Global ILM model meeting evolution of the MBSC
-
Upload
johannes-ide -
Category
Data & Analytics
-
view
251 -
download
2
Transcript of Global ILM model meeting evolution of the MBSC
![Page 1: Global ILM model meeting evolution of the MBSC](https://reader035.fdocuments.us/reader035/viewer/2022071815/55a8825b1a28ab4b058b4892/html5/thumbnails/1.jpg)
Evolution of the M&BSC role
![Page 2: Global ILM model meeting evolution of the MBSC](https://reader035.fdocuments.us/reader035/viewer/2022071815/55a8825b1a28ab4b058b4892/html5/thumbnails/2.jpg)
5. M&BSC role
• Coaching of ILM CCs/Hosting Entities
• Ensure CCP Transition
• Review Eligibility
• Manage Bidding Process/Review Bids
• Tracking of Bids
• Ensure Reporting of CC/Host Entity
• Lead Decision Making
• Recommendations to Plenary
• Report to Plenary on SC work
• Knowledge Management• Education & Support to bid interested entities
• Education to mandated entities
• Manage IC Contingency Plans/Back-up Plans
• Monitoring Red-Flags towards ILM
ILM Board
![Page 3: Global ILM model meeting evolution of the MBSC](https://reader035.fdocuments.us/reader035/viewer/2022071815/55a8825b1a28ab4b058b4892/html5/thumbnails/3.jpg)
Responsibilities
Pre-Bidding
*ILM Seminar for Interested Bidding entities during previous ILM
*Template files for bidding (Budget)
*Bidding Process Education Video
*Bidding Booklet
*Eligibility List
Receive Request, Assess, Update
Bidding
Assessment of criteria for Eligibility List
Assessment of Bids based on Minimums
Decision-Making on Allocation for Hosting Entities that fulfill Minimums with immediate automatic effect in case of 0,1 Hosting Options
Post-Bidding
*What to do now package for Hosting Entity
*CCP Selection Committee Participation
*CCP Transition Coordination
*MC-CC Contract Instructions & Facilitation
*CC Transition Involvement for Education
*CC Planning Feedback (Budget & Sales)
ILM Preparation
*AI Physical Visits Overview
*Monthly/Bi-Weekly Ongoing Coaching & Tracking of CC
*Formal Reporting from CC directly to ILMB
*Request of Additional Reporting from CC/Host Entity
*Monitoring Red-Flags (>6 months before ILM)
Recommendations about Red-Flags/Re-Allocation to Plenary (>6 months before ILM)
*Contingency Plan for IC
Have a list & information for back-up Hosting Entities 6 months to 1 year before IC
Post ILM
*Consolidation of Discharge Report
*Decision Making on Discharge with immediate effect
*Recommendation for next ILMs
General
*Knowledge Management
Information Center
*Legislation (Mandates regarding ILMs)
*Reporting to Plenary in every Legislative Meeting (ILM/VLM)
-Board Activities
-Board Decisions
-ILMs Progress
![Page 4: Global ILM model meeting evolution of the MBSC](https://reader035.fdocuments.us/reader035/viewer/2022071815/55a8825b1a28ab4b058b4892/html5/thumbnails/4.jpg)
Why is it different than M&BSC?• Not only MCPs but experts
• Part time chair
• More responsibilities and decision making power
• Own budget
ILM Board Accountability to PLENARY:-Ratify ILM Board Chair
-Discharge ILM Board if they don't have confidence in them/their decision
ILMB Budget In scope of 1 yearCCP
TransitionIncoming CCP, Outgoing CCP, ILM board chair Travel Costs
Physical Visits 2 ILM Host Entities for 2 AI Members each time
ILM Presence 2 ILMs for ILM Board Chair