 0.0000.000
566 Z2019.0765Loralai
CPapproved
CONSTRUCTION OF ROAD FROM N-70 TO DILOR ALIZAI DISTRICT LORALAI (LENGTH 4.00 KM)
32.0000.000
32.000 0.0000.000
0.000 0% 32.0000.000
0.000 32.000 100% 0.0000.000
565 Z2019.0761Nasirabad
CPapproved
CONST: OF B/T 2KM FROM KANDI CHECK POST TO GOTH NABI BAKSH KHAN DISTRICT NASEERABAD
18.0000.000
18.000 0.0000.000
0.000 0% 18.0000.000
0.000 18.000 100% 0.0000.000
564 Z2019.0736Nasirabad
CPapproved
CONSTRUCTION OF BLACK TOP ROAD FROM PANHWER TO SADORA KHAN BOHAR ,DODA KHAN BOHAR.
20.8900.000
20.890 0.0000.000
0.000 0% 20.8900.000
0.000 20.890 100% 0.0000.000
563 Z2019.0735Nasirabad
CPapproved
CONST OF BLACK TOP ROAD GOTH RASOOL BAKHSH PANDRANI TO BANGUL PANDRANI SOBHA KHAN SASOLI.
11.9900.000
11.990 0.0000.000
0.000 0% 11.9900.000
0.000 11.990 100% 0.0000.000
562 Z2019.0734Nasirabad
CPapproved
CONSTRUCTION OF BLACK TOP ROAD NATIONAL HIGHWAY TO SHAFI MOHAMMAD UMRANI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
561 Z2019.0733Nasirabad
CPapproved
CONSTRUCTION OF BLACK TOP ROAD MIR HASSAN ROAD TO BILAWAL KATOHAR,FOUJ ALI KATOHAR.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
560 Z2019.0732Nasirabad
CPapproved
CONSTRUCTION OF BLACK TOP ROAD TEPUL SHAKH TO ALI SHAIR UMRANI,SADORA UMRANI,NOBAT PANDRANI.
65.3900.000
65.390 0.0000.000
0.000 0% 65.3900.000
0.000 65.390 100% 0.0000.000
559 Z2019.0731Nasirabad
CPapproved
CONSTRUCTION OF BLACK TOP ROAD N-65 TO ASLAM SHAH,SAMANA KHAN UMRANI.
15.1400.000
15.140 0.0000.000
0.000 0% 15.1400.000
0.000 15.140 100% 0.0000.000
558 Z2019.0730Nasirabad
CPapproved
CONSTRUCTION OF BLACK TOP ROAD QAISER KHAN UMRANI,NOOR AHMED UMRANI.
12.3700.000
12.370 0.0000.000
0.000 0% 12.3700.000
0.000 12.370 100% 0.0000.000
557 Z2019.0729Nasirabad
CPapproved
CONSTRUCTION OF BLACK TOP ROAD N-65 TO JHUDAIR SHAKH.
93.0200.000
93.020 0.0000.000
0.000 0% 93.0200.000
0.000 93.020 100% 0.0000.000
556 Z2019.0721Kachhi
CPapproved
CONSTRUCTION OF REHABILIATION ROAD FROM BASTI MUSA TO MEHASAR SHAHWANI (25 KM).
16.2350.000
16.235 0.0000.000
0.000 0% 16.2350.000
0.000 16.235 100% 0.0000.000
555 Z2019.0720Kachhi
CPapproved
CONSTRUCTION OF BLACK TOP ROAD SALARABAD TO MEHSAR SHAHWANI ROAD (13.5 KM).
150.0000.000
150.000 0.0000.000
0.000 0% 150.0000.000
0.000 150.000 100% 0.0000.000
554 Z2019.0719Kachhi
CPapproved
CONSTRUCTION OF BLACK TOP ROAD ARIFABAD TO BOLAN DAM INCLUDING 500 RFT PRE STRESSED BRIDGE.
160.0000.000
160.000 0.0000.000
0.000 0% 160.0000.000
0.000 160.000 100% 0.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 67: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/67.jpg)
Public Sector Development Programme (Sectorwise)
63 of 214
585 Z2019.0813Khuzdar
CPapproved
CONST: OF B/T GOL BIT ROAD KHARK.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
584 Z2019.0809Khuzdar
CPapproved
CONST: OF B/T ROAD KILLI ZALAKHAN ZEHRI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
583 Z2019.0808Khuzdar
CPapproved
CONSTRUCTION OF BT ROAD FROM ZEHRI BAZAR TO NOORGAMA QADEEM 4 KM ZEHRI.
25.0000.000
25.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 100% 0.0000.000
582 Z2019.0807Khuzdar
CPapproved
CONSTRUCTION OF BT ROAD AT DANDAR JADEED TEHSIL ZEHRI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
581 Z2019.0806Nasirabad
CPapproved
REHIBILATATION OF BLACK TOP ROAD FROM MAZAR KHAN GOLA VIA BARI SHAKH TO KHAN PUR PUL NASEERABAD.
100.0000.000
100.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 100% 0.0000.000
580 Z2019.0805Khuzdar
CPapproved
CONST: OF BT ROAD AT TRASANI JADEED TEHSIL ZEHRI.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
579 Z2019.0804Khuzdar
CPapproved
CONST: B/T ROAD N-8 VIA PURPOK CHAPOTHAROW LAD TO SUFAID PATHAR ZEDI KHUZDAR.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
578 Z2019.0801Sohbatpur
CPapproved
REHABILITATION OF BLACK TOP ROAD MAIN SHOBAT PUR ROAD TO HAJI YAR MOHAMMAD KHOSA 3 KM
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
577 Z2019.0798Sohbatpur
CPapproved
REHABILITATION OF BLACK TOP ROAD PANHWAR CROSS TO CITY PANHWAR 3 KM
18.0000.000
18.000 0.0000.000
0.000 0% 18.0000.000
0.000 18.000 100% 0.0000.000
576 Z2019.0795Sohbatpur
CPapproved
REHABILITATION OF BLACK TOP ROAD MAIN SOHBAT PUR VIA UMAR KHAN TO SIM SHAKH 2 KM
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
575 Z2019.0791Sohbatpur
CPapproved
REHABILITATION OF BLACK TOP ROAD VILLAGE MOHAMMAD AZEEM MAGSI TO MAIN ROAD CHATAN PATI MEER HASSAN 8.00 KM
48.0000.000
48.000 0.0000.000
0.000 0% 48.0000.000
0.000 48.000 100% 0.0000.000
574 Z2019.0790Sohbatpur
CPapproved
CONSTRUCTION OF OF B/T ROAD KAREEM SUMALANI TO SARDAR SUMALANI 2.00 KM
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
573 Z2019.0786Sohbatpur
CPapproved
REH: OF BLACK TOP ROAD MAIN SOHBAT PUR ROAD TO SHER MUHAMMAD CROSS VIA AZAM KHAN KHOSA VILLAGE ABDUL RASHEED 3.00 KM
18.0000.000
18.000 0.0000.000
0.000 0% 18.0000.000
0.000 18.000 100% 0.0000.000
572 Z2019.0779Sohbatpur
CPapproved
REHABILITATION OF BLACK TOP ROAD JHANDA TALAB TO UCH SHAKH 2.00 KM
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
571 Z2019.0775Sohbatpur
CPapproved
REHABILITATION OF BLACK TOP ROAD BHAND MANJHI PUR ROAD TO SHAHI WAH(3.00 KM)
18.0000.000
18.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 55% 8.0000.000
570 Z2019.0769Loralai
CPapproved
CONST: OF B/T ROAD FROM MURGHA ROAD TO MANGOCHER NUSKHAIL DISTRICT LORALAI (LENGTH 5.00 KM)
40.0000.000
40.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 100% 0.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 68: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/68.jpg)
Public Sector Development Programme (Sectorwise)
64 of 214
601 Z2019.1047Pishin
CPapproved
CONST: OF B/T ROAD FROM MAIN HAIKALZAI PISHIN ROAD TO KILLI DIST. PISHIN (2.25 KM)
16.2500.000
16.250 0.0000.000
0.000 0% 16.2500.000
0.000 16.250 100% 0.0000.000
600 Z2019.0967Awaran
CPapproved
CONSTRUCTION OF ROAD FROM SHANDI BAZAR TO HIGH SCHOOL
13.2730.000
13.273 0.0000.000
0.000 0% 13.2730.000
0.000 13.273 100% 0.0000.000
599 Z2019.0964Awaran
CPapproved
CONSTRUCTION OF ROAD FROM BAZAG TO TAKARI USMAN GOTH
18.8730.000
18.873 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 52% 8.8730.000
598 Z2019.0962Awaran
CPapproved
CONSTRUCTION OF B/T ROAD FROM MASHI TO ABIDABAD.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
597 Z2019.0926Khuzdar
CPapproved
CONST: OF ROAD KACHA, NALL, ARANJI, WADH.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
596 Z2019.0890Kech
CPapproved
CONST: OF B/T ROAD FROM MAIN BAZAR TO OLD FISH MARKET KECH.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
595 Z2019.0889Kech
CPapproved
CONSTRUCTION OF B/T ROAD FROM DATE RESEARCH FARM TO SHAHABAD KECH
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
594 Z2019.0833Sohbatpur
CPapproved
REHEBILITATION OF (PATCH WORK) MAIN SOHBAT PUR ROAD TO BHAND 9.00 KM
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
593 Z2019.0831Sohbatpur
CPapproved
REHEBILITATION OF BLACK TOP ROAD SHAHI DIP JHUDARE SHAH TO SAKHI MUHAMMAD BAKSH KHOSA NOOR PUR 4.00 KM
24.0000.000
24.000 0.0000.000
0.000 0% 24.0000.000
0.000 24.000 100% 0.0000.000
592 Z2019.0828Sohbatpur
CPapproved
REHABILITATION OF B/T ROAD KUNDI TO AKBAR KHOSA 5 KM.
18.0000.000
18.000 0.0000.000
0.000 0% 18.0000.000
0.000 18.000 100% 0.0000.000
591 Z2019.0826Sohbatpur
CPapproved
REHABILITAION OF BLACK TOP ROAD MAIN CHANDI CHOWK TO KHALANI 2 KM
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
590 Z2019.0824Sohbatpur
CPapproved
CONST: OF B/T ROAD FROM JUMAL BRIDGE TO PAT FEEDER VIA POLICE STATION ADILPUR 2 KM.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
589 Z2019.0822Sohbatpur
CPapproved
REHABILITAION OF BLACK TOP ROAD MOLVI QADIR BAKHSH TO MAJHI PUR VIA WAHEED MURAD KHOSA 5 KM
18.0000.000
18.000 0.0000.000
0.000 0% 18.0000.000
0.000 18.000 100% 0.0000.000
588 Z2019.0819Sohbatpur
CPapproved
REHABILITATION OF BLACK TOP ROAD SHAHI WAH TO HAJI ABDUL HAMEED KHOSA GOTH NOOR PUR 3 KM
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
587 Z2019.0817Khuzdar
CPapproved
CONST; OF B/T ROAD FROM KHUWAN TO PANI WAND MOLA.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
586 Z2019.0814Khuzdar
CPapproved
CONSTRUCTION OF BT ROAD FROM PIR IBRAHIM TO KARKH.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 69: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/69.jpg)
Public Sector Development Programme (Sectorwise)
65 of 214
616 Z2019.1119Harnai
CPapproved
CONSTRUCTION OF TUFF TILES & SIDE DRAINS & REMAINING WORK OF MANDIR AT HINDU MUHALA DISTRICT HARNAI
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
615 Z2019.1118Harnai
CPapproved
CONS: OF TUFF TILES & SIDE DINES & CONST: OF B/WALL AT CHRISTEN GRAVEYARD AND CHURCH AT SHAHRAG AND HARNAI
25.0000.000
25.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 100% 0.0000.000
614 Z2019.1115Shaheed
Sikandarabad
CPapproved
CONSTRUCTION OF BLACK TOP ROAD FROM KILLI BALINA RODENI DISTRICT SHAHEED SIKANDERABAD (LENGTH 3 K.M)
21.0000.000
21.000 0.0000.000
0.000 0% 21.0000.000
0.000 21.000 100% 0.0000.000
613 Z2019.1114Shaheed
Sikandarabad
CPapproved
CONSTRUCTION OF BLACK TOP ROAD FROM SURAB BZAR TO NIGHAR, KILLI REHSANI DISTRICT SHAHEED SIKANDERABAD (LENGTH 10 KM)
82.5000.000
82.500 0.0000.000
0.000 0% 82.5000.000
0.000 82.500 100% 0.0000.000
612 Z2019.1113Shaheed
Sikandarabad
CPapproved
CONSTRUCTION OF BLACK TOP ROAD FROM MAKRAN ROAD TO KILLI KIAZAI GIDDER,DISTRICT SHAHEED SIKANDERABAD (LENGTH 8 K.M)
66.0000.000
66.000 0.0000.000
0.000 0% 66.0000.000
0.000 66.000 100% 0.0000.000
611 Z2019.1108Quetta
CPapproved
CONST: OF B/T ROAD FROM HUDDA TO KILLI ALLAH ABAD.
40.2000.000
40.200 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 49% 20.2000.000
610 Z2019.1079Kalat
CPapproved
CONST: OF B/T ROAD FROM KOT LANGAU TO BARINCHINA KHALIQ ABAD DIST. KALAT.
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
609 Z2019.1078Kalat
CPapproved
CONST: OF B/T ROAD WITH BOX CULVERT KILLI BAQA & SHAM ROAD KHALIQABAD DIST. KALAT.
60.0000.000
60.000 0.0000.000
0.000 0% 60.0000.000
0.000 60.000 100% 0.0000.000
608 Z2019.1077Kalat
CPapproved
CONST: OF B/T ROAD FOR KALAT BAZAR DISTRICT KALAT.
100.0000.000
100.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 100% 0.0000.000
607 Z2019.1053Pishin
CPapproved
CONST: OF B/T ROAD FROM MAIN SARANAN / CHAMAN ROAD TO KILLI SHADIZAI DIST. PISHIN (2 KM)
13.0000.000
13.000 0.0000.000
0.000 0% 13.0000.000
0.000 13.000 100% 0.0000.000
606 Z2019.1052Pishin
CPapproved
CONST: OF B/T ROAD FROM MAIN DUB-KHANZAI/HURAMZAI ROAD TO GHUNDAI INRAHIMZAI DIST. PISHIN (2 KM)
26.0000.000
26.000 0.0000.000
0.000 0% 26.0000.000
0.000 26.000 100% 0.0000.000
605 Z2019.1051Pishin
CPapproved
CONST OF B/T ROAD FROM DUB-KHANZAI/ HORAMZAI ROAD TO GHUNDAI IBRAHIMZAI DIST. PISHIN (2 KM)
13.0000.000
13.000 0.0000.000
0.000 0% 13.0000.000
0.000 13.000 100% 0.0000.000
604 Z2019.1050Pishin
CPapproved
CONST: OF B/T ROAD FROM DUB-KHANZAI ROAD TO SALAD NEKA DIST. PISHIN (3.5 KM)
23.0000.000
23.000 0.0000.000
0.000 0% 23.0000.000
0.000 23.000 100% 0.0000.000
603 Z2019.1049Pishin
CPapproved
CONST: OF B/T ROAD FROM KHAR BADIZAI TO SIDDIQUE BADIZAI DIST. PISHIN (3 KM)
19.5000.000
19.500 0.0000.000
0.000 0% 19.5000.000
0.000 19.500 100% 0.0000.000
602 Z2019.1048Pishin
CPapproved
CONST: OF B/T ROAD FROM MANZARAI TO SUFYANZAI DIST. PISHIN (3.5 KM)
22.7500.000
22.750 0.0000.000
0.000 0% 22.7500.000
0.000 22.750 100% 0.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 70: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/70.jpg)
Public Sector Development Programme (Sectorwise)
66 of 214
632 Z2019.1191Bela
CPapproved
BYPASS BELA CITY ALI PANKHA TO HALID ROAD BELA WITH A BRIDGE 328 RFT WITH APPROACHES.
75.0000.000
75.000 0.0000.000
0.000 0% 75.0000.000
0.000 75.000 100% 0.0000.000
631 Z2019.1190Bela
CPapproved
CONSTRUCTION OF BLACK TOP ROAD FROM YOUNAS GOTH TO CHANNAL GOTH KATHORE BELA 6-KM DISTRICT LASBELA.
77.0590.000
77.059 0.0000.000
0.000 0% 77.0590.000
0.000 77.059 100% 0.0000.000
630 Z2019.1189Bela
CPapproved
IMPROVEMENT / REHBILITATION B.T ROAD DUDDER CAMP TO KANRAJ THANA AND SAIB KHAN 15- KM DISTRICT LASBELA.
195.1240.000
195.124 0.0000.000
0.000 0% 195.1240.000
0.000 195.124 100% 0.0000.000
629 Z2019.1184Kech
CPapproved
CONST: OF BRIDGE DADDAY RIVER KHUDDAN DASHT.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
628 Z2019.1183Ziarat
CPapproved
CONST: OF NEW SANJAVI BY PASS ROAD
100.0000.000
100.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 100% 0.0000.000
627 Z2019.1181Kech
CPapproved
CONST: OF BLACK TOP ROAD FROM M-8 TO BALIN DASHT.
44.2050.000
44.205 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 45% 24.2050.000
626 Z2019.1179Kech
CPapproved
CONST: OF BLACK TOP KOHAK DASHT ROAD DISTRICT KECH.
29.4150.000
29.415 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 34% 19.4150.000
625 Z2019.1178Quetta
CPapproved
CONST: OF B/T ROAD FROM KILLI ISMAIL TO TAJIK ABAD.
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
624 Z2019.1177Kech
CPapproved
CONST: OF BLACK TOP ROAD FROM M-8 TO CHOT BAZAR DASHT.
49.8900.000
49.890 0.0000.000
0.000 0% 49.8900.000
0.000 49.890 100% 0.0000.000
623 Z2019.1176Kech
CPapproved
CONST: OF BALCK TOP ROAD FROM M-8 TO DAHYAT BAZAR DASHT.
26.0000.000
26.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 38% 16.0000.000
622 Z2019.1175Kech
CPapproved
CONST: OF BLACK TOP ROAD FROM M-8 TO SANGAI DASHT.
67.3080.000
67.308 0.0000.000
0.000 0% 67.3080.000
0.000 67.308 100% 0.0000.000
621 Z2019.1174Kech
CPapproved
CONST: OF BLACK TOPPING OF ROAD FROM BALNIGORE TO KAHREEN DASHT.
29.4150.000
29.415 0.0000.000
0.000 0% 12.5000.000
0.000 12.500 42% 16.9150.000
620 Z2019.1173Kech
CPapproved
CONST: OF BLACK TOP ROAD FROM SANGEE CROSS TO DADDAY DASHT.
67.7160.000
67.716 0.0000.000
0.000 0% 67.7160.000
0.000 67.716 100% 0.0000.000
619 Z2019.1160Ziarat
CPapproved
CONST OF MAIN ROAD FROM SANJAVI TO KILLI POI
32.0000.000
32.000 0.0000.000
0.000 0% 32.0000.000
0.000 32.000 100% 0.0000.000
618 Z2019.1146Ziarat
CPapproved
BLACK/TOPPING OF MURDAR KACH ROAD.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
617 Z2019.1121Bela
CPapproved
WIDENING/REHAB: OF HINGLAJ MATA MANDIR ROAD FROM COASTAL HIGHWAY UP TO 9-KM DISTRICT LASBELA
120.0000.000
120.000 0.0000.000
0.000 0% 60.0000.000
0.000 60.000 50% 60.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 71: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/71.jpg)
Public Sector Development Programme (Sectorwise)
67 of 214
648 Z2019.1230Gwadar
CPapproved
CONSTRUCTION OF BT ROAD FROM BABARSHOR TO PEHRAG VIA KHUDADAD GOTH PASNI 2.00 KM
11.0000.000
11.000 0.0000.000
0.000 0% 11.0000.000
0.000 11.000 100% 0.0000.000
647 Z2019.1227Gwadar
CPapproved
CONSTRUCTION OF ROAD FROM BAKSHAI PUMP TO COLLEGE
19.7680.000
19.768 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 9.7680.000
646 Z2019.1224Gwadar
CPapproved
CONSTRUCTION OF CHAKULAI COASTAL HIGHWAY LINK ROAD GWADER
25.0000.000
25.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 40% 15.0000.000
645 Z2019.1205Bela
CPapproved
CONSTRUCTION OF BLACK TOP ROAD I/C RCC RETAINING WALL FROM GADDANI CITY TO BARKAT GOTH (1.5KM)
39.3400.000
39.340 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 38% 24.3400.000
644 Z2019.1204Bela
CPapproved
BT ROAD FROM SARENWARI ALI M. MOONDRA FARM TO BARHI GOTH, HANDOO SHAHOKAND SARDAR GOTH 6.50 KM UC JAMYOUSAF ABAD BELA
79.6610.000
79.661 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 31% 54.6610.000
643 Z2019.1203Bela
CPapproved
CONSTRUCTIONOF INTERNAL BT ROAD WINDER CITY AREA (7 KM)
49.5000.000
49.500 0.0000.000
0.000 0% 49.5000.000
0.000 49.500 100% 0.0000.000
642 Z2019.1202Bela
CPapproved
CONST. OF EASTERN BY PASS AND N-25 TO HUB BRIDGE SAKRAN ROAD 9 KM
148.7000.000
148.700 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 33% 98.7000.000
641 Z2019.1201Bela
CPapproved
BT RD FAZULAH BURA TO MOZA TORI&GAB KORI VIA DHER PEER GRAVE YARD CONNECT VILLAGES TO LAKHRA VIA GHAFOR HOTEL UTHAL7KM
99.0000.000
99.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 30% 69.0000.000
640 Z2019.1199Bela
CPapproved
BT ROAD RCD TO SYED NOOR ALI SHAH KATHOR BELA. (4.4KM)
48.5600.000
48.560 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 41% 28.5600.000
639 Z2019.1198Bela
CPapproved
BT ROAD HAJI KANDERA, HASSAN GADOR, ALI MUHAMMAD SOOR, SIDDIQ SHEIKH GOTH BOHAR (10 KM).
78.5000.000
78.500 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 25% 58.5000.000
638 Z2019.1197Bela
CPapproved
BT ROAD BARA BAGH TO LOYANI GOTH BELA. (5KM)
70.0000.000
70.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 28% 50.0000.000
637 Z2019.1196Bela
CPapproved
CONSTRUCTION OF KISHARI BRIDGE CONNECTING TO BELA 1320 RFT.
194.0400.000
194.040 0.0000.000
0.000 0% 60.0000.000
0.000 60.000 30% 134.0400.000
636 Z2019.1195Bela
CPapproved
BT RD VILLAGE M.ABDULLAH MURAD DAGARZAI USMAN USII L.BAKHSH H.AMIN, GAMMANI ALLAH BAKHSH KUND MALIR UC LIARI.(6.5 KM)
42.5440.000
42.544 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 47% 22.5440.000
635 Z2019.1194Bela
CPapproved
IMPROVEMENT/REHABLITATION OF B/T ROAD FROM N-25 TO KHURKHERA (10 KM)
88.0570.000
88.057 0.0000.000
0.000 0% 88.0570.000
0.000 88.057 100% 0.0000.000
634 Z2019.1193Bela
CPapproved
IMPROVEMENT/REHABLITATION OF B/T ROAD FROM N-25 TO DAAM- 12 KM
99.7120.000
99.712 0.0000.000
0.000 0% 99.7120.000
0.000 99.712 100% 0.0000.000
633 Z2019.1192Bela
CPapproved
IMPROVEMENT/REHABLITATION OF BT ROAD UTHAL TO LAKHRA (20 KM).
188.1730.000
188.173 0.0000.000
0.000 0% 188.1730.000
0.000 188.173 100% 0.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 72: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/72.jpg)
Public Sector Development Programme (Sectorwise)
68 of 214
664 Z2019.1288Quetta
CPapproved
CONST OF BLACK TOP ROAD 3 KM INCLUDING OPEN DRAIN AT KILLI SAHIBZADA KUCHLAK QUETTA
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
663 Z2019.1287Quetta
CPapproved
CONST OF BLACK TOP ROAD 2 KM INCLUDING OPEN DRAIN AT KILLI MALIK SHAAHJAN KUCHLAK QUETTA
18.0000.000
18.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 55% 8.0000.000
662 Z2019.1277Kohlu
CPapproved
CONSTT: OF B/T ROAD AND SEWVERAGE LINE AT MARRI COLONY AT DISTRICT KOHLU.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
661 Z2019.1269Kohlu
CPapproved
CONSTRUCTION OF B/T ROAD TIRKHA TO GIRSINI KHOLU
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
660 Z2019.1267Kohlu
CPapproved
CONST OF B/T ROAD FROM MITAZAI TO TANGA TAL DISTT KOHLU
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
659 Z2019.1266Kohlu
CPapproved
CONSTRUCTION OF B/T ROAD MAIN SIBI ROAD TO GARI DISTT KOHLU
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
658 Z2019.1265Kohlu
CPapproved
CONSTRUCTION OF B/T ROAD TRIMAN CROSS, MIR JAHANZEB TO BARELI
60.0000.000
60.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 16% 50.0000.000
657 Z2019.1264Kohlu
CPapproved
CONSTRUCTION OF B/T ROAD NILI KARIM BAKHSH TO WADERA NOOR AHMED KALWANI KHOLU
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
656 Z2019.1262Kohlu
CPapproved
CONSTRUCTION OF B/T ROAD KILLI ALI BAIG, SHAHAL SHEHER TO CHAKO NALA, TAKRAO & PAINWALI
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
655 Z2019.1261Kohlu
CPapproved
CONSTRUCTION OF B/T ROAD REHMANABAD TO DHILL KHOLU
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
654 Z2019.1259Kohlu
CPapproved
CONSTRUCTION OF B/T ROAD KILLI MIR NOOR AHMED TO MAAKORI TAMBOO KHOLU.
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
653 Z2019.1258Kohlu
CPapproved
CONSTRUCTION OF ROAD BARDUF TO DURWAZOO KHOLU
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
652 Z2019.1253Kohlu
CPapproved
CONSTRUCTION OF B/T ROAD IN THE DISTT HQ KOHLU
80.0000.000
80.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 25% 60.0000.000
651 Z2019.1251Kohlu
CPapproved
CONSTRUCTION OF B/T ROAD FROM BY-PASS TO THUMBELI & WADERA BALOO KHAN AT DISTT KOHLU
17.0000.000
17.000 0.0000.000
0.000 0% 17.0000.000
0.000 17.000 100% 0.0000.000
650 Z2019.1245Kech
CPapproved
CONST: OF BLACK TOPING ROAD FROM M-8 TO KICKIN 3 KM
32.4770.000
32.477 0.0000.000
0.000 0% 32.4770.000
0.000 32.477 100% 0.0000.000
649 Z2019.1232Gwadar
CPapproved
CONSTRUCTION OF B/T ROAD FROM MAIN CHOWK TO LALA HASSAN HOUSE SURBANDAR DISTRICT GWADAR
12.3800.000
12.380 0.0000.000
0.000 0% 12.3800.000
0.000 12.380 100% 0.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 73: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/73.jpg)
Public Sector Development Programme (Sectorwise)
69 of 214
679 Z2019.1451Barkhan
CPapproved
CONSTRUCTION OF BLACK TOP ROAD, FROM RAKHNI BARKHAN ROAD TO BARGHIYANI VIA HAJI IBRAHIM SHAHOO WALA.(4.00 KM)*
29.0530.000
29.053 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 51% 14.0530.000
678 Z2019.1448Barkhan
CPapproved
CONSTRUCTION OF BLACK TOP ROAD, FROM MOHMA SMAD KHAN ROAD TO KHARAR BUZDAR KM 0.00 TO KM 4.00. (4.00 KM)
26.6540.000
26.654 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 56% 11.6540.000
677 Z2019.1446Barkhan
CPapproved
CONSTRUCTION OF BLACK TOP ROAD, FROM VITAKRI TO DOLWAYEE KM 0.00 TO KM 3.70. (3.70 KM)
22.0000.000
22.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 68% 7.0000.000
676 Z2019.1444Barkhan
CPapproved
CONSTRUCTION OF BLACK TOP ROAD, MAT, KHARCHA. (5 KM)
38.9460.000
38.946 0.0000.000
0.000 0% 38.9460.000
0.000 38.946 100% 0.0000.000
675 Z2019.1432Nushki
CPapproved
CONSTRUCCTION OF NUSHKI BYPASS.
150.0000.000
150.000 0.0000.000
0.000 0% 75.0000.000
0.000 75.000 50% 75.0000.000
674 Z2019.1421Provincial
CPapproved
REHABILITATION OF NAWA KILLI BYPASS WITH SIDE DRAINS AND IMPROVEMENT WITH WIDENING OF SHOULDERS.
300.0000.000
300.000 0.0000.000
0.000 0% 150.0000.000
0.000 150.000 50% 150.0000.000
673 Z2019.1401Quetta
CPapproved
CONST OF B/T ROADS AT KHILJI COLONY, MUSA COLONY, BARECH ABAD, FAQIRABAD & KILLI ALIZAI SARYAB QTA
35.0000.000
35.000 0.0000.000
0.000 0% 35.0000.000
0.000 35.000 100% 0.0000.000
672 Z2019.1399Quetta
CPapproved
REH: CONST OF B/T ROADS (GULSHEN BARECH TOWN, KILLI BAKTH MOHD, MULA KHAIL ABAD) E BYPASS QTA
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
671 Z2019.1398Quetta
CPapproved
CONST: OF B/T ROADS ( KASHMIR KHAN ROAD, KHILJI TOWN, BABA JAN TOWN, BALOCH KHAN COL) E BYPAS QTA
25.0000.000
25.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 100% 0.0000.000
670 Z2019.1365Qilla
AbdullahCPapproved
CONST: OF ROAD 06 KM FROM BUKARZAI CHOWK TO BUKARZAI.
45.0000.000
45.000 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 11% 40.0000.000
669 Z2019.1364Qilla
AbdullahCPapproved
CONST: OF ROAD 03 KM FROM KILLI GULISTAN KAREZ TO KILLI AZIZABAD GULISTAN.
21.0000.000
21.000 0.0000.000
0.000 0% 21.0000.000
0.000 21.000 100% 0.0000.000
668 Z2019.1361Quetta
CPapproved
B/TOPPING OF ROAD AT TAREEN ROAD, KASI QILLA, BALOCHI STREET, PIR MOHD ROAD, NICHARI ROAD, ETC *.
100.0000.000
100.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 20% 80.0000.000
667 Z2019.1301Chagai
CPapproved
B/T RD IN KILLIES K.UMER K,W.BAZAR LINK FC COL:,H.A.NABI, NOKUNDI CITY& KK.BUX, M.ESSA MAIN KILLI TO 0 POINT TAFTAN CITY
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
666 Z2019.1290Pishin
CPapproved
B/T ROAD FOR KILLI NASARAN ,MUGHATIAN & BOSTAN PISHIN
16.0000.000
16.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 62% 6.0000.000
665 Z2019.1289Qilla
SaifullahCPapproved
BLOCK TOP ROAD FOR KILLI KAN MEHTERZAI KILLA SAIFULLAH
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 74: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/74.jpg)
Public Sector Development Programme (Sectorwise)
70 of 214
694 Z2019.1510Barkhan
CPapproved
CONSTRUCTION OF BLACK TOP ROAD, FROM MAIN BAGHAU ROAD TO NAREERI (5KM)
38.9460.000
38.946 0.0000.000
0.000 0% 38.9460.000
0.000 38.946 100% 0.0000.000
693 Z2019.1509Barkhan
CPapproved
CONSTRUCTION OF BLACK TOP ROAD, MAIN RAKHNI BARKHAN ROAD TO HAIDER ROTAR VIA FLOUR MILL RAKHNI. (8.20 KM)
56.2440.000
56.244 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 35% 36.2440.000
692 Z2019.1508Barkhan
CPapproved
CONSTRUCTION OF BLACK TOP ROAD, FROM MAIN RAKHNI BARKHAN ROAD TO BASTI MOHKHAM DIN BAIDIYANI (4.60 KM)
34.9260.000
34.926 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 42% 19.9260.000
691 Z2019.1501Quetta
CPapproved
CONST OF 3 KM MAIN KOTWAL ROAD ALONGWITH SIDE DRAINAGE SYSTEM AT QUETTA.
21.0000.000
21.000 0.0000.000
0.000 0% 21.0000.000
0.000 21.000 100% 0.0000.000
690 Z2019.1484Quetta
CPapproved
CONST: OF B/T ROAD KILLI KHAIRULLAH,GWADAR COLONY KHAZAI AND MARYANI ABAD SAMUNGLI PB-25 QUETTA
16.6700.000
16.670 0.0000.000
0.000 0% 16.6700.000
0.000 16.670 100% 0.0000.000
689 Z2019.1482Quetta
CPapproved
B/T LINKS ROADS IN SOUTHERN & NORTHERN SIDE OF ABDUL KHALIQ ROAD,MALIK RUSTAM KUCHA, NASARAN AND NAWA KILLI QUETTA
16.6700.000
16.670 0.0000.000
0.000 0% 16.6700.000
0.000 16.670 100% 0.0000.000
688 Z2019.1481Quetta
CPapproved
CONST:OF B/T ROAD KILLI UMAR,SHEIKH MANDA AND KILLI ALMAS PB-25 QUETTA LENGTH 2.42 KMS
16.6700.000
16.670 0.0000.000
0.000 0% 16.6700.000
0.000 16.670 100% 0.0000.000
687 Z2019.1474Barkhan
CPapproved
CONSTRUCTION OF BLACK TOP ROAD, FROM HAKEEMANI ROAD TO BASTI DADAN MAROOFANI BANNI (3.00 KM)
22.9440.000
22.944 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 65% 7.9440.000
686 Z2019.1473Barkhan
CPapproved
CONSTRUCTION OF BLACK TOP ROAD, FROM MAIN RAKHNI BARKHAN ROAD TO BASTI SADRANI, RAKHNI (4.50 KM)
32.0470.000
32.047 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 46% 17.0470.000
685 Z2019.1472Barkhan
CPapproved
CONSTRUCTION OF BLACK TOP ROAD, HAJI DADLI ROAD TO BASTI GUL FARAD KUCH VIA DARWANI. (5.00 KM)
38.9460.000
38.946 0.0000.000
0.000 0% 38.9460.000
0.000 38.946 100% 0.0000.000
684 Z2019.1461Barkhan
CPapproved
CONSTRUCTION OF BLACK TOP ROAD, FROM WADERA KHAMEES HALYANI TO ALLA BAKHSH HALYANI TAKHRA. (2.00 KM)
13.5760.000
13.576 0.0000.000
0.000 0% 13.5760.000
0.000 13.576 100% 0.0000.000
683 Z2019.1459Barkhan
CPapproved
CONSTRUCTION OF BLACK TOP ROAD, NAR KOT TO BAHODRA AREA (6.00 KM)*
49.0680.000
49.068 0.0000.000
0.000 0% 49.0680.000
0.000 49.068 100% 0.0000.000
682 Z2019.1457Barkhan
CPapproved
CONST: OF BLACK TOP ROAD, DADA SHAH MAHMOOD RAOD TO SAID MOHAMMAD DAIM VIA LOHAR DURKIYANI HUSSAIN (5.00 KM)*
36.5620.000
36.562 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 41% 21.5620.000
681 Z2019.1456Barkhan
CPapproved
CONST: OF BLACK TOP ROAD, DADA SHAH MAHMOOD ROAD TO NIHAL KHAN DAIM NALA KHAN DAIM DOULA GHAIR (5.00 KM)*
39.0530.000
39.053 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 38% 24.0530.000
680 Z2019.1455Barkhan
CPapproved
CONSTRUCTION OF BLACK TOP ROAD, REMAINING PORTIONS OF GUMBRAK ROAD VIA NALA. (4.00 KM)*
29.0530.000
29.053 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 51% 14.0530.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 75: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/75.jpg)
Public Sector Development Programme (Sectorwise)
71 of 214
710 Z2019.1574Kharan
CPapproved
CONSTRUCITON OF ROADS TAKIA FAQEERZAI LINK JAHANGIRABAD DISTRICT KHARAN
25.0000.000
25.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 40% 15.0000.000
709 Z2019.1572Zhob
CPapproved
CONST: & WIDENING OF B/T ROAD FROM DR.KAMAL KHAN CHOWK TO AIRPORT ROAD VIA MOHALLAH ISLAMYAR DIST: ZHOB(1.25KM)
60.0000.000
60.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 66% 20.0000.000
708 Z2019.1567Quetta
CPapproved
LINK ROAD FROM W/BYPASS HAZARA TOWN TO SARIAB ROAD TO E/BYPASS,(6.5 KM),3+3+BRIDGE (QUETTA PACKAGE)
1950.0000.000
1950.000 0.0000.000
0.000 0% 200.0000.000
0.000 200.000 10% 1750.0000.000
707 Z2019.1562Quetta
CPapproved
REHABILITATION / DUALIZATION OF B/T ROAD FROM NAWA KILLI CHECK POST TO HANNA AND CM ANNEXE HANNA QUETTA
150.0000.000
150.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 33% 100.0000.000
706 Z2019.1560Quetta
CPapproved
LINK ROAD FROM WESTEREN BYPASS TO SARIAB ROAD NEAR RADIO STATION TOWER,(3.7 KM),3+3+BRG (QUETTA PACKAGE)
844.0000.000
844.000 0.0000.000
0.000 0% 250.0000.000
0.000 250.000 29% 594.0000.000
705 Z2019.1559Quetta
CPapproved
WIDENING OF SAMUNGLI ROAD FROM KOYLA PHATAK TO KHEZAI CHOWK QUETTA
1000.0000.000
1000.000 0.0000.000
0.000 0% 200.0000.000
0.000 200.000 20% 800.0000.000
704 Z2019.1558Quetta
CPapproved
DUALIZATION OF BADINI LINK ROAD (1.5 KM) (QUETTA PAKAGE)
575.0000.000
575.000 0.0000.000
0.000 0% 200.0000.000
0.000 200.000 34% 375.0000.000
703 Z2019.1557Quetta
CPapproved
WIDENING AND IMPROVEMENT OF PATEL ROAD QUETTA
300.0000.000
300.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 33% 200.0000.000
702 Z2019.1556Quetta
CPapproved
WIDENING AND IMPROVEMENT OF PRINCE ROAD
500.0000.000
500.000 0.0000.000
0.000 0% 150.0000.000
0.000 150.000 30% 350.0000.000
701 Z2019.1555Quetta
CPapproved
IMPROVEMENT & WIDENING OF SARIAB ROAD FROM CUSTOM TO IRRIGATION COLONY (7.0 KM) (QUETTA PACKAGE)
7300.0000.000
7300.000 0.0000.000
0.000 0% 700.0000.000
0.000 700.000 9% 6600.0000.000
700 Z2019.1554Quetta
CPapproved
IMPROVEMENT OF SIRKI ROAD QUETTA
500.0000.000
500.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 20% 400.0000.000
699 Z2019.1553Quetta
CPapproved
WIDENING AND IMPROVEMENT OF BREWERY ROAD FRPM JOINT ROAD TO START OF EXISTING BRIDGE (2KM)
1000.0000.000
1000.000 0.0000.000
0.000 0% 200.0000.000
0.000 200.000 20% 800.0000.000
698 Z2019.1552Nushki
CPapproved
RECONDITIONING AND WIDENING FROM QADIRBAD TO ZARO ROAD (LENGTH 92KM)
769.1130.000
769.113 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 13% 669.1130.000
697 Z2019.1519Khuzdar
CPapproved
CONSTRUCTION OF ROAD KACHA, NALL, ARANJI, WADH.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
696 Z2019.1512Barkhan
CPapproved
CONSTRUCTION OF BLACK TOP ROAD, FROM GULLO DAMAN ROAD TO BASTI MOHMA SAMAD KHAN (2.85 KM)*
18.0000.000
18.000 0.0000.000
0.000 0% 14.0000.000
0.000 14.000 77% 4.0000.000
695 Z2019.1511Barkhan
CPapproved
CONSTRUCTION OF BLACK TOP ROAD, FROM DADA SHAH MAHMOOD TO KARECHRA (4.00 KM)
24.0000.000
24.000 0.0000.000
0.000 0% 14.0000.000
0.000 14.000 58% 10.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 76: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/76.jpg)
Public Sector Development Programme (Sectorwise)
72 of 214
726 Z2019.1669Qilla
AbdullahCPapproved
CONST: OF ROAD 4 KM KILLI DAD MUHD GHIZAI TO KILLI SHAD KAHOD GHIBZAI.
28.0000.000
28.000 0.0000.000
0.000 0% 28.0000.000
0.000 28.000 100% 0.0000.000
725 Z2019.1668Qilla
AbdullahCPapproved
CONST: OF ROAD 5 KM KILLI JANGLE BAZAR TO KILLI MOMEEN PIRALIZAI.
35.0000.000
35.000 0.0000.000
0.000 0% 35.0000.000
0.000 35.000 100% 0.0000.000
724 Z2019.1667Qilla
AbdullahCPapproved
CONST: OF ROAD 2 KM KILLI MALAK MUHD YOUNAS SAZO PIRALZAI TO KILLI KARI GHULAM WALI SAZO PIRALIZAI.
14.0000.000
14.000 0.0000.000
0.000 0% 14.0000.000
0.000 14.000 100% 0.0000.000
723 Z2019.1666Qilla
AbdullahCPapproved
CONST: OF ROAD 3 KM KILLI BAZ MUHD PIRALIZAI TO KILLI HAJI SAMAD PIRALIZAI.
21.0000.000
21.000 0.0000.000
0.000 0% 21.0000.000
0.000 21.000 100% 0.0000.000
722 Z2019.1665Qilla
AbdullahCPapproved
CONST: OF ROAD 3 KM KILLI HURAMZAI-II, MALAK HAMID KOLAK.
21.0000.000
21.000 0.0000.000
0.000 0% 21.0000.000
0.000 21.000 100% 0.0000.000
721 Z2019.1633Sohbatpur
CPapproved
CONST. OF BRIDGE ON NASEER CANAL GOTH MUHAMMAD HASSAN BANGULZAI U/C ROOPA.& VILLAGE NABI DAD JKRANI ON JUDHAIR SHAH
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
720 Z2019.1632Sohbatpur
CPapproved
REHABILITATION OF BLACK TOP ROAD JHANDRI TO IBRAHEEM KHAN VIA ISMAIL KHAN TO JHANDA TALAB 5 KM
18.0000.000
18.000 0.0000.000
0.000 0% 18.0000.000
0.000 18.000 100% 0.0000.000
719 Z2019.1629Bela
CPapproved
CONST: OF B/T ROAD 25 KM FROM RCD ROAD TO HINDO JAMOT GOTH DABDA JAM YOUSAF ABAD BELA.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
718 Z2019.1621Musa Khail
CPapproved
CONST: OF B/T ROAD FROM MAIN N-70 ROAD VIA SHAM TO RARASHAM CITY 19 KM.
85.5000.000
85.500 0.0000.000
0.000 0% 85.5000.000
0.000 85.500 100% 0.0000.000
717 Z2019.1616Panjgur
CPapproved
CONST: OF DUAL CARRIAGE WAY FROM WASHBOOD BYPASS TO GRAMKAN CROSS.
358.6000.000
358.600 0.0000.000
0.000 0% 170.0000.000
0.000 170.000 47% 188.6000.000
716 Z2019.1600Sibi
CPapproved
REH: / PATCH WORK OF ROAD FROM BAGH CITY TO TANGOTI (8 KM) TEHSIL BAGH SIBI.
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
715 Z2019.1595Nushki
CPapproved
CONS: OF B/T ROAD OF KILLI GHARIBABAD, DISTRICT NUSHKI.
80.0000.000
80.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 50% 40.0000.000
714 Z2019.1594Nushki
CPapproved
CONST: OF B/T ROAD OF KILLI QAZIABAD, DISTRICT NUSHKI.
80.0000.000
80.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 50% 40.0000.000
713 Z2019.1589Quetta
CPapproved
CONST: OF B/T ROAD ALI ABAD, KHALIQ SHAHEED ROAD, AHMED KOHZAD ROAD, HUSSAIN ABAD, ZAKIR ABAD, ETC HAZARA TOWN QUETTA
80.0000.000
80.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 25% 60.0000.000
712 Z2019.1576Panjgur
CPapproved
CONST: OF B/T ROAD FROM MAIN QUETTA ROAD TO GHS GRAMKAN PANJGUR. 3KM.
40.0000.000
40.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 25% 30.0000.000
711 Z2019.1575Loralai
CPapproved
CONST: OF B/T ROAD FROM SANJAVI DUKI CROSS TO LORALAI (12 KM).
314.3500.000
314.350 0.0000.000
0.000 0% 80.0000.000
0.000 80.000 25% 234.3500.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 77: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/77.jpg)
Public Sector Development Programme (Sectorwise)
73 of 214
742 Z2019.1695Quetta
CPapproved
CONSTT: OF B/T ROAD AT CHASHMA ACHOZAI TO SARA GHURGAI QUETTA.
42.0000.000
42.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 47% 22.0000.000
741 Z2019.1692Quetta
CPapproved
CONSTT: OF B/T ROAD AND DRAIN AT WESTREN BYPASS TO SABZAL ROAD QUETTA.
50.0000.000
50.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 50% 25.0000.000
740 Z2019.1691Mastung
CPapproved
CONSTRUCTION OF B/T ROAD MAIN ROAD TO SAI PUSHT TO KILLI ABDUL MALIK DASHT DISTRICT MASTUNG 2KM
16.6000.000
16.600 0.0000.000
0.000 0% 16.6000.000
0.000 16.600 100% 0.0000.000
739 Z2019.1689Mastung
CPapproved
CONSTRUCTION OF B/T ROAD MAIN ROAD SAI PUSHT TO KILLI GHULAM QADIR DASHT DISTRICT MASTUNG 3KM
24.8000.000
24.800 0.0000.000
0.000 0% 24.8000.000
0.000 24.800 100% 0.0000.000
738 Z2019.1688Quetta
CPapproved
CONSTT: OF INTERNAL ROADS IN KILLI LOWER KAREZ SARIAB ROAD PB-30 QUETTA. (6.25 KM).
50.0000.000
50.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 50% 25.0000.000
737 Z2019.1687Mastung
CPapproved
CONSTRUCTION OF B/T ROAD N-65 TO JALAB GANDAN DASHT DISTRICT MASTUNG 5KM
41.0000.000
41.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 60% 16.0000.000
736 Z2019.1686Quetta
CPapproved
CONSTT: OF INTERNAL ROADS NEAR BURMA HOTEL SARIAB ROAD PB-30 QUETTA. (2.5 KM).
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
735 Z2019.1685Mastung
CPapproved
CONSTRUCTION OF B/T ROAD ASIMABAD TO KUMBILA DASHT DISTRICT MASTUNG
75.0000.000
75.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 66% 25.0000.000
734 Z2019.1684Kachhi
CPapproved
CONSTRUCTION OF B/T (REMAINING WORK) MANI SANNI ROAD LUNDA KACHHI (5 KM) DISTRICT KACHHI
60.0000.000
60.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 50% 30.0000.000
733 Z2019.1683Kachhi
CPapproved
CONSTRUCTION OF B/T ROAD FROM MESHAR KHATTAN TO DILDAR (7 KM) DISTRICT KACHHI
94.5000.000
94.500 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 52% 44.5000.000
732 Z2019.1680Jhal Magsi
CPapproved
RE-CARPETING B/T ROAD FROM M-8 TO MITHOW
16.0000.000
16.000 0.0000.000
0.000 0% 16.0000.000
0.000 16.000 100% 0.0000.000
731 Z2019.1679Jhal Magsi
CPapproved
CONSTRUCTION OF B/T ROAD FROM SHAMBANI TO KHICHI JADEED, DISTRICT JHAL MAGSI
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
730 Z2019.1678Nasirabad
CPapproved
CONST: OF B/T ROAD MANJHOO SHORI BRIDGE TO GOTH RAIS MOLA BAKSH MANJHOO
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
729 Z2019.1677Shaheed
Sikandarabad
CPapproved
CONST: OF B/T ROAD FROM KALGHALI TO SHANA DISTRICT SHAHEED SIKANDAR ABAD (LENGTH 8.50 KM)
86.3800.000
86.380 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 46% 46.3800.000
728 Z2019.1674Jaffarabad
CPapproved
B/T ROAD FROM MIRWA RD TO NOORPUR JAMALI 1.25KM
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
727 Z2019.1670Qilla
AbdullahCPapproved
CONST: OF ROAD 3 KM KILLI SALAD TANA CHAWK TO SALAD TANA VILLAGE.
21.0000.000
21.000 0.0000.000
0.000 0% 21.0000.000
0.000 21.000 100% 0.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 78: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/78.jpg)
Public Sector Development Programme (Sectorwise)
74 of 214
758 Z2019.1765Jaffarabad
CPapproved
REHABILIATION OF MAIN QUETTA USTA MUHAMMAD ROAD DERA ALLAH YAR TO ROJHAN JAMALI 13 KM JAFFARABAD
100.0000.000
100.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 50.0000.000
757 Z2019.1754Khuzdar
CPapproved
CONSTT: OF 6 KM ROAD FROM BADRI ROAD AIK NOHAKZAI CHOWK UP TO GORISTANI RCD.
50.0000.000
50.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 50% 25.0000.000
756 Z2019.1752Gwadar
CPapproved
CONSTRUCTION OF B/T RD BAKHSHI PUMP TO COLLEGE
19.7700.000
19.770 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 9.7700.000
755 Z2019.1751Gwadar
CPapproved
CONSTRUCTION CHAKULI COASTEL HIGH WAY LINK ROAD
25.0000.000
25.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 60% 10.0000.000
754 Z2019.1742Nushki
CPapproved
CONSTRUCTION OF BLACK TOP ROAD AND SEWERAGE LINE KILLI HAJI MOHAMMAD HASSAN KISANKORI.
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
753 Z2019.1741Nushki
CPapproved
CONSTRUCTION OF BLACK TOP ROAD FROM BALANOSH TO KILLI MALIK FAIZ MOHAMMAD NAWAR
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
752 Z2019.1740Nushki
CPapproved
CONSTRUCTION/WIDENING OF BLACK TOP ROAD FROM ANAM BOSTAN TO GAZNALI ROAD .
100.0000.000
100.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 40% 60.0000.000
751 Z2019.1717Washuk
CPapproved
CONSTRUCTION OR BLACK TOP ROAD MUSAKHAIL TOWN DISTRICT WAHSUK LENGTH 2.50 KM
26.0000.000
26.000 0.0000.000
0.000 0% 13.0000.000
0.000 13.000 50% 13.0000.000
750 Z2019.1716Washuk
CPapproved
CONSTRUCTION OF BLASK TOP RAOD THALO TO PALIAT VIA NEEL DISTRICT WASHUK LENGTH 3 KM
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
749 Z2019.1714Pishin
CPapproved
CONSTRUCTION OF B/T ROAD & TUFF TILE MOHALLA ZIA TAREEN KILLI ALIZAI PISHIN.
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
748 Z2019.1711Quetta
CPapproved
CONST: OF B/T ROAD FROM N-50 TO KARKHASA ROAD HOUSE QUETTA (LENGTH 3KM) & CYCLING AND JOGGING TRACK
50.0000.000
50.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 50% 25.0000.000
747 Z2019.1706Sibi
CPapproved
REHABILITATION OF BLACK TOP ROAD FROM DAMBOLI TO KHANO SHERHAR LEHRI DISTRICT SIBI
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
746 Z2019.1705Quetta
CPapproved
COSNT: & RECARPETING OF ROAD WARD NO. 54 KILLI SHAHOZAI, KILLI IBRAHIM ZAI, ALLAH BAD & ADJOINING AREAS
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
745 Z2019.1704Sibi
CPapproved
REHABILITATION OF BLACK TOP ROAD FROM LEHRI TO WAZIR MACHHI
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
744 Z2019.1703Sibi
CPapproved
CONSTRUCTION OF BLACK TOP ROAD FROM N-65 TO MACH MIRAN LEHRI
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
743 Z2019.1698Pishin
CPapproved
CONSTRUCTION OF B/T ROAD AT KILLI NILLI BOSTAN.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 79: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/79.jpg)
Public Sector Development Programme (Sectorwise)
75 of 214
774 Z2019.1836Quetta
CPapproved
CONST: OF B/T ROAD FROM MAIN QAMBRANI ROAD TO KILLI SHAREEF ABAD, QUETTA
50.0000.000
50.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 50% 25.0000.000
773 Z2019.1829Quetta
CPapproved
CONST: OF BRIDGE AT KILLI SHAMOZAI SARIAB ROAD QUETTA.
52.0000.000
52.000 0.0000.000
0.000 0% 26.0000.000
0.000 26.000 50% 26.0000.000
772 Z2019.1828Quetta
CPapproved
CONST: OF B/T ROAD AT KILLI KAMALOO SARIAB ROAD QUETTA 5 KM.
45.0000.000
45.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 55% 20.0000.000
771 Z2019.1825Quetta
CPapproved
CONST:OF B/T ROAD INTERNAL ROADS AND SEWERAGE SYSTEM IN RAILWAY HOUSING SOCIETY JOINT ROAD, QUETTA
40.0000.000
40.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 50% 20.0000.000
770 Z2019.1824Quetta
CPapproved
CONST: OF B/T ROAD INTERNAL ROADS AND SEWERAGE SYSTEM IN GREEN TOWN SARIYAB ROAD QUETTA.
33.0000.000
33.000 0.0000.000
0.000 0% 16.5000.000
0.000 16.500 50% 16.5000.000
769 Z2019.1820Kalat
CPapproved
BLACK TOP ROAD FROM ISKALKU TO SHEIKHARI 18 KM.
13.0000.000
13.000 0.0000.000
0.000 0% 13.0000.000
0.000 13.000 100% 0.0000.000
768 Z2019.1816Kalat
CPapproved
BLACK TOP ROAD KALAT TOWN TO ISKALKU 22KM.
16.0000.000
16.000 0.0000.000
0.000 0% 16.0000.000
0.000 16.000 100% 0.0000.000
767 Z2019.1813Chagai
CPapproved
LINK ROAD N-40 TO MASHKICHAH.
50.0000.000
50.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 50% 25.0000.000
766 Z2019.1805Quetta
CPapproved
CONSTT: OF B/T ROADS AT BALOCHI STREET, SHALDARA, USMAN ABAD & OASHTOONABAD DISTRICT QUETTA.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
765 Z2019.1798Quetta
CPapproved
CONSTRUCTINO OF BT ROAD FROM KILLI ANDERABAD KATIR KUCHLAK QUETTA
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
764 Z2019.1797Pishin
CPapproved
CONSTRUCTION OF BT ROAD KILLI HAJI SAIFUDDIN POPALZAI.
18.0000.000
18.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 55% 8.0000.000
763 Z2019.1796Qilla
AbdullahCPapproved
RE CARPETING OF BT ROAD FROM SYED HAMEED CROSS TO POPALZAI KILLI (4KM).
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
762 Z2019.1776Zhob
CPapproved
CONSTRUCTION OF BLACK TOP ROAD N-50 TO KILLI MUSAZAI DISTRICT ZHOB.
90.0000.000
90.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 33% 60.0000.000
761 Z2019.1772Jaffarabad
CPapproved
B/T RD MAIN KHAN WAH CANAL TO VILLAGE GUL KHAN KHOSA,HAIRBIAR, JALAL BHAND, MOUZAM,GORMANI KOT ETC 8KM
100.0000.000
100.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 40% 60.0000.000
760 Z2019.1767Dera Bugti
CPapproved
CONSTT: OF BLACK TOP ROAD FROM SHAM KHAIRAN TO LATO WAD ATEHSIL QADIRABAD.
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
759 Z2019.1766Dera Bugti
CPapproved
REHABILITATION OF BLACK TOP ROAD FROM MAT KUND TO MULA HOTEL BAIKER, TEHSIL QADIRABAD, DISTRICT DERA BUGTI. (6 KM).
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 80: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/80.jpg)
Public Sector Development Programme (Sectorwise)
76 of 214
790 Z2019.1890Pishin
CPapproved
CONSTRUCTION & WIDENING OF PISHIN CITY BYPASS DISTRICT PISHIN (LENGTH 2.00 KM).
200.0000.000
200.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 25% 150.0000.000
789 Z2019.1888Quetta
CPapproved
CONST:O B/T ROADS & SIDE DRAINS FROM MAIN SARIAB RD TO MIR USMAN PIRKANI MOH: PIRKANIABAD,MOHA: ALIZAI,KHILJI COL: ETC
201.0000.000
201.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 49% 101.0000.000
788 Z2019.1880Khuzdar
CPapproved
CONST: OF B/T ROAD GHAR JHALRI TO DRIKO ZEEDI.
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
787 Z2019.1867Khuzdar
CPapproved
CONSTRUCTION OF B/T ROAD MAROWAL TO LAD KHUZDAR
40.0000.000
40.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 100% 0.0000.000
786 Z2019.1865Khuzdar
CPapproved
CONSTRUCTION OF B/T ROAD FROM HENAR NOGHE TO CHUKI NOGHE BAGHBANA KHUZDAR
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
785 Z2019.1863Khuzdar
CPapproved
CONSTRUCTION OF B/T ROAD FROM KILLI YAR MUHAMMAD TO KILLI SALEH MUHAMMAD NOGHE BAGHBAN KHUZDAR
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
784 Z2019.1862Khuzdar
CPapproved
CONSTRUCTION OF B/T ROAD FROM QADIRI HOTEL TO KILLI KHURASANI NOGHE BAGHBANA KHUZDAR
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
783 Z2019.1861Khuzdar
CPapproved
CONSTRUCTION OF B/T ROAD FROM NHA ROAD TO SAEEDABAD NOGHE BAGHBANA KHUZDAR
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
782 Z2019.1860Kharan
CPapproved
CONSTRUCTION OF BLACK TOP ROAD KILLI PURPET KILLI MULLA FAZAL KOOTAN DISTRICT KHARAN
40.0000.000
40.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 50% 20.0000.000
781 Z2019.1859Kharan
CPapproved
CONSTRUCTION OF B/T ROAD FROM YAKMACH TO BULANDUK DISTRICT KHARAN
100.0000.000
100.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 50.0000.000
780 Z2019.1858Kharan
CPapproved
CONSTRUCTION / CUTTING OF KHARAN NAMAK - PASS ROAD
150.0000.000
150.000 0.0000.000
0.000 0% 75.0000.000
0.000 75.000 50% 75.0000.000
779 Z2019.1853Mastung
CPapproved
CONSTRUCTION OF B/T RD KILLI LOOCHA TINDLAN
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
778 Z2019.1851Quetta
CPapproved
RE-CARPETING OF STREETS & LANES FOR UNION COUNCILS QUETTA
22.0000.000
22.000 0.0000.000
0.000 0% 11.0000.000
0.000 11.000 50% 11.0000.000
777 Z2019.1849Quetta
CPapproved
PAVEMENT OF ROADS FOR UNION COUNCILS QUETTA
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
776 Z2019.1848Quetta
CPapproved
ADDITIONAL WORKS FOR POLICE GRAMMER SCHOOL POLICE LINE QUETTA
18.0000.000
18.000 0.0000.000
0.000 0% 18.0000.000
0.000 18.000 100% 0.0000.000
775 Z2019.1838Quetta
CPapproved
CONST: OF B/T ROAD FROM MAIN QAMBRANI ROAD TO GIRLS HIGH SCHOOL, KILLI QAMBRANI, QUETTA
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 81: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/81.jpg)
Public Sector Development Programme (Sectorwise)
77 of 214
806 Z2019.1907Ziarat
CPapproved
REPAIR OF MANNA ROAD, DISTRICT ZIARAT
100.0000.000
100.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 30% 70.0000.000
805 Z2019.1906Jhal Magsi
CPapproved
WIDENING & RECONDITIONING OF B/T ROAD FROM NAUTAL TO GANDAWAH.
2191.4400.000
2191.440 0.0000.000
0.000 0% 200.0000.000
0.000 200.000 9% 1991.4400.000
804 Z2019.1905Dera Bugti
CPapproved
CONST: /BLACK TOPPING ROAD FROM RAKHNI TO BAIKAR.(LENGTH 75KM)(PHASE-I)
390.0000.000
390.000 0.0000.000
0.000 0% 90.0000.000
0.000 90.000 23% 300.0000.000
803 Z2019.1904Kalat
CPapproved
CONST OF BLACK TOP ROAD KALAT HARBOI TO GUZG.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
802 Z2019.1903Jaffarabad
CPapproved
REH: OF B/T ROAD FROM BALAN SHAKH TO KHER THAR CANAL ( 7 KM ).
120.0000.000
120.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 33% 80.0000.000
801 Z2019.1902Jaffarabad
CPapproved
REH: OF B/T ROAD FROM ROJHAN JAMALI TO MOHABBAT SHAKH ( 6 KM ).
70.0000.000
70.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 42% 40.0000.000
800 Z2019.1901Quetta
CPapproved
B/T ROAD OF KILLI SUFI, SAMALI, KATHEER, STATION, MALIK MEHRAB & ADJOINING AREAS & KILLI MALIK GUL MOHD KHAN KUCHLAK.
250.0000.000
250.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 20% 200.0000.000
799 Z2019.1900Sohbatpur
CPapproved
SOHABTPUR TO KASHMORE ROAD (PHASE 1).
1000.0000.000
1000.000 0.0000.000
0.000 0% 200.0000.000
0.000 200.000 20% 800.0000.000
798 Z2019.1899Sibi
CPapproved
WIDENING , RECONDITIONING OF BAKHTIARABAD TO LEHRI ROAD N-65 TO LEHRI.
400.0000.000
400.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 25% 300.0000.000
797 Z2019.1898Nasirabad
CPapproved
CONT OF BLACKTOP ROAD FROM N-65 TO PHULEJI ZARINA BALINA VIA SYED HASSAN TAHIR KOT KORAR BANRI DISTT NASEERABAD.
500.0000.000
500.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 20% 400.0000.000
796 Z2019.1897Zhob
CPapproved
CONSTRUCTION OF B/T OF INTERNAL ROADS IN ZHOB CITY.
100.0000.000
100.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 40% 60.0000.000
795 Z2019.1895Kech
CPapproved
CONSTRUCTION OF B/T ROAD FROM SORO MAND TO TALAMB MAND VIA BULLO MAND DISTRICT KECH (10 KM).
120.0000.000
120.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 33% 80.0000.000
794 Z2019.1894Washuk
CPapproved
CONSTUCTION OF KAMAN ROD BRIDGE WITH PROTECTION WORK B/W PLANTAK, MASHKHAIL ROAD.
300.0000.000
300.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 16% 250.0000.000
793 Z2019.1893Duki
CPapproved
CONSTRUCTION OF B/T ROAD FROM CHALGHAZI CROSS TO KAREZ VIA WAHVI.
302.6500.000
302.650 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 16% 252.6500.000
792 Z2019.1892Nasirabad
CPapproved
B/T ROAD FROM N-65 MAJOSHOORI GHAFOORABAD MIR WAH SHAHI CHONKI FAIZABAD.
937.0000.000
937.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 10% 837.0000.000
791 Z2019.1891Nasirabad
CPapproved
WIDENING AND IMPROVERMENT OF BLACK TOPPED ROAD FROM N-65 TO CHATTAR DISTRICT NASEERABAD LENGTH 40.00 KM.
472.0000.000
472.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 21% 372.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 82: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/82.jpg)
Public Sector Development Programme (Sectorwise)
78 of 214
822 Z2019.1971Quetta
CPapproved
REHABILITATION OF ROAD FROM WESTERN BYPASS TO MUSHLAK FIRING RANGE
62.2570.000
62.257 0.0000.000
0.000 0% 62.2570.000
0.000 62.257 100% 0.0000.000
821 Z2019.1970Awaran
CPapproved
CONSTRUCTION STRUCTURE WORK OF ROAD FROM MASHKAI TO JAHO VIA KAPORE
180.0000.000
180.000 0.0000.000
0.000 0% 90.0000.000
0.000 90.000 50% 90.0000.000
820 Z2019.1969Pishin
CPapproved
DUALLIZATION OF INTERNAL BYPASS ROAD PISHIN.
105.0000.000
105.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 47% 55.0000.000
819 Z2019.1968Quetta
CPapproved
CONSTRUCTION OF 230 (RUNNING METERS) FLYOVER AT PAF BASE
203.0410.000
203.041 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 49% 103.0410.000
818 Z2019.1967Loralai
CPapproved
CONSTRUCTION OF ROAD MEKHTAR-CHAMALANG.
900.0000.000
900.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 11% 800.0000.000
817 Z2019.1966Gwadar
CPapproved
CONST: OF BLACK TOPPED ROAD TURBAT - PASNI.
1000.0000.000
1000.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 10% 900.0000.000
816 Z2019.1948Bela
CPapproved
CONST: OF B/T ROAD & SEWERAGE SYSTEM AT GHAREEB ABAD AMEER ABAD GLAXY TOWN AT HUB TWON DIST: LASBELLA.
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
815 Z2019.1946Bela
CPapproved
CONST: OF B/T ROAD FORM NOORANI CROSS TO WADERA SALEH BAPRA GOTH(5KM) PHASE-1,DIST: BELA.
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
814 Z2019.1944Ziarat
CPapproved
REHABILITATION OF ZIARAT TO SANJAVI ROAD
200.0000.000
200.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 50% 100.0000.000
813 Z2019.1938Kohlu
CPapproved
CONST: OF BLACK TOPPED ROAD AND SEWERAGE LINE AT MARRI COLONY AT DISTRICT KOHLU
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
812 Z2019.1933Kachhi
CPapproved
CONST. OF BLACK TOP FROM MACH TO MARGAT DISTRICT KACHHI.
450.0000.000
450.000 0.0000.000
0.000 0% 200.0000.000
0.000 200.000 44% 250.0000.000
811 Z2019.1926Quetta
CPapproved
FEASIB: STUDY OF ROAD CONST: TO THE TOP OF "LOE NIKAN" TOP OF CHAR SHAKH WITH POTENTIAL OF TOURISM DEV:.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
810 Z2019.1921Nasirabad
CPapproved
CONST OF B/T ROAD FROM TEPUL SHAKH TO MIR GHULAM NABI UMRANI
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
809 Z2019.1917Nasirabad
CPapproved
CONST OF B/T RD TO JAKRANI PUL TO DOST M. PANDRANI PUL
22.7000.000
22.700 0.0000.000
0.000 0% 22.7000.000
0.000 22.700 100% 0.0000.000
808 Z2019.1909Sibi
CPapproved
CONSTT: OF B/T ROAD FROM MACH MURAD WAH MIRAN TRIHER.
95.0000.000
95.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 31% 65.0000.000
807 Z2019.1908Bela
CPapproved
B/T ROAD FROM SHAH NOORAN CROSS TO WADERS SALEH BAPRS GOTH AND ISMAIL GOTH TEHSIL HUB.
100.0000.000
100.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 30% 70.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 83: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/83.jpg)
Public Sector Development Programme (Sectorwise)
79 of 214
838 Z2019.2050Quetta
CPapproved
PREMIX CARPETING OF MAIN DUAL TRACK WITH JMF FROM SMANGLI ROAD TOWARDS CANTT LIMIT JINNAH TOWN QUETTA CANTT:
25.0000.000
25.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 40% 15.0000.000
837 Z2019.2044Pishin
CPapproved
KILLI SALAUDINGUAL 2 KM BT ROAD
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
836 Z2019.2042Pishin
CPapproved
B/T ROAD KILLI YASIR BATEZAI 2 KM
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
835 Z2019.2040Pishin
CPapproved
B/T ROAD KILLI AHMED KHAN BOSTAN 2KM
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
834 Z2019.2038Pishin
CPapproved
CONST: OF BALOZAI BT ROAD 4 KM.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
833 Z2019.2034Kech
CPapproved
CONST OF B/T ROAD FROM RODBUN TO GOMAZAI
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
832 Z2019.2032Barkhan
CPapproved
CONST OF B/T ROAD, SIDE DRAINS AND TUFF TILES BASTI SOHRAB ABAD & BASTI GANWANI, RAKNI
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
831 Z2019.2031Bela
CPapproved
IMPROVEMNET/REHAB: OF B/T ROAD LAKHRA TO KANKI BRIDGE AWARAN ROAD 46.90 KM.
466.1310.000
466.131 0.0000.000
0.000 0% 150.0000.000
0.000 150.000 32% 316.1310.000
830 Z2019.2028Gwadar
CPapproved
CONSTRUCTION OF BYPASS BELA CITY ROAD CONNECTING WITH MAIN RCD QUETTA CITY
170.0000.000
170.000 0.0000.000
0.000 0% 170.0000.000
0.000 170.000 100% 0.0000.000
829 Z2019.2019Zhob
CPapproved
CONST: OF B/T ROAD FROM N-50 (PANI TAQSEEM) TO AIRPORT ROAD, DISTRICT ZHOB.
39.4000.000
39.400 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 50% 19.4000.000
828 Z2019.2006Quetta
CPapproved
CONST: OF ROAD FROM PAIND KHAN ROAD TO ALMO CHOWK.
10.0000.000
10.000 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 50% 5.0000.000
827 Z2019.1981Sibi
CPapproved
CONSTRUCTION OF ROAD SIBI VIA TALLI TO KAHAN.
1000.0000.000
1000.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 10% 900.0000.000
826 Z2019.1980Dera Bugti
CPapproved
CONSTRUCTION OF ROAD DERA BUGTI SANGSILA
1000.0000.000
1000.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 10% 900.0000.000
825 Z2019.1979Quetta
CPapproved
CONSTRUCTION OF LATERAL ROAD NORTH OF ASKARI PARK
83.6000.000
83.600 0.0000.000
0.000 0% 83.6000.000
0.000 83.600 100% 0.0000.000
824 Z2019.1974Nushki
CPapproved
CONSTRUCTION OF NUSHKI CITY BYPASS - AFGHAN BORDER
150.0000.000
150.000 0.0000.000
0.000 0% 75.0000.000
0.000 75.000 50% 75.0000.000
823 Z2019.1972Chagai
CPapproved
CONSTRUCTION OF ROAD AMRI CROSS - AMRI CHARBAN
720.0000.000
720.000 0.0000.000
0.000 0% 150.0000.000
0.000 150.000 20% 570.0000.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 84: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/84.jpg)
Public Sector Development Programme (Sectorwise)
80 of 214
846 Z2019.2097Khuzdar
CPapproved
CONST: OF B/T ROAD FROM HENAL NOGHA TO CHUKI NOHA BAGHBANA.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
845 Z2019.2096Kachhi
CPapproved
CONST: OF B/T ROAD FROM MASHKAF TO BARAM.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
844 Z2019.2095Khuzdar
CPapproved
CONST: OF B/T ROAD MAROWAL TO LAD.
40.0000.000
40.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 50% 20.0000.000
843 Z2019.2075Washuk
CPapproved
CONST OF B/T ROAD FROM 0 POINT TO MASHKEL
70.0000.000
70.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 57% 30.0000.000
842 Z2019.2074Pishin
CPapproved
CONSTRUCTION OF 18 KM ROAD KILLA HAJI KHAN, SASUBAI, SRI, GHARAGHI, MANDAALIZAI,SABORA TO ZHARKAS
150.0000.000
150.000 0.0000.000
0.000 0% 70.0000.000
0.000 70.000 46% 80.0000.000
841 Z2019.2068Pishin
CPapproved
CONST: OF B/T ROAD KILLI SABOOR AGHA & TAHIR AGHA.
65.5000.000
65.500 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 61% 25.5000.000
840 Z2019.2053Quetta
CPapproved
CARPETING OF ROADS USING JMF AT SHAHBAZ TOWN PHASE-II QUETTA CANTT:
17.0000.000
17.000 0.0000.000
0.000 0% 17.0000.000
0.000 17.000 100% 0.0000.000
839 Z2019.2051Pishin
CPapproved
B/T ROAD 4 KM KILLI NIAMAT BATEZAI
45.0000.000
45.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 33% 30.0000.000
0.000 0.000 0.000 0.000
Roads(401 New Projects) GoB/FPA Sub-Total
45401.701
45401.701
0.000 0.000 16716.532
0.000 16716.532
28685.169
Sector: Communication
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Roads
Chapter: COMMUNICATION
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
New
Roads(528 Projects) Total
79523.400
79842.067
23623.659
23914.539 20929.531
0.000 20955.892
34970.210
Sub-Sector Total (FPA) 318.667 290.880 26.361 1.426
2019 - 20 Original
![Page 85: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/85.jpg)
Public Sector Development Programme (Sectorwise)
81 of 214
862 Z2009.0406Zhob
Approved
CONST: OF KILLI NAZAR KHAN TO HAZRAT SAHIB ROAD 27 KM.
191.2460.000
191.246 172.2090.000
172.209 90% 19.0370.000
0.000 19.037 100% 0.0000.000
861 Z2009.0405Qilla
SaifullahApproved
CONSTRUCTION OF KSF SHARAN ROAD.
260.0630.000
260.063 229.7110.000
229.711 88% 30.3520.000
0.000 30.352 100% 0.0000.000
860 Z2009.0312Zhob
Approved
CONSTRUCTION OF DANA ABDULLAHZAI ROAD 50 KM.
412.0620.000
412.062 258.6050.000
258.605 62% 50.0000.000
0.000 50.000 74% 103.4570.000
859 Z2009.0310Qilla
SaifullahApproved
CONSTRUCTION OF DUMAR KACH ROAD 30 KM.
366.8880.000
366.888 256.4030.000
256.403 69% 10.0000.000
0.000 10.000 72% 100.4850.000
858 Z2005.0641ProvincialApproved
CONST. ROGHANI LOIBANDI AND DUMER KACH ROAD 60 KM.
286.0600.000
286.060 279.6030.000
279.603 97% 6.4570.000
0.000 6.457 100% 0.0000.000
857 Z2005.0523Zhob
Approved
CONST. OF B/T ROAD KILLI MARRIUM TO GOUSTRI BEHLOOL 128 KM ZHOB.
696.5090.000
696.509 334.7690.000
334.769 48% 20.0000.000
0.000 20.000 50% 341.7400.000
856 Z2005.0360Pishin
Approved
CONST. OF DOORI SALMAN KHAIL NALI YASEENZAI GHAZA BAND AJRAM ROAD 30 KM PISHIN.
277.6180.000
277.618 269.6980.000
269.698 97% 7.9200.000
0.000 7.920 100% 0.0000.000
855 Z2005.0353Loralai
Approved
NARI ANDRA ROAD MEKTHER. 170.3580.000
170.358 119.9010.000
119.901 70% 10.0000.000
0.000 10.000 76% 40.4570.000
854 Z2005.0253Pishin
Approved
CONST. OF VARIOUS B/T ROADS IN KHANOZAI AREA PISHIN.
340.5140.000
340.514 300.0570.000
300.057 88% 0.1000.000
0.000 0.100 88% 40.3570.000
853 Z2005.0221Awaran
Approved
CONSTRUCTION OF LINK ROAD BAZDAD, AWARAN.
193.7380.000
193.738 115.7380.000
115.738 59% 20.0000.000
0.000 20.000 70% 58.0000.000
852 Z2005.0218Awaran
Approved
CONST: OF B/T ROAD & STRUCTURE - GISHKORE TO TANZILA LINK ROAD 25 KM.
249.7870.000
249.787 131.7870.000
131.787 52% 30.0000.000
0.000 30.000 64% 88.0000.000
851 Z2004.1163Musa KhailApproved
CONST:/BLACK TOPPING OF ROADS FROM MUSAKHAIL TO KAJOORI ROAD 131 KM .
756.0540.000
756.054 634.3970.000
634.397 83% 50.0000.000
0.000 50.000 90% 71.6570.000
850 Z2004.0938Qilla
SaifullahApproved
CONST: OF KILLA SAIFULLAH AND MUSLIM BAGH TOWN ROAD .
454.5010.000
454.501 431.0440.000
431.044 94% 10.0000.000
0.000 10.000 97% 13.4570.000
849 Z2004.0673Musa KhailApproved
CONST OF KANGRI CHAAP SADOZAI ROAD MUSAKHAIL .
233.9900.000
233.990 213.1500.000
213.150 91% 20.8400.000
0.000 20.840 100% 0.0000.000
848 Z2004.0659Qilla
AbdullahApproved
CONST OF MEHMOOD NIKA PATTI ROAD SEGAI GULSITAN .
297.6910.000
297.691 217.4930.000
217.493 73% 5.0000.000
0.000 5.000 74% 75.1980.000
847 Z2004.0172Qilla
SaifullahApproved
CONST:/BLACK TOPPING OF RAGHA SULTANZAI MULGHAZAR KHAZINA ROAD 30 KM.
623.5120.000
623.512 378.7500.000
378.750 60% 30.0000.000
0.000 30.000 65% 214.7620.000
Subsector: Road (BDA)
Sector: Communication
Chapter: COMMUNICATION
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 86: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/86.jpg)
Public Sector Development Programme (Sectorwise)
82 of 214
877 Z2014.0084Harnai
Approved
CONST: OF BRIDGE ON NAKUS AT AZARA DAM DIST: HARNAI.
96.5200.000
96.520 50.4000.000
50.400 52% 46.1200.000
0.000 46.120 100% 0.0000.000
876 Z2011.0878Qilla
SaifullahApproved
CONST: OF B/T ROAD THANGA HAIDER ZAI-SHAHZAI ROAD, KILLASAIFULLAH
300.0000.000
300.000 155.0000.000
155.000 51% 10.0000.000
0.000 10.000 55% 135.0000.000
875 Z2011.0875Qilla
SaifullahApproved
CONST: OF NAWA BATOZAI ROAD KILLA SAIFULLAH.
251.0000.000
251.000 160.3570.000
160.357 63% 10.0000.000
0.000 10.000 67% 80.6430.000
874 Z2011.0810ProvincialApproved
IMPROVEMENT, WIDENING & B/T OF SPERA RAGHA ROAD FROM KHANOZAI CROSS TO LORALAI KILLA SAIFULLAH ROAD 95.5 KM (50:50).
1604.7050.000
1604.705 627.5710.000
627.571 39% 400.0000.000
0.000 400.000 64% 577.1340.000
873 Z2011.0804Zhob
Approved
CONST:/BLACK TOPPED ROAD FROM ZHOB TO KHAWANDY DIST. ZHOB.
141.7620.000
141.762 100.4850.000
100.485 70% 10.0000.000
0.000 10.000 77% 31.2770.000
872 Z2010.0882Loralai
Approved
CONST: OF BLACK TOP ROAD ZAR KAREZ VIA KHOHAR DAME TO SREY PARSHAY DIST. LORALAI 23 KM.
117.9040.000
117.904 87.5990.000
87.599 74% 10.0000.000
0.000 10.000 82% 20.3050.000
871 Z2010.0881Loralai
Approved
CONST: OF B/T ROAD N-70 TANG CHECK POST VIA NARAIDAGG TO NA-70 CHANNALI AT DIST. LORALAI 24.250 KM.
101.9500.000
101.950 76.9500.000
76.950 75% 25.0000.000
0.000 25.000 100% 0.0000.000
870 Z2010.0877Qilla
SaifullahApproved
CONST: OF B/T OF VARIOUS LINK ROADS IN MAIN PITAB DAULATAZAI, GHAIBZAI & SAIBZAI PROJECT AREAS, K.SAIFULLAH 28 KM.
252.3360.000
252.336 221.8290.000
221.829 87% 30.5070.000
0.000 30.507 100% 0.0000.000
869 Z2010.0845ProvincialApproved
CONST: OF REMAINING WORKS OF ICB-5 I.E "ZHOB MIR ALI KHEL-KAJHURI ROAD 91 KM DIST. ZHOB & SHERANI.
7430.1680.000
7430.168 6180.4000.000
6180.400 83% 1249.7680.000
0.000 1249.768 100% 0.0000.000
868 Z2010.0781Quetta
Approved
CONST: OF BLACK TOPPED ROAD NAWA KILLI TO MAIN NHA ROAD, QUETTA.
2373.1320.000
2373.132 1280.4500.000
1280.450 53% 1092.6820.000
0.000 1092.682 100% 0.0000.000
867 Z2010.0739Zhob
Approved
CONST: OF ROAD FROM SARDAR ROIDAD TO SABAKZAI DAM, ZHOB 20 KM.
135.8680.000
135.868 128.5630.000
128.563 94% 7.3050.000
0.000 7.305 100% 0.0000.000
866 Z2010.0570Qilla
SaifullahApproved
CONST: OF BLACK TOPPING ROAD FROM BELLO CROSS TO GAR SAMALAN, MUSLIM BAGH 30 KM.
443.9240.000
443.924 395.4670.000
395.467 89% 10.0000.000
0.000 10.000 91% 38.4570.000
865 Z2010.0458Harnai
Approved
CONST:OF PRESTRESS BRID. INC. APP:RD RETAINING WALL, BOX CULVERT AT TORKHAM, DOMIL BRIDGE GUT RD, ZAR. SHEPOWAL PROT:
129.9990.000
129.999 99.5330.000
99.533 76% 10.0000.000
0.000 10.000 84% 20.4660.000
864 Z2010.0388Quetta
Approved
CONST: OF VARIOUS ROADS AND STREET OF PB-6 QUETTA.
233.5710.000
233.571 208.9610.000
208.961 89% 10.6100.000
0.000 10.610 94% 14.0000.000
863 Z2010.0351Musa KhailApproved
CONSTRUCTION/BLACK TOPPING OF LINK ROADS MUSAKHAIL 70 KM.
709.8530.000
709.853 529.1070.000
529.107 74% 60.7460.000
0.000 60.746 83% 120.0000.000
Subsector: Road (BDA)
Sector: Communication
Chapter: COMMUNICATION
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 87: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/87.jpg)
Public Sector Development Programme (Sectorwise)
83 of 214
884 Z2017.0314Quetta
Approved
INSTAL: OF SECURITY CAMERAS & WALK THROUGH GATES & CONST: OF WALLS AT IMAMBARGAH QNAGHARI PB-II.
10.0000.000
10.000 2.3290.000
2.329 23% 7.6710.000
0.000 7.671 100% 0.0000.000
883 Z2017.0313Quetta
Approved
CONST: OF PUBLIC WASHROOMS & CUBICLES AT SYEDABAD, AKAMDAR ROAD, PB-II.
19.9870.000
19.987 9.0000.000
9.000 45% 10.9870.000
0.000 10.987 100% 0.0000.000
882 Z2016.1189Qilla
SaifullahApproved
CONST: OF TUBLI BADINI ROAD DIST: QILLA SAIFULLAH (DEVOLVED).
253.6890.000
253.689 40.0000.000
40.000 15% 20.0000.000
0.000 20.000 23% 193.6890.000
881 Z2016.0255NasirabadApproved
CONST: OF MAIN SEWARAGE NALA IN D.M.JAMALI PB-28.
24.7560.000
24.756 17.0000.000
17.000 68% 7.7560.000
0.000 7.756 100% 0.0000.000
880 Z2015.1370Qilla
AbdullahApproved
CONST:/ REPAIR OF CHAMAN ROGHANI ROAD VIA ABATOO HAZAR GANJI TO GULLISTAN INAYATULLAH KAREZ, PHASE-III
307.0000.000
307.000 260.3000.000
260.300 84% 10.0000.000
0.000 10.000 88% 36.7000.000
879 Z2015.0891Pishin
Approved
CONSTRUCTION OF PEDESTRIAN BRIDGE AT MANZAKI DISTRICT PISHIN.
60.7020.000
60.702 25.0000.000
25.000 41% 20.0000.000
0.000 20.000 74% 15.7020.000
878 Z2014.0876Qilla
AbdullahApproved
CONSTRUCTION OF B/T ROAD BOGHRA PICKET TO BOGHRA TOP 8 KM.
167.9570.000
167.957 147.0000.000
147.000 87% 10.0000.000
0.000 10.000 93% 10.9570.000
Road (BDA)(38 Ongoing Projects) GoB/FPA Sub-Total
20977.374
20977.374
15146.616
15146.616 3388.858 0.000 3388.858 2441.900
0.000 0.000 0.000 0.000
Subsector: Road (BDA)
Sector: Communication
Chapter: COMMUNICATION
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 88: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/88.jpg)
Public Sector Development Programme (Sectorwise)
84 of 214
899 Z2019.1889Quetta
CPapproved
CONST:/SPECIAL REHB: OF 25 METER RANGE AND TRAP RANGE AT BALOCHISTAN (B.R.A) RIFEL & PISTOL RANGE QUETTA CANNT.
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
898 Z2019.1116Loralai
CPapproved
SANITATION RECREATION OF HALL AND BOUNDARY WALL BALMEEKI COLONY LORALAI
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
897 Z2019.1073Zhob
CPapproved
LAYING OF TUFFTILES DRAINAGE SYSTEM BALMEEK COLONY ZHOB
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
896 Z2019.1072Jaffarabad
CPapproved
CONS: OF PCC STREETS AFGAN STREET, RESHAM STREET EXTENTION, REH: OF HALL HINDU PANCHAYAT USTA MOHAMMAD
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
895 Z2019.1071Nushki
CPapproved
CONST: OF B/T ROAD WITH SIDE DRAINAGE LINE STREET LIGHTS NEW HINDU MOHALLAH NOSHKI.
40.0000.000
40.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 75% 10.0000.000
894 Z2019.1069Jhal Magsi
CPapproved
CONST: OF B/T ROAD FROM DARGAH BABA KRISHNA NAND TO SHAM SHAN GHAT (1.5KM ) AT GANDHAWA DIST. JHAL MAGASI.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
893 Z2019.1063Sohbatpur
CPapproved
CONSTRUCTION OF SEWERAGE SYSTEM AND TUFF TILES AT HINDU MOUHLLAH SOHBAT PUR DISTRICT SUBAT PUR
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
892 Z2019.1041Chagai
CPapproved
CONSTRUCTION OF B/T ROAD FROM BAZAR TO SHAM SHAN GHAT (0.5 KM)AT DISTRICT DALBANDIN
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
891 Z2019.1022Quetta
CPapproved
CONSTRUCTION /REHABILITATION OF ROAD AT ESSA NAGRI QUETTA.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
890 Z2019.1016Quetta
CPapproved
CONSTRUCTION /REHABILITATION OF B/T ROAD PARSI COLONY AT DISTRICT QUETTA
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
889 Z2019.1015Harnai
CPapproved
CONST: OF B/T ROAD KHOST BAZAR AND KHUDRANI SCHOOL ROAD, DIST. HARNAI (1.5 KM)
16.0000.000
16.000 0.0000.000
0.000 0% 16.0000.000
0.000 16.000 100% 0.0000.000
888 Z2019.1013Harnai
CPapproved
CONST: OF B/T ROAD SHRAGE ROAD, DIST. HARNAI (5 KM).
47.0000.000
47.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 63% 17.0000.000
887 Z2019.1011Harnai
CPapproved
CONST: OF B/T ROAD DISTRICT COMPLEX BYPASS ROAD TO GROMI ROAD, DIST. HARNAI. (1.5 KM DUAL CARRIAGE)
65.0000.000
65.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 38% 40.0000.000
886 Z2019.1010Harnai
CPapproved
CONST: OF B/T ROAD GOCHINA TO HARNAI VIA TALIB LEASE SHORT CUT TO HARNAI, DIST. HARNAI (2.05 KM).
50.0000.000
50.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 40% 30.0000.000
885 Z2019.0983Kalat
CPapproved
REH: OF DASHT GORAN 10 KM ROAD DISTRICT KALAT.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
Road (BDA)(15 New Projects) GoB/FPA Sub-Total
373.000 373.000 0.000 0.000 266.000 0.000 266.000 107.000
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Subsector: Road (BDA)
Chapter: COMMUNICATION
Sector: Communication
New
2019 - 20 Original
![Page 89: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/89.jpg)
Public Sector Development Programme (Sectorwise)
85 of 214
0.000 0.000 0.000 0.000
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Road (BDA)(53 Projects) Total
21350.374
21350.374
15146.616
15146.616 3654.858 0.000 3654.858 2548.900
Sector Total (FPA) 318.667 290.880 26.361 1.426
Sector: COMMUNICATION(581 Projects)
100873.774
101192.441
38770.275
39061.155 24584.389
0.000 24610.750
37519.110
2019 - 20 Original
![Page 90: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/90.jpg)
Public Sector Development Programme (Sectorwise)
86 of 214
915 Z2018.0900Bela
Approved
10 MINI WEIRS IN BELA, LAKHRA, UTHAL, KANRAJ ETC IN LASBELA DISTRICT
25.0000.000
25.000 15.0000.000
15.000 60% 10.0000.000
0.000 10.000 100% 0.0000.000
914 Z2017.1725Kachhi
Approved
CONSTT: OF PCC WATER CHANNEL IN SANNI AREA, MASHKAF & DHADAR.
50.0000.000
50.000 30.0000.000
30.000 60% 20.0000.000
0.000 20.000 100% 0.0000.000
913 Z2017.1710Quetta
Approved
IMPROVEMENT OF STORM WATER DRAINAGE IN PB-03 (BDA).
20.0000.000
20.000 10.0000.000
10.000 50% 10.0000.000
0.000 10.000 100% 0.0000.000
912 Z2017.1703Khuzdar
Approved
CONSTRUCTION OF STORM WATER CHANNEL FROM SORO TO BUNDARO DAM, ANJIRA ZEHRI.
50.0000.000
50.000 30.0000.000
30.000 60% 20.0000.000
0.000 20.000 100% 0.0000.000
911 Z2017.1702Khuzdar
Approved
CONSTRUCTION OF STORM WATER CHANEL FROM ANJIRA CHASHMA TO ANJIRA VILLAGE.
50.0000.000
50.000 30.0000.000
30.000 60% 20.0000.000
0.000 20.000 100% 0.0000.000
910 Z2017.1465Khuzdar
Approved
CONST: OF STORM WATER CHANNEL FORM SORO TO BUNDAROW DAM, ANJIRA ZEHRI
50.0000.000
50.000 30.0000.000
30.000 60% 20.0000.000
0.000 20.000 100% 0.0000.000
909 Z2017.1462Khuzdar
Approved
CONST: OF STORM WATER CHANNEL FROM ANJIRA CHASHMA TO ANJIRA VILLAGE, KHUZDAR
50.0000.000
50.000 30.0000.000
30.000 60% 20.0000.000
0.000 20.000 100% 0.0000.000
908 Z2016.0398Kech
Approved
PROTECTION BUND AT AKHTER ABAD OF SURANI KECH, GINNA KECH & MOHD HASSAN BAZARA, KECH.
18.0000.000
18.000 16.0000.000
16.000 88% 2.0000.000
0.000 2.000 100% 0.0000.000
907 Z2016.0164Kachhi
Approved
PROTECTION BAND IN BALANARI DISTRICT KACHHI.
25.0000.000
25.000 22.5000.000
22.500 90% 2.5000.000
0.000 2.500 100% 0.0000.000
906 Z2016.0060ProvincialApproved
BALOCHISTAN INTEGRATED WATER RESOURCE MANAGEMENT PROJECT(BIWRMP).
564.00020378.00
0
20942.000
13.3480.000
13.348 0% 100.000351.000
0.000 451.000 2% 450.65220027.000
905 Z2015.0742JaffarabadApproved
IMPROVEMENT OF HAIR DIN DRAINAGE SYSTEM.
575.0000.000
575.000 500.0000.000
500.000 86% 10.0000.000
0.000 10.000 88% 65.0000.000
904 Z2015.0739NasirabadApproved
IMPROVEMENT OF PAT FEEDER, KHIRTHER CANAL DISTRIBUTARIES.
500.0000.000
500.000 443.4200.000
443.420 88% 10.0000.000
0.000 10.000 90% 46.5800.000
903 Z2014.0007Kohlu
Approved
PAZHA WEIR PERENNIAL IRRIGATION SCHEME IN KOHLU.
345.0000.000
345.000 187.0000.000
187.000 54% 80.0000.000
0.000 80.000 77% 78.0000.000
902 Z2012.0091Kohlu
Approved
CONST: OF RETAINING WALL AT BOTH SIDE OF KANJ RIVER 1.5 KM AT TEHSIL MAWAND , DISTRICT KOHLU.
18.6600.000
18.660 13.6600.000
13.660 73% 5.0000.000
0.000 5.000 100% 0.0000.000
901 Z2010.0918Bela
Approved
CONST:OF NEW AQUEDUCT AT RD8+125 OF MAIN LASBELA CANAL + CONST:OF NEW ADUEDUCT RD15+465 MEMON GARAH LASBELA CANAL.
438.5060.000
438.506 413.2020.000
413.202 94% 25.3040.000
0.000 25.304 100% 0.0000.000
900 Z2010.0480Harnai
Approved
CONSTRUCTION OF PROTECTION WALLS AT DIST. HARNAI.
238.0000.000
238.000 207.9730.000
207.973 87% 10.0000.000
0.000 10.000 91% 20.0270.000
Subsector: Surface Irrigation
Sector: Irrigation
Chapter: WATER
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 91: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/91.jpg)
Public Sector Development Programme (Sectorwise)
87 of 214
931 Z2018.1252Jhal MagsiApproved
CLEANING AND DESALTING OF FLOOD IRRIGATION CANALS U/C HATYARI
30.0000.000
30.000 14.0000.000
14.000 46% 16.0000.000
0.000 16.000 100% 0.0000.000
930 Z2018.1250Jhal MagsiApproved
CLEANING AND DESALTING OF FLOOD IRRIGATION CANALS IN U/C JHALL MAGSI
20.0000.000
20.000 10.0000.000
10.000 50% 10.0000.000
0.000 10.000 100% 0.0000.000
929 Z2018.1246Jhal MagsiApproved
CLEANING AND DESALTING OF FLOOD IRRIGATION CANAL IN U/C SAFRANI.
50.0000.000
50.000 20.0000.000
20.000 40% 10.0000.000
0.000 10.000 60% 20.0000.000
928 Z2018.1243Jhal MagsiApproved
CLEANING AND DESELTING OF FLOOD IRRIGATION CANAL IN U/C MAT SINDHAR.
20.0000.000
20.000 10.0000.000
10.000 50% 10.0000.000
0.000 10.000 100% 0.0000.000
927 Z2018.1224Jhal MagsiApproved
REHABILITATION & IMPROVEMENT OF FLOOD PROTECTION BAND DHORI IN UC NOT MAGSI
30.0000.000
30.000 15.0000.000
15.000 50% 15.0000.000
0.000 15.000 100% 0.0000.000
926 Z2018.1219Jhal MagsiApproved
IMPR & REH: OF F & P BUND KOT MAGSI TO CHUKHI VILLAGE
30.0000.000
30.000 15.0000.000
15.000 50% 15.0000.000
0.000 15.000 100% 0.0000.000
925 Z2018.1217Jhal MagsiApproved
RAISING, STRENGTHENING & BERN CUTTING OF DHORI DISTRY FROM RD 0 TO RD 52.
20.0000.000
20.000 10.0000.000
10.000 50% 10.0000.000
0.000 10.000 100% 0.0000.000
924 Z2018.1214Jhal MagsiApproved
REHABILITATION & CLEANING OF FLOOD IRRIGATION CANAL IN UC SINGHAR
22.0000.000
22.000 15.0000.000
15.000 68% 7.0000.000
0.000 7.000 100% 0.0000.000
923 Z2018.1213Jhal MagsiApproved
REHABILITATION & CLEANING OF GUS CANAL IN UC SAFRANI DISTRICT JHAL MAGSI.
20.0000.000
20.000 10.0000.000
10.000 50% 10.0000.000
0.000 10.000 100% 0.0000.000
922 Z2018.1206Jhal MagsiApproved
DESILTING AND REHABILITATION SCAPE DISTTRY.
20.0000.000
20.000 10.0000.000
10.000 50% 10.0000.000
0.000 10.000 100% 0.0000.000
921 Z2018.1202Jhal MagsiApproved
EXTENSION AND REPAIR FLOOD PROTECTION BAND JHAL MAGSI TOWN
20.0000.000
20.000 10.0000.000
10.000 50% 10.0000.000
0.000 10.000 100% 0.0000.000
920 Z2018.1186JaffarabadApproved
REH: OF JAWAD ABAD MINOR, 9L MINOR OF MOHABAT DISTRIBUTARY AND CONST: OF UMER KOT MINOR OF JHAT PAT DISTRIBUTARY.
95.0000.000
95.000 40.0000.000
40.000 42% 30.0000.000
0.000 30.000 73% 25.0000.000
919 Z2018.1184JaffarabadApproved
REH: & DISTRIBUTARIES OF PAT FEEDER CANAL SYSTEM, JAFFARABAD AND NASEERABAD.
400.0000.000
400.000 100.0000.000
100.000 25% 100.0000.000
0.000 100.000 50% 200.0000.000
918 Z2018.1181JaffarabadApproved
DE-SILTING OF KHIRTHER CANAL AND ITS DISTRIBUTARIES.
300.0000.000
300.000 110.0000.000
110.000 36% 100.0000.000
0.000 100.000 70% 90.0000.000
917 Z2018.0903Bela
Approved
REHABILITATION OF NURG TAR FLOOD IRRIGATION SCHEME
467.5470.000
467.547 50.0000.000
50.000 10% 417.5470.000
0.000 417.547 100% 0.0000.000
916 Z2018.0901Bela
Approved
REST: OF CHANNEL B & CLEARANCE OF CHANNEL, IN OBA LIARI, OBA-2 LAKHRA AND KUK CHANAL LAKHRA.
10.7000.000
10.700 8.0000.000
8.000 74% 2.7000.000
0.000 2.700 100% 0.0000.000
Subsector: Surface Irrigation
Sector: Irrigation
Chapter: WATER
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 92: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/92.jpg)
Public Sector Development Programme (Sectorwise)
88 of 214
947 Z2018.1945Kech
Approved
REH: / RESTORATION OF APEEG DELAY ACTION DAM TEHSIL TUMP.
50.0000.000
50.000 20.0000.000
20.000 40% 30.0000.000
0.000 30.000 100% 0.0000.000
946 Z2018.1923Sibi
Approved
RESERVOIR FOR MURAD WAH SHUMALI NEAR TOWER TEHSIL LEHRI
25.0000.000
25.000 10.0000.000
10.000 40% 15.0000.000
0.000 15.000 100% 0.0000.000
945 Z2018.1909Kech
Approved
REH: & RESTORATION OF SMALL STORAGE RESERVOIRS NADAGI KAUR, BELAG, DOR DAGAR & HOTAG.
50.0000.000
50.000 25.0000.000
25.000 50% 25.0000.000
0.000 25.000 100% 0.0000.000
944 Z2018.1908Sibi
Approved
RESTORATION OF FLOOD DAMAGES OF 3RD DISTRIBUTION IRRIGATION SCHEME FUJAL TEHSIL LEHRI
50.0000.000
50.000 20.0000.000
20.000 40% 30.0000.000
0.000 30.000 100% 0.0000.000
943 Z2018.1907Sibi
Approved
RES: OF FLOOD DAMAGES OF 1ST DISTRIBUTION IRRG: SCHEME FUJAL TEHSIL LEHRI
50.0000.000
50.000 15.0000.000
15.000 30% 35.0000.000
0.000 35.000 100% 0.0000.000
942 Z2018.1480Kachhi
Approved
CONST:/REH: OF PROTECTION BANDS TEHSIL MACH GISHTRI.
20.0000.000
20.000 10.0000.000
10.000 50% 10.0000.000
0.000 10.000 100% 0.0000.000
941 Z2018.1474Kachhi
Approved
CONST: OF DAM IN DANDRO AREA DISTRICT KACHHI.
40.0000.000
40.000 20.0000.000
20.000 50% 20.0000.000
0.000 20.000 100% 0.0000.000
940 Z2018.1465Kachhi
Approved
CONST: OF WATER RESERVOIRS IN GARH & KONTRI AREA.
40.0000.000
40.000 20.0000.000
20.000 50% 20.0000.000
0.000 20.000 100% 0.0000.000
939 Z2018.1455Kachhi
Approved
CONT: OF WATER RESERVOIR AT TEHSIL BALA NARI AND SANNI DISTRICT KACHHI.
20.0000.000
20.000 4.3000.000
4.300 21% 15.7000.000
0.000 15.700 100% 0.0000.000
938 Z2018.1441Kachhi
Approved
CONT: OF FLOOD PROTECTION BONDS IN TEHSIL DHADAR, BALA NARI, MACH,SANNI, BOLAN WEAR.
40.0000.000
40.000 20.0000.000
20.000 50% 20.0000.000
0.000 20.000 100% 0.0000.000
937 Z2018.1390Kachhi
Approved
EXTEN: & IMPROV: OF 20 NO’S OF WATER CHANNELS FOR SUNNI SUB DIVISION KACHHI.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
936 Z2018.1379ProvincialApproved
IMPL: OF NATIONAL FLOOD PROTECTION PLAN N-IV(NFPP-IV) (PROVINCIAL SHARE)
17070.000
0.000
17070.000
0.0000.000
0.000 0% 50.0000.000
0.000 50.000 0% 17020.0000.000
935 Z2018.1269Jhal MagsiApproved
CONSTRUCTION OF 4 NOS REGULATORS AND BRIDGE ON MUT CANAL WARYAM AND JAGIRANI CANALS U/C HATHYARI
25.0000.000
25.000 15.0000.000
15.000 60% 10.0000.000
0.000 10.000 100% 0.0000.000
934 Z2018.1262Jhal MagsiApproved
REHABILITATION AND CLEANING YAKDAR WAH IV/CANAL IV IN U/C SAFRANI
5.0000.000
5.000 3.5000.000
3.500 70% 1.5000.000
0.000 1.500 100% 0.0000.000
933 Z2018.1260Jhal MagsiApproved
REHABILITATION AND CLEANING YAKDAR FLOOD CANAL-III IN U/C SAFRANI.
5.0000.000
5.000 3.5000.000
3.500 70% 1.5000.000
0.000 1.500 100% 0.0000.000
932 Z2018.1257Jhal MagsiApproved
REHABILITATION AND CLEANING OF YAKDAR FLOOD CANAL-II IN U/C SAFRANI
5.0000.000
5.000 3.5000.000
3.500 70% 1.5000.000
0.000 1.500 100% 0.0000.000
Subsector: Surface Irrigation
Sector: Irrigation
Chapter: WATER
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 93: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/93.jpg)
Public Sector Development Programme (Sectorwise)
89 of 214
954 Z2018.4146Musa KhailApproved
CONST: OF FLOOD PROTECTION WALL KILLI ZARAK ABAD KINGRI.
20.0000.000
20.000 10.0000.000
10.000 50% 10.0000.000
0.000 10.000 100% 0.0000.000
953 Z2018.4073Zhob
Approved
CONSTUCTION OF FLOOD PROTECTION AND INFILTRATION GALLARY AND REMODELING SALIZA IRRIGATION CHANNEL
70.0000.000
70.000 30.0000.000
30.000 42% 10.0000.000
0.000 10.000 57% 30.0000.000
952 Z2018.3887Jhal MagsiApproved
RAISING & STRENGTHENING OF DORI BAND DISTRY (REMAINING WORKS).
47.8300.000
47.830 20.0000.000
20.000 41% 27.8300.000
0.000 27.830 100% 0.0000.000
951 Z2018.3196Jhal MagsiApproved
REHABILITATION AND CLEANING YAKDAR FLOOD CANAL-V IN U/C SAFRANI
5.0000.000
5.000 3.5000.000
3.500 70% 1.5000.000
0.000 1.500 100% 0.0000.000
950 Z2018.2261Musa KhailApproved
CONSTRUCTION/REHABILITATION OF KHAN WAH IRRIGATION CHANEL, DURUG, DISTRICT MUSAKHEL
15.0000.000
15.000 10.0000.000
10.000 66% 5.0000.000
0.000 5.000 100% 0.0000.000
949 Z2018.1976Kech
Approved
CONST: OF FLOOD PROTECTION BUND PATAN KAHOOR TO SHEZADAR BAZAR TURBAT.
30.0000.000
30.000 20.0000.000
20.000 66% 10.0000.000
0.000 10.000 100% 0.0000.000
948 Z2018.1956Kech
Approved
CONST: OF FLOOD PROTECTION BUND KHALILABAD TURBAT.
50.0000.000
50.000 25.0000.000
25.000 50% 25.0000.000
0.000 25.000 100% 0.0000.000
Surface Irrigation(55 Ongoing Projects) GoB/FPA Sub-Total
22325.243
42703.243
2747.403 2747.403 1532.581 0.000 1883.581 18045.259
20378.000
0.000 351.000 20027.000
Subsector: Surface Irrigation
Sector: Irrigation
Chapter: WATER
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 94: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/94.jpg)
Public Sector Development Programme (Sectorwise)
90 of 214
970 Z2019.0502Sibi
CPapproved
CONSTRUCTION OF FLOOD PROTECTION BUND FOR BAKHRA GHULAM BOLAK VILLAGE DISTRICT SIBI.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
969 Z2019.0501Sibi
CPapproved
DE-SILTING OF FLOOD CANAL KHAIRWAH TO GULLA WEHAR TEHSIL LEHRI
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
968 Z2019.0500Sibi
CPapproved
CONSTRUCTION OF FLOOD PROTECTION BUND FOR VILLAGE KASHMISABAD TEHSIL LEHRI
13.0000.000
13.000 0.0000.000
0.000 0% 13.0000.000
0.000 13.000 100% 0.0000.000
967 Z2019.0498Sibi
CPapproved
CONSTRUCTION OF FLOOD PROTECTION BUND AT BAKHTIARABAD CITY TEHSIL LEHRI
65.0000.000
65.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 38% 40.0000.000
966 Z2019.0442Zhob
CPapproved
REHABILITATION OF KABURA VIALA WEIR AT MAINA BAZAR DISTRICT ZHOB
25.0000.000
25.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 100% 0.0000.000
965 Z2019.0439Zhob
CPapproved
CONSTRUCTION OF SHARA KHOSTI, MAROOF KHOSTI, DAG KHOSTI & UMERZAI KHOSTI IRRIGATION SCHEME ZHOB
34.6640.000
34.664 0.0000.000
0.000 0% 34.6640.000
0.000 34.664 100% 0.0000.000
964 Z2019.0429Jaffarabad
CPapproved
EFFICIENT UTILIZ:OF WATER RECOURSES THR: LINING OF WATER COURSES DIFFERENT VILLAGES TEHSIL USTA MUHAMMAD & GANDAKHA.
40.0000.000
40.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 100% 0.0000.000
963 Z2019.0376Jaffarabad
CPapproved
CONST: OF SIPHON AT BHAGH HEAD ISLAM KHAN JAMALI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
962 Z2019.0322Bela
CPapproved
CONST: OF FLOOD PROTECTION BAND VILLAGE LASI & ABADIES SAKRAN AREA TEHSIL HUB.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
961 Z2019.0316Duki
CPapproved
CONSTRUCTION OF FLOOD PROTECTION STRUCTURE IN KILLI NIMAKAI DISTRICT DUKI.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
960 Z2019.0312Duki
CPapproved
CONSTRUCTION OF FLOOD PROTECTION IN KILLI MARJANZAI.
40.0000.000
40.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 100% 0.0000.000
959 Z2019.0296Jaffarabad
CPapproved
DE-SILTING OF MAIN KHIRTHAR CANAL FROM KHANPUR PUL TO FAIZABAD PUL.
37.0000.000
37.000 0.0000.000
0.000 0% 37.0000.000
0.000 37.000 100% 0.0000.000
958 Z2019.0284Bela
CPapproved
CONST:OF PROT: BAND VIL:SALEH M.SAKARAN,W.BUX BEZENJO,ABBAS GADOOR KUND & KHATOO FLOOD IRRI: SCH:,SORH DURJI
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
957 Z2019.0051Chagai
CPapproved
CONST: OF FLOOD PROT: BUND DIST. CHAGAI, kILLI JAN BAIG NADIRABAD, H.KOCHAL ZAMEEN BUND, SYEDABAD YAHQOOB PEERAKZAI ETC
25.0000.000
25.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 100% 0.0000.000
956 Z2019.0015Provincial
CPapproved
REVIVAL OF BALOCHISTAN WATER RESOURCES PROGRAMM (EURO 65 MILLION).
100.0009128.000
9228.000 0.0000.000
0.000 0% 5.000100.000
0.000 105.000 1% 95.0009028.000
955 Z2019.0006Provincial
CPapproved
BALOCHISTAN WATER RESOURCES DEVELOPMENT PROJECT (BWRDP).
3975.00015194.00
0
19169.000
0.0000.000
0.000 0% 100.000525.000
0.000 625.000 3% 3875.00014669.000
Subsector: Surface Irrigation
Sector: Irrigation
Chapter: WATER
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 95: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/95.jpg)
Public Sector Development Programme (Sectorwise)
91 of 214
986 Z2019.0593Jaffarabad
CPapproved
DE-SILTING FROM KHIRTHAR CANAL TO FAIZABAD DISTRY.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
985 Z2019.0592Jaffarabad
CPapproved
DE-SILTING OF DUMB DISTRY FROM KHIRTHAR CANAL.
13.0000.000
13.000 0.0000.000
0.000 0% 13.0000.000
0.000 13.000 100% 0.0000.000
984 Z2019.0591Jaffarabad
CPapproved
DE-SILTING OF MAIN KHIRTHAR CANAL FROM FAIZABAD PUL TO QABOOLA PUL.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
983 Z2019.0589Nasirabad
CPapproved
DES: OF UMRANI, DISTRY FROM RD-10 TO 45 & CONST: OF GATES MANJHO SHORI SUB DIV: DISTR: PAT FEEDER CANAL
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
982 Z2019.0588Nasirabad
CPapproved
REHABILITATION OF MINORS UMRANI, RUPA & MAGSI DISTRY, PAT FEEDER CANAL
25.0000.000
25.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 100% 0.0000.000
981 Z2019.0587Nasirabad
CPapproved
CONST: OF MINOR FOR MOZA BANK, GHORSHANI, AERI BARON, MIR WAH BURR, MANJHOSHORI / PAT FEEDER CANAL
70.0000.000
70.000 0.0000.000
0.000 0% 70.0000.000
0.000 70.000 100% 0.0000.000
980 Z2019.0567Sibi
CPapproved
RAISING & STRENGTHENING OF FLOOD PROTECTION BAND EAST SIDE LEHRI TOWN TEHSIL LEHRI.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
979 Z2019.0531Kech
CPapproved
CONSTRUCTION OF FLOOD PROTECTION BUND SHORMA KAUR UC NODIZ, DISTRICT KECH
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
978 Z2019.0529Kech
CPapproved
CONSTRUCTION OF FLOOD PROTECTION BUND NASIR ABAD GODI DHAR, DISTRICT KECH
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
977 Z2019.0528Kech
CPapproved
CONSTRUCTION OF FLOOD PROTECTION BUND NOK-E-RAH, NIZAR ABAD, DISTRICT KECH
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
976 Z2019.0515Sibi
CPapproved
CONST: OF GABION SPURS AND CONST: OF CUNNET ON KHAN WAH RIVER (4 NO 50 FT EACH CUNNET 50 FT) IN TEHSIL LEHRI
12.5600.000
12.560 0.0000.000
0.000 0% 12.5600.000
0.000 12.560 100% 0.0000.000
975 Z2019.0513Sibi
CPapproved
DE-SILTING OF KHAIR WAH DOWN CANNAL 2ND DISTRIBUTION IRRIGATION SCHEME (RD 0 TO 3280 FT) IN TEHSIL LEHRI SIBI
12.5600.000
12.560 0.0000.000
0.000 0% 12.5600.000
0.000 12.560 100% 0.0000.000
974 Z2019.0511Sibi
CPapproved
REHABILITATION/DE-SILTING OF KHAIR WAH CANNAL TEHSIL LEHRI SIBI
14.6300.000
14.630 0.0000.000
0.000 0% 14.6300.000
0.000 14.630 100% 0.0000.000
973 Z2019.0509Sibi
CPapproved
CONSTRUCTION OF FLOOD PROTECTION BUND , WATER RESERVOIR AND FLOOD CANAL KHANOO VILLAGE TEHSIL LEHRI SIBI
44.3070.000
44.307 0.0000.000
0.000 0% 20.3070.000
0.000 20.307 45% 24.0000.000
972 Z2019.0507Sibi
CPapproved
CONSTRUCTION OF WATER RESERVOIR FOR VILLAGE IN TEHSIL LEHRI
50.0000.000
50.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 50% 25.0000.000
971 Z2019.0505Sibi
CPapproved
CONSTRUCTION OF WEIR ON 1ST DISTRIBUTION SYSTEM FUJAL RIVER TEHSIL LEHRI
50.0000.000
50.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 40% 30.0000.000
Subsector: Surface Irrigation
Sector: Irrigation
Chapter: WATER
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 96: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/96.jpg)
Public Sector Development Programme (Sectorwise)
92 of 214
1002 Z2019.0713Sibi
CPapproved
RAISING & STRENGTHENING FLOOD PROTECTION BAND MURAD WAH GOLA VILLAGE TEHSIL LEHRI.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
1001 Z2019.0712Sibi
CPapproved
CONST: OF GUIDE BAND AT KHAN WAH FROM BASTI LOHARAN TO BOYS HIGH SCHOOL TEHSRI LEHRI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1000 Z2019.0711Sibi
CPapproved
CONST: OF FLOOD PROTECTION WALL MAIN KHAIRWAH DISTRIBUTION IRRI: SYS: DOWN STREAM TEHSIL LEHRI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
999 Z2019.0710Kachhi
CPapproved
INSTALLATION OF TRICKLE / DRIP IRRIGATION SYSTEM WITH ACCESSORIES IN REHAR.(UP&d)
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
998 Z2019.0708Jhal Magsi
CPapproved
LINING OF GARRANG MINOR IN U/C JHAL MAGSI.
15.0000.000
15.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 66% 5.0000.000
997 Z2019.0707Jhal Magsi
CPapproved
CONSTRUCTION OF BAKHAR MINOR IN U/C JHAL MAGSI AND REHABILITATION OF 8 NO. MINOR IN U/C SAIFABAD.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
996 Z2019.0706Jhal Magsi
CPapproved
CLEANING AND DE-SILTING OF KAREZ, SAINA, HARA, KATOHAR AND GARRANG IN U/C JHAL MAGSI.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
995 Z2019.0705Jhal Magsi
CPapproved
CLEANING AND DE-SILTING OF 60,65 MINOR KHADIM HUSSAIN AND ALI BAIG CANAL IN U/C SAFARANI.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
994 Z2019.0704Jhal Magsi
CPapproved
RESTORATION OF X-REGULATOR GATE AT ESCAPE CHANNEL AND CONSTRUCTION OF VRB AT LAIBO-II CANAL.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
993 Z2019.0703Jhal Magsi
CPapproved
CLEANING AND DE-SILTING OF SUB-ESCAPE, MISKAN AND NIHAL KHAN MINOR.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
992 Z2019.0702Jhal Magsi
CPapproved
CLEANING AND DE-SILTING OF WARYAM AND JAGIRANI MINOR.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
991 Z2019.0612Musa Khail
CPapproved
CONST: OF FLOOD PROTCETION SCHEMES BARKOI ESSOT AREA.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
990 Z2019.0610Musa Khail
CPapproved
CONST: OF FLOOD PROTCETION SCHEMES REIJ UMRANI NO 2 TEHSIL DRUG.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
989 Z2019.0609Musa Khail
CPapproved
CONST: OF FLOOD PROTCETIONSCHEMES IN REIJ IMRANI TEHSIL DRUG.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
988 Z2019.0607Musa Khail
CPapproved
CONST: OF IRRIGATION SCHEMES SHAPILA TANGI SAR AREA.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
987 Z2019.0596Jaffarabad
CPapproved
DE-SILTING FROM KHIRTHAR CANAL TO KHANPUR DISTRY
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
Subsector: Surface Irrigation
Sector: Irrigation
Chapter: WATER
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 97: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/97.jpg)
Public Sector Development Programme (Sectorwise)
93 of 214
1018 Z2019.0870Sohbatpur
CPapproved
DE-SILTATION OF UCH & MANUTHI CANAL DISTRICT SOHBAT PUR
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1017 Z2019.0868Sohbatpur
CPapproved
DE-SILTATION OF NASEER DISTRIBUTARY DISTRICT SOHBAT PUR
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1016 Z2019.0866Sohbatpur
CPapproved
DE-SILTATION OF JHUDAIR DISTRIBUTARY DISTRICT SOHBAT PUR
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1015 Z2019.0865Sohbatpur
CPapproved
CONSTRUCTION OF REGULATOR GATES OF UCH LINK DISTRICT SOHBAT PUR
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1014 Z2019.0863Kech
CPapproved
DELAY ACTION DAM SMAN-E-KOOR ABSAR KECH.
80.0000.000
80.000 0.0000.000
0.000 0% 80.0000.000
0.000 80.000 100% 0.0000.000
1013 Z2019.0862Sohbatpur
CPapproved
CONST: OF RETAINING WALL ( LEFIT SIDE + RIGHT SIDE ) D/S OF X- REGULATOR AT RD7+000 NASEERSHAKH SOHBATPUR
28.0200.000
28.020 0.0000.000
0.000 0% 28.0200.000
0.000 28.020 100% 0.0000.000
1012 Z2019.0856Kech
CPapproved
CONST: OF FLOOD PROTECTION BUND U/C GINNAH IN DISTRICT KECH
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
1011 Z2019.0850Kech
CPapproved
CONST: OF FLOOD PROTECTION BUND ALONG LEFT BANK OF DUKRAM KAUR FOR PROTECTION OF SALALAH BAZAR TURBAT DISTRICT KECH
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1010 Z2019.0848Kech
CPapproved
CONST: OF FLOOD PROTECTION BUND ON KECH KAUR AT JUSAK VILLAGE DISTRICT KECH
35.0000.000
35.000 0.0000.000
0.000 0% 35.0000.000
0.000 35.000 100% 0.0000.000
1009 Z2019.0825Khuzdar
CPapproved
CONST: OF PROTECTION BUND AT LAKHARO AREA KHUR SHARP KARKH, MAT AREA KARKH, AND BALUNK AREA KARKH.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
1008 Z2019.0773Sohbatpur
CPapproved
CONST: OF CANAL BRIDGE SIM SHAKH AT GOTH KHAN BUGHTI AND MIR BHADUR KHAN KHOSA.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1007 Z2019.0763Loralai
CPapproved
CONST: OF STONE MASONRY FLOOD CHANNEL NEAR MUSLM TOWN DGKHAN ROAD BYPASS AREA DIST. LORALAI
40.0000.000
40.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 100% 0.0000.000
1006 Z2019.0760Loralai
CPapproved
CONST: OF STONE MASONRY FLOOD NALLA NEAR KILLI HAJI BAQI SHAHKAREZ AREA DISTRICT LORALAI
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
1005 Z2019.0758Loralai
CPapproved
CONST: OF STONE MASONRY FLOOD NALLA NEAR ARBASIN RODLIN KILLI RODLIN AREA DISTRICT LORALAI
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1004 Z2019.0755Loralai
CPapproved
CONSTRUCTION OF STONE MASONRY FLOOD CHANNEL FROM WAPDA COLONY TO JANKSON NALLA IN A LENGTH OF 1 KM.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1003 Z2019.0714Sibi
CPapproved
STRENG: & RAISING OF FLOOD PROTECTION FOR HOUSES OF TALI VILLAGE SIBI.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
Subsector: Surface Irrigation
Sector: Irrigation
Chapter: WATER
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 98: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/98.jpg)
Public Sector Development Programme (Sectorwise)
94 of 214
1034 Z2019.1170Kech
CPapproved
REH: & RESTORATION OF SMALL STORAGE RESERVOIR DIWAL DASHT.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
1033 Z2019.1166Kech
CPapproved
REHABILITATION & RESTORATION OF SANGAI STORAGE POND TEHSIL DASHT.
13.0000.000
13.000 0.0000.000
0.000 0% 13.0000.000
0.000 13.000 100% 0.0000.000
1032 Z2019.1150Harnai
CPapproved
FLOOD PROTECTION WALL FOR KILLI ISAMABAD AGRICULTURE HARNAI DISTRICT HARNAI
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1031 Z2019.1148Ziarat
CPapproved
FLOOD PROTECTION WALL FOR AGRICULTURE FOR KILLI DUMMARAN SINJAVI DISTRICT ZIARAT
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1030 Z2019.1111Shaheed
Sikandarabad
CPapproved
CONSTRUCTION OF DOBANZIL DELAY ACTION DAM IN SURAB AREA DISTRICT SHAHEED SIKANDERABAD
130.0000.000
130.000 0.0000.000
0.000 0% 130.0000.000
0.000 130.000 100% 0.0000.000
1029 Z2019.1025Harnai
CPapproved
PROTECTION WALL AT KILLI KORI AND KILLI SAAZO, DIST. HARNAI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1028 Z2019.1021Harnai
CPapproved
FLOOD PROTECTION AT KILLI SHEKHAN AND KILLI MAPANI, DIST. HARNAI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1027 Z2019.0980Gwadar
CPapproved
FLOOD PROTECTION BUNDATH OF RECENT FLOOD AFFECTED AREAS IN GWADAR
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1026 Z2019.0960Awaran
CPapproved
PROT: WALL FOR JAHOO IN VARIOUS U/CS(MIR A.JAN BEZENJO KORAK, K.JAHOO, FAQEER,ZAHID & S.KORAK,MOLA R.B.KORAK).& OTHERS
51.4250.000
51.425 0.0000.000
0.000 0% 51.4250.000
0.000 51.425 100% 0.0000.000
1025 Z2019.0954Awaran
CPapproved
COSNT: OF PROTECTION WALL SAIRH.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
1024 Z2019.0930Khuzdar
CPapproved
CONST: FOR PROTECTION SAROONA, NALL, ARANJI, WADH.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1023 Z2019.0902Chagai
CPapproved
CONSTRUCTION OF FLOOD PROTECTION BUND AT AMINABAD DISTRICT CHAGAI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1022 Z2019.0900Chagai
CPapproved
CONSTRUCTION OF FLOOD PROTECTION BUND AT CHEATER AREA DISTRICT CHAGAI.
70.0000.000
70.000 0.0000.000
0.000 0% 70.0000.000
0.000 70.000 100% 0.0000.000
1021 Z2019.0899Chagai
CPapproved
REHABILITATION OF LEJAY KAREZ SUB TEHSIL CHAGAI DISTRICT CHAGAI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1020 Z2019.0892Kech
CPapproved
CONST: OF SPURS ON LEFT SIDE OF FLOOD PROTECTION BUND AT KECH KAUR DIST. KECH.
40.0000.000
40.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 100% 0.0000.000
1019 Z2019.0888Kech
CPapproved
CONST: OF GABIAN WALL ALONG DOKURM RIVER AT KOH-E-MURAD ZIARAT KECH
16.4500.000
16.450 0.0000.000
0.000 0% 16.4500.000
0.000 16.450 100% 0.0000.000
Subsector: Surface Irrigation
Sector: Irrigation
Chapter: WATER
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 99: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/99.jpg)
Public Sector Development Programme (Sectorwise)
95 of 214
1050 Z2019.1625Kech
CPapproved
CONST: OF FLOOD PROTECTION BAND HAJI BADAN KAUR ATTAULLAH BAZAR MAND & KOHAD BAZAR TUMP.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1049 Z2019.1613Quetta
CPapproved
PROTECTION OF WALL AT KILLI NEW BALOLZAIN KUCHLAK, QUETTA.
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
1048 Z2019.1592Sibi
CPapproved
CONST: OF MARGINAL BAND BETWEEN LEHRI RIVER & FUJAL RIVER & CONT: OF CUNNENT IN LEHRI RIVER.
14.5000.000
14.500 0.0000.000
0.000 0% 14.5000.000
0.000 14.500 100% 0.0000.000
1047 Z2019.1591Sibi
CPapproved
CONST: OF PROTECTION BAND FOR VILLAGES KHAIR WAH, GULLA WAERH & MUCH IN TEHSIL LEHRI.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
1046 Z2019.1590Sibi
CPapproved
REH: OF MAIN TALI CANNAL & QASAR WAH, MACHI WAH IN TALLI SIBI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1045 Z2019.1577Musa Khail
CPapproved
CONST: OF FLODD PROTECTION WALL & CULVERTS AT KILLI RODE MALEZAI DISTRICT MUSAKAHAIL.
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
1044 Z2019.1469Panjgur
CPapproved
PROTECTION BAND AT RIVER AKHUND GHULAM HUSSAIN KHUDABADAN PANJGUR.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
1043 Z2019.1458Qilla
AbdullahCPapproved
GABION FILLED FLOOD PROT: WALLS FOR HOUSES OF KILLIES SOHI, MURDA, PURANA CHAMAN, THEKIDAR HASSAN IN TEH:CHAMAN
46.7040.000
46.704 0.0000.000
0.000 0% 46.7040.000
0.000 46.704 100% 0.0000.000
1042 Z2019.1441Khuzdar
CPapproved
PROTECTION BUND KAPPAR NOOR GAMA ZEHRI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1041 Z2019.1263Kech
CPapproved
FLOOD PROTECTION BAND ASKANI DAP ABSOR.
11.1000.000
11.100 0.0000.000
0.000 0% 11.1000.000
0.000 11.100 100% 0.0000.000
1040 Z2019.1256Kech
CPapproved
CONST: OF FLOOD/PERENNIAL IRRIGATION SCHEME DRAM-KOL PIDARK IN DISTRICT KECH.
85.0000.000
85.000 0.0000.000
0.000 0% 85.0000.000
0.000 85.000 100% 0.0000.000
1039 Z2019.1248Kohlu
CPapproved
CONSTRUCTION OF GILL DAFF FLOOD PROTECTION WALL TAMBOO AREA KHOLU
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1038 Z2019.1211Bela
CPapproved
CONSTRUCTION OF PROTECTION BAND FOR PER GOTH AND ADJOINING VILLAGES LUNDA DHORA UTHAL
45.0000.000
45.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 44% 25.0000.000
1037 Z2019.1210Bela
CPapproved
CONSTRUCTION OF BARA BAGH & ADJACENT VILLAGES FLOOD PROTECTION BUND
45.0000.000
45.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 44% 25.0000.000
1036 Z2019.1207Bela
CPapproved
CONSTRUCTION OF PROTECTION BAND ORKI UC SHEH LAKHRA
25.0000.000
25.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 60% 10.0000.000
1035 Z2019.1188Kachhi
CPapproved
REH: OF WATER CHANNELS AT SUNNY KACHHI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
Subsector: Surface Irrigation
Sector: Irrigation
Chapter: WATER
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 100: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/100.jpg)
Public Sector Development Programme (Sectorwise)
96 of 214
1065 Z2019.1790Jhal Magsi
CPapproved
REHABLITATION AND DE-SILTING OF ALLAH BAKHSH CHANELL IN MOUZA KACHI KHONA IN U/C BURIJA.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1064 Z2019.1788Jhal Magsi
CPapproved
REHABLITATION & IMPROVEMENT OF NAZEER MINOROFF MOUZA GAGAN IN U/C MIR PUR OFF TAK FROM PAT FEEDER EXTENSION.
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
1063 Z2019.1787Jhal Magsi
CPapproved
REHABLITATION & IMPROVEMENT OF HAMAL KHAN MINOROFF TAKE FROM PATFEEDER CANAL EXTENSION IN U/C MIR PUR.
14.0000.000
14.000 0.0000.000
0.000 0% 14.0000.000
0.000 14.000 100% 0.0000.000
1062 Z2019.1785Jhal Magsi
CPapproved
REHABLITATION & DE-SILTING OF GHULAM QADIR CANAL MOUZA MISIRI KHOSA IN U/C PUNJAK.
11.0000.000
11.000 0.0000.000
0.000 0% 11.0000.000
0.000 11.000 100% 0.0000.000
1061 Z2019.1779Jhal Magsi
CPapproved
REHABLITATION & IMPROVEMENT OF DHORA CANAL U/C JHAL MAGSI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1060 Z2019.1778Shirani
CPapproved
CONST: OF STONE MASONRY PROT: WALL & STONE MASONRY FOR PROT: OF AGRI: LANDS & HOUSES OF KILLI SHAR GHALI UNION.
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
1059 Z2019.1769Dera Bugti
CPapproved
REHABILITATION OF WATER COURSE AT KILLI HAI MUSA DEENARI, TEHSIL SUI, DERA BUGTI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1058 Z2019.1750Nushki
CPapproved
WATER RES: MGT THROUGH CONST: WATER STORAGE TANKS INSTALLATION OF PVC/RDD PIPES AND DRILLING OF BORE
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
1057 Z2019.1749Nushki
CPapproved
CONSTRUCTION OF FLOOD PROTECTION BUND FOR GAVE YARD KILI BADINI DISTRICT NOSHKI
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
1056 Z2019.1748Nushki
CPapproved
CONSTRUCTION OF FLOOD PROTECTION BUND FOR KILLI HAJI SHAH MOHAMMAD KISANKORI DISTRICT NOSHKI
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1055 Z2019.1735Kech
CPapproved
REHABILITATION AND RESTORATION OF SMALL STORAGE WATER RESERVOIR NADGHANI KUMBAIL.
14.8000.000
14.800 0.0000.000
0.000 0% 14.8000.000
0.000 14.800 100% 0.0000.000
1054 Z2019.1730Kech
CPapproved
REHABILITATION & RESTORATION OF SMALL STORAGE RESERVOIR SOHREE BAL DASHT.
50.0000.000
50.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 40% 30.0000.000
1053 Z2019.1712Duki
CPapproved
CONSTRUCTION OF FLOOD PROTECTION STRUCTURE AND SPUR RIGHT BANK OF ANAMBAR RIVER ON SARDAR BAGH AREA, DUKI.
50.0000.000
50.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 50% 25.0000.000
1052 Z2019.1673Jaffarabad
CPapproved
DESILTING FROM MAIN KHIRTAR CANAL TO GHAFAR MINOR TEHSIL USTA MUHAMMAD
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1051 Z2019.1631Kech
CPapproved
CONST:OF FLOOD PROT: BUND RIGHT SIDE OF KECH KAUR AT U/C GINNAH & LEFT SIDE OF KECH KAUR NEAR SORAP, TURBAT.
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
Subsector: Surface Irrigation
Sector: Irrigation
Chapter: WATER
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 101: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/101.jpg)
Public Sector Development Programme (Sectorwise)
97 of 214
1079 Z2019.2033Kech
CPapproved
CONST OF FLOOD PROTECTION BAND WALI M. BAZAR SRINKIN
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1078 Z2019.2024Sibi
CPapproved
DE-SILTING OF KHAIR WAH DOWN CANNAL 2ND DISTRIBUTION IRRIGATION SCEME (RD O TO 3280FT) IN TEHSIL LEHRI SIBI
12.5600.000
12.560 0.0000.000
0.000 0% 12.5600.000
0.000 12.560 100% 0.0000.000
1077 Z2019.1984Kech
CPapproved
CONST: OF FLOOD PROTECTION BAND AT CHORBOK KALLAG SANI DIST: KECH.
30.0000.000
30.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 33% 20.0000.000
1076 Z2019.1978Ziarat
CPapproved
REVIVAL OF URAS KARAIZ. 50.0000.000
50.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 50% 25.0000.000
1075 Z2019.1976Ziarat
CPapproved
CONSTRUCTION OF PURANA SANJAVI TANGI DAM.
50.0000.000
50.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 50% 25.0000.000
1074 Z2019.1965Musa Khail
CPapproved
CONSTRUCTION OF DELAY ACTION DAM KILLI NAZEER MUSAKHAIL DISTRICT MUSAKHAIL.
80.0000.000
80.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 50% 40.0000.000
1073 Z2019.1952Kharan
CPapproved
IRRIGATION & PROTECTION SCHEME IN SURGARDERN GWASH KHARAN
100.0000.000
100.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 30% 70.0000.000
1072 Z2019.1916Kech
CPapproved
CONST: OF FLOOD PROTECTION BUND OF LEFT AND RIGHT SIDE OF KECH KAUR PHASE-III
300.0000.000
300.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 16% 250.0000.000
1071 Z2019.1845Qilla
SaifullahCPapproved
EXTENSION & IMPROVEMENT OF KHAIZAL KAREAZ IN KAN MEHTERZAI AREA DIST.KILLA SAIFULLAH
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
1070 Z2019.1844Qilla
SaifullahCPapproved
EXTENSION & IMPROVEMENT OF SARA KHULA KAREZ IN KAN MEHTERZAI AREA DIST.KILLA SAIFULLAH.
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
1069 Z2019.1837Sibi
CPapproved
DE-SILTING OF STATE FEEDER FLOOD CANAL AT 2ND DISTRIBUTION SCHEME TEHSIL LEHRI,DISW SIBI.
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
1068 Z2019.1795Jhal Magsi
CPapproved
STRUCTURE WORK & MINOR OF BEGARI CANAL JHAL MAGSI.
183.6400.000
183.640 0.0000.000
0.000 0% 80.0000.000
0.000 80.000 43% 103.6400.000
1067 Z2019.1794Jhal Magsi
CPapproved
REHABILITATION AND IMPROVEMENT OF ALI DOST AND ABDUL MAJEED FLOOD CANAL IN U/C PANJUK.
18.5000.000
18.500 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 54% 8.5000.000
1066 Z2019.1793Jhal Magsi
CPapproved
REHABILITATION AND IMPROVEMENT OF PHOTO KHOSA AND KHUDA DAD FLOOD CANAL IN U/C SAFARANI DISTRICT JHAL MAGSI.
19.5000.000
19.500 0.0000.000
0.000 0% 10.5000.000
0.000 10.500 53% 9.0000.000
24322.000
0.000 625.000 23697.000
Surface Irrigation(125 New Projects) GoB/FPA Sub-Total
7695.920 32017.920
0.000 0.000 2875.780 0.000 3500.780 4820.140
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Surface Irrigation
Chapter: WATER
Sector: Irrigation
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Surface Irrigation(180 Projects) Total
30021.163
74721.163
2747.403 2747.403 4408.361 0.000 5384.361 22865.399
2019 - 20 Original
![Page 102: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/102.jpg)
Public Sector Development Programme (Sectorwise)
98 of 214
Sub-Sector Total (FPA) 44700.000
0.000 976.000 43724.000
2019 - 20 Original
![Page 103: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/103.jpg)
Public Sector Development Programme (Sectorwise)
99 of 214
1095 Z2018.0769Barkhan
Approved
CONST: OF PEER WALI DAM DAMANI AREA DISTRICT BARKHAN.
66.7690.000
66.769 20.0000.000
20.000 29% 20.0000.000
0.000 20.000 59% 26.7690.000
1094 Z2018.0761Barkhan
Approved
CONST: OF LANJANI DAM KHATTA CHOWKI AREA DISTRCIT BARKHAN.
20.0000.000
20.000 15.8570.000
15.857 79% 4.1430.000
0.000 4.143 100% 0.0000.000
1093 Z2018.0759Barkhan
Approved
CONST: OF HOTI DAM AT BAGHAO DISTRICT BARKHAN.
25.0000.000
25.000 9.0000.000
9.000 36% 16.0000.000
0.000 16.000 100% 0.0000.000
1092 Z2018.0757Barkhan
Approved
CONST: OF KHANKI RINDH DAM SUMAN AREA DISTRCIT BARKHAN.
34.5740.000
34.574 13.8860.000
13.886 40% 20.6880.000
0.000 20.688 100% 0.0000.000
1091 Z2017.1717Kharan
Approved
CONSTRUCTION OF GARUK STORAGE DAM DIST. KHARAN.
1011.1860.000
1011.186 100.0000.000
100.000 9% 500.0000.000
0.000 500.000 59% 411.1860.000
1090 Z2017.1589Pishin
Approved
CONST: OF DAM IN DIST: PISHIN. 100.0000.000
100.000 60.0000.000
60.000 60% 10.0000.000
0.000 10.000 70% 30.0000.000
1089 Z2017.1003Qilla
SaifullahApproved
TOIWAR / BATOZAI STORAGE DAM, DIST: KILLA SAIFULLAH.
217.2380.000
217.238 170.2000.000
170.200 78% 47.0380.000
0.000 47.038 100% 0.0000.000
1088 Z2017.1001Qilla
AbdullahApproved
CONST: OF 100 SMALL DAMS IN TEHSIL DOBANDI, GULISTAN, KILLA ABDULLAH & CHAMAN (PROVINCIAL SHARE).
525.2160.000
525.216 130.2000.000
130.200 24% 200.0000.000
0.000 200.000 62% 195.0160.000
1087 Z2017.0994Gwadar
Approved
CONST: OF BASOL DAM DIST: GAWADAR (PROVINCIAL SHARE).
1578.6490.000
1578.649 1550.0000.000
1550.000 98% 28.6490.000
0.000 28.649 100% 0.0000.000
1086 Z2016.1163NasirabadApproved
EXTENSION OF PAT FEEDER CANAL THIRD PARTY VALIDATION OF WORK DONE.
11.0000.000
11.000 3.0000.000
3.000 27% 8.0000.000
0.000 8.000 100% 0.0000.000
1085 Z2016.1128Musa KhailApproved
CONST: OF KAHJORI DAM DIST: MUSA KHAIL.PB-15
125.0000.000
125.000 50.0000.000
50.000 40% 65.0000.000
0.000 65.000 92% 10.0000.000
1084 Z2016.1126Musa KhailApproved
CONST: OF KHARH TANGI DAM U/C WAH HASAN KHEL DIST: MUSA KHAIL,PB-15.
80.0000.000
80.000 55.0000.000
55.000 68% 25.0000.000
0.000 25.000 100% 0.0000.000
1083 Z2016.0800ProvincialApproved
CONSTRUCTION OF PROVINCIAL DAMS IN BALOCHISTAN.
5000.0000.000
5000.000 4091.4210.000
4091.421 81% 500.0000.000
0.000 500.000 91% 408.5790.000
1082 Z2015.1372Musa KhailApproved
CONST:OF KHAZOBI KILLI KHADOZAI DELAY ACTION DAM INCLUDING FLOOD PERENNIAL W.C.SYSTEM IN TOI SAR AREA.
90.7960.000
90.796 39.8000.000
39.800 43% 15.0000.000
0.000 15.000 60% 35.9960.000
1081 Z2014.1003Gwadar
Approved
REHABILITATION OF BELLAR STORAGE DAM PASNI DIST: GAWADAR.
110.0000.000
110.000 94.6400.000
94.640 86% 15.3600.000
0.000 15.360 100% 0.0000.000
1080 Z2013.0348Qilla
AbdullahApproved
CONST: OF DELAY ACTION DAM AT INNAYATULLAH KAREZ DIST. QILLA ABDULLAH.
184.6500.000
184.650 156.2850.000
156.285 84% 5.0000.000
0.000 5.000 87% 23.3650.000
Subsector: Dams
Sector: Irrigation
Chapter: WATER
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 104: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/104.jpg)
Public Sector Development Programme (Sectorwise)
100 of 214
1099 Z2018.4243Kachhi
Approved
CONST: OF PROTECTION BUND IN MACH & BALANARI.
80.0000.000
80.000 30.0000.000
30.000 37% 50.0000.000
0.000 50.000 100% 0.0000.000
1098 Z2018.4068Zhob
Approved
CONSTRUCTION OF DAM AT KILLI WANI SAMAZAI DAM ZHOB
20.0000.000
20.000 7.0000.000
7.000 35% 13.0000.000
0.000 13.000 100% 0.0000.000
1097 Z2018.3631MastungApproved
CONST: OF JALAB GANDAIN DAM, DASHT DISTRICT MASTUNG.
46.7100.000
46.710 10.0000.000
10.000 21% 20.0000.000
0.000 20.000 64% 16.7100.000
1096 Z2018.0895Bela
Approved
SMALL CHECK DAMS, PIR BAMBUL, WASRA LANDHI, SAND, LOHI KANRAJ
80.0000.000
80.000 35.0000.000
35.000 43% 45.0000.000
0.000 45.000 100% 0.0000.000
0.000 0.000 0.000 0.000
Dams(20 Ongoing Projects) GoB/FPA Sub-Total
9406.788 9406.788 6641.289 6641.289 1607.878 0.000 1607.878 1157.621
Subsector: Dams
Sector: Irrigation
Chapter: WATER
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 105: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/105.jpg)
Public Sector Development Programme (Sectorwise)
101 of 214
1115 Z2019.0955Awaran
CPapproved
CONST: KEEL COR DAM TEHSIL JAHOO.
55.0000.000
55.000 0.0000.000
0.000 0% 55.0000.000
0.000 55.000 100% 0.0000.000
1114 Z2019.0876Qilla
SaifullahCPapproved
CONST: OF DAM AT KILLI KAN MEHTARZAI MUSLIM BAGH.
143.9200.000
143.920 0.0000.000
0.000 0% 43.9200.000
0.000 43.920 30% 100.0000.000
1113 Z2019.0751Loralai
CPapproved
CONSTRUCTION OF CHECK DAM IN SHAKH MANDA PATHAN KOT AREA DISTRICT LORALAI
33.5000.000
33.500 0.0000.000
0.000 0% 33.5000.000
0.000 33.500 100% 0.0000.000
1112 Z2019.0613Musa Khail
CPapproved
CONST: OF DELAY ACTION DAM NEA KILLY CHAAP MALIK, ABDUL AZIZ, AZIZ ABAD KINGRI.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1111 Z2019.0499Quetta
CPapproved
CONST. OF DAM AT PANJPAI SARDAR AURENGZAIB SUMALANI.
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
1110 Z2019.0440Zhob
CPapproved
CONSTRUCTION OF GRAVITY CHECK DAM IN KILLI ALI KHAN ZAI DISTRICT ZHOB
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1109 Z2019.0431Kech
CPapproved
CONST: OF GARRUKI DELAY ACTION DAM AT GOKDAN DISTRICT KECH.
150.0000.000
150.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 66% 50.0000.000
1108 Z2019.0264Dera Bugti
CPapproved
CONST: OF MAST THUL CHECK DAM PEER KOH DERA BUGTI.
14.0000.000
14.000 0.0000.000
0.000 0% 14.0000.000
0.000 14.000 100% 0.0000.000
1107 Z2019.0263Dera Bugti
CPapproved
CONST: OF TOBA CHECK DAM DERA BUGTI.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1106 Z2019.0262Dera Bugti
CPapproved
CONST: OF KALO KUSHT CHECK DAM ZAIN KOH DERA BUGTI.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
1105 Z2019.0261Dera Bugti
CPapproved
CONST: OF SAKKA KHAN CHECK DAM ZAIN KOH DERA BUGTI.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
1104 Z2019.0260Dera Bugti
CPapproved
CONST: OF BOGH CHECK DAM HAFT WALI ZAIN KOH DERA BUGTI.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1103 Z2019.0259Dera Bugti
CPapproved
CONST: OF CHECK DAM ON SAHIVE CHR PEER KOH DERA BUGTI.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
1102 Z2019.0258Dera Bugti
CPapproved
CONST: OF PESH BOGI STORAGE CHEK DAM DERA BUGTI.
35.0000.000
35.000 0.0000.000
0.000 0% 35.0000.000
0.000 35.000 100% 0.0000.000
1101 Z2019.0237Qilla
SaifullahCPapproved
REHABILITATION/IMPROVEMENT OF ARAMBI MASAZAI DELAY ACTION DAM KILLA ABDULLAH.
40.2500.000
40.250 0.0000.000
0.000 0% 40.2500.000
0.000 40.250 100% 0.0000.000
1100 Z2019.0023Jhal Magsi
CPapproved
CONSTRUCTION OF NAULONG DAM.
2000.00036500.00
0
38500.000
0.0000.000
0.000 0% 20.00020.000
0.000 40.000 0% 1980.00036480.000
Subsector: Dams
Sector: Irrigation
Chapter: WATER
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 106: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/106.jpg)
Public Sector Development Programme (Sectorwise)
102 of 214
1131 Z2019.1387Qilla
SaifullahCPapproved
CONST:OF DESILTING OF DARA DRA D.ACTION DAM KAN METHERZAI AREA & CONST:OF KILLI SARANA CHECK DAM MUSLIMBAGH K.SAIF.
15.0000.000
15.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 66% 5.0000.000
1130 Z2019.1298Pishin
CPapproved
CONSTRUCTION OF CHECK DAM FOR KILLI MURGHAZAKARIAZAI TEHSIL NANASAHIB PISHIN.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1129 Z2019.1285Qilla
SaifullahCPapproved
CONST OF CHECK DAM FOR KILLI PEROZAI KAN MEHTERZI & HAZAR SHAKH KONJAGHAI DISTRICT KILLA SAIFULLAH.
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
1128 Z2019.1284Quetta
CPapproved
CONST OF CHECK DAM JALOGEER KUCHLAK & DRAIN (NALAI) QUETTA
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
1127 Z2019.1260Kech
CPapproved
IMPROVEMENT OF SPILLWAY & DULY ACTION DAM.
11.5000.000
11.500 0.0000.000
0.000 0% 11.5000.000
0.000 11.500 100% 0.0000.000
1126 Z2019.1237Gwadar
CPapproved
MAKING OF PC II FOR MONJO DAM TAIL OF DASHT RIVER FOR TEHSIL JEWANI AND TEHSIL SUNSTAR
10.6800.000
10.680 0.0000.000
0.000 0% 10.6800.000
0.000 10.680 100% 0.0000.000
1125 Z2019.1236Gwadar
CPapproved
CONSTRUCTION OF SHENZANI STORAGE DAM DISTRICT GWADAR
500.0000.000
500.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 20% 400.0000.000
1124 Z2019.1217Bela
CPapproved
CONSTRUCTION OF KARKACHA DAM UC HARA SETHAR TEHSIL LAKHRA
120.0000.000
120.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 33% 80.0000.000
1123 Z2019.1216Bela
CPapproved
CONSTRUCTION OF ANEERO DAM MITHRI UC KHURKHERA TEHSIL SONMIANI.
50.0000.000
50.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 40% 30.0000.000
1122 Z2019.1208Bela
CPapproved
CONSTRUCTION OF GAJRO DAM MITHRI UC KHURKHERA TEHSIL SONMIANI
35.0000.000
35.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 42% 20.0000.000
1121 Z2019.1168Kech
CPapproved
REH: & RESTORATION OF SMALL STORAGE WATER RESERVOIR SEKKI, TEHSIL DASHT.
29.7700.000
29.770 0.0000.000
0.000 0% 29.7700.000
0.000 29.770 100% 0.0000.000
1120 Z2019.1167Kech
CPapproved
CONSULTANCY SERVICE FOR FEASIBILITY STUDY OF DADDAY DELAY ACTION DAM TEHSIL DASHT.
10.8800.000
10.880 0.0000.000
0.000 0% 10.8800.000
0.000 10.880 100% 0.0000.000
1119 Z2019.1112Shaheed
Sikandarabad
CPapproved
CONSTRUCTION OF MAT SHANARI DELAY ACTION DAM DISTRICT SHAHEED SIKANDERABAD
109.0000.000
109.000 0.0000.000
0.000 0% 109.0000.000
0.000 109.000 100% 0.0000.000
1118 Z2019.0986Gwadar
CPapproved
IMP: OF SPILLWAY KANIRO DAM GAWADAR
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1117 Z2019.0961Kachhi
CPapproved
CONST: OF DAM AT BOLAN AT DISTRICT KACCHI
250.0000.000
250.000 0.0000.000
0.000 0% 160.0000.000
0.000 160.000 64% 90.0000.000
1116 Z2019.0957Awaran
CPapproved
CONST: BARIT PIR ANDAR DAM DISTRICT AWARAN.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
Subsector: Dams
Sector: Irrigation
Chapter: WATER
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 107: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/107.jpg)
Public Sector Development Programme (Sectorwise)
103 of 214
1147 Z2019.1843Qilla
SaifullahCPapproved
CONST: OF CHECK DAM IN CHANDAL GUD IN KAN MEHTARZAI AREA DIST. KILLA SAIFULLAH
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
1146 Z2019.1815Chagai
CPapproved
CHECK DAM MASHKICHAH DISTRICT CHAGAI.
50.0000.000
50.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 50% 25.0000.000
1145 Z2019.1814Chagai
CPapproved
CONST: OF DARWAZAGO TANG KACHAO DAM.
100.0000.000
100.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 50.0000.000
1144 Z2019.1770Dera Bugti
CPapproved
REHABILITATION OF BHAL DAM TEHSIL QADIRABAD DISTRICT DERA BUGTI.
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
1143 Z2019.1768Dera Bugti
CPapproved
CONSTT: OF DARAT DAM KUP DILGAWASH.
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
1142 Z2019.1762Gwadar
CPapproved
FEASIBILITY STUDY MAKING PC-II FOR MOJO DAM TAIL OF DASHT RIVER FOR TEHSIL JEWANI AND TEHSIL SUNTSAR
200.0000.000
200.000 0.0000.000
0.000 0% 80.0000.000
0.000 80.000 40% 120.0000.000
1141 Z2019.1581Kech
CPapproved
CONST: OF STORAGE DAM AT HETAN KALLAG SANI.
50.0000.000
50.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 40% 30.0000.000
1140 Z2019.1580Kech
CPapproved
FEASIBILITY STUDY OF DAM AT GASH KOOR-SANI KALLAG.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1139 Z2019.1521Barkhan
CPapproved
CONSTRUCTION OF REACHAR CHECK DAM GHULO DAMAN CHAPPAR AREA*
59.9000.000
59.900 0.0000.000
0.000 0% 59.9000.000
0.000 59.900 100% 0.0000.000
1138 Z2019.1518Barkhan
CPapproved
CONSTRCUTION OF DELAY ACTION DAM KUNNAL AREA (TAKHRA)*
53.6420.000
53.642 0.0000.000
0.000 0% 53.6420.000
0.000 53.642 100% 0.0000.000
1137 Z2019.1517Barkhan
CPapproved
CONSTRCUTION OF CHANNAL CHECK DAM KHATTA CHOWKI LANJANI AREA (TAKHRA)*
10.6000.000
10.600 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 47% 5.6000.000
1136 Z2019.1516Barkhan
CPapproved
CONSTRCUTION OF KHARRAH CHECK DAM CHOWDHI BHGHAO AREA
30.4000.000
30.400 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 49% 15.4000.000
1135 Z2019.1515Barkhan
CPapproved
CONSTRCUTION OF DHONGHI LAHREE CHECK DAM BADYANI AREA (TAKHRA)
17.4000.000
17.400 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 57% 7.4000.000
1134 Z2019.1514Barkhan
CPapproved
CONSTRUCTION OF CHECK DAM BOHREE SHEER KHAN BHGHAO AREA
37.4210.000
37.421 0.0000.000
0.000 0% 37.4210.000
0.000 37.421 100% 0.0000.000
1133 Z2019.1513Barkhan
CPapproved
CONSTRUCTION OF BOWATTA CHECK DAM DUBAH AREA RAKHNI
14.0000.000
14.000 0.0000.000
0.000 0% 14.0000.000
0.000 14.000 100% 0.0000.000
1132 Z2019.1427Provincial
CPapproved
CONSTRUCTION OF CHECK DAMS AND OTHER RETENTION STRUCTURES IN BALOCHISTAN.
1000.0000.000
1000.000 0.0000.000
0.000 0% 200.0000.000
0.000 200.000 20% 800.0000.000
Subsector: Dams
Sector: Irrigation
Chapter: WATER
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 108: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/108.jpg)
Public Sector Development Programme (Sectorwise)
104 of 214
1155 Z2019.2054Kachhi
CPapproved
CONST: OF DAM IN TAYYAB SANI KACHHI.
70.0000.000
70.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 71% 20.0000.000
1154 Z2019.2048Pishin
CPapproved
DABAK DAM KACH HASANZAI 125.0000.000
125.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 20% 100.0000.000
1153 Z2019.2045Pishin
CPapproved
CHECK DAM KILLI SHERBAZBALOZAI
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1152 Z2019.1958Provincial
CPapproved
NATIONAL PROGRAMME FOR ENHANCING COMMAND AREA OF SMALL & MINI DAMES IN BARANI AREAS OF PAKISTAN(BAL: COMP) 5 YEARS
5120.4460.000
5120.446 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 1% 5020.4460.000
1151 Z2019.1932Quetta
CPapproved
RAISING / STRENGTHENING OF EXISITING SARA GHURGAI DELAY ACTION DAM DISTRICT QUETTA
35.0000.000
35.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 57% 15.0000.000
1150 Z2019.1931Quetta
CPapproved
CONSTRUCTION OF KACH DELAY ACTION DAM SARA KHULA AREA DISTRICT QUETTA
250.0000.000
250.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 20% 200.0000.000
1149 Z2019.1914Kachhi
CPapproved
BOLAN DAM 1500.0000.000
1500.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 6% 1400.0000.000
1148 Z2019.1852Zhob
CPapproved
CONST: OF DARGA MANDEZAI STORAGE DAM ZHOB.
38.0000.000
38.000 0.0000.000
0.000 0% 38.0000.000
0.000 38.000 100% 0.0000.000
36500.000
0.000 20.000 36480.000
Dams(56 New Projects) GoB/FPA Sub-Total
12694.309
49194.309
0.000 0.000 2085.463 0.000 2105.463 10608.846
Sector: Irrigation
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Subsector: Dams
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Chapter: WATER
New
Dams(76 Projects) Total
22101.097
58601.097
6641.289 6641.289 3693.341 0.000 3713.341 11766.467
Sub-Sector Total (FPA) 36500.000
0.000 20.000 36480.000
Sector: WATER(256 Projects)
52122.260
133322.260
9388.692 9388.692 8101.702 0.000 9097.702 34631.866
Sector Total (FPA) 81200.000
0.000 996.000 80204.000
2019 - 20 Original
![Page 109: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/109.jpg)
Public Sector Development Programme (Sectorwise)
105 of 214
1166 Z2017.1444Quetta
Approved
E-FILLING SYSTEM CIVIL SECRETARIAT QUETTA.
100.0000.000
100.000 20.0000.000
20.000 20% 10.0000.000
0.000 10.000 30% 70.0000.000
1165 Z2017.1441Quetta
Approved
ESTABLISHMENT OF GOB DATA CENTRE.
200.0000.000
200.000 5.0000.000
5.000 2% 195.0000.000
0.000 195.000 100% 0.0000.000
1164 Z2016.1144Gwadar
Approved
GWADAR SAFE CITY PROJECT PHASE-I (50:50 COST SHARING BASIS).
1475.8890.000
1475.889 0.0000.000
0.000 0% 238.0000.000
0.000 238.000 16% 1237.8890.000
1163 Z2016.1096ProvincialApproved
ESTABLISHMENT OF DIGITAL LIBRARY / DIGITIZATION OF LAWS / ACTS.
20.3560.000
20.356 9.3560.000
9.356 45% 11.0000.000
0.000 11.000 100% 0.0000.000
1162 Z2015.1386ProvincialApproved
COPACITY BUILDING OF IT AND COMPUTER PROFESSIONAL IN BALOCHISTAN.
100.0000.000
100.000 30.0000.000
30.000 30% 5.0000.000
0.000 5.000 35% 65.0000.000
1161 Z2015.1322ProvincialApproved
LAND REVANUE MANAGEMENT INFORMATION SYSTEM (LRMIS).
2504.4800.000
2504.480 124.5090.000
124.509 4% 100.0000.000
0.000 100.000 8% 2279.9710.000
1160 Z2015.0716ProvincialApproved
ESTABLISHMENT OF INFORMATION TECHNOLOGY TRAINING CENTRE AT HARNAI, ZHOB, DERA ALLAH YAR, TURBAT & KILLA ABDULLAH.
90.0000.000
90.000 39.7780.000
39.778 44% 30.0000.000
0.000 30.000 77% 20.2220.000
1159 Z2015.0715ProvincialApproved
VIRTUAL EDUCATION SYSTEM IN 100 SECONDARY AND HIGHER SECONDARY SCHOOLS IN BALOCHISTAN.
45.7000.000
45.700 9.9500.000
9.950 21% 10.0000.000
0.000 10.000 43% 25.7500.000
1158 Z2013.0003ProvincialApproved
LAND REVENUE MANAGEMENT INFORMATION SYSTEM (BOR).
120.0000.000
120.000 97.8850.000
97.885 81% 22.1150.000
0.000 22.115 100% 0.0000.000
1157 Z2012.0343Quetta
Approved
QUETTA SAFE CITY PROJECT. 2488.7500.000
2488.750 56.4970.000
56.497 2% 800.0000.000
0.000 800.000 34% 1632.2530.000
1156 Z2010.0039ProvincialApproved
CONSTRUCTION OF INFORMATION TECHNOLOGY INSTITUTES AT DERA MURAD JAMALI, KALAT, KSF AND ZIARAT.
62.2890.000
62.289 53.6170.000
53.617 86% 6.6720.000
0.000 6.672 96% 2.0000.000
Information Technology(11 Ongoing Projects) GoB/FPA Sub-Total
7207.464 7207.464 446.592 446.592 1427.787 0.000 1427.787 5333.085
0.000 0.000 0.000 0.000
Subsector: Information Technology
Sector: Information Technology
Chapter: INFORMATION TECH:
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 110: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/110.jpg)
Public Sector Development Programme (Sectorwise)
106 of 214
1171 Z2019.1977Quetta
CPapproved
ESTAB: OF IT PARK AT QUETTA. 1400.0000.000
1400.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 7% 1300.0000.000
1170 Z2019.1419Provincial
CPapproved
VIRTUAL EDUCATION SYSTEM PROJECT.
100.0000.000
100.000 0.0000.000
0.000 0% 60.0000.000
0.000 60.000 60% 40.0000.000
1169 Z2019.1400Quetta
CPapproved
FEASABILITY FOR QUETTA SMART CITY.
100.0000.000
100.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 50.0000.000
1168 Z2019.1397Provincial
CPapproved
E- GOVERNANCE CMDU. 130.0000.000
130.000 0.0000.000
0.000 0% 130.0000.000
0.000 130.000 100% 0.0000.000
1167 Z2019.0098Provincial
CPapproved
ASTRONOMICAL / SPACE OBSERVATORY FOR SCIENCE EDUCATIONAL, RESEARCH & RECREATIONAL PURPOSE IN QTA,ZIARAT & LASBELLA.
300.0000.000
300.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 33% 200.0000.000
Information Technology(5 New Projects) GoB/FPA Sub-Total
2030.000 2030.000 0.000 0.000 440.000 0.000 440.000 1590.000
0.000 0.000 0.000 0.000
New
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Subsector: Information Technology
Chapter: INFORMATION TECH:
Sector: Information Technology
Information Technology(16 Projects) Total
9237.464 9237.464 446.592 446.592 1867.787 0.000 1867.787 6923.085
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: INFORMATION TECH:(16 Projects)
9237.464 9237.464 446.592 446.592 1867.787 0.000 1867.787 6923.085
2019 - 20 Original
![Page 111: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/111.jpg)
Public Sector Development Programme (Sectorwise)
107 of 214
1186 Z2018.3838Quetta
Approved
CONSTRUCTION OF ADDITIONAL CLASSROOMS AND IMPROVEMENT OF EXISTING FACILITIES AT GBPS QAISER COLONY PASHTOON DARA
7.0000.000
7.000 4.0000.000
4.000 57% 3.0000.000
0.000 3.000 100% 0.0000.000
1185 Z2018.3819Quetta
Approved
CONSTRUCTION OF FUTSAL GROUND/IRON FENCES AND STADIUM LIGHTS AT GOVERNMENT BOYS SHAHEED SHAFIQ AHMED KHAN SCHOOL
22.5000.000
22.500 10.0000.000
10.000 44% 5.0000.000
0.000 5.000 66% 7.5000.000
1184 Z2018.3780Quetta
Approved
CONST OF ADD ROOMS AT (GBMS RIND GAR, GGPS MAROOF TOWN, GPS SADAR TOWN, GPS BARECHABAD, GBPS KILLI ALIZAI MUSA COLONY
23.0000.000
23.000 10.0000.000
10.000 43% 5.0000.000
0.000 5.000 65% 8.0000.000
1183 Z2018.3753Zhob
Approved
CONST: OF UP-GRADATION GBPS INTO MIDDLE LEVEL BUILDINGS, KILLI WANI, KILLI TORE SHAH BADENZAI,
35.0000.000
35.000 16.0000.000
16.000 45% 10.0000.000
0.000 10.000 74% 9.0000.000
1182 Z2018.3039Zhob
Approved
CONST: OF ADD: CLASS ROOMS GBP SCHOOL, GGP SCHOOLS, MIDDLE SCHOOLS, HIGH SCHOOLS, HIGH SCHOOL (ANNEXURE -IV)
40.0000.000
40.000 14.9990.000
14.999 37% 10.0010.000
0.000 10.001 62% 15.0000.000
1181 Z2018.2999SohbatpurApproved
PROV: OF NEW SCHOOLS AND ADD: ROOMS AT DIFFERENT SCHOOLS IN DIFFERENT VILLAGES (ANNEX-J)
80.3000.000
80.300 40.0000.000
40.000 49% 10.0000.000
0.000 10.000 62% 30.3000.000
1180 Z2018.2442NasirabadApproved
UP GRADATION OF TWO GBMS TO GBHS WADERA SHAKER KHAN & QADIR ABAD TAMBOO
15.0000.000
15.000 5.0000.000
5.000 33% 10.0000.000
0.000 10.000 100% 0.0000.000
1179 Z2017.1615ProvincialApproved
CONST: OF BOYS AND GIRLS PRIMARY SCHOOLS AT PANJGOOR
27.5000.000
27.500 5.0000.000
5.000 18% 20.0000.000
0.000 20.000 90% 2.5000.000
1178 Z2017.0627NasirabadApproved
CONSTRUCTION /REHABILITATION OF SCHOOLS IN PB-28.
10.0000.000
10.000 4.0000.000
4.000 40% 6.0000.000
0.000 6.000 100% 0.0000.000
1177 Z2017.0157Bela
Approved
BUILDING TO SHELTERLESS SCHOOLS DOUBLE ROOM/SINGLE ROOM IN UTHAL, BELA, LAKRA, KANRAJ IN DIST. LASBELA.
10.0000.000
10.000 6.1160.000
6.116 61% 3.8840.000
0.000 3.884 100% 0.0000.000
1176 Z2016.0447Nushki
Approved
TWO ADD: CLASSROOMS & B/WALL FOR BOYS PRIMARY SCHOOL KILLI WADERA HIDAYATULLAH.
3.0000.000
3.000 1.8770.000
1.877 62% 1.1230.000
0.000 1.123 100% 0.0000.000
1175 Z2016.0445Nushki
Approved
ADD:CLASS ROOMS FOR GBPS KILLI HAJI MEHRULLAH,WARD. 04 GHARIBABAD, HAJI MUHAMMAD AZAM, ETC.
9.6000.000
9.600 3.3190.000
3.319 34% 6.2810.000
0.000 6.281 100% 0.0000.000
1174 Z2016.0315ProvincialApproved
CONST: OF SHELTERLESS SCHOOLS/ADD: ROOMS IN GOVT. SCHOOLS OF JAFFARABAD & SOHBATPUR.
14.6000.000
14.600 1.5000.000
1.500 10% 13.1000.000
0.000 13.100 100% 0.0000.000
1173 Z2016.0133Duki
Approved
CONST: OF BUILDING FOR SHELTER-LESS SCHOOLS, DUKI.
28.0000.000
28.000 13.0000.000
13.000 46% 15.0000.000
0.000 15.000 100% 0.0000.000
1172 Z2016.0053Jhal MagsiApproved
ADDITIONAL ROOMS IN GGPS SAZGANI, GBPS SAZGANI & GPS BERAL ABAD.
7.5000.000
7.500 4.5000.000
4.500 60% 3.0000.000
0.000 3.000 100% 0.0000.000
Subsector: Primary Education
Sector: Education
Chapter: EDUCATION
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 112: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/112.jpg)
Public Sector Development Programme (Sectorwise)
108 of 214
1187 Z2018.3842Quetta
Approved
CONSTRUCTION FO ADDITIONAL CLASS ROOMS AT GBPS TOWN NO. 3 SIRKI ROAD QUETTA
8.0000.000
8.000 5.0000.000
5.000 62% 3.0000.000
0.000 3.000 100% 0.0000.000
0.000 0.000 0.000 0.000
Primary Education(16 Ongoing Projects) GoB/FPA Sub-Total
341.000 341.000 144.311 144.311 124.389 0.000 124.389 72.300
Subsector: Primary Education
Sector: Education
Chapter: EDUCATION
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 113: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/113.jpg)
Public Sector Development Programme (Sectorwise)
109 of 214
1201 Z2019.0358Jaffarabad
CPapproved
CONST:OF GBMS ABDUL KAREEM BABAR 5 CLASS ROOMS WITH W/R BEMIS CODE 05692.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1200 Z2019.0357Jaffarabad
CPapproved
CONST: OF GBHS GAREEBABAD JAMALI 2 ADDITIONAL ROOMS WITH BOUNDARY WALL BEMIS CODE 05514.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1199 Z2019.0356Jaffarabad
CPapproved
CONST: OF THREE ADD: C/ROOMS ALONG WITH B/WALL & TOILETS GGPS LAL BUX NAWARA.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1198 Z2019.0355Jaffarabad
CPapproved
CONST: OF GBPS MAMMUL KHOSA 4 ROOMS WITH W/R BEMIS CODE 05702.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1197 Z2019.0354Jaffarabad
CPapproved
CONST: OF GGPS SHAMIR KHAN RIND GOTH SOBDAR KHAN RIND 2 ROOMS WITH W/R WITH B/WALL BEMIS CODE 3142-43.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1196 Z2019.0332Duki
CPapproved
CONSTT: OF SHELTER LESS GBPS SAIF ULLAH CHUMIYA TALAO BEMIS CODE: 10261 & ZINDA ROAD BAKHTIYAR KHAN BEMIS CODE 4398.
19.0000.000
19.000 0.0000.000
0.000 0% 19.0000.000
0.000 19.000 100% 0.0000.000
1195 Z2019.0329Duki
CPapproved
CONSTT: OF SHELTER LESS GBPS SARDAR ESSA KHAN BANHAR, DISTRICT DUKI, BEMIS CODE: 4304.
9.5000.000
9.500 0.0000.000
0.000 0% 9.5000.000
0.000 9.500 100% 0.0000.000
1194 Z2019.0324Duki
CPapproved
GGPS RAZ MUHAMMAD MIANZAI CODE: 10050, GBPS KILLI NOOR-UL-AMIN DHAKKI,GBPS, KILLI GULLA KHAN WADERA ZAI GANDEHRI.
28.5000.000
28.500 0.0000.000
0.000 0% 28.5000.000
0.000 28.500 100% 0.0000.000
1193 Z2019.0269Dera Bugti
CPapproved
CONST: OF SHELTERLESS GBPS KILLI CHAKAR SUI & GBPS KILLI WAZIR KHAN IN DERA BUGTI.
18.0000.000
18.000 0.0000.000
0.000 0% 18.0000.000
0.000 18.000 100% 0.0000.000
1192 Z2019.0268Dera Bugti
CPapproved
CONST: OF SHELTERLESS GBPS WALI DARBAR ZAIN & GBPS RAHIM DAD DERA BUGTI.
18.0000.000
18.000 0.0000.000
0.000 0% 18.0000.000
0.000 18.000 100% 0.0000.000
1191 Z2019.0266Dera Bugti
CPapproved
CONST: SHELTER LESS SCHOOLS GBPS HUNDU MOHALA NAWAB QILLA, GBPS SAHU SAEOF & GBPS HAZOORBUX, DERA BUGTI.
27.0000.000
27.000 0.0000.000
0.000 0% 27.0000.000
0.000 27.000 100% 0.0000.000
1190 Z2019.0265Dera Bugti
CPapproved
CONST: OF NEW PS KACHI CANAL MOZA 1 & GGPS HAJI SHAH ALI PESH BOGI OF NEW PRIMARY GIRLS SCHOOL KACHI CANAL MOZA 1.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
1189 Z2019.0064Chagai
CPapproved
CONST:OF ADDL:C/R &2 TOIL:FOR GBPS MOLVI M.ALIM NOKUNDI,KILLI KARTOKA KATAKAR & AJBANI KALANI, GB&GPS S.HASHIM KHAN.
35.0000.000
35.000 0.0000.000
0.000 0% 17.5000.000
0.000 17.500 50% 17.5000.000
1188 Z2019.0057Chagai
CPapproved
CONST:OF ADDL: CLASS ROOMS & 2 TOILETS FOR GBPS KILLI NAWAB KHAN, KILLI ZAKRIA, KILLI MALIK BADAL KHAN, PADAG.
21.0000.000
21.000 0.0000.000
0.000 0% 11.0000.000
0.000 11.000 52% 10.0000.000
Subsector: Primary Education
Sector: Education
Chapter: EDUCATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 114: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/114.jpg)
Public Sector Development Programme (Sectorwise)
110 of 214
1217 Z2019.0486Zhob
CPapproved
CONST: OF BOYS PRIMARY SCHOOL AT KILLI SULEMANKHANZAI, PADUAZAI, KHADARZAI, LAGHANI (RAKHPUR), DIST. ZHOB
9.5000.000
9.500 0.0000.000
0.000 0% 9.5000.000
0.000 9.500 100% 0.0000.000
1216 Z2019.0485Zhob
CPapproved
CONSTRUCTION OF BOYS PRIMARY SCHOOL AT KILLI HAMRAN, DISTRICT ZHOB
9.5000.000
9.500 0.0000.000
0.000 0% 9.5000.000
0.000 9.500 100% 0.0000.000
1215 Z2019.0484Zhob
CPapproved
CONSTRUCTION OF BOYS PRIMARY SCHOOL AT KILLI DERGAMENDIZAI, DISTRICT ZHOB
9.5000.000
9.500 0.0000.000
0.000 0% 9.5000.000
0.000 9.500 100% 0.0000.000
1214 Z2019.0447Zhob
CPapproved
CONSTRUCTION OF SHELTERLESS GIRLS PRIMARY SCHOOL AT KILLI WARSAK, DISTRICT ZHOB
9.5000.000
9.500 0.0000.000
0.000 0% 9.5000.000
0.000 9.500 100% 0.0000.000
1213 Z2019.0446Zhob
CPapproved
CONSTRUCTION OF SHELTERLESS BOYS PRIMARY SCHOOL AT KILLI MARDANZAI HAJI SHAMAI, DISTRICT ZHOB
9.5000.000
9.500 0.0000.000
0.000 0% 9.5000.000
0.000 9.500 100% 0.0000.000
1212 Z2019.0370Jaffarabad
CPapproved
CONST: OF GGPS GOTH HAJI JUMA KHAN RONGHA UC CHALGARI 3 ROOMS WITH WASH ROOM WITH B/W BEMIS CODE 12445.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1211 Z2019.0369Jaffarabad
CPapproved
REHBT: OF GGPS ABDUL SATTAR BHATTI DERA ALLAH YAR BEMIS CODE 05671.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1210 Z2019.0368Jaffarabad
CPapproved
CONST: OF GBPS GOTH BAHRAM KHAN KANDRANI 4 ADDITIONAL ROOMS WITH W/R BEMIS CODE 05343.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1209 Z2019.0367Jaffarabad
CPapproved
CONST: OF 3 ADDITIONAL ROOMS WITH W/R GPS GOTH ALLAH BACHAYA BANGULZAI BEMIS CODE 08791.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1208 Z2019.0366Jaffarabad
CPapproved
REHBT: OF GGPS SHAHEED MURAD COLONY DERA ALLAH YAR BEMIS CODE 10074.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1207 Z2019.0364Jaffarabad
CPapproved
CONST: OF GBPS MANZOR KHAN HIJWANI 3 ADDITIONAL ROOMS WITH W/R BEMIS CODE 05694.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1206 Z2019.0363Jaffarabad
CPapproved
CONST: OF 3 ADDITIONAL ROOMS WITH W/R GBPS MANZOR AHMED KHOSA BEMIS CODE 05677.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1205 Z2019.0362Jaffarabad
CPapproved
REHBT: OF GBPS ESSA KHAN RIND BEMIS CODE 05359.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1204 Z2019.0361Jaffarabad
CPapproved
CONST: OF ADDITIONAL ROOMS WITH W/R IN GGPS HASHIM PANDRANI AT ALI HASSAN MAGSI BEMIS CODE 10635.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1203 Z2019.0360Jaffarabad
CPapproved
CONST: OF ADDITIONAL ROOMS WITH TOILETS IN GPS GOTH ALLAH BUKHSH GISHKORI BEMIS CODE 12411.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1202 Z2019.0359Jaffarabad
CPapproved
CONST: OF GPS GOTH MOHAMMAD NAWAZ KHAN DASHTI BEMIS CODE 16158.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
Subsector: Primary Education
Sector: Education
Chapter: EDUCATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 115: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/115.jpg)
Public Sector Development Programme (Sectorwise)
111 of 214
1232 Z2019.0932Khuzdar
CPapproved
ADD: FACILITIES IN GBPS IN KUDO, HASHUMA, N.ABAD, LONDO, AWAK, KIRODO, RUSTAM, BADRI, THIRKUSH, HAZAR GANJ CHUTY.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1231 Z2019.0770Loralai
CPapproved
CONST:OF SHELTERLEES GBPS BARNIMA KALA, B.C:04225, G.RASOL TARKAI B.C: 04303 & GHAZI KHAN P-KOT B.C:04347 LORALAI.
27.0000.000
27.000 0.0000.000
0.000 0% 27.0000.000
0.000 27.000 100% 0.0000.000
1230 Z2019.0754Nasirabad
CPapproved
CONSTRUCTION OF SHELTER LESS GOVT: BOYS PRIMARY SCHOOL ABDUL RASOOL.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1229 Z2019.0753Nasirabad
CPapproved
CONSTRUCTION OF SHELTER LESS GOVT: BOYS PRIMARY SCHOOL MEHRAN UMRANI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1228 Z2019.0750Nasirabad
CPapproved
CONSTRUCTION OF SHELTER LESS GOVT: BOYS PRIMARY SCHOOL ABDUL RASHEED UMRANI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1227 Z2019.0749Nasirabad
CPapproved
CONSTRUCTION OF SHELTER LESS GOVT: BOYS PRIMARY SCHOOL MIR JUMA KHAN UMRANI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1226 Z2019.0748Nasirabad
CPapproved
CONSTRUCTION OF SHELTER LESS GOVT: BOYS PRIMARY SCHOOL ALI MUHAMAMD UMRANI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1225 Z2019.0747Nasirabad
CPapproved
CONSTRUCTION OF SHELTER LESS GOVT: BOYS PRIMARY SCHOOL NIHAL DIN SOLANGI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1224 Z2019.0745Nasirabad
CPapproved
CONSTRUCTION OF SHELTER LESS GOVT: BOYS PRIMARY SCHOOL MUHAMAMD UMAR.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1223 Z2019.0743Nasirabad
CPapproved
CONSTRUCTION OF SHELTER LESS GOVT: BOYS PRIMARY JAVED ALI UMRANI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1222 Z2019.0594Nasirabad
CPapproved
CONST: OF ADDITIONAL ROOMS AT P/SCHOOL PEER MUHAMAMD MENGAL PB-12
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1221 Z2019.0565Sibi
CPapproved
B/W OF GGPS RASOOL ABAD, B.CODE.08071, 6 ROOMS /TOILETS OF GBMS DUR M. HANBHI & CONST: OF (10 ADDL; ROOM/1 TOILET
12.0000.000
12.000 0.0000.000
0.000 0% 8.0000.000
0.000 8.000 66% 4.0000.000
1220 Z2019.0490Zhob
CPapproved
CONST: OF GIRLS PRIMARY SCHOOL AT WASTA GARWANDI, KAKAR KHURASAN, DIST. ZHOB
9.5000.000
9.500 0.0000.000
0.000 0% 9.5000.000
0.000 9.500 100% 0.0000.000
1219 Z2019.0488Zhob
CPapproved
CONSTRUCTION OF BOYS PRIMARY SCHOOL AT KILLI QAMARZAI ALI KHAN ZAI, DIST. ZHOB
9.5000.000
9.500 0.0000.000
0.000 0% 9.5000.000
0.000 9.500 100% 0.0000.000
1218 Z2019.0487Zhob
CPapproved
CONSTRUCTION OF GIRLS PRIMARY SCHOOL AT KILLI MAGHDOOBZAI VIALA, DIST. ZHOB
9.5000.000
9.500 0.0000.000
0.000 0% 9.5000.000
0.000 9.500 100% 0.0000.000
Subsector: Primary Education
Sector: Education
Chapter: EDUCATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 116: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/116.jpg)
Public Sector Development Programme (Sectorwise)
112 of 214
1245 Z2019.1308Kech
CPapproved
CONST: OF 800FT B/W ALL IN GBMS NALI BALGHTER & 2 TOILETS, GBPS DANDSAR DANDAN, 3 ADD: C/R GBPS KARKI ETC
19.5610.000
19.561 0.0000.000
0.000 0% 19.5610.000
0.000 19.561 100% 0.0000.000
1244 Z2019.1307Kech
CPapproved
CONST:OF 600FT B/W &2 TOIL:FOR GBPS KOCHA KILI, GBHS GWARKOOP,GBHS TEJBAN & CONST:OF 800FT B/W AT GGPS D.SIR SHAHRAG
25.2520.000
25.252 0.0000.000
0.000 0% 25.2520.000
0.000 25.252 100% 0.0000.000
1243 Z2019.1306Kech
CPapproved
CONST: OF 600FT B/W & 2 TOILETS FOR GGPS GILL, GBPS KORO PUSHT, GBPS YAQOOB MUHALLA, GBPS MASHRAQI SOLO ETC
15.9420.000
15.942 0.0000.000
0.000 0% 15.9420.000
0.000 15.942 100% 0.0000.000
1242 Z2019.1274Kech
CPapproved
CONST 2 ADD: C/ROOMS FOR GBPS DAMBANI, CODE:11662, RAKO MOHLA. CODE: 05989, GBPS ALANDOR C:09038 & GBHS BIT.C:05980)
11.8760.000
11.876 0.0000.000
0.000 0% 11.8760.000
0.000 11.876 100% 0.0000.000
1241 Z2019.1180Ziarat
CPapproved
ROOMS FOR SHELTERLESS PS ZIARAT, ZARGHON GHER, KANOBI AGHBARG,KHRASHANG,CHILAIZ M HAJI,TORAMANA & GHER KHAWA M.A.RAHIM
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
1240 Z2019.1064Pishin
CPapproved
ADDITIONAL CLASS ROOMS FOR GBPS KILLI KOZ SHINGHARAI, BEMIS CODE: 01229 TEHSIL HURAMZAI DIST. PISHIN.
6.0000.000
6.000 0.0000.000
0.000 0% 6.0000.000
0.000 6.000 100% 0.0000.000
1239 Z2019.1044Awaran
CPapproved
CONST: OF ADD: C/ROOMS A/W B/ W IN VARIOUS TEHSILS GBPS PIR B.BAZAR, GBPS. MALLAN, GBPS: B.GOT,GBPS.JAHL METAG & OTHER
19.2000.000
19.200 0.0000.000
0.000 0% 19.2000.000
0.000 19.200 100% 0.0000.000
1238 Z2019.1006Harnai
CPapproved
CONST: OF EXAMINATION HALL FOR GBHS AT HARNAI BAZAR BEMIS CODE: 08181.
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
1237 Z2019.1005Harnai
CPapproved
CONST:OF 7 C/ROOMS, PRINCIPLE ROOM, STAFF ROOMS, B/WALLS, TOILETS & UG TANKS AT GBPS KILLI KHADRANI BEMIS CODE: 4080.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1236 Z2019.1000Gwadar
CPapproved
REH: AND B/W IN GBHS KULDAN,JIWANI & GGHS PISHUKAN & GBMS ORMARA GWADAR
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
1235 Z2019.0996Gwadar
CPapproved
CONST: OF 2 CLASSROOM GGPSCHOOLS AHMED BAZAR KOLANCH& GBPS IQRA, GGMSCHOOL NALIENT AND ROBAR AND GBS ZARAN GWADAR
14.0000.000
14.000 0.0000.000
0.000 0% 14.0000.000
0.000 14.000 100% 0.0000.000
1234 Z2019.0995Gwadar
CPapproved
CONST: ADD: 2CLASSROOMS GGPS KAUDAAHMED MOULA,AMBI KOLANCH,CHIB KALMATI &GGHS SURBUNDAR GGMS CHUR BUNDAR,GBPS MOJO
16.0000.000
16.000 0.0000.000
0.000 0% 16.0000.000
0.000 16.000 100% 0.0000.000
1233 Z2019.0992Gwadar
CPapproved
CONST: OF ADD: 2 CLASS ROOMS IN GGPS&GBPS BANDARI,GGMS A.RAHIM BAZAR &GGPS SHAY M.BAZAR PALLERY,GBPS MAJEED BAZAR SUI
13.0000.000
13.000 0.0000.000
0.000 0% 13.0000.000
0.000 13.000 100% 0.0000.000
Subsector: Primary Education
Sector: Education
Chapter: EDUCATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 117: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/117.jpg)
Public Sector Development Programme (Sectorwise)
113 of 214
1260 Z2019.1539Barkhan
CPapproved
CONSTRUCTION OF GBPS FAIZ MOHAMMAD BAHAUDRA(BMIS CODE 13142)
9.5000.000
9.500 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 52% 4.5000.000
1259 Z2019.1538Barkhan
CPapproved
CONSTRUCTION OF GBPS HAJI REMAN MARHA(BMIS CODE 12357)
9.5000.000
9.500 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 52% 4.5000.000
1258 Z2019.1537Barkhan
CPapproved
CONSTRUCTION OF GBPS MALIK USMAN LANHJANI(BMIS CODE 12040)
9.5000.000
9.500 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 52% 4.5000.000
1257 Z2019.1536Barkhan
CPapproved
CONSTRUCTION OF GBPS RAHEEM HUSSANI(08548)
9.5000.000
9.500 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 52% 4.5000.000
1256 Z2019.1535Barkhan
CPapproved
CONSTRUCTION OF GBPS MOHAMMAD GUL BANDANI(BMIS CODE 13353)
9.5000.000
9.500 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 52% 4.5000.000
1255 Z2019.1534Barkhan
CPapproved
CONSTRUCTION OF GBPS AHMED KHAN JALWANI(BMIS CODE 07123)
9.5000.000
9.500 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 52% 4.5000.000
1254 Z2019.1532Barkhan
CPapproved
CONSTUCTION OF GBPS LODANI (BMIS CODE 07684) BARKHAN
9.5000.000
9.500 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 52% 4.5000.000
1253 Z2019.1530Barkhan
CPapproved
CONSTRUCTION OF GBPS SHAHBAZ JALWANI(BMIS CODE 15934)
9.5000.000
9.500 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 52% 4.5000.000
1252 Z2019.1529Barkhan
CPapproved
CONSTRUCTION OF GGPS WADERA DIN MOHAMMAD HASANI(BMIS CODE 12626)
9.5000.000
9.500 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 52% 4.5000.000
1251 Z2019.1413Quetta
CPapproved
ADD C/R, EX:HALL, PRINC:OFF: GGPS NASRULLAH K.ZAYRAI ,GBMS KHIL:COL:, GBPS BRCHABAD,ALIZAI, GGPS MAHROOF T, E BYPASS.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1250 Z2019.1313Kech
CPapproved
3 ADD: C/R FOR BPS MUHDABAD MEHNAZ, 3 ADD: C/R FOR GGPS KARKI SAMI, 3 FOR GBPS KORE PUSH, 3 FOR GBPS REKSER BIT.
19.0680.000
19.068 0.0000.000
0.000 0% 19.0680.000
0.000 19.068 100% 0.0000.000
1249 Z2019.1312Kech
CPapproved
3 ADD: C/R FOR GBPS GAMOOK, 3 ADD: CLASS ROOMS FOR GBPS JAT KOLWAH, 3 ADD: CLASS ROOMS FOR GBPS SARI KALLAG JAMAK
34.1230.000
34.123 0.0000.000
0.000 0% 34.1230.000
0.000 34.123 100% 0.0000.000
1248 Z2019.1311Kharan
CPapproved
3 ADD: CLASS ROOMS FOR GBPS GARDANK. CODE: 05992 &4 ADD: CLASS ROOMS FOR GBPS KALLAG SAMI CODE: 05926
14.1230.000
14.123 0.0000.000
0.000 0% 14.1230.000
0.000 14.123 100% 0.0000.000
1247 Z2019.1310Kech
CPapproved
3 ADD: C/R FOR GBPS MOHAMMAD ABAD, 3 ADD: CLASS ROOMS FOR GBPS CHIB & 3 ADD: CLASS ROOMS FOR GBPS REKO. CODE: 05989
24.1230.000
24.123 0.0000.000
0.000 0% 24.1230.000
0.000 24.123 100% 0.0000.000
1246 Z2019.1309Kech
CPapproved
CONST: OF EXAM. HALL AT GHS HERRNK, CONST: OF BUILD:, B/W & TOILET AT GGMS, REKO & CONST: OF 2 ADD: C/R GHSS PIDRAK.
19.3920.000
19.392 0.0000.000
0.000 0% 10.3920.000
0.000 10.392 53% 9.0000.000
Subsector: Primary Education
Sector: Education
Chapter: EDUCATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 118: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/118.jpg)
Public Sector Development Programme (Sectorwise)
114 of 214
1276 Z2019.1872Khuzdar
CPapproved
CONST: OF SHELTERLESS GBPS AT KILLI MIR IKHLAQUE TULAI, KHIDRANI.
9.5000.000
9.500 0.0000.000
0.000 0% 9.5000.000
0.000 9.500 100% 0.0000.000
1275 Z2019.1850Zhob
CPapproved
CONST: OF BOYS PRIMARY SCHOOL AT KILLI YAQOOBZAI, DISTRICT ZHOB
9.5000.000
9.500 0.0000.000
0.000 0% 9.5000.000
0.000 9.500 100% 0.0000.000
1274 Z2019.1672Qilla
AbdullahCPapproved
CONST: OF ADDL: INFRASTRUCTURE AT PS KILLI SHAD KAHOL, KILLI SALEHZAI, LAMARA, YOUSOF PAHLWAN, GARDI PINAKAI.
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
1273 Z2019.1609Quetta
CPapproved
PROV:OF EXISTING FACIL:OF 2 C/R & 2 TOILETS FOR GBPS & GGPS IN KILLIES DAWI SAMALI, SHARIF SAMALI, MALAKHAIL ABAD ETC
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
1272 Z2019.1551Barkhan
CPapproved
CONST: OF GBPS KALO KHAN HALWANI(BMIS CODE 11184) BARKHAN
9.5000.000
9.500 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 52% 4.5000.000
1271 Z2019.1550Barkhan
CPapproved
CONST: OF GBPS GIRHMONAH(BMIS CODE 06978) BARKHAN
9.5000.000
9.500 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 52% 4.5000.000
1270 Z2019.1549Barkhan
CPapproved
CONST: OF GBPS SULTAN MUT (BMIS CODE 06994) BARKHAN
9.5000.000
9.500 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 52% 4.5000.000
1269 Z2019.1548Barkhan
CPapproved
CONST: OF GBPS CHACHA(BMIS CODE 06990 ) BARKHAN
9.5000.000
9.500 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 52% 4.5000.000
1268 Z2019.1547Barkhan
CPapproved
CONST: OF GBPS KHAN MOHD SADARANI(BMIS CODE 08627 ) BARKHAN
9.5000.000
9.500 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 52% 4.5000.000
1267 Z2019.1546Barkhan
CPapproved
CONSTRUCTION OF GBPS MIR MOHAMMAD(BMIS CODE 12653)
9.5000.000
9.500 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 52% 4.5000.000
1266 Z2019.1545Barkhan
CPapproved
CONSTRUCTION OF GBPS MOHAMMAD ASHRAF BUZDAR(BMIS CODE 14656).
9.5000.000
9.500 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 52% 4.5000.000
1265 Z2019.1544Barkhan
CPapproved
CONSTRUCTION OF GBPS AZEEM BUZDAR(BMIS CODE 16338)
9.5000.000
9.500 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 52% 4.5000.000
1264 Z2019.1543Barkhan
CPapproved
CONSTRUCTION OF GBPS REHMAN LOHMA KUCH(BMIS CODE 07089)
9.5000.000
9.500 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 52% 4.5000.000
1263 Z2019.1542Barkhan
CPapproved
CONSTRUCTION OF GBPS GUL JAN SHALMANI(BMIS CODE 0785)
9.5200.000
9.520 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 52% 4.5200.000
1262 Z2019.1541Barkhan
CPapproved
CONSTRUCTION OF BGPS ALLAH BAKHSH KANDALI(BMIS CODE 12334)
9.5000.000
9.500 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 52% 4.5000.000
1261 Z2019.1540Barkhan
CPapproved
CONSTRUCTION OF GBPS MARRI BURHA HAJI IBRAHIM(BMIS CODE 07070)
9.5000.000
9.500 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 52% 4.5000.000
Subsector: Primary Education
Sector: Education
Chapter: EDUCATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 119: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/119.jpg)
Public Sector Development Programme (Sectorwise)
115 of 214
1283 Z2019.2039Kech
CPapproved
CONST OF SHELTERLESS GPB SCHOOLS, CHAGOGI BAZAR, ZAMURAN BAZAR BALECHA, RAISABAD & ADJOINING AREAS
25.0000.000
25.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 100% 0.0000.000
1282 Z2019.2021Provincial
CPapproved
GOVT. OF BALOCHISTAN PROGRAM FOR ESTAB: OF NEW PRIMARY SCHOOLS IN BALOCHISTAN.
330.0000.000
330.000 0.0000.000
0.000 0% 150.0000.000
0.000 150.000 45% 180.0000.000
1281 Z2019.2016Kohlu
CPapproved
CONST: OF GOVT. PRIMARY SCHOOL KILLI JAMAL KHAN KOHLU.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1280 Z2019.1877Khuzdar
CPapproved
CONST: OF SHELTERLESS GBPS AT KUMB BULANDABAD SASOL.
9.5000.000
9.500 0.0000.000
0.000 0% 9.5000.000
0.000 9.500 100% 0.0000.000
1279 Z2019.1876Khuzdar
CPapproved
CONST: OF SHELTERLESS GBPS AT KILLI SARDARI SHAHER KARIZ SASOL.
9.5000.000
9.500 0.0000.000
0.000 0% 9.5000.000
0.000 9.500 100% 0.0000.000
1278 Z2019.1875Khuzdar
CPapproved
CONST: OF ADDITIONAL (03) C/ROOMS AT GBPS KILLI ALAM KHAN URNACH.
9.5000.000
9.500 0.0000.000
0.000 0% 9.5000.000
0.000 9.500 100% 0.0000.000
1277 Z2019.1874Khuzdar
CPapproved
CONST: OF SHELTERLESS GGPS CHOKALLY MULLAZAI URNACH.
5.0000.000
5.000 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 100% 0.0000.000
0.000 0.000 0.000 0.000
Primary Education(96 New Projects) GoB/FPA Sub-Total
1610.680 1610.680 0.000 0.000 1295.660 0.000 1295.660 315.020
Sector: Education
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Primary Education
Chapter: EDUCATION
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
New
Primary Education(112 Projects) Total
1951.680 1951.680 144.311 144.311 1420.049 0.000 1420.049 387.320
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 120: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/120.jpg)
Public Sector Development Programme (Sectorwise)
116 of 214
1297 Z2018.3262NasirabadApproved
CONSTRUCTION / UPGRADATION OF PRIMARY SCHOOL TO MIDDLE
15.0000.000
15.000 5.0000.000
5.000 33% 5.0000.000
0.000 5.000 66% 5.0000.000
1296 Z2018.3187Musa KhailApproved
CONST AND UP GRAD OF PRIMARY SCHOOL TO MIDDLE SCHOOL NISHPA KILLA SHAIRZAMAN TEHSIL ZIMRI PALASEEN
10.0000.000
10.000 3.0000.000
3.000 30% 3.0000.000
0.000 3.000 60% 4.0000.000
1295 Z2018.2513ProvincialApproved
CHIEF MINISTER’S INITIATIVE FOR PROVISION OF BUILDING TO SHELTER LESS SCHOOL (ALREADY IDENTIFIED – ANNEXURE)
1500.0000.000
1500.000 974.6660.000
974.666 64% 525.3340.000
0.000 525.334 100% 0.0000.000
1294 Z2018.2510ProvincialApproved
CHIEF MINISTER’S LAPTOPS SCHEME TO DESERVING STUDENTS OF BALOCHISTAN
500.0000.000
500.000 250.0000.000
250.000 50% 100.0000.000
0.000 100.000 70% 150.0000.000
1293 Z2018.2495ProvincialApproved
ESTABLISHMENT OF 800 EMIS CELL AT CLUSTER CENTRE.
577.0000.000
577.000 100.0000.000
100.000 17% 100.0000.000
0.000 100.000 34% 377.0000.000
1292 Z2018.2493ProvincialApproved
CHIEF MINISTER SCHOOL IMPROVEMENT DEVELOPMENT PROGRAMM FOR 200 MIDDLE SCHOOLS (CLUSTER).
1500.0000.000
1500.000 0.0000.000
0.000 0% 1000.0000.000
0.000 1000.000 66% 500.0000.000
1291 Z2018.2487ProvincialApproved
CHIEF MINISTER'S SCHOOL INFRASTRUCTURE AND IMPROVEMENT DEVELOPMENT PROGRAM FOR 100 HIGH SCHOOLS IN BALOCHISTAN
983.4000.000
983.400 0.0000.000
0.000 0% 983.4000.000
0.000 983.400 100% 0.0000.000
1290 Z2018.2482ProvincialApproved
CONTINUOS PROFESSIONAL DEVELOPMENT PROGRAM FOR TEACHERS.
605.1200.000
605.120 11.0000.000
11.000 1% 15.0000.000
0.000 15.000 4% 579.1200.000
1289 Z2018.0832Barkhan
Approved
CONSTRUCTION OF ADDITIONAL ROOMS IN DISTRICT BARKHAN
20.0000.000
20.000 9.9970.000
9.997 49% 10.0030.000
0.000 10.003 100% 0.0000.000
1288 Z2017.1081Panjgur
Approved
PROVISION OF TWO COASTERS/ SCHOOL BUS FOR GGHS CHITKAN AND GGHS TAAR OFFICE.
14.0000.000
14.000 7.0000.000
7.000 50% 7.0000.000
0.000 7.000 100% 0.0000.000
1287 Z2016.0824Barkhan
Approved
UPGRADATION OF GGPS BASTI AZAM JAN & GBPS TO MIDDLE LEVEL BASTI GHULAM RASOOL SHAH.
7.4240.000
7.424 2.0000.000
2.000 26% 2.0000.000
0.000 2.000 53% 3.4240.000
1286 Z2016.0798Kachhi
Approved
CONST: OF MISSING INFRASTRUCTURE, M.S HAJIJAW (2) ROOMS,P.MJANGU SHAHAR (2) ROOMS,H.S.S SHORAN SANNI,ETC.
10.8910.000
10.891 7.0000.000
7.000 64% 3.8910.000
0.000 3.891 100% 0.0000.000
1285 Z2016.0689SohbatpurApproved
CONST: OF ADD: ROOMS/ B/WALLLS, TOILETS, EXAM: HALLS & LABS OF SCHOOLS IN TEHSIL SOHBATPUR, HAIRDIN, ETC.
33.2950.000
33.295 23.2950.000
23.295 69% 10.0000.000
0.000 10.000 100% 0.0000.000
1284 Z2014.0173Kech
Approved
PROVISION OF MISSING INFRASTURCTURE, CONST: OF ADDL: CLASS ROOMS.
60.0000.000
60.000 50.0030.000
50.003 83% 9.9970.000
0.000 9.997 100% 0.0000.000
Middle Education(14 Ongoing Projects) GoB/FPA Sub-Total
5836.130 5836.130 1442.961 1442.961 2774.625 0.000 2774.625 1618.544
0.000 0.000 0.000 0.000
Subsector: Middle Education
Sector: Education
Chapter: EDUCATION
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 121: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/121.jpg)
Public Sector Development Programme (Sectorwise)
117 of 214
1303 Z2019.2020Provincial
CPapproved
GOVT. OF BALOCHISTAN PROGRAM FOR ESTAB: OF MIDDLE SCHOOLS IN BALOCHISTAN.
495.0000.000
495.000 0.0000.000
0.000 0% 200.0000.000
0.000 200.000 40% 295.0000.000
1302 Z2019.0638Jaffarabad
CPapproved
CONST:/REHABILITATION OF BOUNDARY WALL, GGMS KOT NOOR MUHAMMAD.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1301 Z2019.0491Quetta
CPapproved
CONST:OF EXAM:HALLS OF GOVT.BOYS/GIRLS M/S IN KILLI RAHIM GUL QILA , MEHTARZAI BALELI, H.MEHRAB, AUTOZAI ETC KUCHLAK
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
1300 Z2019.0445Zhob
CPapproved
CONST: OF 6 ADDITIONAL CLASS ROOMS AT GOVT. BOYS MIDDLE SCHOOL NASIRABAD ZHOB
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1299 Z2019.0327Duki
CPapproved
CONSTT: OF SHELTER SCHOOL GBMS JADEED ZARGHOON, DISTRICT DUKI BEMIS CODE: 04407.
9.5000.000
9.500 0.0000.000
0.000 0% 9.5000.000
0.000 9.500 100% 0.0000.000
1298 Z2019.0025Provincial
CPapproved
ESTABLISHMENT & INSTITUTIONALIZATION OF PERFORMANCE MGT. SYSTEM IN EDUCATION DEPARTMENT.
200.0000.000
200.000 0.0000.000
0.000 0% 150.0000.000
0.000 150.000 75% 50.0000.000
0.000 0.000 0.000 0.000
Middle Education(6 New Projects) GoB/FPA Sub-Total
754.500 754.500 0.000 0.000 409.500 0.000 409.500 345.000
Sector: Education
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Middle Education
Chapter: EDUCATION
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
New
Middle Education(20 Projects) Total
6590.630 6590.630 1442.961 1442.961 3184.125 0.000 3184.125 1963.544
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 122: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/122.jpg)
Public Sector Development Programme (Sectorwise)
118 of 214
1318 Z2018.3825Quetta
Approved
CONSTRUCTION OF FUTSAL GROUND/IRON FENCES AND STATIUM LIGHTS AT GOVERNMENT BOYS SPECIAL HIGH SCHOOL
22.5000.000
22.500 10.0000.000
10.000 44% 12.5000.000
0.000 12.500 100% 0.0000.000
1317 Z2018.3454Panjgur
Approved
CONST OF B/WALL AND BATHROOMS BHS SARAWAN,ADDITIONAL ROOM P/S MOHALLAH MUNIR ,ADD ROOMS GH/S GHAREEB ABAD
13.0000.000
13.000 3.0000.000
3.000 23% 10.0000.000
0.000 10.000 100% 0.0000.000
1316 Z2018.1275Kech
Approved
CONST: OF ADDITIONAL CLASS ROOMS AT GGHS TUMP.
50.0000.000
50.000 13.0000.000
13.000 26% 10.0000.000
0.000 10.000 46% 27.0000.000
1315 Z2018.1106Kachhi
Approved
CONSTRUCTION OF AUDITORIUM GOVT: HIGH SCHOOL BAGH KACHHI.
10.0000.000
10.000 5.0000.000
5.000 50% 5.0000.000
0.000 5.000 100% 0.0000.000
1314 Z2017.1476Quetta
Approved
UPGRAD: OF H.S SANDEMAN GHS, SPL: GSH, PAK GHS, RAILWAY GHS,ALAMO CHK GHS, IRRI: COLONY GHS, SAT: TOWN GGHS TO HSS
200.0000.000
200.000 145.0000.000
145.000 72% 55.0000.000
0.000 55.000 100% 0.0000.000
1313 Z2017.1471Quetta
Approved
CONSTRUCTION OF BUILDING FOR SECONDARY EDUCATION DIRECTORATE .
110.0000.000
110.000 80.0000.000
80.000 72% 30.0000.000
0.000 30.000 100% 0.0000.000
1312 Z2017.0719Bela
Approved
UP-GRADATION OF 03 MIDDLE SCHOOL INTO HIGH.
13.5000.000
13.500 4.6450.000
4.645 34% 2.0000.000
0.000 2.000 49% 6.8550.000
1311 Z2016.0600Sibi
Approved
MULTIPURPOSE HALL FOR GBHS SIBI,MULTIPURPOSE HALL FOR GBHS DOMKI, 01 ADDL: ROOM FOR GBPS DERGAH, ETC.
14.0000.000
14.000 7.9920.000
7.992 57% 6.0080.000
0.000 6.008 100% 0.0000.000
1310 Z2016.0319Kech
Approved
UP-GRADATION OF PS INTO MIDDLE & MIDDLE INTO HIGH LEVEL & CONST: OF ADD: ROOMS FOR SHELTER-LESS SCHOOLS, MAND.
50.0000.000
50.000 20.0000.000
20.000 40% 6.0000.000
0.000 6.000 52% 24.0000.000
1309 Z2016.0018Chagai
Approved
CONST: OF ADDITIONAL CLASS ROOM WITH B/WALL KILLI HASSAN ABAD, GGHS NOKUNDI & ADD: C/ROOM IN FC PUBLIC SCHOOL (PB-39).
15.0000.000
15.000 5.0000.000
5.000 33% 2.0000.000
0.000 2.000 46% 8.0000.000
1308 Z2015.1392ProvincialApproved
BALOCHISTAN EDUCATION PROJECT (BEP)-GLOBAL PARTENERSHIP FOR EDUCATION (GPE)(E.UNION-€20 M,UNICEF-€10M).
1.0006720.000
6721.000 0.0000.000
0.000 0% 1.0001251.000
0.000 1252.000 18% 0.0005469.000
1307 Z2015.0497Quetta
Approved
CONST: OF LIBRARY AT PB-II, (TH: COMM:).
40.0000.000
40.000 30.0000.000
30.000 75% 10.0000.000
0.000 10.000 100% 0.0000.000
1306 Z2015.0089Loralai
Approved
CONST:OF ADDITIONAL CLASS ROOMS IN THE VILLAGES TEHSIL BORI MEKHTAR AND LORALAI CITY.
20.0000.000
20.000 12.0000.000
12.000 60% 8.0000.000
0.000 8.000 100% 0.0000.000
1305 Z2014.0763Quetta
Approved
CONST: OF RESIDENTIAL SCHOOL FOR ORPHAN CHILD (STUDENTS) AT PB-II, QUETTA
280.0000.000
280.000 277.5000.000
277.500 99% 2.5000.000
0.000 2.500 100% 0.0000.000
1304 Z2011.0303Quetta
Approved
CONST: OF ADDITIONAL CLASS ROOMS IN 27 NO SCHOOLS PB-6 QUETTA.
63.1760.000
63.176 55.1760.000
55.176 87% 8.0000.000
0.000 8.000 100% 0.0000.000
Subsector: Secondary Education
Sector: Education
Chapter: EDUCATION
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 123: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/123.jpg)
Public Sector Development Programme (Sectorwise)
119 of 214
1319 Z2018.3858Quetta
Approved
PROVISION OF MISSING FACILITIES/ INFRASTRUCTURE AND SECURITY SYSTEM IN GOVERNMENT SCHOOLS OF SARIAB AREA,
100.0000.000
100.000 50.0000.000
50.000 50% 50.0000.000
0.000 50.000 100% 0.0000.000
6720.000 0.000 1251.000 5469.000
Secondary Education(16 Ongoing Projects) GoB/FPA Sub-Total
1002.176 7722.176 718.313 718.313 218.008 0.000 1469.008 65.855
Subsector: Secondary Education
Sector: Education
Chapter: EDUCATION
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 124: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/124.jpg)
Public Sector Development Programme (Sectorwise)
120 of 214
1334 Z2019.0590Kech
CPapproved
CONST: OF TOILETS OF VARIOUS SCHOOLS FOR GBHS, MIDDLE SCHOOLS AND PRIMARY SCHOOLS OF TEH:TUMP, KECH
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
1333 Z2019.0586Kech
CPapproved
CONST: OF EXAMINATION HALL FOR GBHS BALICHA, TUMP.
8.0000.000
8.000 0.0000.000
0.000 0% 8.0000.000
0.000 8.000 100% 0.0000.000
1332 Z2019.0585Kech
CPapproved
CONST: OF BOUNDARY WALL 600RFT GBHS BALICHA, GGCSP CHEERI BAZAR GOMAZI, GBHS KHAIRABAD, GBPS LALLEIN
6.0000.000
6.000 0.0000.000
0.000 0% 6.0000.000
0.000 6.000 100% 0.0000.000
1331 Z2019.0580Kech
CPapproved
CONST:OF 4/2 NO OF ADD:C.R,GBHS,K.ABAD,GGPS ROD BUN,GGHS K.ABAD,GBMS SOLBAND,GGMS N.ABAD GGCSP NASABZ DAZEN & OTHERS
31.0000.000
31.000 0.0000.000
0.000 0% 31.0000.000
0.000 31.000 100% 0.0000.000
1330 Z2019.0538Quetta
CPapproved
REH/CONST OF ADD: ROOM, LIBRARY & LAB AT GBHS, GGHS HAZARA TOWN, GHSAMIN ABAD, HAZARA TOWN/ GGHS, ETC.
56.0000.000
56.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 44% 31.0000.000
1329 Z2019.0475Jaffarabad
CPapproved
CONST:OF B/WALL MIR NOOR MUHAMMAD KHAN JAMALI MINI FOOTBALL STADIUM AT GBH USTA MUHAMMAD.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
1328 Z2019.0444Zhob
CPapproved
CONST: OF 2 ADDL:C/ROOMS AT GGMS OMZHA,4 ADDI: C/ROOMS, W. STOREAGE TANK, TOIL:& OTH: MISSING FACILI:AT GBHS QAMARDIN
13.0000.000
13.000 0.0000.000
0.000 0% 13.0000.000
0.000 13.000 100% 0.0000.000
1327 Z2019.0443Zhob
CPapproved
CONSTRUCTION OF M.P.H , LIBRARY AND ADDITIONAL CLASS ROOMS FOR GOVT. MODEL HIGH SECONDARY SCHOOL ZHOB.
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
1326 Z2019.0378Jaffarabad
CPapproved
CONST : OF LIBRARY FOR GGHS DERA ALLAH YAR.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1325 Z2019.0365Jaffarabad
CPapproved
CONST: OF EXAMINATION HALL GBHS ROJHAN JAMALI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1324 Z2019.0330Quetta
CPapproved
REHAB:OF GGHS MOMIN ABAD GBPS MOMIN ABAD, GBPS MARIABAD, FOR GBPS NASIR ABAD, & GGHS SYEDABAD,QUETTA.
23.0000.000
23.000 0.0000.000
0.000 0% 23.0000.000
0.000 23.000 100% 0.0000.000
1323 Z2019.0267Dera Bugti
CPapproved
REH: OF DAMAGED & ADD: C/ ROOM GBHS DERA BUGTI & CONST: OF REH: DAMAGED & B/WALL TOILET ADD: C/ ROOMS GBHS PESH BOGI.
16.5000.000
16.500 0.0000.000
0.000 0% 16.5000.000
0.000 16.500 100% 0.0000.000
1322 Z2019.0238Qilla
SaifullahCPapproved
EXT/WIDENING OF GOVT GIRLS HIGH SCHOOL PIR ALIZAI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1321 Z2019.0117Provincial
CPapproved
PROVISION OF SCIENCE LAB FACILITY IN EXISTING HIGH SCHOOLS.
510.0000.000
510.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 19% 410.0000.000
1320 Z2019.0080Provincial
CPapproved
UPGRADATION TO HIGH TO HIGHER SECONDARY SCHOOLS.
1000.0000.000
1000.000 0.0000.000
0.000 0% 200.0000.000
0.000 200.000 20% 800.0000.000
Subsector: Secondary Education
Sector: Education
Chapter: EDUCATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 125: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/125.jpg)
Public Sector Development Programme (Sectorwise)
121 of 214
1349 Z2019.0985Panjgur
CPapproved
CONSTRUCTION OF TOILETS AND ADDITIONAL ROOMS FOR GOVERNMENT SCHOOLS IN DISTRICT PANJGUR
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1348 Z2019.0928Khuzdar
CPapproved
CONST: OF SCHOOL BUILDING REPAIRS ARANJI, SAROONA, NALL, WAHIR, ORNACH, KORARO, SONARO, WADH.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1347 Z2019.0893Kech
CPapproved
COSNT: OF ADD: CLASS ROOMS AND TWO TOILETS IN GBMS KOHDA YOUSAF ABSAR AND GBHS ABSAR KECH.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1346 Z2019.0861Kech
CPapproved
PROVISION OF BUILDING TO SHELTERLESS SCHOOLS GBPS SHAHABAD
9.5000.000
9.500 0.0000.000
0.000 0% 9.5000.000
0.000 9.500 100% 0.0000.000
1345 Z2019.0839Sohbatpur
CPapproved
REPAIR AND MAINTANINCE B/WALL , WASH FACILITIES (A) GBPS JALO KHAN U/C DIRGHEE 5291 (B)GPS YASEEN ABAD KHOSA.ETC
10.2000.000
10.200 0.0000.000
0.000 0% 10.2000.000
0.000 10.200 100% 0.0000.000
1344 Z2019.0837Sohbatpur
CPapproved
CONT: OF 1NO ADDIT: CLASS ROOM AND B/WALL, WASH FACILITIES (A) GP SCHOOL ETC
12.9000.000
12.900 0.0000.000
0.000 0% 12.9000.000
0.000 12.900 100% 0.0000.000
1343 Z2019.0835Sohbatpur
CPapproved
ADDIT: 1NO CLASS ROOM &B/WALL , WASH FACILITIES GBP SCHOOL MUHABAT KHAN,GBP SCHOOL AMANULLAH KANRANI, ETC.
28.8000.000
28.800 0.0000.000
0.000 0% 28.8000.000
0.000 28.800 100% 0.0000.000
1342 Z2019.0778Quetta
CPapproved
UPGRADATION OF BOYS AND GIRLS MIDDLE SCHOOL TO HIGH SCHOOL AT MYAAN GUNDI.
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
1341 Z2019.0740Nasirabad
CPapproved
CONST OF 04 NOS ADD: C/ROOM IN GOVT: HIGH SCHOOL SYED MEHMOOD SHAH/BOUNDRY WALL GBPS BUZDAR KHAN PANDRANI.
12.3000.000
12.300 0.0000.000
0.000 0% 12.3000.000
0.000 12.300 100% 0.0000.000
1340 Z2019.0717Kachhi
CPapproved
RESIDENTIAL HOUSE FOR HEAD MASTERS SHORAN GIRLS HIGH SCHOOL.
15.5000.000
15.500 0.0000.000
0.000 0% 15.5000.000
0.000 15.500 100% 0.0000.000
1339 Z2019.0716Kachhi
CPapproved
RESIDENTIAL APARTMENTS MCR SECONDARY HIGHER SCHOOL
80.0000.000
80.000 0.0000.000
0.000 0% 80.0000.000
0.000 80.000 100% 0.0000.000
1338 Z2019.0693Quetta
CPapproved
CONST: OF CLASS ROOMS/REHAB: WORKS & PROVIDING MISSING FACILITIES AT 28 NOS EXISTING SCHOOLS AT PB-28
75.0000.000
75.000 0.0000.000
0.000 0% 75.0000.000
0.000 75.000 100% 0.0000.000
1337 Z2019.0648Jaffarabad
CPapproved
CONST: 40 ADDL: C/ROOMS FOR DIFF: BOYS & GIRLS SCHOOLS TEH: USTA MUHD: & GANDAKHA GGMS NOOR PUR/GBMS/FEU ABAD JAM ETC
60.0000.000
60.000 0.0000.000
0.000 0% 60.0000.000
0.000 60.000 100% 0.0000.000
1336 Z2019.0646Jaffarabad
CPapproved
REHAB OF DIFFERENT BOYS/ GIRLS SCHOOLS TEHSIL USTA MUHD. & GANDAKHA GBHS HAQ BAHOO GBHS RUSTOOM 'DIAN ETC
37.0000.000
37.000 0.0000.000
0.000 0% 37.0000.000
0.000 37.000 100% 0.0000.000
1335 Z2019.0641Jaffarabad
CPapproved
REHAB: OF GGPS USTA MUHAMMAD CITY( PRIM, SECTION) GBHS GAND.HA GGHS USTA MUHAMMAD CITY.
13.0000.000
13.000 0.0000.000
0.000 0% 13.0000.000
0.000 13.000 100% 0.0000.000
Subsector: Secondary Education
Sector: Education
Chapter: EDUCATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 126: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/126.jpg)
Public Sector Development Programme (Sectorwise)
122 of 214
1363 Z2019.1601Sibi
CPapproved
CONST: OF ADD: C/ROOMS OF GGHS LEHRI, GBPS BURRA LEHRI & MULTISTORY HALL AT GBHS TALLI.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
1362 Z2019.1586Quetta
CPapproved
CONST: OF GOVT: BOYS HIGH SCHOOLAT HAZARA TOWN, QUETTA.
60.0000.000
60.000 0.0000.000
0.000 0% 60.0000.000
0.000 60.000 100% 0.0000.000
1361 Z2019.1585Quetta
CPapproved
CONST: OF GOVT: GIRLS HIGH SCHOOL AT HAZARA TOWN , QUETTA.
60.0000.000
60.000 0.0000.000
0.000 0% 60.0000.000
0.000 60.000 100% 0.0000.000
1360 Z2019.1499Quetta
CPapproved
REH & ADD: WORKS IN 07 SCHOOLS IN PB-25 QUETTA
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1359 Z2019.1416Provincial
CPapproved
GOVT. OF BALOCHISTAN PROGRAM FOR ESTAB: OF HIGH SCHOOLS IN BALOCHISTAN.
825.0000.000
825.000 0.0000.000
0.000 0% 200.0000.000
0.000 200.000 24% 625.0000.000
1358 Z2019.1314Kech
CPapproved
CONST: OF ADD: C/R & B/W GGMS ALANDOOR.GBHS GOORKOOP ETC & CONST: OF SHELTER LESS GBPS CHEERL GILL IN BULEDA.
20.4140.000
20.414 0.0000.000
0.000 0% 20.4140.000
0.000 20.414 100% 0.0000.000
1357 Z2019.1305Kech
CPapproved
CONST:OF SHELTER LESS GBPS TASH, BALGATHAR IN BULEDA, CONST: OF 1000FT B/W & TOILETS FOR GGHS M.KORE PUSHT ETC.
23.2590.000
23.259 0.0000.000
0.000 0% 23.2590.000
0.000 23.259 100% 0.0000.000
1356 Z2019.1304Kech
CPapproved
CONST:OF SHELTER LESS GBPS JADAIN BAZAR BIT, GBPS DOORBUN BIT, GBPS BAZPEESH IN BULEDA & GBPS GESHTOK IN BULEDA.
26.3350.000
26.335 0.0000.000
0.000 0% 26.3350.000
0.000 26.335 100% 0.0000.000
1355 Z2019.1302Kech
CPapproved
CONST:OF 2 ADD: C/R FOR GBHS NAG ZAM, GBHS ALANDOOR, GBMS GARDANK, GBMS NAWANOZAMRAN & GGHS KORO PUSHI.
20.7130.000
20.713 0.0000.000
0.000 0% 20.7130.000
0.000 20.713 100% 0.0000.000
1354 Z2019.1292Qilla
SaifullahCPapproved
CONST OF 4 NO ADD ROOMS KILLI GBHS KAN MEHTARZAI & 2 NO ADD CLASS ROOMS GGHS KAN MEHTARZAI KILLA SAIFULLAH
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1353 Z2019.1279Kech
CPapproved
CONST:OF ADD: C/R FOR GGPS KICKIN SHAHRAK. C:06177,GBHS SOLO BULEDAC:05985,GGHS SHARAK. C:06167& GBHS KOSHAK.C: 05979
10.8760.000
10.876 0.0000.000
0.000 0% 10.8760.000
0.000 10.876 100% 0.0000.000
1352 Z2019.1187Chagai
CPapproved
CONST: OF B/W IN GHS KILLI QASIM KHAN DALBANDIN CHAGAI
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1351 Z2019.1075Shaheed
Sikandarabad
CPapproved
ADDL. CLASS ROOMS G.B.S DIST. SHAHEED SIKANDERABAD, G.B.H.S LAKOHRIAN, G.B.M.S MOLI, G.B.M.S RODENI SURAB.
24.6000.000
24.600 0.0000.000
0.000 0% 24.6000.000
0.000 24.600 100% 0.0000.000
1350 Z2019.1074Shaheed
Sikandarabad
CPapproved
ADDL. CLASS ROOMS G.G.S DIST. SHAHEED SIKANDERABAD, G.G.M.S KILLI TOBA GIDDER, REKIZAI GIDDER & OTHERS
32.8000.000
32.800 0.0000.000
0.000 0% 32.8000.000
0.000 32.800 100% 0.0000.000
Subsector: Secondary Education
Sector: Education
Chapter: EDUCATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 127: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/127.jpg)
Public Sector Development Programme (Sectorwise)
123 of 214
1372 Z2019.2093Khuzdar
CPapproved
CONOST: OF TWO CLASSROOMS & EXAMINATION HALL FOR GBHS SARRAJ GRESHA NAAL.
12.5000.000
12.500 0.0000.000
0.000 0% 12.5000.000
0.000 12.500 100% 0.0000.000
1371 Z2019.2009Quetta
CPapproved
CONST: OF CLASS ROOMS & COMPUTER LAB GOVT. GIRLS HIGH SCHOOL HUDA.
19.5000.000
19.500 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 51% 9.5000.000
1370 Z2019.1936Qilla
AbdullahCPapproved
CONSTRUCTION OF ADDITIONAL INFRASTRUCTURE AT HS KILLI SAZO, KUTUB PIRALIZAI
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1369 Z2019.1834Mastung
CPapproved
CONST: ADDL: ROOMS IN GOVT BOYS HIGH SCHOOL FOR ESTABLISHING INTERMEDIATE GOVT BOYS COLLEGE ISPLINJI MASTUNG
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
1368 Z2019.1830Kalat
CPapproved
CONSTRUCTION OF EXAMINATION HALL FOR HIGH SCHOOL GHS MUGHALZAI, BHS KOHING, GHS POLICE LINE.
26.0000.000
26.000 0.0000.000
0.000 0% 16.0000.000
0.000 16.000 61% 10.0000.000
1367 Z2019.1827Ziarat
CPapproved
CONST: OF ADDITIONAL CLASS ROOM WITH WASHROOM AND BOUNDARY WALL GIRLS ZIARAT MIDDLE SCHOOL.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
1366 Z2019.1747Nushki
CPapproved
REHABILIATION OF GOVERNMENT GIRLS HIGH SCHOOL GHARIBABAD DISTRICT NOSHKI
10.2500.000
10.250 0.0000.000
0.000 0% 10.2500.000
0.000 10.250 100% 0.0000.000
1365 Z2019.1713Washuk
CPapproved
CONST FOR ADDITIONAL CLASS ROOM AND LIBRARY TCHSIL NAAG, BASIMA WASHUK AND NEW JANGIA
60.4000.000
60.400 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 49% 30.4000.000
1364 Z2019.1610Quetta
CPapproved
REHAB: OF GBHS KILLI BAROZAI AGHBAR IN PB 24 QUETTA ETC.
11.0000.000
11.000 0.0000.000
0.000 0% 11.0000.000
0.000 11.000 100% 0.0000.000
0.000 0.000 0.000 0.000
Secondary Education(53 New Projects) GoB/FPA Sub-Total
3568.347 3568.347 0.000 0.000 1652.447 0.000 1652.447 1915.900
Sector: Education
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Secondary Education
Chapter: EDUCATION
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
New
Secondary Education(69 Projects) Total
4570.523 11290.523
718.313 718.313 1870.455 0.000 3121.455 1981.755
Sub-Sector Total (FPA) 6720.000 0.000 1251.000 5469.000
2019 - 20 Original
![Page 128: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/128.jpg)
Public Sector Development Programme (Sectorwise)
124 of 214
1388 Z2014.0060Quetta
Approved
KHAN SHAHEED EDUCATIONAL ENCLAVE (FEMALE) AT SPINY ROAD QUETTA.
654.4130.000
654.413 578.0000.000
578.000 88% 50.0000.000
0.000 50.000 95% 26.4130.000
1387 Z2014.0052Qilla
AbdullahApproved
CADET COLLEGE KILLA ABDULLAH.
1346.8170.000
1346.817 462.2600.000
462.260 34% 100.0000.000
0.000 100.000 41% 784.5570.000
1386 Z2014.0035ProvincialApproved
ESTABLISHMENT OF NEW ELEMENTARY COLLEGE (KECH, NOUSHKI, QILLA SAIFULLAH & JAFFARABAD).
500.0000.000
500.000 368.7810.000
368.781 73% 50.0000.000
0.000 50.000 83% 81.2190.000
1385 Z2012.0739Panjgur
Approved
ESTABLISHMENT OF CADET COLLEGE PANJGUR (DEVOLVED).
1112.7770.000
1112.777 823.2000.000
823.200 73% 80.0000.000
0.000 80.000 81% 209.5770.000
1384 Z2012.0738JaffarabadApproved
ESTABLISHMENT OF CADET COLLEGE JAFFARABAD (DEVOLVED).
1082.3280.000
1082.328 815.5000.000
815.500 75% 100.0000.000
0.000 100.000 84% 166.8280.000
1383 Z2012.0737Kohlu
Approved
ESTABLISHMENT OF CADET COLLEGE KOHLU (DEVOLVED).
1158.1360.000
1158.136 645.5500.000
645.550 55% 150.0000.000
0.000 150.000 68% 362.5860.000
1382 Z2012.0736Nushki
Approved
ESTABLISHMENT OF CADET COLLEGE NOSHKI (DEVOLVED).
1217.5240.000
1217.524 670.2600.000
670.260 55% 150.0000.000
0.000 150.000 67% 397.2640.000
1381 Z2012.0734Qilla
SaifullahApproved
ESTABLISHMENT OF CADET COLLEGE KILLA SAIFULLAH AT NASAI (DEVOLVED).
1151.6840.000
1151.684 825.0000.000
825.000 71% 150.0000.000
0.000 150.000 84% 176.6840.000
1380 Z2011.0548Kech
Approved
CONST: OF GOVT: BOYS INTER COLLEGE AT NEGORE DASHT DIST. KECH (UP&D).
42.7180.000
42.718 30.0000.000
30.000 70% 1.0000.000
0.000 1.000 72% 11.7180.000
1379 Z2011.0547Kech
Approved
CONST: OF GOVERNMENT BOYS/GIRLS INTER COLLEGE AT MAND, KECH (UP&D).
39.4020.000
39.402 30.0000.000
30.000 76% 1.0000.000
0.000 1.000 78% 8.4020.000
1378 Z2010.0405MastungApproved
CONST: OF BUILDING FOR GOVT. INTER GIRLS & BOYS COLLEGE KANAK, MASTUNG.
222.0200.000
222.020 200.4900.000
200.490 90% 21.5300.000
0.000 21.530 100% 0.0000.000
1377 Z2009.0362Pishin
Approved
ESTABLISHMENT OF CADET COLLEGE PISHIN (REVISED).
1129.3910.000
1129.391 679.6860.000
679.686 60% 150.0000.000
0.000 150.000 73% 299.7050.000
1376 Z2009.0283Qilla
AbdullahApproved
CONSTT: OF GOVT. BOYS INTER COLLEGE, ABDUR REHMANZAI, GULISTAN (BDA).
103.0250.000
103.025 96.0000.000
96.000 93% 7.0250.000
0.000 7.025 100% 0.0000.000
1375 Z2009.0076Panjgur
Approved
CONST: OF GIRLS COLLEGE KHUDAABADAN, PANJGUR.
56.8370.000
56.837 55.8370.000
55.837 98% 1.0000.000
0.000 1.000 100% 0.0000.000
1374 Z2003.1152Qilla
SaifullahApproved
CONST: OF BUILDING FOR GIRLS COLLEGE MUSLIM BAGH AND KSF (REVISED).
188.6880.000
188.688 178.0220.000
178.022 94% 10.6660.000
0.000 10.666 100% 0.0000.000
1373 Z2003.0767Gwadar
Approved
UP-GRADATION OF INTER COLLEGE GWADAR TO DEGREE LEVEL INCLUDING BOUNDRY WALL (REVISED) (PHASE-I+II).
515.1500.000
515.150 411.0740.000
411.074 79% 80.0000.000
0.000 80.000 95% 24.0760.000
Subsector: College Education
Sector: Education
Chapter: EDUCATION
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 129: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/129.jpg)
Public Sector Development Programme (Sectorwise)
125 of 214
1404 Z2017.0049ProvincialApproved
CONST: OF BACHELOR LODGES / FLATS IN ALL DEGREE COLLEGES OF BALOCHISTAN (HAVING NO RESIEDNTIAL ACCOMODATION).
500.0000.000
500.000 90.2000.000
90.200 18% 20.0000.000
0.000 20.000 22% 389.8000.000
1403 Z2017.0048ProvincialApproved
INFRASTRUCTURE DEV: IN ALL EXISTING DEGREE COLLEGES OF BALOCHISTAN BS PROGRAM (HEC REQUIREMENT).
1000.0000.000
1000.000 0.0000.000
0.000 0% 400.0000.000
0.000 400.000 40% 600.0000.000
1402 Z2016.1188ProvincialApproved
PROVISION OF SECURITY ARRANGEMENTS AT VARIOUS CADET COLLEGES OF BALOCHISTAN.
129.0000.000
129.000 95.1600.000
95.160 73% 33.8400.000
0.000 33.840 100% 0.0000.000
1401 Z2016.1183Zhob
Approved
ESTABLISHMENT OF BRC AT ZHOB (PHASE-III).
334.7460.000
334.746 170.2000.000
170.200 50% 20.0000.000
0.000 20.000 56% 144.5460.000
1400 Z2015.1388Kharan
Approved
CONST: OF INTER COLLEGE MISKAN-E-KALAT, DISTRICT KHARAN.
104.0000.000
104.000 84.0000.000
84.000 80% 20.0000.000
0.000 20.000 100% 0.0000.000
1399 Z2015.1357Kalat
Approved
CONSTRUCTION OF BRC AT KALAT.
216.5520.000
216.552 130.0000.000
130.000 60% 10.0000.000
0.000 10.000 64% 76.5520.000
1398 Z2015.1356Kalat
Approved
CONST: OF POLYTECHNIC INSTITUTE FOR BOYS AT KHALIQ-ABAD DIST. KALAT.
320.0000.000
320.000 175.3000.000
175.300 54% 15.0000.000
0.000 15.000 59% 129.7000.000
1397 Z2015.0862Bela
Approved
CONSTRUCTION OF ADDITIONAL COMPONENTS OF BRC UTHAL PHASE-II.
200.0000.000
200.000 70.4210.000
70.421 35% 129.5790.000
0.000 129.579 100% 0.0000.000
1396 Z2015.0859ProvincialApproved
CONSTRUCTION OF ADDITIONAL ACADEMIC BLOCKS & HOSTELS AT BRC KHUZDAR & BRC LORALAI.
180.0000.000
180.000 163.3030.000
163.303 90% 16.6970.000
0.000 16.697 100% 0.0000.000
1395 Z2015.0853Dera BugtiApproved
CONSTRUCTION OF ADDITIONAL COMPONENTS OF MILITARY COLLEGE SUI.
286.8190.000
286.819 172.2290.000
172.229 60% 50.0000.000
0.000 50.000 77% 64.5900.000
1394 Z2015.0849Kalat
Approved
COSNTRUCTION OF BUILDING OF GOVT. GIRLS INTER COLLEGE KHALIQ ABAD MANGOCHAR KALAT.
101.7170.000
101.717 79.6350.000
79.635 78% 10.0000.000
0.000 10.000 88% 12.0820.000
1393 Z2015.0839ProvincialApproved
CONST: OF 15 ADD:LABORATORIES / LIBRARIES AT GOVT. BOYS DEGREE COLLEGE PISHIN, QUETTA, LORALAI, LASBELA & KHARAN.
79.7800.000
79.780 75.1940.000
75.194 94% 2.0000.000
0.000 2.000 96% 2.5860.000
1392 Z2015.0817ProvincialApproved
CONS: OF BUILDING FOR UP-GRADATION TO DEGREE LEVEL OF GOVT. GIRLS DEGREE COLLEGE ZHOB, MUSLIM BAGH & KILLA SAIFULLAH
87.0000.000
87.000 77.0000.000
77.000 88% 5.0000.000
0.000 5.000 94% 5.0000.000
1391 Z2014.0082Kharan
Approved
BALOCHISTAN RESIDENTIAL COLLEGE KHARAN.
196.1680.000
196.168 186.1680.000
186.168 94% 10.0000.000
0.000 10.000 100% 0.0000.000
1390 Z2014.0081Sibi
Approved
BALOCHISTAN RESIDENTIAL COLLEGE SIBI.
196.1680.000
196.168 115.9000.000
115.900 59% 10.0000.000
0.000 10.000 64% 70.2680.000
1389 Z2014.0075ProvincialApproved
CONST: OF 14 NOS BOYS/GIRLS INTER COLLEGES (DISTRICTS HAVING NO COLLEGE).
1492.8700.000
1492.870 499.1390.000
499.139 33% 70.0000.000
0.000 70.000 38% 923.7310.000
Subsector: College Education
Sector: Education
Chapter: EDUCATION
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 130: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/130.jpg)
Public Sector Development Programme (Sectorwise)
126 of 214
1412 Z2018.3421Pishin
Approved
CONST: OF LAW COLLEGE PISHIN.
100.0000.000
100.000 35.0000.000
35.000 35% 20.0000.000
0.000 20.000 55% 45.0000.000
1411 Z2018.2163MastungApproved
STRENGHTENING & UPLIFTING OF CADAT COLLEGE MASTUNG.
100.0000.000
100.000 10.0000.000
10.000 10% 90.0000.000
0.000 90.000 100% 0.0000.000
1410 Z2018.1605Qilla
SaifullahApproved
CONST: OF HOSTEL AT CADET COLLEGE KILLA SAIFULLAH
94.9400.000
94.940 5.0000.000
5.000 5% 20.0000.000
0.000 20.000 26% 69.9400.000
1409 Z2018.0751Chagai
Approved
CONST: OF SARDAR SARFRAZ KHAN SANJRANI INTERAL COLLEGE TEHSIL CHAGAI.
100.0000.000
100.000 25.0000.000
25.000 25% 10.0000.000
0.000 10.000 35% 65.0000.000
1408 Z2018.0733Awaran
Approved
CONSTRUCTION OF INTER COLLEGE AT MASHKAY.
70.0000.000
70.000 5.0000.000
5.000 7% 10.0000.000
0.000 10.000 21% 55.0000.000
1407 Z2017.1489Qilla
AbdullahApproved
ESTABLISHMENT OF GOVT BOYS INTER COLLEGE INAYATULAH KARAZ.
50.0000.000
50.000 20.0000.000
20.000 40% 10.0000.000
0.000 10.000 60% 20.0000.000
1406 Z2017.1194Awaran
Approved
ESTABLISHMENT OF GIRLS COLLEGE AT AWARAN.
30.0000.000
30.000 22.0000.000
22.000 73% 8.0000.000
0.000 8.000 100% 0.0000.000
1405 Z2017.0052Quetta
Approved
CONSTRUCTION / ESTABLISHMENT OF BOYS INTER COLLEGE AT EASTERN BYPASS QUETTA.
100.0000.000
100.000 75.0000.000
75.000 75% 25.0000.000
0.000 25.000 100% 0.0000.000
College Education(40 Ongoing Projects) GoB/FPA Sub-Total
16590.670
16590.670
9250.509 9250.509 2117.337 0.000 2117.337 5222.824
0.000 0.000 0.000 0.000
Subsector: College Education
Sector: Education
Chapter: EDUCATION
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 131: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/131.jpg)
Public Sector Development Programme (Sectorwise)
127 of 214
1427 Z2019.0164Qilla
AbdullahCPapproved
CONSTRUCTION OF BOUNDARY WALL 1600 RFT RAISING OF EXISTING BOUNDARY WALL AT GOVT: BOYS DEGREE COLLEGE CHAMAN.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1426 Z2019.0163Bela
CPapproved
ESTAB OF MULTIPURPOSE HALL, RAISING OF B/W WITH BARBED WIRE & RENOVATION OF MAIN ENTRANCE GATE AT GBDC BELA.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
1425 Z2019.0162Nushki
CPapproved
CONST: OF 4 FLAT, 3 NO CLASS-IV QUARTER, GUARD ROOM, GARAGE FOR 2 BUSES, CAFETERIA AND MULTIPURPOSE HALL AT GGDC NUSHKI.
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
1424 Z2019.0161Khuzdar
CPapproved
CONSTRUCTION OF 05 NO ADDITIONAL CLASS ROOMS AT GOVERNMENT BOYS DEGREE COLLEGE KHUZDAR
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1423 Z2019.0159Jaffarabad
CPapproved
CONSTRUCTION OF MULTIPURPOSE HALL AT GOVT: BOYS INTER COLLEGE DERA ALLAH YAR.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1422 Z2019.0158Quetta
CPapproved
CONST: OF ADD: CLASS ROOM 05 NO, MULTIPURPOSE HALL AND STUDENT HOSTEL 20- ROOM AT GOVT: COLLEGE OF COMMERCE, QUETTA.
80.0000.000
80.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 50% 40.0000.000
1421 Z2019.0157Gwadar
CPapproved
CONSTRUCTION FOR UP-GRADATION TO DEGREE LEVEL BUILDING AT GOVT: GIRLS INTER COLLEGE GAWADAR
100.0000.000
100.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 50.0000.000
1420 Z2019.0156Kalat
CPapproved
CONSTRUCTION FOR UP-GRADATION TO DEGREE LEVEL BUILDING AT GOVT: GIRLS INTER COLLEGE KALAT
100.0000.000
100.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 50.0000.000
1419 Z2019.0155Bela
CPapproved
CONSTRUCTION FOR UP-GRADATION TO DEGREE LEVEL BUILDING AT GOVT: GIRLS INTER COLLEGE HUB
100.0000.000
100.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 50.0000.000
1418 Z2019.0154Sohbatpur
CPapproved
CONSTRUCTION FOR UP-GRADATION TO DEGREE LEVEL BUILDING AT GOVT: BOYS INTER COLLEGE HAIRDIN
100.0000.000
100.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 50.0000.000
1417 Z2019.0153Chagai
CPapproved
CONSTRUCTION FOR UP-GRADATION TO DEGREE LEVEL BUILDING AT GOVT: GIRLS INTER COLLEGE DALBANDIN
100.0000.000
100.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 50.0000.000
1416 Z2019.0152Kech
CPapproved
CONSTRUCTION FOR UP-GRADATION TO DEGREE LEVEL BUILDING AT GOVT: GIRLS DEGREE COLLEGE TURBAT
100.0000.000
100.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 50.0000.000
1415 Z2019.0151Khuzdar
CPapproved
CONSTRUCTION FOR UP-GRADATION TO DEGREE LEVEL BUILDING AT GOVT: GIRLS DEGREE COLLEGE KHUZDAR
100.0000.000
100.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 50.0000.000
1414 Z2019.0150Panjgur
CPapproved
CONSTRUCTION FOR UP-GRADATION TO DEGREE LEVEL BUILDING AT GIRLS DEGREE COLLEGE PANJGOOR
100.0000.000
100.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 50.0000.000
1413 Z2019.0147Quetta
CPapproved
CONST: / ESTABLISHMENT OF DIGITAL LIBRARY WITH ALL ACCESSORIES AT GOVT: POSTGRADUATE COLLEGE QUETTA CANTT:
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
Subsector: College Education
Sector: Education
Chapter: EDUCATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 132: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/132.jpg)
Public Sector Development Programme (Sectorwise)
128 of 214
1437 Z2019.1922Provincial
CPapproved
MISSING FACILITIES FOR ALL CADET & RESIDENTIAL COLLEGES OF BALOCHISTAN.
1000.0000.000
1000.000 0.0000.000
0.000 0% 200.0000.000
0.000 200.000 20% 800.0000.000
1436 Z2019.1587Quetta
CPapproved
CONST: OF GOVT: BOYS COLLEGE KIRANI ROAD NEW HAZARA TOWN, QUETTA.
100.0000.000
100.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 100% 0.0000.000
1435 Z2019.1579Kech
CPapproved
CONST: OF LAW COLLEGE AT TURBAT.
100.0000.000
100.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 25% 75.0000.000
1434 Z2019.1435Provincial
CPapproved
BUSES FOR GIRLS COLLEGES (PHASE I).
300.0000.000
300.000 0.0000.000
0.000 0% 200.0000.000
0.000 200.000 66% 100.0000.000
1433 Z2019.0854Kech
CPapproved
CONST: OF GOVERNMENT BOYS DEGREE COLLEGE SHAH ABAD, TURBAT
100.0000.000
100.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 100% 0.0000.000
1432 Z2019.0425Panjgur
CPapproved
CONSTRUCTION OF PROFESSOR FLATS OF POLYTECHNIC COLLEGE AT PANJGUR
60.0000.000
60.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 33% 40.0000.000
1431 Z2019.0168Turbat
CPapproved
CONSTRUCTION OF BOUNDARY WALL 3000 RFT AT BOYS INTER COLLEGE BULEDA
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1430 Z2019.0167Kachhi
CPapproved
CONSTRUCTION OF 08 NO ADDITIONAL CLASS ROOMS, 02 BUS GARAGE AND MAIN ENTRANCE GATE AT GOVT: BOYS DEGREE COLLEGE BHAG.
16.0000.000
16.000 0.0000.000
0.000 0% 16.0000.000
0.000 16.000 100% 0.0000.000
1429 Z2019.0166Barkhan
CPapproved
CONSTRUCTION OF BACHELOR LODGE AT GOVT: BOYS DEGREE COLLEGE BARKHAN.
25.0000.000
25.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 100% 0.0000.000
1428 Z2019.0165Musa Khail
CPapproved
CONSTRUCTION OF BOUNDARY WALL AT GOVT: BOYS DEGREE COLLEGE MUSA KHAIL.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
0.000 0.000 0.000 0.000
College Education(25 New Projects) GoB/FPA Sub-Total
2781.000 2781.000 0.000 0.000 1326.000 0.000 1326.000 1455.000
Sector: Education
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: College Education
Chapter: EDUCATION
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
New
College Education(65 Projects) Total
19371.670
19371.670
9250.509 9250.509 3443.337 0.000 3443.337 6677.824
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 133: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/133.jpg)
Public Sector Development Programme (Sectorwise)
129 of 214
1441 Z2017.1621Quetta
Approved
MISSING FACILITIES / ADDITIONAL WORK OF GIRLS HOSTEL AT SBK WOMEN UNIVERSITY BREWARY ROAD QUETTA.
31.6100.000
31.610 15.0000.000
15.000 47% 16.6100.000
0.000 16.610 100% 0.0000.000
1440 Z2015.1369Quetta
Approved
PURCHASE OF LAND FOR ESTABLISHMENT OF CAMPUS OF NATIONAL UNIVERSITY OF SCIENCE & TECHNOLOGY (NUST) IN QUETTA.
1219.0000.000
1219.000 820.0000.000
820.000 67% 50.0000.000
0.000 50.000 71% 349.0000.000
1439 Z2015.0867Quetta
Approved
CONSTRUCTION OF ELEMENTARY LABORATORY SCHOOL AT SBK WOMEN UNIVERSITY QUETTA.
96.1860.000
96.186 93.5000.000
93.500 97% 2.6860.000
0.000 2.686 100% 0.0000.000
1438 Z2013.0070Khuzdar
Approved
ESTABLISHMENT OF SHAHEED SIKANDER ZEHRI UNIVERSITY KHUZDAR.
2848.0000.000
2848.000 1480.7720.000
1480.772 51% 300.0000.000
0.000 300.000 62% 1067.2280.000
0.000 0.000 0.000 0.000
University Education(4 Ongoing Projects) GoB/FPA Sub-Total
4194.796 4194.796 2409.272 2409.272 369.296 0.000 369.296 1416.228
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: University Education
Chapter: EDUCATION
Sector: Education
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
2019 - 20 Original
![Page 134: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/134.jpg)
Public Sector Development Programme (Sectorwise)
130 of 214
1442 Z2019.1864Quetta
CPapproved
MISSING FAC/ CONST OF B/W WITH GATES FOR NEWLY CONSTRUCTED EXISTING GIRLS HOSTEL UOB.
24.0000.000
24.000 0.0000.000
0.000 0% 24.0000.000
0.000 24.000 100% 0.0000.000
University Education(1 New Projects) GoB/FPA Sub-Total
24.000 24.000 0.000 0.000 24.000 0.000 24.000 0.000
0.000 0.000 0.000 0.000
Subsector: University Education
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Sector: Education
Chapter: EDUCATION
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
University Education(5 Projects) Total
4218.796 4218.796 2409.272 2409.272 393.296 0.000 393.296 1416.228
2019 - 20 Original
![Page 135: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/135.jpg)
Public Sector Development Programme (Sectorwise)
131 of 214
1452 Z2018.1823Sibi
Approved
REH: & PROV: OF MISSING INFRASTRUCTURE IN GIRLS/BOYS MIDDLE / HIGH SCHOOLS SIBI & LEHRI.
30.0000.000
30.000 10.5000.000
10.500 35% 10.0000.000
0.000 10.000 68% 9.5000.000
1451 Z2017.1453Awaran
Approved
ESTAB: OF SHAHEED SIKANDAR ZEHRI CADET COLLEGE AWARAN.
1405.7740.000
1405.774 600.2000.000
600.200 42% 300.0000.000
0.000 300.000 64% 505.5740.000
1450 Z2017.0564Kech
Approved
PROVISION OF ADDITIONAL & MISSING INFRASTRUCTURE OF SEVERAL SCHOOLS & COLLEGES IN PB-49 KECH II.
30.0000.000
30.000 27.0000.000
27.000 90% 3.0000.000
0.000 3.000 100% 0.0000.000
1449 Z2017.0552Kech
Approved
ADDITIONAL WORKS FOR DDOS, OFFICES OF DASHT, TUMP, MAND (50 LAC PER EACH)
15.0000.000
15.000 7.0000.000
7.000 46% 8.0000.000
0.000 8.000 100% 0.0000.000
1448 Z2016.0801ProvincialApproved
CHIEF MINISTER PROGRAM FOR PROVISION OF DRINKING WATER AND TOILETS IN SCHOOLS.
1000.0000.000
1000.000 482.4000.000
482.400 48% 517.6000.000
0.000 517.600 100% 0.0000.000
1447 Z2016.0470Washuk
Approved
CONST: OF ADD: CLASS ROOMS/ RESIDENTIAL QUARTER /B.WALLS, LIBRARY FOR SCHOOLS IN WASHUK.
27.4000.000
27.400 5.0000.000
5.000 18% 10.0000.000
0.000 10.000 54% 12.4000.000
1446 Z2016.0411MastungApproved
CONST: OF SHELTERLESS SCHOOLS, ADD: C/ROOMS AT AREAS OF MASTUNG.
29.9000.000
29.900 19.9000.000
19.900 66% 10.0000.000
0.000 10.000 100% 0.0000.000
1445 Z2016.0193Panjgur
Approved
MISSING FACILITIES IN PB-42,SCHOOLS. PANJGOOR-1.
29.7030.000
29.703 20.4100.000
20.410 68% 9.2930.000
0.000 9.293 100% 0.0000.000
1444 Z2016.0138Kech
Approved
PROV: OF ADD: AND MISSING INFRASTRUCTURE OF SEVERAL SCHOOLS AND COLLEGES IN PB-49.
45.0000.000
45.000 33.4580.000
33.458 74% 4.5420.000
0.000 4.542 84% 7.0000.000
1443 Z2015.1029SohbatpurApproved
ADD: ROOMS BULEDIES (KARIM BULEDI MEHMOOD GOLA, ALLAH RAKHYA,SADIQ BEHRANI, MOHD UMER, JAVEEDABAD, DEEDAR KANDRANI ETC.
10.0000.000
10.000 6.6100.000
6.610 66% 3.3900.000
0.000 3.390 100% 0.0000.000
General Education(10 Ongoing Projects) GoB/FPA Sub-Total
2622.777 2622.777 1212.478 1212.478 875.825 0.000 875.825 534.474
0.000 0.000 0.000 0.000
Subsector: General Education
Sector: Education
Chapter: EDUCATION
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
General Education(10 Projects) Total
2622.777 2622.777 1212.478 1212.478 875.825 0.000 875.825 534.474
2019 - 20 Original
![Page 136: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/136.jpg)
Public Sector Development Programme (Sectorwise)
132 of 214
1455 Z2018.4263Bela
Approved
PROV: OF EQUIPMENT,FURNITURE & OTHER FACILITIES TO GOVT: POLYTECHNIC INSTITUTE FOR BOYS AT UTHAL.
183.4950.000
183.495 25.3310.000
25.331 13% 158.1640.000
0.000 158.164 100% 0.0000.000
1454 Z2015.0857Gwadar
Approved
CONSTRUCTION OF NEW ACADEMIC BLOCK & HOSTEL AT GWADAR INSTITUTE OF TECHNOLOGY GWADAR.
95.9700.000
95.970 80.6710.000
80.671 84% 15.2990.000
0.000 15.299 100% 0.0000.000
1453 Z2013.0354Sibi
Approved
CONST: OF POLY TECHNIC INSTITUTE AT SIBI.
539.9910.000
539.991 473.0850.000
473.085 87% 66.9060.000
0.000 66.906 100% 0.0000.000
0.000 0.000 0.000 0.000
Technical Education(3 Ongoing Projects) GoB/FPA Sub-Total
819.456 819.456 579.087 579.087 240.369 0.000 240.369 0.000
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Technical Education
Chapter: EDUCATION
Sector: Education
Technical Education(3 Projects) Total
819.456 819.456 579.087 579.087 240.369 0.000 240.369 0.000
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: EDUCATION(284 Projects)
40145.532
46865.532
15756.931
15756.931 11427.456
0.000 12678.456
12961.145
Sector Total (FPA) 6720.000 0.000 1251.000 5469.000
2019 - 20 Original
![Page 137: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/137.jpg)
Public Sector Development Programme (Sectorwise)
133 of 214
1466 Z2018.2858Quetta
Approved
UP-GRADATION OF POLICE LINE BHU INTO RHC (20 BEDDED HOSPITAL).
50.0000.000
50.000 25.0000.000
25.000 50% 25.0000.000
0.000 25.000 100% 0.0000.000
1465 Z2018.2610ProvincialApproved
ESTABLISHMENT OF EMERGENCY CENTERS ON MAIN HIGHWAYS OF BALOCHISTAN (PPHI)
3409.4740.000
3409.474 260.0000.000
260.000 7% 427.0000.000
0.000 427.000 20% 2722.4740.000
1464 Z2018.2245Musa KhailApproved
UPGRADATION OF BHU AT HABIBABAD NAKHAL TEHSIL TOISAR DISTRICT MUSAKHAIL
12.0000.000
12.000 7.0000.000
7.000 58% 5.0000.000
0.000 5.000 100% 0.0000.000
1463 Z2018.2167Qilla
AbdullahApproved
CONST: OF BLOOD BANK BUILDING AT CHAMAN.
15.0000.000
15.000 10.0000.000
10.000 66% 5.0000.000
0.000 5.000 100% 0.0000.000
1462 Z2018.1350Kharan
Approved
CONST: OF TEHSIL HEADQUARTER HOSPITAL MISKAN-E-KALAT, KHARAN.
50.0000.000
50.000 30.0000.000
30.000 60% 20.0000.000
0.000 20.000 100% 0.0000.000
1461 Z2018.1347Kharan
Approved
CONSTRUCTION OF BUILDING OF RHC NAROO DISTRICT KHARAN
20.0000.000
20.000 10.0000.000
10.000 50% 10.0000.000
0.000 10.000 100% 0.0000.000
1460 Z2018.1330Kalat
Approved
12 AMBULANCES FOR BHU’S AT KHALIQABAD & KALAT
50.0000.000
50.000 25.0000.000
25.000 50% 25.0000.000
0.000 25.000 100% 0.0000.000
1459 Z2016.0578Bela
Approved
BOUNDRY WALL RCC HINGLAJ MATHA HUB, REHB: OF DISPENCIRY HINGLAJ MATHA HUB.
12.0000.000
12.000 6.0000.000
6.000 50% 6.0000.000
0.000 6.000 100% 0.0000.000
1458 Z2016.0019Chagai
Approved
REH: OF CIVIL DISPENSARY AT GAWALSTOP & BARAPCHA BAZAR U/C BARAPCHA (PB-39).
9.9000.000
9.900 7.9000.000
7.900 79% 2.0000.000
0.000 2.000 100% 0.0000.000
1457 Z2012.0818ProvincialApproved
BALOSHISTAN NUTRITION PROGRAM FOR MOTHER & CHILDREN (FOREIGN AIDED).
298.5201194.100
1492.620 198.7170.000
198.717 13% 90.000635.000
0.000 725.000 61% 9.803559.100
1456 Z2012.0683Ziarat
Approved
BUILDING FOR TEHSIL HEAD QAUARTER HOSPITAL SINJAWI DIST.ZIARAT.
20.0000.000
20.000 10.0000.000
10.000 50% 10.0000.000
0.000 10.000 100% 0.0000.000
Primary Health Care(11 Ongoing Projects) GoB/FPA Sub-Total
3946.894 5140.994 589.617 589.617 625.000 0.000 1260.000 2732.277
1194.100 0.000 635.000 559.100
Subsector: Primary Health Care
Sector: Health
Chapter: HEALTH
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 138: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/138.jpg)
Public Sector Development Programme (Sectorwise)
134 of 214
1482 Z2019.1249Kech
CPapproved
IMPROV:/ADDL: ROOMS B/W & TOILETS FOR BHU KASAK KECH
15.0000.000
15.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 66% 5.0000.000
1481 Z2019.1246Kech
CPapproved
IMPROV:/ADDITIONAL ROOMS B/W, TOILETS, FOR BHU DANDAR KECH
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
1480 Z2019.1221Gwadar
CPapproved
UPGRADATION OF PUSHOKAN BHU AND UPGRADATION OF NALIAN BHQ
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1479 Z2019.1182Provincial
CPapproved
PROVISION OF AMBULLANCES AT KHUZDAR, DALBANIN AND LASBELA HINGLAJ MATA .
20.2500.000
20.250 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 49% 10.2500.000
1478 Z2019.0970Gwadar
CPapproved
REHABILITATION/CONTT: BOUNDRY WALL RHC ORMARA GWADAR
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1477 Z2019.0966Gwadar
CPapproved
REHABILITATION OF BHU'S CHURBANDAR, ROBAR, KAUDA ISHAQ BAZAR, HAIDER BAZDAR POSTOO GWADAR
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
1476 Z2019.0699Jhal Magsi
CPapproved
CONSTRUCTION OF ADDITIONAL WORK IN RHC JHAL MAGSI.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1475 Z2019.0635Jaffarabad
CPapproved
REH: OF 8 BHU/ & 2 CD TEH. USTA MOHD, GANDAKHA, BAGH TAIL, BAGH HEAD/SIBI JADEED /ALI ABAD JAMALI ETC
25.0000.000
25.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 100% 0.0000.000
1474 Z2019.0631Jaffarabad
CPapproved
REHABILITATION BHU GANDAKHA.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1473 Z2019.0535Quetta
CPapproved
REHABILITATION OF MNCH CENTRE AT HAZARA TOWN BLOCK-I, QUETTA.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1472 Z2019.0533Quetta
CPapproved
CONSTRUCTION OF BHU AT HAZARA TOWN, QUETTA.
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
1471 Z2019.0450Zhob
CPapproved
CONSTRUCTION OF BURN UNIT AT DHQ HOSPITAL
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
1470 Z2019.0449Zhob
CPapproved
PROVISION OF INCUBATOR FOR CHILDREN WARD
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1469 Z2019.0448Zhob
CPapproved
4X4 AMBULANCES FOR DISTRICT HEADQUARTER HOSPITAL & RURAL HEALTH CENTRES
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1468 Z2019.0308Quetta
CPapproved
ADDITIONAL WORKS AT BHU OLD MARI ABAD, QUETTA.
30.0000.000
30.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 40% 18.0000.000
1467 Z2019.0104Chagai
CPapproved
EXTENSION & IM PROV: OF CIVIL DISPENSARY BUILDING FOR BARABCHA, DIST. CHAGAI
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
Subsector: Primary Health Care
Sector: Health
Chapter: HEALTH
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 139: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/139.jpg)
Public Sector Development Programme (Sectorwise)
135 of 214
1497 Z2019.1873Khuzdar
CPapproved
REH: OF BHU AT KILLI IKHLAQUE TULAI, KHIDRANI.
9.5000.000
9.500 0.0000.000
0.000 0% 9.5000.000
0.000 9.500 100% 0.0000.000
1496 Z2019.1710Duki
CPapproved
UPGRADATION OF BHU INTO RHC KILLI SARDAR JUNGLE TEHSIL LUNI DISTRICT DUKI.
46.6000.000
46.600 0.0000.000
0.000 0% 26.6000.000
0.000 26.600 57% 20.0000.000
1495 Z2019.1627Quetta
CPapproved
ADD: ROOMS & ALLIED FACILITIES AT KILLI SHADI KHAN, QMABRANI QUETTA (UP&D).
25.0000.000
25.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 100% 0.0000.000
1494 Z2019.1617Shaheed
Sikandarabad
CPapproved
EXT: OF BUILD. & CONST: OF QUARTER (GRADE 11-14) IN CIVIL DISPENSARY KILLI CHAD GIDDER SURAB.
10.9000.000
10.900 0.0000.000
0.000 0% 10.9000.000
0.000 10.900 100% 0.0000.000
1493 Z2019.1611Quetta
CPapproved
CONST: OF ROOMS FOR BHU AT KUCHLAK, KILLI SAMALI, AGHBARG. NOHSAR & SAMLALI.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
1492 Z2019.1602Shaheed
Sikandarabad
CPapproved
EXT: OF BUILD. & CONST: OF QUARTER (GRADE 11-14) IN CIVIL DISPENSARY KILLI MOOSA KHANZAI DASHT-E-GORAN SURAB.
10.9000.000
10.900 0.0000.000
0.000 0% 10.9000.000
0.000 10.900 100% 0.0000.000
1491 Z2019.1583Quetta
CPapproved
CONST: OF BHU AT M.ALI REZAI NEAR IMAM BARGAH M.BAQIR, HAZARA TOWN QUETTA.
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
1490 Z2019.1578Musa Khail
CPapproved
CONSTRUCTION OF BUILDING FOR RHC DRUG MUSA KHAIL.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1489 Z2019.1418Provincial
CPapproved
CONST: OF ONE NEW BHU/RHC IN EACH TEHSIL OF BALOCHISTAN (EXC: DIV: & DISTRICT HQ).
1000.0000.000
1000.000 0.0000.000
0.000 0% 200.0000.000
0.000 200.000 20% 800.0000.000
1488 Z2019.1404Quetta
CPapproved
CONST: OF GUARD ROOM & TOILET BLOCKS AT BHUS MEHMOODABAD,MUSLIM ITHEHAD COLONY,E BY PASS QUETTA.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1487 Z2019.1383Gwadar
CPapproved
PASNI HOSPITAL COMPLETION. 200.0000.000
200.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 25% 150.0000.000
1486 Z2019.1382Provincial
CPapproved
UP-GRADATION OF LADY DIFFEREN HOSPITAL.
300.0000.000
300.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 16% 250.0000.000
1485 Z2019.1381Provincial
CPapproved
STRENGTHEING OF 16 POTENTIALS DHQS50 BEDDED HOSPITAL(SEED MONEY FOR INVESTMENT/ SELF SUSTAINABILITY/OUT SOURCEING.
1000.0000.000
1000.000 0.0000.000
0.000 0% 200.0000.000
0.000 200.000 20% 800.0000.000
1484 Z2019.1252Kech
CPapproved
CONSTRUCTION OF BASIC HEALTH UNIT AT BHU KOCHAG GILLI BULADA KECH
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
1483 Z2019.1250Kech
CPapproved
IMPROV:/ADDL: ROOMS B/W & TOILETS FOR BHU THANK HOSHAB KECH.
15.0000.000
15.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 66% 5.0000.000
Subsector: Primary Health Care
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Chapter: HEALTH
Sector: Health
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
2019 - 20 Original
![Page 140: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/140.jpg)
Public Sector Development Programme (Sectorwise)
136 of 214
1498 Z2019.2047Dera Bugti
CPapproved
CONST OF QUARTERS AT BHU KILLI DR MASHKEEF
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
Primary Health Care(32 New Projects) GoB/FPA Sub-Total
3033.150 3033.150 0.000 0.000 954.900 0.000 954.900 2078.250
0.000 0.000 0.000 0.000
Subsector: Primary Health Care
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Chapter: HEALTH
Sector: Health
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Primary Health Care(43 Projects) Total
6980.044 8174.144 589.617 589.617 1579.900 0.000 2214.900 4810.527
Sub-Sector Total (FPA) 1194.100 0.000 635.000 559.100
2019 - 20 Original
![Page 141: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/141.jpg)
Public Sector Development Programme (Sectorwise)
137 of 214
1514 Z2014.0091Zhob
Approved
CONST: OF NEW BLOCK AT WOMEN HOSPITAL ZHOB.
40.0000.000
40.000 24.0000.000
24.000 60% 16.0000.000
0.000 16.000 100% 0.0000.000
1513 Z2014.0050Quetta
Approved
PAEDETRIATIC COMPLEX AT SANDEMAN PROVINCIAL HOSPITAL QUETTA.
268.0000.000
268.000 119.1620.000
119.162 44% 148.8380.000
0.000 148.838 100% 0.0000.000
1512 Z2014.0030Kalat
Approved
30 BEDDED TEHSIL HEADQUARTER HOSPITAL, KHALIQ ABAD MANGOCHER, KALAT.
49.1650.000
49.165 37.9790.000
37.979 77% 11.1860.000
0.000 11.186 100% 0.0000.000
1511 Z2014.0029Quetta
Approved
NEW OPD BLOCK AT SANDEMAN PROVINCIAL HOSPITAL, QUETTA.
198.1860.000
198.186 185.6860.000
185.686 93% 12.5000.000
0.000 12.500 100% 0.0000.000
1510 Z2013.0200Quetta
Approved
REVAMPING OF BOLAN MEDICAL COLLEGE QUETTA.
808.2310.000
808.231 783.2310.000
783.231 96% 25.0000.000
0.000 25.000 100% 0.0000.000
1509 Z2013.0038Quetta
Approved
SAFE BLOOD TRANSFUSION PROJECT (GOB 182.80, KPW SHARE 114.79).
397.0000.000
397.000 244.5000.000
244.500 61% 50.0000.000
0.000 50.000 74% 102.5000.000
1508 Z2013.0006Quetta
Approved
ESTABLISHMENT OF FORENSIC SCIENCE LABORATORY AT QUETTA (PROSECUTION DEPT:).
747.8480.000
747.848 170.0000.000
170.000 22% 100.0000.000
0.000 100.000 36% 477.8480.000
1507 Z2012.0517Washuk
Approved
DHQ HOSPITAL, WASHUK. 252.2790.000
252.279 79.5000.000
79.500 31% 20.0000.000
0.000 20.000 39% 152.7790.000
1506 Z2011.0544Kech
Approved
CONST: OF 50 BEDDED HOSPITAL AT TUMP PB-50 DIST. KECH (UP&D).
123.3240.000
123.324 42.5000.000
42.500 34% 5.0000.000
0.000 5.000 38% 75.8240.000
1505 Z2011.0491Qilla
AbdullahApproved
CONST: OF 50 BEDDED HOSPITAL AT KILLI ABDUL REHMANZAI, KILLA ABDULLAH (BDA).
133.6000.000
133.600 81.0000.000
81.000 60% 10.0000.000
0.000 10.000 68% 42.6000.000
1504 Z2011.0284Nushki
Approved
CONST: OF 50 BEDDED HOSPITAL, NUSHKI.
151.3690.000
151.369 46.3690.000
46.369 30% 105.0000.000
0.000 105.000 100% 0.0000.000
1503 Z2009.0319Gwadar
Approved
CONSTRUCTION OF 50 BEDDED HOSPITAL AT PASNI (OMANI GRANT).
0.100440.900
441.000 0.000233.860
233.860 53% 0.10016.800
0.000 16.900 56% 0.000190.240
1502 Z2009.0031Kalat
Approved
CONSTRUCTION OF 50 BEDDED HOSPITAL AT KALAT.
197.5470.000
197.547 186.5970.000
186.597 94% 10.9500.000
0.000 10.950 100% 0.0000.000
1501 Z2004.0159Qilla
AbdullahApproved
IMPROVEMENT OF DHQ HOSPITAL CHAMAN.
235.7240.000
235.724 204.6270.000
204.627 86% 31.0970.000
0.000 31.097 100% 0.0000.000
1500 Z2003.0645ProvincialApproved
STRENGTHENING OF EXPANDED PROGRAMME ON IMMUNIZATION (GAVI).
3728.0006300.000
10028.000
2306.86078.631
2385.491 23% 250.000227.000
0.000 477.000 28% 1171.1405994.369
1499 H1997.0004ProvincialApproved
T.B CONTROL PROGRAMME (DOTS).
550.7020.000
550.702 336.2790.000
336.279 61% 80.0000.000
0.000 80.000 75% 134.4230.000
Subsector: Curative Health Care
Sector: Health
Chapter: HEALTH
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 142: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/142.jpg)
Public Sector Development Programme (Sectorwise)
138 of 214
1530 Z2017.1515Quetta
Approved
CONSTRUCTION OF MISCELLANEOUS SURGICAL UNIT FATIMA JINNAH HOSPITAL.
526.6680.000
526.668 100.0000.000
100.000 18% 50.0000.000
0.000 50.000 28% 376.6680.000
1529 Z2017.1508ProvincialApproved
ESTAB: OF BALOCHISTAN INSTITUTE OF NEURO-SCIENCES/STROKE (BINS)
500.0000.000
500.000 280.4000.000
280.400 56% 50.0000.000
0.000 50.000 66% 169.6000.000
1528 Z2017.1505Quetta
Approved
EXT:OF EXIST: INSTIT: BUILD:CONST:OF NEW ADMIN BLOCK,OPD BLOCK, AUDIT:LIB ALONG WITH PUR: OF MEDICAL EQUIP:FOR BINUQ.
1200.0000.000
1200.000 100.2000.000
100.200 8% 5.0000.000
0.000 5.000 8% 1094.8000.000
1527 Z2017.1149Khuzdar
Approved
IMPRO: & REHA: OF NURSING HOSPITAL KHUZDAR.
50.0000.000
50.000 25.0000.000
25.000 50% 25.0000.000
0.000 25.000 100% 0.0000.000
1526 Z2017.0078Quetta
Approved
CONSTRUCTION OF WAREHOUSE FOR MSD.
300.0000.000
300.000 10.5000.000
10.500 3% 60.0000.000
0.000 60.000 23% 229.5000.000
1525 Z2016.1182ProvincialApproved
AVIAN PANDEMIC INFLUENZA CONTROL PROGRAM.
300.0000.000
300.000 35.0000.000
35.000 11% 10.0000.000
0.000 10.000 15% 255.0000.000
1524 Z2016.1180ProvincialApproved
BLINDNESS CONTROL PROGRAM.
300.0000.000
300.000 35.0000.000
35.000 11% 10.0000.000
0.000 10.000 15% 255.0000.000
1523 Z2016.1179Quetta
Approved
ESTABLISHMENT OF DENTAL COLLEGE QUETTA.
1000.0000.000
1000.000 51.6700.000
51.670 5% 100.0000.000
0.000 100.000 15% 848.3300.000
1522 Z2016.1147ProvincialApproved
VECTOR BORNE DISEASES (MALARIA, ZIKA, LEISHMANIASIS, DENGI, CHIKUNGUNYA & CHF)
2500.0000.000
2500.000 130.0000.000
130.000 5% 100.0000.000
0.000 100.000 9% 2270.0000.000
1521 Z2016.1146ProvincialApproved
NATIONAL PROGRAM FOR FAMILY PLANNING AND PHC, BALOCHISTAN.
3974.6370.000
3974.637 330.0000.000
330.000 8% 100.0000.000
0.000 100.000 10% 3544.6370.000
1520 Z2016.1145ProvincialApproved
CHIEF MINISTER'S INITIATIVE FOR HEPATITIS CONTROL PROGRAM, BALOCHISTAN (PHASE-II).
2755.9070.000
2755.907 815.1200.000
815.120 29% 150.0000.000
0.000 150.000 35% 1790.7870.000
1519 Z2016.1109Khuzdar
Approved
CONST: OF NAAL CITY HOSPITAL, KHUZDAR.
270.0000.000
270.000 140.0000.000
140.000 51% 20.0000.000
0.000 20.000 59% 110.0000.000
1518 Z2015.1344ProvincialApproved
PRIME MINISTER'S NATIONAL HEALTH INSURANCE PROGRAM.
1204.4500.000
1204.450 474.5540.000
474.554 39% 50.0000.000
0.000 50.000 43% 679.8960.000
1517 Z2015.1343ProvincialApproved
NATIONAL MATERNAL NEWBORN & CHILD CARE (MNCH) PROGRAMME BALOCHISTAN.
1400.0000.000
1400.000 1011.5800.000
1011.580 72% 150.0000.000
0.000 150.000 82% 238.4200.000
1516 Z2015.0854ProvincialApproved
STRE: OF 08 DHQS & CONST: OF BACH: HOSTEL FOR DR. AT SIBI, ZHOB, HARNAI, BELA, KALAT, K. ABDULLAH, PANJGOOR & KHARAN.
450.0000.000
450.000 380.4340.000
380.434 84% 38.9200.000
0.000 38.920 93% 30.6460.000
1515 Z2014.1170ProvincialApproved
HIV/AIDS CONTROL PROGRAM BALOCHISTAN.
279.3200.000
279.320 162.6500.000
162.650 58% 50.0000.000
0.000 50.000 76% 66.6700.000
Subsector: Curative Health Care
Sector: Health
Chapter: HEALTH
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 143: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/143.jpg)
Public Sector Development Programme (Sectorwise)
139 of 214
1535 Z2018.4237Quetta
Approved
CONST: OF OPD PTHOLOGY, PSYCHOLOGICAL B/WALL AND ETC.
80.0000.000
80.000 20.0000.000
20.000 25% 20.0000.000
0.000 20.000 50% 40.0000.000
1534 Z2018.1348Kharan
Approved
NEW PATIENT WARD FOR SHEIKH ZAID HOSPITAL KHARAN DISTRICT KHARAN ALOGNWITH DIALYSIS MACHINES AND TRAUMA EQUIPMENT
30.0000.000
30.000 10.0000.000
10.000 33% 20.0000.000
0.000 20.000 100% 0.0000.000
1533 Z2018.1138JaffarabadApproved
REHABILITATION OF CIVIL HOSPITAL USTA MUHAMMAD,
70.0000.000
70.000 20.0000.000
20.000 28% 50.0000.000
0.000 50.000 100% 0.0000.000
1532 Z2018.0876Bela
Approved
PROV: OF HEALTH FACILITIES IN HOSPITALS OF BELA, UTHAL, LAKHRA, INTERNAL PAVEMENTS AND REST IN LASBELA.
30.0000.000
30.000 15.0000.000
15.000 50% 15.0000.000
0.000 15.000 100% 0.0000.000
1531 Z2017.1516Quetta
Approved
ESTABLISHMENT OF GASTRO -ENTEROLOGY INSTITUTE .
100.0000.000
100.000 75.0000.000
75.000 75% 25.0000.000
0.000 25.000 100% 0.0000.000
6740.900 312.491 243.800 6184.609
Curative Health Care(37 Ongoing Projects) GoB/FPA Sub-Total
25202.057
31942.957
9070.398 9382.889 1974.591 0.000 2218.391 14157.068
Subsector: Curative Health Care
Sector: Health
Chapter: HEALTH
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 144: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/144.jpg)
Public Sector Development Programme (Sectorwise)
140 of 214
1550 Z2019.1185Ziarat
CPapproved
3 NOS OF HIACE AMBULANCES FOR THQ SANJAVI DISTT: ZIARAT.
28.0000.000
28.000 0.0000.000
0.000 0% 28.0000.000
0.000 28.000 100% 0.0000.000
1549 Z2019.1158Harnai
CPapproved
PROV: OF 3 NO. AMBULANCE WITH ACCESSORIES FOR DISTRICT HOSPITAL HARNAI
28.0000.000
28.000 0.0000.000
0.000 0% 28.0000.000
0.000 28.000 100% 0.0000.000
1548 Z2019.0823Khuzdar
CPapproved
CONST: OF BACHELOR HOSTEL MALE AND FEMALE SHAHEED SIKANDAR (50 BEDED) MEMORIAL HOSPITAL TEH: ZEHRI.
70.0000.000
70.000 0.0000.000
0.000 0% 70.0000.000
0.000 70.000 100% 0.0000.000
1547 Z2019.0698Jhal Magsi
CPapproved
CONSTRUCTION OF TRAUMA CENTER DHQ HOSPITAL GANDAWAH.
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
1546 Z2019.0630Jaffarabad
CPapproved
CONST: OF BOUNDARY WALL CIVIL HOSPITAL USTA MUHAMMAD.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1545 Z2019.0629Jaffarabad
CPapproved
REHABILITATION OF LABOUR HOSPITAL USTA MUHAMMAD.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
1544 Z2019.0451Zhob
CPapproved
PROVISION OF FOUR DIALYSES MACHINES FOR DHQ HOSPITAL ZHOB
8.0000.000
8.000 0.0000.000
0.000 0% 8.0000.000
0.000 8.000 100% 0.0000.000
1543 Z2019.0352Quetta
CPapproved
CONSTRUCTION OF 30 BEDED ( BACHA KHAN HOSPITAL) HOSPITAL AT NAWA KILLI QUETTA.
500.0000.000
500.000 0.0000.000
0.000 0% 340.0000.000
0.000 340.000 68% 160.0000.000
1542 Z2019.0307Quetta
CPapproved
PROV: OF MEDICAL EQUIPMENTS DIALYSIS MACHINE (03 NOS) & ENDOSCOPE MACHINE FOR SHAHEED BENAZIR BHUTTO HOSPITAL, QUETTA.
28.0000.000
28.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 42% 16.0000.000
1541 Z2019.0142Provincial
CPapproved
REVENUE COST FOR COMPLETED SCHEMES, 50 BEDDED HOSPITAL KALAT ,DHQ CHAMAN,GHOUSABAD,KHUDABADAN (100 EACH).
400.0000.000
400.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 25% 300.0000.000
1540 Z2019.0094Provincial
CPapproved
EQUIPMENTS FOR TRAUMA CENTERS KHUZDAR, BMCH & SHEIKH ZAYED HOSPITAL.
180.0000.000
180.000 0.0000.000
0.000 0% 180.0000.000
0.000 180.000 100% 0.0000.000
1539 Z2019.0093Provincial
CPapproved
ESTAB OF THALASSEMIA CENTRES AT DHQ SIBI, ZHOB, KHUZDAR, KECH, NASEERABAD, KHARAN (PHASE-I).
80.0000.000
80.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 50% 40.0000.000
1538 Z2019.0092Provincial
CPapproved
MOBILE HEALTH UNIT TO CATER FOR THE AREAS OUT OF REACH OF HEALTH FACILITIES (01 IN EACH DIVISION).
70.0000.000
70.000 0.0000.000
0.000 0% 70.0000.000
0.000 70.000 100% 0.0000.000
1537 Z2019.0091Provincial
CPapproved
PROV: OF FURNITURE & FIXTURE FOR EXISTING 8 RECENTLY CONSTRUCTED HOSTELS.
64.0000.000
64.000 0.0000.000
0.000 0% 64.0000.000
0.000 64.000 100% 0.0000.000
1536 Z2019.0090Provincial
CPapproved
PROV: OF DIALYSIS MACHINE (4 EACH) WITH ALL ACCESSORIES IN DHQ CHAGAI, J.G.Q HOSPITAL HUB, KALAT, PISHIN, KHARAN, ETC.
144.0000.000
144.000 0.0000.000
0.000 0% 144.0000.000
0.000 144.000 100% 0.0000.000
Subsector: Curative Health Care
Sector: Health
Chapter: HEALTH
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 145: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/145.jpg)
Public Sector Development Programme (Sectorwise)
141 of 214
1565 Z2019.2061Quetta
CPapproved
CARDIAC EMERGENCY RESPONSE CENTER AT BMC HOSPITAL.
1000.0000.000
1000.000 0.0000.000
0.000 0% 150.0000.000
0.000 150.000 15% 850.0000.000
1564 Z2019.2036Kech
CPapproved
REH & ADD: WORK FOR BHU PULLABAD, THAGRAN KALAG, SHANKAN NODIZ
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
1563 Z2019.1975Duki
CPapproved
CONST: OF DHQ HOSPITAL DUKI. 200.0000.000
200.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 25% 150.0000.000
1562 Z2019.1973Sibi
CPapproved
CONST: OF TRAUMA CENTER AT SIBI OLD HOSPITAL SIBI.
14.0000.000
14.000 0.0000.000
0.000 0% 14.0000.000
0.000 14.000 100% 0.0000.000
1561 Z2019.1943Quetta
CPapproved
SHEIKH ZAID CANCER & GENERAL HOSPITAL.
1000.0000.000
1000.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 10% 900.0000.000
1560 Z2019.1934Qilla
AbdullahCPapproved
CONST: OF 50 BEDDED HOSPITAL AT KILLA ABDULLAH.
500.0000.000
500.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 20% 400.0000.000
1559 Z2019.1800Mastung
CPapproved
CONSTRUCTION OF RURAL HEALTH CENTER AT MAL SARPARAH KIRDIGAP DISTRICT MASTUNG
50.0000.000
50.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 60% 20.0000.000
1558 Z2019.1756Gwadar
CPapproved
REH: OF CIVIL HOSPITAL JEWANI 10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1557 Z2019.1755Gwadar
CPapproved
NEW BUILDING FOR CIVIL HOSPITAL GWADAR ALONG WITH RESIDENCE FOR DOCTORS
150.0000.000
150.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 33% 100.0000.000
1556 Z2019.1681Nasirabad
CPapproved
CONST: OF BUILDING FOR RHC CHATTAR DISTRICT NASIRABAD
50.0000.000
50.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 50% 25.0000.000
1555 Z2019.1676Kech
CPapproved
REH: OF BHU AT PHATAN-E-KHOOR DISTRICT KECH
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
1554 Z2019.1588Provincial
CPapproved
BALOCHISTAN MEDICAL SUPPORT PROGRAM (POVERTY ERADICATION INITIATIVE). GOB SHARE 300M,PEI SHARE 750M
300.000750.000
1050.000 0.0000.000
0.000 0% 50.000250.000
0.000 300.000 28% 250.000500.000
1553 Z2019.1377Quetta
CPapproved
EXTENSION OF TRAUMA CENTRE (OLD BLOCK) AT SPH QUETTA.
200.0000.000
200.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 50% 100.0000.000
1552 Z2019.1222Gwadar
CPapproved
ESTABLISHMENT OF KIDNEY CENTER AT GWADAR
60.0000.000
60.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 41% 35.0000.000
1551 Z2019.1220Gwadar
CPapproved
NEW BUILDING FOR CIVIL HOSPITAL GWADAR ALONG WITH RESIDENCES FOR DOCTORS
150.0000.000
150.000 0.0000.000
0.000 0% 35.0000.000
0.000 35.000 23% 115.0000.000
750.000 0.000 250.000 500.000
Curative Health Care(30 New Projects) GoB/FPA Sub-Total
5401.000 6151.000 0.000 0.000 1940.000 0.000 2190.000 3461.000
Subsector: Curative Health Care
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Chapter: HEALTH
Sector: Health
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
2019 - 20 Original
![Page 146: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/146.jpg)
Public Sector Development Programme (Sectorwise)
142 of 214
Sub-Sector Total (FPA) 7490.900 312.491 493.800 6684.609
Curative Health Care(67 Projects) Total
30603.057
38093.957
9070.398 9382.889 3914.591 0.000 4408.391 17618.068
2019 - 20 Original
![Page 147: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/147.jpg)
Public Sector Development Programme (Sectorwise)
143 of 214
1568 Z2013.0071Kech
Approved
ESTAB: OF MEDICAL COLLEGE KECH AT TURBAT.
3491.0000.000
3491.000 2912.3980.000
2912.398 83% 578.6020.000
0.000 578.602 100% 0.0000.000
1567 Z2013.0069Khuzdar
Approved
CONSTRUCTION OF MEDICAL COLLEGE AT KHUZDAR.
6933.1800.000
6933.180 957.9450.000
957.945 13% 500.0000.000
0.000 500.000 21% 5475.2350.000
1566 Z2013.0068Loralai
Approved
CONSTRUCTION OF MEDICAL COLLEGE AT LORALAI.
5171.7300.000
5171.730 617.3240.000
617.324 11% 500.0000.000
0.000 500.000 21% 4054.4060.000
0.000 0.000 0.000 0.000
General(3 Ongoing Projects) GoB/FPA Sub-Total
15595.910
15595.910
4487.667 4487.667 1578.602 0.000 1578.602 9529.641
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Chapter: HEALTH
Sector: Health
Subsector: General
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
General(3 Projects) Total
15595.910
15595.910
4487.667 4487.667 1578.602 0.000 1578.602 9529.641
Sector: HEALTH(113 Projects)
53179.011
61864.011
14147.682
14460.173 7073.093 0.000 8201.893 31958.236
Sector Total (FPA) 8685.000 312.491 1128.800 7243.709
2019 - 20 Original
![Page 148: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/148.jpg)
Public Sector Development Programme (Sectorwise)
144 of 214
1583 Z2017.0700Quetta
Approved
LOCAL BORES FOR SATELLITE TOWN, PASHTOONABD, KILLLI SHEIKHAN AND USMANABAD, PB-03.
10.0000.000
10.000 8.0000.000
8.000 80% 2.0000.000
0.000 2.000 100% 0.0000.000
1582 Z2017.0696Quetta
Approved
CONST: OF OHSR AT AFGHAN MEENA AND AFGHAN DARRA, ADDA PASHTOONABAD AND LANDI PASHTOONABAD PB-03.
15.0000.000
15.000 7.0000.000
7.000 46% 8.0000.000
0.000 8.000 100% 0.0000.000
1581 Z2017.0619Shaheed
Sikandarabad
Approved
CONST: OF 5 NOS WSS FOR TEHSIL SURAB, SHAHEED SIKANDARABAD.
30.0000.000
30.000 15.0000.000
15.000 50% 15.0000.000
0.000 15.000 100% 0.0000.000
1580 Z2015.1394Quetta
Approved
CONSTRUCTION OF MANGI DAM, QUETTA.(FEDERAL 50% BALOCHISTAN 50%).
4667.0200.000
4667.020 1215.7000.000
1215.700 26% 1200.0000.000
0.000 1200.000 51% 2251.3200.000
1579 Z2015.1281Panjgur
Approved
WSS FOR PANJGUR CITY WITH 3 NOS OVERHEAD TANKS & PIPELINES.
300.0000.000
300.000 227.9900.000
227.990 76% 23.0100.000
0.000 23.010 83% 49.0000.000
1578 Z2015.0871ProvincialApproved
C.D.W.A PROJECT PHASE-II WITH SOLAR SYSTEM.
300.0000.000
300.000 190.0000.000
190.000 63% 40.0000.000
0.000 40.000 76% 70.0000.000
1577 Z2015.0797JaffarabadApproved
PROV: OF WSS, ELECTRICITY & APPROACH ROAD FOR TURKISH HOUSING SCHEME (FLOOD AFFECTED) DERA ALLAH YAR (PDMA).
142.0000.000
142.000 109.1000.000
109.100 76% 32.9000.000
0.000 32.900 100% 0.0000.000
1576 Z2014.1029Kachhi
Approved
CONST: OF WSS SANI TO BHAG DSIT: KACHHI.
224.1200.000
224.120 206.1200.000
206.120 91% 18.0000.000
0.000 18.000 100% 0.0000.000
1575 Z2014.0096Dera BugtiApproved
WATER SUPPLY SCHEME AT PIRKOH DIST. DERA BUGTI.
296.1180.000
296.118 40.7280.000
40.728 13% 20.3390.000
0.000 20.339 20% 235.0510.000
1574 Z2014.0022ProvincialApproved
10 SMALL DAMS FOR WATER SUPPLY PURPOSE FOR TOWNS FACING WATER SHORTAGE.
493.8200.000
493.820 413.1010.000
413.101 83% 80.7190.000
0.000 80.719 100% 0.0000.000
1573 Z2014.0001ProvincialApproved
KACHHI PLAIN WATER SUPPLY SCHEME PHASE-II.
2039.8350.000
2039.835 1517.9210.000
1517.921 74% 250.0000.000
0.000 250.000 86% 271.9140.000
1572 Z2013.0053ProvincialApproved
REP:OF T/W AT KARKHASA W.F, W.W.FIELD, KILLI MIR PATHAN, K.JUMMA SAM:RD AND OTHERS.
69.0280.000
69.028 51.9100.000
51.910 75% 1.1180.000
0.000 1.118 76% 16.0000.000
1571 Z2012.0899ProvincialApproved
CLEAN DRINKING WATER FOR ALL PROJECT (CONTRACTOR LIABILITIES).
120.2630.000
120.263 115.2630.000
115.263 95% 5.0000.000
0.000 5.000 100% 0.0000.000
1570 Z2010.0320ProvincialApproved
PROVISION OF DRINKING WATER TO THE FISHER MEN COMMUNITIES ALONG WITH COAST LINE ITALIAN DEBT SWAP AGREEMENT(PIDSA).
50.000445.000
495.000 40.0000.000
40.000 8% 5.0000.000
0.000 5.000 9% 5.000445.000
1569 Z2009.0320Gwadar
Approved
LAYING OF PARALLEL PIPELINE SWALL GWARM TO PASNI TOWN (OMANI GRANT).
0.100678.979
679.079 0.00031.800
31.800 4% 0.100369.600
0.000 369.700 59% 0.000277.579
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 149: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/149.jpg)
Public Sector Development Programme (Sectorwise)
145 of 214
1599 Z2018.1248Chagai
Approved
AUGMENTATION OF VARIOUS WATER SUPPLY SCHEME IN CHAGAI DIST.
55.0000.000
55.000 25.0000.000
25.000 45% 10.0000.000
0.000 10.000 63% 20.0000.000
1598 Z2018.1235Jhal MagsiApproved
WATER SUPPLY SCHEME FOR KOT MAGSI VILLAGE
21.0000.000
21.000 10.0000.000
10.000 47% 11.0000.000
0.000 11.000 100% 0.0000.000
1597 Z2018.1233Chagai
Approved
CONST: OF WATER SUPPLY SCHEME FOR YAKMACH CITY, DISTRICT CHAGAI.
50.0000.000
50.000 25.0000.000
25.000 50% 10.0000.000
0.000 10.000 70% 15.0000.000
1596 Z2018.1189JaffarabadApproved
ADDITION OF OVERHEAD TANK AT MAIN WATER SUPPLY SCHEME DERA ALLAH YAR CITY
20.0000.000
20.000 14.0000.000
14.000 70% 6.0000.000
0.000 6.000 100% 0.0000.000
1595 Z2018.1085Bela
Approved
INSTT: OF WATER TANKS WITH PIPE LINES OF WSS OF UTHAL, BELA, LAKHRA,& KANRAJ.
10.0000.000
10.000 8.9190.000
8.919 89% 1.0810.000
0.000 1.081 100% 0.0000.000
1594 Z2018.1060Bela
Approved
SOLAR WATER BORES FOR DRINKING PURPOSE FOR VILLAGES OF UTHAL, BELA, LAKHRA, KANRAJ IN LASBELA DISTRICT.
100.0000.000
100.000 59.9600.000
59.960 59% 20.0000.000
0.000 20.000 79% 20.0400.000
1593 Z2018.0870Dera BugtiApproved
WSS ZAIN KOH TEHSIL & DISTRICT DERA BUGTI
200.0000.000
200.000 13.1800.000
13.180 6% 15.0000.000
0.000 15.000 14% 171.8200.000
1592 Z2018.0858Chagai
Approved
WATER SUPPLY SCHEME FOR SUB TEHSIL CHAGAI CITY
80.0000.000
80.000 16.4500.000
16.450 20% 10.5500.000
0.000 10.550 33% 53.0000.000
1591 Z2018.0852Bela
Approved
WSS FOR HINGLAJ MATA MANDIR HINGOL NADI TO HIGLAJ MANDIR WITH R/O PLANT
15.0000.000
15.000 3.0000.000
3.000 20% 12.0000.000
0.000 12.000 100% 0.0000.000
1590 Z2017.1722Dera BugtiApproved
WATER SUPPLY SCHEME SUI TOWN (SOURCE GOPAT) (DBDP) (E.COST 893.40, FED. EXP. 333.333/GOB SHARE 560.067).
560.0670.000
560.067 55.0000.000
55.000 9% 200.0000.000
0.000 200.000 45% 305.0670.000
1589 Z2017.1704Musa KhailApproved
WATER SUPPLY SCHEME DURUG TOWN, DISTRICT MUSAKHEL.
30.0000.000
30.000 18.0000.000
18.000 60% 12.0000.000
0.000 12.000 100% 0.0000.000
1588 Z2017.1497Bela
Approved
WSS AT WINDER. 40.0000.000
40.000 30.0000.000
30.000 75% 10.0000.000
0.000 10.000 100% 0.0000.000
1587 Z2017.1496ProvincialApproved
WSS FOR OBA LAKHRRA. 30.0000.000
30.000 20.0000.000
20.000 66% 10.0000.000
0.000 10.000 100% 0.0000.000
1586 Z2017.1160Khuzdar
Approved
CONST: OF WSS TEHSIL ZEHRI. 100.0000.000
100.000 90.1690.000
90.169 90% 2.8310.000
0.000 2.831 93% 7.0000.000
1585 Z2017.0950Quetta
Approved
REPLACEMENT OF FILTERATION PLANT OF QUETTA CITY.
48.0000.000
48.000 25.0000.000
25.000 52% 23.0000.000
0.000 23.000 100% 0.0000.000
1584 Z2017.0946Quetta
Approved
AUGMENTATION, EXTENSION & NEW WSS, OHSR & PIPE LINES AT KILLI DEBA, ALAMO, SHABO, TARKHA, RAILWAY, HUDA QUETTA.
35.0000.000
35.000 3.9000.000
3.900 11% 30.0000.000
0.000 30.000 96% 1.1000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 150: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/150.jpg)
Public Sector Development Programme (Sectorwise)
146 of 214
1615 Z2018.2706Loralai
Approved
WATER SUPPLY SCHEME AT KILLI SURGHUND U/C KACH AMACKZAI TEHSIL BORI DISTRICT LORALAI
5.0000.000
5.000 2.2540.000
2.254 45% 2.7460.000
0.000 2.746 100% 0.0000.000
1614 Z2018.2646Loralai
Approved
SUPPLY OF SOLAR WATER PUMPING SYSTEMS FOR WSS IN LORALAI.
20.0000.000
20.000 10.0000.000
10.000 50% 10.0000.000
0.000 10.000 100% 0.0000.000
1613 Z2018.2198Panjgur
Approved
20 NO WSS SORDO PANJGUR 50.0000.000
50.000 1.0000.000
1.000 2% 20.0000.000
0.000 20.000 42% 29.0000.000
1612 Z2018.2012Qilla
AbdullahApproved
WSS INCLUDING BORES, MACHINERY SETS, PVC PIPES AND PUMP HOUSE IN KILLI GULISTAN KARIZ, TEHSIL GULISTAN.
20.0000.000
20.000 5.6000.000
5.600 28% 5.4000.000
0.000 5.400 55% 9.0000.000
1611 Z2018.2001Qilla
AbdullahApproved
TUBE WELL/BORE WITH SOLAR SYSTEM KILLI ABDUL REHMAN ZAI, TEHSIL GULISTAN
15.0000.000
15.000 7.5000.000
7.500 50% 7.5000.000
0.000 7.500 100% 0.0000.000
1610 Z2018.1975Qilla
AbdullahApproved
REH/CONST OF WSS BORE WITH SOLAR SYS: IN TEHSIL KILLA ABDULLAH KILLI MAJAK, ARAMBI, KULAK, MAIZAI ADDA & FARRAKHI
50.0000.000
50.000 20.0000.000
20.000 40% 10.0000.000
0.000 10.000 60% 20.0000.000
1609 Z2018.1397Kech
Approved
WSS KOLAO,NASIRABAD,GODEE,HOTHABADA,MEERABAD,RAISABAD, KHAIRABAD,NODEZAI,ALLAH BAKHT & GIBON KALATUK
50.0000.000
50.000 20.0000.000
20.000 40% 10.0000.000
0.000 10.000 60% 20.0000.000
1608 Z2018.1395Gwadar
Approved
STRENGTHENING OF WSS SUNSTAR.
62.0000.000
62.000 1.8040.000
1.804 2% 10.1960.000
0.000 10.196 19% 50.0000.000
1607 Z2018.1391Kech
Approved
INSTALLATION OF PUMPING HOUSE FOR WSSS AT MAINAZ, BIT, CHIB, SAMI, KICKAN, DISTRICT KECH
8.0000.000
8.000 3.2000.000
3.200 40% 4.8000.000
0.000 4.800 100% 0.0000.000
1606 Z2018.1388Kech
Approved
WATER SUPPLY SCHEMES SIRKAZAI ZAMURAN AND MALLOI, KECH
10.0000.000
10.000 5.0000.000
5.000 50% 5.0000.000
0.000 5.000 100% 0.0000.000
1605 Z2018.1365JaffarabadApproved
CONST: /REH: WSS FOR TEHSIL USTA MUHAMMAD & GANDKHA DISTRICT JAFFARABAD.
30.0000.000
30.000 15.0000.000
15.000 50% 5.0000.000
0.000 5.000 66% 10.0000.000
1604 Z2018.1292Kachhi
Approved
WSS FOR SANI TEHSIL SANI 10.0000.000
10.000 5.0000.000
5.000 50% 5.0000.000
0.000 5.000 100% 0.0000.000
1603 Z2018.1291Kachhi
Approved
WSS KATHAN DISTRICT KACHHI 15.0000.000
15.000 10.0000.000
10.000 66% 5.0000.000
0.000 5.000 100% 0.0000.000
1602 Z2018.1256Kachhi
Approved
WATER SUPPLY SCHEME FOR SIBRI CHANDRAMA DISTRICT KACHI
6.0000.000
6.000 5.0000.000
5.000 83% 1.0000.000
0.000 1.000 100% 0.0000.000
1601 Z2018.1251Jhal MagsiApproved
WATER SUPPLY SCHEME JHAL MAGSI HINDU MUHALLAH 1,2,3,4
15.0000.000
15.000 10.0000.000
10.000 66% 5.0000.000
0.000 5.000 100% 0.0000.000
1600 Z2018.1249Jhal MagsiApproved
WATER SUPPLY SCHEME BARIJA TO BAND MEHMOOD MISSER AND SHAHDI HAR VILLAGES
22.0000.000
22.000 10.0000.000
10.000 45% 5.0000.000
0.000 5.000 68% 7.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 151: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/151.jpg)
Public Sector Development Programme (Sectorwise)
147 of 214
1626 Z2018.4118Kohlu
Approved
CONST: OF WSS/REH: KOHLU. 20.0000.000
20.000 10.0000.000
10.000 50% 10.0000.000
0.000 10.000 100% 0.0000.000
1625 Z2018.3968Zhob
Approved
REMAINING WORK OF AUGMENTATION OF WSS ZHOB TOWN.
180.0000.000
180.000 50.0000.000
50.000 27% 30.0000.000
0.000 30.000 44% 100.0000.000
1624 Z2018.3933SohbatpurApproved
LYING OF PIPELINES, RENOVATION OF WATER SUPPLY, INSTAL: OF SOLAR SYS: FOR WSS AT DIFFERENT VILLAGES
52.5000.000
52.500 25.0000.000
25.000 47% 1.5000.000
0.000 1.500 50% 26.0000.000
1623 Z2018.3572Zhob
Approved
WATER SUPPLY SCHEME OF ZHOB TOWN
100.0000.000
100.000 50.0000.000
50.000 50% 20.0000.000
0.000 20.000 70% 30.0000.000
1622 Z2018.3483ProvincialApproved
05 MGD RO SEA WATER DE-SALINATION PLANT AT GWADAR (CPEC) 33% GOB SHARE TOTAL COST 5071.43.
1673.5720.000
1673.572 150.0000.000
150.000 8% 400.0000.000
0.000 400.000 32% 1123.5720.000
1621 Z2018.3456ProvincialApproved
PROCUREMENT OF DRILLING BITS & ACCESSORIES.
46.0000.000
46.000 20.0000.000
20.000 43% 26.0000.000
0.000 26.000 100% 0.0000.000
1620 Z2018.3144Qilla
AbdullahApproved
WSS IN U/CS MAZAI I, MAZAI II HABIBZAI I , HABIBZAI II MASAZAI AND JUNGLE PIRALIZAI (22 JOBS).
77.0000.000
77.000 25.0000.000
25.000 32% 5.0000.000
0.000 5.000 38% 47.0000.000
1619 Z2018.3135Qilla
AbdullahApproved
WSS IN U/CS PIRALIZAI, ARAMBI KAKOZAI, ARAMBI MASAZAI, KULAK BADWAN (23 JOBS)
80.5000.000
80.500 30.0000.000
30.000 37% 5.0000.000
0.000 5.000 43% 45.5000.000
1618 Z2018.3052Musa KhailApproved
DRILLING OF TUBEWELL FOR EXISTING WSS KILLI NOOR HASSAN ANDERPUR MUSAKHAIL.
5.0000.000
5.000 3.2000.000
3.200 64% 1.8000.000
0.000 1.800 100% 0.0000.000
1617 Z2018.2904NasirabadApproved
CONSTRUCTION / PROVISION OF WATER SUPPLY SCHEME KHIRTHAR KANAL TO VILLAGE ALLAH ABAD
20.0000.000
20.000 10.0000.000
10.000 50% 10.0000.000
0.000 10.000 100% 0.0000.000
1616 Z2018.2870Musa KhailApproved
SUPPLY OF SOLAR WATER PUMPING SYSTEMS FOR WSS IN MUSAKHEL
20.0000.000
20.000 14.0000.000
14.000 70% 6.0000.000
0.000 6.000 100% 0.0000.000
1123.979 31.800 369.600 722.579
Water Supply Schemes(58 Ongoing Projects) GoB/FPA Sub-Total
12813.943
13937.922
5093.969 5125.769 2711.590 0.000 3081.190 5008.384
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 152: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/152.jpg)
Public Sector Development Programme (Sectorwise)
148 of 214
1642 Z2019.0217Washuk
CPapproved
CONST: OF WSS KILLI GHULAM QADIR, SALEEM CHOTE, MDADDA MAK, JAN MOHD, DAMAK ZERD ADJOINING AREAS.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1641 Z2019.0216Washuk
CPapproved
CONST: OF WSS KILLI HABASH, MOHD ASLAM, LAWANG, MOLVI YAR MOHD, ABDUL SALAM & OTHERS.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1640 Z2019.0215Qilla
SaifullahCPapproved
WATER SUPPLY SCHEME KILLI MOLVI ATTAULLAH, SALEH M. GHIBZAI.
14.0000.000
14.000 0.0000.000
0.000 0% 14.0000.000
0.000 14.000 100% 0.0000.000
1639 Z2019.0214Qilla
AbdullahCPapproved
WATER SUPPLY SCHEME KILLI SAZAO PIRALIZAI-1, ARAMBI PIRALIZAI.
21.0000.000
21.000 0.0000.000
0.000 0% 21.0000.000
0.000 21.000 100% 0.0000.000
1638 Z2019.0203Mastung
CPapproved
CONST: OF SOLAR BASED WATER SUPPLY SCHEME AT HAJI NIAZ MUHAMMAD GHAZGI DISTRICT MASTUNG
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1637 Z2019.0201Kachhi
CPapproved
CONST: OF SOLAR BASED WSS AT JAMIA MATL-EL-ULOOM DHADAR, DISTRICT KACHHI
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1636 Z2019.0198Quetta
CPapproved
CONST: OF SOLAR BASED WSS AT JAMIA MATLA-EL-ULOOM, BREWERY ROAD, QUETTA
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1635 Z2019.0197Kalat
CPapproved
CONST: OF SOLAR BASED WATER SUPPLY SCHEME AT MALGHEY PANDRAN DIST. KALAT
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1634 Z2019.0196Kalat
CPapproved
CONSTRUCTION OF SOLAR WATER SUPPLY SCHEME AT KOHANG KALAT
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1633 Z2019.0126Kachhi
CPapproved
REPLACEMENT OF WATER SUPPLY GI PIPELINE AT CJ MACH.
20.0000.000
20.000 0.0000.000
0.000 0% 7.0000.000
0.000 7.000 35% 13.0000.000
1632 Z2019.0115Provincial
CPapproved
ESTBL. OF BILLING & COLLECTION SYSTEM FOR TOWNSHIPS INCL. CONSUMER DATABASE, COMPUTER CELL, SOFTWARE & HARDWARE COMP.
100.0000.000
100.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 50.0000.000
1631 Z2019.0112Chagai
CPapproved
AUGMENTATION/E&I OF WSS SIAH JUNGLE DALBANDIN.
31.8000.000
31.800 0.0000.000
0.000 0% 31.8000.000
0.000 31.800 100% 0.0000.000
1630 Z2019.0109Chagai
CPapproved
PROTECTION OF BAND FOR WSS BOOTIG, NOKUNDI , E&I OF WSS NOKUNDI & TEST BORE FOR WSS BOOTIG, NOKUNDI, DIST. CHAGAI.
17.2000.000
17.200 0.0000.000
0.000 0% 17.2000.000
0.000 17.200 100% 0.0000.000
1629 Z2019.0106Provincial
CPapproved
SOLARIZATION OF EXISTING WATER SUPPLY SCHEMES (250 SCHEMES)
1000.0000.000
1000.000 0.0000.000
0.000 0% 200.0000.000
0.000 200.000 20% 800.0000.000
1628 Z2019.0087Chagai
CPapproved
LARGE WATER SUPPLY SCHEME 7- NOS (PER COST 3.00 MILLION)
21.0000.000
21.000 0.0000.000
0.000 0% 21.0000.000
0.000 21.000 100% 0.0000.000
1627 Z2019.0086Chagai
CPapproved
SMALL WATER SUPPLY SCHEMES 124- NOS (PER COST 2.00 MILLION)
248.0000.000
248.000 0.0000.000
0.000 0% 248.0000.000
0.000 248.000 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 153: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/153.jpg)
Public Sector Development Programme (Sectorwise)
149 of 214
1657 Z2019.0233Qilla
SaifullahCPapproved
WATER SUPPLY SCHEME KILLI KULAZAI, POPULZAI, SYEDAN MASJID.
21.0000.000
21.000 0.0000.000
0.000 0% 21.0000.000
0.000 21.000 100% 0.0000.000
1656 Z2019.0232Qilla
SaifullahCPapproved
WATER SUPPLY SCHEME KILLI SALEHZAI, GIRDAI PINAKAI, DAMAN GHABZAI.
21.0000.000
21.000 0.0000.000
0.000 0% 21.0000.000
0.000 21.000 100% 0.0000.000
1655 Z2019.0231Qilla
SaifullahCPapproved
WATER SUPPLY SCHEME KILLI SHAH MIR, MURAD KHAN, DAD M-GHABZAI.
21.0000.000
21.000 0.0000.000
0.000 0% 21.0000.000
0.000 21.000 100% 0.0000.000
1654 Z2019.0230Qilla
SaifullahCPapproved
WATER SUPPLY SCHEME KILLI NEW MAJAK, KHWJA DAD, KUTUB.
21.0000.000
21.000 0.0000.000
0.000 0% 21.0000.000
0.000 21.000 100% 0.0000.000
1653 Z2019.0229Qilla
SaifullahCPapproved
WATER SUPPLY SCHEME KILLI CHOORHI MASAZAI, WALL MASAZAI.
17.5000.000
17.500 0.0000.000
0.000 0% 17.5000.000
0.000 17.500 100% 0.0000.000
1652 Z2019.0228Qilla
SaifullahCPapproved
WATER SUPPLY SCHEME KILLI NAIKO KAHOL ARAMBAI, MEZAI.
11.2000.000
11.200 0.0000.000
0.000 0% 11.2000.000
0.000 11.200 100% 0.0000.000
1651 Z2019.0226Washuk
CPapproved
CONST: OF WSS KILLIES GREEN TOWN, GHABASH MIYARI, SHAKRULLAH GORAGI, MULA KHAIR MOHD,JANGEZAI, ETC.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1650 Z2019.0225Washuk
CPapproved
CONST: WSS KILLIES ALLAH BAKSH SAR CHSHMA, HAJI ABDUL SHAKOOR NAAG, NEW CHAD ABDUL KHALIQ, JAMAL SASOLI NAAG & OTHERS
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1649 Z2019.0224Washuk
CPapproved
CONST: OF WSS KILLIES MULLA ANAYATULLAH SARAP, GHULAM RASOOL SARAP, SABZAL KHAN MUSAZAI REGI, ETC.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1648 Z2019.0223Washuk
CPapproved
CONST: OF WSS KILL KHAIR BAKSH RASANI, MULAI USAMA ZARD, HAZOOR BAKSH ZARD, ADBUL QADIR CHAD ZARD & OTHERS
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1647 Z2019.0222Washuk
CPapproved
CONST: OF WSS KILLI MIR MAROO KHAN MULLAZAI, SHAHID GUL MULLAZAI, MEER PEER DAD MULLAZAI PAL JAT & OTHERS
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1646 Z2019.0221Washuk
CPapproved
CONST: OF WSS JUMAL RAGI, SAIFULLAH DAMBI SARAP, RAZA MOHD, SAR CHISHMA, INAYATULLAH KOCHI NAAG & OTHERS
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1645 Z2019.0220Washuk
CPapproved
CONST: WSS ABDUL MALIK SARAP, MULLA BUKSH BANSAR, MULAI SULTAN MOD GORAJI, KHER JAN LOOP, GHULAM JAN KERICHI & OTHERS
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1644 Z2019.0219Qilla
SaifullahCPapproved
WATER SUPPLY SCHEME KILLI BADWAN, SALAD THANA.
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
1643 Z2019.0218Washuk
CPapproved
CONST: WSS KILLI HAJI NOOR MOHD, JORAK ANDER KOTE, MAMAI, MOHD SHARIF KRAGAI, MOHD MURAD & OTHERS.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 154: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/154.jpg)
Public Sector Development Programme (Sectorwise)
150 of 214
1673 Z2019.0252Dera Bugti
CPapproved
CONST: OF WATER SUPPLY SCHEME GUNJA & WSS KILLI ATTA MUHAMMAD PESH BOGI IN DERA BUGTI
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
1672 Z2019.0251Dera Bugti
CPapproved
CONST: OF WATER SUPPLY SCHEME LARRO PATTI & WSS LANJA IN DERA BUGTI.
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
1671 Z2019.0250Dera Bugti
CPapproved
SOLAR BASED WSS PESHI NORTH & WSS PROBHAGI SHADO IN BAIKER, DERA BUGTI.
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
1670 Z2019.0249Dera Bugti
CPapproved
SOLAR BASED WSS KILLI DASHT-E-GORAN ZAREEN & SOLAR TUBE WELL FOR WSS MANDAWANI SHAMSAR IN DERA BUGTI.
13.3000.000
13.300 0.0000.000
0.000 0% 13.3000.000
0.000 13.300 100% 0.0000.000
1669 Z2019.0248Dera Bugti
CPapproved
CONST: OF WSS MARRI IN SUI & SOLAR BASED TUBE WELL FOR WSS KILLI DASHT –E- GORAN BALAI IN DERA BUGTI.
11.3000.000
11.300 0.0000.000
0.000 0% 11.3000.000
0.000 11.300 100% 0.0000.000
1668 Z2019.0247Dera Bugti
CPapproved
E&I OF WATER SUPPLY SCHEME DERA BUGTI TOWN.
45.0000.000
45.000 0.0000.000
0.000 0% 45.0000.000
0.000 45.000 100% 0.0000.000
1667 Z2019.0246Dera Bugti
CPapproved
E&I OF WATER SUPPLY SCHEME LOPE DERA BUGTI.
24.0000.000
24.000 0.0000.000
0.000 0% 24.0000.000
0.000 24.000 100% 0.0000.000
1666 Z2019.0245Dera Bugti
CPapproved
CONST: OF WSS MURRA MARROW & WSS BAZ PUNCH MARROW IN DERA BUGTI.
17.3000.000
17.300 0.0000.000
0.000 0% 17.3000.000
0.000 17.300 100% 0.0000.000
1665 Z2019.0244Dera Bugti
CPapproved
CONST: OF WSS BELJ MARROW & WSS KALAI DOR IN DERA BUGTI.
14.4000.000
14.400 0.0000.000
0.000 0% 14.4000.000
0.000 14.400 100% 0.0000.000
1664 Z2019.0243Dera Bugti
CPapproved
CONST: OF WSS BULLO MARROW & WSS SHAMOL MARROW IN DERA BUGTI.
15.3000.000
15.300 0.0000.000
0.000 0% 15.3000.000
0.000 15.300 100% 0.0000.000
1663 Z2019.0242Dera Bugti
CPapproved
SOLAR BASED WSS HABIB RAHI & WSS KILLI KUKI IN DERA BUGTI.
12.7000.000
12.700 0.0000.000
0.000 0% 12.7000.000
0.000 12.700 100% 0.0000.000
1662 Z2019.0241Dera Bugti
CPapproved
SOLAR BASED FOR WSS KILLI MIAH & WSS KILLI KASHI IN DERA BUGTI.
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
1661 Z2019.0240Dera Bugti
CPapproved
SOLAR BASED WSS KILLI DINWANI & WSS KILLI DEHPOAL IN DERA BUGTI.
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
1660 Z2019.0236Qilla
SaifullahCPapproved
WATER SUPPLY SCHEME KILLI BAKHSHO, WALI M-BAKHSHO.
14.0000.000
14.000 0.0000.000
0.000 0% 14.0000.000
0.000 14.000 100% 0.0000.000
1659 Z2019.0235Qilla
SaifullahCPapproved
WATER SUPPLY SCHEME KILLI FAQEERAN KULAK, HABIBZAI-I, II, DASARA KAREZ.
31.5000.000
31.500 0.0000.000
0.000 0% 31.5000.000
0.000 31.500 100% 0.0000.000
1658 Z2019.0234Qilla
SaifullahCPapproved
WATER SUPPLY SCHEME KILLI MALAK HAMEED KULAK, IMRANZAI, LAMRAN, MAIN K-ADBULLAH VILLAGE.
28.0000.000
28.000 0.0000.000
0.000 0% 28.0000.000
0.000 28.000 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 155: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/155.jpg)
Public Sector Development Programme (Sectorwise)
151 of 214
1689 Z2019.0286Quetta
CPapproved
CONSTRUCTION OF WSS KILLI DURRANI, PASHTOON ABAD, QUETTA.
7.8000.000
7.800 0.0000.000
0.000 0% 7.8000.000
0.000 7.800 100% 0.0000.000
1688 Z2019.0285Quetta
CPapproved
CONSTRUCTION OF WSS KASI QILLA, QUETTA.
7.8000.000
7.800 0.0000.000
0.000 0% 7.8000.000
0.000 7.800 100% 0.0000.000
1687 Z2019.0283Quetta
CPapproved
CONSTRUCTION OF WSS MUHALLA MUDASAR SIDDIQ NEAR PS QUAID ABAD, QUETTA.
7.8000.000
7.800 0.0000.000
0.000 0% 7.8000.000
0.000 7.800 100% 0.0000.000
1686 Z2019.0282Quetta
CPapproved
REHAB / REPLACEMENT OF BORE WSS LOHARI MUHALLA, QUETTA.
6.0000.000
6.000 0.0000.000
0.000 0% 6.0000.000
0.000 6.000 100% 0.0000.000
1685 Z2019.0281Quetta
CPapproved
REHAB / REPLACEMENT OF BORE WSS SARAI NAMAK, ALAMDAR ROAD, QUETTA.
6.5000.000
6.500 0.0000.000
0.000 0% 6.5000.000
0.000 6.500 100% 0.0000.000
1684 Z2019.0279Quetta
CPapproved
CONSTRUCTION OF WSS KILLI PIR MUHAMMAD ROAD, QUETTA.
7.7000.000
7.700 0.0000.000
0.000 0% 7.7000.000
0.000 7.700 100% 0.0000.000
1683 Z2019.0278Bela
CPapproved
SOLAR WSS WITH P/L GOTH NOORANI JAMALI LOHI SH,N.ALI JAMALI LOHI SH:,P.JAMALI &ESSA JAMALI LOHI,DARGAH A.SHAH.
11.9300.000
11.930 0.0000.000
0.000 0% 11.9300.000
0.000 11.930 100% 0.0000.000
1682 Z2019.0277Quetta
CPapproved
CONSTRUCTION OF WSS KHARTAR NEAR MARIABAD SCHOOL, QUETTA.
7.8000.000
7.800 0.0000.000
0.000 0% 7.8000.000
0.000 7.800 100% 0.0000.000
1681 Z2019.0275Bela
CPapproved
SOLAR WSS W. P/L IN GOTH B.BARIJA, RAMZAN,CHUTTA, HASKHAILY, BARIJA, HAMLANI & SIDIQANI, AP.NOTANI,BANDIJA,H. MERRA.
16.0600.000
16.060 0.0000.000
0.000 0% 16.0600.000
0.000 16.060 100% 0.0000.000
1680 Z2019.0274Quetta
CPapproved
REHAB / REPLACEMENT OF BORE WASA TUBEWELL, MUHALLA MUHIB ARBAB, QUETTA.
6.0000.000
6.000 0.0000.000
0.000 0% 6.0000.000
0.000 6.000 100% 0.0000.000
1679 Z2019.0273Quetta
CPapproved
CONSTRUCTION OF WSS MUHALLA TONAY ABAD, QUETTA.
8.0000.000
8.000 0.0000.000
0.000 0% 8.0000.000
0.000 8.000 100% 0.0000.000
1678 Z2019.0257Dera Bugti
CPapproved
REH: OF WSS SIGHARI & AUGMAENTATION OF WSS BHUTTO BEE DERA BUGTI.
13.5000.000
13.500 0.0000.000
0.000 0% 13.5000.000
0.000 13.500 100% 0.0000.000
1677 Z2019.0256Dera Bugti
CPapproved
AUGMENTATION OF WSS PESHI & WSS KALO KUSHT IN DERA BUGTI.
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
1676 Z2019.0255Dera Bugti
CPapproved
AUGMENTATION OF WSS KORDANI & WSS LANDI IN DERA BUGTI
11.2000.000
11.200 0.0000.000
0.000 0% 11.2000.000
0.000 11.200 100% 0.0000.000
1675 Z2019.0254Dera Bugti
CPapproved
CONST: OF WATER SUPPLY SCHEME KILLI MARRI NORTH NEAR SUI NALA & WSS TALLI MAT IN DERA BUGTI
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
1674 Z2019.0253Dera Bugti
CPapproved
CONST: OF WATER SUPPLY SCHEME KILLI ASHQANI & WSS KILLI MACHI GORAN NEELGH IN DERA BUGTI
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 156: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/156.jpg)
Public Sector Development Programme (Sectorwise)
152 of 214
1705 Z2019.0380Jaffarabad
CPapproved
CONSTRUCTION OF WSS AT VILLAGE HAJI FATEH MUHAMMAD SHAHWANI UC CATTLE FORM.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1704 Z2019.0379Jaffarabad
CPapproved
CONSTRUCTION OF WSS AT VILLAGE UMER KOT UC ROJHAN JAMALI.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1703 Z2019.0351Quetta
CPapproved
PROVIDING PIPE LINE IN KECHI BAIG, ZARAKHOO& HANNA IN OLD WSS.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1702 Z2019.0350Quetta
CPapproved
CONST: WSS IN MIANGHUNDI, & KECHI BAIG
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1701 Z2019.0346Kharan
CPapproved
KHARAN CITY WSS. 150.0000.000
150.000 0.0000.000
0.000 0% 150.0000.000
0.000 150.000 100% 0.0000.000
1700 Z2019.0337Kharan
CPapproved
PROV. OF WSS IN NOROZ-E-KALAT (U.C), SARAWAN (U.C), RASKOH (U.C) AND TOTAZAI (U.C)
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
1699 Z2019.0331Duki
CPapproved
SOLAR BASED WSS IN AREA OF KILLI DEEWANA SHAH HAJI KHURSHID, SAFAR KHAND SHADOZAI, SALEH ZAI DIN MUHAMMAD, ETC.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1698 Z2019.0319Duki
CPapproved
SOLAR BASED WSS IN AREA OF U/C KILLI SARDAR DUKI, SHARQI THAL, GHARBI THAL, WAYALA DUKI AREA KILLI OLD DUKI, ETC.
43.0000.000
43.000 0.0000.000
0.000 0% 43.0000.000
0.000 43.000 100% 0.0000.000
1697 Z2019.0318Duki
CPapproved
SOLAR BASED WSS IN AREA OF UNION COUNCIL WAVAI-I, WAVAI-II, LAKKI-I, LAKKI-II, GHARBI LUNI, SHARQI LUNI.
67.0000.000
67.000 0.0000.000
0.000 0% 67.0000.000
0.000 67.000 100% 0.0000.000
1696 Z2019.0317Duki
CPapproved
WSS KILLIES AKBAR MACHLI SAADULLAH KHAN, ZAR GUL, MATER JAFFAR, ABUL SALAM KHAN MANAZAI, ETC.
60.2700.000
60.270 0.0000.000
0.000 0% 60.2700.000
0.000 60.270 100% 0.0000.000
1695 Z2019.0315Duki
CPapproved
WSS KILLIES SAGGAR, MARJANZAI LUNI, HAJI SHER ZAMAN LUNI KAREZ, SHAH WAZIR LUNI BUNHAIR, PAIND KHAN WARIZAI, BABOOGAN.
38.7080.000
38.708 0.0000.000
0.000 0% 38.7080.000
0.000 38.708 100% 0.0000.000
1694 Z2019.0314Duki
CPapproved
WSS KILLIES SARDAR JANGAL AREA, DEWANA SHAHER, SAMAD KHAN LUNI, SARDAR TAHIR LUNI NIMAKI, ETC.
40.7430.000
40.743 0.0000.000
0.000 0% 40.7430.000
0.000 40.743 100% 0.0000.000
1693 Z2019.0304Quetta
CPapproved
EXTENSION OF WATER RSUPPLY SCHEMS AT SANAI ABAD WARD-14 QUETTA
5.0000.000
5.000 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 100% 0.0000.000
1692 Z2019.0303Quetta
CPapproved
REPLACEMENT OF RUSTY PIPE LINES OF OLD WSS AT WARD 10, TO 16, 19,20,37 & HAZARA HOUSING SOCIETY & GULISTAN TOWN QTA:
31.2000.000
31.200 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 32% 21.2000.000
1691 Z2019.0290Quetta
CPapproved
CONSTRUCTION OF WSS KASI QABRISTAN, QUETTA.
7.8000.000
7.800 0.0000.000
0.000 0% 7.8000.000
0.000 7.800 100% 0.0000.000
1690 Z2019.0288Quetta
CPapproved
CONSTRUCTION OF WSS HALQA-37 TAREEN ROAD, PASHTOON ABAD, QUETTA.
7.8000.000
7.800 0.0000.000
0.000 0% 7.8000.000
0.000 7.800 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 157: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/157.jpg)
Public Sector Development Programme (Sectorwise)
153 of 214
1720 Z2019.0456Zhob
CPapproved
WSS KILI SARKAI SAHRAYI M JAN KKR, BAROKAI DAWOOD SHAZAI, HAMRI ADM KHN LALAKHAIL, KHWAJAKZAI, TAKAI,
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1719 Z2019.0454Zhob
CPapproved
WSS KILI CHA UCHKAI TORAMO, BAKHTIAR LALAKHEL,GUL HABIB JABARKHEL,NAWAKACH WAZIR KHN GULZARKHEL,GHS QAMARDIN, SAMBAZA
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1718 Z2019.0424Pishin
CPapproved
WSS KILLIS MANZAKI & PISHIN CITY AREA
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
1717 Z2019.0422Pishin
CPapproved
WSS KILLIS YARO MANDAN, AMEERJAN, SAKAN KHAN QILLA, MALIKYAR, HYDERZAISYEDAN
22.5000.000
22.500 0.0000.000
0.000 0% 22.5000.000
0.000 22.500 100% 0.0000.000
1716 Z2019.0420Pishin
CPapproved
WSS FOR KILLIS NEW TORA SHAH , KAMALZAI, HAFIZ ABAD , THARATA 3PISHIN. & OTHERS (II) DISTRECT PISHIN
18.0000.000
18.000 0.0000.000
0.000 0% 18.0000.000
0.000 18.000 100% 0.0000.000
1715 Z2019.0419Pishin
CPapproved
WSS AT KILLI KHAIRO HUSAIN, KILLI BALLAWARRI, KILLI SANGAR TALBAN, KILLI TORA SHAH & OTHERS
18.0000.000
18.000 0.0000.000
0.000 0% 18.0000.000
0.000 18.000 100% 0.0000.000
1714 Z2019.0418Pishin
CPapproved
WSS & FIXING AT KILLI SHEKHALZAI, LAMARRAN, KILLI GHAREEB ABAD, KILLI ABDULLAH JAN & OTHERS
18.0000.000
18.000 0.0000.000
0.000 0% 18.0000.000
0.000 18.000 100% 0.0000.000
1713 Z2019.0414Pishin
CPapproved
WSS & FIXING AT KILLI BUND SHEKHALZAI, ZAREEFABAD ,KILLI MALIKYAR, CITY AREA PISHIN & OTHERS
18.0000.000
18.000 0.0000.000
0.000 0% 18.0000.000
0.000 18.000 100% 0.0000.000
1712 Z2019.0411Pishin
CPapproved
WSS FOR KILLI MIAN KHANZAI PISHIN, COLLEGE COLONY, THARATA ONE, THARATA TWO PISHIN & OTHERS
18.0000.000
18.000 0.0000.000
0.000 0% 18.0000.000
0.000 18.000 100% 0.0000.000
1711 Z2019.0405Pishin
CPapproved
CONST: OF WSS KILLI BASHIRABAD KHANOZAI, DILSORA, AMIR KHAN SAKHOBIA, MALAZAI TEHSIL NANA SAHIB ROAD MALAZAI.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1710 Z2019.0404Pishin
CPapproved
CONST: OF WSS "KHANOZAI TOWN & MARGHA ZAKARYAZAI" KAREZAT PISHIN.
35.0000.000
35.000 0.0000.000
0.000 0% 35.0000.000
0.000 35.000 100% 0.0000.000
1709 Z2019.0384Jaffarabad
CPapproved
CONST: OF NEW OHSR 50000 GALLONS CAPACITY AND LAYING OF PIPE LINES AT WSS DERA ALLAH YAR TOWN.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1708 Z2019.0383Jaffarabad
CPapproved
CONSTRUCTION OF WSS AT VILLAGE QUTAB DIN JAMALI UC HAFEEZ ABAD.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1707 Z2019.0382Jaffarabad
CPapproved
CONSTRUCTION OF WSS AT VILLAGE ALLAH BAKHSH MENGAL UC RAN PATNI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1706 Z2019.0381Jaffarabad
CPapproved
CONSTRUCTION OF WSS AT VILLAGE ABDUL SAMAD NECHARI UC MANJHOTI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 158: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/158.jpg)
Public Sector Development Programme (Sectorwise)
154 of 214
1735 Z2019.0522Sibi
CPapproved
CONSTRUCTION OF WSS CHAR MORI, D/D OF TUBE WELL FOR VILLAGE MALL SIBI
14.9400.000
14.940 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 66% 4.9400.000
1734 Z2019.0521Quetta
CPapproved
WSS AT KUCHLAK, PANJPAI, KILLI STATION, KILLI BARAT, KILLI ESA KHAN, KILLI ATOZAI.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
1733 Z2019.0520Quetta
CPapproved
WSS AT KUCHLAK, BALELI, KILLI KATHEER, NOHSAR, AGHBARG, KILLI MEHTARZAI, SAMUNGLI.
40.0000.000
40.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 100% 0.0000.000
1732 Z2019.0519Sibi
CPapproved
CONSTRUCTION OF WSS FOR NEW POPULATION VILLAGE TALLI-II SIB
17.0700.000
17.070 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 58% 7.0700.000
1731 Z2019.0506Quetta
CPapproved
WSS AT KUCHLAK, BALELI, KILLI KATHEER, NOHSAR, KILLI MEHTARZAI IN PB-24 ETC
25.0000.000
25.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 100% 0.0000.000
1730 Z2019.0496Quetta
CPapproved
WSS AND WATER STORAGE TANK AT KHALID KHAN GULISTAN.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1729 Z2019.0493Quetta
CPapproved
WSS AT BALELI, KILLI SUFI, AGHBARG, PANJPAI, SHEIKHMANDA & CHASHMA
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
1728 Z2019.0492Quetta
CPapproved
PROV OF PE PIPES AT AGHBARG, BALELI, KUCHLAK, KARAK, SAMALI, SHEIKHMANDA, CHASHMA, PANJPAI, NOHSAR & KILLI SOFI QTA
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
1727 Z2019.0482Quetta
CPapproved
PROVIDING AND LAYING OF PIPELINE AND CONSTRUCTION OF OHSR 20000 GALLONS FOR HUDDA AND KILLI ISMAIL.
21.5000.000
21.500 0.0000.000
0.000 0% 21.5000.000
0.000 21.500 100% 0.0000.000
1726 Z2019.0467Quetta
CPapproved
CONSTRUCTION OF WSS KAITI RAISANI AND KILLI ARBABAN HUDDA, QUETTA.
10.5000.000
10.500 0.0000.000
0.000 0% 10.5000.000
0.000 10.500 100% 0.0000.000
1725 Z2019.0466Zhob
CPapproved
WSS KILLI GHARZAI BAKHTPOOR M. KHAIL, NARAI TARKHA SAMIULLAH MIR KHAIL, SAMBAZA HAJI KARIM, ESSAZAI MANDOKHAIL.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1724 Z2019.0465Quetta
CPapproved
CONSTRUCTION OF WSS KILLI GUL ABAD SIRKI, QUETTA.
10.5000.000
10.500 0.0000.000
0.000 0% 10.5000.000
0.000 10.500 100% 0.0000.000
1723 Z2019.0464Zhob
CPapproved
WSS IN KILLIS SANTOI BABAR, ORBALAN BABAR MALAK ZAHIR, GARDA BABAR, DANA ABDULLAH ZAI, REH: WSS KILLI SHIN KACH.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1722 Z2019.0463Zhob
CPapproved
WSS KILI WALAMA MOHDKHEL HAJI SAFAR KHAN,GULZARKHEL AKBER KHN/BALOCH KHN,TABLIGHI MARKAZ, PIRKAI BABAR,MANDAZAI BABAR
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1721 Z2019.0460Zhob
CPapproved
WSS KILLI WACH GHABARG HAYAT THOLAKHAIL, CHURMA ADAM LALAKHAL, GHARZAI BAKHTPOOR MOHD KHAIL, AKOZAI, INZARA, GUL KACH
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 159: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/159.jpg)
Public Sector Development Programme (Sectorwise)
155 of 214
1751 Z2019.0566Sibi
CPapproved
SUPPLY & INSTAL: OF PURIFICATION PLANTS FOR G GRILS&BOYS COLLEGE,NURSING HOSTEL,GIRLS SCHOOL SIBI,BOYS SCHOOL LEHRI
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1750 Z2019.0559Quetta
CPapproved
AUGMENTATION OF WSS FOR HAZARA QABRISTAN TUBEWELL FOR HAZARA TOWN, QUETTA.
5.0000.000
5.000 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 100% 0.0000.000
1749 Z2019.0558Quetta
CPapproved
AUGMENTATION OF WSS FOR ALI TOWN TUBEWELL FOR HAZARA TOWN, QUETTA.
5.0000.000
5.000 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 100% 0.0000.000
1748 Z2019.0557Quetta
CPapproved
AUGMENTATION OF WSS FOR IQBAL ABAD TUBEWELL FOR HAZARA TOWN, QUETTA.
5.0000.000
5.000 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 100% 0.0000.000
1747 Z2019.0556Quetta
CPapproved
AUGMENTATION OF WSS FOR BAHADUR ABAD TUBEWELL FOR HAZARA TOWN, QUETTA.
5.0000.000
5.000 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 100% 0.0000.000
1746 Z2019.0555Quetta
CPapproved
REPLACEMENT OF RUSTY PIPELINES OF OLD WSS HAZARA TOWN QUETTA.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1745 Z2019.0554Quetta
CPapproved
CONSTRUCTION OF OHCR 2 LACS GALLON + PIPELINE, NEAR HAZARA QABRISTAN, HAZARA TOWN, QUETTA.
15.0000.000
15.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 66% 5.0000.000
1744 Z2019.0553Quetta
CPapproved
CONSTRUCTION OF WSS KARKHASA VALLEY (FOR HAZARA TOWN), WESTERN BYPASS, QUETTA.
8.5000.000
8.500 0.0000.000
0.000 0% 8.5000.000
0.000 8.500 100% 0.0000.000
1743 Z2019.0552Quetta
CPapproved
CONSTRUCTION OF WSS UPPER KIRANI ROAD (FOR HAZARA TOWN), WESTERN BYPASS, QUETTA.
8.6000.000
8.600 0.0000.000
0.000 0% 8.6000.000
0.000 8.600 100% 0.0000.000
1742 Z2019.0551Quetta
CPapproved
CONSTRUCTION OF WSS BADEZAI TOWN (FOR PASHTOON BAGH & KHILJI ABAD), WESTERN BYPASS, QUETTA.
8.5000.000
8.500 0.0000.000
0.000 0% 8.5000.000
0.000 8.500 100% 0.0000.000
1741 Z2019.0550Quetta
CPapproved
CONSTRUCTION OF WSS CHILTAN-I, WESTERN BYPASS TOWARDS EAST (FOR HAZARA TOWN), DAMAN E KOH, QUETTA.
8.0000.000
8.000 0.0000.000
0.000 0% 8.0000.000
0.000 8.000 100% 0.0000.000
1740 Z2019.0549Quetta
CPapproved
CONSTRUCTION OF WSS HAZARA QABRISTAN, HAZARA TOWN, WESTERN BYPASS, QUETTA.
7.6000.000
7.600 0.0000.000
0.000 0% 7.6000.000
0.000 7.600 100% 0.0000.000
1739 Z2019.0548Quetta
CPapproved
CONSTRUCTION OF WSS KILLA KIAZAI, WESTERN BYPASS, QUETTA.
7.8000.000
7.800 0.0000.000
0.000 0% 7.8000.000
0.000 7.800 100% 0.0000.000
1738 Z2019.0547Quetta
CPapproved
CONSTRUCTION OF WSS KHALIQ ABAD / AMINABAD NEAR FC CHECK POST, NEAR WESTERN BYPASS, QUETTA
8.0000.000
8.000 0.0000.000
0.000 0% 8.0000.000
0.000 8.000 100% 0.0000.000
1737 Z2019.0526Sibi
CPapproved
CONST OF WSS: WATER TANK ALONG WITH SOLAR SYSTEM FOR RHC IN LEHRI, TALLI AND LUNI, DISTRICT SIBI
13.0000.000
13.000 0.0000.000
0.000 0% 13.0000.000
0.000 13.000 100% 0.0000.000
1736 Z2019.0524Sibi
CPapproved
IMPROVEMENT OF WSS LEHRI TOWN
24.6700.000
24.670 0.0000.000
0.000 0% 24.6700.000
0.000 24.670 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 160: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/160.jpg)
Public Sector Development Programme (Sectorwise)
156 of 214
1765 Z2019.0628Jaffarabad
CPapproved
PROV:& INSTAL:OF WATER FILTRATION PLANT FOR VILLAGES ABDUL HAMEED, GHULAM QAIR ETC TEHSIL USTA MUHD & GANDAKHA.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1764 Z2019.0626Shirani
CPapproved
CONST: OF WSS SHEERI ZUGHAMAI LAWARAAREA DAM, SHERANI.
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
1763 Z2019.0623Shirani
CPapproved
CONST: OF WSS WITH SOLAR SYSTEM AT KILLI IBRAHIM KHEL (PARWARA), HAJI NAZAR KHAN HARIFAL, SHERAO & OTHERS
21.4370.000
21.437 0.0000.000
0.000 0% 21.4370.000
0.000 21.437 100% 0.0000.000
1762 Z2019.0622Shirani
CPapproved
REH: OF WSS INZER KHAIZAI,KILLI KAPIP, KROAI WASTA, KILLI MANKAI TOOR GHUNDAI, LAWARAH SHERANI.
24.5000.000
24.500 0.0000.000
0.000 0% 24.5000.000
0.000 24.500 100% 0.0000.000
1761 Z2019.0621Musa Khail
CPapproved
CONST OF WSS KILLI ZERI BAND MUSAKHEL, SUR GHUND U/C TOIR SAR & REPL OF PIPE LINE OLD WSSRARASHAM TOWN
24.8440.000
24.844 0.0000.000
0.000 0% 24.8440.000
0.000 24.844 100% 0.0000.000
1760 Z2019.0620Jaffarabad
CPapproved
CONSTRUCTION OF NEW WATER SUPPLY SCHEMES VILLAGE MOULA BALCHSH DASHTI U/C BAND MANIK.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1759 Z2019.0619Musa Khail
CPapproved
CONST OF WSS KILLI MOHD SHAH ZARAD RARASHAM, LAHANI MUHELLA RARASHAM TOWN, NOOR SHAH SHAM, ETC.
36.9380.000
36.938 0.0000.000
0.000 0% 36.9380.000
0.000 36.938 100% 0.0000.000
1758 Z2019.0618Jaffarabad
CPapproved
EXTENSION AND IMPROVEMENT OF WATER SUPPLY SCHEMES ALI ABAD TEHSIL USTA MUHAMMAD.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1757 Z2019.0617Musa Khail
CPapproved
CONST OF WSS MOHD SULMAN KINGRI, MERA KHAN LAKHAI, MUSTAFA SHAMERZAI KINGRI, REHMAT KHANSOOR KINGRI, ETC.
27.1000.000
27.100 0.0000.000
0.000 0% 27.1000.000
0.000 27.100 100% 0.0000.000
1756 Z2019.0616Jaffarabad
CPapproved
EXTENSION AND IMPROVEMENT OF WATER SUPPLY SCHEMES FAISAL KOT TEHSIL USTA MUHAMMAD.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1755 Z2019.0615Musa Khail
CPapproved
CONST OF WSS KILLI SAMI AGHBERG KARGHAL, CHAPPAR ESSOT, MUFTI ESSA NALI BUGHDADZAI, TOORAK KHURAMZAI
35.6810.000
35.681 0.0000.000
0.000 0% 35.6810.000
0.000 35.681 100% 0.0000.000
1754 Z2019.0614Jaffarabad
CPapproved
EXTENSION AND IMPROVEMENT OF WATER SUPPLY SCHEMES KHAN PUR JAMALI TEHSIL USTA MUHAMMAD
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1753 Z2019.0598Kech
CPapproved
WSS NASEEB Q. B BAZAR DAZEN, LALLEN BAZAR K.ABAD, ANWAR CHOGAGAI, BAIDULLAH BAZAR SOLBAND & OTHERS TUMP KECH
35.0000.000
35.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 42% 20.0000.000
1752 Z2019.0568Kech
CPapproved
REH: OF WSS TUMP CITY, WSS BALOCHABAD TUMP, EXISTING WSS IN SUB DIVISION TUMP.
18.0000.000
18.000 0.0000.000
0.000 0% 18.0000.000
0.000 18.000 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 161: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/161.jpg)
Public Sector Development Programme (Sectorwise)
157 of 214
1781 Z2019.0682Nushki
CPapproved
CONSTT: OF WSS FOR KILLI JAMAL ABAD NOKJOW NUSHKI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1780 Z2019.0681Nushki
CPapproved
CONSTT: OF WSS FOR KILLI MUHAMMAD KHAN, KILLI NAIK MUHAMMAD, KILLI RARHUK MALL ABAD NUSHKI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1779 Z2019.0680Nushki
CPapproved
CONSTT: OF WSS FOR KILLLIES SYED KHAN, KILLI AHMED WALL NAZD KILLI FAQEERAN NUSHKI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1778 Z2019.0679Nushki
CPapproved
CONSTT: OF WSS FOR KILLI ZANGAL KHAN, KILLI MUBARAK, KILLI MIRZA KHAN NUSHKI.
10.1000.000
10.100 0.0000.000
0.000 0% 10.1000.000
0.000 10.100 100% 0.0000.000
1777 Z2019.0678Nushki
CPapproved
CONSTT: OF WSS FOR KILLI BAGHANI KESHANGI NUSHKI.
10.0500.000
10.050 0.0000.000
0.000 0% 10.0500.000
0.000 10.050 100% 0.0000.000
1776 Z2019.0677Nushki
CPapproved
P&L of G.I PIPE LINE FOR WSS KILLI QAZI ABAD NUSHKI.
10.3000.000
10.300 0.0000.000
0.000 0% 10.3000.000
0.000 10.300 100% 0.0000.000
1775 Z2019.0676Nushki
CPapproved
CONST: OF WSS FOR KILLI HAJI GHULAM HUSSAN TARI KISANKORI NUSHKI.
10.0500.000
10.050 0.0000.000
0.000 0% 10.0500.000
0.000 10.050 100% 0.0000.000
1774 Z2019.0675Nushki
CPapproved
CONST: OF WSS FOR KILLI DARZI CHA NUSHKI.
10.2000.000
10.200 0.0000.000
0.000 0% 10.2000.000
0.000 10.200 100% 0.0000.000
1773 Z2019.0674Nushki
CPapproved
CONST: OF WSS FOR KILLI SAHIB ZADA NUSHKI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1772 Z2019.0673Nushki
CPapproved
CONST: OF WSS FOR KILLI SARDAR BADINI NUSHKI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1771 Z2019.0672Nushki
CPapproved
CONST: OF WSS FOR KILLI QADIR ABAD MASHREQI NUSHKI.
10.0500.000
10.050 0.0000.000
0.000 0% 10.0500.000
0.000 10.050 100% 0.0000.000
1770 Z2019.0671Nushki
CPapproved
CONST: OF WSS FOR KILLI MENGAL NUSHKI.
10.0500.000
10.050 0.0000.000
0.000 0% 10.0500.000
0.000 10.050 100% 0.0000.000
1769 Z2019.0659Quetta
CPapproved
CONST: OF WSS AT LOHER KAREZ & KILLI SHAHOZAI QUETTA
15.5000.000
15.500 0.0000.000
0.000 0% 15.5000.000
0.000 15.500 100% 0.0000.000
1768 Z2019.0658Quetta
CPapproved
CONST: OF WSS AT KILLI FEROZABAD & KILLI SABZAL QUETTA.
14.5000.000
14.500 0.0000.000
0.000 0% 14.5000.000
0.000 14.500 100% 0.0000.000
1767 Z2019.0657Quetta
CPapproved
CONST: OF WSS AT KILLI BANGULZAI WAPDA GRID & KASHMIRABAD QAMBRANI ROAD QUETTA
16.0000.000
16.000 0.0000.000
0.000 0% 16.0000.000
0.000 16.000 100% 0.0000.000
1766 Z2019.0647Shirani
CPapproved
CONST OF WSS KILLI SHIN GHER,KILLI DAWEL GUD SHERANI, KILLI DERYA KHAN ZAIHARIFAL SHERANI.
17.5000.000
17.500 0.0000.000
0.000 0% 17.5000.000
0.000 17.500 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 162: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/162.jpg)
Public Sector Development Programme (Sectorwise)
158 of 214
1797 Z2019.0746Loralai
CPapproved
WSS KILLI ZANGIWAL KUDEZAI & KILLI SAGAR, LORALAI.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1796 Z2019.0744Loralai
CPapproved
WSS KILLI MURTAT, DILLI, SAPIYAN NASARAN, DARGAI KUDEZAI & REH OF WSS SHABOZAI LORALAI.
28.0000.000
28.000 0.0000.000
0.000 0% 28.0000.000
0.000 28.000 100% 0.0000.000
1795 Z2019.0742Loralai
CPapproved
WSS KILLI IBRAHIM KUNDI NASARABAD AND REH OF ORIAGAI KAKARAN LORALAI.
14.0000.000
14.000 0.0000.000
0.000 0% 14.0000.000
0.000 14.000 100% 0.0000.000
1794 Z2019.0741Loralai
CPapproved
REH: OF WSS DARGAI SARGARAH, GURMAI JUMA KHAN & KACH AMAQZAI UC KACH AMAQZAI DISTRICT LORALAI.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1793 Z2019.0739Loralai
CPapproved
REH: OF WSS LORALAI TOWN TO NASAR ABAD AREA.
50.8000.000
50.800 0.0000.000
0.000 0% 50.8000.000
0.000 50.800 100% 0.0000.000
1792 Z2019.0738Loralai
CPapproved
REH: OF WSS LORALAI TOWN TO RODLIN AND BUKHARI SCHEME AREA.
71.7000.000
71.700 0.0000.000
0.000 0% 71.7000.000
0.000 71.700 100% 0.0000.000
1791 Z2019.0737Loralai
CPapproved
AUGMENTATION OF WSS LORALAI TOWN TO MODEL TOWN/MUSLIM ABAD AREA.
78.7000.000
78.700 0.0000.000
0.000 0% 78.7000.000
0.000 78.700 100% 0.0000.000
1790 Z2019.0728Kachhi
CPapproved
WATER SUPPLY SCHEME KALOI. 30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
1789 Z2019.0727Kachhi
CPapproved
REHABILITATION OF NAGHARI WATER SUPPLY.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
1788 Z2019.0726Kachhi
CPapproved
REHABILITATION OF AL BURZ WATER SUPPLY.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
1787 Z2019.0725Kachhi
CPapproved
REHAB OF SHORAN WATER SUPPLY, SUNNRI WATER SUPPLY SHAR E KANDHAR TO MEHSAR WATER SUPPLY, GHELA WATER.
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
1786 Z2019.0724Kachhi
CPapproved
WATER SUPPLY SCHEME MCR SECONDARY HIGH SCHOOL.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1785 Z2019.0715Jhal Magsi
CPapproved
CONSTRUCTION OF WSS VILLAGE DIN MUHAMMAD.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1784 Z2019.0692Quetta
CPapproved
INSTALLATION OF WSS AT WARD NO.2,3,4 AND HALQA NO.2,3,6,25,26,39,40, AND 48 DISTRICT QUETTA.
150.0000.000
150.000 0.0000.000
0.000 0% 150.0000.000
0.000 150.000 100% 0.0000.000
1783 Z2019.0685Nushki
CPapproved
CONSTT: OF WSS FOR KILLI NASEER ABAD, QAZI ABAD WARD NO 4 NUSHKI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1782 Z2019.0684Nushki
CPapproved
SUPPLY AND INSTALLATION OF PVC LINE FOR WSS NUSHKI.
10.1500.000
10.150 0.0000.000
0.000 0% 10.1500.000
0.000 10.150 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 163: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/163.jpg)
Public Sector Development Programme (Sectorwise)
159 of 214
1813 Z2019.0842Kech
CPapproved
CONST: OF WSS ALLAH BAKHT KALATUK TURBAT.
8.0000.000
8.000 0.0000.000
0.000 0% 8.0000.000
0.000 8.000 100% 0.0000.000
1812 Z2019.0841Kech
CPapproved
E&I OF WSS NEW BALOCHABAD FOR SAKI DAD BAZAR, GAYBUN TURBAT
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1811 Z2019.0840Kech
CPapproved
E&I OF WSS 1). KOLWAHI BAZAR. 2). KOSHKALAT. 3). SHAHI TUMP. 4). TURBAT TOWN. 5). ABSOR
7.5000.000
7.500 0.0000.000
0.000 0% 7.5000.000
0.000 7.500 100% 0.0000.000
1810 Z2019.0836Kech
CPapproved
AUG: OF TOWN SHIP WSS PHE SUB DIVISION TURBAT
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1809 Z2019.0832Khuzdar
CPapproved
WSS IN KILLIES, RAEES JALAL NOORGUMA,PACHAPO ZEHRI, ETC & EXTEN: OF WSS KILLI HAJI MOLA BUX BULAZAI, ETC.
10.5000.000
10.500 0.0000.000
0.000 0% 10.5000.000
0.000 10.500 100% 0.0000.000
1808 Z2019.0830Khuzdar
CPapproved
WSS SCHEME KILLIES , BAJOI BAGHBANA, GORAWA KHATKAPAR, MUHD ISHAQUE UMARANI ABE NOGHAI, ETC.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1807 Z2019.0821Khuzdar
CPapproved
CONST: OF WSS NOORGAMA QADEEM NOORGAMA JADEED,KILLI SHADI KHAN TARASANI AND AZAD NOORGAMA ZEHRI.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1806 Z2019.0803Jaffarabad
CPapproved
EXTENSION & IMPROVEMENT OF WATER SUPPLY SCHEME USTA MUHAMMAD PHASE-II, DIST. JAFFARABAD
37.9000.000
37.900 0.0000.000
0.000 0% 37.9000.000
0.000 37.900 100% 0.0000.000
1805 Z2019.0802Jaffarabad
CPapproved
EXTENSION & IMPROVEMENT OF WATER SUPPLY SCHEME USTA MUHAMMAD PHASE-I, DIST. JAFFARABAD
53.9000.000
53.900 0.0000.000
0.000 0% 53.9000.000
0.000 53.900 100% 0.0000.000
1804 Z2019.0799Kachhi
CPapproved
WATER SUPPLY SCHEME AT VILLAGE MACHI, UNION COUNCIL ESBANI, TEHSIL SUNNI.
6.5000.000
6.500 0.0000.000
0.000 0% 6.5000.000
0.000 6.500 100% 0.0000.000
1803 Z2019.0797Kachhi
CPapproved
WATER SUPPLY SCHEME AT VILLAGE DERA SARDAR KHAN RIND, UNION COUNCIL ESBANI, TEHSIL SUNNI.
6.5000.000
6.500 0.0000.000
0.000 0% 6.5000.000
0.000 6.500 100% 0.0000.000
1802 Z2019.0789Quetta
CPapproved
CONSTRUCTION OF SOLAR WATER SUPPLY SCHEMES WITH OVER HEAD WATER TANK AT SHAHEEN BANGLOWS, SARIAB ROAD.
18.0000.000
18.000 0.0000.000
0.000 0% 18.0000.000
0.000 18.000 100% 0.0000.000
1801 Z2019.0787Quetta
CPapproved
CONSTRUCTION OF WATER SUPPLY SCHEME AT JINNAH TOWN.
7.0000.000
7.000 0.0000.000
0.000 0% 7.0000.000
0.000 7.000 100% 0.0000.000
1800 Z2019.0759Nasirabad
CPapproved
WSS GOTH SYED HASSAN SHAH.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1799 Z2019.0757Nasirabad
CPapproved
CONSTRUCTION OF WSS DERA MURAD JAMALI GHARBI PHASE-II TEHSIL DERA MURAD JAMALI.
90.7000.000
90.700 0.0000.000
0.000 0% 90.7000.000
0.000 90.700 100% 0.0000.000
1798 Z2019.0756Nasirabad
CPapproved
CONSTRUCTION OF WSS DERA MURAD JAMALI SHARQI PHASE-II TEHSIL DERA MURAD JAMALI.
90.7000.000
90.700 0.0000.000
0.000 0% 90.7000.000
0.000 90.700 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 164: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/164.jpg)
Public Sector Development Programme (Sectorwise)
160 of 214
1828 Z2019.0897Qilla
AbdullahCPapproved
CONST: OF WSS KILLI HAJI RANGEEN MURDA KAREZ AND WSS KILLI HAJI HAMEED ULLAH CHAMAN
11.1500.000
11.150 0.0000.000
0.000 0% 11.1500.000
0.000 11.150 100% 0.0000.000
1827 Z2019.0895Qilla
AbdullahCPapproved
"CONSTRUCTION OF WSS KILLI MURDA KAREZ CHAMAN AND WSS KILLI PADO KAREZ DISTRICT KILLA ABDULLAH AT CHAMAN "
188.9900.000
188.990 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 52% 88.9900.000
1826 Z2019.0883Qilla
SaifullahCPapproved
WATER SUPPLY SCHEMES IN KILLI MAMOON, TALARAI MOHD JAN K-SAIFULLAH.
15.0000.000
15.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 66% 5.0000.000
1825 Z2019.0877Qilla
SaifullahCPapproved
SOLAR BASE WSS KILLI KHAN GHUTAI, ABDUL REHMAN & NEW ABADI BATOZAI SARWAR ABAD.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
1824 Z2019.0873Sohbatpur
CPapproved
CONSTRUCTION OF WSS GOTH HAJI JUMAL KHAN BUGTI AND SURROUNDING VILLAGES.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1823 Z2019.0872Sohbatpur
CPapproved
AUGMENTATION OF WSS MUHAMMAD ASLAM JEYANI & SURROUNDING VILLAGES
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1822 Z2019.0871Sohbatpur
CPapproved
AUGMENTATION OF WSS SOHBAT PUR TOWN
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1821 Z2019.0869Qilla
SaifullahCPapproved
CONST OF WSS KILLI YAYA WALL, BADINI BAZAR TOWN, KAJEER LOI BAND MUHALA NEAR DC OFFICE, GHARI KAZA MIRZAI MUSLIM BAGH.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1820 Z2019.0867Qilla
SaifullahCPapproved
CONSTRUCTION OF WSS KILLI SPINGAI LOI BAND, GARSALMAN, KAZA BAYANA KACHH MALAZAI MUSLIM BAGH.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1819 Z2019.0864Qilla
SaifullahCPapproved
CONSTRUCTION OF WSS BY PASS MUSLIM BAGH TOWN, MARPAL KAN MEHTARZAI,GWAL ISMAILZAI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1818 Z2019.0860Qilla
SaifullahCPapproved
CONST OF WSS KILLI MARGHA FAKEERZAI, SHINKAI, MADDRASSA ARABIA, WARATALARY, LOI BAND, KHUSAN LOI BAND, SIRKAI LOI BAND.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1817 Z2019.0855Qilla
SaifullahCPapproved
CONST: OF WSS KILLI JHANGIR, PEWARA GHAROZAI, NAJEEB UD DIN LOI BAND, RUSTOM KHAIL BADINI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1816 Z2019.0847Kech
CPapproved
E&I OF WSS SORAG BAZAR TURBAT
2.1000.000
2.100 0.0000.000
0.000 0% 2.1000.000
0.000 2.100 100% 0.0000.000
1815 Z2019.0844Kech
CPapproved
E&I OF WSS SHAHI TUMP DASHTI BAZAR KOSHKALAT TURBAT
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1814 Z2019.0843Kech
CPapproved
CONST: OF WSS SHAHABAD ABSOR KECH.
13.0000.000
13.000 0.0000.000
0.000 0% 13.0000.000
0.000 13.000 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 165: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/165.jpg)
Public Sector Development Programme (Sectorwise)
161 of 214
1843 Z2019.0956Khuzdar
CPapproved
WSS RAIN LANGOVE NAAL, WSS CHOTAPARKO & WSS KATTAN DIST. KHUZDAR.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1842 Z2019.0949Awaran
CPapproved
CONST:OF WSS A/W S.SYSTEM IN KELLIES RODAIN TAJ.M GOTH SUNDOM, RAHIM BAKHSH Z.KANDARI, S.BAZAR LABACH, & OTHER
19.0750.000
19.075 0.0000.000
0.000 0% 19.0750.000
0.000 19.075 100% 0.0000.000
1841 Z2019.0948Awaran
CPapproved
CONST:OF WSS A/W S.SYSTEM IN KELLIES AZIZ LAL.M GOTH MAROOKI,ALAM CHANAL BAZAG GOTH, HAJI LAL JAN LIQAT & OTHER
11.3750.000
11.375 0.0000.000
0.000 0% 11.3750.000
0.000 11.375 100% 0.0000.000
1840 Z2019.0946Awaran
CPapproved
CONST: OF WSS A/W S.SYSTEM IN KELLIES AYUB BAZAR GOOSHNAG, IMAM BAKHSH BAZAR SAARI MALAR, W.BAKHSH & OTHER
11.3750.000
11.375 0.0000.000
0.000 0% 11.3750.000
0.000 11.375 100% 0.0000.000
1839 Z2019.0945Awaran
CPapproved
CONST:OF WSS A/S.SYSTEM IN KELLIES A.WAHID BAZAR SUNDUM, MAJBOOR ABAD S.MALDAR, BADAL.S BAZAR MALLAR & OTHERS
11.3750.000
11.375 0.0000.000
0.000 0% 11.3750.000
0.000 11.375 100% 0.0000.000
1838 Z2019.0915Khuzdar
CPapproved
CONST: OF WSS HAZARGANJI, DERNALI, GAROK NALL.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1837 Z2019.0914Khuzdar
CPapproved
CONST: OF WSS ARANJI, KANJAR, KARARO, SANARO WADH.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1836 Z2019.0913Khuzdar
CPapproved
CONST: OF WSS SARONA, SHAH NOORANI WADH.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1835 Z2019.0911Qilla
AbdullahCPapproved
CONSTRUCTION OF WSS BYPASS ROAD NO.-2 CHAMAN AND WSS KILLI TAKEDAR-I CHAMAN
18.6340.000
18.634 0.0000.000
0.000 0% 18.6340.000
0.000 18.634 100% 0.0000.000
1834 Z2019.0906Qilla
AbdullahCPapproved
CONST:WSS KILLIHAJI SALAH UDDIN SIRAJUDDIN & WSS KILLI MURDA KAREZ CULAN KAHOL CHAMAN
18.9360.000
18.936 0.0000.000
0.000 0% 18.9360.000
0.000 18.936 100% 0.0000.000
1833 Z2019.0905Qilla
AbdullahCPapproved
CONSTRUCTION OF WSS CITY TOWN GUL BARAN SARDA WAHAB AND WSS KILLI CHAMAN TOWN DISTRICT KILLA ABDULLAH AT CHAMAN.
18.5460.000
18.546 0.0000.000
0.000 0% 18.5460.000
0.000 18.546 100% 0.0000.000
1832 Z2019.0904Qilla
AbdullahCPapproved
CONST:OF WSS KILLI MURDA KAREZ-2 AND WSS KILLI ZARGHOON ABAD CHAMAN
10.6200.000
10.620 0.0000.000
0.000 0% 10.6200.000
0.000 10.620 100% 0.0000.000
1831 Z2019.0903Qilla
AbdullahCPapproved
CONSTRUCTION OF WSS KILLI GUL ARDOZAI AND WSS KILLI HAJI SALAHUDDIN ZAREEN CHAMAN
14.8930.000
14.893 0.0000.000
0.000 0% 14.8930.000
0.000 14.893 100% 0.0000.000
1830 Z2019.0901Qilla
AbdullahCPapproved
S&I OF PUMPING MACHINERY WATER SUPPLY SCHEMES SUPPLYING & LAYING OF PVC PIPE LINE FOR EXISTING WSS CHAMAN
18.2000.000
18.200 0.0000.000
0.000 0% 18.2000.000
0.000 18.200 100% 0.0000.000
1829 Z2019.0898Qilla
AbdullahCPapproved
CONSTRUCTION OF WSS KILLI MURDA KAREZ JAN KAHOL AND WSS KILLI ANDSOZ CHOWK-2 CHAMAN
18.6000.000
18.600 0.0000.000
0.000 0% 18.6000.000
0.000 18.600 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 166: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/166.jpg)
Public Sector Development Programme (Sectorwise)
162 of 214
1856 Z2019.1014Awaran
CPapproved
CONST: OF WSS ALONGWITH SOLAR SYSTEM IN KELLIES HAJI MIRAN GOTH KUMBI JAHOO,ZIARAT DUN PIRANDER & OTHERS
11.3750.000
11.375 0.0000.000
0.000 0% 11.3750.000
0.000 11.375 100% 0.0000.000
1855 Z2019.1009Harnai
CPapproved
WSS & INSTAL: OF SOLAR SYSTEM WITH BORE AT SHIN LESA KHOST & KILLI MALIK SAADULLAH DIST. HARNAI.
10.1200.000
10.120 0.0000.000
0.000 0% 10.1200.000
0.000 10.120 100% 0.0000.000
1854 Z2019.1002Gwadar
CPapproved
WSS CHIBWARI KULANCH, KALMAT AND GAWADAR
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
1853 Z2019.0991Panjgur
CPapproved
WSS WITH SOLAR SYST IN KELLIES, ABDULLAH BAZAR RAISH PEESH PAROOM, KOHBUN PANJGOOR, DUZ PAROOM AMEER BAZAR, & OTHERS
11.3750.000
11.375 0.0000.000
0.000 0% 11.3750.000
0.000 11.375 100% 0.0000.000
1852 Z2019.0981Panjgur
CPapproved
WSS WITH SOLAR SYST IN KELLIES, HAZOOR BAKHSH BAZAR PANCHI, A.KARIM BAZAR PANCHI,SAIBKAHAN,SURAAP & OTHERS.
11.3750.000
11.375 0.0000.000
0.000 0% 11.3750.000
0.000 11.375 100% 0.0000.000
1851 Z2019.0979Mastung
CPapproved
CONSTT: OF WSS WITH SOLAR SYSTEM AT KILLI MALIK SAFIADEEN KANDAWA DIST. MASTUNG.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1850 Z2019.0978Panjgur
CPapproved
CONST:OF WSS WITH SOLAR SYST IN KELLIES,NOKAR,GHAR,SORCHAL,PATHAN DUR,GORKADAN,PILKOH GUDAMI & ADJOINING AREAS.
16.3750.000
16.375 0.0000.000
0.000 0% 16.3750.000
0.000 16.375 100% 0.0000.000
1849 Z2019.0976Awaran
CPapproved
CONST: OF WSS ALONGWITH SOLAR SYSTEM IN VARIOUS KELLIES MOHAMMAD A.BAZAR GICHK, JOHAN KARKIDAAL & ADJOINING AREAS.
13.0650.000
13.065 0.0000.000
0.000 0% 13.0650.000
0.000 13.065 100% 0.0000.000
1848 Z2019.0975Quetta
CPapproved
CONST: OF WSS IN MCQ COLONY HAZARA TOWN, CHRISTIAN COLONY KHIAZAI, CHRISTIAN HOUSING SCHEEM KOTWALL, QUETTA
21.0000.000
21.000 0.0000.000
0.000 0% 21.0000.000
0.000 21.000 100% 0.0000.000
1847 Z2019.0974Mastung
CPapproved
CONST: OF WSS WITH SOLAR SYSTEM AT KILLI QAZIYAN DIST. MASTUNG
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1846 Z2019.0973Panjgur
CPapproved
WSS WITH SOLAR SYST IN KELLIES,KALLARI, S.KHAN, KHUWASTI KAN, SAR GAZ BAZAR, S.SAJADI CHIB GICHK BAZAR PANJGOR.
11.3750.000
11.375 0.0000.000
0.000 0% 11.3750.000
0.000 11.375 100% 0.0000.000
1845 Z2019.0971Kalat
CPapproved
CONST: OF WSS KILLI RAIS FAQIR MOHAMMAD KHESON DOON, KIL.MOHD. SHAHI MALIKI, KILLI KHATRENZAN (SOLAR BASED) KALAT
24.2000.000
24.200 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 82% 4.2000.000
1844 Z2019.0958Pishin
CPapproved
CONST:OF WSS KILLI BATEZAI & PROV: OF ELECTRICITY & MACHINERY FOR WSS AT TEH: HURAM ZAI KILLI GANGLZAI, HAJZAI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 167: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/167.jpg)
Public Sector Development Programme (Sectorwise)
163 of 214
1869 Z2019.1033Awaran
CPapproved
CONST: OF WSS A/W S.SYSTEM IN KELLIES S.NONDARA,SEHRAK NONDARA,MOLVI A.WAHAB G.MASHKAY,M.AYUB BANDAIL & OTHER
11.3750.000
11.375 0.0000.000
0.000 0% 11.3750.000
0.000 11.375 100% 0.0000.000
1868 Z2019.1032Awaran
CPapproved
CONST: OF WSS A/W S.SYSTEM IN KELLIES S.SAJJADI G.JAHOO, M.SULIMAN G. SOORH JAHOO,B.KHAIR ABAD BAZDAD,& OTHER
11.3750.000
11.375 0.0000.000
0.000 0% 11.3750.000
0.000 11.375 100% 0.0000.000
1867 Z2019.1031Awaran
CPapproved
CONST: OF WSS ALONGWITH SOLAR SYSTEM IN KELLIES N.MUSA GOTH, MURAD JAN SAIB N.MOHAMMED GUJJAR & OTHERS
11.3750.000
11.375 0.0000.000
0.000 0% 11.3750.000
0.000 11.375 100% 0.0000.000
1866 Z2019.1030Pishin
CPapproved
CONST:OF WSS. & INST: OF SOLAR SYSTEM WITH PIPELINE FOR KILLI JALALABAD QALA BATAIZAI, TEHSIL PISHIN.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1865 Z2019.1029Awaran
CPapproved
CONST: OF WSS ALONGWITH SOLAR SYSTEM IN KELLIES IN DUR M.BASHIR GOTH KOOTO JAHO,SHAKI DAD SASTAGAN & OTHERS
11.3750.000
11.375 0.0000.000
0.000 0% 11.3750.000
0.000 11.375 100% 0.0000.000
1864 Z2019.1028Awaran
CPapproved
CONSTRUCTION OF WSS ALONGWITH SOLAR SYSTEM IN KELLIES H.BASHIR H.GOTH, DAROGA QAMBAR DATI,ABDU GOTH & OTHERS
14.3590.000
14.359 0.0000.000
0.000 0% 14.3590.000
0.000 14.359 100% 0.0000.000
1863 Z2019.1027Awaran
CPapproved
CONST:OF WSS ALONGWITH SOLAR SYSTEM IN KELLIES E.NODU MAROOKI,M.BAKHSH LAGASI ,M.SALA SARMASTANI , & OTHERS
11.3750.000
11.375 0.0000.000
0.000 0% 11.3750.000
0.000 11.375 100% 0.0000.000
1862 Z2019.1026Awaran
CPapproved
CONST: OF WSS ALONGWITH SOLAR SYSTEM IN KELLIES RAZA MOHAMMED GOTH KORRO,CHANAL GAZI GOTH DAMB JAHOO,& OTHER
11.3750.000
11.375 0.0000.000
0.000 0% 11.3750.000
0.000 11.375 100% 0.0000.000
1861 Z2019.1024Awaran
CPapproved
CONSTRUCTION OF WSS ALONGWITH SOLAR SYSTEM IN KELLIES AMER BAKHSH YAQOOB GOTH TEERTAIJ,HAJI JAN & OTHERS
11.3750.000
11.375 0.0000.000
0.000 0% 11.3750.000
0.000 11.375 100% 0.0000.000
1860 Z2019.1023Awaran
CPapproved
CONSTRUCTION OF WSS ALONGWITH SOLAR SYSTEM IN KELLIES ALI AKBAR BAZAR ZEEK,SHAHDAD UMER SHADI GISHKOR,& OTHER
11.3750.000
11.375 0.0000.000
0.000 0% 11.3750.000
0.000 11.375 100% 0.0000.000
1859 Z2019.1020Awaran
CPapproved
CONSTRUCTION OF WSS ALONGWITH SOLAR SYSTEM IN KELLIES ATTA MUHAMMAD GOTH GHANDCHAI,HAR BAZAR MARASHUM,& OTHER
11.3750.000
11.375 0.0000.000
0.000 0% 11.3750.000
0.000 11.375 100% 0.0000.000
1858 Z2019.1018Awaran
CPapproved
CONST: OF WSS ALONGWITH SOLAR SYSTEM IN KELLIES HAJI MIRAN GOTH KUMBI JAHOO,ZIARAT DUN PIRANDER & OTHERS
11.3750.000
11.375 0.0000.000
0.000 0% 11.3750.000
0.000 11.375 100% 0.0000.000
1857 Z2019.1017Ziarat
CPapproved
WSS FOR KILLI MALAK AKHTAR MUHAMMAD MANNA & KILLI MALIK HALEEM SHORT CUT, DIST. ZIARAT.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 168: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/168.jpg)
Public Sector Development Programme (Sectorwise)
164 of 214
1883 Z2019.1060Pishin
CPapproved
CONST: OF WSS AT KARBALA DAVIAN MUHALLA, TEHSIL HURAMZAI, DIST. PISHIN.
7.5000.000
7.500 0.0000.000
0.000 0% 7.5000.000
0.000 7.500 100% 0.0000.000
1882 Z2019.1059Pishin
CPapproved
CONST: OF WSS AT KILLI TORKHAIL ZARKHAIL, TEHSIL HURAMZAI, DIST. PISHIN.
7.5000.000
7.500 0.0000.000
0.000 0% 7.5000.000
0.000 7.500 100% 0.0000.000
1881 Z2019.1058Pishin
CPapproved
CONST: OF WSS KILLI BASHA U/C AJRUM, TEHSIL SARANAN, DIST. PISHIN.
7.5000.000
7.500 0.0000.000
0.000 0% 7.5000.000
0.000 7.500 100% 0.0000.000
1880 Z2019.1057Pishin
CPapproved
WSS KILLI MANZARAI ASHAZAI, TEHSIL SARANAN, DIST. PISHIN.
7.5000.000
7.500 0.0000.000
0.000 0% 7.5000.000
0.000 7.500 100% 0.0000.000
1879 Z2019.1056Pishin
CPapproved
CONST:OF WSS KILLI KARBALA, DIST. PISHIN.
7.5000.000
7.500 0.0000.000
0.000 0% 7.5000.000
0.000 7.500 100% 0.0000.000
1878 Z2019.1055Pishin
CPapproved
CONST: OF WSS KILLI HURAMZAI, DIST. PISHIN.
7.5000.000
7.500 0.0000.000
0.000 0% 7.5000.000
0.000 7.500 100% 0.0000.000
1877 Z2019.1054Pishin
CPapproved
WSS FOR KILLI SYED ABDUL SAMAD, TEHSIL SARANAN, DIST. PISHIN.
7.5000.000
7.500 0.0000.000
0.000 0% 7.5000.000
0.000 7.500 100% 0.0000.000
1876 Z2019.1043Awaran
CPapproved
CONST: OF WSS A/W S.SYSTEM IN KELLIES MAJEED BEDI, FAIZ.M MALLER, BARKAT B.BAZAR ZEEK, N.KEHRAN KORO & OTHER
16.3750.000
16.375 0.0000.000
0.000 0% 16.3750.000
0.000 16.375 100% 0.0000.000
1875 Z2019.1042Awaran
CPapproved
CONST:OF WSS A/W S.SYSTEM IN KELLIES H.SHAMBAY,REHKAN,ATTA.M BAZAR ZEEK,A.UULAH G.KANA ZEELAG, M.NOOR & OTHERS
11.3750.000
11.375 0.0000.000
0.000 0% 11.3750.000
0.000 11.375 100% 0.0000.000
1874 Z2019.1039Awaran
CPapproved
CONST:OF WSS A/W S.SYSTEM IN KELLIES D.MOHAMMED B.GOTH ZEEK KOLWA B.GOTH NADAGO PIRANDAR,MALANG UMRANI & OTHER
11.3750.000
11.375 0.0000.000
0.000 0% 11.3750.000
0.000 11.375 100% 0.0000.000
1873 Z2019.1038Awaran
CPapproved
CONST:OF WSS A/W S.SYSTEM IN KELLIES S.ULLAH BAZAR,M.GOTH KOOLANJ,SAWALI MAWALI,HASAN G. BAREETH DAMB & OTHER
11.3750.000
11.375 0.0000.000
0.000 0% 11.3750.000
0.000 11.375 100% 0.0000.000
1872 Z2019.1037Awaran
CPapproved
CONST: OF WSS A/W S.SYSTEM IN KELLIES BABO M.BAKHSH G.JOOHAY SAR,NAYA ABADI SAYA QUL, F.MUHAMMED & OTHER
11.3750.000
11.375 0.0000.000
0.000 0% 11.3750.000
0.000 11.375 100% 0.0000.000
1871 Z2019.1036Awaran
CPapproved
CONST:OF WSS A/W S.SYSTEM IN KELLIES M.RAMZAM S.GOTH, H.ULLAH BAZAR KANDARO,SOORG, S.BAZAR BAZDAD,& OTHER
11.3750.000
11.375 0.0000.000
0.000 0% 11.3750.000
0.000 11.375 100% 0.0000.000
1870 Z2019.1035Awaran
CPapproved
CONST: OF WSS A/W S.SYSTEM IN KELLIES S.ABAD J.MASHKAY, JAMIA MASJID KALAT C.MASHKAY, G.NABI G.SHER & OTHER
11.3750.000
11.375 0.0000.000
0.000 0% 11.3750.000
0.000 11.375 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 169: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/169.jpg)
Public Sector Development Programme (Sectorwise)
165 of 214
1898 Z2019.1107Kalat
CPapproved
WSS KILLI ABDUL SHAKOOR KHALIQ ABAD, KILLI MUBARIK KHALIQ ABAD
18.1000.000
18.100 0.0000.000
0.000 0% 18.1000.000
0.000 18.100 100% 0.0000.000
1897 Z2019.1106Kalat
CPapproved
WSS KILLI AZIZ KHALIQ ABAD, KILLI MAJEED KHALIQ ABAD
17.3000.000
17.300 0.0000.000
0.000 0% 17.3000.000
0.000 17.300 100% 0.0000.000
1896 Z2019.1105Shaheed
Sikandarabad
CPapproved
SOLAR BASED WSS KILLI GUNDAN,KILLI GORANJO,KILLI MORTAKO GIDDER & KILLI MIRAJI CHAD GIDDER DIST. SHAHEED SIKANDERABAD
28.5220.000
28.522 0.0000.000
0.000 0% 28.5220.000
0.000 28.522 100% 0.0000.000
1895 Z2019.1104Shaheed
Sikandarabad
CPapproved
CONSTR. OF SOLAR BASED WSS KILLI BITAGOO, GADAZAI AND KILLI DASH-E- KATAI, DASHT-E- GORAN DIST. SHAHEED SIKANDERABAD
21.9400.000
21.940 0.0000.000
0.000 0% 21.9400.000
0.000 21.940 100% 0.0000.000
1894 Z2019.1103Kalat
CPapproved
WSS KILLI MASTER MURAD CHOTANK KHALIQ ABAD, KHAJAE UNION COUNCIL NACHARA KALAT
13.7940.000
13.794 0.0000.000
0.000 0% 13.7940.000
0.000 13.794 100% 0.0000.000
1893 Z2019.1102Shaheed
Sikandarabad
CPapproved
CONSTRUCTION OF SOLAR BASED WSS KILLI JEEWA,KILLI MOLI AND GOWARIGHAN DISTRICT SHAHEED SIKANDERABAD
21.4000.000
21.400 0.0000.000
0.000 0% 21.4000.000
0.000 21.400 100% 0.0000.000
1892 Z2019.1101Kalat
CPapproved
WSS JOHAN KHALIQ ABAD, KILLI CHURRI KHALIQ ABAD
17.7350.000
17.735 0.0000.000
0.000 0% 17.7350.000
0.000 17.735 100% 0.0000.000
1891 Z2019.1100Kalat
CPapproved
WSS MUSTAFA MEERANZAI KHALIQ ABAD, GAJAN KOHAK KHALIQ ABAD
16.1960.000
16.196 0.0000.000
0.000 0% 16.1960.000
0.000 16.196 100% 0.0000.000
1890 Z2019.1099Shaheed
Sikandarabad
CPapproved
CONSTR. OF SOLAR BASED WSS KILLI RODENI GIDDER, KILLI ALIABAD & KILLI MIR ABDUL NABI GIDER DIST. SHAHEED SIKANDERABAD
22.4000.000
22.400 0.0000.000
0.000 0% 22.4000.000
0.000 22.400 100% 0.0000.000
1889 Z2019.1096Kalat
CPapproved
WSS KATELI, NEECHARA KALAT. 11.6790.000
11.679 0.0000.000
0.000 0% 11.6790.000
0.000 11.679 100% 0.0000.000
1888 Z2019.1094Kalat
CPapproved
WSS KILLI PANDRAN KASH, DASHT KALAN KALAT
18.2880.000
18.288 0.0000.000
0.000 0% 18.2880.000
0.000 18.288 100% 0.0000.000
1887 Z2019.1092Kalat
CPapproved
WSS KILLI CHASHMA BANGULZAI, ALIZAI GAIWAN KALAT.
14.8900.000
14.890 0.0000.000
0.000 0% 14.8900.000
0.000 14.890 100% 0.0000.000
1886 Z2019.1090Kalat
CPapproved
WSS ISKALKOO KALAT, AMEERI, PASSHAR, KALAT BAZAR
20.7620.000
20.762 0.0000.000
0.000 0% 20.7620.000
0.000 20.762 100% 0.0000.000
1885 Z2019.1089Kalat
CPapproved
WSS TUGHU CHAPPER KALAT, SAKHI SASOLI NEEMURGH KALAT
18.2280.000
18.228 0.0000.000
0.000 0% 18.2280.000
0.000 18.228 100% 0.0000.000
1884 Z2019.1067Pishin
CPapproved
CONST: OF WSS IN TEHSIL SARANAN & HURAMZAI AT KILLI MALIZAI, MANZARAI IBRAHIMZ, SAINZAI, BASHA ETC
24.0000.000
24.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 41% 14.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 170: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/170.jpg)
Public Sector Development Programme (Sectorwise)
166 of 214
1914 Z2019.1136Ziarat
CPapproved
CONSTRUCTION OF NEW WSS POI DISTRICT ZIARAT
40.0000.000
40.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 100% 0.0000.000
1913 Z2019.1135Ziarat
CPapproved
CONSTRUCTION OF WSS SINJAVI BAZAR DISTRICT ZIARAT
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
1912 Z2019.1134Bela
CPapproved
WSS ALONG WITH SOLAR SYSTEM IN SAHIB KHAN GOTH SHAMALI KANRAJ BELA DISTRICT LASBELA
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1911 Z2019.1133Sibi
CPapproved
REHABILITATION OF WSS AND NEW PIPELINES HINDU MOHALLAH SIBI
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1910 Z2019.1132Ziarat
CPapproved
WSS KILLI SYED SHAHEED BABA DISTRICT ZIARAT
8.9700.000
8.970 0.0000.000
0.000 0% 8.9700.000
0.000 8.970 100% 0.0000.000
1909 Z2019.1131Quetta
CPapproved
CONST: OF WSS AT GULSHAN COLONY QUETTA
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1908 Z2019.1130Ziarat
CPapproved
WSS KILLI OUCH AGHBIRG SINJAVI TEHSIL DISTRICT ZIARAT
13.0000.000
13.000 0.0000.000
0.000 0% 13.0000.000
0.000 13.000 100% 0.0000.000
1907 Z2019.1129Quetta
CPapproved
WSS AT AKHTAR MOHAMMAD ROAD LACHI MOHALLAH QUETTA.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1906 Z2019.1128Chagai
CPapproved
WSS OVERHEAD TANK PIPELINES AND WITH ALL COMPONENTS R.O PLANT HINDU MOHALLAH DALBANDIN.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1905 Z2019.1127Ziarat
CPapproved
WSS KILLI MALAK KHANAN SINJAVI TEHSIL DISTRICT ZIARAT
10.5000.000
10.500 0.0000.000
0.000 0% 10.5000.000
0.000 10.500 100% 0.0000.000
1904 Z2019.1126Ziarat
CPapproved
WSS KILLI AGHBARG KANOBI SANJAVI TEHSIL DISTRICT ZIARAT.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1903 Z2019.1125Ziarat
CPapproved
EXTENSION IMPROVEMENT OF WATER SUPPLY SCHEME KILLI KAWAS DISTRICT ZIARAT
18.0000.000
18.000 0.0000.000
0.000 0% 18.0000.000
0.000 18.000 100% 0.0000.000
1902 Z2019.1124Jhal Magsi
CPapproved
REHABILITATION AND EXTENSION WSS OVERHEAD TANK WITH NEW PIPELINES GANDAHWA DISTRICT JHALLMAGSHI.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
1901 Z2019.1123Ziarat
CPapproved
EXTENSION & IMPROVEMENT OF WATER SUPPLY SCHEME DISTRICT ZIARAT TOWN
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
1900 Z2019.1110Kalat
CPapproved
WSS MIR JAN KHALIQ ABAD, KILLI KHAIR MUHAMMAD KHALIQ ABAD, MIR MANZOOR LANGAU KILLI KHALIQ ABAD
24.2000.000
24.200 0.0000.000
0.000 0% 24.2000.000
0.000 24.200 100% 0.0000.000
1899 Z2019.1109Kalat
CPapproved
WSS KILLI FATEH MOHAMMAD KHALIQ ABAD, KILLI MALIK JAN KHAN KHALIQ ABAD
16.6000.000
16.600 0.0000.000
0.000 0% 16.6000.000
0.000 16.600 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 171: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/171.jpg)
Public Sector Development Programme (Sectorwise)
167 of 214
1930 Z2019.1157Kech
CPapproved
CONST: OF WSS BISHOLI AND SURROUNDING AREA DASHT.
18.1290.000
18.129 0.0000.000
0.000 0% 18.1290.000
0.000 18.129 100% 0.0000.000
1929 Z2019.1156Kech
CPapproved
CONST: OF WSS FROM ZAHREEN BUG TO MULLAHI NIGORE.
41.4120.000
41.412 0.0000.000
0.000 0% 41.4120.000
0.000 41.412 100% 0.0000.000
1928 Z2019.1154Kech
CPapproved
CONST: OF WSS TALAMB ABDUL GHANI GUL MOHAMMAD BAZAR MAND.
5.0000.000
5.000 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 100% 0.0000.000
1927 Z2019.1153Kech
CPapproved
CONSTRUCTION OF WSS KARKAK DASHT.
8.1350.000
8.135 0.0000.000
0.000 0% 8.1350.000
0.000 8.135 100% 0.0000.000
1926 Z2019.1152Kech
CPapproved
CONTRACTION OF WSS SECHENCHEN DASHT.
8.8700.000
8.870 0.0000.000
0.000 0% 8.8700.000
0.000 8.870 100% 0.0000.000
1925 Z2019.1151Kech
CPapproved
REH: OF WSS IMAM BAZAR GORKHANI SEECHI BALNIGORE, TURBAT.
4.3630.000
4.363 0.0000.000
0.000 0% 4.3630.000
0.000 4.363 100% 0.0000.000
1924 Z2019.1149Kech
CPapproved
CONST: OF WSS KAPKAPAR BALNIGORE.
6.0820.000
6.082 0.0000.000
0.000 0% 6.0820.000
0.000 6.082 100% 0.0000.000
1923 Z2019.1145Kech
CPapproved
CONST:OF WSS FOR KASAR DANNUK, KASAR LUBBI, KASAR KOH-E-BUNM KASAR BAN BAZAR, KUNARY, SANGAHI & DADDAY DASHT, TURBAT
115.2100.000
115.210 0.0000.000
0.000 0% 115.2100.000
0.000 115.210 100% 0.0000.000
1922 Z2019.1144Ziarat
CPapproved
CONSTRUCTION OF WSS ZINDRA DISTRICT ZIARAT
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1921 Z2019.1143Harnai
CPapproved
WSS TOOR KHUM ZINDA PEER DISTRICT HARNAI
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1920 Z2019.1142Ziarat
CPapproved
CONSTRUCTION OF WSS AKRAM SAKHOBI
10.8300.000
10.830 0.0000.000
0.000 0% 10.8300.000
0.000 10.830 100% 0.0000.000
1919 Z2019.1141Ziarat
CPapproved
CONSTRUCTION OF WSS REGOHRA DISTRICT ZIARAT
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1918 Z2019.1140Ziarat
CPapproved
CONSTRUCTION OF WSS ZARGHOON GHER
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1917 Z2019.1139Ziarat
CPapproved
CONSTRUCTION OF WSS TOOR SHOR WAYALA
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1916 Z2019.1138Loralai
CPapproved
WSS LORALAI BALMEKI NEAR BUKHARI SCHEME ARABSEEN DISTRICT LORALAI
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1915 Z2019.1137Harnai
CPapproved
CONSTRUCTION OF WSS KACHA COLONY SHAHRAG DISTRICT HARNAI
19.7000.000
19.700 0.0000.000
0.000 0% 19.7000.000
0.000 19.700 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 172: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/172.jpg)
Public Sector Development Programme (Sectorwise)
168 of 214
1945 Z2019.1233Kohlu
CPapproved
CONSTRUCTION OF WSS KILLI ALI BAIG KHOLU
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1944 Z2019.1231Kohlu
CPapproved
CONST:OF GRAVITY BASED WSS OBLONE SUB-TEHSIL TAMBOO KHOLU
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
1943 Z2019.1229Kohlu
CPapproved
CONST: OF WSS NEW KILLI KOHLU
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1942 Z2019.1228Kohlu
CPapproved
CONST: OF WSS KUCHAR FOR WATER SUPPLY TO KILLI MIR NOOR AHMED KHOLU
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1941 Z2019.1226Kohlu
CPapproved
CONST: OF GRAVITY BASED WSS FROM NARGOSI TO SUKKA KHOLU.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1940 Z2019.1223Kech
CPapproved
WSS AT UMAID ALI BAZAR BALOOR,E&I/WSS KO.BASHEER AHMED, E&I OF WSS REH-E-SAR& E&I OF WSS CHIB FOR VILL: M.OMAR KHAN.
10.2840.000
10.284 0.0000.000
0.000 0% 10.2840.000
0.000 10.284 100% 0.0000.000
1939 Z2019.1218Kech
CPapproved
WSS AT QASIM BAZAR KARKI SAMI,SADIQ BAZAR PAKOTAG, E&I OF WSS SAND BAZAR& SHAHEED AYOUB BULEDI INT:COLLEGE BULEDA
18.8000.000
18.800 0.0000.000
0.000 0% 18.8000.000
0.000 18.800 100% 0.0000.000
1938 Z2019.1215Kech
CPapproved
WSS AT KUMBLI HIRRONK, MAQSOOD BAZAR ASHAL DANDAR, MIA MAYAR BAZAR NIGORE&E&I OF WSS NADEEM BAZZAR BULED.
45.1800.000
45.180 0.0000.000
0.000 0% 45.1800.000
0.000 45.180 100% 0.0000.000
1937 Z2019.1214Kech
CPapproved
WSS KIKEN BALOHCI, KOHDA MUHAMMAD BAZAR SHAHRAK, KOR-E-PUSHT, BIT BULEDA&MEHNAZ BULEDA.
13.9010.000
13.901 0.0000.000
0.000 0% 13.9010.000
0.000 13.901 100% 0.0000.000
1936 Z2019.1213Kech
CPapproved
CONT:OF WSS AT SINGABAD KARKI SAMI,GAT-E-DAP KOLWAH, NAKO MALANG BAZAR BAL TANK& LAL MUHAMMAD BAZAR BAL TANK.
16.6000.000
16.600 0.0000.000
0.000 0% 16.6000.000
0.000 16.600 100% 0.0000.000
1935 Z2019.1212Kech
CPapproved
CONT: OF WSS AT KISAK BALOCHI, JATH KOLWAH& MEHMOOD BAZAR SAHIKE.
12.7000.000
12.700 0.0000.000
0.000 0% 12.7000.000
0.000 12.700 100% 0.0000.000
1934 Z2019.1206Bela
CPapproved
CONSTRUCTION OF WATER SUPPLY SYSTEM FOR LIARI & LAKHRA DSITRICT LASBELA(FROM CHANKARA TO LIARI VIA OBA 1,2,3)
220.0000.000
220.000 0.0000.000
0.000 0% 80.0000.000
0.000 80.000 36% 140.0000.000
1933 Z2019.1164Kech
CPapproved
CONST: OF WSS DRACHKOO EAST & WEST BALNIGORE DASHT.
19.1390.000
19.139 0.0000.000
0.000 0% 19.1390.000
0.000 19.139 100% 0.0000.000
1932 Z2019.1161Kech
CPapproved
CONST: OF WSS SAMI CHAT MAND.
4.5650.000
4.565 0.0000.000
0.000 0% 4.5650.000
0.000 4.565 100% 0.0000.000
1931 Z2019.1159Kech
CPapproved
CONST: OF WSS BULLO MAND BORE NO. I & BORE NO.II SUB DIVISION TUMP.
19.6500.000
19.650 0.0000.000
0.000 0% 19.6500.000
0.000 19.650 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 173: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/173.jpg)
Public Sector Development Programme (Sectorwise)
169 of 214
1960 Z2019.1367Qilla
AbdullahCPapproved
WATER SUPPLY SCHEME KILLI GULISTAN KAREZ, JANO KAHUL.
30.0000.000
30.000 0.0000.000
0.000 0% 16.0000.000
0.000 16.000 53% 14.0000.000
1959 Z2019.1346Quetta
CPapproved
CONST: OF WSS PIR MUHAMMAD ROAD *.
7.7000.000
7.700 0.0000.000
0.000 0% 7.7000.000
0.000 7.700 100% 0.0000.000
1958 Z2019.1345Quetta
CPapproved
CONST: OF WSS MUHALLA ABBAS HALLA GULLA *.
7.8000.000
7.800 0.0000.000
0.000 0% 7.8000.000
0.000 7.800 100% 0.0000.000
1957 Z2019.1333Pishin
CPapproved
WSS KILLIS, BAGERZAI AND GANGALZAI TEHSIL HURAMZAI DISTRICT PISHIN
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1956 Z2019.1294Pishin
CPapproved
CONST: OF WSS KILLI ABDUL SAMAD SARNAN DIST. PISHIN.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1955 Z2019.1283Qilla
SaifullahCPapproved
CONST OF WSS WITH SOLAR SYSTEM NAWA KILLI MUSLIM BAGH & DARA JALAL KHANZAI DISTRICT KILLA SAIFULLAH.
16.0000.000
16.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 62% 6.0000.000
1954 Z2019.1282Qilla
SaifullahCPapproved
CONST OF WSS SURA KHULA KAN MEHTERZAI & WSS KILLI PEROZAI KAN MEHTERZAI MUSLIM BAGH IN KILLA SAIFULLAH.
15.0000.000
15.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 66% 5.0000.000
1953 Z2019.1281Qilla
SaifullahCPapproved
CONST OF WSS WITH SOLAR SYS SARANA MEHTERZAI & WSS SHINA VIALA KAN MEHTERZAI MUSLIM BAGH KILLA SAIFULLAH.
16.0000.000
16.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 62% 6.0000.000
1952 Z2019.1280Quetta
CPapproved
WSS WITH SOLAR SYSTEM FOR KILLI MALAK SHAJAHAN SAIFULLAH KHAN . SAIBZADA, KUCHLAK, QUETTA
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
1951 Z2019.1278Kohlu
CPapproved
CONST: OF SOLAR ENERGIZED MINI WSS IN U.C SOFAID,NASHO,TAMBOO, MAWAND,GIRSANAT,YARANIN & K.KHAN SHAHAR.
305.0000.000
305.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 32% 205.0000.000
1950 Z2019.1247Kohlu
CPapproved
REHABILITATION AND SOLAR ENERGIZATION OF WATER SUPPLY SCHEME MASTOKALI KHOLU
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1949 Z2019.1244Gwadar
CPapproved
LAYING OF WATER SUPPLY PIPELINE 6 DIA FOR WARD I AND 5 OF HAIDER GOTH OF PASNI TOWN
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1948 Z2019.1243Gwadar
CPapproved
CONSTRUCTION OF 1.0 LAC GALLON CAPACITY WITH 2NOS TURBINES FOR WSS TUSUK TEHSIL ORMARA
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
1947 Z2019.1235Kohlu
CPapproved
CONST: OF WATER STORAGE TANK WSS IN KOHLU TOWN AND GOVERNMENT INTERMEDIATE COLLEGE, KOHLU.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1946 Z2019.1234Kohlu
CPapproved
CONST: OF SOLAR ENERGISED WATER SUPPLY SCHEME AT REHMANABAD, KILLI ALI SHER AND JAMIL ABAD KHOLU
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 174: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/174.jpg)
Public Sector Development Programme (Sectorwise)
170 of 214
1976 Z2019.1449Mastung
CPapproved
SOLARIZATION OF EXISTING WSS MALIKAN, BABKANI, TAKH KAWI, TURKAMAN, KAREZ SAIFULLAH, RODENI, KARIM ABAD, GM COLONY
44.1000.000
44.100 0.0000.000
0.000 0% 44.1000.000
0.000 44.100 100% 0.0000.000
1975 Z2019.1445Mastung
CPapproved
SOLARIZATION OF EXISTING WSS KILLI PATKI, MIR AHMED, BASHAM, KANAK, KILLI WARIS
22.9100.000
22.910 0.0000.000
0.000 0% 22.9100.000
0.000 22.910 100% 0.0000.000
1974 Z2019.1442Mastung
CPapproved
SOLARIZATION OF EXISTING WSS KILLI SHAPTCH, MALL SARPARA, GARH RUSTAMZAI
12.9900.000
12.990 0.0000.000
0.000 0% 12.9900.000
0.000 12.990 100% 0.0000.000
1973 Z2019.1440Mastung
CPapproved
CONST: OF WSS BABRI, KHAD KOCHA, SYED HALEEM KANAK.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
1972 Z2019.1439Mastung
CPapproved
CONST: OF WSS AT KHAD KOCHA MASTUNG
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1971 Z2019.1429Pishin
CPapproved
RAISING OF KHANOZAI STORAGE DAM FOR AUG: OF WSS FOR KHANOZAI TOWN WITH ESTAB: OF TWO WATER SUPPLY SCHEME.
100.0000.000
100.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 100% 0.0000.000
1970 Z2019.1407Quetta
CPapproved
WSS FOR KILLI H RAZ MOHD BARECH MUSA COLONY & PROVISION OF PIPE LINE AT E BY PASS QTA.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
1969 Z2019.1405Quetta
CPapproved
WSS IN KILLIES BAKHT MOHD,ABDUL MANAN,KHILJI COLONY AT EASTERN BY PASS QTA.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
1968 Z2019.1392Provincial
CPapproved
COMPLETION OF QUETTA WATER SUPPLY AND ENVIRONMENT PROJECT (QWESIP)
1000.0000.000
1000.000 0.0000.000
0.000 0% 200.0000.000
0.000 200.000 20% 800.0000.000
1967 Z2019.1391Provincial
CPapproved
FEASIBILITY OF SMALL, MEDIUM DAMS FOR WATER STRESSED AREAS/ TOWN SOLELY FOR DRINKING PURPOSE
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
1966 Z2019.1375Qilla
AbdullahCPapproved
CONSTRUCTION OF WSS NAWY KILLI JANO TEHSIL GULISTAN, KAREZ ARAMBAI.
12.2000.000
12.200 0.0000.000
0.000 0% 12.2000.000
0.000 12.200 100% 0.0000.000
1965 Z2019.1374Qilla
AbdullahCPapproved
CONST: OF WSS AT KILLI FAROOQ KANDI SAIGAI, HAJI NAEEM SHAMSHOZAI, AZHNEZAI, TEHSIL GULISTAN.
24.2000.000
24.200 0.0000.000
0.000 0% 24.2000.000
0.000 24.200 100% 0.0000.000
1964 Z2019.1371Qilla
AbdullahCPapproved
CONST OF WSS AT KILI MUHAMMAD UMAR SAIGAI, KILI SAIAGAI TEHSIL GULISTAN.
16.2000.000
16.200 0.0000.000
0.000 0% 16.2000.000
0.000 16.200 100% 0.0000.000
1963 Z2019.1370Qilla
AbdullahCPapproved
WATER SUPPLY SCHEME KILLI GHUNDAK JABBAR TOBA, KAREZGAI SHELLA.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1962 Z2019.1369Qilla
AbdullahCPapproved
WATER SUPPLY SCHEME KILLI GWAL TOBA, BAYANZAI TUBA.
24.0000.000
24.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 41% 14.0000.000
1961 Z2019.1368Qilla
AbdullahCPapproved
WATER SUPPLY SCHEME KILLI NAURAK GULISTAN.
27.0000.000
27.000 0.0000.000
0.000 0% 16.0000.000
0.000 16.000 59% 11.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 175: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/175.jpg)
Public Sector Development Programme (Sectorwise)
171 of 214
1991 Z2019.1500Qilla
AbdullahCPapproved
CONST: OF WSS KILLI MURDA KAREZ-3 & WSS KILLI LALAI & WSS KILLI ABDUL RAZAQ CHAMAN DIST: KILLA ABDULLAH.
17.9140.000
17.914 0.0000.000
0.000 0% 17.9140.000
0.000 17.914 100% 0.0000.000
1990 Z2019.1498Quetta
CPapproved
INST: OF WSS KILLI UMAR AND OVERHEAD TANK (20000 GALLON) IN TEACHER COLONY NAWA KILLI QUETTA
12.5000.000
12.500 0.0000.000
0.000 0% 12.5000.000
0.000 12.500 100% 0.0000.000
1989 Z2019.1497Qilla
AbdullahCPapproved
CONST: OF WSS KILLI TAKI-2 & WSS KILLI GULDAR BAGHICHA-I CHAMAN DIST: KILLA ABDULLAH.
18.6340.000
18.634 0.0000.000
0.000 0% 18.6340.000
0.000 18.634 100% 0.0000.000
1988 Z2019.1496Quetta
CPapproved
WATER SUPPLY SCHEME KHAROOT ABAD AND PROVISION OF LAYNING JOINT OF PIPELINE HALQA 49-50-51
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1987 Z2019.1495Quetta
CPapproved
CONST: OF WATER SUPPLY SCHEMES IN JATAK ABAD AND MUSLIM ABAD SHAIKH MANDA QUETTA
13.0000.000
13.000 0.0000.000
0.000 0% 13.0000.000
0.000 13.000 100% 0.0000.000
1986 Z2019.1494Qilla
AbdullahCPapproved
CONST: OF WSS KILLI TAKI-1 & WSS KILLI LANDI KAREZ CHAMAN DIST: KILLA ABDULLAH.
18.5910.000
18.591 0.0000.000
0.000 0% 18.5910.000
0.000 18.591 100% 0.0000.000
1985 Z2019.1493Quetta
CPapproved
CONST: OF TWO NOS WSS AT KILLI SHAH ALAM,ZARGHON ABAD PHASE-II &REHABILITATION OF WSS KILLI SAYADAN NAWA KILLI QUETTA.
15.2000.000
15.200 0.0000.000
0.000 0% 15.2000.000
0.000 15.200 100% 0.0000.000
1984 Z2019.1492Qilla
AbdullahCPapproved
CONST:OF WSS KILLI MALAK ABDUL REHMAN SAFAR KHAN & WSS KILLI TAKI-3 CHAMAN DIST: KILLA ABDULLAH.
11.1030.000
11.103 0.0000.000
0.000 0% 11.1030.000
0.000 11.103 100% 0.0000.000
1983 Z2019.1491Qilla
AbdullahCPapproved
CONST:OF WSS KILLI ADDA KAHOL H.ABDUL WAHID MALEZAI, NASEEBULLAH & WSS KILLI DAMAN ASHEZAI ALQA S.GUL ZAMAN CHAMAN.
11.0420.000
11.042 0.0000.000
0.000 0% 11.0420.000
0.000 11.042 100% 0.0000.000
1982 Z2019.1485Qilla
AbdullahCPapproved
CONST: OF WSS KILLI BYPASS BARAMA, HAJI AZAM JAN CHAMAN & WSS CITY-I MUHALLA NAZAR AHMED CHAMAN DIST: KILLA ABDULLAH.
14.3930.000
14.393 0.0000.000
0.000 0% 14.3930.000
0.000 14.393 100% 0.0000.000
1981 Z2019.1480Qilla
AbdullahCPapproved
CONST: OF WSS BARAF KARKHANA SAMIULLAH AND WSS KILLI WARIS SALEZAI BERMA CHAMAN DIST: KILLA ABDULLAH.
18.8560.000
18.856 0.0000.000
0.000 0% 18.8560.000
0.000 18.856 100% 0.0000.000
1980 Z2019.1479Qilla
AbdullahCPapproved
CONST: OF WSS KILLI MOHALLA HAJI BAKHT-3 & WSS KILLI HAJI ASGHAR ASPHAZ CHAMAN DIST: KILLA ABDULLAH.
13.3490.000
13.349 0.0000.000
0.000 0% 13.3490.000
0.000 13.349 100% 0.0000.000
1979 Z2019.1478Qilla
AbdullahCPapproved
CONST: OF WSS KILLI ANZARGI KAREZ & WSS KILLI HAJI AKBAR KHAN AT CHAMAN DIST: KILLA ABDULLAH.
18.3260.000
18.326 0.0000.000
0.000 0% 18.3260.000
0.000 18.326 100% 0.0000.000
1978 Z2019.1477Qilla
AbdullahCPapproved
CONST:OF WSS KILLI MOHALLA HAJI BAKHT ANDSOZ CHOWK & WSS KILLI TOZZI KAREZ CHAMAN DIST: KILLA ABDULLAH.
18.6340.000
18.634 0.0000.000
0.000 0% 18.6340.000
0.000 18.634 100% 0.0000.000
1977 Z2019.1476Qilla
AbdullahCPapproved
CONST: OF WSS KILLIHAJI SALAH UDDIN SIRAJUDDIN & WSS KILLI MURDA KAREZ CULAN KAHOL CHAMAN DIST: KILLA ABDULLAH.
18.9360.000
18.936 0.0000.000
0.000 0% 18.9360.000
0.000 18.936 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 176: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/176.jpg)
Public Sector Development Programme (Sectorwise)
172 of 214
2007 Z2019.1637Chagai
CPapproved
CONST: OF WSS KILLIES, THALAB TAFTAN, ABDUL QADOOS, AZEEM SHAH, HAJI SYED M.SIALOQ, AND HAJI HUZOOR BUX PARAHI
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2006 Z2019.1636Chagai
CPapproved
CONST: OF WSS IN KILLIES, GADOPASEELAH, BRAUQ, GHULAM MUSTAFA KAPOK, SIACHANG, AND JHANDI KHAMA U/C PADAG
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2005 Z2019.1615Khuzdar
CPapproved
WSS BAKHALY, GERPERAB, SOHAIL DERAKALA & SOKHY LOHENDIVE WADH.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2004 Z2019.1614Khuzdar
CPapproved
WSS KILLI DARNELI CHOTAZAI NAL, SONARO, ARENJI KAKAHEER WADH.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2003 Z2019.1612Quetta
CPapproved
CONST: OF WATER STORAGE TANKS AT AGHBAR, BALELI, CHASHMA, PANJPAI NOHSAR & KILLISUFI IN QUETTA.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2002 Z2019.1596Sibi
CPapproved
PROV: OF WSS & LAYING OF PIPE LINE FOR MACHI KOH-I & II TALLI, KILLI DUR MOHD, RAILWAY COLONY, LANGOV MUHALLAH, NOORPUR.
16.0100.000
16.010 0.0000.000
0.000 0% 16.0100.000
0.000 16.010 100% 0.0000.000
2001 Z2019.1568Khuzdar
CPapproved
WSS BAKHALY, GERPERAH, SOHAIL DERAKALA & SOKHY LOHENDIVE WADH.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2000 Z2019.1566Khuzdar
CPapproved
WSS KILLI DARNELI CHOTAZAI NAL, SONARO, ARENJI KAKAHEER WADH.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1999 Z2019.1531Khuzdar
CPapproved
CONSTRUCTION OF WSS HAZARGANJI, DERNALI, GAROK NALL.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
1998 Z2019.1527Barkhan
CPapproved
WSS FOR KHAKO ROSWANI AND AND BASTI BUNGLA JANLANI BARKHAN
10.4770.000
10.477 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 47% 5.4770.000
1997 Z2019.1525Barkhan
CPapproved
WSS FOR BASTI HAJI MEER MOHAMMAD PHATIANI AND RAHAMTHAN LODANI RAKHNI
10.3620.000
10.362 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 48% 5.3620.000
1996 Z2019.1523Barkhan
CPapproved
WSS FOR BASTI KACHI JOGIANI AND BASTI ASHAQ LANGANI U/C WATAKARI BARKHAN*
12.6930.000
12.693 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 39% 7.6930.000
1995 Z2019.1507Qilla
AbdullahCPapproved
CONST: OF WSS KILLI HAJI NAIMATULLAH & WSS KILLI MURDA KAREZ-I. DIST: KILLA ABDULLAH AT CHAMAN.
18.9240.000
18.924 0.0000.000
0.000 0% 18.9240.000
0.000 18.924 100% 0.0000.000
1994 Z2019.1504Quetta
CPapproved
WSS AT BILAL COLONY & KILLI WAZIR MOHALLAH NASRULLAH SHAH CHASHMA ACHOZAI QUETTA.
130.0000.000
130.000 0.0000.000
0.000 0% 130.0000.000
0.000 130.000 100% 0.0000.000
1993 Z2019.1503Quetta
CPapproved
WSS KILLI BACHA AGHA BALELI QUETTA, DOST AGHA SARIAB ROAD, KASI ABAD SARIAB.
24.0000.000
24.000 0.0000.000
0.000 0% 24.0000.000
0.000 24.000 100% 0.0000.000
1992 Z2019.1502Qilla
AbdullahCPapproved
CONST: OF WSS KILLI ZAHIR & WSS KILLI HAJI MUHAMMAD HASSAN CHAMAN DIST: KILLA ABDULLAH.
12.2440.000
12.244 0.0000.000
0.000 0% 12.2440.000
0.000 12.244 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 177: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/177.jpg)
Public Sector Development Programme (Sectorwise)
173 of 214
2020 Z2019.1652Chagai
CPapproved
WSS KILLIES, NEHAL KHAN DASHT-E-GORAN, JAN BAIG NADIR ABAD, ROZ M. HAJI M. RASOOL, & HAJI ALI KHAN SANJRANIU/C CHAGHI
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2019 Z2019.1651Chagai
CPapproved
WSS KILLIES SARDAR M. AZAM, MIR KHAN CHAHAMURI, HAJI M.NALAAB (NAFAS KHAN), MAJOR HAKEEM DAD, MIR HASSAN SHEHSALAR ETC
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2018 Z2019.1650Chagai
CPapproved
WSS KILLIES H.M. KHAIRKARODUK, SULTAN M.REKINOKCHA, H.ABAD PEERKZAI, MALIK PASAND GHAT BAROTH, & BABOO M.AFZAL SHADRAK
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2017 Z2019.1649Chagai
CPapproved
WSS KILLIES AASHLO, JANDI KHAMA, MUHAMMAD WARIS SASOLI CHARSAR, KHUDABAKSH, & NAIK M.ZORBADMAZANG U/C PADAG
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2016 Z2019.1648Chagai
CPapproved
WSS KILLIES SAI SHOMAN, M.QASIM SASOLI, ALI BAKHSH REKO, TAJ MUHAMMAD HASSNI, & JEEHAND KHAN CHEATAR U/C PADAG
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2015 Z2019.1647Chagai
CPapproved
WSS KILLIES, DAD KHUD, MEHRAB KHAN DEWANAG, HAMAL KHAN GOWN:, RAJEH, GAREEBHALQ, DEWANA, & H.MIRZA GOWAN: U/C JHULI
14.0000.000
14.000 0.0000.000
0.000 0% 14.0000.000
0.000 14.000 100% 0.0000.000
2014 Z2019.1646Chagai
CPapproved
WSSKILLIES, AGHA MEHMOOD GULGAZ,GUL ZAMAN, SARDAR ATTAULLAH, FAQEERDARAMEN, & GHULAM MUHIUD DIN U/C BARABCHA
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2013 Z2019.1645Chagai
CPapproved
WSS KILLIES S.BAHDUR NOTEZAI, A. HAKEEM KHAR, M.HANIF NOTEZAI, BISMILLAH P. & SAR. M.UMAR, M. HASSNI P. UC CHILGHAZI
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2012 Z2019.1643Chagai
CPapproved
CONST: OF WSS KILLIES H.PEER M. SUMALANI, MALIK BARAN LASH., H. JAN KHAN SHADISHEF, CHANDAR KHAN & SYED GLAMOR SHAH.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2011 Z2019.1642Chagai
CPapproved
CONST:OF WSS KILLIES, H.IBRAHIM CHEATER, DAWOODABAD DAL:, JAN BAIG N-ABAD, H.ABDUL SAMAD PAD. & S.FAIZULLAHLASHKERAB
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
2010 Z2019.1640Chagai
CPapproved
CONST:OF WSS KILLIES, NOOR M. BHOOLO, JUMA KHAN MUSAZAI, HAKEEM DAD, SARDAR YAQOOB PEERKZAI, & GUL MOHAMMAD MEERANI
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2009 Z2019.1639Chagai
CPapproved
CONST: OF WSS KILLIES, H.ABDUL KAREEM, HAJI SAIFO KHAN, SHAH NAZAR, MALIK GULZAMAN, & TEHMOOR CHAHI BARABCHA
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2008 Z2019.1638Chagai
CPapproved
CONST:OF WSS KILLIES, M. KHAIR M.DAMARDAG, ALLAH BUKSH GWAN:, GHULAM M. DAREGWAN, YAQOOB NOTEZAI, AYUB KAHNI & ETC
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 178: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/178.jpg)
Public Sector Development Programme (Sectorwise)
174 of 214
2034 Z2019.1694Mastung
CPapproved
CONSTRUCTION OF WSS VILLAGE SAI PUSHT DASHT DISTRICT MASTUNG
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2033 Z2019.1693Mastung
CPapproved
CONSTRUCTION OF WSS VILLAGE UMERDHOOR DASHT DISTRICT MASTUNG
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2032 Z2019.1690Quetta
CPapproved
WSS LOWER KAREZ, HAMEED COLONY, NABI ABAD, KHAIR AFOOR TOWN BURMAN HOTEL QUETTA.
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
2031 Z2019.1663Qilla
AbdullahCPapproved
AUG:/EXTEN: OF EXISTING WSS KILLI IMRANZAI, ARMBI MESEZAI, JANGLE PIRALIZAI, DADAN MACHKA, HABIBZAI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2030 Z2019.1662Qilla
AbdullahCPapproved
AUG:/EXTEN: OF EXISTING WSS KILLI MOLVI ATTAULLAH,DAD M GHIBZAI, MEZAI-I,II,HAMID KOLAK,WALMASSAZAI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2029 Z2019.1661Chagai
CPapproved
WSS KILLIES, MOLANA ABDUL AYUB, HAJI JAN MOHAMMAD, HAJI NOKBAND, MEERANZAI, MALIK SARWAR, & H.RASOOL KHAN AMEEN ABAD
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
2028 Z2019.1660Chagai
CPapproved
WSS KILLIES, M.MEHRAB DEWAN:, MASTER TAWAKAL SHENGARO UC JHULI, & H.MIRZA SHA E DAW. KIRTAKA, KHUDA E DAD MANDOZAI ETC
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
2027 Z2019.1659Chagai
CPapproved
WSS KILLIES,YAQOOBPEERAKZAI, SUMALZAI, SOOBEDAR JAMAL AKAZAI, DARWESH SHEHZAI & SAKHIIKHLAS SHEHZAI UC ZIARAT BALANOSH
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2026 Z2019.1658Chagai
CPapproved
WSS KILLIES, MULLA MUBEEN, GOWA JOHI, NAJAM UD DIN, DOGANAN, & HAJI GUL MUHAMMAD LASHKARAB U/C ZIARAT BALANOSH
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2025 Z2019.1657Chagai
CPapproved
WSS KILLIES, AKBAR KHAN S., SHAFI M. MENGAL, JAN BAIG LANGAU CHAGHI, M.MEHRAB GAISHERDAN, & MIRFATIH M., MIR KHAN CHA
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2024 Z2019.1656Chagai
CPapproved
WSS KILLIES, HAJI CHERAGH, HAJI BILAL, HAJI JAN MOHAMMAD, MALIK PEERDAD, & HAJI AHMED DIN BARABCHA
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
2023 Z2019.1655Chagai
CPapproved
WSS KILLIES BARAN EJBARI, H.MALIK SHAH, BAZ M. KHAN, JAMIL AHMED S., SHAHBAZ K.PATKUK, & SARDAR ANWER JAN S. UC AMURI
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
2022 Z2019.1654Chagai
CPapproved
WSS KILLIES, PEER DAD JOOJUKI, SHAH SALEEM YAK MACH, M.SALEEM ZAYE, S.ABDUL QADIR S-SALAR & H.MURAD SUMALANI BISHRI,
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2021 Z2019.1653Chagai
CPapproved
WSS KILLIES DURBANCHA, ESSA TAHIR, MULLA TAWAKAL DURBUNCHA, RAZAHIMASHKICHAH, & M.RAMZAN UMAY U/C NOKUNDI
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 179: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/179.jpg)
Public Sector Development Programme (Sectorwise)
175 of 214
2050 Z2019.1733Kech
CPapproved
CONSTRUCTION OF WSS DANDAR, MAKSAR & KARKAK TEHSIL DASHT KECH.
22.1400.000
22.140 0.0000.000
0.000 0% 12.1400.000
0.000 12.140 54% 10.0000.000
2049 Z2019.1732Kech
CPapproved
E&I OF WSS ZAHREEN BUG TO NEW ZARHEEN BUG TEHSIL DASHT.
36.7300.000
36.730 0.0000.000
0.000 0% 16.7300.000
0.000 16.730 45% 20.0000.000
2048 Z2019.1731Washuk
CPapproved
CONST OF WSS IN KITTIES OF U/C PLANTHAK MUHAMMAD KAREEM QAMBAR, 1-LARCH NAWAR, MUHAMMAD NASCCR REKI
11.8000.000
11.800 0.0000.000
0.000 0% 11.8000.000
0.000 11.800 100% 0.0000.000
2047 Z2019.1729Washuk
CPapproved
CONST OF WSS IN KILLICS U/C JANGIAN HAJI ABDUL QUDOOS KHURMAGAI, ABDUL GHAFOOR JALWAR, GHULAM M. JALWAR
12.9600.000
12.960 0.0000.000
0.000 0% 12.9600.000
0.000 12.960 100% 0.0000.000
2046 Z2019.1728Pishin
CPapproved
WATER SUPPLY AT MUHAKKA ZIA TAREEN KILLI ALIZAI ALONG WITH OHSR TANK.
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
2045 Z2019.1727Kohlu
CPapproved
SOLAR BASED WSS AT KILLI BABU FAIZ, KILLI BABU KAMAL DISTRICT KHOLU.
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
2044 Z2019.1726Washuk
CPapproved
CONST OF WSS KILLIES OF U/C SINGER HAJI MUHAMMAD HASSAN GORAGI, GHULAM QADIR GORAGI AND GHARHEC DINAR
14.0000.000
14.000 0.0000.000
0.000 0% 14.0000.000
0.000 14.000 100% 0.0000.000
2043 Z2019.1725Quetta
CPapproved
WATER SUPPLY AT NAWA KILLI, TAREEN SHAHAR, HANA, GHUTAI SHELA, BAREZAI & ADJOINING AREAS.
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
2042 Z2019.1724Washuk
CPapproved
CONST & EXT OF WSS IN KILLIES OF U/C NAG KIRACHI MUHALLA JALIL, NAAG TOWN AND NADIR DOMBEN, MUHAMMAD KARCEM
20.5000.000
20.500 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 48% 10.5000.000
2041 Z2019.1723Washuk
CPapproved
CONSTRUCTION OF WSS KILLIES, ZIARAT , MIR MUHAMMAD ULM. DAMAG, PATK DISTRICT WASHUK
10.4000.000
10.400 0.0000.000
0.000 0% 10.4000.000
0.000 10.400 100% 0.0000.000
2040 Z2019.1722Quetta
CPapproved
WSS AT HALKA 49,50,51,52 HANA, SAHIBZADA, KILLI SARANGZAI, KILLI UMAR, ZARKHOO & ADJOINING AREAS.
50.0000.000
50.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 50% 25.0000.000
2039 Z2019.1721Washuk
CPapproved
CONST: OF WSS KILLICS OF U/C KURRAGI GOHAR KHAN SIAHOZAI, KAROGAI, MASTER IMDAD MUMAI, BASIMA
19.7000.000
19.700 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 9.7000.000
2038 Z2019.1719Washuk
CPapproved
CONST: OF WSS KILLIES OF U/C KURRAGI SHAH MUHAMMAD AND KHAN MUHAMMAD ZAYAK, BASIMA, DISTRICT WASHUK.
13.0000.000
13.000 0.0000.000
0.000 0% 13.0000.000
0.000 13.000 100% 0.0000.000
2037 Z2019.1709Sibi
CPapproved
CONSTRUCTION OF WATER SUPPLY SCHEME FOR MURAD WAH GOLAR AND RELO MIAN KHAN, TEHSIL LEHRI
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2036 Z2019.1708Sibi
CPapproved
WATER SUPPLY SCHEME FOR GORHI LEHRI, AMEER ABAD , TEHSIL LEHRI, DISTRICT SIBI
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2035 Z2019.1696Mastung
CPapproved
CONSTRUCTION OF WSS VILLAGE DATAVZAI DASHT DISTRICT MASTUNG
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 180: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/180.jpg)
Public Sector Development Programme (Sectorwise)
176 of 214
2063 Z2019.1761Khuzdar
CPapproved
CONSTRUCTION OF WSS WITH SOLAR SYSTEM FOR KILLI WAHEED TAMRANI BARANEE BHENT, KILLI SAMAD TAMRANI & ADJOINING AREAS.
15.0000.000
15.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 66% 5.0000.000
2062 Z2019.1760Khuzdar
CPapproved
CONSTT: OF WSS WITH SOLAR SYSTEM FOR KILLI SADIQ QALANDARI, DARWAZO TOOTAK, HAJI ABDULLAH KHIAZAI & ADJOINING AREAS.
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
2061 Z2019.1759Khuzdar
CPapproved
CONSTT: OF WSS WITH SOLAR SYSTEM FOR KILLI NASEER ABAD (GORISTANI), KILLI QUDOOS SASOLI, KALGHALO SUB TEHSSIL SAROONA.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2060 Z2019.1757Khuzdar
CPapproved
CONSTT: OF WSS WITH SOLAR SYSTEM FOR KILLI BADRI.
16.3200.000
16.320 0.0000.000
0.000 0% 8.3200.000
0.000 8.320 50% 8.0000.000
2059 Z2019.1746Nushki
CPapproved
PROVISION OF SOLAR SYSTEM & 20000 RFT PIPELINE FOR WSS KILLI HAJI MOHAMMAD HASSAN BADINI KISANKORI
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2058 Z2019.1745Nushki
CPapproved
WSS KILLI HAJI SHAH MOHAMMAD BADINI KISANKORI/ALONGWITH BORE SOLAR PIPE LINE, PUMP HOUSE WATER TANK.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2057 Z2019.1744Nushki
CPapproved
WSS FOR KILLI NOOR MOHAMMAD QADIR BUX KISANKORI DISTRICT NOSHKI/ALONGWITH BORE SOLAR PIPE LINE, PUMP HOUSE .
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2056 Z2019.1743Nushki
CPapproved
WSS FOR KILLI MALIK NOOR MOHAMMAD QAZNALI DETRACT NOSHKI/ALONGWITH BORE SOLAR PIPE LINE, PUMP HOUSE .
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2055 Z2019.1739Washuk
CPapproved
CONST OF WSS IN KILLICS OF TEHSIL MASHKAIL CHAKUL, AHOGO, MIR RASOOL BAKHSH GADUK AND THACHAP
12.5000.000
12.500 0.0000.000
0.000 0% 12.5000.000
0.000 12.500 100% 0.0000.000
2054 Z2019.1738Washuk
CPapproved
CONST OF WSS IN KILLIES OF TEHSIL MASHKEL SHER M. PATYSAR, A.QUDOOS SAYCHA, SOTGAN OLD LAGASHTH MASHKEL
12.4000.000
12.400 0.0000.000
0.000 0% 12.4000.000
0.000 12.400 100% 0.0000.000
2053 Z2019.1737Washuk
CPapproved
CONSTRUCTION OF WSS IN KITTIES OF U/C GARHANG NIKKOH, DAHLO AND HAJI RAHEEM LOOLINGI DISTRICT WASHUK
12.8900.000
12.890 0.0000.000
0.000 0% 12.8900.000
0.000 12.890 100% 0.0000.000
2052 Z2019.1736Washuk
CPapproved
CONST OF WSS IN KILLI OF U/C GARHANG M.SHAMS UDDIN, HCHA, SALAM BAIG, SHIMSHAN NO.2, MOLWI GUL M.NAZEER, SOREH AMAG
11.0300.000
11.030 0.0000.000
0.000 0% 11.0300.000
0.000 11.030 100% 0.0000.000
2051 Z2019.1734Washuk
CPapproved
CONST OF WSS IN KILLI U/C JANGIAN MULLA SHER M.JALWAR, ASFAND ABAD NEW JANGIAN,ABDULLAH KOBEEN, AMEER BUX SHAOGERI
11.3500.000
11.350 0.0000.000
0.000 0% 11.3500.000
0.000 11.350 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 181: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/181.jpg)
Public Sector Development Programme (Sectorwise)
177 of 214
2079 Z2019.1809Mastung
CPapproved
CONSTRUCTION OF WSS KILLI ABDUL QADIR GIRANI DASHT
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2078 Z2019.1807Mastung
CPapproved
CONSTUCTION OF WSS AT MASTUNG CITY
103.0000.000
103.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 48% 53.0000.000
2077 Z2019.1806Mastung
CPapproved
CONSTRUCTION OF WSS KILLI SADEEN KANAK TAKRI QASIM KANAK
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2076 Z2019.1804Mastung
CPapproved
CONSTRUCTION OF WSS KILLI KUND UMRANI MASTUNG
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2075 Z2019.1803Mastung
CPapproved
CONSTRUCTION OF WSS KILLI NAWA SHER SHEENAB
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2074 Z2019.1802Mastung
CPapproved
REHABILIATION OF WSS SEKOZAI DASHT
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2073 Z2019.1801Mastung
CPapproved
CONSTRUCTION OF WSS SYED HALEEM KANAK
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2072 Z2019.1792Quetta
CPapproved
WSS WITH ALL COMPONENTS AT SHAHZAMAN ROAD & WAHDAT COLONY QUETTA
14.0000.000
14.000 0.0000.000
0.000 0% 14.0000.000
0.000 14.000 100% 0.0000.000
2071 Z2019.1791Quetta
CPapproved
WSS WITH ALL COMPONENTS FOR MENGAL ABAD WARD 35 SATELLITE TOWN & MARRI STREET ARBAB KARAM KHAN ROAD QUETTA
14.0000.000
14.000 0.0000.000
0.000 0% 14.0000.000
0.000 14.000 100% 0.0000.000
2070 Z2019.1789Quetta
CPapproved
WSS WITH ALL COMPONENTS FOR SATELLITE TOWN BLOCK NO. 2, 3, 4 QUETTA
21.0000.000
21.000 0.0000.000
0.000 0% 21.0000.000
0.000 21.000 100% 0.0000.000
2069 Z2019.1775Dera Bugti
CPapproved
CONSTT: OF WSS SHAIKH BAND KHARCHA TEHSIL QADIRABAD.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2068 Z2019.1774Dera Bugti
CPapproved
CONSTT: OF WSS KILLI NEW ZAR KHAN AT BAIKER, TEHSIL QADIRABAD.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2067 Z2019.1773Dera Bugti
CPapproved
CONSTT: OF WSS CHOTO TO KILLI BASHKIA, TEHSIL QADIRABAD.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2066 Z2019.1771Dera Bugti
CPapproved
CONSTT: OF WSS DHAKA KHARCHA BAIKER, TEHSIL QADIRABAD.
15.0000.000
15.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 66% 5.0000.000
2065 Z2019.1764Khuzdar
CPapproved
CONSTT: OF WSS WITH SOLAR SYSTEM FOR KILLI MIRWANI UMARABAD, KILLI IBRAHIM, KILLI DOST MUHAMMAD & ADJOINING AREAS.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2064 Z2019.1763Khuzdar
CPapproved
CONSTT: OF WSS WITH SOLAR SYSTEM FOR KILLI SHAH NAWAZ GHAROK, KILLI HAJI RASHEED MENGAL GHAROK DHAT & ADJOINING AREAS.
15.0000.000
15.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 66% 5.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 182: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/182.jpg)
Public Sector Development Programme (Sectorwise)
178 of 214
2095 Z2019.1878Khuzdar
CPapproved
CONST: OF TWO WSS AT KILLI HAJI ABDULLAH SUMALANI U/C KHODA KARASK NALL.
7.0000.000
7.000 0.0000.000
0.000 0% 7.0000.000
0.000 7.000 100% 0.0000.000
2094 Z2019.1854Quetta
CPapproved
CONSTRUCTINO OF TUBEWELLS/PIPELINES & LOCAL BORE FOR QUETTA AREA
44.0000.000
44.000 0.0000.000
0.000 0% 18.0000.000
0.000 18.000 40% 26.0000.000
2093 Z2019.1847Qilla
SaifullahCPapproved
CONST: OF WSS ALONG WITH SOLAR SYSTEM AT MOHALLA NOOR ULLAH KAN MEHTARZAI MUSLIM BAGH
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
2092 Z2019.1846Qilla
SaifullahCPapproved
CONST: OF WSS ALONG WITH SOLAR SYSTEM AT KILLI SUDES KAKAR KAN MEHTARZAI MUSLIM BAGH.
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
2091 Z2019.1840Quetta
CPapproved
WSS KILLI SHADI KHAN, KILLI KHALIFS GARLI SARIAB ROAD.
17.0000.000
17.000 0.0000.000
0.000 0% 17.0000.000
0.000 17.000 100% 0.0000.000
2090 Z2019.1833Quetta
CPapproved
COSNT: OF WSS KILLI SHAREEF ABAD QAMBRANI ROAD AND KILLI SHAMOZAI
16.0000.000
16.000 0.0000.000
0.000 0% 16.0000.000
0.000 16.000 100% 0.0000.000
2089 Z2019.1831Quetta
CPapproved
CONST: OF WSS KLLI KAMALO AND KILLI BAROVE.
16.0000.000
16.000 0.0000.000
0.000 0% 16.0000.000
0.000 16.000 100% 0.0000.000
2088 Z2019.1826Mastung
CPapproved
COSNSTRUCTION OF WSS KILLI MERANI KANAK
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
2087 Z2019.1823Kalat
CPapproved
WATER SUPPLY SCHEME VILLAGE ZIARAT, VILLAGE KHUDA BAKSH SAMANDAR, VILLAGE TAKARI MAHBOOB SHAHWANI.
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
2086 Z2019.1822Mastung
CPapproved
CONSTRUCTION OF WSS KILLI MUHAMMAD SHAHI KANAK
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2085 Z2019.1821Mastung
CPapproved
CONSTRUCTION OF WSS PULL MARROW
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
2084 Z2019.1818Mastung
CPapproved
CONSTRUCTION OF SOLAR BASED WSS HIGH SCHOOL SPEZAND KILLI
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2083 Z2019.1817Mastung
CPapproved
CONSTRUCTION OF WSS KILLI GAD MAROW DASHT
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2082 Z2019.1812Mastung
CPapproved
CONSTRUCTION OF WSS KILLI BABRI MASTUNG
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2081 Z2019.1811Mastung
CPapproved
CONSTRUCTION OF WSS KILLI BANGULZAI KHAWAJA KHIZAR MASTUNG
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2080 Z2019.1810Mastung
CPapproved
CONSTRUCTINO OF WSS KILLI YAR MUHAMMAD KANAK
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 183: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/183.jpg)
Public Sector Development Programme (Sectorwise)
179 of 214
2111 Z2019.1994Khuzdar
CPapproved
WSS KAHAN, ORNACH CITY KHUZDAR
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2110 Z2019.1993Shaheed
Sikandarabad
CPapproved
W.S.S KILLI ABDULLAH MENGAL CHAKKULI, HAJI MEHRAB KHAN, CHAD SHERALI, KILLI MUNEER AHMED, SHANA.
14.0000.000
14.000 0.0000.000
0.000 0% 7.0000.000
0.000 7.000 50% 7.0000.000
2109 Z2019.1990Qilla
AbdullahCPapproved
CONST: OF WSS KILLI HAJI NIMATULLAH KULAK TEHSIL KILLA ABDULLAH.
7.0000.000
7.000 0.0000.000
0.000 0% 7.0000.000
0.000 7.000 100% 0.0000.000
2108 Z2019.1989Khuzdar
CPapproved
W.S.S KILLI MASTER YOUSUF RAMDANZAI, SARDAR HAYAT KHAN, SARDAR MORAD KHAN SHEIKH & ADJOINING AREAS.
18.0000.000
18.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 55% 8.0000.000
2107 Z2019.1988Khuzdar
CPapproved
W.S.S KILLI SHAREEF SHAHOL,KILLI NASEERABAD, MOLVI ALISHER QALANDRANI,ALI AKBAR SHEIKH, KISHARI AGJOINING AREAS.
12.0000.000
12.000 0.0000.000
0.000 0% 6.0000.000
0.000 6.000 50% 6.0000.000
2106 Z2019.1987Ziarat
CPapproved
WSS FOR MALIK SARWAR JAN WANI AT SANJVI, DIST. ZIARAT.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2105 Z2019.1986Quetta
CPapproved
WSS ZARGHOON ABAD PHASE-III NAWA KILLI QUETTA.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2104 Z2019.1985Nasirabad
CPapproved
CONST: OF WSS FOR VILLAGE SHER MOHAMMAD,BHANGER,CHATTER WSS GOTH LANDI BALENA NASIRAABD.
15.0930.000
15.093 0.0000.000
0.000 0% 15.0930.000
0.000 15.093 100% 0.0000.000
2103 Z2019.1963Jaffarabad
CPapproved
WSS GOTH QURBAN ALI BUGTI TEH. USTA MUHAMMAD DISTRICT JAFFARABAD
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2102 Z2019.1947Qilla
AbdullahCPapproved
CONST: OF WSS KILLI HAJI NAIMATULLAH KOLAK TEHSIL K. ABDULLAH
7.0000.000
7.000 0.0000.000
0.000 0% 7.0000.000
0.000 7.000 100% 0.0000.000
2101 Z2019.1925Dera Bugti
CPapproved
CONSTRUCTION OF WSS SUI TOWN BASED ON KACHHI CANAL VIA HARON NALA
231.7500.000
231.750 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 17% 191.7500.000
2100 Z2019.1924Loralai
CPapproved
REH: OF WSS LORALAI TOWN (SHORT TERN) DISTRICT LORALAI
200.0000.000
200.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 20% 160.0000.000
2099 Z2019.1919Chagai
CPapproved
PUZHOHI WSS FOR DALBANDIN TOWN
413.7100.000
413.710 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 12% 363.7100.000
2098 Z2019.1882Panjgur
CPapproved
WSS MOHALLAH HAJI ELAHI BUX WASHAP SIRI KORAN.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2097 Z2019.1881Panjgur
CPapproved
WSS SYEDULLAH BAZAR GOWARGO, KILLI FAIZ JAN RAHIM ABAD GOWARGO.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2096 Z2019.1879Khuzdar
CPapproved
CONST: OF WSS AT KILLI YAR MUHAMMAD & AABI NOGHE BAGHBANA.
6.5000.000
6.500 0.0000.000
0.000 0% 6.5000.000
0.000 6.500 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 184: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/184.jpg)
Public Sector Development Programme (Sectorwise)
180 of 214
2126 Z2019.2041Kech
CPapproved
WSS TALAMB ARIF BAZAR MAND DASHT
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2125 Z2019.2037Barkhan
CPapproved
WSS AT BASTI SOHRAB ABAD RAKNI
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
2124 Z2019.2035Kech
CPapproved
WSS DUNOK SAR BAZAR, GHULAM M. BAZAR SRIKIN, HUSSAIN ALI BAZAR KONSH KALAT TUMP MAJEED BAZAR & ADJOINING AREA
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
2123 Z2019.2029Kalat
CPapproved
WSS KILLI KHOOR KHALIQABAD 5.0000.000
5.000 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 100% 0.0000.000
2122 Z2019.2025Bela
CPapproved
WSS WITH SOLAR IN GOTHS SUNGHOR,SERO BALOCH & RAZA MOHAMMAD SONMIANI BELA
8.0000.000
8.000 0.0000.000
0.000 0% 8.0000.000
0.000 8.000 100% 0.0000.000
2121 Z2019.2012Pishin
CPapproved
CONST: OF WSS WALMA TOBA KAKARI.
10.0000.000
10.000 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 50% 5.0000.000
2120 Z2019.2011Pishin
CPapproved
WSS KILLI SHER GHALAI TEHSIL BARSHORE.
10.0000.000
10.000 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 50% 5.0000.000
2119 Z2019.2010Pishin
CPapproved
WSS KILLI ZARGHOON NEAR KHOSHAB KAREZAT.
10.0000.000
10.000 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 50% 5.0000.000
2118 Z2019.2008Quetta
CPapproved
CONST: OF OHSR 20000 GALLON KILLI ALMO I/C P/LAY PVC PIPE 3' DAI.
10.0000.000
10.000 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 50% 5.0000.000
2117 Z2019.2007Quetta
CPapproved
CONST: OF WSS MENGAL ABAD DOUBLE ROAD.
10.2000.000
10.200 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 49% 5.2000.000
2116 Z2019.1999Shaheed
Sikandarabad
CPapproved
W.S.S KILLI ABDULLAH RAUF MOHAMMADZAI,ALAM KHAN MOHAMMADZAI,INAMULLAH MOHAMMADZAI, MAANDAWAL, ABDUL QADIR GWARANJAV.
12.0000.000
12.000 0.0000.000
0.000 0% 6.0000.000
0.000 6.000 50% 6.0000.000
2115 Z2019.1998Khuzdar
CPapproved
WSS KILLI MEER JAN GAZGI, KILLI DHANI BUX BADOZAI,
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2114 Z2019.1997Khuzdar
CPapproved
WSS KILLI AMIR TAMRANI, KAHAN, KILLI KHAIR JAN RODENI, KILLI SHAREEF CHANNAL ALI, KILLI KANGROZAI, KORARO.
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
2113 Z2019.1996Shaheed
Sikandarabad
CPapproved
W.S.S KILLI SAADULLAH MOHAMMADZAI, LUTFULLAH QASIM KHANZAI,HAFIZ SIDDIQ, CHUKKI.
12.0000.000
12.000 0.0000.000
0.000 0% 6.0000.000
0.000 6.000 50% 6.0000.000
2112 Z2019.1995Khuzdar
CPapproved
WSS KILLI ABDUL BASIT SHEIKH, ABDUL GHAFOOR LANGVO, DIST. KHUZDAR.
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
Subsector: Water Supply Schemes
Sector: Public Health Engineering
Chapter: PUBLIC HEALTH ENG:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 185: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/185.jpg)
Public Sector Development Programme (Sectorwise)
181 of 214
2142 Z2019.2094Qilla
SaifullahCPapproved
CONST: OF WSS ALONGWITH SOLAR SYSTEM KILLI JANAN ABAD MANDAK & NEW KILLI KHAN ABAD.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2141 Z2019.2090Qilla
SaifullahCPapproved
CONST: OF WSS KHUDA-E-DAD MUHALLAH MUSLIM BAGH.
8.5000.000
8.500 0.0000.000
0.000 0% 8.5000.000
0.000 8.500 100% 0.0000.000
2140 Z2019.2089Pishin
CPapproved
CONST: OF WSS WITH SOLAR KILLI NAN ABAD.
5.0000.000
5.000 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 100% 0.0000.000
2139 Z2019.2088Quetta
CPapproved
SOLARIZATION OF WSS AT MARRI CAMP HAZAR GANJI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2138 Z2019.2086Jaffarabad
CPapproved
CONSTT. OF BOUNDARY WALL AROUND WATER WORKS PUMPING MACHINERY OF WSS, GOTH MOHD SHARIF LEHRI
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2137 Z2019.2085Pishin
CPapproved
WSS KILLI JALATLARAI, UC BRAHAM KHAN, TOBA KAKARIDIST PISHIN
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2136 Z2019.2084Pishin
CPapproved
WSS KILLI SHINAGHARA, UC ROAD, TEHSIL NANA SAHIB. DIST PISHIN
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2135 Z2019.2083Pishin
CPapproved
WSS KILLI CHURMIYAN, UC DILSORA, TEHSIL NANA SB DIST PISHIN
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2134 Z2019.2082Pishin
CPapproved
WSS KILLI SUFIYAN, MUNICIPAL COMMITTEE AND TEHSIL HURAMZAI, DIST PISHIN
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2133 Z2019.2081Pishin
CPapproved
WSS KILLI ZARGHOON, KHANAI 10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2132 Z2019.2080Kachhi
CPapproved
WSS KILLI MAJOR SATAKZAI MACH.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2131 Z2019.2079Pishin
CPapproved
WSS KILLI WALGI,TOBAKAKARI, DIST PISHIN
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2130 Z2019.2078Pishin
CPapproved
WSS KILLI WALMA,TOBA KAKARI,DIST PISHIN
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2129 Z2019.2077Pishin
CPapproved
WSS KILLI SHARGHALAI, TEHSILBARSHORE, DIST PISHIN
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2128 Z2019.2052Quetta
CPapproved
RESTORATION OF T/W BORING AND INSTALLATION OF SUBMERSIBLE PUMP SHAHBAZ TOWN PHASE-II.
4.0000.000
4.000 0.0000.000
0.000 0% 4.0000.000
0.000 4.000 100% 0.0000.000
2127 Z2019.2046Quetta
CPapproved
INSTALLATION OF T/W WITH COMPLETE SWTICH ROOM WITH PUMPIG MACHINERY SURVEY 144.
11.1500.000
11.150 0.0000.000
0.000 0% 11.1500.000
0.000 11.150 100% 0.0000.000
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Subsector: Water Supply Schemes
Chapter: PUBLIC HEALTH ENG:
Sector: Public Health Engineering
New
2019 - 20 Original
![Page 186: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/186.jpg)
Public Sector Development Programme (Sectorwise)
182 of 214
0.000 0.000 0.000 0.000
Water Supply Schemes(516 New Projects) GoB/FPA Sub-Total
12391.469
12391.469
0.000 0.000 9132.677 0.000 9132.677 3258.792
Water Supply Schemes(574 Projects) Total
25205.412
26329.391
5093.969 5125.769 11844.267
0.000 12213.867
8267.176
Sub-Sector Total (FPA) 1123.979 31.800 369.600 722.579
Sector Total (FPA) 1123.979 31.800 369.600 722.579
Sector: PUBLIC HEALTH ENG:(574 Projects)
25205.412
26329.391
5093.969 5125.769 11844.267
0.000 12213.867
8267.176
2019 - 20 Original
![Page 187: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/187.jpg)
Public Sector Development Programme (Sectorwise)
183 of 214
2149 Z2018.1074Kachhi
Approved
CONST: OF BUILDINGS GBPS IN SANI KILIL TAYAB GOTH, BANGUL KHAN GOTH, KHUDA DOST GOTH, SHAHEED NAWAZ ABAD SANI TEHSIL.
10.0000.000
10.000 7.0000.000
7.000 70% 3.0000.000
0.000 3.000 100% 0.0000.000
2148 Z2017.1526Quetta
Approved
PROV:OF EQUIP: INSTITUTE FOR ORTHOTICS & PROSTHETIC TECH:AT DIRECTORATE OF SOCIAL WELFARE DEPT:BREWARY ROAD.
70.0000.000
70.000 60.0000.000
60.000 85% 10.0000.000
0.000 10.000 100% 0.0000.000
2147 Z2017.0082Quetta
Approved
CONSTRUCTION OF DIRECTORATE OF HUMAN RIGHTS, LITERACY AND NON- FORMAL EDUCATION AT QUETTA.
100.0000.000
100.000 10.0000.000
10.000 10% 30.0000.000
0.000 30.000 40% 60.0000.000
2146 Z2016.1118JaffarabadApproved
CONST: OF COMMUNITY HALL AT CAMP NAWABZADA SHAHEED SIKANDER ZEHRI.
10.0000.000
10.000 5.0000.000
5.000 50% 5.0000.000
0.000 5.000 100% 0.0000.000
2145 Z2016.0124Kech
Approved
CONST: OF DRUG REHABILITATION CENTER.
15.0000.000
15.000 11.9830.000
11.983 79% 3.0170.000
0.000 3.017 100% 0.0000.000
2144 Z2014.0719Khuzdar
Approved
CONST: OF COMMUNITY CENTER FOR ZEEDI SHER, PB-35 KHUZDAR
20.0000.000
20.000 14.8500.000
14.850 74% 5.1500.000
0.000 5.150 100% 0.0000.000
2143 Z2011.0576Quetta
Approved
WELFARE CENTER FOR SHEMALE CITIZEN.
33.7220.000
33.722 11.5310.000
11.531 34% 22.1910.000
0.000 22.191 100% 0.0000.000
Social Welfare(7 Ongoing Projects) GoB/FPA Sub-Total
258.722 258.722 120.364 120.364 78.358 0.000 78.358 60.000
0.000 0.000 0.000 0.000
Subsector: Social Welfare
Sector: Social Welfare & Women Dev:
Chapter: SOCIAL WELFARE
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 188: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/188.jpg)
Public Sector Development Programme (Sectorwise)
184 of 214
2160 Z2019.1920Provincial
CPapproved
BALOCHISTAN SPECIAL CHILDREN PROGRAM.
500.0000.000
500.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 20% 400.0000.000
2159 Z2019.1623Kech
CPapproved
CONST: OF B/W & SHELTER FOR THE GRAVEYARDS OF LALLEEN, TUMP CITY, PULLABAD, HOTABAD, KUNSH KALAT & BALICHA BAZAR.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
2158 Z2019.1505Quetta
CPapproved
CONST BOUNDARY WALL AROUND THE GRAVYARD AT NAWA KILLI QUETTA.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2157 Z2019.1380Quetta
CPapproved
CONSTRUCTION OF TOILETS/RAMPS AND SUCH FACILITIES IN PUBLIC OFFICES.
100.0000.000
100.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 30% 70.0000.000
2156 Z2019.1172Ziarat
CPapproved
BOUNDARY WALL/SHADES OF GRAVEYARD KILLI DUMMARAN DISTRICT ZIARAT
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2155 Z2019.0305Quetta
CPapproved
CONSTRUCTION OF DEAF & DUMB SCHOOL AT NASIRABAD , ALAMDAR ROAD QUETTA.
19.5000.000
19.500 0.0000.000
0.000 0% 19.5000.000
0.000 19.500 100% 0.0000.000
2154 Z2019.0207Jaffarabad
CPapproved
FUNDS FOR SOCIAL WELFARE TRAINING & REHABILITATION CENTER (T8SRC) FEMALE AT USTA MUHAMMAD CITY
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
2153 Z2019.0141Nasirabad
CPapproved
CONSTRUCTION OF BUILDING FOR ESTABLISHMENT OF DAR-UL-AMAN AT NASIRABAD
40.0000.000
40.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 100% 0.0000.000
2152 Z2019.0137Provincial
CPapproved
ESTABLISHMENT OF TREATMENT AND REHABILITATION COMPLEX FOR DRUG ADDICTS OF DISTRICT PANJGOOR, LASBELA & LORALAI
200.0000.000
200.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 50% 100.0000.000
2151 Z2019.0018Provincial
CPapproved
ESTABLISHMENT OF SOCIAL PROTECTION & POVERTY ALLIVIATION AUTHORITY.
1000.0000.000
1000.000 0.0000.000
0.000 0% 700.0000.000
0.000 700.000 70% 300.0000.000
2150 Z2019.0013Provincial
CPapproved
HUMAN DEVELOPMENT PROJECT.
500.0003500.000
4000.000 0.0000.000
0.000 0% 50.00050.000
0.000 100.000 2% 450.0003450.000
Social Welfare(11 New Projects) GoB/FPA Sub-Total
2434.500 5934.500 0.000 0.000 1114.500 0.000 1164.500 1320.000
3500.000 0.000 50.000 3450.000
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Subsector: Social Welfare
Sector: Social Welfare & Women Dev:
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Chapter: SOCIAL WELFARE
New
Social Welfare(18 Projects) Total
2693.222 6193.222 120.364 120.364 1192.858 0.000 1242.858 1380.000
Sub-Sector Total (FPA) 3500.000 0.000 50.000 3450.000
2019 - 20 Original
![Page 189: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/189.jpg)
Public Sector Development Programme (Sectorwise)
185 of 214
2161 Z2019.1945Provincial
CPapproved
CONSTRUCTION OF YOUTH HOSTEL 2 FEMALE & 2 MALE AT ZIARAT AND GWADAR.
240.0000.000
240.000 0.0000.000
0.000 0% 120.0000.000
0.000 120.000 50% 120.0000.000
0.000 0.000 0.000 0.000
Youth Affairs(1 New Projects) GoB/FPA Sub-Total
240.000 240.000 0.000 0.000 120.000 0.000 120.000 120.000
Sector: Sports, Culture, Tourism & Youth Affairs
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Youth Affairs
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Chapter: SOCIAL WELFARE
New
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Youth Affairs(1 Projects) Total
240.000 240.000 0.000 0.000 120.000 0.000 120.000 120.000
2019 - 20 Original
![Page 190: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/190.jpg)
Public Sector Development Programme (Sectorwise)
186 of 214
2176 Z2019.1940Kohlu
CPapproved
CONST: ADDL. WORKS OF MOSQUES JAMILA MASJID KOHLU TOWN, MASJID NOOR AHMED
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
2175 Z2019.1608Quetta
CPapproved
REHAB:/CONST: OF 2 HALLS & BATHROOMS GFI CHURCH & BALMIK MANDIR BAIL AHTA JOINT ROAD QUETTA.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2174 Z2019.1607Bela
CPapproved
CONST:OF RELIGIOUS/SOCIAL GATHERING (SAT SONG) HALLS LADIES & GENTS WITH BATHROOMS JHULAY LAL MANDIR HUB LASBELLA.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2173 Z2019.1606Quetta
CPapproved
CONST:OF ADDL:ROOMS, HALL, & REHAB: MANDIR AT QUETTA CANT: GURDWAEA GURU NANK ETC GYMKHANA GURD: CANTT ETC.
40.0000.000
40.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 50% 20.0000.000
2172 Z2019.1605Kachhi
CPapproved
CONST: OF ROOMS PUJ UDSIN GOBIND DHAM KOLPUR.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2171 Z2019.1604Jhal Magsi
CPapproved
CONST: OF ROOMS, HALL, BHAWANI MANDIR, SHIVAL RAM MAN: KRISHON MAN: JHULAY LAL MAN: PANCHAYAT MAN: JHAL MAGSI.
40.0000.000
40.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 50% 20.0000.000
2170 Z2019.1363Quetta
CPapproved
B/TOPPING OF ROAD FROM HAZARA GRAVEYARD TO FIRING RANGE *.
40.0000.000
40.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 50% 20.0000.000
2169 Z2019.1120Bela
CPapproved
CONST: OF TOILETS/INCLUDING COMPREHENSIVE SEWERAGE LINE AT HINGLAJ MATA MANDIR DISTRICT LASBELA
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
2168 Z2019.0887Kech
CPapproved
COMPLETION OF JAMA MASJID GINNAH
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2167 Z2019.0881Sohbatpur
CPapproved
CONSTRUCTION OF MAJIHI PUR MANDAR
12.5000.000
12.500 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 80% 2.5000.000
2166 Z2019.0878Sohbatpur
CPapproved
CONSTRUCTION OF SOHBAT PUR MANDER
12.5000.000
12.500 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 80% 2.5000.000
2165 Z2019.0688Quetta
CPapproved
CONST:ROOMS,WAZUKHANA, FIXING OF F/SHADE,REHAB:WORKS OF IMAM BARGAH HUSSAINI, NASIRAZA S/TOWN & IMAM BARGAH KALA PB-28
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2164 Z2019.0687Quetta
CPapproved
CONST:OF ROOMS,FIXING OF FIBER SHADE AND REHAB: WORKS OF 5 NOS CHURCHES,2 NOS MANDIRS & 1 NO GURDWARA AT PB-28
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2163 Z2019.0683Quetta
CPapproved
CONST: OF ISTINJA KHANA,WAZU KHANA,FIXING OF FIBER SHADE & PROVIDING MISSING FACILITIES AT 20NOS MASAJIDS OF PB-28
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2162 Z2019.0081Provincial
CPapproved
STRENGTHENING OF SECURITY & SURVELLIENCE SYSTEM OF CHURCHES IN BALOCHISTAN.
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
Sector: Social Welfare
Chapter: SOCIAL WELFARE
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
New
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Religious Affairs
2019 - 20 Original
![Page 191: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/191.jpg)
Public Sector Development Programme (Sectorwise)
187 of 214
0.000 0.000 0.000 0.000
Religious Affairs(15 New Projects) GoB/FPA Sub-Total
345.000 345.000 0.000 0.000 270.000 0.000 270.000 75.000
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Religious Affairs(15 Projects) Total
345.000 345.000 0.000 0.000 270.000 0.000 270.000 75.000
Sector Total (FPA) 3500.000 0.000 50.000 3450.000
Sector: SOCIAL WELFARE(34 Projects)
3278.222 6778.222 120.364 120.364 1582.858 0.000 1632.858 1575.000
2019 - 20 Original
![Page 192: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/192.jpg)
Public Sector Development Programme (Sectorwise)
188 of 214
2177 Z2019.0120Provincial
CPapproved
CLIMATE CHANGE CONTROL CENTER IN BALOCHISTAN WITH ADVANCE WEATHER STATIONS, RADARS AND RIVER STREAM GAUGES.
600.0000.000
600.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 16% 500.0000.000
0.000 0.000 0.000 0.000
Environment(1 New Projects) GoB/FPA Sub-Total
600.000 600.000 0.000 0.000 100.000 0.000 100.000 500.000
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Sector: Environment
Subsector: Environment
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
New
Chapter: ENVIRONMENT
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Environment(1 Projects) Total
600.000 600.000 0.000 0.000 100.000 0.000 100.000 500.000
Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: ENVIRONMENT(1 Projects)
600.000 600.000 0.000 0.000 100.000 0.000 100.000 500.000
2019 - 20 Original
![Page 193: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/193.jpg)
Public Sector Development Programme (Sectorwise)
189 of 214
2187 Z2018.3944ProvincialApproved
CONST: OF OFFICE BUILDING FOR DIVISIONAL DIRECTOR & ASSISTANT DIRECTOR LOCAL GOVERNMENT.
30.0000.000
30.000 10.0000.000
10.000 33% 10.0000.000
0.000 10.000 66% 10.0000.000
2186 Z2018.2555ProvincialApproved
BR/ DEV: COMMUNITY EMPOWERMENT PROJECT (BRDCEP).
500.0005000.000
5500.000 499.000499.000
998.000 18% 0.1000.000
0.000 0.100 18% 0.9004501.000
2185 Z2018.1558Kachhi
Approved
FIXING OF TUFF TILES IN MACH, DHADAR & MASHKAF.
30.0000.000
30.000 14.0000.000
14.000 46% 16.0000.000
0.000 16.000 100% 0.0000.000
2184 Z2017.1447Sibi
Approved
CONSTRUCTION OF NEW BLOCK, IN LOCAL GOVT: REST HOUSE AT SIBI.
30.0000.000
30.000 20.0000.000
20.000 66% 10.0000.000
0.000 10.000 100% 0.0000.000
2183 Z2017.1172Khuzdar
Approved
CONST: OF PARK, ROCK POOLS, HUTS & PICNIC POINTS AT SWENDAH TEHSIL ZEHRI.
10.0000.000
10.000 5.0000.000
5.000 50% 5.0000.000
0.000 5.000 100% 0.0000.000
2182 Z2016.1034Khuzdar
Approved
CONSTRUCTION AND B/T ROAD SOMAR CROSS TO GARO KIT KHUZDAR.
70.0000.000
70.000 62.0000.000
62.000 88% 1.0000.000
0.000 1.000 90% 7.0000.000
2181 Z2014.1106ProvincialApproved
CONST: OF STORM WATER DRAIN AND SEWERAGE SYSTEM FOR OLD TOWN GWADAR (GDA).
594.8700.000
594.870 508.2400.000
508.240 85% 86.6300.000
0.000 86.630 100% 0.0000.000
2180 Z2014.0150Quetta
Approved
CONST: OF COMMUNITY CENTER AT GULISTAN TOWN QUETTA (THROUGH COMMISSIONER).
90.2160.000
90.216 10.0000.000
10.000 11% 5.0000.000
0.000 5.000 16% 75.2160.000
2179 Z2014.0067ProvincialApproved
OFFICE BUILDINGS FOR DISTRICT COUNCIL (LEHRI, SOHBATPUR, CHAMAN, CHAGAI, HARNAI & WASHUK).
90.0000.000
90.000 80.0000.000
80.000 88% 10.0000.000
0.000 10.000 100% 0.0000.000
2178 Z2013.0015Quetta
Approved
CONSTRUCTION OF NEW PARKS IN QUETTA CITY.
163.2000.000
163.200 155.5000.000
155.500 95% 7.7000.000
0.000 7.700 100% 0.0000.000
5000.000 499.000 0.000 4501.000
Local Govt(10 Ongoing Projects) GoB/FPA Sub-Total
1608.286 6608.286 1363.740 1862.740 151.430 0.000 151.430 93.116
Subsector: Local Govt
Sector: Local Govt & Rural Development
Chapter: LOCAL GOVT:
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 194: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/194.jpg)
Public Sector Development Programme (Sectorwise)
190 of 214
2202 Z2019.0349Quetta
CPapproved
P.C.C TUFF/T KECHI BAIG, SHADENZAI& HANNA
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2201 Z2019.0342Kharan
CPapproved
CONST. & REH. OF B/T ROADS FROM SARAWAN TO SIBI , JANGAL TO NAROO RD, KITO TO KOOTAN, GWASH TO BEDIYAN
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
2200 Z2019.0336Kharan
CPapproved
DEV: WATER TUBEWELLS WITH SOLAR IN SARWAN, TOMULK, JAMAK, NOROZ-E-KALAT, RASKOH, TOTAZAI, JODA-E-KALAT, MISKAN-E-KALAT
100.0000.000
100.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 100% 0.0000.000
2199 Z2019.0328Quetta
CPapproved
REHABILITATION OF UC OFFICE WARD -16 NASIRABAD, ALAMDAR ROAD, QUETTA.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2198 Z2019.0325Quetta
CPapproved
PROVISION OF STREET LIGHTS FOR MAJ. MUHAMMAD ALI SHAHEED ROAD, GULISTAN TOWN, QUETTA.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2197 Z2019.0323Qilla
AbdullahCPapproved
SOLARIZATION OF WSS IN AREA OF KILLI DOLANGI, TEHSIL GULISTAN.
18.4390.000
18.439 0.0000.000
0.000 0% 18.4390.000
0.000 18.439 100% 0.0000.000
2196 Z2019.0321Duki
CPapproved
WATER TANKS IN UNION COUNCIL JUNGLE AREA KILLI WAHKAM RABAD, WAYALA DUKI AREA KILLI OLD DUKI.
16.0000.000
16.000 0.0000.000
0.000 0% 16.0000.000
0.000 16.000 100% 0.0000.000
2195 Z2019.0320Quetta
CPapproved
CONST:OF ROADS,SIDE DRAINS & SEWERAGE LINES AT ALAMDAR ROAD, TOGHIROAD,REHMATULLAH ROAD,S:ESSA KHAN ROAD,H.H.SOCIETY.
80.0000.000
80.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 50% 40.0000.000
2194 Z2019.0311Quetta
CPapproved
CONSTRUCTION OF PCC STREET, STAIRS &TOUGH TILES AT MARIABAD, ALAMDAR ROAD, PASHTOON ABAD, SHALDARA, KASI QILA QUETTA.
90.0000.000
90.000 0.0000.000
0.000 0% 60.0000.000
0.000 60.000 66% 30.0000.000
2193 Z2019.0189Jaffarabad
CPapproved
CONST: OF BOUNDARY WALL GRAVEYARD NEAR QURBAN COLONY USTA MUHAMMAD.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
2192 Z2019.0187Khuzdar
CPapproved
WSS ALONG WTIH SOALR SYSTEM IN VILLAGES KHUND, SUNNI AND SEVENTH MARHALA TEHSIL KHUZDAR
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2191 Z2019.0088Quetta
CPapproved
CONST: OF CONFERANCE HALL & ALLIED FACILITIES AT DGPR QUETTA.
40.0000.000
40.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 100% 0.0000.000
2190 Z2019.0084Provincial
CPapproved
PROV: OF REMAINING FACILITIES OF CHILD BIRTH REGISTRATION IN BALOCHISTAN.
147.1630.000
147.163 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 33% 97.1630.000
2189 Z2019.0083Provincial
CPapproved
CONST: OF OFFICE BUILDING FOR MUNICIPAL COMMITTEE GANDAWA, SHERANI, KHARAN, BARKHAN, SOHBATPUR, KOHLU, HURAMZAI, ETC.
225.0000.000
225.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 22% 175.0000.000
2188 Z2019.0082Provincial
CPapproved
CONST: OF DIRECTOR GENERAL LG OFFICE / ELECTION CELL AUTHORITY & OTHER.
100.0000.000
100.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 50.0000.000
Subsector: Local Govt
Sector: Local Govt & Rural Development
Chapter: LOCAL GOVT:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 195: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/195.jpg)
Public Sector Development Programme (Sectorwise)
191 of 214
2217 Z2019.0792Quetta
CPapproved
SUPPLYING/INSTALLATION OF STREET LIGHTS AT BANK COLONY QAMBRANI-I, QAMBRANI-II AND SARMAST ABAD, QAMBRANI.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
2216 Z2019.0722Kachhi
CPapproved
PROVISION OF TUFF TILES & SIDE DRAINS FOR SHORAN CITY.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
2215 Z2019.0649Quetta
CPapproved
LAYING OF TUFF TILES AT WARD NO. 52, 54,55,56,57 & 58 PB-30 SARIAB QUETTA.
13.6000.000
13.600 0.0000.000
0.000 0% 13.6000.000
0.000 13.600 100% 0.0000.000
2214 Z2019.0563Quetta
CPapproved
PROVIDING AND FIXING OF STREET LIGHTS & SPANE WIRE FOR HAZARA TOWN AND NEW HAZARA TOWN, QUETTA.
25.0000.000
25.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 40% 15.0000.000
2213 Z2019.0562Quetta
CPapproved
SEWERAGE LINES AT MAIN KIRANI ROAD, KHALIQ ABAD ROAD, KHALIQ SHAHEED ROAD, QUETTA.
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
2212 Z2019.0561Quetta
CPapproved
CONSTRUCTION OF SIDE DRAIN AND PIPE CULVERTS AT NEW HAZARA TOWN, QUETTA.
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
2211 Z2019.0560Quetta
CPapproved
CONST OF PCC STREETS, TOUGH TILES AT KILLI KIAZAI, PASHTOON BAGH, FAISAL TOWN, A-ONE CITY, RAISANI TOWN, ETC.
80.0000.000
80.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 31% 55.0000.000
2210 Z2019.0508Quetta
CPapproved
CONST. OF DRAINS & PCC STREETS AT KUCHLAK, BALELI, KILLI KATHEER, NOHSAR, MEHTARZAI, SAMUNGLI IN PB-24 ETC
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
2209 Z2019.0504Quetta
CPapproved
INSTAL: OF PLASTIC WATER TANKS AT BALELI, KILLI NOHSAR, KILLI MEHTARZAI, SAMUNGLI IN PB-24 ETC
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2208 Z2019.0503Quetta
CPapproved
INSTALLATION OF STREET LIGHTS AT KUCHLAK, KILLI KATHEER, NOHSAR, KILLI MEHTARZAI, SAMUNGLI, IN PB-24 ETC
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2207 Z2019.0481Quetta
CPapproved
CONSTRUCTION OF TUFF TILE, SEWERAGE DRAINAGE AT KILLI ISMAIL QUETTA.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2206 Z2019.0476Quetta
CPapproved
CONST: OF B/T ROAD, SEWARAGE LINE AT MADDRASA COLONY BLOCK # 5 SATELLITE TOWN.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2205 Z2019.0461Quetta
CPapproved
CONST: OF TUFF TILE, SEWERAGE DRAINAGE AT KILLI ALAM KHAN AND KILLI PAIND KHAN QUETTA.
12.5000.000
12.500 0.0000.000
0.000 0% 12.5000.000
0.000 12.500 100% 0.0000.000
2204 Z2019.0457Quetta
CPapproved
CONSTRUCTION OF TUFF TILE, SEWERAGE DRAINAGE AT HUDDA, DEBA, TIRKHA AND SHEIKH HASSANI, QUETTA.
22.0000.000
22.000 0.0000.000
0.000 0% 22.0000.000
0.000 22.000 100% 0.0000.000
2203 Z2019.0410Pishin
CPapproved
WSS FOR KILLI GOLAI, DAB, ISMAIL ZAI, KIRAL ABAD & OTHERS.
18.0000.000
18.000 0.0000.000
0.000 0% 18.0000.000
0.000 18.000 100% 0.0000.000
Subsector: Local Govt
Sector: Local Govt & Rural Development
Chapter: LOCAL GOVT:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 196: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/196.jpg)
Public Sector Development Programme (Sectorwise)
192 of 214
2232 Z2019.1070Jhal Magsi
CPapproved
CONSTRUCTION OF SEWERAGE SYSTEM AT HINDU MOHALLAH GANDHAWA.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
2231 Z2019.1068Jaffarabad
CPapproved
CONS:OF SEWERAGE SYSTEM BHAGHORI MOUHLLAH DERA ALLAH YAR DISTRICT JAFFAR ABAD.FILLING AND REH: OF SHAMSHAN GATH.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2230 Z2019.1066Jhal Magsi
CPapproved
CONST: OF LYING, FIXING OF T/TILES AT DARGAH FATEH PUR, CONS: OF BOUNDARYWALL SHAMSHAN GATH GANDHWA.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2229 Z2019.1065Sohbatpur
CPapproved
CONST: OF LYING AND FIXING OF TUFF TILES HINDU MOHALLAH MAJHI PUR DISTRICT SOBAT PUR.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2228 Z2019.1062Jhal Magsi
CPapproved
CONST: OF SEWERAGE SYSTEM AND TUFF TILES AT HINDU MOULLAH 1,2,3,4 DISTRICT JHAL MAGASI.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2227 Z2019.1061Quetta
CPapproved
CONS:SEW/SYS CHRISTEN COLONY KILLI KHAIZAI, SEW/LINE AT STREET -1 YUHANABAD NAWA KILLI , SOLAR S/LIGHTS KHAIZAI CHOWK
16.0000.000
16.000 0.0000.000
0.000 0% 16.0000.000
0.000 16.000 100% 0.0000.000
2226 Z2019.1040Quetta
CPapproved
CONS:OF PCC STREET ,SEW/SYS,T /TILES ESSA NAGRI,KILI GOHWERABAD BILAL COLONY SEW/LINE KILI DEBA NEAR CHRISTEN MOHALLAH
29.0000.000
29.000 0.0000.000
0.000 0% 29.0000.000
0.000 29.000 100% 0.0000.000
2225 Z2019.1019Quetta
CPapproved
CONSTRUCTION OF/ TUFF TILES/ BOUNDARY WALL /RENOVATION OF PRAYERS ROOMS AT PARSI GRAVEYARD AT DISTRICT QUETTA
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2224 Z2019.1003Qilla
SaifullahCPapproved
SUPPLY & INSTAL: OF SOLAR PANAL STREET LIGHTS WITH COMPLETE ACCESSORIES AT KILLA SAIFULLAH CITY.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2223 Z2019.1001Duki
CPapproved
SUPPLY & INSTAL: OF SOLAR PANAL STREET LIGHTS WITH COMPLETE ACCESSORIES AT MUNCIPAL AREA DUKI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2222 Z2019.0999Duki
CPapproved
CONST: OF DRAIN, CULVERTS, BLACK TOP ROAD & PROVIDING FIXING TUFF TILE AT MUNICPLE ARERA , DUKI.
18.0000.000
18.000 0.0000.000
0.000 0% 18.0000.000
0.000 18.000 100% 0.0000.000
2221 Z2019.0953Washuk
CPapproved
CONST: OF ROAD, YAK MUCH TO KILLISITGHAN DIST. WASHUK.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
2220 Z2019.0952Bela
CPapproved
CONST:OF BOUNDARY WALL,TUFF TILES, GURDWARA SONMINAI & TOILET BLOCK TUFF TILE SHUWALA MANDIR DIST. LASBELLA.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2219 Z2019.0951Bela
CPapproved
CONST: OF STAIRS & TUFF TILES ON MOUNTAIN CHANDAR GUPTA HINGLAJ DIST. LASBELLA.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2218 Z2019.0950Bela
CPapproved
CONST: OF ROADS, SEWERAGE, TUFF TILES, WATER SUPPLY, PARK AT HINDU MOHALLAUTHAL DIST. LASBELLA.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
Subsector: Local Govt
Sector: Local Govt & Rural Development
Chapter: LOCAL GOVT:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 197: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/197.jpg)
Public Sector Development Programme (Sectorwise)
193 of 214
2246 Z2019.1347Qilla
AbdullahCPapproved
1 BORE ALONGWITH SOLAR SYS:IN COM NEW KILLI SHAMSOZAI & 3 SOL:SYS: FOR T/W FAQIRAN, BUZRRANI, GOVT:COLL: A.REHMAN ZAI
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
2245 Z2019.1342Qilla
AbdullahCPapproved
02 NO BORES ALONG WITH SOLAR SYSTEM IN COMMUNITY KILLI MASEZAI I, KILLI MASEZAI II
11.0000.000
11.000 0.0000.000
0.000 0% 11.0000.000
0.000 11.000 100% 0.0000.000
2244 Z2019.1341Qilla
AbdullahCPapproved
4 BORES ALONG WITH SOLAR SYS:IN COMMUNITY KILLI NORAK SULEM:, ZAKRIYA ZAI NORAK, MULLA YAHYA NOORAK & U/C DAROZAI
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2243 Z2019.1340Qilla
AbdullahCPapproved
3 BORES ALONG WITH SOLAR SYS:IN COMMUNITY KILLI MOLVI DAD MUHMMAD SPINA TEZAH, KHARGAI & ZARABAND & KILLI ABEZAN
16.0000.000
16.000 0.0000.000
0.000 0% 16.0000.000
0.000 16.000 100% 0.0000.000
2242 Z2019.1339Qilla
AbdullahCPapproved
3 BORES ALONG WITH SOLAR SYS:IN COMMUNITY KILLI ABDUL REHMAN ZAI KHANZAI, ABDUL REHMANZAI, USMAN ZAI & SAPLA LAJWAR
23.0000.000
23.000 0.0000.000
0.000 0% 23.0000.000
0.000 23.000 100% 0.0000.000
2241 Z2019.1338Qilla
AbdullahCPapproved
02 NO BORES ALONG WITH SOLAR SYSTEM IN COMMUNITY KILLI SHAMSOZAI, KILLI AHMED KHAILAN, SYEDAN
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2240 Z2019.1336Qilla
AbdullahCPapproved
5 BORES ALONG WITH SOLAR SYS: IN COMMUNITY KILLI JANO DADGAI, AHMED KHAN, KARIM GUL:, AZDENZAI PINAKAI & UC GULISTAN
25.0000.000
25.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 100% 0.0000.000
2239 Z2019.1332Harnai
CPapproved
CONST:OF DRAINAGE WALL, FLOOD PROT: WALL & SUP: OF CLUSTER SOLAR SYS: FOR KILLI KHAIR ABAD,SHEIKHAN,GACHINA & OTHERS
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2238 Z2019.1331Quetta
CPapproved
CONST: OF SIDE DRAINS, ROADS & FLOOD PROTECTION WALL NAWAKILLI LAST STOP
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2237 Z2019.1329Quetta
CPapproved
CONST: OF JANAZAGA KILLI BAZI ESSAKHAIL HANA, SULAMANZAI, SATONIKA, SOORPULL, SARINGZAI URRAK
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2236 Z2019.1186Bela
CPapproved
DRILLING AND DEV: OF LOCAL BORES IN JURISDICATION OF MC HUB BELA
10.1000.000
10.100 0.0000.000
0.000 0% 10.1000.000
0.000 10.100 100% 0.0000.000
2235 Z2019.1155Quetta
CPapproved
FIXING OF TILES IN HALL & REH: ARIYA SAMAJ MANDIR, WSS AT YOUHANA ABADCONST DRAIN & LANGAR HALL KACHI BAIG, ETC.
14.0000.000
14.000 0.0000.000
0.000 0% 14.0000.000
0.000 14.000 100% 0.0000.000
2234 Z2019.1147Quetta
CPapproved
CONS:S/LINE AKHTAR MOHD ROAD, L/BORE AT SST DHAM ESSA NAGHRI ,MINORITY BHAI COMMUNITY GRAVEYARD.
16.0000.000
16.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 62% 6.0000.000
2233 Z2019.1122Kachhi
CPapproved
CONST: OF FLOOD PROTECTION BAND FOR VILLAGES OF TAYAB CHAKAR MARDI PERAT / BERMANI & LUNDAV U/C SUNNY.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
Subsector: Local Govt
Sector: Local Govt & Rural Development
Chapter: LOCAL GOVT:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 198: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/198.jpg)
Public Sector Development Programme (Sectorwise)
194 of 214
2261 Z2019.1603Harnai
CPapproved
CONST: OF B/WALL SHADES OF GRAVEYARD HARNAI TOWN.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2260 Z2019.1593Quetta
CPapproved
CONST: OF PCC STREET & TOUGH TILES AT HAZARA GRAVEYARD, HAZARA TOWN, QUETTA.
30.0000.000
30.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 33% 20.0000.000
2259 Z2019.1489Quetta
CPapproved
CONS: OF ADD: ROOMS AND TOILET BLOCK IN ADJOINING MADDRASAS AND BOUNDARY WALL KOTWAL GRAVEYARD QUETTA
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2258 Z2019.1488Quetta
CPapproved
CONS: OF FLOOD DRAIN AT MALA KHAIL ABAD STREET NO #3 AND KHAROOT ABAD ALMAS QUETTA
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2257 Z2019.1487Quetta
CPapproved
CONS: OF FLOOD DRAIN AT KUCHA MALIK RUSTAM & MALIK SIKANADAR MASJID NEAR WAPDA TRAINING CENTER NAWA KILLI QUETTA
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2256 Z2019.1450Mastung
CPapproved
CONST: OF 26 NO SOLAR BASED WSS KAREZ SOR, FAIZ ABAD, PRINGABAD, GHNJADORI, PATKI, KARDIGAP CITY, QUMBAILA, ETC
40.0000.000
40.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 100% 0.0000.000
2255 Z2019.1393Provincial
CPapproved
ESTABLISHMENT OF MODEL MARKET/ SUNDAY BAZAAR AT DISTRICT HEADQUARTERS IN ALL DISTRICTS
300.0000.000
300.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 33% 200.0000.000
2254 Z2019.1384Quetta
CPapproved
LAYING OF TOUGH TILES AT MAIRAJ BANGLOWS KILLI BARAT.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2253 Z2019.1359Quetta
CPapproved
PROV: FIXING OF STREET LIGHTS FOR GULISTAN TOWN, ARBAB STREET, KHUDAIDAD, KASI QILLA, MARIABAD & ALAMDAR ROAD *.
50.0000.000
50.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 40% 30.0000.000
2252 Z2019.1358Qilla
AbdullahCPapproved
PROV:OF 2 LOCAL BORE ALONG WITH SOALR SYS:IN COMM: KILLI W.KHAJ: SEGI, SEGI & SUP:OF SOL:SYS: FOR T/W IN K.ADAM ZAI
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
2251 Z2019.1355Quetta
CPapproved
CONST: OF U/C OFFICE SYED ABAD WARD-14 ALAMDAR ROAD *.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2250 Z2019.1354Qilla
AbdullahCPapproved
SUPPLY OF CLUSTER SOLAR SYSTEM FOR JILOCAL GOVTAH, ABTO GULISTAN.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
2249 Z2019.1353Quetta
CPapproved
CONST: OF U/C OFFICE MARIABAD, ALAMDAR ROAD WARD-15.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2248 Z2019.1352Quetta
CPapproved
CONST: OF PCC STREETS, STAIRS, TOUGH TILES AT WARD NO. 10, 11, 12, 13, 14, 15 & 16.
60.0000.000
60.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 83% 10.0000.000
2247 Z2019.1349Quetta
CPapproved
CONST: OF SEWARAGE LINE AT WARD NO. 9, 10, 12, 13, 14, 15, 16, 17, 19, 20, 21, 36, 37, 42 *.
40.0000.000
40.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 100% 0.0000.000
Subsector: Local Govt
Sector: Local Govt & Rural Development
Chapter: LOCAL GOVT:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 199: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/199.jpg)
Public Sector Development Programme (Sectorwise)
195 of 214
2277 Z2019.1786Quetta
CPapproved
REHABLITATION OF TANA ROAD SATELLITE TOWN, QUETTA
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2276 Z2019.1784Quetta
CPapproved
REHABLITATION OF GAILANI ROAD GIRLS COLLEGE SATELLITE TOWN, QUETTA
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2275 Z2019.1783Quetta
CPapproved
REHABLITATION OF BLACK TOP ROAD AT KALAT ROAD B-3 SATELLITE TOWN QUETTA
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2274 Z2019.1782Quetta
CPapproved
CONSTRUCTION OF BLACK TOP ROAD AT SIBI ROAD B-3 SATELLITE TOWN, QUETTA
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2273 Z2019.1781Quetta
CPapproved
INSTALLATION OF SOLAR STREETLIGHT B-2-3-4 AND 5 SATELLITE TOWN, QUETTA
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2272 Z2019.1780Quetta
CPapproved
SEWERAGE LINE AND TUFF TILES AT B-3 SATELLITE TOWN QUETTA
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
2271 Z2019.1720Quetta
CPapproved
DARAINAGE SYSTEM AT HANNA URAK, NAWA KILLI AND QUETTA.
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
2270 Z2019.1718Quetta
CPapproved
CONSTRUCTION OF DRAINAGE SYSTEM, ROADS TOUGH TILES AT NAWA KILLI, HANA & ADJOINING AREAS.
90.0000.000
90.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 44% 50.0000.000
2269 Z2019.1715Quetta
CPapproved
CONSTRUCTION OF ROAD, DRAINAGE, TUFF TILE, SEWERAGE AT SAMANUGLI, KHEZI, KILLI BADEZAI, SHEIKHMANDA & ADJOINING AREAS.
80.0000.000
80.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 50% 40.0000.000
2268 Z2019.1707Quetta
CPapproved
CONST: OF DRAIN WARD NO. 54 KILLI SHAHOZAI KILLI IBRAHIM ZAI, ALLAHABAD, GHAFAR STREET & ADJOINING AREAS.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2267 Z2019.1702Quetta
CPapproved
CONST: OF SWERAGE LINE OF ROAD WARD NO. 54 KILLI SHAHOZAI, IBRAHIM ZAI, MOHD HUSSAIN & ADJOINING AREAS.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2266 Z2019.1700Quetta
CPapproved
CONST OF TUFF TILE OF ROAD WARD NO. 54 KILLI SHAHOZAI, KILLI IBRAHIM ZAI, GHAFAR STEET & ADJOINING AREAS.
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
2265 Z2019.1697Quetta
CPapproved
CONSTT: OF ROAD, DRAIN AND SEWERAGE SYSTEM AT MEHMOOD MEENA, ACHAKZAI COLONY AND SATELLITE TOWN, QUETTA.
63.0000.000
63.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 47% 33.0000.000
2264 Z2019.1682Jhal Magsi
CPapproved
CONST: OF PUBLIC PARK JHAL MAGSI TOWN, JHAL MAGSI
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
2263 Z2019.1622Mastung
CPapproved
CONST: OF PCC STREET SEWARAGE SYSTEM & TOUGH TILES KILLI LADHA.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2262 Z2019.1618Quetta
CPapproved
PROV: OF STREET LIGHTS IN KECHI BAIG & SHADENZAI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
Subsector: Local Govt
Sector: Local Govt & Rural Development
Chapter: LOCAL GOVT:
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 200: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/200.jpg)
Public Sector Development Programme (Sectorwise)
196 of 214
2291 Z2019.2057Quetta
CPapproved
LAYING OF WSS PIPE LINENET WORK AT SHAHBAZ TOWN PHASE-II QUETTA CANTTAT SHAHBAZ TOWN PHASE-II QUETTA CANTT:
1.1000.000
1.100 0.0000.000
0.000 0% 1.1000.000
0.000 1.100 100% 0.0000.000
2290 Z2019.2055Quetta
CPapproved
LAYING/IMPROV: OF SEWERAGE NETWORK AT SHAHBAZ TOWN PHASE-II QUETTA CANTTRS.9
9.0000.000
9.000 0.0000.000
0.000 0% 9.0000.000
0.000 9.000 100% 0.0000.000
2289 Z2019.2043Qilla
AbdullahCPapproved
CONST OF FLOOD PROTECTION WALL/ BANDAT DISTRICT KILLA ABDULLAH
54.2180.000
54.218 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 55% 24.2180.000
2288 Z2019.2005Khuzdar
CPapproved
WSS AT SUNI KUND 7-MARLA. 10.0000.000
10.000 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 50% 5.0000.000
2287 Z2019.2004Khuzdar
CPapproved
WSS AT ANWER ABAD, ATTA ABAD, JALA ABAD GAWANI GRESHA NAAL.
10.0000.000
10.000 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 50% 5.0000.000
2286 Z2019.2003Khuzdar
CPapproved
CONST: OF B/T ROAD NAL MAIN ROAD TO GULBIT FEROZ ABAD.
10.0000.000
10.000 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 50% 5.0000.000
2285 Z2019.2002Khuzdar
CPapproved
CONST: OF B/T ROAD MULGUZAR NIAMJO GHAZNAVI STREET KARKH KOLONOI.
10.0000.000
10.000 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 50% 5.0000.000
2284 Z2019.2001Khuzdar
CPapproved
CONST: OF PCC STREET / DRAIN / FOOTPATH / TOUGH TILES AT MUHALLA GUZGI IMAIL ABAD.
10.0000.000
10.000 0.0000.000
0.000 0% 5.0000.000
0.000 5.000 50% 5.0000.000
2283 Z2019.1991Quetta
CPapproved
CONST: OF DRAINS, TOUGH TILES, SEWRAGE LINE AT BARRECH ABAD & KHAROOTABAD.
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
2282 Z2019.1983Quetta
CPapproved
CONST: OF DRAINS, TOUGH TILES & SEWARAGE SYSTEM AT NASRULLAH KHAN CHOWK U/C 21,22 & 41.
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
2281 Z2019.1982Quetta
CPapproved
CONST: OF DRAINS, TOUGH TILES & SEWARAGE SYSTEM AT PASHTOOM DARA AT MOHD KHAIR ROAD & LINK STREETS.
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
2280 Z2019.1871Khuzdar
CPapproved
CONSTRUCTION OF SEWERAGE DRAIN FROM NALL BAZAR TO NADI FACTORY NALL KHUZDAR
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
2279 Z2019.1855Quetta
CPapproved
CONST:OF SEWERAGE SYSTEM/FLOOD DRAINS/ TROUGHTILES FOR QUETTA
36.0000.000
36.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 55% 16.0000.000
2278 Z2019.1799Quetta
CPapproved
CONSTRUCTION OF TUFF TILE AND DRAINS IN STREETS OF ANDERABAD KATIR KUCHLAK QUETTA
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
0.000 0.000 0.000 0.000
Local Govt(104 New Projects) GoB/FPA Sub-Total
3039.120 3039.120 0.000 0.000 2012.739 0.000 2012.739 1026.381
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
New
Sector: Local Govt & Rural Development
Chapter: LOCAL GOVT:
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Local Govt
Local Govt(114 Projects) Total
4647.406 9647.406 1363.740 1862.740 2164.169 0.000 2164.169 1119.497
Sub-Sector Total (FPA) 5000.000 499.000 0.000 4501.000
2019 - 20 Original
![Page 201: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/201.jpg)
Public Sector Development Programme (Sectorwise)
197 of 214
Sector: LOCAL GOVT:(114 Projects)
4647.406 9647.406 1363.740 1862.740 2164.169 0.000 2164.169 1119.497
Sector Total (FPA) 5000.000 499.000 0.000 4501.000
2019 - 20 Original
![Page 202: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/202.jpg)
Public Sector Development Programme (Sectorwise)
198 of 214
2292 Z2017.0085ProvincialApproved
ESTABLISHMENT OF WOMEN CENTERS AT DIVISIONAL LEVEL AT KECH, LORALAI & NASEERABAD.
120.0000.000
120.000 20.0000.000
20.000 16% 20.0000.000
0.000 20.000 33% 80.0000.000
Women Development(1 Ongoing Projects) GoB/FPA Sub-Total
120.000 120.000 20.000 20.000 20.000 0.000 20.000 80.000
0.000 0.000 0.000 0.000
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Sector: Social Welfare & Women Development
Chapter: WOMEN DEVELOPMENT
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Women Development
2019 - 20 Original
![Page 203: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/203.jpg)
Public Sector Development Programme (Sectorwise)
199 of 214
2296 Z2019.1410Provincial
CPapproved
WORKING WOMEN HOSTEL FOR SINGLE & FAMILY AT DIVISION HEADQUARTERS OF BALOCHISTAN.
600.0000.000
600.000 0.0000.000
0.000 0% 150.0000.000
0.000 150.000 25% 450.0000.000
2295 Z2019.0794Quetta
CPapproved
IMPROVEMENT OF SHELTER HOMES OF SOCIAL WELFARE AND WOMEN DEVELOPMENT AT QUETTA..
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
2294 Z2019.0139Provincial
CPapproved
WOMEN BAZARS AT QUETTA, KHUZDAR, KHARAN, LORALAI AND GWADAR.
100.0000.000
100.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 25% 75.0000.000
2293 Z2019.0135Provincial
CPapproved
WOMEN BUSINESS INCUBATION CENTRE AT QUETTA, KHUZDAR, KHARAN, LORALAI & GWAWAR.
100.0000.000
100.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 30% 70.0000.000
Women Development(4 New Projects) GoB/FPA Sub-Total
815.000 815.000 0.000 0.000 220.000 0.000 220.000 595.000
0.000 0.000 0.000 0.000
Subsector: Women Development
Sector: Social Welfare & Women Development
Chapter: WOMEN DEVELOPMENT
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Women Development(5 Projects) Total
935.000 935.000 20.000 20.000 240.000 0.000 240.000 675.000
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: WOMEN DEVELOPMENT(5 Projects)
935.000 935.000 20.000 20.000 240.000 0.000 240.000 675.000
Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 204: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/204.jpg)
Public Sector Development Programme (Sectorwise)
200 of 214
2303 Z2018.4147Kachhi
Approved
CONST: OF B/T ROAD IN DASHTRI CHANDRAMI.
40.0000.000
40.000 20.0000.000
20.000 50% 20.0000.000
0.000 20.000 100% 0.0000.000
2302 Z2018.3955Washuk
Approved
REHABILIATION / RE-CONSTRUCTION OF GOVT BUILDING EFFECTED BY TERRORISM DISTRICT WASHUK.
100.0000.000
100.000 35.0000.000
35.000 35% 65.0000.000
0.000 65.000 100% 0.0000.000
2301 Z2018.2820Khuzdar
Approved
CONST: OF OFFICE BUILDING & ACCOMODATION FOR UP&D DEPARTMENT AT KHUZDAR.
60.0000.000
60.000 30.0000.000
30.000 50% 30.0000.000
0.000 30.000 100% 0.0000.000
2300 Z2018.2362Kech
Approved
WATER SUPPLY SCHEME PIPE LINE MALIK ABDAD DISTRICT KECH
98.0000.000
98.000 40.0000.000
40.000 40% 40.0000.000
0.000 40.000 81% 18.0000.000
2299 Z2018.1598Bela
Approved
CONST: OF BLACK TOP ROAD FROM MAIN SONMIANII ROAD VIA SHERO & RAZAHI BALOCH VILLAGES.
30.0000.000
30.000 25.0000.000
25.000 83% 5.0000.000
0.000 5.000 100% 0.0000.000
2298 Z2017.1186Khuzdar
Approved
CONST: OF SHAHEED NAWABZADA SIKANDER KHAN ZEHRI PARK KARKH.
30.0000.000
30.000 20.0000.000
20.000 66% 10.0000.000
0.000 10.000 100% 0.0000.000
2297 Z2013.0205Kech
Approved
TURBAT CITY DEVELOPMENT PROJECT / MASTER PLAN.
5146.1510.000
5146.151 2215.0000.000
2215.000 43% 500.0000.000
0.000 500.000 52% 2431.1510.000
Urban Planning & Development(7 Ongoing Projects) GoB/FPA Sub-Total
5504.151 5504.151 2385.000 2385.000 670.000 0.000 670.000 2449.151
0.000 0.000 0.000 0.000
Subsector: Urban Planning & Development
Sector: Urban Planning & Development
Chapter: URBAN PLANNING & DEVELOPMENT
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 205: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/205.jpg)
Public Sector Development Programme (Sectorwise)
201 of 214
2319 Z2019.0200Mastung
CPapproved
CONST: OF SOLAR WSS AT ZEHRI GATH.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2318 Z2019.0193Khuzdar
CPapproved
PCC DRAINS, TOUGH TILES IN MOHALLA ZARINA KATHAN MENGAL ABAD
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2317 Z2019.0186Khuzdar
CPapproved
PCC DRAINS, TOUGH TILES IN MOHALLA JAFFARABAD BALINA KATHAN
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2316 Z2019.0185Khuzdar
CPapproved
PCC DRAINS, TOUGH TILES IN MOHALLA PESHI KATHAN, SAAT MARHALA LATIFABAD
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2315 Z2019.0183Khuzdar
CPapproved
PCC DRAINS, TOUGH TILES IN MOHALLA KAND HAKIM ABAD
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2314 Z2019.0182Khuzdar
CPapproved
B/T, PCC DRAINS, TOUGH TILES IN MOHALLA FAIZABAD LIZZO
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2313 Z2019.0180Khuzdar
CPapproved
PCC DRAINS, TOUGH TILES IN MOHALLA SHAHWANI SALEH ABAD
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2312 Z2019.0179Khuzdar
CPapproved
PCC DRAINS, TOUGH TILES IN MOHALLA KANAK & ISMAIL ABAD
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2311 Z2019.0178Khuzdar
CPapproved
PCC DRAINS, TOUGH TILES IN MOHALLA KOSHAK & SONEJI
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2310 Z2019.0177Khuzdar
CPapproved
WSS ALONG WITH SOALR SYSTEM SONEJI, KOSHAK, KANAK U/C KOSHAK
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2309 Z2019.0176Khuzdar
CPapproved
WSS ALONG WITH SOALR SYSTEM HAIKAL, GORAST, HAINARO, DO LARRII U/C
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2308 Z2019.0175Khuzdar
CPapproved
WSS ALONG WITH SOALR SYSTEM JAWARJI GIREESHA, TAGHAB GIREESHA, SARAP GIREESHA, SHEIKH ABADI U/C GIREESHA
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2307 Z2019.0174Khuzdar
CPapproved
WSS ALONG WITH SOALR SYSTEM IN KILLI GANGOO, BAIT, NATHOO, ADAM ZAI U/C FEROZ ABAD
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2306 Z2019.0173Khuzdar
CPapproved
WSS ALONG WITH SOALR SYSTEM KILLI ABDUL QUDOOS, ZEHRI, PAHAB MAS U/C FEROZABAD
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2305 Z2019.0172Khuzdar
CPapproved
WSS ALONG WITH SOALR SYSTEM MOHALLAH KHAIR WAH, RAHIM ABAD BAJKI U/C ZARINA KATHAN.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2304 Z2019.0050Provincial
CPapproved
DEV: OF MASTER PLANS OF REMAINING 30 DISTRICT HEADQUARTERS/TOWNS & HUB TOWN OF BALOCHISTAN
500.0000.000
500.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 20% 400.0000.000
Subsector: Urban Planning & Development
Sector: Urban Planning & Development
Chapter: URBAN PLANNING & DEVELOPMENT
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 206: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/206.jpg)
Public Sector Development Programme (Sectorwise)
202 of 214
2335 Z2019.0857Provincial
CPapproved
SOLAR BASED WSS AT KILLI SHAHNAWAZ, WINDER & KILLI ASGHARABAD, SIBI.
16.0000.000
16.000 0.0000.000
0.000 0% 16.0000.000
0.000 16.000 100% 0.0000.000
2334 Z2019.0845Kech
CPapproved
COSNT: OF 1 KM SEWERAGE LINE FROM CHAHSAR CROSS TO CHAHSAR CAR WASH SERVICE TURBAT
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2333 Z2019.0818Khuzdar
CPapproved
CONST: OF B/T KHAND ZEHRI. 10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2332 Z2019.0815Khuzdar
CPapproved
CONSTRUCTION OF BT ROAD FROM C&W REST HOUSE TO DAIRY FARM KAHAN ZEHRI 8 KM ZEHRI.
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
2331 Z2019.0812Khuzdar
CPapproved
CONSTRUCTION OF BT ROAD PEESHAK TO KOTANO 10 KM BAGHBANA.
80.0000.000
80.000 0.0000.000
0.000 0% 80.0000.000
0.000 80.000 100% 0.0000.000
2330 Z2019.0800Kachhi
CPapproved
CONSTT: OF B/T ROAD FROM MIZARI CHOWK TO MALL GHASHKORI.
110.5500.000
110.550 0.0000.000
0.000 0% 110.5500.000
0.000 110.550 100% 0.0000.000
2329 Z2019.0796Kachhi
CPapproved
CONSTRUCTION OF B/T ROAD KILLI SARDAR SATAKZAI, MACH.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
2328 Z2019.0785Quetta
CPapproved
IMPROVEMENT OF SEWERAGE SYSTEM AT JINNAH TOWN.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2327 Z2019.0782Quetta
CPapproved
IMPROVEMENT OF B/T ROAD OF JINNAH TOWN.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
2326 Z2019.0781Quetta
CPapproved
IMPROVEMENT OF ROAD ROUND ABOUT AT JINNAH TOWN.
9.0000.000
9.000 0.0000.000
0.000 0% 9.0000.000
0.000 9.000 100% 0.0000.000
2325 Z2019.0777Quetta
CPapproved
CONSTRUCTION OF B/T ROAD, SIDE DRAINS AND INSTALLATION OF STREET LIGHTS, ESSA NAGRI.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2324 Z2019.0776Quetta
CPapproved
CONSTRUCTION OF B/T ROAD FROM MYAAN GHUNDI CHOWK TO KILLI BILAL.
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
2323 Z2019.0774Quetta
CPapproved
CONSTRUCTION OF B/T ROAD FROM MAIN QAMBRANI ROAD TO LINK ROAD BANK COLONY AND SHAHEEN COLONY.
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
2322 Z2019.0436Kech
CPapproved
E&I OF WSS AT PHATAN-E-KAHOOR DISTRICT KECH.
10.0500.000
10.050 0.0000.000
0.000 0% 10.0500.000
0.000 10.050 100% 0.0000.000
2321 Z2019.0435Kech
CPapproved
25 COMMUNITY WATER SUPPLY SCHEMES ALONG WITH SOLAR SYSTEM IN DISTRICT KECH
75.0000.000
75.000 0.0000.000
0.000 0% 75.0000.000
0.000 75.000 100% 0.0000.000
2320 Z2019.0204Mastung
CPapproved
CONST: OF WSS WITH SOLAR KILLI CHAKOL KAREZ HINDU.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
Subsector: Urban Planning & Development
Sector: Urban Planning & Development
Chapter: URBAN PLANNING & DEVELOPMENT
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 207: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/207.jpg)
Public Sector Development Programme (Sectorwise)
203 of 214
2350 Z2019.1396Provincial
CPapproved
NEW MODEL TOWNS IN PUBLIC PRIVATE PARTNERSHIP (BHA) (PILOT PROJECT)
500.0000.000
500.000 0.0000.000
0.000 0% 300.0000.000
0.000 300.000 60% 200.0000.000
2349 Z2019.1395Provincial
CPapproved
QUETTA MASTER PLAN. 300.0000.000
300.000 0.0000.000
0.000 0% 300.0000.000
0.000 300.000 100% 0.0000.000
2348 Z2019.1386Kalat
CPapproved
CONST: OF INTERNAL ROADS OF KALAT TOWN.
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
2347 Z2019.1385Khuzdar
CPapproved
CONST: OF INTERNAL ROADS OF KHUZDAR TOWN.
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
2346 Z2019.1162Bela
CPapproved
FAMILY PARK AND RECREATION HALL HINDU MOHALLAH UTHAL DISTRICT LASBELA
20.0000.000
20.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 50% 10.0000.000
2345 Z2019.1117Kharan
CPapproved
CONSTRUCTION OF TOILETS RASKO DISTRICT KHARAN
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
2344 Z2019.1046Panjgur
CPapproved
CUTTING OF ROAD SAKAI KALAT GICHIK TO PATHKIN TO CPEC ROAD PANJGUR.
60.0000.000
60.000 0.0000.000
0.000 0% 60.0000.000
0.000 60.000 100% 0.0000.000
2343 Z2019.0994Kech
CPapproved
B/T ROAD:AIRPORT RD TO MOHEEM RODBUNI HOUSE;QASIM DASHTI HOUSE TO AZIZULLAH HOUSE OVERSEAS CLNY TURBAT DISTT KECH 870M
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
2342 Z2019.0990Kech
CPapproved
CONST. OF 2 ADD. CLASS ROOMS AND TOILETS FOR BOYS/GIRLS SCHOOLS TEHSIL TURBAT, TUMP & DASHT.
25.0000.000
25.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 100% 0.0000.000
2341 Z2019.0988Panjgur
CPapproved
SUPPLY & INSTALLATION OF SOLAR LIGHTS AT DISTRICT PANJGUR
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2340 Z2019.0987Panjgur
CPapproved
CONSTRUCTION OF WSS AND OVERHEAD TANK 10 NOS. IN DISTRICT PANJGUR
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2339 Z2019.0972Quetta
CPapproved
LAYING OF TUFF TILES AT KILLI SADAAT, KILLI JEO, QUETTA
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2338 Z2019.0969Quetta
CPapproved
CONST: B/WALL WITH CONCERTINA WIRE WATER PIPE LINE AT CHRISTIAN TOWN SAMUNGLI ROAD, QUETTA
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2337 Z2019.0968Quetta
CPapproved
CONST: OF B/T ROAD, OPEN DRAINS & WATER PIPE LINE 2 NO. GATES, TUFF TILES AT CHRISTIAN COLONY SHAHZAMAN ROAD, QUETTA
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2336 Z2019.0963Quetta
CPapproved
CONST: B/WALL, ADDITIONAL ROOMS, WASHROOMS, FLOORING, STAIRS AT CHRIST GLORIOUS CHURCH NAWA KILLI QUETTA
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
Subsector: Urban Planning & Development
Sector: Urban Planning & Development
Chapter: URBAN PLANNING & DEVELOPMENT
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 208: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/208.jpg)
Public Sector Development Programme (Sectorwise)
204 of 214
2366 Z2019.2049Kech
CPapproved
WSS DAD MUHAMMAD BAZAR ZAREEN BUG DASHT
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
2365 Z2019.2017Gwadar
CPapproved
IMPLEMENTATION OF GWADAR SMART PORT CITY MASTER PLAN
1000.0000.000
1000.000 0.0000.000
0.000 0% 500.0000.000
0.000 500.000 50% 500.0000.000
2364 Z2019.2000Panjgur
CPapproved
CONST: OF SOLAR WSS, PIPE LINES HAJI BADAL KHAN BAZAR GOZAR GICHIK PANGOR.
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
2363 Z2019.1955Kachhi
CPapproved
CONSTRUCTION OF B/T ROAD FROM N-65 TO CHANDRAMI DISTRICT KACCHI.
90.0000.000
90.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 33% 60.0000.000
2362 Z2019.1941Ziarat
CPapproved
DEVELOPMENT OF ZIARAT TOWN (PROV. SHARE RS.500 M) 50:50.
250.0000.000
250.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 40% 150.0000.000
2361 Z2019.1935Quetta
CPapproved
PROVISION OF LAND AND CONST: OF WELL PLANNED NEW FOUR (04) GRAVEYARDS IN QUETTA CITY (QDA).
250.0000.000
250.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 40% 150.0000.000
2360 Z2019.1930Chagai
CPapproved
MASTER PLANNING OF DALBANDIN.
100.0000.000
100.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 20% 80.0000.000
2359 Z2019.1928Kech
CPapproved
CONST: OF B/T ROAD 1 KM FROM BAHOOT VILLAGE TO ISMAIL VILLAGE KOLWAI BAZAR ABSAR KECH.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2358 Z2019.1886Panjgur
CPapproved
CONST: OF SIDE B/WALL & TWO ROOMS AT BALCOH STAR CLUB KHAN ZAHINGI ESSAI.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2357 Z2019.1841Quetta
CPapproved
CONST: OF OVER HEAD WATER TANK AT KHILJI COLONY, SARIAB ROAD
22.0000.000
22.000 0.0000.000
0.000 0% 22.0000.000
0.000 22.000 100% 0.0000.000
2356 Z2019.1835Quetta
CPapproved
SUPPLYING/INSTAL: OF STREET LIGHTS AT BANK COLONY QAMBRANI-I, QAMBRANI-II & SARMAST ABAD, QAMBRANI, QUETTA.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
2355 Z2019.1819Quetta
CPapproved
CONST:OF DRAIN, TUFF TILE, PCC & SEW: SYS: AT SHALDARA, H.GHAIBI RD, M.NAZAR CHOWK & LINK ST. DURRANI BAGH
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
2354 Z2019.1808Quetta
CPapproved
CONSTT: OF DRAIN, TUFF TILE, PCC & SEWERAGE SYSTEM AT USMAN ABAD, NOORZAI COOLONY PASHTOONABAD.
40.0000.000
40.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 100% 0.0000.000
2353 Z2019.1628Bela
CPapproved
CONST: OF B/T ROAD FROM REK GOTH TO GADORE GOAK LASBELA.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
2352 Z2019.1571Quetta
CPapproved
REH: OF LIAQAT,S/TOWN(GENTS & LADIES),SADIQ SHAHEED,AIRPORT RD GREEN BELT, BENAZIR & BMC SPINY HEALTH PARK (QUETTA PKG)
108.2490.000
108.249 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 27% 78.2490.000
2351 Z2019.1417Provincial
CPapproved
APNA GHAR SCHEME (PILOT PROJECT) (BHA).
1000.0000.000
1000.000 0.0000.000
0.000 0% 300.0000.000
0.000 300.000 30% 700.0000.000
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Subsector: Urban Planning & Development
Chapter: URBAN PLANNING & DEVELOPMENT
Sector: Urban Planning & Development
New
2019 - 20 Original
![Page 209: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/209.jpg)
Public Sector Development Programme (Sectorwise)
205 of 214
0.000 0.000 0.000 0.000
Urban Planning & Development(63 New Projects) GoB/FPA Sub-Total
5335.849 5335.849 0.000 0.000 2992.600 0.000 2992.600 2343.249
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Urban Planning & Development(70 Projects) Total
10840.000
10840.000
2385.000 2385.000 3662.600 0.000 3662.600 4792.400
Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: URBAN PLANNING & DEVELOPMENT(70 Projects)
10840.000
10840.000
2385.000 2385.000 3662.600 0.000 3662.600 4792.400
2019 - 20 Original
![Page 210: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/210.jpg)
Public Sector Development Programme (Sectorwise)
206 of 214
2376 Z2017.1011Pishin
Approved
CONST: OF 132 KV GRID STATION AT KAN MEHTERZAI (50:50 SHARE).
124.8850.000
124.885 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 40% 74.8850.000
2375 Z2016.1130Duki
Approved
VILLAGE ELECTRIFICATION IN DUKI.
165.0000.000
165.000 156.2400.000
156.240 94% 8.7600.000
0.000 8.760 100% 0.0000.000
2374 Z2016.0635Sibi
Approved
PROVISION OF ELECTRIFICATION GOAT WELYA BAGHDAR & DARGAHA INYAT SHAH SHAMSI 22 POLES,HOME SOLAR SYSTEM ,ETC.
20.2690.000
20.269 10.5380.000
10.538 51% 9.7310.000
0.000 9.731 100% 0.0000.000
2373 Z2016.0572Pishin
Approved
PROV: & INST: OF SOLAR HOME SYSTEM FOR BARSHORE & TOBA KAKARI (PB-09).
24.9210.000
24.921 18.4210.000
18.421 73% 6.5000.000
0.000 6.500 100% 0.0000.000
2372 Z2016.0348Kachhi
Approved
PROVISION OF SOLAR TUBEWELL OF SHORAN TEHSIL SANNI & SOLAR TUBE WELLS FOR SIBREE.
20.0000.000
20.000 18.0000.000
18.000 90% 2.0000.000
0.000 2.000 100% 0.0000.000
2371 Z2016.0140Kech
Approved
SOLAR ELECT: & PROV: OF SOLAR HOME APPLIANCES OF VARIOUS VILLAGES IN ZAMURAN KECH-2 & PROV: OF TRANSF:& POLES TO HOSH.
49.9300.000
49.930 37.5540.000
37.554 75% 12.3760.000
0.000 12.376 100% 0.0000.000
2370 Z2015.0083Loralai
Approved
PROVISION OF SOLAR SYSTEM, TEHSIL BORI MEKHTAR AND LORALAI CITY.
40.0000.000
40.000 29.2100.000
29.210 73% 10.7900.000
0.000 10.790 100% 0.0000.000
2369 Z2014.0540Washuk
Approved
INSTALLATION OF 01 NO SOLAR SYSTEM AT WIRELESS LOOP TOWER NEW JANGIAN AND 14 NOS SOLAR SYSTEM AT WSS U/CS, WASHUK
43.0940.000
43.094 41.9440.000
41.944 97% 1.1500.000
0.000 1.150 100% 0.0000.000
2368 Z2013.0039Quetta
Approved
INSTALLATION OF SOLAR POWER SYSTEM IN P&D DEPT: CM HOUSE & GOVERNOR HOUSE BALOCHISTAN.
157.6220.000
157.622 146.0490.000
146.049 92% 11.5730.000
0.000 11.573 100% 0.0000.000
2367 Z2011.0567Quetta
Approved
PROVISION OF SOLAR STREET LIGHTS, AIRPORT ROAD.
158.0000.000
158.000 141.2500.000
141.250 89% 5.0000.000
0.000 5.000 92% 11.7500.000
Power(10 Ongoing Projects) GoB/FPA Sub-Total
803.721 803.721 599.206 599.206 117.880 0.000 117.880 86.635
0.000 0.000 0.000 0.000
Subsector: Power
Sector: Power
Chapter: POWER
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 211: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/211.jpg)
Public Sector Development Programme (Sectorwise)
207 of 214
2390 Z2019.0518Quetta
CPapproved
PROV:OF 80 HT POLES & 60 LT POLES KILLI KHANO, MULLAZAI, SAHIBZADA, ABDULZAI, KHANEZAI, GHIBZAI, S.NABI BAKSH ETC
13.0000.000
13.000 0.0000.000
0.000 0% 13.0000.000
0.000 13.000 100% 0.0000.000
2389 Z2019.0517Quetta
CPapproved
PROV:OF 18 50 KV TRANSF:AT KILLI KHANO, MULLAZAI, SAHIBZADA, ABDUL ZAI, KHANEZAI, GHIBZAI, S.NABI BAKSH, PANJPAI ETC
11.0000.000
11.000 0.0000.000
0.000 0% 11.0000.000
0.000 11.000 100% 0.0000.000
2388 Z2019.0516Quetta
CPapproved
PROV: OF 16 NOS 100 KV TRANSF:AT KUCHLAK, BALELI, CHASHMA, KARAK, SAMALII, NOHSAR, AGHBARG & PANJPAI IN PB-24
13.0000.000
13.000 0.0000.000
0.000 0% 13.0000.000
0.000 13.000 100% 0.0000.000
2387 Z2019.0430Pishin
CPapproved
PROV. & INSTALL OF TRANSFORMER 50 AND 100 KV/ POLES FOR U/C YARO (1) & (2) FAIZ ABAD, MALIKYAR ISMAILZAISYEDAN & OTHERS
20.1500.000
20.150 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 49% 10.1500.000
2386 Z2019.0375Jaffarabad
CPapproved
STREET SOLAR LIGHT POLLS AT MOHABBAT SH:, QAIDI SH:, BALAN SH: & BARI SH: AT MAIN USTA MOHD ROAD TO JHAT PAT ROAD.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2385 Z2019.0374Jaffarabad
CPapproved
STREET SOLAR LIGHT POLLS AT DERA ALLAH YAR CITY.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2384 Z2019.0373Jaffarabad
CPapproved
PROV OF MISSING & NEW ELECTRIC FACIL: IN UC BAND MANIK, CATTLE FARM , RAN PATTANI, HAFEEZABAD & ABDUL GHAFFAR.
13.0000.000
13.000 0.0000.000
0.000 0% 13.0000.000
0.000 13.000 100% 0.0000.000
2383 Z2019.0372Jaffarabad
CPapproved
PROVISION OF MISSING & NEW ELECTRIC FACILITIES IN UC ROJHAN JAMALI , RAMZEPUR , NASERABAD , YET GARGH & CHALGARI.
12.7300.000
12.730 0.0000.000
0.000 0% 12.7300.000
0.000 12.730 100% 0.0000.000
2382 Z2019.0371Jaffarabad
CPapproved
PROVISION OF MISSING ELECTRIC FACILITIES IN CITY DERA ALLAH YAR.
13.3600.000
13.360 0.0000.000
0.000 0% 13.3600.000
0.000 13.360 100% 0.0000.000
2381 Z2019.0347Quetta
CPapproved
VILLAGE ELECTRICFICATION IN KECHI BAIG & U/C SHADENZAI & ADJOINING AREAS.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2380 Z2019.0306Quetta
CPapproved
INSTALLATION OF TRANSFORMERS & PCC POLES 35 NOS., ALAMDAR RAOD AND MARIABAD, QUETTA
70.0000.000
70.000 0.0000.000
0.000 0% 70.0000.000
0.000 70.000 100% 0.0000.000
2379 Z2019.0298Bela
CPapproved
ELECTRI: OF VILLAGES, GOTH SHAKIR BALOCH, HASAN SAJIDIROZI KHAN, NABI DAD & SOURROUNDING GOTHS, lASBELLA.
116.5000.000
116.500 0.0000.000
0.000 0% 116.5000.000
0.000 116.500 100% 0.0000.000
2378 Z2019.0171Khuzdar
CPapproved
PROVISION OF 50 KV TRANSFORMERS AT KILLI ISMAIL ABAD, KATHAN, QADIRABAD,KHUZDAR BAZAR AND OTHERS
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2377 Z2019.0072Provincial
CPapproved
R & T FEASIBILITY STUDIES. 100.0000.000
100.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 50% 50.0000.000
Subsector: Power
Sector: Power
Chapter: POWER
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 212: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/212.jpg)
Public Sector Development Programme (Sectorwise)
208 of 214
2405 Z2019.0851Qilla
SaifullahCPapproved
SOLAR HOME SYSTEM FOR TEHSIL/UC LOIBAND, TEH:UC BADINI, TEH:/UC MUSLIM, TEH/UC KILLA SAIFULLAH.
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
2404 Z2019.0846Qilla
SaifullahCPapproved
ELECTRIFI: IN TOWN MUSLIM BAGH, K. SAIF:, SARDAR & MC M.BAGH, SARDAR & MC kILLA sAIF: KANMETHERZAI ADJOING AREAS.
40.0000.000
40.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 50% 20.0000.000
2403 Z2019.0829Khuzdar
CPapproved
PROVISION OF ELECTRICITY TO TEH: MOLA AND SURROUNDING VILLAGES.
80.0000.000
80.000 0.0000.000
0.000 0% 80.0000.000
0.000 80.000 100% 0.0000.000
2402 Z2019.0827Khuzdar
CPapproved
PROVISION OF TRANSFARMER AND ELECTRIC POLLS FOR KARKH KHUZDAR.
40.0000.000
40.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 100% 0.0000.000
2401 Z2019.0820Khuzdar
CPapproved
BIFURCATION OF CITY FEEDER NORGAMA TEH: ZEHRI KHUZDAR.
29.4000.000
29.400 0.0000.000
0.000 0% 29.4000.000
0.000 29.400 100% 0.0000.000
2400 Z2019.0811Jaffarabad
CPapproved
PRV: OF TRANSF: HT/LT POLES IN 44 STREETS TEH: USTA MUHD. & GRID STATION 132 KVA FEEDER CITY USTA MUHD.
39.0000.000
39.000 0.0000.000
0.000 0% 39.0000.000
0.000 39.000 100% 0.0000.000
2399 Z2019.0810Nasirabad
CPapproved
PRV:OF TRANSF: HT/LT POLES IN 11 VILLAGES OF TEH:TAMBOO GRID STATION MANJHO SHORI 66 KVA MEER WAH FEEDER NASEERABAD
23.9900.000
23.990 0.0000.000
0.000 0% 23.9900.000
0.000 23.990 100% 0.0000.000
2398 Z2019.0783Quetta
CPapproved
INSTALLATION OF SOLAR STREET LIGHTS AT JINNAH TOWN.
30.0000.000
30.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 100% 0.0000.000
2397 Z2019.0764Loralai
CPapproved
ELECTRIFI: AT BACHA KHAN CHOWK, MOH: ZARAI BANK, JAMIA MASJID, PUNJAI MOH:, SARDAR THANA, HOSPITAL & ADJOINING AREA.
23.9690.000
23.969 0.0000.000
0.000 0% 23.9690.000
0.000 23.969 100% 0.0000.000
2396 Z2019.0762Nasirabad
CPapproved
PROV: OF ELECTRICITY & TRANS: 25 KVA, 50 KVA & 100 KVA IN MOHALLAS, COLNIES & VILLAGE OF NASIRABAD.
10.2500.000
10.250 0.0000.000
0.000 0% 10.2500.000
0.000 10.250 100% 0.0000.000
2395 Z2019.0686Nushki
CPapproved
PROV: OF HIT/LT POLES ALONG WITH TRANSFORMERS FOR KILLIES MENGAL, BADINI, MUL, AHMED WALL, KISHINGI & DAK NUSHKI.
19.8000.000
19.800 0.0000.000
0.000 0% 19.8000.000
0.000 19.800 100% 0.0000.000
2394 Z2019.0656Quetta
CPapproved
PRO: OF TRANFORMERS & POLLS IN WARD NO 52, 54, 55, 56, 57 & 58 PB-30 DIST. QUETTA.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2393 Z2019.0602Nasirabad
CPapproved
PROVISION OF ELECTRICITY POLES AN DTRANSFORMERS TEHSIL BABA KOT, LANDHI TEHSIL TAMBOO & D.M. JAMALI
65.0000.000
65.000 0.0000.000
0.000 0% 65.0000.000
0.000 65.000 100% 0.0000.000
2392 Z2019.0541Kech
CPapproved
AUG: OF 132 / 11KV, 6.3 MVA POWER TRANSFORMERS WITH 20/26 MVA POWER TRANSFORMER AT 132 KV GRID STATION TUMP DIST. KECH
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
2391 Z2019.0525Quetta
CPapproved
INSTALLATION OF ELECTRIC TRANSFORMERS & POLLS (60 NOS.) AT HAZARA TOWN, QUETTA.
60.0000.000
60.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 50% 30.0000.000
Subsector: Power
Sector: Power
Chapter: POWER
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 213: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/213.jpg)
Public Sector Development Programme (Sectorwise)
209 of 214
2419 Z2019.1273Kohlu
CPapproved
PROV: OF ELECT: KILLI TAJ.M ORYANI,KILLI MIR KHAN KALKANI,KILLI SALEH NAHAR,KILLI FATEH.M, LAL .M SHAHIJA BHAGIA
7.5000.000
7.500 0.0000.000
0.000 0% 7.5000.000
0.000 7.500 100% 0.0000.000
2418 Z2019.1272Kohlu
CPapproved
PROVISION OF ELECTRICITY MIAN LINE TO KILLI SHAH GUL PEERDADANI,MAIN LINE TO KILLI KUNGRANI NEAR MOMIN CHECK POST
7.5000.000
7.500 0.0000.000
0.000 0% 7.5000.000
0.000 7.500 100% 0.0000.000
2417 Z2019.1271Kohlu
CPapproved
PROV:OF ELECTRICITY KILLI KALWANI, KILLI A.KHANTAMBOO,KILLI FILHAL PETOLEUM TO BOHERI QALANDRANI,MIR KAMALNI,& OTHERS
31.0000.000
31.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 48% 16.0000.000
2416 Z2019.1242Gwadar
CPapproved
INSTALLATION OF ELECTRIC POLES & TRANSFORMERS IN TOWNS GAWADER, JIWANI, PASNI & U/C PISHUKAN ADJCENT AREA..
100.0000.000
100.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 30% 70.0000.000
2415 Z2019.1238Kech
CPapproved
TRANSF:50&100 KVA HT & LT POLES: KIKEN, PIDRAK, SAMI,SHAPUK,HERRONK, SINGABAD,TAJABAN, HOSHAB,TALSAR, T.BALGATHAR, ETC
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2414 Z2019.1225Kech
CPapproved
TRANSFORMER 50 & 100 KVA H.T & L.T POLES: KOCHA BULEDA, REKO BULEDA, MEHNAZ, SOLO,CHIP, BIT, KOSHK&SHARAK.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2413 Z2019.1219Bela
CPapproved
UPGRADATION OF WAYARO FEEDER
87.2200.000
87.220 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 34% 57.2200.000
2412 Z2019.1012Awaran
CPapproved
PROVISION OF TRANSFORMER 25 / 100 (KV) WITH POLES UC KALLAG
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2411 Z2019.1007Harnai
CPapproved
INSTALLATION OF SOLAR STREET LIGHTS AT U/C COAST, U/C SHARAK, U/C NAHKAS, U/C HARNAI BAZAR.
30.0000.000
30.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 33% 20.0000.000
2410 Z2019.0924Khuzdar
CPapproved
PROV: OF TRANSFORMERS & POLES FOR BRAHMZAI, NAZAR SHAHKH, KILLI WADH TOWN, NADEEM LOOP, DENEIR NALL & ADJACENT KILLIES.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2409 Z2019.0922Khuzdar
CPapproved
SOLAR SYSTEM FOR HOMES FOR ARANJI, SARONA, SHAH NOORANI, KANJAR MARI ORNACH, WADH, NALL, WAHID, WADH.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2408 Z2019.0891Kech
CPapproved
ENERGIZATION AND REHABILITATION OF ELECTRIC SYSTEM TUREBATMUNICPLE AREA.(HT POLE LT POILE AND TRASFORMERS)
50.0000.000
50.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 100% 0.0000.000
2407 Z2019.0884Sohbatpur
CPapproved
PROV:OF HT/ LT POLES TRANSF:IN U/CS GANDAR,KNDI, GHARI, ROOPA,BETTI, & VIL: KHAIR BUX, BEHRAM BUGHTI & ADJOINING AREA.
117.4210.000
117.421 0.0000.000
0.000 0% 117.4210.000
0.000 117.421 100% 0.0000.000
2406 Z2019.0852Qilla
SaifullahCPapproved
VILLAGE ELECTRICIAN BIJLI LINE FOR MARGHA TO LOIBAND TO BADINI HT.
30.0000.000
30.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 50% 15.0000.000
Subsector: Power
Sector: Power
Chapter: POWER
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 214: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/214.jpg)
Public Sector Development Programme (Sectorwise)
210 of 214
2434 Z2019.1868Khuzdar
CPapproved
INSTALLATION 37 NOS 50KVA TRANSFORMERS & POLES IN PB-38 KHUZDAR
24.6100.000
24.610 0.0000.000
0.000 0% 24.6100.000
0.000 24.610 100% 0.0000.000
2433 Z2019.1753Gwadar
CPapproved
100 TRANSFORMERS AND 200 POLLS FOR GWADAR DISTRICT
100.0000.000
100.000 0.0000.000
0.000 0% 40.0000.000
0.000 40.000 40% 60.0000.000
2432 Z2019.1701Nasirabad
CPapproved
ELECTRIFICATION FOR GOTH KASHMIR KOTH CAMP ABDULLAH
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2431 Z2019.1619Quetta
CPapproved
PROV:& INSTAL:OF POLES &TRANSF: KILLIES MALIK JAFFAR, ABDUL RAZIQ, M.HANIF SAHIBZADA & SURROUNDING KUCHLAK.
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2430 Z2019.1573Musa Khail
CPapproved
PROVISION OF ELECTRICITY TO KIARA AND GARGOJI DISTRICT MUSA KHAIL.
23.9000.000
23.900 0.0000.000
0.000 0% 13.9000.000
0.000 13.900 58% 10.0000.000
2429 Z2019.1486Quetta
CPapproved
PROVISION OF ELECTRICITY AND TRANSFORMERS IN 49, 50, 51, 52 & SAMUNGLI PB-25 QUETTA
25.0000.000
25.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 100% 0.0000.000
2428 Z2019.1422Qilla
AbdullahCPapproved
VILLAGE ELECTRIFICATION IN UC TEKDAR M. HASSAN, UC KHAIRABAD I & II, MC CHAMAN, UC ROGHANI I &II GULDAR ADJCENT UC.
117.2250.000
117.225 0.0000.000
0.000 0% 117.2250.000
0.000 117.225 100% 0.0000.000
2427 Z2019.1403Quetta
CPapproved
ELECTRIF: IN KHILJEE COLONY, SARIAB MIL, KILLI ALIZAI, BERACHABAD, MUSA COL:, BOSA MANDI, GANJ PERI EST: BY PASS QTA.
25.0000.000
25.000 0.0000.000
0.000 0% 25.0000.000
0.000 25.000 100% 0.0000.000
2426 Z2019.1394Provincial
CPapproved
ROSHAN BALOCHISTAN THROUGH SOLARIZATION AS OFF GRID SOLUTION (PHASE I)@
1000.0000.000
1000.000 0.0000.000
0.000 0% 500.0000.000
0.000 500.000 50% 500.0000.000
2425 Z2019.1356Qilla
AbdullahCPapproved
FIXING AND SUPPLY OF PVC PIPE 3 DAYA FOR KILLI ABDUL RAHMAN ZAI, LAJOWER GULISTAN KILLA ABDULLAH
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
2424 Z2019.1327Qilla
AbdullahCPapproved
PROV: OF TRANSFORMARS IN U/C NOORAK SULMANKHAIL, ABDUL RAHMANZAI, LAJWAR, DAROZAI, SAGI, MASSAZAI & GULISTAN
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
2423 Z2019.1326Qilla
SaifullahCPapproved
VILLAGE ELECTRIFICATION TRANSMISSION LINE MURGA TO LOIBAND TO BADANI.
15.0000.000
15.000 0.0000.000
0.000 0% 15.0000.000
0.000 15.000 100% 0.0000.000
2422 Z2019.1293Qilla
SaifullahCPapproved
PROV: OF TRANSFORMER WITH POLES FOR U/C KHAN MATHERZAI MUSLIM BAGH TOWN K.SAIFULLAH ROD JOGAZAI AREA.DIST: K.S.
18.0000.000
18.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 55% 8.0000.000
2421 Z2019.1276Kohlu
CPapproved
HOME SOLARIZATION OF (10) U/C ORYANI, GIRSINI, SFAID, DHILI, MAIWAND, NILI, TAMBOO, KARAM SHEHER, BOHERI,TOWN
70.0000.000
70.000 0.0000.000
0.000 0% 70.0000.000
0.000 70.000 100% 0.0000.000
2420 Z2019.1275Kohlu
CPapproved
PROV: OF ELECTRICITY KHAN NAHAR KILLIES JARRAK,WAZIR KHAN SHAHIJA GIRSINI, MUSA KHAN FATEH,M KAMALZAI & OTHER
10.0000.000
10.000 0.0000.000
0.000 0% 10.0000.000
0.000 10.000 100% 0.0000.000
Subsector: Power
Sector: Power
Chapter: POWER
New
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 215: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/215.jpg)
Public Sector Development Programme (Sectorwise)
211 of 214
2445 Z2019.1939Kohlu
CPapproved
PROV: OF STREET LIGHTS AT KILLI MIR NOOR AHMED KOHLU
12.0000.000
12.000 0.0000.000
0.000 0% 12.0000.000
0.000 12.000 100% 0.0000.000
2444 Z2019.1915Nasirabad
CPapproved
PROV: OF ELECTRICITY & TRANSFORMARS 25 KVA, 50 KVA AND 100 KVA IN MOHALLAS , COLONIES, VILLAGES AND DM JAMALI
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2443 Z2019.1913Kech
CPapproved
ESTABLISHMENT OF GRID STATION STATION AT NASIR ABAD KECH
90.0000.000
90.000 0.0000.000
0.000 0% 30.0000.000
0.000 30.000 33% 60.0000.000
2442 Z2019.1912Pishin
CPapproved
CONST: OF 132 KV GRID STATOIN AT BARSHORE AND 132 KV SDR ALIZAI, BARSHORE TRANSMISSION LINE,DISTRICT PISHIN(40 KM)
628.3600.000
628.360 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 7% 578.3600.000
2441 Z2019.1911Qilla
AbdullahCPapproved
CONSTRUCTION OF 132 KV GRID STATION AT CHAMAN
401.6300.000
401.630 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 12% 351.6300.000
2440 Z2019.1910Ziarat
CPapproved
CONSTT: OF SANJAVI GRID STATION 132 KV, TEHSIL SANJAVI, DISTRICT ZIARAT
330.0000.000
330.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 15% 280.0000.000
2439 Z2019.1885Panjgur
CPapproved
INST: OF HT/LT POLES ALONGWITH TRANS: IN U/C SYED ABDUL KILLI KOR SAKAI & 11 KVA OUTGOING PANEL FOR RHC KOR BALKATAR.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2438 Z2019.1884Panjgur
CPapproved
INST: OF HT / LT POLES ALONG WITH TRANSFORMERS KILLI SANDANI SIR ESSAI, DOZNAB, ESSAI, TASP & CHITKAN.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2437 Z2019.1883Panjgur
CPapproved
INSTALLATION OF SOLAR HOME SYSTEM U/C GICHK, GOWARGO, KALAG, KEELKOR, PAROOM, NOKOOR, KOHBUN.
20.0000.000
20.000 0.0000.000
0.000 0% 20.0000.000
0.000 20.000 100% 0.0000.000
2436 Z2019.1870Khuzdar
CPapproved
INSTALLATION OF 63 NOS OF 50 KVA TRANSFORMERS & POLES IN PB-40 KHUZDAR
27.0400.000
27.040 0.0000.000
0.000 0% 27.0400.000
0.000 27.040 100% 0.0000.000
2435 Z2019.1869Khuzdar
CPapproved
INSTALLATION OF 150 NOS KVA TRANSFORMERS & POLES IN PB-39 KHUZDAR
75.2600.000
75.260 0.0000.000
0.000 0% 75.2600.000
0.000 75.260 100% 0.0000.000
Power(69 New Projects) GoB/FPA Sub-Total
4642.815 4642.815 0.000 0.000 2491.455 0.000 2491.455 2151.360
0.000 0.000 0.000 0.000
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
New
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Power
Chapter: POWER
Sector: Power
Power(79 Projects) Total
5446.536 5446.536 599.206 599.206 2609.335 0.000 2609.335 2237.995
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: POWER(79 Projects)
5446.536 5446.536 599.206 599.206 2609.335 0.000 2609.335 2237.995
Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 216: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/216.jpg)
Public Sector Development Programme (Sectorwise)
212 of 214
2456 Z2017.1439Bela
Approved
MODERNIZATION OF GADDANI SHIP BREAKING YARD (50:50 SHARE WITH SHIP BREAKERS) (PPP MODE) (BDA).
256.4700.000
256.470 170.0000.000
170.000 66% 30.0000.000
0.000 30.000 77% 56.4700.000
2455 Z2016.0839ProvincialApproved
CM DISTRCIT DEVELOPMENT PLAN (RS 200 MILLION EACH DISTRICT HQ EXCLUDING DIV: HQ).
5400.0000.000
5400.000 4900.0000.000
4900.000 90% 500.0000.000
0.000 500.000 100% 0.0000.000
2454 Z2016.0836Quetta
Approved
CM PROGRAM FOR IMPROVING URBAN & CIVIC INFRA:& SERVICES IN QUETTA CITY.
13319.408
0.000
13319.408
5050.5000.000
5050.500 37% 3000.0000.000
0.000 3000.000 60% 5268.9080.000
2453 Z2016.0835ProvincialApproved
CM PROG: FOR IMP: CIVIC & URBAN INFRA: AT DIV:HQ(1BN KHUZDAR,800 LORALAI,RS 200 ZHOB & 500 EACH KECH,DM JAMALI ,SIBI.
3700.0000.000
3700.000 3349.2030.000
3349.203 90% 350.7970.000
0.000 350.797 100% 0.0000.000
2452 Z2016.0804ProvincialApproved
PROGRAM FOR UPLIFT OF CONFLICT AFFECTED MARRI AREAS IN SIBI DIVISION.
250.0000.000
250.000 0.0000.000
0.000 0% 100.0000.000
0.000 100.000 40% 150.0000.000
2451 Z2016.0063ProvincialApproved
BALOCHISTAN ECONOMIC DEVELOPMENT PROJECT (BEDP)(SDI).
100.000203.780
303.780 25.0000.000
25.000 8% 25.0000.000
0.000 25.000 16% 50.000203.780
2450 Z2016.0058ProvincialApproved
GOVERNANCE & POLICY PROJECT (GPP) BALOCHISTAN.
50.0001632.000
1682.000 16.300151.700
168.000 9% 10.000576.430
0.000 586.430 44% 23.700903.870
2449 Z2016.0057ProvincialApproved
BALOCHISTAN SUSTAINABLE DEVELOPMENT GOALS PROJECTS (50:50 GOB AND UNDP FUNDING)
250.000250.000
500.000 100.0000.000
100.000 20% 50.0000.000
0.000 50.000 30% 100.000250.000
2448 Z2015.1349ProvincialApproved
MULTIPLE INDICATOR CLUSTER SURVEY.
99.00010.000
109.000 65.0000.000
65.000 59% 34.0000.000
0.000 34.000 90% 0.00010.000
2447 Z2014.0101ProvincialApproved
FEASIBILITY STUDIES AND RESEARCH (CONT: NATURE).
1000.0000.000
1000.000 469.6870.000
469.687 46% 200.0000.000
0.000 200.000 66% 330.3130.000
2446 Z2009.0002ProvincialApproved
GWADAR-LASBELLA LIVELIHOOD SUPPORT PROJECT (IFAD).
401.8603833.000
4234.860 325.9071760.000
2085.907 49% 20.0001976.260
0.000 1996.260 96% 55.95396.740
5928.780 1911.700 2552.690 1464.390
Others(11 Ongoing Projects) GoB/FPA Sub-Total
24826.738
30755.518
14471.597
16383.297 4319.797 0.000 6872.487 6035.344
Sector: Other Schemes
Chapter: OTHER SCHEMES
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Ongoing
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Others
2019 - 20 Original
![Page 217: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/217.jpg)
Public Sector Development Programme (Sectorwise)
213 of 214
2460 Z2019.2022Quetta
CPapproved
FACE LIFTING & BEAUTIFICATION OF QUETTA CITY (QUETTA PACKAGE)
1000.0000.000
1000.000 0.0000.000
0.000 0% 400.0000.000
0.000 400.000 40% 600.0000.000
2459 Z2019.1949Provincial
CPapproved
BALOCHISTAN AWAMI DISTRICT DEVELOPMENT PROGRAMME (BADDP).
5300.0000.000
5300.000 0.0000.000
0.000 0% 5300.0000.000
0.000 5300.000 100% 0.0000.000
2458 Z2019.0020Provincial
CPapproved
PUBLIC INVESTMENT MANAGEMENT PROJECT BALOCHISTAN.
250.0000.000
250.000 0.0000.000
0.000 0% 50.0000.000
0.000 50.000 20% 200.0000.000
2457 Z2019.0008Provincial
CPapproved
BALOCHISTAN LIVELIHOOD AND ENTREPRENEUSHIP PROJECT (BLEP).
200.0005780.000
5980.000 0.0000.000
0.000 0% 50.00050.000
0.000 100.000 1% 150.0005730.000
Others(4 New Projects) GoB/FPA Sub-Total
6750.000 12530.000
0.000 0.000 5800.000 0.000 5850.000 950.000
5780.000 0.000 50.000 5730.000
Chapter: OTHER SCHEMES
New
Sector: Other Schemes
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Others
Others(15 Projects) Total
31576.738
43285.518
14471.597
16383.297 10119.797
0.000 12722.487
6985.344
Sub-Sector Total (FPA) 11708.780
1911.700 2602.690 7194.390
2019 - 20 Original
![Page 218: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/218.jpg)
Public Sector Development Programme (Sectorwise)
214 of 214
2461 Z2017.1014ProvincialApproved
FEASIBILTY STUDIES CPEC PROJECTS.
500.0000.000
500.000 117.9290.000
117.929 23% 20.0000.000
0.000 20.000 27% 362.0710.000
Public Private Partnership(1 Ongoing Projects) GoB/FPA Sub-Total
500.000 500.000 117.929 117.929 20.000 0.000 20.000 362.071
0.000 0.000 0.000 0.000
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Ongoing
Sector: Others
Chapter: OTHER SCHEMES
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Public Private Partnership
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Public Private Partnership(1 Projects) Total
500.000 500.000 117.929 117.929 20.000 0.000 20.000 362.071
Sector: OTHER SCHEMES(16 Projects)
32076.738
43785.518
14589.526
16501.226 10139.797
0.000 12742.487
7347.415
Sector Total (FPA) 11708.780
1911.700 2602.690 7194.390
Grand Total (FPA) 124191.823
4095.396 7561.451 112534.976
Grand Total: (2461 Projects) 433416.510
557608.333
125563.715
129659.111 100553.392
0.000 108114.843
207299.403
2019 - 20 Original
![Page 219: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/219.jpg)
LIST OF SCHEMES TO BE REASSESED
FOR SOCIO-ECONOMIC VIABILITY
![Page 220: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/220.jpg)
PSDP Abstract - Sectorwise
9 INFORMATION TECH: 0.100 0.000 0.100 1 0.000 0.000 0.000 0 0.100 0.000 0.100 1 0.53%
10 EDUCATION 2.400 0.000 2.400 24 0.000 0.000 0.000 0 2.400 0.000 2.400 24 12.77%
7 COMMUNICATION 7.900 0.000 7.900 79 0.000 0.000 0.000 0 7.900 0.000 7.900 79 42.02%
15 URBAN PLANNING & DEVELOPMENT
1.000 0.000 1.000 10 0.000 0.000 0.000 0 1.000 0.000 1.000 10 5.32%
13 SOCIAL WELFARE 0.100 0.000 0.100 1 0.000 0.000 0.000 0 0.100 0.000 0.100 1 0.53%
14 LOCAL GOVT: 0.500 0.000 0.500 5 0.000 0.000 0.000 0 0.500 0.000 0.500 5 2.66%
11 HEALTH 1.400 0.000 1.400 14 0.000 0.000 0.000 0 1.400 0.000 1.400 14 7.45%
12 PUBLIC HEALTH ENG: 0.500 0.000 0.500 5 0.000 0.000 0.000 0 0.500 0.000 0.500 5 2.66%
6 P.P.&H. 0.600 0.000 0.600 6 0.000 0.000 0.000 0 0.600 0.000 0.600 6 3.19%
16 POWER 0.700 0.000 0.700 7 0.000 0.000 0.000 0 0.700 0.000 0.700 7 3.72%
1 AGRICULTURE 1.600 0.000 1.600 16 0.000 0.000 0.000 0 1.600 0.000 1.600 16 8.51%
8 WATER 1.200 0.000 1.200 12 0.000 0.000 0.000 0 1.200 0.000 1.200 12 6.38%
17 FOREIGN AID 0.100 0.000 0.100 1 0.000 0.000 0.000 0 0.100 0.000 0.100 1 0.53%
4 MANPOWER 0.100 0.000 0.100 1 0.000 0.000 0.000 0 0.100 0.000 0.100 1 0.53%
5 SPORTS 0.100 0.000 0.100 1 0.000 0.000 0.000 0 0.100 0.000 0.100 1 0.53%
2 FISHERIES 0.300 0.000 0.300 3 0.000 0.000 0.000 0 0.300 0.000 0.300 3 1.60%
3 INDUSTRIES 0.200 0.000 0.200 2 0.000 0.000 0.000 0 0.200 0.000 0.200 2 1.06%
Total 18.800 0.000 18.800 188 0.000 0.000 0.000 0 18.800 0.000 18.800 188
2019 - 20 OriginalAllocation Ongoing Schemes Ongoing Allocation New Schemes New Allocation Total Total % Total
S N Chapter GOB FPA Total Schemes GOB FPA Total Schemes GOB FPA Total Schemes
![Page 221: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/221.jpg)
Public Sector Development Programme (Sectorwise)
1 of 32
2019 - 20 Original
![Page 222: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/222.jpg)
Public Sector Development Programme (Sectorwise)
2 of 32
15 Z2017.1706Qilla
SaifullahApproved
AGRICULTURE DEVELOPMENT THROUGH WATER RESOURCES MANAMGMENT KILLA SAIFULLAH (OFWM).
60.0000.000
60.000 30.0000.000
30.000 50% 0.1000.000
0.000 0.100 50% 29.9000.000
14 Z2017.1481Loralai
Approved
LEVELING OF AGRI: LAND, CONST: OF WST & INSTALL: OF PVC PIPE LINES AT SHERO KUDAZAI KILLI DERGAI MANANABAD ETC.
14.9920.000
14.992 7.0000.000
7.000 46% 0.1000.000
0.000 0.100 47% 7.8920.000
13 Z2017.1443ProvincialApproved
CONST: WATER STORAGE TANKS/DRILLING DEV. OF AGRI BORE/L BORE/INSTALLATION OF PVC PIPE & PUMP PISHIN , QTA.
99.9990.000
99.999 90.2000.000
90.200 90% 0.1000.000
0.000 0.100 90% 9.6990.000
12 Z2017.1369Panjgur
Approved
REPAIR/MAINTENANCE OF KAREZES & CONST: OF PROTECTION WALL & WST GISHKORE ETC.
49.9950.000
49.995 40.0000.000
40.000 80% 0.1000.000
0.000 0.100 80% 9.8950.000
11 Z2017.1319Qilla
AbdullahApproved
AGRICULTURE PRODUCTIVITY ENHANCEMENT THROUGH WATER RESORUCE MGT. TEHSIL DOBANDI & GULISTAN.
150.0000.000
150.000 50.0000.000
50.000 33% 0.1000.000
0.000 0.100 33% 99.9000.000
10 Z2017.0900Qilla
AbdullahApproved
PROV:/INSTAL: OF LOCAL BORE, SOLAR SYSTEM, PVC PIPES, ETC FOR AGRICULTURE PURPOSE.
123.1000.000
123.100 111.0360.000
111.036 90% 0.1000.000
0.000 0.100 90% 11.9640.000
9 Z2017.0176Panjgur
Approved
PROVISION OF SOLAR SCHEME FOR AGRICULTURE PURPOSE (OFWM).
99.9960.000
99.996 90.2000.000
90.200 90% 0.1000.000
0.000 0.100 90% 9.6960.000
8 Z2016.1080ProvincialApproved
INSTALLATION OF SOLAR OPERATED SYSTEM UPTO 150 RFT 2" FOR AGRI: PURPOSE IN U/C SHAHABZAI,& OTHERS SHIRANI CUM ZHOB.
28.5000.000
28.500 20.0000.000
20.000 70% 0.1000.000
0.000 0.100 70% 8.4000.000
7 Z2016.0724Kalat
Approved
PROV: OF PVC PIPELINE, WATER PONDS, WATER CHANNELS, TRENCHES FOR GRAPS ORCHARD & LAND LEVELING IN PB-36 KALAT.
22.0000.000
22.000 5.0000.000
5.000 22% 0.1000.000
0.000 0.100 23% 16.9000.000
6 Z2015.1109Sibi
Approved
INSTALLATION OF SOLAR OPERATED SYSTEM IN DISTRICT SIBI, BAKHTIRABAD, LEHRI.
44.0000.000
44.000 10.0000.000
10.000 22% 0.1000.000
0.000 0.100 22% 33.9000.000
5 Z2015.1078Pishin
Approved
SUP:& INST: OF SUBMERSIBLE MACHINERY DRI: & DEVE: OF BORES & INST: OF PVC PIPES FOR AGRICULTURE PUROSE 22 U/C,PB-10.
12.7000.000
12.700 5.0000.000
5.000 39% 0.1000.000
0.000 0.100 40% 7.6000.000
4 Z2015.0944Quetta
Approved
LAND LEVELLING FOR AGRICULTURE PURPOSE PANJPAI DIST. QUETTA.
10.0000.000
10.000 5.0480.000
5.048 50% 0.1000.000
0.000 0.100 51% 4.8520.000
3 Z2014.0679Musa KhailApproved
LOCAL BORES FOR AGRICULTRE PURPOSE IN TEHSIL KINGRI, DRUG & MUSAKHAIL
37.0000.000
37.000 9.0000.000
9.000 24% 0.1000.000
0.000 0.100 24% 27.9000.000
2 Z2014.0020ProvincialApproved
WATER MANAGEMENT PROGRAM (WATER COURSES, PONDS ETC).
1500.0000.000
1500.000 1483.7220.000
1483.722 98% 0.1000.000
0.000 0.100 98% 16.1780.000
1 Z2004.0083ProvincialApproved
CONST: OF MARKET SQUARES AT LORALAI, K. SAIFULLAH, PISHIN, LASBELA, PANJGUR & KHUZDAR.
187.8810.000
187.881 159.8560.000
159.856 85% 0.1000.000
0.000 0.100 85% 27.9250.000
Subsector: Agricultural Extension
Sector: Agriculture
Chapter: AGRICULTURE
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
2019 - 20 Original
![Page 223: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/223.jpg)
Public Sector Development Programme (Sectorwise)
3 of 32
Agricultural Extension(15 Ongoing Projects) GoB/FPA Sub-Total
2440.163 2440.163 2116.062 2116.062 1.500 0.000 1.500 322.601
0.000 0.000 0.000 0.000
Agricultural Extension(15 Projects) Total
2440.163 2440.163 2116.062 2116.062 1.500 0.000 1.500 322.601
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 224: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/224.jpg)
Public Sector Development Programme (Sectorwise)
4 of 32
16 Z2013.0118Quetta
Approved
COMPLETION OF IN COMPLETE SCHEMES (GREEN BALOCHISTAN PROJECT).
1000.0000.000
1000.000 934.5510.000
934.551 93% 0.1000.000
0.000 0.100 93% 65.3490.000
0.000 0.000 0.000 0.000
Agricultural Research(1 Ongoing Projects) GoB/FPA Sub-Total
1000.000 1000.000 934.551 934.551 0.100 0.000 0.100 65.349
Subsector: Agricultural Research
Ongoing
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Chapter: AGRICULTURE
Sector: Agriculture
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Agricultural Research(1 Projects) Total
1000.000 1000.000 934.551 934.551 0.100 0.000 0.100 65.349
Sector: AGRICULTURE(16 Projects)
3440.163 3440.163 3050.613 3050.613 1.600 0.000 1.600 387.950
Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 225: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/225.jpg)
Public Sector Development Programme (Sectorwise)
5 of 32
19 Z2014.0025ProvincialApproved
SHRIMP AQUACULTURE DEVELOPMENT AT COASTAL AREAS.
20.0000.000
20.000 6.5000.000
6.500 32% 0.1000.000
0.000 0.100 33% 13.4000.000
18 Z2013.0031Zhob
Approved
ESTABLISHMENT OF SEMI COLD FISH HATCHERY AT SABAKZAI DAM DISTRICT ZHOB, BALOCHISTAN.
63.1800.000
63.180 41.5000.000
41.500 65% 0.1000.000
0.000 0.100 65% 21.5800.000
17 Z2004.0081Bela
Approved
CONST: OF JETTY AND FISH HARBOUR AT DAMB (BCDA).
536.0910.000
536.091 82.1000.000
82.100 15% 0.1000.000
0.000 0.100 15% 453.8910.000
Fisheries(3 Ongoing Projects) GoB/FPA Sub-Total
619.271 619.271 130.100 130.100 0.300 0.000 0.300 488.871
0.000 0.000 0.000 0.000
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Subsector: Fisheries
Chapter: FISHERIES
Sector: Agriculture
Ongoing
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Fisheries(3 Projects) Total
619.271 619.271 130.100 130.100 0.300 0.000 0.300 488.871
Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: FISHERIES(3 Projects)
619.271 619.271 130.100 130.100 0.300 0.000 0.300 488.871
2019 - 20 Original
![Page 226: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/226.jpg)
Public Sector Development Programme (Sectorwise)
6 of 32
21 Z2017.1392Musa KhailApproved
ESTABLISHMENT OF WOOL COLLECTION AND CARPET CENTER AT MUSKHAIL.
30.0000.000
30.000 5.0000.000
5.000 16% 0.1000.000
0.000 0.100 17% 24.9000.000
20 Z2011.0850Gwadar
Approved
LEVELING OF UNEVEN LAND, SUPPLY & INST: OF STREET LIGHT AT RD ST-1 & RD CA, CONST OF ROAD ST-1 & ST-2 60' WIDE ROAD ETC.
343.1070.000
343.107 165.0000.000
165.000 48% 0.1000.000
0.000 0.100 48% 178.0070.000
0.000 0.000 0.000 0.000
Industries(2 Ongoing Projects) GoB/FPA Sub-Total
373.107 373.107 170.000 170.000 0.200 0.000 0.200 202.907
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Ongoing
Sector: Industries & Commerce
Chapter: INDUSTRIES
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Industries
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Industries(2 Projects) Total
373.107 373.107 170.000 170.000 0.200 0.000 0.200 202.907
Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: INDUSTRIES(2 Projects)
373.107 373.107 170.000 170.000 0.200 0.000 0.200 202.907
2019 - 20 Original
![Page 227: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/227.jpg)
Public Sector Development Programme (Sectorwise)
7 of 32
22 Z2010.0478Quetta
Approved
CONST: OF EMBROIDERY CENTRE AND TECHNICAL TRAINING CENTRE (KHARTAR) ALAMDAR ROAD, QUETTA.
40.0000.000
40.000 23.7000.000
23.700 59% 0.1000.000
0.000 0.100 59% 16.2000.000
0.000 0.000 0.000 0.000
Labour & Manpower(1 Ongoing Projects) GoB/FPA Sub-Total
40.000 40.000 23.700 23.700 0.100 0.000 0.100 16.200
Subsector: Labour & Manpower
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Ongoing
Sector: Labour & Manpower
Chapter: MANPOWER
Labour & Manpower(1 Projects) Total
40.000 40.000 23.700 23.700 0.100 0.000 0.100 16.200
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: MANPOWER(1 Projects)
40.000 40.000 23.700 23.700 0.100 0.000 0.100 16.200
2019 - 20 Original
![Page 228: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/228.jpg)
Public Sector Development Programme (Sectorwise)
8 of 32
23 Z2011.0132Kachhi
Approved
TRY POT TUBEWELL/ COMMUNITY HALLS/ PLAY GROUNDS/ PARKS ETC.
30.0000.000
30.000 14.5000.000
14.500 48% 0.1000.000
0.000 0.100 48% 15.4000.000
0.000 0.000 0.000 0.000
Sports -(1 Ongoing Projects) GoB/FPA Sub-Total
30.000 30.000 14.500 14.500 0.100 0.000 0.100 15.400
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Sector: Sports
Subsector: Sports -
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Ongoing
Chapter: SPORTS
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Sports -(1 Projects) Total
30.000 30.000 14.500 14.500 0.100 0.000 0.100 15.400
Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: SPORTS(1 Projects)
30.000 30.000 14.500 14.500 0.100 0.000 0.100 15.400
2019 - 20 Original
![Page 229: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/229.jpg)
Public Sector Development Programme (Sectorwise)
9 of 32
27 Z2017.0103ProvincialApproved
CONSTRUCTION OF MULTI-STOREYED OFFICE COMPLEXES FOR VARIOUS DEPARTMENTS (ONE AT EACH DIVISIONAL HQS).
1200.0000.000
1200.000 140.0000.000
140.000 11% 0.1000.000
0.000 0.100 11% 1059.9000.000
26 Z2014.0797Quetta
Approved
CONST: OF OFFICE BUILDING FOR CITA LEF & DISTRICT ACCOUNTS OFFICE, QUETTA.
112.7430.000
112.743 15.0000.000
15.000 13% 0.1000.000
0.000 0.100 13% 97.6430.000
25 Z2013.0034Outside
BalochistanApproved
BALOCHISTAN HOUSE KARACHI. 61.6100.000
61.610 20.0000.000
20.000 32% 0.1000.000
0.000 0.100 32% 41.5100.000
24 Z2012.0021Harnai
Approved
CONST:OF DISTRICT JAIL AT HARNAI.
119.4130.000
119.413 87.0000.000
87.000 72% 0.1000.000
0.000 0.100 72% 32.3130.000
0.000 0.000 0.000 0.000
Physical Planning & Housing(4 Ongoing Projects) GoB/FPA Sub-Total
1493.766 1493.766 262.000 262.000 0.400 0.000 0.400 1231.366
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Sector: Physical Planning & Housing
Subsector: Physical Planning & Housing
Chapter: P.P.&H.
Physical Planning & Housing(4 Projects) Total
1493.766 1493.766 262.000 262.000 0.400 0.000 0.400 1231.366
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 230: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/230.jpg)
Public Sector Development Programme (Sectorwise)
10 of 32
29 Z2014.0916NasirabadApproved
CONST: OF RPO RESIDENCE GRADE-20 & RPO OFFICE AT NASEERABAD.
36.6800.000
36.680 0.0750.000
0.075 0% 0.1000.000
0.000 0.100 0% 36.5050.000
28 Z2014.0914NasirabadApproved
CONST: OF POLICE STATION AT PULEJI TEHSIL CHATAR DIST: NASEERABAD.
15.0670.000
15.067 5.0000.000
5.000 33% 0.1000.000
0.000 0.100 33% 9.9670.000
L.E.A.S/G.A Buildings(2 Ongoing Projects) GoB/FPA Sub-Total
51.747 51.747 5.075 5.075 0.200 0.000 0.200 46.472
0.000 0.000 0.000 0.000
Subsector: L.E.A.S/G.A Buildings
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Chapter: P.P.&H.
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Sector: Physical Planning & Housing
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
L.E.A.S/G.A Buildings(2 Projects) Total
51.747 51.747 5.075 5.075 0.200 0.000 0.200 46.472
Sector: P.P.&H.(6 Projects)
1545.513 1545.513 267.075 267.075 0.600 0.000 0.600 1277.838
Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 231: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/231.jpg)
Public Sector Development Programme (Sectorwise)
11 of 32
45 Z2004.0941Awaran
Approved
CONST: OF AWARAN TO TANZALA ROAD 65 KM.
253.7100.000
253.710 154.5260.000
154.526 60% 0.1000.000
0.000 0.100 60% 99.0840.000
44 Z2004.0857Kech
Approved
CONST: BLACK TOPPING OF TURBAT PASNI ROAD FROM KM 44 TO COASTAL HIGHWAY PHASE-II .
881.9130.000
881.913 551.9130.000
551.913 62% 0.1000.000
0.000 0.100 62% 329.9000.000
43 Z2004.0579Zhob
Approved
CONST OF B/T ROAD FROM ARTH BUND TO KOHMAI, HARAMZAI DWALGUD, BABAKARZAI, IBRAHIMKHAIL ZHOB 22.825 KM.
144.4610.000
144.461 135.9610.000
135.961 94% 0.1000.000
0.000 0.100 94% 8.4000.000
42 Z2004.0521Pishin
Approved
CONST: & B/T OF ROAD AT SALMANKHAIL SANYTIYA GHAZABAND ROAD 30 KM.
104.0970.000
104.097 17.4510.000
17.451 16% 0.1000.000
0.000 0.100 16% 86.5460.000
41 Z2004.0174Qilla
SaifullahApproved
CONST: OF ZAMA SHAH MURAD OBLOON AGHBARGAI ROAD 70.2 KM.
393.3900.000
393.390 351.7570.000
351.757 89% 0.1000.000
0.000 0.100 89% 41.5330.000
40 Z2004.0051Panjgur
Approved
CONSTRUCTION OF KHUDABADAN TO NUKKER CHEDGI ROAD 67.275 KM.
764.7680.000
764.768 643.8000.000
643.800 84% 0.1000.000
0.000 0.100 84% 120.8680.000
39 Z2003.1153Qilla
SaifullahApproved
CONSTRUCTION OF ROAD FROM N-50 TO MURGHA FAQIRZAI 99 KM.
624.3930.000
624.393 504.1420.000
504.142 80% 0.1000.000
0.000 0.100 80% 120.1510.000
38 Z2003.0988Loralai
Approved
CONSTRUCTION OF B/T GHARHWAS TO WAHVI ROAD 43.50 KM.
136.7840.000
136.784 124.7840.000
124.784 91% 0.1000.000
0.000 0.100 91% 11.9000.000
37 Z2003.0078Shirani
Approved
CONST:/BLACK TOPPING OF HASOOBAND, LAHAR OZHDAN KORI WASTA, LASBANDI, NIMPARAW ROAD 60 KM.
347.9880.000
347.988 300.3700.000
300.370 86% 0.1000.000
0.000 0.100 86% 47.5180.000
36 Z2003.0073Musa KhailApproved
B/T OF ROAD TANGISAR TO KEWAN 29.5 KM.
100.2450.000
100.245 98.7930.000
98.793 98% 0.1000.000
0.000 0.100 98% 1.3520.000
35 Z2003.0070Loralai
Approved
B/T OF DUKI HOSRI ROAD VARIZAI GUMBAZ SECTION KM 47 TO 68 (21 KM).
139.6250.000
139.625 113.0250.000
113.025 80% 0.1000.000
0.000 0.100 81% 26.5000.000
34 Z2003.0051Awaran
Approved
CONST: OF BLACK TOPPED ROAD I/C STRUCTURE WORKS OF AWARAN MASHKEY ROAD 75 KM.
170.6600.000
170.660 121.0500.000
121.050 70% 0.1000.000
0.000 0.100 70% 49.5100.000
33 Z2003.0050Awaran
Approved
CONST: OF BLACK TOPPED ROAD I/C STRUCTURE WORK JAOO PILLARI ROAD KM 0 TO 70.
165.2450.000
165.245 129.2750.000
129.275 78% 0.1000.000
0.000 0.100 78% 35.8700.000
32 Z2003.0049Awaran
Approved
IMPROVEMENT OF CAMP JAOO TO DELEJI ROAD VIA SHANDAI 30 KM.
144.6180.000
144.618 137.1680.000
137.168 94% 0.1000.000
0.000 0.100 94% 7.3500.000
31 Z2003.0044Bela
Approved
CONST:/BLACK TOPPING OF ROAD FROM BELA TO LAKHRA 48.25 KM.
267.3420.000
267.342 225.9850.000
225.985 84% 0.1000.000
0.000 0.100 84% 41.2570.000
30 Z2003.0028Khuzdar
Approved
CONST: OF ROAD FROM ZEHRI TO GANDAWA 110 KM.
415.9350.000
415.935 344.6620.000
344.662 82% 0.1000.000
0.000 0.100 82% 71.1730.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 232: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/232.jpg)
Public Sector Development Programme (Sectorwise)
12 of 32
61 Z2011.0377Pishin
Approved
CONST:/BLACK TOPPING OF VARIOUS INTERNAL ROADS IN PB-10, PISHIN.
145.2040.000
145.204 126.7470.000
126.747 87% 0.1000.000
0.000 0.100 87% 18.3570.000
60 Z2011.0229Ziarat
Approved
CONSTT: OF 35.00 KM POI GHUNZAH SASNAK ROAD IN ZIARAT.
157.9860.000
157.986 99.5290.000
99.529 63% 0.1000.000
0.000 0.100 63% 58.3570.000
59 Z2011.0228Ziarat
Approved
CONST:/EXTENSION & B/T OF 23.5 KM VARIOUS ROADS IN ZIARAT.
99.5100.000
99.510 94.1180.000
94.118 94% 0.1000.000
0.000 0.100 94% 5.2920.000
58 Z2011.0145Awaran
Approved
CONST: OF 15.7 KM BLACK TOP ROAD INCLUDING STRUCTURE WORKS KORAK TO PATASK TEHSIL JHOU AWARAN.
80.0000.000
80.000 50.0000.000
50.000 62% 0.1000.000
0.000 0.100 62% 29.9000.000
57 Z2011.0144Awaran
Approved
CONST: OF 21 KM BLACK TOPPED ROADS INCLUDING STRUCTURE WORKS JEBRI TO JORI TEHSIL MASHKAI AWARAN.
120.0000.000
120.000 51.8070.000
51.807 43% 0.1000.000
0.000 0.100 43% 68.0930.000
56 Z2011.0130Kachhi
Approved
CONST: OF B/T ROADS, REHABILITATION / PATCH WORK 34.70 KM, DIST. KACHHI.
355.6930.000
355.693 345.6930.000
345.693 97% 0.1000.000
0.000 0.100 97% 9.9000.000
55 Z2010.0646Duki
Approved
CONSTT: OF 56 KM B/T ROADS I/C 800 RFT BRIDGE IN VARIOUS AREAS OF TEHSHIL DUKI.
381.9780.000
381.978 332.1960.000
332.196 86% 0.1000.000
0.000 0.100 86% 49.6820.000
54 Z2010.0639Awaran
Approved
CONST: OF B/T ROAD INCLUDING STRUCTURE WORK MASHKAI TO KHUZDAR ROAD 29 KM.
96.5000.000
96.500 46.6500.000
46.650 48% 0.1000.000
0.000 0.100 48% 49.7500.000
53 Z2009.0273Kech
Approved
ESTENSION WIDTH OF BLACK TOPPED ROAD ROADBUN - GOMAZAI 25.6 KM.
65.0000.000
65.000 50.0250.000
50.025 76% 0.1000.000
0.000 0.100 77% 14.8750.000
52 Z2009.0129Gwadar
Approved
CONSTRUCTION OF B/T ROAD FROM GUBO OF SAMATHI VIA DOOM, GWADAR (23 KM)
107.8160.000
107.816 86.0590.000
86.059 79% 0.1000.000
0.000 0.100 79% 21.6570.000
51 Z2009.0023Kech
Approved
CONST: OF BRIDGE NO. 2 AT GOMAZI NIHANG RIVER KECH (608 RFT).
80.0000.000
80.000 35.0500.000
35.050 43% 0.1000.000
0.000 0.100 43% 44.8500.000
50 Z2009.0018Kech
Approved
CONST:/EXTENSION OF 700 RFT NIHANG BRIDGE ON ZUBEDA JALAL ROAD.
112.6450.000
112.645 92.6450.000
92.645 82% 0.1000.000
0.000 0.100 82% 19.9000.000
49 Z2008.0034Loralai
Approved
CONST:/BLACK TOPPING OF MEKHTAR-CHAMALANG ROAD (REMAINING WORKS) DISTRICT LORALAI LENGTH 76 KM, (MINERALS).
411.8650.000
411.865 260.5720.000
260.572 63% 0.1000.000
0.000 0.100 63% 151.1930.000
48 Z2005.0571Pishin
Approved
CONST:/BLACK TOPPING OF GHAZABAND AJRAM SULTAN BASHA ROAD 60 KM, PISHIN.
370.1280.000
370.128 290.6520.000
290.652 78% 0.1000.000
0.000 0.100 78% 79.3760.000
47 Z2005.0283Shirani
Approved
CONST. OF B/T ROAD FROM KILLI POLAN TO KILLI TORA MURGHA VIA PAZHI NARRI 40 KM.
350.3660.000
350.366 230.0580.000
230.058 65% 0.1000.000
0.000 0.100 65% 120.2080.000
46 Z2005.0012Awaran
Approved
BLACK TOPPING OF CAMP JAHOO TO METGO ROAD UPTO ATTA MOHAMMAD GOTH 21 KM.
107.6890.000
107.689 78.0000.000
78.000 72% 0.1000.000
0.000 0.100 72% 29.5890.000
Subsector: Roads
Sector: Communication
Chapter: COMMUNICATION
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 233: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/233.jpg)
Public Sector Development Programme (Sectorwise)
13 of 32
77 Z2017.1664Loralai
Approved
CONST: OF CHAMALANG-KINGRI ROAD.
150.0000.000
150.000 19.1500.000
19.150 12% 0.1000.000
0.000 0.100 12% 130.7500.000
76 Z2016.1107Quetta
Approved
CONST" OF TAKHTANI BYEPASS GHOUSABAD TO SARYAB LINK ROAD QUETTA.
57.4590.000
57.459 50.0000.000
50.000 87% 0.1000.000
0.000 0.100 87% 7.3590.000
75 Z2015.1271Loralai
Approved
CONST: OF B/T ROAD BORI & MAKHTER DIST: LORALAI.
150.0000.000
150.000 145.0000.000
145.000 96% 0.1000.000
0.000 0.100 96% 4.9000.000
74 Z2015.1269Pishin
Approved
COSNT: OF B/T ROAD ALZAI PISHIN TO KARBALA.
60.0000.000
60.000 15.3000.000
15.300 25% 0.1000.000
0.000 0.100 25% 44.6000.000
73 Z2012.0878JaffarabadApproved
CONST: OF PCC STREETS, PIPE CULVERTS WATER PONDS AND EARTHEN EMBANKMENT FOR VARIOUS VILLAGES AT DIST: JAFFARABAD.
115.1110.000
115.111 114.1110.000
114.111 99% 0.1000.000
0.000 0.100 99% 0.9000.000
72 Z2012.0842Gwadar
Approved
CONST:OF VARIOUS ROADS IN DIST. GAWADAR 56.5 KM.
178.6190.000
178.619 85.0000.000
85.000 47% 0.1000.000
0.000 0.100 47% 93.5190.000
71 Z2012.0789Awaran
Approved
CUTTING AND IMPROVMENT OF TRANCH ROAD AWARAN 22.00 KM.
20.0000.000
20.000 15.0250.000
15.025 75% 0.1000.000
0.000 0.100 75% 4.8750.000
70 Z2012.0724Quetta
Approved
IMPROVEMENT OF QUETTA CITY ROADS.
2595.0000.000
2595.000 2532.5000.000
2532.500 97% 0.1000.000
0.000 0.100 97% 62.4000.000
69 Z2012.0496Loralai
Approved
CONST:OF AGBARGH JALALZAI ROAD, LORALAI 4.50 KM.
120.0000.000
120.000 43.8430.000
43.843 36% 0.1000.000
0.000 0.100 36% 76.0570.000
68 Z2012.0419Loralai
Approved
CONST:OF B/T ROADS IN VARIOUS AREA OF DUKI LUNI AREA 24.50 KM.
120.0000.000
120.000 110.0250.000
110.025 91% 0.1000.000
0.000 0.100 91% 9.8750.000
67 Z2012.0179Kech
Approved
CONST: OF B/T ROAD CHIB TO MENAZ BULEDA IN PB-49 DISTRICT TURBAT 10 KM.
43.2300.000
43.230 14.6800.000
14.680 33% 0.1000.000
0.000 0.100 34% 28.4500.000
66 Z2012.0013Awaran
Approved
CONSTRUCTION OF BLACK TOP ROAD FORM ZEEK TO KANNCHI, UNION COUNCIL GISHKORE 11.25 Km AWARAN.
70.0000.000
70.000 27.6610.000
27.661 39% 0.1000.000
0.000 0.100 39% 42.2390.000
65 Z2012.0012Awaran
Approved
CONSTRUCTION/CUTTING/BLACK TOPPING AND STRUCTURE WORK OF ROAD FROM MASHKEY TO JAHOO VIA KAPORE 16.5 Km DISTRICT AWARAN.
180.0000.000
180.000 90.0000.000
90.000 50% 0.1000.000
0.000 0.100 50% 89.9000.000
64 Z2011.0862Gwadar
Approved
CONST: OF BLACK TOPPED ROAD FROM COASTAL HIGHWAY TO GAROKI VIA DAAT VILLAGE ORMARA (16 KM) DIST. GWADAR.
95.9940.000
95.994 65.3870.000
65.387 68% 0.1000.000
0.000 0.100 68% 30.5070.000
63 Z2011.0604Loralai
Approved
CONTS: OF BYPASS MEKHTER ROAD CHAMALANG LORALAI (MINES & MINERALS).
60.5210.000
60.521 26.8260.000
26.826 44% 0.1000.000
0.000 0.100 44% 33.5950.000
62 Z2011.0419Gwadar
Approved
CONST: OF 44 KM VARIOUS ROADS IN DIST GWADAR.
185.4280.000
185.428 137.5460.000
137.546 74% 0.1000.000
0.000 0.100 74% 47.7820.000
Subsector: Roads
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Chapter: COMMUNICATION
Sector: Communication
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
2019 - 20 Original
![Page 234: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/234.jpg)
Public Sector Development Programme (Sectorwise)
14 of 32
0.000 0.000 0.000 0.000
Roads(48 Ongoing Projects) GoB/FPA Sub-Total
12298.916
12298.916
9716.517 9716.517 4.800 0.000 4.800 2577.599
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Roads(48 Projects) Total
12298.916
12298.916
9716.517 9716.517 4.800 0.000 4.800 2577.599
2019 - 20 Original
![Page 235: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/235.jpg)
Public Sector Development Programme (Sectorwise)
15 of 32
93 Z2009.0022Pishin
Approved
CONST: OF B/T ROAD FROM ROD MALAZAI, PISHIN.
388.6800.000
388.680 187.1500.000
187.150 48% 0.1000.000
0.000 0.100 48% 201.4300.000
92 Z2009.0021Musa KhailApproved
CONST: OF B/T ROAD MUSAKHAIL TO LAWARA (30 KM).
384.2320.000
384.232 246.7750.000
246.775 64% 0.1000.000
0.000 0.100 64% 137.3570.000
91 Z2009.0017Pishin
Approved
CONST: OF B/T RODH MALAZAI GHARSHINAN, PISHIN
497.5760.000
497.576 288.5050.000
288.505 57% 0.1000.000
0.000 0.100 58% 208.9710.000
90 Z2005.0551Panjgur
Approved
B/T TASP KALUNG VIA PACHI MADNI ROAD 23.6 KM.
150.7090.000
150.709 125.7110.000
125.711 83% 0.1000.000
0.000 0.100 83% 24.8980.000
89 Z2005.0451Gwadar
Approved
CONST. OF ROAD FROM KALAG KULANCHTO COASTAL HIGHWAY.
176.7370.000
176.737 146.2800.000
146.280 82% 0.1000.000
0.000 0.100 82% 30.3570.000
88 Z2005.0258Qilla
SaifullahApproved
CONST: OF SHAN NARI TO KUNDAYARA ROAD LINK TO QAMARDIN ROAD.
466.5930.000
466.593 240.3900.000
240.390 51% 0.1000.000
0.000 0.100 51% 226.1030.000
87 Z2005.0097Gwadar
Approved
GAWADAR CROSS TO NALLANT (60 KM).
364.9370.000
364.937 110.3270.000
110.327 30% 0.1000.000
0.000 0.100 30% 254.5100.000
86 Z2005.0096Kech
Approved
GOWARKOP CROSS PIDROK TO HOSHAB ROAD (55KM).
289.6440.000
289.644 120.0560.000
120.056 41% 0.1000.000
0.000 0.100 41% 169.4880.000
85 Z2005.0067Kech
Approved
CONSTRUCTION OF BRIDGE AT GOMAZAI NALLA KECH.
134.4230.000
134.423 73.2710.000
73.271 54% 0.1000.000
0.000 0.100 54% 61.0520.000
84 Z2004.1123Kech
Approved
CONST:/BLACK TOPPING OF ALANDOOR TO NAWANO 44 KM DIST. KECH .
177.4910.000
177.491 97.4910.000
97.491 54% 0.1000.000
0.000 0.100 54% 79.9000.000
83 Z2004.1101Zhob
Approved
CONST: OF ROADS & DRAINAGE SYSTEM OF ZHOB TOWN AREA .
206.5430.000
206.543 167.6570.000
167.657 81% 0.1000.000
0.000 0.100 81% 38.7860.000
82 Z2004.0819Loralai
Approved
CONSTRUCTION OF DOSURKA ROAD LORALAI .
158.2060.000
158.206 147.9400.000
147.940 93% 0.1000.000
0.000 0.100 93% 10.1660.000
81 Z2004.0580Zhob
Approved
CONST: OF B/T ROAD FROM LOWARA TO MUSAKHAIL ROAD ZHOB 32 KM .
267.8500.000
267.850 191.0790.000
191.079 71% 0.1000.000
0.000 0.100 71% 76.6710.000
80 Z2004.0561Zhob
Approved
CONST: OF ROAD FROM AHMED DARGAH TO GAT SAR ROAD ZHOB 23 KM .
175.5600.000
175.560 152.6420.000
152.642 86% 0.1000.000
0.000 0.100 87% 22.8180.000
79 Z2004.0173Qilla
SaifullahApproved
CONST: OF TODA SAFARZAI ROAD 42 KM .
838.4610.000
838.461 703.0160.000
703.016 83% 0.1000.000
0.000 0.100 83% 135.3450.000
78 Z2001.0465Musa KhailApproved
BLACK TOPPING OF MUSA KHAIL DRUG ROAD (TANGI SIR PORTION) 7.5 KM.
328.6030.000
328.603 269.7090.000
269.709 82% 0.1000.000
0.000 0.100 82% 58.7940.000
Subsector: Road (BDA)
Sector: Communication
Chapter: COMMUNICATION
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
2019 - 20 Original
![Page 236: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/236.jpg)
Public Sector Development Programme (Sectorwise)
16 of 32
108 Z2015.1272Qilla
AbdullahApproved
REH: OF ROAD FROM TABINA CROSS TO BAYAN MALAZAI 12KM.
131.6940.000
131.694 39.4360.000
39.436 29% 0.1000.000
0.000 0.100 30% 92.1580.000
107 Z2011.0877Qilla
SaifullahApproved
CONT: OF B/T OF VARIOUS ROADS IN NASAI AREA, KILLA SAIFULLAH (PACKAGE-II).
1116.1100.000
1116.110 526.7000.000
526.700 47% 0.1000.000
0.000 0.100 47% 589.3100.000
106 Z2011.0432Qilla
SaifullahApproved
CONST: OF B/T ROAD PISHIN CROSS TO KURRAM VIA SIRKAI DIST. KILLA SAIFULLAH LENGTH 68.00 KM.
790.8110.000
790.811 545.8110.000
545.811 69% 0.1000.000
0.000 0.100 69% 244.9000.000
105 Z2011.0304Quetta
Approved
B/T ROADS IN KILLIES OF PB-6 DIST. QUETTA.
111.9100.000
111.910 46.6050.000
46.605 41% 0.1000.000
0.000 0.100 41% 65.2050.000
104 Z2010.1016ProvincialApproved
CONST: OF BLACK TOPPING OF ROAD FROM ZIARAT CROSS TO SHARAN TANGI QUETTA (LENGTH 11+234 KM).
1189.7840.000
1189.784 675.2000.000
675.200 56% 0.1000.000
0.000 0.100 56% 514.4840.000
103 Z2010.0933Quetta
Approved
WIDENNING AND IMPROVEMENT OF RAISANI ROAD (BETWEEN ARBAB KARAM KHAN AND SABZAL ROAD) (QDA).
325.6960.000
325.696 289.3120.000
289.312 88% 0.1000.000
0.000 0.100 88% 36.2840.000
102 Z2010.0880Qilla
SaifullahApproved
CONST: OF B/T ROAD KALA PATHAR TO SPERA THARA, MAIN BADINI & LINK ROAD AT MUSLIM BAGH 52 KM.
309.2770.000
309.277 261.9720.000
261.972 84% 0.1000.000
0.000 0.100 84% 47.2050.000
101 Z2010.0879Qilla
SaifullahApproved
CONST: OF BLACK TOP MAIN ROAD PINAKI TO MURGHA FAKIRZAI VIA OF MOLVI ALI MOHAMMAD 62 KM.
779.7700.000
779.770 536.8070.000
536.807 68% 0.1000.000
0.000 0.100 68% 242.8630.000
100 Z2010.0878Qilla
SaifullahApproved
CONST: OF BLACK TOPPING OF ROAD FROM NASAI BAZAR TO THAKARI & LINK ROADS, KILLA SAIFULLAH(PACKAGE-I)
392.7800.000
392.780 156.1700.000
156.170 39% 0.1000.000
0.000 0.100 39% 236.5100.000
99 Z2010.0876Qilla
SaifullahApproved
CONST: OF B/T OF ROAD FROM TAIVERA TO GHOREZAI, KILLA SAIFULLAH 30 KM.
223.2410.000
223.241 112.6950.000
112.695 50% 0.1000.000
0.000 0.100 50% 110.4460.000
98 Z2010.0839Qilla
AbdullahApproved
CONST: OF BLACK TOPPED ROADS DOOBADNI TUBA ACHAKAZAI DIST. KILLA ABDULLAH.
984.0340.000
984.034 810.7800.000
810.780 82% 0.1000.000
0.000 0.100 82% 173.1540.000
97 Z2010.0774Qilla
AbdullahApproved
CONST: OF B/T ROAD FROM SYED HAMEED CROSS TO GULISTAN ( ROGHANI ROAD) ROAD AT DIST. QILLA ABDULLAH.
345.4380.000
345.438 302.8490.000
302.849 87% 0.1000.000
0.000 0.100 87% 42.4890.000
96 Z2010.0398Qilla
AbdullahApproved
CONST: OF ROADS IN PB-13 VARIOUS AREA OF KILLA ABDULLAH LENGTH 53 KM.
301.5040.000
301.504 222.5530.000
222.553 73% 0.1000.000
0.000 0.100 73% 78.8510.000
95 Z2009.0407Shirani
Approved
CONST: OF GAWALGUT KUMAI SHARGHULI KILLI ABDULLAH KHAN TARAKAI 24.40 KM.
218.8100.000
218.810 116.5050.000
116.505 53% 0.1000.000
0.000 0.100 53% 102.2050.000
94 Z2009.0324Kech
Approved
CONST: OF BRIDGE ZARINBUG (DASHT) TO PISHAL VIA DORO KANDUG, DIST. KECH (370 M).
140.2300.000
140.230 57.9250.000
57.925 41% 0.1000.000
0.000 0.100 41% 82.2050.000
Road (BDA)(31 Ongoing Projects) GoB/FPA Sub-Total
12367.334
12367.334
7969.319 7969.319 3.100 0.000 3.100 4394.915
0.000 0.000 0.000 0.000
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Subsector: Road (BDA)
Chapter: COMMUNICATION
Sector: Communication
Ongoing
2019 - 20 Original
![Page 237: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/237.jpg)
Public Sector Development Programme (Sectorwise)
17 of 32
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Road (BDA)(31 Projects) Total
12367.334
12367.334
7969.319 7969.319 3.100 0.000 3.100 4394.915
Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: COMMUNICATION(79 Projects)
24666.250
24666.250
17685.836
17685.836 7.900 0.000 7.900 6972.514
2019 - 20 Original
![Page 238: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/238.jpg)
Public Sector Development Programme (Sectorwise)
18 of 32
115 Z2017.1727Ziarat
Approved
CONST: OF SMALL DAMS/KAREZAT FLOOD PROTECTION WALLS & DRILLING OF BORES LAYING OF PIPE LINE IN DIST. ZIARAT
100.0000.000
100.000 60.0000.000
60.000 60% 0.1000.000
0.000 0.100 60% 39.9000.000
114 Z2016.1138Awaran
Approved
PROTECTION WALL OF NAAL RIVER AT JHAO.
400.0000.000
400.000 268.2400.000
268.240 67% 0.1000.000
0.000 0.100 67% 131.6600.000
113 Z2012.0537Qilla
SaifullahApproved
DEVELOPMENT SCHEMES OF DISTRICT, QILLA SAIFULLAH (EXT: & IMPROV: OF KAREZES IN DIST. QILLA SAIFULLAH).
230.2590.000
230.259 50.0000.000
50.000 21% 0.1000.000
0.000 0.100 21% 180.1590.000
112 Z2012.0530Qilla
SaifullahApproved
EXTENSION AND IMPROVEMENT OF KAREZES, QILL SAIFULLAH.
50.0000.000
50.000 40.0000.000
40.000 80% 0.1000.000
0.000 0.100 80% 9.9000.000
111 Z2011.0703NasirabadApproved
CONST: OF UNTUM FLOOD PROTECTION SCHEME IN DIST. NASIRABAD.
195.3100.000
195.310 157.7720.000
157.772 80% 0.1000.000
0.000 0.100 80% 37.4380.000
110 Z2011.0420Gwadar
Approved
REPAIR OF BANDAT AND SMALL DAMS GWADAR.
100.0000.000
100.000 79.5000.000
79.500 79% 0.1000.000
0.000 0.100 79% 20.4000.000
109 Z2010.0556Kachhi
Approved
IRRIGATION SCHEMES IN KACHHI DISTRICT.
129.8780.000
129.878 113.8780.000
113.878 87% 0.1000.000
0.000 0.100 87% 15.9000.000
0.000 0.000 0.000 0.000
Surface Irrigation(7 Ongoing Projects) GoB/FPA Sub-Total
1205.447 1205.447 769.390 769.390 0.700 0.000 0.700 435.357
Ongoing
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Surface Irrigation
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Chapter: WATER
Sector: Irrigation
Surface Irrigation(7 Projects) Total
1205.447 1205.447 769.390 769.390 0.700 0.000 0.700 435.357
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 239: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/239.jpg)
Public Sector Development Programme (Sectorwise)
19 of 32
120 Z2017.1585Zhob
Approved
CONSTRUCTION OF SMALL DAMS IN DISTRICT ZHOB.
300.0000.000
300.000 150.0000.000
150.000 50% 0.1000.000
0.000 0.100 50% 149.9000.000
119 Z2017.1409Pishin
Approved
CONSTRUCTION OF DAMS IN DISTRICT PISHIN.
300.0000.000
300.000 10.0000.000
10.000 3% 0.1000.000
0.000 0.100 3% 289.9000.000
118 Z2012.0176Kech
Approved
CONST: OF DAMBANY DAM BIT BULEDA IN PB-49 DISTRICT TURBAT.
17.5000.000
17.500 11.5960.000
11.596 66% 0.1000.000
0.000 0.100 66% 5.8040.000
117 Z2012.0174Kech
Approved
CONST:OF SIMSORI DAM BULEDA IN PB-49 DISTRICT TURBAT.
50.6580.000
50.658 20.5450.000
20.545 40% 0.1000.000
0.000 0.100 40% 30.0130.000
116 Z2012.0173Kech
Approved
COSNT: OF SHROMAG KOCHA DAM BULEDA IN PB-49 DISTRICT TURBAT.
34.1300.000
34.130 13.5200.000
13.520 39% 0.1000.000
0.000 0.100 39% 20.5100.000
0.000 0.000 0.000 0.000
Dams(5 Ongoing Projects) GoB/FPA Sub-Total
702.288 702.288 205.661 205.661 0.500 0.000 0.500 496.127
Sector: Irrigation
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Chapter: WATER
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Ongoing
Subsector: Dams
Dams(5 Projects) Total
702.288 702.288 205.661 205.661 0.500 0.000 0.500 496.127
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: WATER(12 Projects)
1907.735 1907.735 975.051 975.051 1.200 0.000 1.200 931.484
Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 240: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/240.jpg)
Public Sector Development Programme (Sectorwise)
20 of 32
121 Z2011.0571ProvincialApproved
ONLINE TAX COLLECTION SYSTEM, EXCISE & TAXATION.
118.0000.000
118.000 116.0750.000
116.075 98% 0.1000.000
0.000 0.100 98% 1.8250.000
Information Technology(1 Ongoing Projects) GoB/FPA Sub-Total
118.000 118.000 116.075 116.075 0.100 0.000 0.100 1.825
0.000 0.000 0.000 0.000
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Chapter: INFORMATION TECH:
Sector: Information Technology
Subsector: Information Technology
Information Technology(1 Projects) Total
118.000 118.000 116.075 116.075 0.100 0.000 0.100 1.825
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: INFORMATION TECH:(1 Projects)
118.000 118.000 116.075 116.075 0.100 0.000 0.100 1.825
Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 241: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/241.jpg)
Public Sector Development Programme (Sectorwise)
21 of 32
126 Z2015.0784ProvincialApproved
CONSTRUCTION OF FULLY EQUIPPED ECE ROOMS IN EXISTING 300 PRIMARY SCHOOLS.
600.0000.000
600.000 186.5960.000
186.596 31% 0.1000.000
0.000 0.100 31% 413.3040.000
125 Z2015.0770ProvincialApproved
CONSTRUCTION OF BUILDING FOR 1395 PRIMARY SHELTER LESS SCHOOLS IN 05 PHASES (PHASE-I).
2000.0000.000
2000.000 446.2500.000
446.250 22% 0.1000.000
0.000 0.100 22% 1553.6500.000
124 Z2015.0062Barkhan
Approved
CONST: OF GGPS BASTI DADWANI, HAJI AZAM JAN HASSANI RARHKAN & GBPS BASTI MIAN KHAN BUZDAR, NOOR KHAN SHAMYANI.
7.5000.000
7.500 2.0000.000
2.000 26% 0.1000.000
0.000 0.100 28% 5.4000.000
123 Z2014.0791Quetta
Approved
L/C FOR SCHOOLS IN PB-04, & UP-GRADATION OF HIGH SCHOOLS.
37.0000.000
37.000 17.0000.000
17.000 45% 0.1000.000
0.000 0.100 46% 19.9000.000
122 Z2014.0062ProvincialApproved
CONST: OF BUILDING FOR ALREADY APPROVED SHELTERLESSS SCHOOLS (300).
1500.0000.000
1500.000 1434.1130.000
1434.113 95% 0.1000.000
0.000 0.100 95% 65.7870.000
0.000 0.000 0.000 0.000
Primary Education(5 Ongoing Projects) GoB/FPA Sub-Total
4144.500 4144.500 2085.959 2085.959 0.500 0.000 0.500 2058.041
Subsector: Primary Education
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Chapter: EDUCATION
Sector: Education
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Primary Education(5 Projects) Total
4144.500 4144.500 2085.959 2085.959 0.500 0.000 0.500 2058.041
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 242: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/242.jpg)
Public Sector Development Programme (Sectorwise)
22 of 32
131 Z2017.1183Khuzdar
Approved
CONST: OF BUILDING FOR MIDDLE SCHOOL UPGRADED TO HIGH LEVEL 05 NOS TEHSIL MOOLA.
25.0000.000
25.000 15.0000.000
15.000 60% 0.1000.000
0.000 0.100 60% 9.9000.000
130 Z2017.1164Khuzdar
Approved
CONST: OF PRIMARY SCHOOLS, PRIMARY TO MIDDLE & MIDDLE TO HIGH SCHOOLS.
140.0000.000
140.000 88.2800.000
88.280 63% 0.1000.000
0.000 0.100 63% 51.6200.000
129 Z2015.0772ProvincialApproved
UP-GRADATION OF 160 PRIMARY SCHOOLS INTO MIDDLE LEVEL 02 PHASES (PHASE-I).
1200.0000.000
1200.000 638.7180.000
638.718 53% 0.1000.000
0.000 0.100 53% 561.1820.000
128 Z2014.0033ProvincialApproved
UP-GRADATION OF MIDDLE SCHOOLS INTO HIGH LEVEL (PHASE-I).
952.6920.000
952.692 734.6330.000
734.633 77% 0.1000.000
0.000 0.100 77% 217.9590.000
127 Z2009.0286Quetta
Approved
PURCHASE OF LAND AND CONSTRUCTION OF BOYS MIDDLE SCHOOL KILLI UMER.
12.5000.000
12.500 7.5000.000
7.500 60% 0.1000.000
0.000 0.100 60% 4.9000.000
Middle Education(5 Ongoing Projects) GoB/FPA Sub-Total
2330.192 2330.192 1484.131 1484.131 0.500 0.000 0.500 845.561
0.000 0.000 0.000 0.000
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Subsector: Middle Education
Chapter: EDUCATION
Sector: Education
Middle Education(5 Projects) Total
2330.192 2330.192 1484.131 1484.131 0.500 0.000 0.500 845.561
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 243: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/243.jpg)
Public Sector Development Programme (Sectorwise)
23 of 32
141 Z2017.1464ProvincialApproved
STRENG: OF KEY SCIENCE LABS IN GOVT: SCHOOLS AT TESHIL LEVEL ACROSS THE COUNTRY (GOB SHARE) I.E. 1/3RD.
167.0000.000
167.000 30.0000.000
30.000 17% 0.1000.000
0.000 0.100 18% 136.9000.000
140 Z2015.1028ProvincialApproved
MISSING FACILITIES GBPS KILLI ALAH BUX, KILLI MOHD HUSSAIN, GG COLLEGE DHADER, GHS LORKAREEZ, WASHK, KACHHI, QUETTA.
12.0000.000
12.000 4.3650.000
4.365 36% 0.1000.000
0.000 0.100 37% 7.5350.000
139 Z2015.0782ProvincialApproved
CONSTRUCTION OF 200 NO MULTIPURPOSE HALLS IN EXISTING BOYS & GIRLS HIGH SCHOOLS.
1000.0000.000
1000.000 525.1080.000
525.108 52% 0.1000.000
0.000 0.100 52% 474.7920.000
138 Z2015.0780ProvincialApproved
CONST: OF ADD:CLASSROOMS IN EXISTING 100 PRIMARY SCHOOLS, 500 MIDDLE & 300 HIGH SCHOOLS. 02 PHASES (PHASE-I).
2400.0000.000
2400.000 580.2590.000
580.259 24% 0.1000.000
0.000 0.100 24% 1819.6410.000
137 Z2015.0776ProvincialApproved
CONSTRUCTION OF BOUNDARY WALL FOR 6667 PRIMARY SCHOOLS, 336 MIDDLE SCHOOLS & 145 HIGH SCHOOLS.
3500.0000.000
3500.000 425.0610.000
425.061 12% 0.1000.000
0.000 0.100 12% 3074.8390.000
136 Z2015.0774ProvincialApproved
UP-GRADATION OF 180 MIDDLE SCHOOLS INTO HIGH SCHOOLS 03-PHASES (PHASE-I).
1000.0000.000
1000.000 660.7690.000
660.769 66% 0.1000.000
0.000 0.100 66% 339.1310.000
135 Z2014.0083Quetta
Approved
ESTABLISHMENT OF IT LABS IN ALL HIGH SCHOOLS OF QUETTA (PILOT PROJECT) JOINT VENTURE).
200.0000.000
200.000 130.0000.000
130.000 65% 0.1000.000
0.000 0.100 65% 69.9000.000
134 Z2014.0065ProvincialApproved
ESTABLISHMENT OF 200 ECE CENTRE @ RS.2.1 M (PHASE-I).
420.0000.000
420.000 282.9650.000
282.965 67% 0.1000.000
0.000 0.100 67% 136.9350.000
133 Z2014.0064ProvincialApproved
CONST: OF GENERAL TOILETS BLOCK IN SCHOOLS @ 0.3 M/UNIT (500) PHASE-I.
200.0000.000
200.000 198.2420.000
198.242 99% 0.1000.000
0.000 0.100 99% 1.6580.000
132 Z2014.0063ProvincialApproved
PROVISION OF 50 TUBE WELLS FOR 50 GIRLS HIGH SCHOOLS (ATLEAST 200 FEMALE STUDENTS/SCHOOL).
264.5100.000
264.510 199.6000.000
199.600 75% 0.1000.000
0.000 0.100 75% 64.8100.000
Secondary Education(10 Ongoing Projects) GoB/FPA Sub-Total
9163.510 9163.510 3036.369 3036.369 1.000 0.000 1.000 6126.141
0.000 0.000 0.000 0.000
Sector: Education
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Secondary Education
Chapter: EDUCATION
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Ongoing
Secondary Education(10 Projects) Total
9163.510 9163.510 3036.369 3036.369 1.000 0.000 1.000 6126.141
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 244: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/244.jpg)
Public Sector Development Programme (Sectorwise)
24 of 32
145 Z2015.0845ProvincialApproved
CONSTRUCTION OF BUILDINGS OF INTER COLLEGES AT BOSTAN, NAWA KILLI & PASHTOONABAD QUETTA.
243.8260.000
243.826 112.0000.000
112.000 45% 0.1000.000
0.000 0.100 45% 131.7260.000
144 Z2015.0811Qilla
AbdullahApproved
CONSTRUCTION/REMAINING WORKS OF INTER COLLEGE HABIBZAI KILLA ABDULLAH.
50.0000.000
50.000 10.0000.000
10.000 20% 0.1000.000
0.000 0.100 20% 39.9000.000
143 Z2013.0129ProvincialApproved
COMPLETION OF IN COMPLETE SCHEMES (PROVISION OF MISSING INFRASTRUCTURE IN COLLEGES PROJECT).
608.8410.000
608.841 596.2870.000
596.287 97% 0.1000.000
0.000 0.100 97% 12.4540.000
142 Z2001.0928Quetta
Approved
COLLEGE TEACHERS TRAINING ACADEMY.
222.3740.000
222.374 172.3460.000
172.346 77% 0.1000.000
0.000 0.100 77% 49.9280.000
0.000 0.000 0.000 0.000
College Education(4 Ongoing Projects) GoB/FPA Sub-Total
1125.041 1125.041 890.633 890.633 0.400 0.000 0.400 234.008
Subsector: College Education
Sector: Education
Chapter: EDUCATION
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
College Education(4 Projects) Total
1125.041 1125.041 890.633 890.633 0.400 0.000 0.400 234.008
Sector: EDUCATION(24 Projects)
16763.243
16763.243
7497.092 7497.092 2.400 0.000 2.400 9263.751
Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 245: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/245.jpg)
Public Sector Development Programme (Sectorwise)
25 of 32
153 Z2018.2817Quetta
Approved
REHABILITATION OF DIFFERENT HEALTH INSTITUTIONS OF QUETTA
20.0000.000
20.000 5.0000.000
5.000 25% 0.1000.000
0.000 0.100 25% 14.9000.000
152 Z2017.1176Khuzdar
Approved
CONSTRUCTION OF NEW BHU BUILDING 06 NOS AT TEHSIL MOOLA.
30.0000.000
30.000 15.0000.000
15.000 50% 0.1000.000
0.000 0.100 50% 14.9000.000
151 Z2017.1166Khuzdar
Approved
CONST: OF NEW BHU'S & CD'S AT TEHSIL ZEHRI.
50.0000.000
50.000 25.0000.000
25.000 50% 0.1000.000
0.000 0.100 50% 24.9000.000
150 Z2014.0530Nushki
Approved
UP-GRADATION OF (09) BHU INTO BHU PLUS AT KILLI HAZAM MENGAL,KILLI IBRAHIM JAMALDINI & OTHERS AT NUSHKI.
27.0000.000
27.000 5.0000.000
5.000 18% 0.1000.000
0.000 0.100 18% 21.9000.000
149 Z2012.0685Ziarat
Approved
BUILDING FOR RURAL HEALTH CENTER AHMADOON DIST.ZIARAT.
10.0000.000
10.000 5.0000.000
5.000 50% 0.1000.000
0.000 0.100 51% 4.9000.000
148 Z2012.0684Ziarat
Approved
BUILDING FOR RURAL HEALTH CENTER MANNA DIST.ZIARAT.
10.0000.000
10.000 5.0000.000
5.000 50% 0.1000.000
0.000 0.100 51% 4.9000.000
147 Z2012.0552Qilla
AbdullahApproved
ESTABLISHMENT OF RURAL HEALTH CENTRE AT KILLI NOURAK SALEMANKHEL GULISTAN (BDA).
37.9880.000
37.988 20.0000.000
20.000 52% 0.1000.000
0.000 0.100 52% 17.8880.000
146 Z2011.0472Qilla
SaifullahApproved
CONTS: OF RHC AT NASAI, ROD JOGEZAI AND NEW MUHALLAH BY PASS ROAD MUSLIM BAGH DIST. QILLA SAIFULLAH.
98.6560.000
98.656 88.7620.000
88.762 89% 0.1000.000
0.000 0.100 90% 9.7940.000
0.000 0.000 0.000 0.000
Primary Health Care(8 Ongoing Projects) GoB/FPA Sub-Total
283.644 283.644 168.762 168.762 0.800 0.000 0.800 114.082
Subsector: Primary Health Care
Sector: Health
Chapter: HEALTH
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Ongoing
Primary Health Care(8 Projects) Total
283.644 283.644 168.762 168.762 0.800 0.000 0.800 114.082
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 246: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/246.jpg)
Public Sector Development Programme (Sectorwise)
26 of 32
159 Z2017.1507Quetta
Approved
INST: OF FULL BODY STAT SCANNER X-RAY MACHINE & VENTILATORS FOR TRAUMA CENTRE, SPH QTA.
200.0000.000
200.000 50.0000.000
50.000 25% 0.1000.000
0.000 0.100 25% 149.9000.000
158 Z2017.0073Quetta
Approved
CONST: OF INSTITUTE FOR ORTHOTICS & PROSTHETIC TECHNOLOGY AT DIRECTORATE OF SOCIAL WELFARE DEPTT: BEROWRAY ROAD QUETTA.
70.0000.000
70.000 45.0000.000
45.000 64% 0.1000.000
0.000 0.100 64% 24.9000.000
157 Z2017.0071Quetta
Approved
INSTALLATION OF FULL BODY STAT SCANNER X-RAY MACHINE FOR TRAUMA CENTRE, SPH QUETTA.
100.0000.000
100.000 80.0000.000
80.000 80% 0.1000.000
0.000 0.100 80% 19.9000.000
156 Z2013.0133ProvincialApproved
COMPELTION OF IN COMPLETE SCHEMES (PROJECT FOR ADDITIONAL INFRASTRUCTURE/ FACILITIES IN ALL DHQS HOSPITALS).
500.0000.000
500.000 291.0460.000
291.046 58% 0.1000.000
0.000 0.100 58% 208.8540.000
155 Z2013.0045ProvincialApproved
COMPLETION OF IN COMPLETE SCHEMES (UP-GRADATION OF 100 BHUS INTO BHU PLUS & 30 RHCS INTO RHC PLUS PROJECT).
1000.0000.000
1000.000 872.0350.000
872.035 87% 0.1000.000
0.000 0.100 87% 127.8650.000
154 Z2004.0560Jhal MagsiApproved
ESTABLISHEMENT OF RHC AHMED PUR JHAL MAGSI.
36.4500.000
36.450 20.4100.000
20.410 55% 0.1000.000
0.000 0.100 56% 15.9400.000
0.000 0.000 0.000 0.000
Curative Health Care(6 Ongoing Projects) GoB/FPA Sub-Total
1906.450 1906.450 1358.491 1358.491 0.600 0.000 0.600 547.359
Subsector: Curative Health Care
Sector: Health
Chapter: HEALTH
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Curative Health Care(6 Projects) Total
1906.450 1906.450 1358.491 1358.491 0.600 0.000 0.600 547.359
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: HEALTH(14 Projects)
2190.094 2190.094 1527.253 1527.253 1.400 0.000 1.400 661.441
Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 247: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/247.jpg)
Public Sector Development Programme (Sectorwise)
27 of 32
164 Z2017.0067Gwadar
Approved
SMALL SCALE DES: PLANTS IN GWADAR(01 EACH ATJIWANI,GANZ,PISHUKAN, GWADAR CITY, SURBANDAR,PASNI, KALMAT & ORMARA)
573.9490.000
573.949 10.8000.000
10.800 1% 0.1000.000
0.000 0.100 1% 563.0490.000
163 Z2016.0636Quetta
Approved
STORM WATER DRAINAGE FROM ARBAB KARAM KHAN ROAD TO MAIN RAILWAY NALA JOINT ROAD.
33.0000.000
33.000 23.0000.000
23.000 69% 0.1000.000
0.000 0.100 70% 9.9000.000
162 Z2015.1186Pishin
Approved
LOCAL BORES WITH COMPLETE ACCESSORIES IN U/C'S INCLUDING M/C KHANOZAI.
30.8000.000
30.800 20.8000.000
20.800 67% 0.1000.000
0.000 0.100 67% 9.9000.000
161 Z2015.0441Barkhan
Approved
AUG: OF 24 LOCAL BORES FOR AGRI: PURPOSE IN AREAS OF BARKHAN.
12.0000.000
12.000 7.0000.000
7.000 58% 0.1000.000
0.000 0.100 59% 4.9000.000
160 Z2011.0300Gwadar
Approved
WATER SUPPLY SCHEMES ORMARA.
257.4590.000
257.459 185.0000.000
185.000 71% 0.1000.000
0.000 0.100 71% 72.3590.000
0.000 0.000 0.000 0.000
Water Supply Schemes(5 Ongoing Projects) GoB/FPA Sub-Total
907.208 907.208 246.600 246.600 0.500 0.000 0.500 660.108
Sector: Public Health Engineering
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Chapter: PUBLIC HEALTH ENG:
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Ongoing
Subsector: Water Supply Schemes
Water Supply Schemes(5 Projects) Total
907.208 907.208 246.600 246.600 0.500 0.000 0.500 660.108
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: PUBLIC HEALTH ENG:(5 Projects)
907.208 907.208 246.600 246.600 0.500 0.000 0.500 660.108
Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 248: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/248.jpg)
Public Sector Development Programme (Sectorwise)
28 of 32
165 Z2012.0811Qilla
SaifullahApproved
CONST:OF FEMALE HOSTEL FOR MADRASSA BINAT MUSLIM BAGH.
75.0000.000
75.000 15.0000.000
15.000 20% 0.1000.000
0.000 0.100 20% 59.9000.000
0.000 0.000 0.000 0.000
Social Welfare(1 Ongoing Projects) GoB/FPA Sub-Total
75.000 75.000 15.000 15.000 0.100 0.000 0.100 59.900
Chapter: SOCIAL WELFARE
Ongoing
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Sector: Social Welfare & Women Dev:
Subsector: Social Welfare
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Social Welfare(1 Projects) Total
75.000 75.000 15.000 15.000 0.100 0.000 0.100 59.900
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: SOCIAL WELFARE(1 Projects)
75.000 75.000 15.000 15.000 0.100 0.000 0.100 59.900
Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 249: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/249.jpg)
Public Sector Development Programme (Sectorwise)
29 of 32
170 Z2017.1728Quetta
Approved
PROVISION OF STREET LIGHT AT HALQA 1, 2, 3, 4, 5 & 6 QUETTA.
50.0000.000
50.000 35.0000.000
35.000 70% 0.1000.000
0.000 0.100 70% 14.9000.000
169 Z2017.1162Khuzdar
Approved
CONST: OF PROTECTION BAND TEHSIL ZEHRI.
50.0000.000
50.000 25.0000.000
25.000 50% 0.1000.000
0.000 0.100 50% 24.9000.000
168 Z2017.1161Khuzdar
Approved
CONST: OF TALABS TEHSIL ZEHRI.
50.0000.000
50.000 20.0000.000
20.000 40% 0.1000.000
0.000 0.100 40% 29.9000.000
167 Z2016.1129Harnai
Approved
UMBRALLA SCHEME FOR UPLIFT COMMUNITY ZARGHOON GHAR IN SOCIAL SECTOR & IRRIGATION.
484.0000.000
484.000 300.0000.000
300.000 61% 0.1000.000
0.000 0.100 62% 183.9000.000
166 Z2016.0011Quetta
Approved
SUPPLY & INSTALLATION OF PLASTIC WATER TANKS HANNA URAK, SARAGHURGAI, NOHSAR (PB-6).
10.0000.000
10.000 5.0000.000
5.000 50% 0.1000.000
0.000 0.100 51% 4.9000.000
Local Govt(5 Ongoing Projects) GoB/FPA Sub-Total
644.000 644.000 385.000 385.000 0.500 0.000 0.500 258.500
0.000 0.000 0.000 0.000
Ongoing
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Subsector: Local Govt
Chapter: LOCAL GOVT:
Sector: Local Govt & Rural Development
Local Govt(5 Projects) Total
644.000 644.000 385.000 385.000 0.500 0.000 0.500 258.500
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: LOCAL GOVT:(5 Projects)
644.000 644.000 385.000 385.000 0.500 0.000 0.500 258.500
2019 - 20 Original
![Page 250: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/250.jpg)
Public Sector Development Programme (Sectorwise)
30 of 32
180 Z2014.0006ProvincialApproved
TOWN DEV: PROGRAM FOR 6 TOWNS UNDER MASTER PLAN PHASE-I (KHUZDAR, D.M. JAMALI, CHAMAN, SIBI, LORALAI & PANJGUR).
900.0000.000
900.000 240.9700.000
240.970 26% 0.1000.000
0.000 0.100 26% 658.9300.000
179 Z2011.0848Kech
Approved
CUTTING & IMPROVEMENT OF ROAD FROM CHUR TO WAKAI AT DIST. KECH.
80.0000.000
80.000 30.0000.000
30.000 37% 0.1000.000
0.000 0.100 37% 49.9000.000
178 Z2011.0775Kech
Approved
CUTTING OF ROAD FROM ASPIKAN TO TAGRANI ROAD DIST. KECH 28 KM.
99.0000.000
99.000 55.0000.000
55.000 55% 0.1000.000
0.000 0.100 55% 43.9000.000
177 Z2011.0772Kech
Approved
WIDENING OF ROAD (3 EITHER SIDE) FROM 12" TO 18" DIST. KECH ZAREEN TO DARO HILL, FROM 0 TO 20 KM.
123.6610.000
123.661 96.4720.000
96.472 78% 0.1000.000
0.000 0.100 78% 27.0890.000
176 Z2011.0047Quetta
Approved
(06) NOS. OF WSS AT QUETTA, PISHIN, DERA BUGTI, KHARAN KHUZDAR, SIBI. (VARIOUS DEV: SCHEMES) (LOCAL & RIG BORE) (UP&D)
29.2000.000
29.200 18.0000.000
18.000 61% 0.1000.000
0.000 0.100 61% 11.1000.000
175 Z2010.0796Kech
Approved
IMP: & SIDENING OF B/T ROAD 12' TO 18' (3' WITHER SIDES FROM BULL NIGOR ROAD TO KOOCHA VIA KUSAR 0 TO 23 KM) (UP&D).
120.0000.000
120.000 100.0000.000
100.000 83% 0.1000.000
0.000 0.100 83% 19.9000.000
174 Z2010.0443Kech
Approved
WIDENING OF ROAD (3' EITHER SIDE) FROM 12' TO 18' DISTRICT KECH NIGOR ROAD (UP&D).
160.0000.000
160.000 113.0000.000
113.000 70% 0.1000.000
0.000 0.100 70% 46.9000.000
173 Z2009.0285Musa KhailApproved
DEVELOPMENT OF MUSA KHAIL TOWN.
537.9600.000
537.960 273.1590.000
273.159 50% 0.1000.000
0.000 0.100 50% 264.7010.000
172 Z2005.0663Gwadar
Approved
MASTER PLAN FOR DEVELOPMENT OF WATER FRONT IN AND AROUND GWADAR (BDA).
67.0500.000
67.050 49.4020.000
49.402 73% 0.1000.000
0.000 0.100 73% 17.5480.000
171 Z2004.0915Qilla
SaifullahApproved
PITAB VALLEY DEVELOPMENT PROJECT QILLA SAIFULLAH (BDA).
672.0500.000
672.050 400.9150.000
400.915 59% 0.1000.000
0.000 0.100 59% 271.0350.000
0.000 0.000 0.000 0.000
Urban Planning & Development(10 Ongoing Projects) GoB/FPA Sub-Total
2788.921 2788.921 1376.918 1376.918 1.000 0.000 1.000 1411.003
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Ongoing
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Chapter: URBAN PLANNING & DEVELOPMENT
Sector: Urban Planning & Development
Subsector: Urban Planning & Development
Urban Planning & Development(10 Projects) Total
2788.921 2788.921 1376.918 1376.918 1.000 0.000 1.000 1411.003
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: URBAN PLANNING & DEVELOPMENT(10 Projects)
2788.921 2788.921 1376.918 1376.918 1.000 0.000 1.000 1411.003
2019 - 20 Original
![Page 251: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/251.jpg)
Public Sector Development Programme (Sectorwise)
31 of 32
187 Z2016.0768Qilla
AbdullahApproved
INST:OF SOLAR HOME SYSTEMS IN VILLAGES OF PB-12, KILLA ABDULLAH-II.
25.0000.000
25.000 20.0000.000
20.000 80% 0.1000.000
0.000 0.100 80% 4.9000.000
186 Z2016.0650Quetta
Approved
PROVISION OF STREET LIGHTS FOR U/C 41, PASHTOONABAD.
5.0000.000
5.000 1.0000.000
1.000 20% 0.1000.000
0.000 0.100 22% 3.9000.000
185 Z2015.1081Pishin
Approved
SOLAR SYSTEM FOR WSS & DOM: PUR: & VILLAGE ELECT:, INST: OF TRNS: 22 U/C INCL: M/C HURAMZAI & M/C PISHIN PB-10.
53.8000.000
53.800 35.2000.000
35.200 65% 0.1000.000
0.000 0.100 65% 18.5000.000
184 Z2015.0320Qilla
AbdullahApproved
INSTALLATION OF SOLAR HOME SYSTEM IN VILLAGES OF PB-12.
52.2380.000
52.238 27.0000.000
27.000 51% 0.1000.000
0.000 0.100 51% 25.1380.000
183 Z2013.0127ProvincialApproved
COMPLETION OF IN COMPLETE SCHEMES (VILLAGE ELECTRIFICATION PROJECT).
500.0000.000
500.000 389.4540.000
389.454 77% 0.1000.000
0.000 0.100 77% 110.4460.000
182 Z2013.0008ProvincialApproved
COMPLETION OF IN COMPLETE SECHEMS (SOLAR HOME SYSTEM PROJECT).
1000.0000.000
1000.000 708.9860.000
708.986 70% 0.1000.000
0.000 0.100 70% 290.9140.000
181 Z2010.0496Pishin
Approved
ELECTRIFICATION OF VARIOUS VILLAGES & PROVISION OF 50 KVA & 25 KVA TRANSFORMERS, BARSHORE / KAREZAT.
60.0000.000
60.000 45.0000.000
45.000 75% 0.1000.000
0.000 0.100 75% 14.9000.000
Power(7 Ongoing Projects) GoB/FPA Sub-Total
1696.038 1696.038 1226.640 1226.640 0.700 0.000 0.700 468.698
0.000 0.000 0.000 0.000
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Sector: Power
Chapter: POWER
Ongoing
Subsector: Power
Power(7 Projects) Total
1696.038 1696.038 1226.640 1226.640 0.700 0.000 0.700 468.698
Sub-Sector Total (FPA) 0.000 0.000 0.000 0.000
Sector: POWER(7 Projects)
1696.038 1696.038 1226.640 1226.640 0.700 0.000 0.700 468.698
Sector Total (FPA) 0.000 0.000 0.000 0.000
2019 - 20 Original
![Page 252: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/252.jpg)
Public Sector Development Programme (Sectorwise)
32 of 32
188 Z2009.0316Gwadar
Approved
CONSTT. OF BLACK TOP ROAD NAGOR SHARIF TO SUNTSAR 54 KM (OMANI GRANT).
0.100861.436
861.536 0.000231.415
231.415 26% 0.1000.000
0.000 0.100 26% 0.000630.021
Roads(1 Ongoing Projects) GoB/FPA Sub-Total
0.100 861.536 0.000 231.415 0.100 0.000 0.100 0.000
861.436 231.415 0.000 630.021
S No Project ID Project Name GOB / FPA
Total GOB / FPA
Total Achv: %
Capital/ FPA
Revenue Total Target%
GOB / FPA
Ongoing
Sector: Communication
Chapter: FOREIGN AID
Estimated Cost Exp: Upto June 2019 Fin: Allocation 2019-20 Fin: Thr: Fwd:
Subsector: Roads
Sub-Sector Total (FPA) 861.436 231.415 0.000 630.021
Roads(1 Projects) Total
0.100 861.536 0.000 231.415 0.100 0.000 0.100 0.000
Sector: FOREIGN AID(1 Projects)
0.100 861.536 0.000 231.415 0.100 0.000 0.100 0.000
Sector Total (FPA) 861.436 231.415 0.000 630.021
Grand Total (FPA) 861.436 231.415 0.000 630.021
Grand Total: (188 Projects) 57804.643
58666.079
34707.453
34938.868 18.800 0.000 18.800 23078.390
2019 - 20 Original
![Page 253: GOVERNMENT OF BALOCHISTAN PLANNING & DEVELOPMENT …balochistan.gov.pk/wp-content/uploads/2019/12/PSDP-2019-20.pdf · Development Goals (SDGs). With the help of above intervention](https://reader035.fdocuments.us/reader035/viewer/2022070711/5ecb0e27d94fba29cb31ce47/html5/thumbnails/253.jpg)
PSDP Abstract - Sectorwise
14 COMMUNICATION 10176.200 0.000 10176.200 322 150.000 0.000 150.000 4 10326.200 0.000 10326.200 326 24.44%
15 WATER 2689.242 351.000 3040.242 89 1109.165 0.000 1109.165 70 3798.407 351.000 4149.407 159 9.82%
16 INFORMATION TECH: 124.473 0.000 124.473 12 0.000 0.000 0.000 0 124.473 0.000 124.473 12 0.29%
11 TOURISM 7.000 0.000 7.000 1 0.000 0.000 0.000 0 7.000 0.000 7.000 1 0.02%
24 POWER 310.527 0.000 310.527 42 0.000 0.000 0.000 0 310.527 0.000 310.527 42 0.73%
13 P.P.&H. 3232.724 0.000 3232.724 129 140.000 0.000 140.000 2 3372.724 0.000 3372.724 131 7.98%
17 EDUCATION 3543.933 1251.000 4794.933 144 1990.623 0.000 1990.623 100 5534.556 1251.000 6785.556 244 16.06%
21 LOCAL GOVT: 392.300 0.000 392.300 24 24.000 0.000 24.000 2 416.300 0.000 416.300 26 0.99%
22 WOMEN DEVELOPMENT 0.000 0.000 0.000 1 0.000 0.000 0.000 0 0.000 0.000 0.000 1 0.00%
23 URBAN PLANNING & DEVELOPMENT
145.058 0.000 145.058 17 165.000 0.000 165.000 6 310.058 0.000 310.058 23 0.73%
18 HEALTH 2107.186 862.000 2969.186 77 496.000 0.000 496.000 22 2603.186 862.000 3465.186 99 8.20%
19 PUBLIC HEALTH ENG: 1939.751 0.000 1939.751 72 1385.602 0.000 1385.602 143 3325.353 0.000 3325.353 215 7.87%
20 SOCIAL WELFARE 39.119 0.000 39.119 9 707.000 0.000 707.000 2 746.119 0.000 746.119 11 1.77%
1 AGRICULTURE 1428.039 0.000 1428.039 43 0.000 0.000 0.000 0 1428.039 0.000 1428.039 43 3.38%
2 LIVESTOCK 145.172 0.000 145.172 19 0.000 0.000 0.000 0 145.172 0.000 145.172 19 0.34%
3 FORESTRY 180.103 0.000 180.103 18 0.000 0.000 0.000 0 180.103 0.000 180.103 18 0.43%
12 INFORMATION 1.840 0.000 1.840 1 0.000 0.000 0.000 0 1.840 0.000 1.840 1 0.00%
26 FOREIGN AID 102.000 2972.690 3074.690 12 0.000 817.000 817.000 2 102.000 3789.690 3891.690 14 9.21%
25 OTHER SCHEMES 2590.060 0.000 2590.060 9 0.000 0.000 0.000 0 2590.060 0.000 2590.060 9 6.13%
4 FISHERIES 92.795 0.000 92.795 11 0.000 0.000 0.000 1 92.795 0.000 92.795 12 0.22%
8 MANPOWER 69.000 0.000 69.000 5 0.000 0.000 0.000 0 69.000 0.000 69.000 5 0.16%
9 SPORTS 73.799 0.000 73.799 23 0.000 0.000 0.000 0 73.799 0.000 73.799 23 0.17%
10 CULTURE 93.097 0.000 93.097 7 25.000 0.000 25.000 1 118.097 0.000 118.097 8 0.28%
5 POP: WEL: 50.000 0.000 50.000 1 0.000 0.000 0.000 0 50.000 0.000 50.000 1 0.12%
6 INDUSTRIES 190.000 0.000 190.000 9 0.000 0.000 0.000 0 190.000 0.000 190.000 9 0.45%
7 MINERALS 29.500 0.000 29.500 2 50.000 0.000 50.000 4 79.500 0.000 79.500 6 0.19%
Total 29752.918 5436.690 35189.608 1099 6242.390 817.000 7059.390 359 35995.308 6253.690 42248.998 1458
2018 - 19 RevisedAllocation Ongoing Schemes Ongoing Allocation New Schemes New Allocation Total Total % Total
S N Chapter GOB FPA Total Schemes GOB FPA Total Schemes GOB FPA Total Schemes