Golden Dawn Minerals Inc.Golden Dawn Minerals Inc. · PDF fileGolden Dawn Minerals Inc.Golden...
Transcript of Golden Dawn Minerals Inc.Golden Dawn Minerals Inc. · PDF fileGolden Dawn Minerals Inc.Golden...
Hw
y #
3
Hw
y #4
1
Hwy #
3
Transmission Line
Power Line
Power Line
B.C. Mine
Rathmullen
Tokyo
Bluebell
Minnie Moore
Jumbo
Emma
Oro Denoro
CyclopsRbell
Pac
Niagara
LG2
Marshall
Sylvester K
Gilt Edge
San Jacinto
Brooklyn
Phoenix
StemwinderCrescent
Lake
Skylark
BayMavis
Prince Henry
LastChance
EPU
Goldfinch
Providence
WarEagle
Snowshoe
Yellow Jacket
RawhideMonarchGrey
Eagle
Winnipeg
Winner
Keno
Athelsan
Wild Rose
Motherlode
No.7
City of Paris
British Columbia
Washington StateBritish Columbia
Washington State
Gre
en
wo
od
Grand ForksM idway
LexingtonLee iixingtotonGOLDEN DAWN MINERALS
Lone Stare SSttarLoL neGOLDEN DAWN MINERALS
GOLDEN DAWN MINERALS
GOLDEN DAWN MINERALS
GOLDEN DAWN MINERALS
Phoenix Property
Golden Crown
BoundaryFalls
GOLDEN DAWN MINERALS
Tam O’Shanter
K i n r o s s G o l d
O p t i o n2017 PEA
2017 PEA
K i n r o s s G o l d
O p t i o n
K i n r o s s G o l d
O p t i o n
K i n r o s s G o l d
O p t i o n
GreenwoodMill
OpenPit
+30 historic mines
NE Clusterof Mines
SW Clusterof Mines
Phoenix Cluster
of Mines
Golden CrownMine
LexingtonMine
May MacMine
296T @ 5.5% Zn
136KT @ 1.37% Cu1.5MT @ 0.95% Cu
254KT @ 1.01% Cu& 0.8 g/t Au
Historic Production
353T @ 22.8 g/t Au& 10.75 g/t Ag
294T @ 7.3% Cu& 392.9 g/t Ag
103KT @ 4.36% Cu& 58 g/t Ag
Near term gold producer
With significant upside potential
www.goldendawnminerals.com
During the mining sector downturn GOM acquired past producing mines, deposits and exploration targets and a modern processing facility in British Columbia's prolific Greenwood mining camp, becoming one of the larg-est land owners in the district. The company plans to start producing at three precious/base metal mine proj-ects in the short term. All three projects are within 15 km of its 100% owned processing facility.
GOM acquired an additional 12,700 ha. of land (Phoenix Property) contiguous with the properties where the Lexington/Golden Crown mines and mill are located. Utilizing modern exploration technology such as deep penetration airborne geophysics the Company plans to revisit the 30 past producting mines, including the major Phoenix mine, in search of potential deep feeder systems which may be the source of mineralization.
Golden Dawn Minerals Inc.Golden Dawn Minerals Inc. TSX.V: GOMTSX.V: GOMFrankfurt Xetra: 3G8AFrankfurt Xetra: 3G8A
OTC : GDMRFOTC : GDMRFGreenwood Precious Metal ProjectGreenwood Precious Metal Project
Golden Dawn Minerals Inc.Golden Dawn Minerals Inc. “A Near Term Producer”“A Near Term Producer”
www.goldendawnminerals.com
Technical information in this document has been approved by Dr. Mathew Ball, P.Geo., a Qualified Person as defined by National Instrument 43-101, and COO of the Company.
May Mac Mine - Silver, Gold, Lead, ZincHistoric production from 1903 to 1983 is reported to be 4,228 tonnes averaging 5.35g/t Au, 227 g/t Ag.Consists of a series of vertical parallel silver,gold veinsRecent UG drilling has extended the Skomac vein an additional 250 meters in depth.and also delineated a second parallel vein (Rose Vein)The Company is awaiting approval to extend the No.7 adit and extract a bulk sample to be processed at its Greenwood Mill.
Greenwood MillMill built and operated briefly in 2008 by Merit Mining Corp., after which it ceased operation due to lack of funding indirectly related to the 2008 market crash.GOM has received permit to restart the mill and receive material from Lexington mine and also potentialy from the numerous smaller historic mines in the Phoenix property if and when re-developed.
Lexington Mine - Copper, GoldMine saw a short period of production in 2008 by Merit Mining Corp., after which it ceased operation due to lack of funding indirectly related to the 2008 market crash.2016 Resource update and 2017 positive PEA.Dewatering has commenced. Material extraction and processing at the Greenwood Mill to start by approximately November.
WestWWWWestWestWesWesWestWestWWestWestWeWWeWestWeWestWestWestWestWestWesWestWestWestWeWestWestWWestWesWestWestWestWWWesWestWWee tWestWesteese tttWestWestWestWestWWestestWestWestWesssWestssestttWestestssWestestWestWestWestesssesWesWestsWeststWestWesWeWeWesesWestttsttWestWestWeeWesttWestWWesWesWWeestttttWestWWWesWW sW PorPoPPPoPorPorPororPoPPPPoroPPPorPoPPPPPorPorPPoorPorPorPoorPorPPooPoPorPorPorPororPPPPorPorPorPPPoPPorPororPorPoorPorPorPoroPorPorrrPoPorrrPPPooooPorPoPPoPoP rrrPorrrtttatatataltaltaltaltaltaltalltalttttaltaltaltaltaltttatatalltataltatattaalattattaatataltattataaltattaalttaaaltaaalataltaatt lWest PortalEastEastEasEEasEaEEastEastEastEastEastEastEastEastEastEasEaststststEastasttaststEastEasEastEastEastEastEastEastastEastastEastastastttEasEastEaEaEastastEasttastEasEEEastEastEasEasasttastEaasastEasEastEastEastEastaEassasttastEasEEastastastastasastssttEaaastttEaststssttEasEaEaaaststEaassEasassssstasssEEEEaa tE ttEEE PPorPorPorPoPPorPorPorPPorPorPororPororPorPororPorPorPorPPorPPPPPoPorPorPoPoroPorPororPorPPPPorPorPoorPorPorPorPPororPoPoPoPorPoPorPorPPPorPorrPorPPPPoPororPorPoorPoPoooooPoPPoPoooorrPP rPooPooorrroooooorrrPoPPPPoorPoPoPoPorPoPooo tttaltataltaltaatatatataltaltaltaltalt llt ltaltaltaltaltaltaltaaltalltatalltaltalalallllalttaltalltalttaatalltalttttaltaltattaatatatatalaltatallllttattataaatt ltaEast Portal
201620162016201620166 ResRResR sRessResouourcurcurcourcourcee2016 Resource
CurrCurrent ent UndeUnd rgrorgrrgrr undundWorkings
Current UndergroundWorkings
Proproposedo UndndergrrgrroundoundouWorkingsings
Proposed UndergroundWorkings
Golden Crown Mine - Gold, Copper
Similar to the Lexington Mine ceased production in 20082016 Resource update and 2017 positive PEA.Company is awaiting drill permit to conduct surface drilling to potentially expand upon the current resource.
to
CurrCurrent UndeUndergroundddddWorkingngs
Current UndergroundWorkings
20161 Resourcrcceeee2016 Resource
Proposede UUndergrg ounundWorkWorkings
Proposed UndergroundWorkings
2017 Preliminary Economic Assessment Highlights
Base case after-tax IRR of 103.4% and NPV of C$19.7MPre-production capital requirements of C$3.4MPre-production period of six months as a result of existing infrastructure and permits from the acquisition of the processing plant and Lexington-Grenoble and Golden Crown Mines Life of mine ("LOM") all-in sustaining costs of US$786 per ounce goldExploration Targets for increasing Mineral Resources at both Lexington and Golden Crown
Lexington, Golden Crown Properties, Deposits and Greenwood Mill
Exploration Target for further mill feed from the company’s 100% owned May Mac Mine
2016 Resource Update (3.5 g/t AuEq cut-off)Class Tonnes Au g/t Cu % AuEq g/t AuEq ozs
Meas & Ind 372,000 6.47 1.05 8.05 96,300Inferred 12,000 4.42 1.03 5.96 2,300
2016 Resource Update (3.5 g/t AuEq cut-off)Class Tonnes Au g/t Cu % AuEq g/t AuEq ozs
Indicated 163,000 11.09 0.56 11.93 62,500Inferred 42,000 9.04 0.43 9.68 13,100
(1) Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability.
(1)
(1)