Global ATM Operational Concept WP 02 · • Global Air Navigation Plan for CNS/ATM Systems (Doc...
Transcript of Global ATM Operational Concept WP 02 · • Global Air Navigation Plan for CNS/ATM Systems (Doc...
International Civil Aviation Organization
Global ATM Operational Concept WP 02
François SALAMBANGA
Workshop on ADS-B
(Dakar, 21-23 July 2014)
“Do we know where to go?”
2 ASECNA Workshop ADS B
YES.
3 ASECNA Workshop ADS B
“Vision without Action is a day-dream,
Action without Vision is a nightmare.”
4 ASECNA Workshop ADS B
The Gap
5 ASECNA Workshop ADS B
Objective
To present the ICAO vision and the steps/actions towards the implementation of the “future” Air Navigation System focusing on the global drivers expressed in the GANP.
6 ASECNA Workshop ADS B
Presentation Outline
• History and Background
• Vision
• Expectations
• How to get there
7 ASECNA Workshop ADS B
History and Background
• FANS
• Tenth Air Navigation Conference
• Global Air Navigation Plan for CNS/ATM Systems (Doc 9750)
• Planning and Implementation Regional Groups embarked on an extensive effort
• SARPs, PANS, Guidance material
• Eleventh Air Navigation Conference.
8 ASECNA Workshop ADS B
Vision statement
To achieve an interoperable global air traffic management system for all users during all phases of flight, that
• meets agreed levels of safety;
• provides for optimum economic operations;
• is environmentally sustainable; and
• meets national security requirements.
9 ASECNA Workshop ADS B
Guiding principles
10 ASECNA Workshop ADS B
• Safety
• Humans
• Technology
• Information
• Collaboration
• Continuity
Concept components
11 ASECNA Workshop ADS B
• Airspace organization and management(AOM)
• Aerodrome operations(AO)
• Demand and capacity balancing(DCB)
• Traffic synchronization(TS)
• Airspace user operations(AUO)
• Conflict management(CM)
• ATM service delivery management(ATM/SDM)
Transition
• Technology is not an end in itself
• Based on clearly-established operational requirements
• Integrated system
12 ASECNA Workshop ADS B
Integration
13
People Systems
Concept components
Management
ATM
Service provider
Aircraft
operations
Maintenance
Engineering
ATM service delivery
management
Communications
Navigation
Surveillance
Airspace User
Aerodrome
Operator
Conflict Management
Information rich environment
Traffic synchronisation
Aerodrome
operations
Airspace user
operations
Demand capacity
balancing
Airspace
organization
and Management
ASECNA Workshop ADS B
Expectations
• Access and Equity • Capacity • Cost-effectiveness • Efficiency • Environment • Flexibility • Global interoperability • Participation by the ATM community • Predictability • Safety • Security
14 ASECNA Workshop ADS B
Global System
15 ASECNA Workshop ADS B
Global System
meeting safety objectives
operate along preferred 4D trajectories
environmental objectives
other business requirements
16 ASECNA Workshop ADS B
How to get there
• The GANP as a catalyst for change
• Provides a global interoperability framework
• Allows adaptation to efficiently meet regional and local needs
17 ASECNA Workshop ADS B
How to get there
• Partnering with industry
• Delivering transitional benefits while we continue our evolution
18 ASECNA Workshop ADS B
How to get there
• Modules
• Elements as options for improvements
• Result in direct performance enhancements
• Based on Industry Roadmaps and current regional activities
• Bring near- and medium-term benefits
19 ASECNA Workshop ADS B
GANP
20
•Represents the initiatives that will contribute to attend the expectations of the aviation community •Main drivers towards the seamless system.
ASECNA Workshop ADS B
Summary
• We needed a vision: the operational concept
• Gap
• Address the KPAs
• Lots of ongoing work
• GANP one of the main drivers.
21 ASECNA Workshop ADS B
We know where to go, but…
“Vision without Action is a day-dream, Action without Vision is a nightmare.”
22 ASECNA Workshop ADS B
23