GMR – Business Workflow System (BWS) Presented by: Sulakshman Madala Kumar Konakalla Ganesh Cheedella

description

GMR – Business Workflow System (BWS). Presented by:. Sulakshman Madala Kumar Konakalla Ganesh Cheedella. Project Sponsor. GMR Group, Information Technologies Dept, 50 Raffles Place, #40-02/03, Singapore Land Tower, Singapore - 048623. T:  (65) 6603 5959 F:  (65) 6533 350. - PowerPoint PPT Presentation

Transcript of GMR – Business Workflow System (BWS)

Page 1: GMR – Business Workflow System (BWS)

GMR – Business Workflow System (BWS) Presented by:

Sulakshman Madala

Kumar Konakalla

Ganesh Cheedella

Page 2: GMR – Business Workflow System (BWS)

Project Sponsor

GMR Group,Information Technologies Dept,50 Raffles Place,#40-02/03, Singapore Land Tower,Singapore - 048623

T: (65) 6603 5959F: (65) 6533 350

Page 3: GMR – Business Workflow System (BWS)

•GMR Group is one of the fastest growing infrastructure organizations

•Employing the Public Private Partnership model

•The Group has successfully implemented several infrastructure projects in various parts of world

Page 4: GMR – Business Workflow System (BWS)

GMR Services offered

•Building Infrastructures

•Building Airports

•Constructing Bridges & Flyovers

Page 5: GMR – Business Workflow System (BWS)

Adding Power to the Business

• Pioneer in Developing Technological Solution for the Business

• Started in 1992 at Houston, TX with 25 employees

• has a global footprint with 4 offices and development centers in US, India

and Singapore

• SKG have over 200 employees as on September 29, 2010

• Our offerings span business and technology consulting, application

services, systems integration, product engineering, Custom Software

Development, maintenance and Re-Engineering IT solutions

Page 6: GMR – Business Workflow System (BWS)

Business NeedScenario 1 (Idle case):

• Employee A has worked for the company for 10 years reporting to Manager M

• Employee A has got 80% of his work documented for every project he worked

• Employee A got retired and Replaced by Employee B with 1 Month overlap

period for knowledge transfer and reporting to Manager M

• Manager M got retired 2 years after employee A got retired and got replaced

by Manager M1 with 1 month overlap period for knowledge transfer

Page 7: GMR – Business Workflow System (BWS)

Business Need - Cont

Though Employee A has done 80% documentation of his work, he has failed to

document 20% of his work for 10 years. Things were fine as long as Manager M is

with the company but when Manager M got retired and Manager M1 is a new hire

where as Employee B is just 2 years old, they started getting issues

Loss of Knowledge:

Client satisfaction:

Clients with whom Manager M1 is dealing with, will be expecting similar quality

and procedure of work from new hire Manager M2

Problems:

Page 8: GMR – Business Workflow System (BWS)

SYSTEM REQUIREMENTS

For Managers:System should allow manager to

For Employees:

System should allow Employee to

Contd..

Page 9: GMR – Business Workflow System (BWS)

SYSTEM REQUIREMENTS

• Generate Project Summary Reports.

• Generate Client based Reports

• Generate Invoice after completion of the each phase of work

For Business Development:

System should allow

General Requirements:

• The proposed system should be having user friendly Interface

• The system should be accessed only through the secured internal network

Page 10: GMR – Business Workflow System (BWS)

System Requirements - Cont

• Generate Human Resource reports

• Generate Reports based on Business proposals.

• Generate Reports on work flows and schedules

• Generate Client based Reports

• Generate Invoice after completion of the each phase of work

For Business Development:

System should allow

General Requirements:

• The proposed system should be having user friendly Interface

• The system should be accessed only through the secured internal network

Page 11: GMR – Business Workflow System (BWS)

Business ValueEstimates of tangible value to the company include

• Increase in $200,000 revenue by attracting new clients by business based proposal

Reports

• Increase in $100,000 revenue from the Re-engineering projects from the returning

clients by avoiding reverse engineering time frame

• Increase in 5% of project revenue by timely billing

Intangible benefits for the company includes but not limited to

• Employee professional growth based on the work

• Avoiding loss of knowledge

• Customer satisfaction

• Security on Documentation

Page 12: GMR – Business Workflow System (BWS)

Any Questions / Suggestions/ Comments?