gogarburn offIces - StudioLK · World Headquarters Gogarburn Edinburgh dr project ref RBS Gogarburn...

1
Suite WH1.12 East London Works, 75 Whitechapel Road, London, E1 1DU +44 (0) 20 3011 2757 www.studiolk.co.uk STUDIO LK LIMITED IS A COMPANY LIMITED BY SHARES; COMPANY NUMBER 8386338 I VAT REGISTRATION NUMBER 159 2293 88 The Studio LK team, whilst with MLA, led and managed the scope of work for this project, which included design, planning, building permits, tender, site supervision and interior design. The Conference Centre is part of a much wider campus of buildings constructed to house the Global HQ of the Royal Bank of Scotland and consists of two storeys (Ground plus 1). The Conference Centre houses a 300 seat auditorium featuring leather covered Italian designed seats, a number of fully flexible meeting rooms for between 5 and 70 people, each complete with moving walls and media walls as well as a large multi-purpose space that was planned to accommodate many functions, from informal meeting spaces to dining, to an additional office area for short term use. Area: 2,500m2 Value: £7.5 Million GBP in 2005 PROJECT INFORMATION LOCATION Edinburgh, Scotland PROJECT TYPE Architecture CLIENT RBS Themes Space Planning Interior Design Architecture STATUS Complete GOGARBURN OFFICES Edinburgh, Scotland - Architecture Studio LK Limited A 1 2 B 4 3 5 A B C D E F G H 6 7 C D E F J M L K 3 N P Q W M RH G C A 1 2 B 4 3 5 A B C D E F G H 6 7 C D E F J M L K 3 N P Q Wor MIC RHW Gene Conf

Transcript of gogarburn offIces - StudioLK · World Headquarters Gogarburn Edinburgh dr project ref RBS Gogarburn...

Page 1: gogarburn offIces - StudioLK · World Headquarters Gogarburn Edinburgh dr project ref RBS Gogarburn Site Office 175 Glasgow Road Edinburgh EH12 9BH T 0131 270 3500 F 0131 270 3680

Suite WH1.12 East London Works, 75 Whitechapel Road, London, E1 1DU

+44 (0) 20 3011 2757 www.studiolk.co.uk

STUDIO LK LIMITED IS A COMPANY LIMITED BY SHARES; COMPANY NUMBER 8386338 I VAT REGISTRATION NUMBER 159 2293 88

The Studio LK team, whilst with MLA, led and managed the scope of work for this project, which included design, planning, building permits, tender, site supervision and interior design. The Conference Centre is part of a much wider campus of buildings constructed to house the Global HQ of the Royal Bank of Scotland and consists of two storeys (Ground plus 1).

The Conference Centre houses a 300 seat auditorium featuring leather covered Italian designed seats, a number of fully flexible meeting rooms for between 5 and 70 people, each complete with moving walls and media walls as well as a large multi-purpose space that was planned to accommodate many functions, from informal meeting spaces to dining, to an additional office area for short term use.

Area: 2,500m2Value: £7.5 Million GBP in 2005

Project InformatIon

Location Edinburgh, Scotland

Project tyPe Architecture

cLient RBS

themes Space PlanningInterior DesignArchitecture

StatuS Complete

gogarburn offIcesedinburgh, Scotland - architecture

studio LK Limited

D-D

(GA)132

A-A

(GA)131

T-T

(GA)135

P-P

(GA)135

T-T

(GA)135

C-C

(GA)131

E-E

(GA)132

F-F

(GA)132

G-G

(GA)133

R-R

(GA)134

E-E

(GA)132

D-D

(GA)132

C-C

(GA)131

F-F

(GA)132

G-G

(GA)133

R-R

(GA)134

A-A

(GA)130

B-B

(GA)131

B-B

(GA)131

N-N

(GA)134

N-N

(GA)134

P-P

(GA)135

I-I

(GA)134

I-I

(GA)134

7500

7500

9000

A

6525

1

9875

2

B

7500

4

4500

3

5

A

6525

B

652575007500

C D

75007500

E F G H

6

7

1636

1125075007500

C D

65257500

E F J

M

6000

6000

1825

6000

L

K

3

N

6000

P

Q

Uplighters setinto stone

LOBBYP.001

FOYERP.004

DISABLEDTOILET

P.017

MALETOILETS

P.019

BUSINESSTOUCHDOWN

P.015

STOREP.016

STAIR P2P.0S2

RIS

ER

P.0

R3

RIS

ER

P.0

R4

LIFT

STOREP.006

GREEN ROOM /MAKE UP

P.007

TECH ROOMP.008

GALLERYP.010

EDIT SUITEP.011

LOBBYP.012

RECEPTION /WAITING

P.005

COMMSROOM

P.063

TV STUDIOP.009

LV SWITCH ROOMP.061

KITCHENSTAFF ROOM

P.062

CORRIDORP.060

STAIR P1P.0S1

GAS METERP.064

RIS

ER

P.0

R1

FEMALESTOILET

P.055

LOBBYP.054

CORRIDORP.046

STOREP.053

OFFICEP.052

STOREP.047

COLDSTORE

P.048

KITCHENP.045 P.051

EXHIBITIONSPACE

P.003

RECEPTION / FOYERP.002

CORRIDORP.025

ADMINOFFICE

P.026

CLOAK ROOMP.027

STAIR P3P.0S3

GREEN ROOMP.029

WCP.030

STAGERAMP

P.040

AUDITORIUMP.038

PLENUMP.028

CLEANERSCBD

P.058

P.049

SOUND &LIGHT LOBBY

P.035

AUDITORIUMACCESS

P.036

LOBBYP.037

STAGEAREA

P.039

RACKROOM

P.022

CLEANERSCBD

P.024

RISERP.0R2

FEMALETOILETS

P.023

CLEANERSCBD

P.021

STOREP.065

MALETOILETS

P.057

P.0S1.1

P.009.1

P.064.1

P.003.1

P.003.2 P.003.3 P.003.4

P.037.1

P.039.1

P.0S3.1

P.001.1

P.002.1

P.0S2.1

P.012.1

P.00W.1

P.00W.2

SOUND &LIGHT LOBBY

P.041

RACK ROOMP.031

P.0

S1

P.061 P.062

P.0

63

P.0

63.1

P.0

66

KITCHENREFUSE

P.066

P.0

45

P.057

P.055

P.0

54P.0

58

P.053

P.047

P.045.2P.045.1

P.004

P.008 P.007

P.010 P.011 P.012

P.015

P.022 P.024

P.016

P.0

09

P.0

05

P.006

P.0

R3

P.004.1

P.004.2

P.017

P.0R2

P.019

P.0R4

P.03

5

P.03

6

P.037

P.031

P.028

P.027

P.026

P.026.1

P.029

P.030

P.025

P.04

1

P.04

0

P.065

P.023

P.0

21

P.0S2

P.00W.3

P.00W.4

1700

General notes etc...............

- - - - -

title

status

scale date drawn

chk

project

descriptionrev

drawing number revision

notes

date

World Headquarters Gogarburn Edinburgh

dr

project ref

RBS Gogarburn Site Office 175 Glasgow Road Edinburgh EH12 9BHT 0131 270 3500 F 0131 270 3680

MICHAEL LAIRDRHWL architects

This drawing may contain components or processes that involve a healthand safety risk during installation, cleaning, maintenance, refurbishmentor removal. A risk assessment has been prepared for works packages bythe designers, which identifies those risks of which the designers areaware. Further risk assessments must also be prepared on behalf of anypersons undertaking any work in relation to the drawings. Refer to all riskassessments before commencing work.

0102 P 00 GA A 100

As Built

P11

General Arrangements Ground Floor

Conference Centre

1:100 @ a1 25.02.03 AJO

GHQ

P7 Staff room added, kitchen refuse relocated 06.01.04 vm jsas per CR 977. Light equipment storeremoved as per CR 1209.

P8 Back of house wall linings removed, 06.04.04 vm jskitchen wall revised as per CR 1412Steel mesh screen to comms room addedas per CR 1415Lobby P035 ceiling revised as per 1437

P9 Comms room mesh wall moved to suit layout10.09.04 vm jsKitchen wall diffusers revised for heating pipetrench

P10 BMS cupboard as per CR 2265. Male toilet 08.11.04 vm jsas per CR 2295. TV studio green room sinkas per CR 2363

P11 Issued to O & M manual. As Built. 20.06.05 DC CP

7500

7500

9000

A

6525

1

9875

2

B

7500

4

4500

3

5

A

6525

B

652575007500

C D

75007500

E F G H

6

7

1636

1125075007500

C D

65257500

E F J

M

6000

6000

1825

6000

L

K

3

N

6000

P

Q

LOBBYP.001

BRIDGEP.101

DISABLEDTOILET

P.125

MALETOILETS

P.126

STAIR P2P.1S2

RIS

ER

P.1

R3

RIS

ER

P.1

R4

LIFT

STAIR P1P.1S1

RIS

ER

P.1

R1

EXHIBITIONSPACE

P.003

RECEPTION / FOYERP.002

GALLERYP.130

STAIR P3P.1S3

DIMMERROOM

P.134

AUDITORIUMP.038

SOUND &LIGHT LOBBY

P.035

AUDITORIUMACCESS

P.036

LOBBYP.037

STAGEAREA

P.039

RISERP.1R2

FEMALETOILETS

P.128

CLEANERSCBD

P.127

CONTROLROOM

P.132

SOUND &LIGHT LOBBY

P.133

MEETINGROOM

P.104

BREAKOUT SPACEP.102

MEETINGROOM

P.106MEETINGROOM

P.105MEETINGROOM

P.103

MEETINGROOM

P.113MEETINGROOM

P.112MEETINGROOM

P.108MEETINGROOM

P.107MEETINGROOM

P.117MEETINGROOM

P.116

STOREP.111

STOREP.120

MEETINGROOM

P.109MEETINGROOM

P.110MEETINGROOM

P.114MEETINGROOM

P.115MEETINGROOM

P.118MEETINGROOM

P.119

P.111.1

P.107 P.108 P.112 P.113 P.116 P.117

P.1S1

P.1

11

P.1

09

P.1

10

P.1

14

P.1

15

P.1

18

P.1

19

P.1

R3

P.1

R1

P.1

20

P.106 P.105 P.104 P.103

P.125 P.101

P.126

P.1R4

P.101.1

P.128

P.1

R2

P.1

27

P.133

P.1S3

P.134

P.132

P.133.1

P.1S

3.1

P.1S2

P.01W.1 P.01W.2 P.01W.3P.01W.3 P.01W.2

P.01W.4 P.01W.4 P.01W.4

ROOFLIGHT OVER

ROOFLIGHT OVER

General notes etc...............

- - - - -

title

status

scale date drawn

chk

project

descriptionrev

drawing number revision

notes

date

World Headquarters Gogarburn Edinburgh

dr

project ref

RBS Gogarburn Site Office 175 Glasgow Road Edinburgh EH12 9BHT 0131 270 3500 F 0131 270 3680

MICHAEL LAIRDRHWL architects

This drawing may contain components or processes that involve a healthand safety risk during installation, cleaning, maintenance, refurbishmentor removal. A risk assessment has been prepared for works packages bythe designers, which identifies those risks of which the designers areaware. Further risk assessments must also be prepared on behalf of anypersons undertaking any work in relation to the drawings. Refer to all riskassessments before commencing work.

0102 P 01 GA A 101

As Built

P10

General Arrangements First Floor

Conference Centre

1:100 @ a1 25.02.03 AJO

GHQ

P1 First issue to BIW. Changes from Scheme 26.06.03 ajo jsDesign to auditorium stair as CR521

P2 Glazing to Auditorium block as CR 593 03.07.03 vm cpP3 Lift shaft changed to blockwork as Cr 614. 18.07.03 ajo js

West escape stair changed to concrete asCR 621. Auditorium terrace units as CR 660.Auditorium inner concrete walls as CR 641

P4 Room tags added. No Cr req'd. All 26.09.03 ajo jsstructural elements updated as per CR 789.Auditorium ceiling and seating updated asper CRs 836 and 926.

P5 Auditorium side lighting recess added as 22.10.03 vm jsper CR 948. Auditorium stage side walls,ceiling and curtain location updated asper CR 995. Trench heating added asper CR 856. Reception plasma display added as per CR 970. Toilet walls movedas per CR 959.

P6 Auditorium stair column moved as per 04.11.03 ajo jsCR 1055.

P7 Auditorium riser diffuser as per CR 1035 27.11.03 vm jsP8 Meeting room wall to exhibition space revised.02.04.04 vm js

First floor breakout/circulation floor finishesrevised. Back of house wall linings deleted.All as per CR 1412Vertical lighting bars added in auditorium asper CR 1399

P9 Male toilet as per CR 2295 08.11.04 vm jsP10 Issued to O & M manual. As Built. 20.06.05 DC CP