Global Activities - AUTOSAR€¦ · Vector Regional Work Package in Japan Organization Face to face...

14
Global Activities Martin Lunt 7 th Open Conference October 23 rd 2014, Detroit @ GM

Transcript of Global Activities - AUTOSAR€¦ · Vector Regional Work Package in Japan Organization Face to face...

Page 1: Global Activities - AUTOSAR€¦ · Vector Regional Work Package in Japan Organization Face to face meetings at Partner’s locations in Japan. Regular phone-conferences. Joint meetings

Global Activities

Martin Lunt

7th Open Conference

October 23rd 2014, Detroit @ GM

Page 2: Global Activities - AUTOSAR€¦ · Vector Regional Work Package in Japan Organization Face to face meetings at Partner’s locations in Japan. Regular phone-conferences. Joint meetings

2014-10-22 3

Overview

AUTOSAR Global Activities

Motivation

Organizational Adaptations

Examples

Page 3: Global Activities - AUTOSAR€¦ · Vector Regional Work Package in Japan Organization Face to face meetings at Partner’s locations in Japan. Regular phone-conferences. Joint meetings

AUTOSAR has Become a Global Standard

AUTOSAR Global Activities 2014-10-22 4

Europe: 91

Legend

Core Partner

Premium Partner

Development Partner

Associate Partner

America: 27

Asia: 67

Africa: 1

Page 4: Global Activities - AUTOSAR€¦ · Vector Regional Work Package in Japan Organization Face to face meetings at Partner’s locations in Japan. Regular phone-conferences. Joint meetings

AUTOSAR Global Activities 2014-10-22 5

Motivation to adapt the AUTOSAR Organization

Foster AUTOSAR as a global standard means:

Make the participation for partners in the different

regions more attractive:

Make F2F-Meetings easier

Cover local / regional requirements (e.g.

provide specific configuration, guidelines…)

Motivate our regional partners to join and

support the standardization process

Avoid the creation of variants of the standard in

the regions

Consider the different distribution of partnership

contracts in the regions

Page 5: Global Activities - AUTOSAR€¦ · Vector Regional Work Package in Japan Organization Face to face meetings at Partner’s locations in Japan. Regular phone-conferences. Joint meetings

2014-10-22 6

Overview

AUTOSAR Global Activities

Motivation

Organizational Adaptations

Examples

Page 6: Global Activities - AUTOSAR€¦ · Vector Regional Work Package in Japan Organization Face to face meetings at Partner’s locations in Japan. Regular phone-conferences. Joint meetings

Organizational Adaptations

AUTOSAR Global Activities 2014-10-22 7

Regional Work

Package

Regional Work Package

Focus on “developing and improving AUTOSAR” like all other work

packages

Any AUTOSAR Premium or Development partner may join the work-

package

AUTOSAR Associate Partners can apply for changing their

partnership type.

FTE contributions are accepted as FTE contributions to any other

work package

AUTOSAR User Groups

Focus on “using AUTOSAR”

Any AUTOSAR Premium, Development or Associate partner may

join the user-group.

At least one AUTOSAR Core, Premium or Development Partner

has to join the user-group in order to take over the speaker role.

User Groups may partly use the AUTOSAR infrastructure

User Groups are self organized

WP-R-xx Flag

AUTOSAR User Group

UG-xx Icon

Page 7: Global Activities - AUTOSAR€¦ · Vector Regional Work Package in Japan Organization Face to face meetings at Partner’s locations in Japan. Regular phone-conferences. Joint meetings

AUTOSAR Organization

AUTOSAR Global Activities 2014-10-22 8

Su

pp

ort

Fu

ncti

on

s

Project Organization

Ad

min

istr

ati

on

Technical Manager

Quality Manager

Change Manager

Release Manager

Technical Office

Quality Assurance

Legal

Team

Communication

Team

Executive Board

Project Leader

Team

Work

Packages

Steering

Committee

Core Partner Lead and WP Subcontractor Regional WPs CP, PP and DP:

User Group

AUTOSAR

User Groups

CP, PP, DP and AP:

Project Management

Specification

Management

Engineering

Page 8: Global Activities - AUTOSAR€¦ · Vector Regional Work Package in Japan Organization Face to face meetings at Partner’s locations in Japan. Regular phone-conferences. Joint meetings

Cross-product concerns

Work Package Structure

Functional Safety

WP-A3

VFB and RTE

WP-A1

COM Stack

WP-A2

Timing Analysis

WP-M1

Diagnostics

WP-A4

MCAL

WP-A5

Application Interfaces

WP-I

WP-I-BODY Body and Comfort

WP-I-ENGINE Powertrain Engine

WP-I-TRSM Powertrain Transmission

WP-I-CHASSIS Chassis Control

WP-I-OCSAFE Occupant and Pedestrian Safety

Software Architecture

WP-A

WP-A-LIB

Libraries

WP-A-PRODERR

Production Errors

Methodology and Templates

WP-M

WP-M-METH Methodology

WP-M-GST Generic Structure Template

WP-M-SWCT Software Component Template

WP-M-SYST System Template ECU Configuration

WP-M-TIMEX Timing Extensions

Legend:

Lead Work Package

Work Package

WP-x.y

Subgroups

Validation

WP-X-VAL

Security

WP-X-SEC

Project Leader Team

Acceptance Test

WP-T

2014-10-22 AUTOSAR Global Activities 9

Japan

WP-R-JP

Subgroups

Page 9: Global Activities - AUTOSAR€¦ · Vector Regional Work Package in Japan Organization Face to face meetings at Partner’s locations in Japan. Regular phone-conferences. Joint meetings

2014-10-22 10

Overview

AUTOSAR Global Activities

Motivation

Organizational Adaptations

Examples

Page 10: Global Activities - AUTOSAR€¦ · Vector Regional Work Package in Japan Organization Face to face meetings at Partner’s locations in Japan. Regular phone-conferences. Joint meetings

AUTOSAR Global Activities 2014-10-22 11

These Partners have already

confirmed their participation:

Toyota (Coach)

Denso (Speaker)

Honda

Bosch

Mazda

JTEKT

Renesas

Panasonic

Vector

Regional Work Package in Japan

Organization

Face to face meetings at

Partner’s locations in Japan.

Regular phone-conferences.

Joint meetings and online

meetings with other WPs.

Structure

Main work-package, sub-

groups and concept groups

Content and responsibilities

Bridging function to JasPar

New concepts, document

ownership, requirements

Expert discussions, reviews,

validation

Explanatory content, guidelines

Acceptance tests …

Japan

WP-R-JP

Page 11: Global Activities - AUTOSAR€¦ · Vector Regional Work Package in Japan Organization Face to face meetings at Partner’s locations in Japan. Regular phone-conferences. Joint meetings

User Group in India is Pilot and Role Model

AUTOSAR Global Activities 2014-10-22 12

These Partners have already

confirmed their participation:

GM (Speaker)

Bosch, ETAS

Brose India Automotive

Continental Automotive

Components (India)

Dassault System

Infosys

Jasmin Infotech

KPIT

L&T

Mahindra

Mentor Graphics

Tata Elxsi,

Tata Consultancy Services

Visteon Technical

and Services center

Volvo

Organization / Structure

Pilot and role model

Self organized

Face to face meetings at

Partner’s locations in India

Speaker reports to PL

Content and responsibilities

Tool interoperability

Content of exchange artifacts

like

ECU extract,

SWC templates

Guidelines, e.g. Migration

Support Documentation

Sample Configurations, Sample

Implementations

Acceptance test

implementations

Demonstrator

India

UG-IN

Page 12: Global Activities - AUTOSAR€¦ · Vector Regional Work Package in Japan Organization Face to face meetings at Partner’s locations in Japan. Regular phone-conferences. Joint meetings

User Group in China is a Fast Follower

AUTOSAR Global Activities 2014-10-22 13

These Partners have already

confirmed their participation:

Bosch (Speaker)

Great Wall

DFM

ETAS

Tongji

University *)

Shanghai

Jiao Tong

University *)

Organization / Structure

Face to face meetings at

Partner’s locations in China.

Self organized

Sub teams for BMS, VCU,

Motor Controller and System

Integration are founded

Content and responsibilities

Guideline “How to Start”

Sample configurations,

implementation and process

(E-Cart Project)

China

UG-CN

*) Application in progress

Page 13: Global Activities - AUTOSAR€¦ · Vector Regional Work Package in Japan Organization Face to face meetings at Partner’s locations in Japan. Regular phone-conferences. Joint meetings

And what about the US …

AUTOSAR Global Activities 2014-10-22 14

WP-R-US (?)

We want you !

Potential Topics

Car 2 Car

OBD

Safety / Security

Aren‘t there enough topics for a regional work package in the US?

Page 14: Global Activities - AUTOSAR€¦ · Vector Regional Work Package in Japan Organization Face to face meetings at Partner’s locations in Japan. Regular phone-conferences. Joint meetings

AUTOSAR Global Activities 2014-10-22 15

Thank you very much

for your attention!