The Studio LK team, whilst with MLA, led and managed the scope of work for this project, which included design, planning, building permits, tender, site supervision and interior design. The Conference Centre is part of a much wider campus of buildings constructed to house the Global HQ of the Royal Bank of Scotland and consists of two storeys (Ground plus 1).
The Conference Centre houses a 300 seat auditorium featuring leather covered Italian designed seats, a number of fully flexible meeting rooms for between 5 and 70 people, each complete with moving walls and media walls as well as a large multi-purpose space that was planned to accommodate many functions, from informal meeting spaces to dining, to an additional office area for short term use.
Area: 2,500m2Value: £7.5 Million GBP in 2005
Project InformatIon
Location Edinburgh, Scotland
Project tyPe Architecture
cLient RBS
themes Space PlanningInterior DesignArchitecture
StatuS Complete
gogarburn offIcesedinburgh, Scotland - architecture
studio LK Limited
D-D
(GA)132
A-A
(GA)131
T-T
(GA)135
P-P
(GA)135
T-T
(GA)135
C-C
(GA)131
E-E
(GA)132
F-F
(GA)132
G-G
(GA)133
R-R
(GA)134
E-E
(GA)132
D-D
(GA)132
C-C
(GA)131
F-F
(GA)132
G-G
(GA)133
R-R
(GA)134
A-A
(GA)130
B-B
(GA)131
B-B
(GA)131
N-N
(GA)134
N-N
(GA)134
P-P
(GA)135
I-I
(GA)134
I-I
(GA)134
7500
7500
9000
A
6525
1
9875
2
B
7500
4
4500
3
5
A
6525
B
652575007500
C D
75007500
E F G H
6
7
1636
1125075007500
C D
65257500
E F J
M
6000
6000
1825
6000
L
K
3
N
6000
P
Q
Uplighters setinto stone
LOBBYP.001
FOYERP.004
DISABLEDTOILET
P.017
MALETOILETS
P.019
BUSINESSTOUCHDOWN
P.015
STOREP.016
STAIR P2P.0S2
RIS
ER
P.0
R3
RIS
ER
P.0
R4
LIFT
STOREP.006
GREEN ROOM /MAKE UP
P.007
TECH ROOMP.008
GALLERYP.010
EDIT SUITEP.011
LOBBYP.012
RECEPTION /WAITING
P.005
COMMSROOM
P.063
TV STUDIOP.009
LV SWITCH ROOMP.061
KITCHENSTAFF ROOM
P.062
CORRIDORP.060
STAIR P1P.0S1
GAS METERP.064
RIS
ER
P.0
R1
FEMALESTOILET
P.055
LOBBYP.054
CORRIDORP.046
STOREP.053
OFFICEP.052
STOREP.047
COLDSTORE
P.048
KITCHENP.045 P.051
EXHIBITIONSPACE
P.003
RECEPTION / FOYERP.002
CORRIDORP.025
ADMINOFFICE
P.026
CLOAK ROOMP.027
STAIR P3P.0S3
GREEN ROOMP.029
WCP.030
STAGERAMP
P.040
AUDITORIUMP.038
PLENUMP.028
CLEANERSCBD
P.058
P.049
SOUND &LIGHT LOBBY
P.035
AUDITORIUMACCESS
P.036
LOBBYP.037
STAGEAREA
P.039
RACKROOM
P.022
CLEANERSCBD
P.024
RISERP.0R2
FEMALETOILETS
P.023
CLEANERSCBD
P.021
STOREP.065
MALETOILETS
P.057
P.0S1.1
P.009.1
P.064.1
P.003.1
P.003.2 P.003.3 P.003.4
P.037.1
P.039.1
P.0S3.1
P.001.1
P.002.1
P.0S2.1
P.012.1
P.00W.1
P.00W.2
SOUND &LIGHT LOBBY
P.041
RACK ROOMP.031
P.0
S1
P.061 P.062
P.0
63
P.0
63.1
P.0
66
KITCHENREFUSE
P.066
P.0
45
P.057
P.055
P.0
54P.0
58
P.053
P.047
P.045.2P.045.1
P.004
P.008 P.007
P.010 P.011 P.012
P.015
P.022 P.024
P.016
P.0
09
P.0
05
P.006
P.0
R3
P.004.1
P.004.2
P.017
P.0R2
P.019
P.0R4
P.03
5
P.03
6
P.037
P.031
P.028
P.027
P.026
P.026.1
P.029
P.030
P.025
P.04
1
P.04
0
P.065
P.023
P.0
21
P.0S2
P.00W.3
P.00W.4
1700
General notes etc...............
- - - - -
title
status
scale date drawn
chk
project
descriptionrev
drawing number revision
notes
date
World Headquarters Gogarburn Edinburgh
dr
project ref
RBS Gogarburn Site Office 175 Glasgow Road Edinburgh EH12 9BHT 0131 270 3500 F 0131 270 3680
MICHAEL LAIRDRHWL architects
This drawing may contain components or processes that involve a healthand safety risk during installation, cleaning, maintenance, refurbishmentor removal. A risk assessment has been prepared for works packages bythe designers, which identifies those risks of which the designers areaware. Further risk assessments must also be prepared on behalf of anypersons undertaking any work in relation to the drawings. Refer to all riskassessments before commencing work.
0102 P 00 GA A 100
As Built
P11
General Arrangements Ground Floor
Conference Centre
1:100 @ a1 25.02.03 AJO
GHQ
P7 Staff room added, kitchen refuse relocated 06.01.04 vm jsas per CR 977. Light equipment storeremoved as per CR 1209.
P8 Back of house wall linings removed, 06.04.04 vm jskitchen wall revised as per CR 1412Steel mesh screen to comms room addedas per CR 1415Lobby P035 ceiling revised as per 1437
P9 Comms room mesh wall moved to suit layout10.09.04 vm jsKitchen wall diffusers revised for heating pipetrench
P10 BMS cupboard as per CR 2265. Male toilet 08.11.04 vm jsas per CR 2295. TV studio green room sinkas per CR 2363
P11 Issued to O & M manual. As Built. 20.06.05 DC CP
7500
7500
9000
A
6525
1
9875
2
B
7500
4
4500
3
5
A
6525
B
652575007500
C D
75007500
E F G H
6
7
1636
1125075007500
C D
65257500
E F J
M
6000
6000
1825
6000
L
K
3
N
6000
P
Q
LOBBYP.001
BRIDGEP.101
DISABLEDTOILET
P.125
MALETOILETS
P.126
STAIR P2P.1S2
RIS
ER
P.1
R3
RIS
ER
P.1
R4
LIFT
STAIR P1P.1S1
RIS
ER
P.1
R1
EXHIBITIONSPACE
P.003
RECEPTION / FOYERP.002
GALLERYP.130
STAIR P3P.1S3
DIMMERROOM
P.134
AUDITORIUMP.038
SOUND &LIGHT LOBBY
P.035
AUDITORIUMACCESS
P.036
LOBBYP.037
STAGEAREA
P.039
RISERP.1R2
FEMALETOILETS
P.128
CLEANERSCBD
P.127
CONTROLROOM
P.132
SOUND &LIGHT LOBBY
P.133
MEETINGROOM
P.104
BREAKOUT SPACEP.102
MEETINGROOM
P.106MEETINGROOM
P.105MEETINGROOM
P.103
MEETINGROOM
P.113MEETINGROOM
P.112MEETINGROOM
P.108MEETINGROOM
P.107MEETINGROOM
P.117MEETINGROOM
P.116
STOREP.111
STOREP.120
MEETINGROOM
P.109MEETINGROOM
P.110MEETINGROOM
P.114MEETINGROOM
P.115MEETINGROOM
P.118MEETINGROOM
P.119
P.111.1
P.107 P.108 P.112 P.113 P.116 P.117
P.1S1
P.1
11
P.1
09
P.1
10
P.1
14
P.1
15
P.1
18
P.1
19
P.1
R3
P.1
R1
P.1
20
P.106 P.105 P.104 P.103
P.125 P.101
P.126
P.1R4
P.101.1
P.128
P.1
R2
P.1
27
P.133
P.1S3
P.134
P.132
P.133.1
P.1S
3.1
P.1S2
P.01W.1 P.01W.2 P.01W.3P.01W.3 P.01W.2
P.01W.4 P.01W.4 P.01W.4
ROOFLIGHT OVER
ROOFLIGHT OVER
General notes etc...............
- - - - -
title
status
scale date drawn
chk
project
descriptionrev
drawing number revision
notes
date
World Headquarters Gogarburn Edinburgh
dr
project ref
RBS Gogarburn Site Office 175 Glasgow Road Edinburgh EH12 9BHT 0131 270 3500 F 0131 270 3680
MICHAEL LAIRDRHWL architects
This drawing may contain components or processes that involve a healthand safety risk during installation, cleaning, maintenance, refurbishmentor removal. A risk assessment has been prepared for works packages bythe designers, which identifies those risks of which the designers areaware. Further risk assessments must also be prepared on behalf of anypersons undertaking any work in relation to the drawings. Refer to all riskassessments before commencing work.
0102 P 01 GA A 101
As Built
P10
General Arrangements First Floor
Conference Centre
1:100 @ a1 25.02.03 AJO
GHQ
P1 First issue to BIW. Changes from Scheme 26.06.03 ajo jsDesign to auditorium stair as CR521
P2 Glazing to Auditorium block as CR 593 03.07.03 vm cpP3 Lift shaft changed to blockwork as Cr 614. 18.07.03 ajo js
West escape stair changed to concrete asCR 621. Auditorium terrace units as CR 660.Auditorium inner concrete walls as CR 641
P4 Room tags added. No Cr req'd. All 26.09.03 ajo jsstructural elements updated as per CR 789.Auditorium ceiling and seating updated asper CRs 836 and 926.
P5 Auditorium side lighting recess added as 22.10.03 vm jsper CR 948. Auditorium stage side walls,ceiling and curtain location updated asper CR 995. Trench heating added asper CR 856. Reception plasma display added as per CR 970. Toilet walls movedas per CR 959.
P6 Auditorium stair column moved as per 04.11.03 ajo jsCR 1055.
P7 Auditorium riser diffuser as per CR 1035 27.11.03 vm jsP8 Meeting room wall to exhibition space revised.02.04.04 vm js
First floor breakout/circulation floor finishesrevised. Back of house wall linings deleted.All as per CR 1412Vertical lighting bars added in auditorium asper CR 1399
P9 Male toilet as per CR 2295 08.11.04 vm jsP10 Issued to O & M manual. As Built. 20.06.05 DC CP