Global Real Time
More Efficiency. More Possibilities
and
More Efficiency. More Possibilities<<Back to Index>>
•General•Well•Message•Operations Report•Real Time•Wellbore•Wellbore Geometry•Risk
Directional Drilling Systems•Tubular / •Bit Record•Open Hole•BHA Run
Fluids Systems•Fluids Report
Surface Logging•Mud Log
Logging While Drilling•Log Well Log (includes Wireline)•Formation Marker
Coring•Sidewall Core•Conventional Core
Surveying•Survey Program•Target •Trajectory
Data ObjectsData Objects
Rig Instrumentation•Rig / Rig Equipment•Cement Job
Source: BakerHughes/Paradigm
Communication•Subscription•Server Capabilities
OriginalUpdatedNew
More Efficiency. More Possibilities<<Back to Index>>
3
enables Schlumberger Operations
InterACT– Full 1.2 and 1.3.1 API - (GetFrom, AddTo, UpdateInStore)– DataHub – scaleability, agregation and synchronisation– Server to Server transfer (Push and Pull)– WITSML Data Browsing
Operation Support Centers (OSC)– Internal – Support, Collaboration, Remote Control– Commercial – Schlumberger Silver, Gold & Platinum OSCs
Answer Products – Enabled for WITSML via “Real Time DataLink”– Drilling Optimization – Perform Toolkit (used internally to monitor performance)– Geosteering – RTGS– Petrophysics – Interactive Petrophysics– Seismic to Simulation - Petrel
More Efficiency. More Possibilities<<Back to Index>>
with Real Time DataLink Designed on the assumption that
servers will be different One WITSML-enabler for multiple
real-time applications Multiple sources and standards
– Static and streaming files– WITSML 1.2 /1.3.1 API Client
Introduced v1 in 2003 Version 3 released Tested with InterACT, InSite,
RigLink, Sitecom and Wellstorm
More Efficiency. More Possibilities<<Back to Index>>
5
in Petrel 2007
Seismic to Simulation Software is now open to Drilling Planning workflow:
– Drilling Risks and Events Exchange– Drilling Risk and Events in the Geological Model
Execution workflow– Trajectory in Real Time– Logs and Risks in Real Time
More Efficiency. More Possibilities<<Back to Index>>
6
WITSML in Petrel 2007: Planning WorkflowDrilling Risks in the Geological Model
More Efficiency. More Possibilities<<Back to Index>>
7
WITSML in Petrel 2007: Execution WorkflowTrajectory, Log, Risks in Real-Time
More Efficiency. More Possibilities<<Back to Index>>
8
WITSML in Petrel 2007: Execution WorkflowTrajectory, Log, Risks in Real-Time
More Efficiency. More Possibilities<<Back to Index>>
InterACT Scalability - Getting data to where its needed…..Depth Data Geoframe
etc
Trajectory Data
Drilling Office etc
Time Data
Operational Data
Downhole Tools
Wellsite data acquisition, aggregation and display
Rig Sensors
InterACT “DataHub”
Client ”ODC”
Schlumberger Secure Center Schlumberger
OSC
InterACT “Hub”
InterACT “Inside”
Specialist Services
NDS / Perform Geosteering
Remote Monitoring
Remote Control
Asset Team Experts
Web based viewers
InterACT interfaces:-
WITSML APIWITSML StreamingWITSML Data Exchange
More Efficiency. More Possibilities<<Back to Index>>
Where is InterACT?
MussafahSedalia
Moscow
Al KhobarKJO
Ciudad del Carmen
Aberdeen
Kuala Lumpur
Beijing
Jakarta
Mumbai
Caracas
Rio de JaneiroMacae
Algeria
Viet Nam
Teleports
ProposedLocalized SitesGlobal Hubs
More Efficiency. More Possibilities<<Back to Index>>
InterACT Usage
More Efficiency. More Possibilities<<Back to Index>>
InterACT Organizations & Wells
More Efficiency. More Possibilities<<Back to Index>>
Questions?