INTRODUCTION TO GAS SUPPLY SYSTEM FOR RESIDENTIALS
AND COMMERCIALSAND COMMERCIALS
Table of ContentsTable of Contents• Introduction to Gas Malaysia• Introduction to Gas Malaysia
• LPG Characteristics
• NG Characteristics
• Supply Concept
• Codes and Standards
G C i• GMB Commitment
INTRODUCTION TO GAS MALAYSIAGAS MALAYSIA
About usIntroduction to Gas Malaysia
• Incorporated on May 16 1992
About usIncorporated on May 16, 1992
• Licensed to distribute natural gas• In 2000 was Licensed to distribute
LPG • Distribute NG and LPG through
pipeline within peninsular pipeline within peninsular Malaysia
ShareholdersIntroduction to Gas Malaysia
Shareholders
Regulatory FrameworkIntroduction to Gas Malaysia
Regulatory Framework
PRIME MINISTER DEPTECONOMIC PLANNING
UNIT
MINISTRY OF ENERGY, GREEN TECHNOLOGY &
WATER
LPG COMPONENTS & CHARACTERISTICSCHARACTERISTICS
LPG Components
OTHERS
p
PROPANE39 5%
OTHERS 0.5%
39.5%
BUTANE60%
LPG CharacteristicsLPG Characteristics
• Tasteless
• Colorless
O i i ll d l• Originally odorless
• Non-toxic• Non-toxic
LPG CharacteristicsLPG Characteristics
Air
LPG
Heavier than air (SG=1 92)Heavier than air (SG=1.92)
NG COMPONENTS & CHARACTERISTICS
NG ComponentsNG ComponentsOTHERS
ETHANE5 4%
OTHERS2.4%
5.4%
METHANE92.2%
NG CharacteristicsNG Characteristics
• Tasteless
• Colorless
O i i ll d l• Originally odorless
• Non-toxic• Non-toxic
NG CharacteristicsNG Characteristics
NGAir
NG
Lighter than air (SG = 0.61)
LPG and NG Characteristics
Description LPG NGp
ComponentsMainly
propane & Mainly
methanebutane
Specific gravity (air = 1.0) 1.92 0.61p g y ( )
Flammability Limit 2% - 10% 5% - 15%
Auto ignition temperature 510oC 630oC
SUPPLY CONCEPTSUPPLY CONCEPT
LPG Supply ConceptSupply Concept
LPG Supply ConceptMANIFOLD
SYSTEM5 psi
COMMERCIAL
SYSTEM
COMMERCIAL
2nd STAGE REGULATORPE pipe
70 i 100 i
METER1ST STAGE REGULATOR
p p70 psi – 100 psi 5 psi 0.5 psi
REGULATOR
RESIDENTIAL
BULK TANK
LPG Bulk TankLPG Bulk Tank
LPG Cylinder ManifoldLPG Cylinder Manifold
NG Transmission SystemSupply Concept
JDA
LAWITK
y
JERNIHKangar
Gurun
Phase 3BEKOK
RESAK
Tok Arun
Kertih Phase 1PGU Loop 1
DUYONGSOTONG
Kuala Lumpur Phase 2
PGU Loop 1
PGU Loop 2
NATUNA
Segamat
Putrajaya
KLIA
Port Dickson
PENINSULAR MALAYSIA GAS Port Dickson
Melaka
Johor BahruPasir Gudang
Singapore
MALAYSIA GAS SUPPLY NETWORK
NG Distribution SystemSupply Concept
NG Distribution System
OdorizerStation
DistrictStationCity Gate
1000 psig
RegulatingStation
4 3 iDistributionLine
PGU
Station Feeder Line
260 psig
Station
60 psig
City Gate 4.3 psig
InternalPiping
M
M
MPiping Multiple End-users/
Shopping ComplexesInternal Piping
M
DistributionLine
Area Station
= METERM0.43 psig
M60 psig
Residential
NG StationNG Station
CODES AND STANDARDSSTANDARDS
N Pi i S ti C d St d d d E i i P ti
Codes and Standards
No Piping Section Codes, Standards and Engineering Practice
1. All Sections Gas Supply Act 1993Gas Supply Regulations 1997
2. Main Pipelines and Stations
ASME B31.8: 2003 – Gas Transmission and Distribution Piping Systemsp g y
3. LPG Storage MS830: 2003 - Code Of Practice For The Storage, Handling And Transportation Of Li fi d P t l G Liquefied Petroleum Gases
4. Internal Piping MS930: 1986 - Code Of Practice For The Installation Of Fuel Gas Piping Systems And Appliances Guidelines on Domestic Gas Piping System (Energy Commission)
GMB COMMITMENT
GMB Commitment
GMB Obj tiGMB Objective
To ensure supply is
• Safe
St bl • Stable
• Continuous• Continuous
Key ResponsibilityGMB Commitment
Key Responsibility
• Daily OperationsPipeline Inspection and surveillancePipeline Inspection and surveillance
Facilities maintenance
Third party supervision
GMB Commitment
Key ResponsibilityKey Responsibility…continuation
• Troubleshoot & Repair
• Emergency Response
• Operations Control Center
GMB Services to CustomersGMB Responsibility
GMB Services to Customers
• Attend to emergency / complaint
• Assist in technical matters
• Ensure compliance with regulations
Call attended: GMB Responsibility
Supply Interruption
Item Category Number of calls
1. Due to system failure/misoperationat GMB's facilities
12
2 Due to third party 502. Due to third party 503. Due to customers 136
T t l 198Total 198Jan – Sep 2013
THANK YOU
Call attended: GMB Responsibility
Gas Leak
Item Category Number ofcalls
1 Due to system failure/misoperation at 1071. Due to system failure/misoperation at GMB's facilities
107
2. Due to third party 2
3. Due to customers 56
Total 165
Jan Jun 2013Jan – Jun 2013
Call attended: GMB Responsibility
Others
Item Category Number ofcalls
1. Gas release 181. Gas release 182. Fire 53. High Pressure 34 L P 334. Low Pressure 335. False alarm 1436. Others 7
Total 209
Jan Jun 2013Jan – Jun 2013