Globul Project TP and External Alarm Connection and Test Guide_ver.2
-
Upload
petyo-georgiev -
Category
Documents
-
view
384 -
download
31
Transcript of Globul Project TP and External Alarm Connection and Test Guide_ver.2
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
1/34
HUAWEI TECHNOLOGIES CO., LTD.
Globul Project TP and External Alarm
connection and test guide
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
2/34
Page 2HUAWEI TECHNOLOGIES CO., LTD.
TP and external alarm solution & cable connect
Ethernet cable connection from TP SMU02B to
Outdoor TP cabinet sensor installation
Existing DDF sensor side alarm cable connecti
TP and external alarm test procedure
Content
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
3/34
Page 3HUAWEI TECHNOLOGIES CO., LTD.
TP indoor with generator
TP indoor without generator
Reuse of existing indoor PSS
TP outdoorTP outdoor installed in shelter without generator
TP outdoor installed in shelter with generator
TP and external alarm solution & cable
connectiontypical scenarios
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
4/34
Page 4HUAWEI TECHNOLOGIES CO., LTD.
Scenario 1 TP Indoor site with Generator
BTS BBU
Existing DDF Box
Door Temperature
&humidity
Smoke Air-condi
TP SMU
R-Phase down
S-Phase down
T-Phase down / AC Main failure
(R+S+T phase down)
Rectifier failure
TP48200B
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
5/34
Page 5HUAWEI TECHNOLOGIES CO., LTD.
ALM No. Globul ALM Requirement Existing DDF to BBU New TP SMU to BBU
ALM1 High/Low Temperature High/Low Temperature
ALM2 Fire/Smoke Fire/Smoke
ALM3 Door open / Tamper/Intrude Door open / Tamper/Intrude
ALM4 Air conditioner failure Air conditioner failure
ALM5 R-phase down / Low fuel level Low fuel level R-phase down
ALM6 S-phase down / Backup generator running Backup generator running S-phase down
ALM7 T-phase down / AC Main failure (R+S+T phase down) Spare T-phase down / AC Main failure (
ALM8 Rectifier failure Spare Rectifier failure
Scenario 1 TP Indoor site with Generator
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
6/34
Page 6HUAWEI TECHNOLOGIES CO., LTD.
Scenario 2 TP Indoor site without Generator
BTS BBU
Krone DDF Box
Door Temperature
&humidity
Smoke Air-condi
TP SMU
R-Phase down
S-Phase down
T-Phase down / AC Main failure
(R+S+T phase down)
Rectifier failure
TP48200B
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
7/34
Page 7HUAWEI TECHNOLOGIES CO., LTD.
Scenario 2TP Indoor site without GeneratorALM No. Globul ALM Requirement Existing DDF to BBU New TP SMU to BBU
ALM1 High/Low Temperature High/Low Temperature
ALM2 Fire/Smoke Fire/Smoke
ALM3 Door open / Tamper/Intrude Door open / Tamper/Intrude
ALM4 Air conditioner failure Air conditioner failure
ALM5 R-phase down / Low fuel level R-phase down
ALM6 S-phase down / Backup generator running S-phase down
ALM7 T-phase down / AC Main failure (R+S+T phase down) T-phase down / AC Main failure
ALM8 Rectifier failure Rectifier failure
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
8/34
Page 8HUAWEI TECHNOLOGIES CO., LTD.
Scenario 3 Reuse existing power system Indoor
BTS BBU
Krone DDF Box
Door Temperature
&humiditySmoke Air-condition
R-Phase down/Low fuel
DG.Runnig/ S-Phase down
T-Phase down/AC Main failure
Rectifier failure
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
9/34
Page 9HUAWEI TECHNOLOGIES CO., LTD.
Scenario 3 Reuse existing power system IndoorALM No. Globul ALM Requirement Existing Krone DDF to BBU
ALM1 High/Low Temperature High/Low Temperature
ALM2 Fire/Smoke Fire/Smoke
ALM3 Door open / Tamper/Intruder Door open / Tamper/Intruder
ALM4 Air conditioner failure Air conditioner failure
ALM5 R-phase down / Low fuel level R-phase down / Low fuel levelALM6 S-phase down / Backup generator running S-phase down / Backup generator running
ALM7 T-phase down / AC Main failure (R+S+T phase down) T-phase down / AC Main failure (R+S+T phase down)
ALM8 Rectifier failure Rectifier failure
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
10/34
Page 10HUAWEI TECHNOLOGIES CO., LTD.
Scenario 4 TP Outdoor Site
BTS BBU
Door Temperature
&humidity
Smoke
TP SMU
R-Phase down
S-Phase down
T-Phase down / AC M
(R+S+T phase down)
Rectifier failure
TP482
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
11/34
Page 11HUAWEI TECHNOLOGIES CO., LTD.
Scenario 4 TP Outdoor SiteALM No. Globul ALM Requirement New TP SMU to BBU
ALM1 High/Low Temperature High/Low Temperature
ALM2 Fire/Smoke Fire/Smoke
ALM3 Door open / Tamper Door open / Tamper
ALM4 Air conditioner failure Spare (No Air conditioner)
ALM5 R-phase down / Low fuel level R-phase down (No generator)ALM6 S-phase down / Backup generator running S-phase down (No generator)
ALM7 T-phase down / AC Main failure (R+S+T phase down) T-phase down / AC Main failure (R+S+T phase down)
ALM8 Rectifier failure Rectifier failure
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
12/34
Page 12HUAWEI TECHNOLOGIES CO., LTD.
Appendix 1 Communication cable for BBU side
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
13/34
Page 13HUAWEI TECHNOLOGIES CO., LTD.
Appendix 2
Communication cable for TP SMU and existing DDF
8-Pin Cable 1 8-Pin Cable 2
ALM1+ ALM1- ALM2+ ALM2- ALM3+ ALM3- ALM4+ ALM4- ALM5+ ALM5- ALM6+ ALM6- ALM7+ ALM7-
Orange&
White OrangeGreen
&White GreenBlue&
White BlueBrown&
White BrownOrange
& White OrangeGreen
&White GreenBlue&
White Blue
TP UIM
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
14/34
Page 14HUAWEI TECHNOLOGIES CO., LTD.
Appendix 3 Globul project alarm setting guide attach
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
15/34
Page 15HUAWEI TECHNOLOGIES CO., LTD.
TP and external alarm solution & cable connect
Ethernet cable connection from TP SMU02B to
Outdoor TP cabinet sensor installation
Existing DDF sensor side alarm cable connecti
TP and external alarm test procedure
Content
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
16/34
Page 16HUAWEI TECHNOLOGIES CO., LTD.
EthernetCable from SMU02B to BBU for all sites
TP48200A/200B
SMU02B
Ethernet cable
UPEU
Step detail:
Connect IOOI on SMU02B and MON0 on BBU U
with provided Ethernet cable. (If MON0 has been us
use MON1 instead.
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
17/34
Page 17HUAWEI TECHNOLOGIES CO., LTD.
TP and external alarm solution & cable connect
Ethernet cable connection from TP SMU02B to
Outdoor TP cabinet sensor installation
Existing DDF sensor side alarm cable connectio
TP and external alarm test procedure
Content
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
18/34
Page 18HUAWEI TECHNOLOGIES CO., LTD.
Outdoor TP Smoke sensor installationInstall the smoke sensor on the top of the cabinet
O
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
19/34
Page 19HUAWEI TECHNOLOGIES CO., LTD.
Outdoor TP temperature and humidity sensor instaInstall the temperature sensor on the left rack in the cabinet
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
20/34
Page 20HUAWEI TECHNOLOGIES CO., LTD.
TP and external alarm solution & cable connect
Ethernet cable connection from TP SMU02B to
Outdoor TP cabinet sensor installation
Existing DDF Sensor side alarm cable connectio
TP and external alarm test procedure
Content
S E i BTS ith SMT EAS
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
21/34
Page 21HUAWEI TECHNOLOGIES CO., LTD.
Scenario 1 Ericsson BTS with SMT EASExt ALM
CODETEXT STRING
New ALM
Need
Sensor side connection change for
New TP
Sensor side c
Reusing
ALM1 HIGH TEMPERATURE ALM1 Series Connect to ALM1 Port Series Con
ALM2 FLOOD None Remove ALM cable Remo
ALM3
EXTERNAL ALARM SYSTEM LOW
BATTERY None Remove ALM cable Remo
ALM4
EXTERNAL ALARM SYSTEM 220V AC
MAIN BREAKDOWN / low battery alternator None Remove ALM cable Remo
ALM5 TAMPER ALM3 Series Connect to Ext ALM3 Port Series Conn
ALM6 FIRE / SMOKE ALM2 Connect to Ext ALM2 Port Connect
ALM7 INTRUDER ALM3 Series Connect to Ext ALM3 Port Series Conn
ALM8 R PHASE BREAKDOWN / R or S or T ALM5 No need Connect
ALM9
S PHASE BREAKDOWN / high engine
temperature / gen running ALM6 No need Connect
ALM10 T PHASE BREAKDOWN /low fuel level ALM7 No need Series ConnALM11 AIR CONDITIONING ALM4 Connect to Ext ALM4 Port Connect
ALM12 ALARM SYSTEM OFF None No need
ALM13 LOW TEMPERATURE ALM1 Series Connect to Ext ALM1 Port Series Conn
ALM14
AVIATION LIGHT / intruder in generator
section None No need
ALM15 LOW BATTERY BTS None No need
ALM16 MAINS 220V AC BREAKDOWN ALM7 No need Series Conn
S i 2 M t l BTS ith SMT EAS
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
22/34
Page 22HUAWEI TECHNOLOGIES CO., LTD.
Scenario 2 Motorola BTS with SMT EAS
Ext ALM
CODE TEXT STRING
New ALM
Need
Sensor side connection change for
New TP
Sensor side
Reusin
ALM1 HIGH / LOW TEMPERATURE ALM1 No need
ALM2 FIRE/SMOKE ALM2 No need
ALM3 INTRUDER ALM3 Series Connect to Ext ALM3 Port Series Con
ALM4 LOW DC VOLTAGE None Remove ALM cable Rem
ALM5 R PHASE BREAKDOWN ALM5 No need
ALM6 FLOOD None No need Rem
ALM7 AC MAINS FAILURE ALM7 No need Series Con
ALM8 AVIATION LIGHT FAILURE None No need Rem
ALM9 TAMPER ALM3 Series Connect to Ext ALM3 Port Series Con
ALM10 AIR CONDITIONER FAILURE ALM4 Connect to Ext ALM4 Port Connec
ALM11 S PHASE BREAKDOWN ALM6 No need Connec
ALM12 T PHASE BREAKDOWN ALM7 No need Series Con
ALM13 RECTIFIER FAILURE ALM8 No need Connec
ALM14 ALARM SYSTEM LOW BATTERY None No need
ALM15 ALARM SYSTEM MAINS AC DOWN None No need
ALM16
PERSONNEL ON SITE /Alarm system
status/ None No need
S i 3 BTS ith A C S EAS
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
23/34
Page 23HUAWEI TECHNOLOGIES CO., LTD.
Scenario 3 BTS with A.C.S EASExt ALM
CODETEXT STRING
New ALM
Need
Sensor side connection change for
New TP
Sensor side
Reusi
ALM1 HIGH / LOW TEMPERATURE ALM1 No need
ALM2 FIRE/SMOKE ALM2 No need
ALM3 DOOR OPEN ALM3 Series Connect to Ext ALM3 Port Series Co
ALM4 LOW DC VOLTAGE (psu1, psu2) None Remove ALM cable Re
ALM5 R or S or T PHASE DOWN ALM5 Series Connect to Ext ALM5 Port Series Co
ALM6 FLOOD None No need Re
ALM7 AC MAINS FAILURE (R and S and T down) ALM7 No need
ALM8 AVIATION LIGHT FAILURE None No need Re
ALM9 TAMPER ALM3 Series Connect to Ext ALM3 Port Series Co
ALM10 AIR CONDITIONER FAILURE ALM4 Connect to Ext ALM4 Port Conne
ALM11 BACKUP GENERATOR RUNNING ALM6 No need Conne
ALM12 SPARE (FREE COOLING ALARM) None No need ALM13 RECTIFIER FAILURE (PSU1, PSU2,) ALM8 No need Conne
ALM14 LOW FUEL LEVEL ALM5 Series Connect to Ext ALM5 Port Series Co
ALM15 FUEL TANK ALARM (where applicable) ALM3 Series Connect to Ext ALM3 Port Series Co
ALM16 PERSONNEL ON SITE None No need
Existing DDF/OVP type on sites
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
24/34
Page 24HUAWEI TECHNOLOGIES CO., LTD.
Existing DDF/OVP type on sitesNew type Ericsson Old type Ericsson DDF
For indoor sites with new TP, make ALM1~ALM4 ports of existing DDF 16 ports to report the 4 existin
to Huawei BTS, ALM5~ALM8 from new TP to Huawei BTS.
For indoor sites reusing existing power, make ALM1~ALM8 ports of existing DDF 16 ports to report t
from DDF to Huawei BTS.
In case of New type Ericsson DDF on site
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
25/34
Page 25HUAWEI TECHNOLOGIES CO., LTD.
In case of New type Ericsson DDF on site
Use the provided by Huawei Ethernet cables for making RG45 connection between BBU/Upper UPEU a
DDF/OVP box without cutting them one cable in case of TP indoor and two cables in case of reusing ex
In this case the sequence of cable connections for external sensors changes as it is shown on the pictur
with yellow labels .
Existing DDF type on sites
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
26/34
Page 26HUAWEI TECHNOLOGIES CO., LTD.
Existing DDF type on sites
Existing DDF on 2123 site Existing DDF on 20
For indoor sites with new TP, make ALM1~ALM4 ports of
existing DDF 16 ports to report the 4 existing alarms from DDF to
Huawei BTS, ALM5~ALM8 from new TP to Huawei BTS.
For indoor sites reusing existing power, make ALM1~ALM8 ports of existing DDF 16 ports to report
from DDF to Huawei BTS.
Existing DDF connection reusing existing Guardian
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
27/34
Page 27HUAWEI TECHNOLOGIES CO., LTD.
Existing DDF connection reusing existing Guardian
Existing DDF sensor side cable connection when reusing existing Gu
without generator.
Short circuit
Alarm 6 port.
Because Gua
dont support
phase down
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
28/34
Page 28HUAWEI TECHNOLOGIES CO., LTD.
TP and external alarm solution & cable connect
Ethernet cable connection from TP SMU02B to
Outdoor TP cabinet sensor installation
Existing DDF Sensor side alarm cable connectio
TP and external alarm test procedure
Content
AC Mains failure alarm test procedure (Necessary)
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
29/34
Page 29HUAWEI TECHNOLOGIES CO., LTD.
AC Mains failure alarm test procedure (Necessary)1. Power on the system normally with battery back up;
2. Switch off the AC input breaker and wait several minutes, view the active alarm informatio
and view the alarm information on M2000 to check if the alarm is reported;
3. Switch on the AC input breaker, view the active alarm information on LCD, and view the alaon M2000 to check if the alarm disappeared.
Indoor TP (TP48200B) Outdoor TP (TP4820
Rectifier failure alarm test procedure (Necessary)
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
30/34
Page 30HUAWEI TECHNOLOGIES CO., LTD.
Rectifier failure alarm test procedure (Necessary)1. Insert a plastic stick to stop the rectifier fan and wait several minutes to check the rectifier
active alarm information on the LCD, and view the alarm information on M2000 to check if the
2. Remove the stick. View the active alarm information on LCD, and view the alarm informatio
check if the alarm disappeared.
Smoke alarm test procedure (Optional)
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
31/34
Page 31HUAWEI TECHNOLOGIES CO., LTD.
Smoke alarm test procedure (Optional)Below is described the usual way to check this alarm but in this project it will be not checked
1. Spray the smoker sensor to check if the alarm is reported with OMC if they view the alarm
on M2000.
2. Wait several minutes after the alarm is active and check with OMC if the alarm is disappear
Temperature and Door open alarm test procedure
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
32/34
Page 32HUAWEI TECHNOLOGIES CO., LTD.
Temperature and Door open alarm test procedure
High temperature alarm test (Optional)
1. Carefully heat the temperature sensor with heat-air-gun to reach the threshold value. Kee
from plastic details and cabinet insulation. View the active alarm information on the LCD
information on M2000 to check if the alarm is reported.
2. Cool the temperature sensor or wait the temperature to be normal, view the alarm informa
check if the alarm is disappeared.
Door open alarm test (Necessary)
1. Open the door of Cabinet or shelter to check the active alarm information on M2000 with O
2. Close the door of Cabinet or shelter to check if the alarm is disappeared on M2000 with O
Air conditioner failure and D.G running alarm test p
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
33/34
Page 33HUAWEI TECHNOLOGIES CO., LTD.
Air conditioner failure and D.G running alarm test p
Air conditioner failure alarm test (Necessary)
1. Shut down the precision air conditioner ( Floor mounted) or heat the temperature sensor o
Conditioner to check if there is a right alarm information on M2000 with OMC.
2. Start the precision air conditioner again and check with OMC if the alarm is disappeared o
D.G (Generator) running alarm test (Optional)
1. Start the generator to check with OMC if the alarm is reported on M2000.
2. Shut down the generator to check with OMC if the alarm is disappeared on M2000.
-
8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2
34/34
Thank youwww.huawei.com
If you have any problem, please contact the persons as be
Nikolay +359 896878010
Neil +359 893332347