GOLASKI LABS · 2021. 7. 22. · C-Pace Required Documents •C-Pace pre-application form •Energy...

18
GOLASKI LABS July 13, 2021

Transcript of GOLASKI LABS · 2021. 7. 22. · C-Pace Required Documents •C-Pace pre-application form •Energy...

Page 1: GOLASKI LABS · 2021. 7. 22. · C-Pace Required Documents •C-Pace pre-application form •Energy Audit Report •Declaration of Condominium (mixed-use projects) •Plats and Plans

GOLASKI LABSJuly 13, 2021

Page 2: GOLASKI LABS · 2021. 7. 22. · C-Pace Required Documents •C-Pace pre-application form •Energy Audit Report •Declaration of Condominium (mixed-use projects) •Plats and Plans
Page 3: GOLASKI LABS · 2021. 7. 22. · C-Pace Required Documents •C-Pace pre-application form •Energy Audit Report •Declaration of Condominium (mixed-use projects) •Plats and Plans
Page 4: GOLASKI LABS · 2021. 7. 22. · C-Pace Required Documents •C-Pace pre-application form •Energy Audit Report •Declaration of Condominium (mixed-use projects) •Plats and Plans

Roofmeadow

P4 Hub

P4 Hub Phase 2

Page 5: GOLASKI LABS · 2021. 7. 22. · C-Pace Required Documents •C-Pace pre-application form •Energy Audit Report •Declaration of Condominium (mixed-use projects) •Plats and Plans

IaMC

MDPMBG

Available Spacefor Lease

Parking

Parking

Page 6: GOLASKI LABS · 2021. 7. 22. · C-Pace Required Documents •C-Pace pre-application form •Energy Audit Report •Declaration of Condominium (mixed-use projects) •Plats and Plans
Page 7: GOLASKI LABS · 2021. 7. 22. · C-Pace Required Documents •C-Pace pre-application form •Energy Audit Report •Declaration of Condominium (mixed-use projects) •Plats and Plans
Page 8: GOLASKI LABS · 2021. 7. 22. · C-Pace Required Documents •C-Pace pre-application form •Energy Audit Report •Declaration of Condominium (mixed-use projects) •Plats and Plans
Page 9: GOLASKI LABS · 2021. 7. 22. · C-Pace Required Documents •C-Pace pre-application form •Energy Audit Report •Declaration of Condominium (mixed-use projects) •Plats and Plans
Page 10: GOLASKI LABS · 2021. 7. 22. · C-Pace Required Documents •C-Pace pre-application form •Energy Audit Report •Declaration of Condominium (mixed-use projects) •Plats and Plans
Page 11: GOLASKI LABS · 2021. 7. 22. · C-Pace Required Documents •C-Pace pre-application form •Energy Audit Report •Declaration of Condominium (mixed-use projects) •Plats and Plans
Page 12: GOLASKI LABS · 2021. 7. 22. · C-Pace Required Documents •C-Pace pre-application form •Energy Audit Report •Declaration of Condominium (mixed-use projects) •Plats and Plans
Page 13: GOLASKI LABS · 2021. 7. 22. · C-Pace Required Documents •C-Pace pre-application form •Energy Audit Report •Declaration of Condominium (mixed-use projects) •Plats and Plans
Page 14: GOLASKI LABS · 2021. 7. 22. · C-Pace Required Documents •C-Pace pre-application form •Energy Audit Report •Declaration of Condominium (mixed-use projects) •Plats and Plans
Page 15: GOLASKI LABS · 2021. 7. 22. · C-Pace Required Documents •C-Pace pre-application form •Energy Audit Report •Declaration of Condominium (mixed-use projects) •Plats and Plans
Page 16: GOLASKI LABS · 2021. 7. 22. · C-Pace Required Documents •C-Pace pre-application form •Energy Audit Report •Declaration of Condominium (mixed-use projects) •Plats and Plans
Page 17: GOLASKI LABS · 2021. 7. 22. · C-Pace Required Documents •C-Pace pre-application form •Energy Audit Report •Declaration of Condominium (mixed-use projects) •Plats and Plans

• The energy conservation measures (ECM) proposed for inclusion in the project are as follows:

• • High-efficiency cooling provided by new rooftop units

• • Variable speed control on air handling units, which allows fans to slow down when

• demand is low.

• • Replacement of existing windows with insulated, low-e glazing systems.

• • LED lighting in all spaces, fixture count per lighting drawings.

• • Additional insulation being installed along with roof replacement.

• • Low-flow plumbing allows not only water savings but hot water energy savings.

Energy Conservation Measures

Page 18: GOLASKI LABS · 2021. 7. 22. · C-Pace Required Documents •C-Pace pre-application form •Energy Audit Report •Declaration of Condominium (mixed-use projects) •Plats and Plans

C-Pace Required Documents

• C-Pace pre-application form

• Energy Audit Report

• Declaration of Condominium (mixed-use projects)

• Plats and Plans as required by the Uniform Condominium Act (mixed-use projects)

• Breakdown of percentage interest of each condo unit (mixed-use projects)

• Appraisal of commercial space (mixed-use projects)

• Mortgage Lienholder Consent Form

• Final C-Pace Application

• Statement of Levy and Lien of Assessment Agreement

• Diversity and Inclusion Plan