GNA Education Presentation - Our Projects

12
Master Planning Design, School Initiatives, Cost Management

Transcript of GNA Education Presentation - Our Projects

Page 1: GNA Education Presentation - Our Projects

Master Planning Design, School Initiatives, Cost Management

Page 2: GNA Education Presentation - Our Projects

Fernwood Academy, Wollaton - £1.5m

CBP and GNA were delighted to be

commissioned by Fernwood School as

Lead Consultant to design the

extension and extensive refurbishment

of the existing core buildings as part of

general updating and improvements.

The scheme included 2 substantial

extensions completed in 2012 and 2013

to accommodate administration, a

new kitchen and dining area and an

office suite. In addition, a new 2 storey

reception block with a full office

management suite was created with a

feature entrance canopy.

Page 3: GNA Education Presentation - Our Projects

St. Bartholomews School, Leicestershire - £2.4m

Commissioned by Leicestershire

County Council as Lead Consultant

to design the full refurbishment and

extension of the Existing St

Bartholomews Primary School.

The scheme included a substantial

extension to accommodate 6 new

classrooms, library and toilet blocks.

In addition, the existing floor space

was fully refurbished to comply with

Building bulletin standards.

Page 4: GNA Education Presentation - Our Projects

NCC Daybrook Learning Centre - £1.3m

CBP Architects were commissioned

under the Nottinghamshire County

Council Framework, as lead Consultant

to design the full refurbishment of the

Daybrook School.

The design included the provision of a

multi-purpose hall for the use by the

school for sport, a meeting

room, classic teaching rooms, a

kitchen and restaurant, and staff

administration block.

Page 5: GNA Education Presentation - Our Projects

Mapperley Plains Primary School, Nottingham

CBP Architects were appointed under

the Nottinghamshire County Council

Framework, as lead consultant to design

and support the construction of a series

of sure start new build centres within the

county.

The buildings were designed to exacting

standards for both safe environments

and inspiring learning spaces.

The majority of the centres were

constructed within the grounds of a

feeder school which benefitted both

facilities.

Page 6: GNA Education Presentation - Our Projects

Mapperley Plains Primary School, Nottingham

Commissioned under the

Nottinghamshire County Council

Framework to produce the working

drawing stage designs, CBP supported

the construction stages of this new

build through to completion and

handover.

Page 7: GNA Education Presentation - Our Projects

Boringdon Primary School, Plymouth - £1.2m

GNA Surveyors were commissioned to

provide cost and health and safety

management for the construction of 3

separate classroom pods each

designed to incorporate 2 classrooms.

The pods use the latest sustainable

technologies in ventilation, energy

consumption, heating and lighting.

The project was phased to allow

completed buildings to be occupied

while the remainder were being

constructed.

Page 8: GNA Education Presentation - Our Projects

SUSTAINABILITY AND ARCHITECTURE

•Solar PanelsProvides heated stored water to boost and increase efficiency of boilers for space heating and hot water supplies. – Free hot water

•Sun TubesProvides natural light to rooms without external windows.Provides natural daylight and therefore reduces running costs.

•Solar powered ventilation fansProvides solar powered ventilation to internal rooms with no running costs.

•Passive VentilationAtrium glazing with automatic opening panels which constantly regulate the heat build up within the building and so reducing cooling costs.

•Grey Water SystemCollection of roof rainwater into underground storage tanks which is then filtered and pumped back into the building for the flushing of toilets and also watering external areas.

•Sustainable DrainageSurface water is filtered back into the ground through the use of soakawaysto reduce the amount of drainage put back into the Local Authority drainage system.

Page 9: GNA Education Presentation - Our Projects

GNA Surveyors were appointed as project and cost

managers for the conversion of a dilapidated building

into a new music department for a public school within

the centre of Westminster, London.

The building required substantial renovation including

new mechanical and electrical installations, a new roof

and re-levelled floors and ceilings.

The challenges of a landlocked site with limited space

were overcome when the basement was extended to

provide additional space. The ground and upper floors

were converted into performance areas and lecture

rooms.

The acoustic performance of the building was critical

and sound insulation; reverberation measures and sound

attenuation were all installed.

In addition two apartments were created at the 2nd floor

level.

Westminster School Building, London - £3m

Page 10: GNA Education Presentation - Our Projects
Page 11: GNA Education Presentation - Our Projects

Midlands based company Schools and Academies Finance [SAAF] have over 20 years

experience meeting the needs of education establishments in what is an ever changing

environment.

SAAF is an independent organisation delivering impartial and unbiased advice

appropriate to your school; all support is designed to meet your school’s priorities whilst

being mindful of the financial restrictions and legal requirements imposed upon schools /

academies.

SAAF consultants actively assist head teachers and governing bodies to meet their

strategic goals via sound financial management services and products. Our sole objective

is to work alongside your school as a partner, removing the day to day worry of financial

management.

SAAF can extend further to offering a full bursar service offering a value for money

alternative to full time employment whilst supporting the school on a short time basis.

A Helping Hand ...

Central Government bodies have attempted to streamline and simplify the process of

academy conversion, yet the process remains complex due to the additional financial

responsibilities and legal requirements involved. SAAF will assist you in making the transition

a seamless one by supporting you through every Stage of the process.

Putting The Pieces Together ...

At SAAF we offer an extensive range of services, we develop our support services based on

the needs of your school.

Page 12: GNA Education Presentation - Our Projects

Master Planning Design, School Initiatives, Cost Management

Contact us:

Michael Day

Associate

GNA Surveyors

0115 9455645

[email protected]

www.gna-surveyors.co.uk

Ray Rudd

Director of Architecture

CBP Architects;

0115 9481144

[email protected]

www.cbp-arch.co.uk

Su Johal

Director

SAAF Ltd;

01623 407270

[email protected]

www.saafinance.com