GORDON STREETSCAPE - STAGE 1 LANDSCAPE WORKS · final concept. POST OFFICE. 3408-3/15 Bluestone...

16
N N/A A REV: ./. 20/12/18 COVER SHEET for construction 1/16 KLEIN LANDSCAPE ARCHITECTURE Karoline Klein Reg. Landscape Architect (AILA) 89 Ford Rd HARCOURT VIC 3453 phone: 0427 417 498 email: [email protected] PROJECT DRAWING TITLE PLAN DETAILS LANDSCAPE ARCHITECT CLIENT DATE: SCALE: STATUS: ISSUE: SHEET: Project 3408 GORDON STREETSCAPE STAGE 1 LANDSCAPE DESIGN RMG for Moorabool Shire Council Project No. 3408 PROJECT GORDON STREETSCAPE - STAGE 1 LANDSCAPE WORKS DRAWING SCHEDULE L01 COVER SHEET L02 OVERVIEW L03 AMENITY AREAS - CONCEPT FOR INFORMATION L04 COMMUNITY HALL - PAVING SETOUT L05 POST OFFICE - PAVING SETOUT L06 TREE SETOUT L07 PLANTING PLAN COMMUNITY HALL L08 PLANTING PLAN POST OFFICE/PLANTING SCHEDULE L09 DETAILS 1 / PAVING L10 DETAILS 2/ PAVING L11 DETAILS 3/ BLUESTONE WALL - FREESTANDING L12 DETAILS 4/ BLUESTONE RETAINING WALL L13 DETAILS 5/ FURNITURE L14 DETAILS 6/ BINS/NOTICE BOARD L15 DETAILS 7/ GRASSING/PLANTING L16 DETAILS 8/ TREE PLANTING GENERAL CONDITIONS: All general conditions of the engineering works and specifications apply to landscape works. All documentation to be read and implemented in conjunction with engineering documentation.

Transcript of GORDON STREETSCAPE - STAGE 1 LANDSCAPE WORKS · final concept. POST OFFICE. 3408-3/15 Bluestone...

Page 1: GORDON STREETSCAPE - STAGE 1 LANDSCAPE WORKS · final concept. POST OFFICE. 3408-3/15 Bluestone Paving Park Seat with Arm and Back Rest existing telephone box bin new community notice

N

N/A

A REV: ./.

20/12/18

COVER SHEET

for construction1/16

KLEIN LANDSCAPE ARCHITECTURE Karoline Klein

Reg. Landscape Architect (AILA)89 Ford Rd

HARCOURT VIC 3453phone: 0427 417 498

email: [email protected]

PROJECT

DRAWING TITLE

PLAN DETAILS

LANDSCAPE ARCHITECT

CLIENT

DATE:SCALE:STATUS:

ISSUE:SHEET:

Project 3408GORDON

STREETSCAPESTAGE 1

LANDSCAPE DESIGNRMG

for Moorabool Shire CouncilProject No. 3408

PROJECT

GORDON STREETSCAPE - STAGE 1LANDSCAPE WORKS

DRAWING SCHEDULE

L01 COVER SHEETL02 OVERVIEWL03 AMENITY AREAS - CONCEPT FOR INFORMATIONL04 COMMUNITY HALL - PAVING SETOUTL05 POST OFFICE - PAVING SETOUTL06 TREE SETOUTL07 PLANTING PLAN COMMUNITY HALLL08 PLANTING PLAN POST OFFICE/PLANTING SCHEDULEL09 DETAILS 1 / PAVINGL10 DETAILS 2/ PAVINGL11 DETAILS 3/ BLUESTONE WALL - FREESTANDINGL12 DETAILS 4/ BLUESTONE RETAINING WALLL13 DETAILS 5/ FURNITUREL14 DETAILS 6/ BINS/NOTICE BOARDL15 DETAILS 7/ GRASSING/PLANTINGL16 DETAILS 8/ TREE PLANTING

GENERAL CONDITIONS:All general conditions of the engineering works andspecifications apply to landscape works.

All documentation to be read and implemented inconjunction with engineering documentation.

AutoCAD SHX Text
KLA
AutoCAD SHX Text
20/12/2018 4:11 PM
AutoCAD SHX Text
11 Gordon docu FINAL 20 Dec 18.dwg
Page 2: GORDON STREETSCAPE - STAGE 1 LANDSCAPE WORKS · final concept. POST OFFICE. 3408-3/15 Bluestone Paving Park Seat with Arm and Back Rest existing telephone box bin new community notice

N

1:400 on A3

KAROLINE KLEIN

Reg. Landscape Architect (AILA)

89 Ford Rd

HARCOURT VIC 3453

phone: 0427 417 498

email: [email protected]

Plan No /Sheet:

Plan Status:

Scale:

Project

Client

Plan Details

Revision No.:

Date:

Landscape Architect

GORDONSTREETSCAPE

STAGE 1LANDSCAPE DESIGN

- OVERVIEW -RMG

for Moorabool Shire Council

30.09.18

final concept-3408-2/15

POST OFFICE

COMMUNITY HALL

MAIN STREET

RUSS

EL S

TREE

T

LYN

DHUR

ST S

TREE

T

European Ash (Fraxinus excelsior'Greenwood') along the northernnature strip of Main Street

Crepe Myrtle to highlightthe community hall

Crepe Myrtle to thesouthern nature strip andto frame the post office

European Ash along Russel St tomatch existing tree planting

new/rejuvanatednature strip

tree to be removed

existing tree

proposed street tree

GORDONBLEU

0 m 2 m 5 m 10 m 20 m

Crepe Myrtle(Lagerstroemia indica'Natchez') - white flowering

European Ash ( Fraxinus excelsior'Greenwood') - matching existing species

on the northern side of Main Street

refer "Amenity Areas" sheet

refer "Amenity Areas" sheet

Golden Ash along southernedge of Main Street

Golden Ash (Fraxinusexcelsior 'Aurea') - goldenautumn foliage CONCEPT PLA

N FOR IN

FORMATIO

N ONLY -

NOT FOR CONST

RUCTION - D

IFFERS F

ROM

CONSTRUCTIO

N DOCUMENTATION

AutoCAD SHX Text
<-- STAGE 1 | STAGE 3 -->
AutoCAD SHX Text
| STAGE 1 -->
AutoCAD SHX Text
KLA
AutoCAD SHX Text
20/12/2018 4:11 PM
AutoCAD SHX Text
11 Gordon docu FINAL 20 Dec 18.dwg
Page 3: GORDON STREETSCAPE - STAGE 1 LANDSCAPE WORKS · final concept. POST OFFICE. 3408-3/15 Bluestone Paving Park Seat with Arm and Back Rest existing telephone box bin new community notice

N

1:125 on A3

KAROLINE KLEIN

Reg. Landscape Architect (AILA)

89 Ford Rd

HARCOURT VIC 3453

phone: 0427 417 498

email: [email protected]

Plan No /Sheet:

Plan Status:

Scale:

Project

Client

Plan Details

Revision No.:

Date:

Landscape Architect

GORDONSTREETSCAPE

LANDSCAPE DESIGNAMENITY AREAS

POST OFFICE / HALLRMG

for Moorabool Shire Council

30.09.18

final concept

POST OFFICE

3408-3/15

Bluestone Paving

Park Seat with Arm and Back Restexistingtelephone box

bin

new communitynotice board

low, ornamentalplantings

new concretefootpath

additionaltree

additionaltree

existing street signto be relocated

existingpower pole park seat

low retaining/seating wall (approx.450 mm above paving level) fromsalvaged bluestone pitchers andsawn blue stone capping

bike hoops

possible pedestriancrossing point

new carparking

COMMUNITY HALL

bin

bike racks

park seat

park seat

low bluestone wall (approx. 450mm above paving level) fromsalvaged bluestone pitchers andsawn bluestone capping

COMMUNITY HALL AMENITY AREA

POST OFFICE AMENITY AREA

disabledparking

pram ramps

995 x 495 x 40 mmbluestone pavers laid in astretcher bond with 495 x245 x 40 mm edge course

existing footpath(remains unchanged)

Telstra pillar. Potentiallyto be relocated.

additionaltree

additionaltree

paving to extend to hallentry, incl. new handrails

sign

sign

sign

sign

995 x 495 x 40 mm bluestonepavers laid in a stretcher bond with495 x 245 x 40 mm edge course

0 m 2 m 5 m 10 m

low bluestone retainingwall/seat (approx. 450 mmabove paving level) fromsalvaged bluestone pitchers andsawn bluestone capping

low, ornamentalplantings

thicker concrete slabfor car vehicle access

Bluestone Paving Bin Surround Bike Racks

Rosemary 'Blue Lagoon' Pig Face Hebe 'Inspiration' Dianella 'Little Jess'

ORNAMENTAL PLANTINGS

STREETSCAPE PAVING/ELEMENTS

CONCEPT PLAN FO

R IN FO

RMATION ONLY

-

NOT FOR CONST

RUCTION - D

IFFERS F

ROM

CONSTRUCTIO

N DOCUMENTATION

AutoCAD SHX Text
KLA
AutoCAD SHX Text
20/12/2018 4:11 PM
AutoCAD SHX Text
11 Gordon docu FINAL 20 Dec 18.dwg
Page 4: GORDON STREETSCAPE - STAGE 1 LANDSCAPE WORKS · final concept. POST OFFICE. 3408-3/15 Bluestone Paving Park Seat with Arm and Back Rest existing telephone box bin new community notice

B 5325

15670

1500

1000

1685

1650

500400750245

16852457500245

1685245

7504001500245

1000

1165

400

500

2750

400

2750

600

300

1000

345

800

3865

4385

27653930

4120

FSL 585.383

500

1445

4995 600

600350

FSL 585.418

FSL 585.641

FSL 585.679

FSL 585.780

FSL 585.820

FSL 585.924

FSL 585.964

N

COMMUNITY HALL

install 2x bike hoopsas per detail 10

retaining wall from bluestonepitchers as per detail 5. Finished

height 450 mm abovesurrounding levels

edge strip from 245 x495 x 40 mm bluestone

pavers as per detail 3

install park seat as perdetail 9 and manufacturer's

instructions

Thicken concrete slab to 150 mmwithin the extent shown on plans andas per detail 2.

995 x 495 x 40 mm bluestone paversas per detail 1, laid in a stretcher bondin the direction as indicated(perpendicular to footpath). Hatchdenotes laying direction, notindividual pavers.

new bin surroundas per detail 7

MAIN STREET

new

reta

inin

g w

all

gard

en b

ed w

ith tr

eenew

par

k se

at

new

par

k se

at

new handrail to entry paving, ifrequired by SuperintendantExtend bluestone paving tohall entry. Remediate baselayer as required forpedestrian traffic.

Paving to extend foranother approx. 600 mm tohall entrance door. Notshown on this plan.

new

reta

inin

g w

all

gard

en b

ed w

ith tr

ee

existing footpathexisting footpath

IJ

IJ

IJ

IJ exte

nt o

f thi

cken

ed c

oncr

ete

match paving to strip drain

EJ

1:50 on A3

A REV: ./.

20/12/18

COMMUNITY HALLPaving Setout

for construction4/16

KLEIN LANDSCAPE ARCHITECTURE Karoline Klein

Reg. Landscape Architect (AILA)89 Ford Rd

HARCOURT VIC 3453phone: 0427 417 498

email: [email protected]

PROJECT

DRAWING TITLE

PLAN DETAILS

LANDSCAPE ARCHITECT

CLIENT

DATE:SCALE:STATUS:

ISSUE:SHEET:

Project 3408GORDON

STREETSCAPESTAGE 1

LANDSCAPE DESIGNRMG

for Moorabool Shire CouncilProject No. 3408

install park seat as perdetail 9 and manufacturer's

instructions

pram crossing as per engineeringdrawings. Kerb ramps to be

paved with bluestone pavers.TGSI to be included. ex

tent

of t

hick

ened

con

cret

e

exte

nt o

f thi

cken

ed c

oncr

ete

IJ

IJ

IJ

IJIJ

isolation joint to back ofkerb as per detail 1

extent of kerb rampshown dashed

finished surface levels as perengineering drawings

fall

995 x 495 x 40 mmbluestone paver

495 x 245 x 40 mm edgestripisolation joint as perdetail 1

dowelledconstruction/expansionjoint as per IDM SD 210

bluestone pitcherretaining wall, extent ofwall shown dashedunder capping stone

finished surface levelas per engineering dwg's

root barrier

grassing by seeding asper specification

LEGEND

FSL 584.60

IJ

EJ EJ EJ EJ

EJ300 50

0

Retaining wall: Top of wall to be 450 mmabove surrounding surface. To be positionedin such a way that paved edged strip abuttsat full width. No cutting of edge strip pavers.Capping stone of wall to overhang edge stripby 50 mm.

Retaining wall: Top of wall tobe 450 mm above surroundingsurface. To be positioned insuch a way that paved edgedstrip abutts at full width. Nocutting of edge strip pavers.Capping stone of wall tooverhang edge strip by 50 mm.

FOOTPATH

new sign

root barrier to edge ofgarden beds as perdetail and specification

NOTE:FSL shown as per engineeringinformation. No natural surfacelevel data were available for theexisting footpath or hall entranceduring the landscape design.Setout to ensure sufficientdrainage at a minimum of 2%across the site and away frombuilding. Level setout to beapproved by Superintandant priorto construction of any surfaces orretaining wall.

AutoCAD SHX Text
KLA
AutoCAD SHX Text
20/12/2018 4:11 PM
AutoCAD SHX Text
11 Gordon docu FINAL 20 Dec 18.dwg
Page 5: GORDON STREETSCAPE - STAGE 1 LANDSCAPE WORKS · final concept. POST OFFICE. 3408-3/15 Bluestone Paving Park Seat with Arm and Back Rest existing telephone box bin new community notice

3750

8900

4500

2000

1250

2750

2500

12900

2000

5150

245

245

600

300

850

975 975

1000

430

300

600

700

N

POST OFFICE

install 2x bike hoopsas per detail 10

retaining wall frombluestone pitchers as

per detail 6

Edge strip to wall from 245x 495 X 40 mm bluestone

pavers as per detail 06.Edge strip to fall away

from wall.

existing tree to be removed

install park seat as perdetail 9 and material

schedule list

pram crossing as perengineering drawings

telephone box toremain unchanged

Telstra pillar

new footpath as perengineering drawings

garden bed

Relocate existingdisplay board orinstall new. TBC. Alignwith corner oftelephone box.

install bin surroundas per detail 7

Reference point foreast/west alignment. Edgeof paving to be off-set by300 mm from existingtelephone box

MAIN STREET

Surrounding ground to be cut andshaped towards new pavement.Grade not to exceed 1:4. To be

seeded as per specification.

bluestone pitcher retaining wall

bin

new park seat

IJIJ

IJ IJ

IJ

IJ

IJ

IJ

IJ

IJ

1:50 on A3

A REV: ./.

20/12/18

POST OFFICEPaving Setout

for construction5/16

KLEIN LANDSCAPE ARCHITECTURE Karoline Klein

Reg. Landscape Architect (AILA)89 Ford Rd

HARCOURT VIC 3453phone: 0427 417 498

email: [email protected]

PROJECT

DRAWING TITLE

PLAN DETAILS

LANDSCAPE ARCHITECT

CLIENT

DATE:SCALE:STATUS:

ISSUE:SHEET:

Project 3408GORDON

STREETSCAPESTAGE 1

LANDSCAPE DESIGNRMG

for Moorabool Shire CouncilProject No. 3408

995 x 495 x 40 mmbluestone pavers as perdetail 1, laid in a stretcherbond in the direction asindicated (perpendicularto footpath). Hatchdenotes laying direction,not individual pavers.

TOW 585.60

FSL 584.94

FSL 584.85 FSL 584.60

FSL 584.80

FSL 584.75

3 % fall

2.5

% fa

ll

3.9 % fall

TOW 585.60

FSL 585.40

fall

fall

fall

fall

create subtledepression/swale in paving

to drain water away fromretaining wall

995 x 495 x 40 mmbluestone paver

495 x 245 x 40 mmedge strip

isolation joint as perdetail 1

expansion joint

bluestone pitcherretaining wall, extentof wall shown dashedunder capping stone

finished surface level

top of wall level

engineering designsurface contour - forinformation onlygrassing by seeding asper specification

LEGEND

FSL 584.60

TOW 585.60

IJ

approx. extent ofexist. display boardDS 585.20

DS 585.00

DS 584.80

DS 584.60DS

585

.40DS 585.60

DS 584.80

DS 5

84.6

0

DS 585.00

DS 585.20

DS 585.40DS 585.40

AutoCAD SHX Text
KLA
AutoCAD SHX Text
20/12/2018 4:11 PM
AutoCAD SHX Text
11 Gordon docu FINAL 20 Dec 18.dwg
Page 6: GORDON STREETSCAPE - STAGE 1 LANDSCAPE WORKS · final concept. POST OFFICE. 3408-3/15 Bluestone Paving Park Seat with Arm and Back Rest existing telephone box bin new community notice

85008500

8500

8500

2300

1500

2650

2000 3000

2000

7500

2000

1500

2500

2500

1000010000

100002500

2500

1000

align treesoppositeeach other

3425

2500

POST OFFICE

COMMUNITY HALL

MAIN STREET

RUSS

EL S

TREE

T

LYN

DHUR

ST S

TREE

T

European Ash along Russel St tomatch existing tree planting

tree to be removed

existing tree

tree to be planted as perdetail 13

root barrier

GORDONBLEU

0 m 2 m 5 m 10 m 20 m

plac

e ce

ntra

llybe

twee

n fo

ot p

ath

and

kerb

place tree centrallyin garden bed

plac

e ce

ntra

llybe

twee

n fo

ot p

ath

and

kerb

2000

8000

place tree centrallybetween footpath

and kerb

NOTE:Tree locations to be markedout on site and to be confirmedwith Moorabool Shire's arboristprior to planting.

existing treesto be removed

place treescentrally betweenfootpath and kerb

92009200

9200

4 Lag Nat

1 Lag Nat

1 Lag Nat

1 Lag Nat

1 Fra Gree

6 Fra Gree

2 Fra Aur

4 Fra Gree

1 Fra Gree

1 Fra Gree

Grassed areas: Install asper specification below.

Nature Strip:Backfill as required with approvedsalvaged material or type B fill. Fill to75 mm below finished nature striplevels. Place 75 mm approved, weedfree topsoil and seed with approvedgrass seed. Where nature strip isconstructed over crushed rock orbituminous hardstand surfaces,surface is to be ripped to 100 mmdepth prior to placing backfill.

N

as shown on A3

A REV: ./.

16/12/18

TREE SETOUT

for construction6/16

KLEIN LANDSCAPE ARCHITECTURE Karoline Klein

Reg. Landscape Architect (AILA)89 Ford Rd

HARCOURT VIC 3453phone: 0427 417 498

email: [email protected]

PROJECT

DRAWING TITLE

PLAN DETAILS

LANDSCAPE ARCHITECT

CLIENT

DATE:SCALE:STATUS:

ISSUE:SHEET:

Project 3408GORDON

STREETSCAPESTAGE 1

LANDSCAPE DESIGNRMG

for Moorabool Shire CouncilProject No. 3408

install root barrier both sides ofnature strip in this section

install root barrier to garden bed edges asshown on sheet 4 and tree planting detail

AutoCAD SHX Text
<-- STAGE 1 | STAGE 3 -->
AutoCAD SHX Text
| STAGE 1 -->
AutoCAD SHX Text
KLA
AutoCAD SHX Text
20/12/2018 4:11 PM
AutoCAD SHX Text
11 Gordon docu FINAL 20 Dec 18.dwg
Page 7: GORDON STREETSCAPE - STAGE 1 LANDSCAPE WORKS · final concept. POST OFFICE. 3408-3/15 Bluestone Paving Park Seat with Arm and Back Rest existing telephone box bin new community notice

B

1:50 on A3

A REV: ./.

20/12/18

COMMUNITY HALLPlanting Plan

for construction7/16

KLEIN LANDSCAPE ARCHITECTURE Karoline Klein

Reg. Landscape Architect (AILA)89 Ford Rd

HARCOURT VIC 3453phone: 0427 417 498

email: [email protected]

PROJECT

DRAWING TITLE

PLAN DETAILS

LANDSCAPE ARCHITECT

CLIENT

DATE:SCALE:STATUS:

ISSUE:SHEET:

Project 3408GORDON

STREETSCAPESTAGE 1

LANDSCAPE DESIGNRMG

for Moorabool Shire CouncilProject No. 3408

5 Dia LJe

9 Dia LJe

7 Dia LJe

15 Dia LJe

2 Heb Ins

1 Heb Ins

1 Heb Ins

5 Ros HMR

9 Ros BLa

3 Heb Ins

3 Ros MHR

5 Dia LJe

9 Ros BLa

1 Lag Nat

1 Lag Nat

Planting Plan Community Hall - western garden bed

Planting Plan Community Hall - eastern garden bedfor plant schedule refer to page 8

N

AutoCAD SHX Text
KLA
AutoCAD SHX Text
20/12/2018 4:11 PM
AutoCAD SHX Text
11 Gordon docu FINAL 20 Dec 18.dwg
Page 8: GORDON STREETSCAPE - STAGE 1 LANDSCAPE WORKS · final concept. POST OFFICE. 3408-3/15 Bluestone Paving Park Seat with Arm and Back Rest existing telephone box bin new community notice

NPOST OFFICE

bike hoops new footpath as perengineering drawings

garden bed

bluestone pitcher retaining wall

IJ

IJ

IJ

IJ

IJ

IJ

1:50 on A3

A REV: ./.

20/12/18

POST OFFICEPlanting Plan/schedule

for construction8/16

KLEIN LANDSCAPE ARCHITECTURE Karoline Klein

Reg. Landscape Architect (AILA)89 Ford Rd

HARCOURT VIC 3453phone: 0427 417 498

email: [email protected]

PROJECT

DRAWING TITLE

PLAN DETAILS

LANDSCAPE ARCHITECT

CLIENT

DATE:SCALE:STATUS:

ISSUE:SHEET:

Project 3408GORDON

STREETSCAPESTAGE 1

LANDSCAPE DESIGNRMG

for Moorabool Shire CouncilProject No. 3408

2 Heb Ins

6 Dia LJe

4 Dia LJe

6 Dia LJe6 Dia LJe

1 Heb Ins

6 Ros BLa6 Ros BLa

9 Dia LJe3 Ros HMR

Planting Plan - Post Office

AutoCAD SHX Text
KLA
AutoCAD SHX Text
20/12/2018 4:11 PM
AutoCAD SHX Text
11 Gordon docu FINAL 20 Dec 18.dwg
Page 9: GORDON STREETSCAPE - STAGE 1 LANDSCAPE WORKS · final concept. POST OFFICE. 3408-3/15 Bluestone Paving Park Seat with Arm and Back Rest existing telephone box bin new community notice

25 mm bedding mortaras per specification

995 x 495 x 40 mm sawnbluestone pavers. 2 mmchamfer (typ) to edge of pavers

100 mm thick reinforcedconcrete slab. 25 MPa,SL 72 mesh placed centrally50mm depth Class 3

FCR compacted to90% modified

5mm nom. grouted jointin accordance withspecification

isolation joint toback of kerb

Scale: 1:10

BLUESTONE PAVING

1

Scale: 1:10

BLUESTONE PAVING ON THICKENED CONCRETE BASE

2

50 mm depth class 3FCR compacted to90% modified

compacted subgrade

40

100

5025

Thicken concrete slab to150 mm/25 Mpa for theareas shown in setoutdrawings. Place SL 72mesh 50 mm from top.

5015

025

40

paving and concreteslab as per detail 1,see above

as shown on A3

A REV: ./.

20/12/18

DETAILS 1Paving

for construction9/16

KLEIN LANDSCAPE ARCHITECTURE Karoline Klein

Reg. Landscape Architect (AILA)89 Ford Rd

HARCOURT VIC 3453phone: 0427 417 498

email: [email protected]

PROJECT

DRAWING TITLE

PLAN DETAILS

LANDSCAPE ARCHITECT

CLIENT

DATE:SCALE:STATUS:

ISSUE:SHEET:

GORDONSTREETSCAPE

STAGE 1LANDSCAPE DESIGN

RMGfor Moorabool Shire Council

Project No. 3408

AutoCAD SHX Text
KLA
AutoCAD SHX Text
20/12/2018 12:33 PM
AutoCAD SHX Text
11 Gordon Det Doc FINAL 20 Dec 10.dwg
Page 10: GORDON STREETSCAPE - STAGE 1 LANDSCAPE WORKS · final concept. POST OFFICE. 3408-3/15 Bluestone Paving Park Seat with Arm and Back Rest existing telephone box bin new community notice

dowelled expansion jointas per IDM SD 210

200 mm zipped Abelflex jointingmaterial (or approved equivalent)to fit snugly between concreteslabs. Seal top of joint with 'THC901' by Tremco (colour grey) orapproved equivalent.

25mm bedding mortaras per specification

50 mm depth Class 3 FCRcompacted to 90% modified

Mulched garden bedas per detail 10.

edge strip from 495 x295 x 40 mm sawnbluestone pavers

Scale: 1:10

BLUESTONE EDGE STRIP ADJACENT TO GARDEN BED

3

Scale: 1:10

EXPANSION JOINT

4

100 mm thick reinforced concrete slab25 Mpa SL 72 mesh placed centrally

compacted subgrade

paving and slabas per detail 1

A REV: ./.

20/12/18

DETAILS 2Paving

for construction10/16

as shown on A3

KLEIN LANDSCAPE ARCHITECTURE Karoline Klein

Reg. Landscape Architect (AILA)89 Ford Rd

HARCOURT VIC 3453phone: 0427 417 498

email: [email protected]

PROJECT

DRAWING TITLE

PLAN DETAILS

LANDSCAPE ARCHITECT

CLIENT

DATE:SCALE:STATUS:

ISSUE:SHEET:

GORDONSTREETSCAPE

STAGE 1LANDSCAPE DESIGN

RMGfor Moorabool Shire Council

Project No. 3408

AutoCAD SHX Text
KLA
AutoCAD SHX Text
20/12/2018 12:33 PM
AutoCAD SHX Text
11 Gordon Det Doc FINAL 20 Dec 10.dwg
Page 11: GORDON STREETSCAPE - STAGE 1 LANDSCAPE WORKS · final concept. POST OFFICE. 3408-3/15 Bluestone Paving Park Seat with Arm and Back Rest existing telephone box bin new community notice

Scale: 1:10

BLUESTONE PITCHER WALL, FREE STANDING, AT COMMUNITY HALL

5

Isolation joint: zipped Abelflex jointing material (orapproved equivalent) to fit snugly between wall andpavers concrete slabs. Seal top of joint with 'THC 901'by Tremco (colour grey) or approved equivalent.

paving and concreteslab as per detail 1

Capping stone from 60 mm sawn bluestone, surfacefinish to match pavers, with chamfered edges. Tooverhang by 50 mm over supporting bluestonepitchers. Set into mortar as per specification.

Wall from salvaged, cleaned bluestone pitchers. Carefullyselect pitchers suitable to form the specified dimensionsof the wall. Lay in stretcher bond with the occassionalpitcher to tie across the wall for stability. Select even facesfor visible wall face, uneven sides to face inwards.

min. of 2% fall

Fill cavity with 25 MPa concrete and compact witheach layer of bluestone to ensure solid fill.

min. of 2% fall

Fill joints with mortar as specified, but medium greycolour. Acid wash wash to remove all surplus grout.

concrete footing, 25 MpA, with

4 bar F 11 trench mesh, top and

bottom 50 mm min. cover

600

400

450

495

4545 - 50

approx. 400

A REV: ./.

16/12/18

DETAILS 3Bluestone Wall,

free standing

for construction11/15

as shown on A3

KLEIN LANDSCAPE ARCHITECTURE Karoline Klein

Reg. Landscape Architect (AILA)89 Ford Rd

HARCOURT VIC 3453phone: 0427 417 498

email: [email protected]

PROJECT

DRAWING TITLE

PLAN DETAILS

LANDSCAPE ARCHITECT

CLIENT

DATE:SCALE:STATUS:

ISSUE:SHEET:

GORDONSTREETSCAPE

STAGE 1LANDSCAPE DESIGN

RMGfor Moorabool Shire Council

Project No. 3408

AutoCAD SHX Text
KLA
AutoCAD SHX Text
20/12/2018 12:33 PM
AutoCAD SHX Text
11 Gordon Det Doc FINAL 20 Dec 10.dwg
Page 12: GORDON STREETSCAPE - STAGE 1 LANDSCAPE WORKS · final concept. POST OFFICE. 3408-3/15 Bluestone Paving Park Seat with Arm and Back Rest existing telephone box bin new community notice

Scale: 1:10

BLUESTONE PITCHER RETAINING WALL, AT POST OFFICE

6

Isolation joint: zipped Abelflex jointing material (orapproved equivalent) to fit snugly between walland pavers concrete slabs. Seal top of joint with'THC 901' by Tremco (colour grey) or approvedequivalent.

paving and concreteslab as per detail 1

Capping stone from 60 mm sawn bluestone, surfacetreatment to match pavers, with chamfered edges. Tooverhang by 50 mm over supporting bluestonepitchers. To be set into mortar as per specification.

Wall from salvaged, cleaned bluestone pitchers. Carefullyselect pitchers suitable to form the specified dimensionsof the wall. Lay in stretcher bond with the occassionalpitcher to tie across the wall for stability. Select even facesfor visible wall face, uneven sides to face inwards.

min. of 2% fall

Fill cavity with 25 MPa concrete and compact witheach layer of bluestone to ensure solid fill.

min. of 2% fall Fill joints with mortar as specified, but medium grey colour.Acid wash bluestone pitchers to remove all surplus grout.

concrete footing, 25 MpA, with

4 bar F 11 trench mesh, top and

bottom 5 mm min. cover

600

400

45 - 50

vary

ing

heig

ht 6

50 -

850

mm

TOW 585.60

vary

ing

heig

ht b

etw

een

200

- 850

mm

Y 12 starter bars, at 1.0 m centres

grassed surface asper detail 9

apply bitumuous paint to pitcherwall where it has contact withsurrounding material to avoidmoisture ingress

compacted subgrade

495approx. 400

A REV: ./.

20/12/18

DETAILS 4Bluestone Retaining Wall

for construction12/16

as shown on A3

KLEIN LANDSCAPE ARCHITECTURE Karoline Klein

Reg. Landscape Architect (AILA)89 Ford Rd

HARCOURT VIC 3453phone: 0427 417 498

email: [email protected]

PROJECT

DRAWING TITLE

PLAN DETAILS

LANDSCAPE ARCHITECT

CLIENT

DATE:SCALE:STATUS:

ISSUE:SHEET:

GORDONSTREETSCAPE

STAGE 1LANDSCAPE DESIGN

RMGfor Moorabool Shire Council

Project No. 3408

AutoCAD SHX Text
KLA
AutoCAD SHX Text
20/12/2018 12:33 PM
AutoCAD SHX Text
11 Gordon Det Doc FINAL 20 Dec 10.dwg
Page 13: GORDON STREETSCAPE - STAGE 1 LANDSCAPE WORKS · final concept. POST OFFICE. 3408-3/15 Bluestone Paving Park Seat with Arm and Back Rest existing telephone box bin new community notice

Not to scale

BIKE HOOP INSTALLATION

8

Not to scale

PARK SEAT INSTALLATION

7

Install CSA bike hoop as per set-out drawing andmanufacturer's instruction.Product: CSA Bike Leaning Rail BR7010Fixing method: Bolt-down

Install CSA park seat as per set-out drawing andmanufacturer's instruction.Product: CSA Albert Park Seat, TM4064Fixing method: Bolt-downFrame to be galvanised finishBatten to be Enviro-slat, colour Walnut

A REV: ./.

20/12/18

DETAILS 5Furniture

for construction13/16

as shown on A3

KLEIN LANDSCAPE ARCHITECTURE Karoline Klein

Reg. Landscape Architect (AILA)89 Ford Rd

HARCOURT VIC 3453phone: 0427 417 498

email: [email protected]

PROJECT

DRAWING TITLE

PLAN DETAILS

LANDSCAPE ARCHITECT

CLIENT

DATE:SCALE:STATUS:

ISSUE:SHEET:

GORDONSTREETSCAPE

STAGE 1LANDSCAPE DESIGN

RMGfor Moorabool Shire Council

Project No. 3408

AutoCAD SHX Text
KLA
AutoCAD SHX Text
20/12/2018 12:33 PM
AutoCAD SHX Text
11 Gordon Det Doc FINAL 20 Dec 10.dwg
Page 14: GORDON STREETSCAPE - STAGE 1 LANDSCAPE WORKS · final concept. POST OFFICE. 3408-3/15 Bluestone Paving Park Seat with Arm and Back Rest existing telephone box bin new community notice

Scale: 1:10

BIN SURROUND INSTALLATION

9

Install Furphy litter bin surround as per set-outdrawing and manufacturer's instruction.Product: Furphy Avenue bin surround, sloped lid, tosuit 240 L bin, all steel parts galvanised finish. Slats:Modwood colour 'Sahara'Fixing method: Bolt-down

Scale: 1:10

NOTICE BOARD INSTALLATION

10

Install CMS directory board as per set-out drawing andmanufacturer's instruction.Product: CSA Park Directory Board, DB9080.Colour: Off-white, roofing: MonumentFixing method: Extended leg/ in ground

A REV: ./.

20/12/18

DETAILS 6Bins/ Notice Board

for construction14/16

as shown on A3

KLEIN LANDSCAPE ARCHITECTURE Karoline Klein

Reg. Landscape Architect (AILA)89 Ford Rd

HARCOURT VIC 3453phone: 0427 417 498

email: [email protected]

PROJECT

DRAWING TITLE

PLAN DETAILS

LANDSCAPE ARCHITECT

CLIENT

DATE:SCALE:STATUS:

ISSUE:SHEET:

GORDONSTREETSCAPE

STAGE 1LANDSCAPE DESIGN

RMGfor Moorabool Shire Council

Project No. 3408

- nominal

only - fi

nal product

to

be determined -

AutoCAD SHX Text
KLA
AutoCAD SHX Text
20/12/2018 12:33 PM
AutoCAD SHX Text
11 Gordon Det Doc FINAL 20 Dec 10.dwg
Page 15: GORDON STREETSCAPE - STAGE 1 LANDSCAPE WORKS · final concept. POST OFFICE. 3408-3/15 Bluestone Paving Park Seat with Arm and Back Rest existing telephone box bin new community notice

Scale: 1:10

GRASSED AREAS

11

Scale: 1:10

PLANTING DETAIL

12

existing sub-soil

site soil, ameliorated with fertiliser and limeas per specifications

75 mm imported topsoil, mixed into existingsite soil and cultivated to a fine tilt

establish grass cover by seeding as perspecification

cultivated subgradeto 150 mm depth, includingapplication of gypsum

225 mm depth approvedimported toposoil

75 mm depth of 20 mm granit mulch as perspecification. Mulch must be kept well away fromstem of plant.

excavate straight sided planting hole largeenough to provide 75 - 100mm clearancearound rootball. backfill with approvedtopsoil, firming progressively. provide'osmocote' or similar approved fertilizer atrecommended rates

A REV: ./.

20/12/18

DETAILS 7Grassing/planting

for construction15/16

as shown on A3

KLEIN LANDSCAPE ARCHITECTURE Karoline Klein

Reg. Landscape Architect (AILA)89 Ford Rd

HARCOURT VIC 3453phone: 0427 417 498

email: [email protected]

PROJECT

DRAWING TITLE

PLAN DETAILS

LANDSCAPE ARCHITECT

CLIENT

DATE:SCALE:STATUS:

ISSUE:SHEET:

GORDONSTREETSCAPE

STAGE 1LANDSCAPE DESIGN

RMGfor Moorabool Shire Council

Project No. 3408

AutoCAD SHX Text
KLA
AutoCAD SHX Text
20/12/2018 12:33 PM
AutoCAD SHX Text
11 Gordon Det Doc FINAL 20 Dec 10.dwg
Page 16: GORDON STREETSCAPE - STAGE 1 LANDSCAPE WORKS · final concept. POST OFFICE. 3408-3/15 Bluestone Paving Park Seat with Arm and Back Rest existing telephone box bin new community notice

3 No. 50 x 50 x 2400 mm hardwood stakes withties, free of splinters, knots or other defects.Remove any pre-existing staking installed innursery. Stakes to be driven 900 mm intoground clear of rootball.

FOR NATURE STRIPS: 75 min depth approvedorganic mulch

FOR GARDEN BEDS:20mm natural crushed granite stone, with no fines.All mulch to extend beyond planting hole over anarea of 1.5 m radius.

Planting hole to be no deeper than pot and 2.5 times thediameter of the rootball wide. Backfilled soil to formwatering dish, min. 75 mm depth. De-glaze sides of hole.

Semi-advanced tree as specified on plan and inschedule

Provide 'Osmocote' fertiliser orsimilar approved as per specificationat rates as recommended by themanufacturer . Backfill with fertilisedsite soil. Firm progressively aroundplant base and sides.

water collar to be installed asper manufacturer'sinstructions

ADJACENT PAVING SURFACE

Scale: 1:10

TREE PLANTING IN NATURE STRIP & GARDEN BED

13

3 No. Hessian ties, 50 mm, at 1/3 treeheight with correct tension to allow forsome tree movement

Root control barrier to edge of adjacent pavement.

Root control barrier to be rigid

HDPE, roll type, 450mm wide, equal to Nylex root

barrier or similar approved. Install to

manufacturer's specifications.

FINISHED SOIL LEVELS

A REV: ./.

20/12/18

DETAILS 8Tree Planting

for construction16/16

as shown on A3

KLEIN LANDSCAPE ARCHITECTURE Karoline Klein

Reg. Landscape Architect (AILA)89 Ford Rd

HARCOURT VIC 3453phone: 0427 417 498

email: [email protected]

PROJECT

DRAWING TITLE

PLAN DETAILS

LANDSCAPE ARCHITECT

CLIENT

DATE:SCALE:STATUS:

ISSUE:SHEET:

GORDONSTREETSCAPE

STAGE 1LANDSCAPE DESIGN

RMGfor Moorabool Shire Council

Project No. 3408

50 - 100

AutoCAD SHX Text
KLA
AutoCAD SHX Text
20/12/2018 12:33 PM
AutoCAD SHX Text
11 Gordon Det Doc FINAL 20 Dec 10.dwg