High Density Concrete Placement
![Page 2: Good Samaritan Medical Center](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814ace550346895db7e7d3/html5/thumbnails/2.jpg)
Walls • Blockouts around door for borated polyethelene and lead plates• Physics port
•Allows staff to check radiation levels in the vault before entering•Sleeve through wall at 45 degrees vertical: Location was critical to prevent radiation leak
![Page 3: Good Samaritan Medical Center](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814ace550346895db7e7d3/html5/thumbnails/3.jpg)
• Lid shoring• Wet weight of lid = over 1.6 million pounds• Designed by engineer; installation checked by engineer
• Fireproofing of beams• Before placement of lid• Use of HD fireproofing to prevent damage by forming and reinforcing activities: No addit’l patching required• OFI – sheet metal cap detail
• Allowed for fireproofing of beams before deck was placed
![Page 4: Good Samaritan Medical Center](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814ace550346895db7e7d3/html5/thumbnails/4.jpg)
Test run: Checked maximum free-fall of aggregate
![Page 5: Good Samaritan Medical Center](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814ace550346895db7e7d3/html5/thumbnails/5.jpg)
PlacementHigh Density Concrete supplied by Central Concrete
![Page 6: Good Samaritan Medical Center](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814ace550346895db7e7d3/html5/thumbnails/6.jpg)
Placement continued…• 187.5 CY placed total• 4.5 CY of concrete batched in each 12 CY truck• Rate of placement
• Started at 30 minutes per truck or more• Ended at 12-15 minutes per truck
![Page 7: Good Samaritan Medical Center](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814ace550346895db7e7d3/html5/thumbnails/7.jpg)
Placement continued ….Central concrete quality control manager onsite: Only person allowed to add chemicals to the mix
![Page 8: Good Samaritan Medical Center](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814ace550346895db7e7d3/html5/thumbnails/8.jpg)
Placement continued…Placement of high density concrete required normal size crew
![Page 9: Good Samaritan Medical Center](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814ace550346895db7e7d3/html5/thumbnails/9.jpg)
Finished vault• Due to high density, concrete finished with few imperfections, even with minimal vibrating• Maximum deflection of the lid measured at 3/16”• 12.5 hour pour• 14 hour day