Going from RED to GREEN - Princeton Section...
Transcript of Going from RED to GREEN - Princeton Section...
![Page 1: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/1.jpg)
Going From
Red to Green (Probation to Preferred)
Princeton Section ASQ
February 13, 2013
Speaker
Jim Werner
1
![Page 2: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/2.jpg)
Frantic Call
• Got Call for Help - SOS • “Urgent - Business Critical” • Need help NOW !!!!!!
2
![Page 3: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/3.jpg)
Incentive to Act
• Placed on Probation by Key Customer
• Meet FDA-QSR** within 6-months or out – LAST CHANCE!!!!
• Potential Loss of >$1.0mm Sales
**21 CFR Part 820, Quality System Regulation
3
![Page 4: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/4.jpg)
Made Site Visit
• Well Established Business • Long time employees • Complete Lack of FDA Regulations • Processes well understood & controlled • No Procedures - No Records
Not uncommon with small medical device mfg’ers
4
![Page 5: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/5.jpg)
Company Background
• Class I Medical Device Mfg’er • Very Low End User Complaints • In business 15+ years • 12 Employees • $ 2- 2.5mm Sales • Highest sales for Private Label, Off-the-
Shelve, National Retail Pharmacy Chain
5
![Page 6: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/6.jpg)
Compliance History
• Failed every past customer audit • Corrective actions promised & promised • No Corrective actions actually taken
Note: Retail Pharm. Chains under FDA scrutiny for no control over Private Label Products – Warning Letters
6
![Page 7: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/7.jpg)
BASIC PROCESS FLOW
FORM COAT CURE
PRE-PACK PACK
7
![Page 8: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/8.jpg)
3 Prong Parallel Approach
8
1. Training (WHY?)
2. Facilities Improvements
3. Documented Quality Sys.
![Page 9: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/9.jpg)
Training (WHY)
• Realization: dental products are medical devices under US Law (Title 21 CFR)
• Not new law • FDA Establishment registration • Penalties $$$$$$ • Training & understanding ongoing
9
![Page 10: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/10.jpg)
Facilities
Viewed as perfect time to make improvements
• Removed clutter (messy, messy …) • Established designate areas • Yellow lines on floor to mark off areas • Partitions installed where appropriate • Signs in place • Acceptance status labeling • Housekeeping improvements
10
![Page 11: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/11.jpg)
Documented
QUALITY SYSTEM (Focus of Tonight)
11
![Page 12: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/12.jpg)
Each manufacturer shall establish* and maintain a quality system that is appropriate for the specific medical device(s) designed or manufactured, and that meets the requirements of this part.
*To define, document (in writing or electronically), and implement
What is this saying?
Why not re-label Siemens’ SOPs and Use?
§820.5 Quality system Says:
12
![Page 13: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/13.jpg)
Device Class (I. II, or III)
13
Pote
ntia
l Ris
k to
Use
r an
d/or
Pat
ient
Procedures & Records
![Page 14: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/14.jpg)
Company size
14
Num
ber o
f Em
ploy
ees
Procedures & Records
![Page 15: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/15.jpg)
Problem Statement
A well established, small manufacturer of a Class I medical device is in danger of losing business to a major customer because its quality system does not comply with FDA regulation 21 CFR Part 820. Its quality system is not well established lacking the required documents, procedures and records.
15
![Page 16: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/16.jpg)
1st Step ?
A. Create Plan B. Start Writing SOP’s C. Cry
16
![Page 17: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/17.jpg)
Failure to Plan is . . . . . . Planning to Fail
17
![Page 18: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/18.jpg)
Plan Should Be Based On?
A. Cost? B. Risk? C. Time?
18
![Page 19: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/19.jpg)
Risk Priorities Created:
• High – Product and/or QMS is potentially at risk
• Medium – Little or no risk to product, QMS needs to be improve to prevent risk
• Low – No risk to product, little or no risk to QMS
(See: ISO 14971 – Risk Management for Medical Devices)
19
![Page 20: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/20.jpg)
Place in Order of Importance?
A. Regulatory control (Failure reports, etc to FDA)
B. Process control (Making the device)
C. Management control (Audits, mgm’t review. Etc)
D. Quality control (Inspection & test activities)
20
![Page 21: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/21.jpg)
Answer to Put in Order of Importance?
D. Quality control B. Process control C. Management control A. Regulatory control
21
![Page 22: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/22.jpg)
Creating a “Working Plan”
• Using the index to FDA regulation created tactical plan on EXCEL spread sheet.
• The spread sheet was then used as the tool to monitor what was done and what needs to be done.
• Plan modified as necessary
22
![Page 23: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/23.jpg)
Federal Register Monday October 7, 1996 Department of Health & Human Services Food and Drug Administration 21 CFR Part 820 - Quality System Regulation
Final rule: October 1, 1996 Effective: June 1, 1997
- Contents - Subpart A - General Provisions 820.1 Scope 820.3 Definitions 820.5 Quality system Subpart B - Quality System Requirements 820.20 Management Responsibility
(a) Quality policy (b) Organization (c) Management review (d) Quality Planning (e) Quality system procedures
820.22 Quality audit 820.25 Personnel
(a) General (b) Training
Subpart C - Design Controls 820.30 Design controls
(a) General (b) Design and development planning (c) Design input (d) Design output (e) Design review (f) Design verification (g) Design validation (h) Design transfer (i) Design changes (j) Design history file
Subpart D - Document Controls 820.40 Document controls
(a) Document approval and distribution (b) Document changes
Subpart E - Purchasing Controls 820.50 Purchasing controls
(a) Evaluation of suppliers, contractors, and consultants
(b) Purchasing data Subpart F - Identification and Traceability 820.60 Identification 820.65 Traceability Subpart G - Production & Process Controls 820.70 Production and process controls
(a) General (b) Production and process changes
(c) Environmental control (d) Personnel (e) Contamination control (f) Buildings (g) Equipment (h) Manufacturing material (I) Automated processes
820.72 Inspect., meas. & test equip. (a) Control of Inspect., meas. & test equip. (b) Calibration (c) Calibration standards
820.75 Process validation Subpart H - Acceptance activities 820.80 Receiving, in-process, and finished
device acceptance (a) General (b) Receiving acceptance activities (c) In-process acceptance activities (d) Final acceptance activities (e) Acceptance records
820.86 Acceptance status Subpart I - Nonconforming Product 820.90 Nonconforming product
(a) Control of nonconforming product (b) Nonconforming review and disposition
Subpart J - Corrective & Preventive Action 820.100 Corrective and preventive action Subpart K - Labeling and Packaging Control 820.120 Device labeling
(a) Label integrity (b) Label inspection (c) Labeling storage (d) Labeling operations (e) Control number
820.130 Device packaging Subpart L - Handling, Storage, Distribution,
and Installation 820.140 Handling 820.150 Storage 820.160 Distribution 820.170 Installation Subpart M - Records 820.180 General requirements (records)
(a) Confidentiality (b) Record retention period (c) Exceptions
820.181 Device master record 820.184 Device history record 820.186 Quality system records 820.198 Complaint files Subpart N - Servicing 820.200 Servicing Subpart O - Statistical Techniques 820.250 Statistical technique
23
Inde
x to
21
CFR
Par
t 820
–
Qua
lity
Syst
em R
egul
atio
n
![Page 24: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/24.jpg)
QSR Section Title Document Procedure Records
Priority H-M-L
Targeted Completion Date
820.40 Document controls P H 1-Jun-12
820.40(a) Document approval & distribution D H 1-Jun-12
820.40(b) Document changes R M 1-Jul-12
820.50 Purchasing controls P M 1-Jul-12
820.50(a) Evaluation of suppliers, contactors, & consultants P R L 1-Aug-12
820.50(b) Purchasing data D M 1-Jul-12
820.60 Identification P H 15-May-12 820.65 Traceability P R n/a n/a
820.70(a) Production & process controls P H 15-May-12
820.70(a)(1) P&PC instructions and methods D H 15-May-12
820.70(a)(2) P&PC device characteristics D H 15-May-12
820.70(a)(5) Workmanship criteria D H 15-May-12
829.70(b) Production and process changes P M 1-Jul-12
820.70(c) Environmental control P H 15-May-12
820.70(d) Personnel D H 15-May-12
820.70(e) Contamination control P H 15-May-12
820.70(g)(1) Equipment - maintenance schedule D R M 1-Jul-12
Cut-out Section of actual EXCEL Spread Sheet of Plan to Document the Quality System to Meet FDA 21-CFR Part 820
24
![Page 25: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/25.jpg)
Example:
25
QSRSection Title Document Procedure Record
PriorityH-M-L
TargetedCompletion
Date820.22 Quality audit P R L 1-Aug820.25(b) Personnel training P R H 1-Jun820.30 Design controls n/a n/a820.40 Document controls P H 1-Jun820.40(a) Doc. Approve/dist. D H 1-Jun820.40(b) Document changes R M 1-Jul820.50 Purchasing controls P M 1-Jul
Discuss: Benefits in doing this?
![Page 26: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/26.jpg)
Worked with Client to Establish* Specifications
• Product • Purchasing • In-process • Product release
*To define, document (in writing or
electronically), and implement
26
![Page 27: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/27.jpg)
Process Followed
1. Write Procedure 2. Approve & Release 3. Train & Implement 4. Records 5. Follow-up
27
![Page 28: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/28.jpg)
1st SOP’s to do?
Which one does not fit? Receiving acceptance Training Management review Document control Product release
28
![Page 29: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/29.jpg)
29
Results – Followed the Plan 3 Documents, 23 SOP’s & 13 Forms
![Page 30: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/30.jpg)
Quality Records
30
If it’s not recorded it didn’t happen!
![Page 31: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/31.jpg)
Beyond FDA Requirements
• Quality Manual • Manufacturing Control Plan • Quality Gates (Positive Release System) • Responsibility Matrix • Approved Supplier List
31
![Page 32: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/32.jpg)
Quality policy
Quality Objectives
Commitment to Quality
Organization
Responsibility & Authority
Mgm’t Representative
Quality Plan
Exclusions to Quality System
![Page 33: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/33.jpg)
Mfg’ing Control Plan (Only output passing inspection is passed on)
FORM COAT CURE
PRE-PACK
CASE PACK
SOP-101 SOP-102 SOP-103
SOP-104 SOP-105
INSPECTQA-201
INSPECT QA-202
INSPECT QA-203
INSPECT QA-204
Doc. Review
& Release
33
![Page 34: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/34.jpg)
34
Responsibility Matix Examplesection Title Pres VP Ops QA Admin820.5 Quality Manual X820.20(a) Quality Policy X820.20(b) Organization X820.22 Quality Audits X820.25 Personnel training X820.40 Document control X820.50 Purchasing X820.70 Production control X820.72(a) Calibration X820.80(a) Acceptance activities X820.70(g) Equipment Maint. X820.20(a) Records X
![Page 35: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/35.jpg)
Final Exam (2-Day 3rd Party Audit)
*3 minor nonconformances 92% Supplier Rating = Preferred
35
![Page 36: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/36.jpg)
*3 Minors were:
1. Document Control Procedure: no reqm’t for annual SOP review**
2. Purchasing Procedure: No reqm’t suppliers must notify of changes**
3. Labels not approved upon receipt**
** None are a FDA-QSR Requirement
36
![Page 37: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/37.jpg)
37
SUCCESS !
![Page 38: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/38.jpg)
In Conclusion
• PROBLEM – Problem statement
• PLAN – Establish & Follow (Modified it)
• RESULTS – Recorded / Measurable . . . Was problem solved or at least its affect minimized?
38
![Page 39: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/39.jpg)
39
Leadership
![Page 40: Going from RED to GREEN - Princeton Section #307asqprinceton.org/wordpress/wp-content/uploads/2013/02/... · 2016-02-13 · Going From . Red to Green (Probation to Preferred) Princeton](https://reader033.fdocuments.us/reader033/viewer/2022042113/5e90176ed99fb2421062738a/html5/thumbnails/40.jpg)
MDQC Medical Device Quality Compliance, LLC
James D. Werner Principal Consultant
P: 1-908-255-9835 FAX: 1-908-252-0339
Email: [email protected]
40