![Page 1: GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 5 of 12 Subsystem Acceptance 1 GLAST Large Area Telescope Pre-Environmental.](https://reader036.fdocuments.us/reader036/viewer/2022072006/56649d1a5503460f949f0270/html5/thumbnails/1.jpg)
Subsystem Acceptance 1
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review
Presentation 5 of 12
GLAST Large Area TelescopeGLAST Large Area Telescope
Pre-Environmental Test Review
Subsystem Acceptance Program
Pat HascallSystems Engineering
Stanford Linear Accelerator Center
Gamma-ray Large Gamma-ray Large Area Space Area Space TelescopeTelescope
![Page 2: GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 5 of 12 Subsystem Acceptance 1 GLAST Large Area Telescope Pre-Environmental.](https://reader036.fdocuments.us/reader036/viewer/2022072006/56649d1a5503460f949f0270/html5/thumbnails/2.jpg)
Subsystem Acceptance 2
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review
Presentation 5 of 12
LAT Test Results RoadmapLAT Test Results Roadmap
• Describe the Subsystem End Item Data Package (EIDP) process
• Summarize the Subsystem test program
![Page 3: GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 5 of 12 Subsystem Acceptance 1 GLAST Large Area Telescope Pre-Environmental.](https://reader036.fdocuments.us/reader036/viewer/2022072006/56649d1a5503460f949f0270/html5/thumbnails/3.jpg)
Subsystem Acceptance 3
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review
Presentation 5 of 12
Subsystem EIDP ProcessSubsystem EIDP Process
• The individual subsystem boxes were documented and delivered using an End Item Data Package process– Contents of the package defined by Systems Engineering
and I&T, to include test results and NCRs to be transferred to the LAT level
• Each subsystem box has a web page containing links to the relevant Acceptance Test Data Packages– Links to the ATDP web pages are available on the PreShip
Review page:• http://www.slac.stanford.edu/exp/glast/flight/rdm/livepreship/lat_preship_review.html
• LAT Project Management, SE, and QA have accepted all subsystems
![Page 4: GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 5 of 12 Subsystem Acceptance 1 GLAST Large Area Telescope Pre-Environmental.](https://reader036.fdocuments.us/reader036/viewer/2022072006/56649d1a5503460f949f0270/html5/thumbnails/4.jpg)
Subsystem Acceptance 4
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review
Presentation 5 of 12
Subsystem WebsitesSubsystem Websites
• ACD– http://glast.gsfc.nasa.gov/acd/
• Calorimeter– http://heseweb.nrl.navy.mil/glast/
• Electronics and DAQ– http://www-glast.slac.stanford.edu/Elec_DAQ/Elec_DAQ_home.htm
• Mechanical– http://www-glast.slac.stanford.edu/MechanicalSystems/MechHome.htm
• Tracker– http://www-glast.slac.stanford.edu/Tracker-Hardware/default.htm
![Page 5: GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 5 of 12 Subsystem Acceptance 1 GLAST Large Area Telescope Pre-Environmental.](https://reader036.fdocuments.us/reader036/viewer/2022072006/56649d1a5503460f949f0270/html5/thumbnails/5.jpg)
Subsystem Acceptance 5
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review
Presentation 5 of 12
Subsystem Environmental Test SummarySubsystem Environmental Test Summary
MP
Sta
tic
-Eq
uiv
Ac
ce
l
Sin
us
iod
al
Vib
rati
on
Ra
nd
om
Vib
rati
on
Ac
ou
sti
c
Sh
oc
k
Fo
ur
TV
AC
Cy
cle
s
Th
erm
al
Ba
lan
ce
Ho
t/C
old
Tu
rn O
n
RE
10
1
RE
10
2
CE
10
2
CE
CM
CS
CM
CS
10
2
CS
06
RS
10
1
RS
10
3
Ma
ss
Pro
pe
rtie
s
√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √√ √ √ √ √ √ √ √
(c) √ √ √ (d) √ √ √ √ √ √ √ √ √ √ √
√ √ √ √ √ √ √ √(e) √ √(f) √ √ √ √ √ √√ √ √ √ √ √ √ √
√(g) √A √A √
√A √A √A √(h) √
P (i) √ √ √ P √
√(g) P(j) P(j) P P P P P P P P P P P P P P
P P
EMIStruc Loads Thermal
ComponentTracker
Proto-Flight (a)
Flight
CalorimeterProto-FlightFlight
ACDProto-Flight (b)
ELXQualFlight
Grid BoxProto-Flight
X-LAT PlateProto-Flight
RadiatorProto-Flight
LATDeferred to Obs
![Page 6: GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 5 of 12 Subsystem Acceptance 1 GLAST Large Area Telescope Pre-Environmental.](https://reader036.fdocuments.us/reader036/viewer/2022072006/56649d1a5503460f949f0270/html5/thumbnails/6.jpg)
Subsystem Acceptance 6
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review
Presentation 5 of 12
Subsystem Environmental Test SummarySubsystem Environmental Test Summary
√ Complete
√A Complete. Design margins are sufficient to allow qual by analysis.
P Planned activity
Not required
(a) TKR EMI qual test performed on FM2.
(b) Performed EMI test on qual BEA. ACD-level EMI test waived per LAT-XR-06733.
(c) Performed at lower level of assembly.
(d) Thermal balance waived per LAT-XR-06769.
(e) GASU and TEM/TPS exceeded RE102 spec. See waivers LAT-XR-08171 and LAT-XR-08173.
(f) HCB VCHP feed exceeded CECM spec. See waiver CCR 433-0374.
(g) Performed on grid #2 to qual levels.
(h) Four thermal cycles at ambient pressure.
(i) Perform pull test and acoustic test in lieu of high level sine vibe. Performed tap test in lieu of low level sine vibe. See deviation CCR 433-0368.
(j) W/O Radiators installed. See deviation CCR 433-0368.
LEGEND:
![Page 7: GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 5 of 12 Subsystem Acceptance 1 GLAST Large Area Telescope Pre-Environmental.](https://reader036.fdocuments.us/reader036/viewer/2022072006/56649d1a5503460f949f0270/html5/thumbnails/7.jpg)
Subsystem Acceptance 7
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review
Presentation 5 of 12
Subsystem Waivers (1/2)Subsystem Waivers (1/2)
CR # Title Description Status
LAT-XR-07058-01
ACD Tile Shell Assembly Interior Volume Stay Clear Violation Interior stay-clear violation of 0.7mm. Approved
LAT-XR-07260-01
ACD Tile Shell Assembly Interior Volume Stay Clear Violation The bottom tile edge violates the stay-clear by 0.5mm. Approved
LAT-XR-07261-01
ACD Outer Volume Stay Clear Violations MLI stay-clear violation of 14mm. Approved
LAT-XR-07263-01
ACD Base Frame Assembly Interior Volume Stay Clear Violation Interior stay-clear violation of 0.4mm. Approved
LAT-XR-06769-01
ACD Thermal Balance Test Eliminate the ACD thermal balance test. Approved
LAT-XR-07833-02
Mass per Unit Area of ACD MMS/TB
To meet the updated orbital debris model, the as-built ACD Micrometeoroid Shield (MMS) and Thermal Blanket (TB) mass per unit area is 0.39 g/cm^2. The requirement is 0.32 g/cm^2. Approved
LAT-XR-07340-01
Tracker Tower Level Hot/Cold Power Cycle
The Tracker tower level hot/cold turn-on sequence test was not performed on tower’s 7, 9, 10, 12 and 13. Approved
![Page 8: GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 5 of 12 Subsystem Acceptance 1 GLAST Large Area Telescope Pre-Environmental.](https://reader036.fdocuments.us/reader036/viewer/2022072006/56649d1a5503460f949f0270/html5/thumbnails/8.jpg)
Subsystem Acceptance 8
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review
Presentation 5 of 12
Subsystem Waivers (2/2)Subsystem Waivers (2/2)
CR # Title Description Status
LAT-XR-08173-01
TEM/TPS EMI Test RE102 Exceedance
The TEM/TPS exceeded the GPS notch by 14 dBuV and the S-band notch by 2 dBuV. The requirement did not include shielding from the EMI skirt and X-LAT plate. The additional shielding provides a minimum 30dB attenuation. Approved
LAT-XR-08171-01
GASU EMI Test RE102 Exceedance Waiver
The GASU exceeded the GPS notch by 5 dBuV and the S-band notch by 9 dBuV. The requirement did not include shielding from the EMI skirt and X-LAT plate. The additional shielding provides a minimum 30dB attenuation. Approved
![Page 9: GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 5 of 12 Subsystem Acceptance 1 GLAST Large Area Telescope Pre-Environmental.](https://reader036.fdocuments.us/reader036/viewer/2022072006/56649d1a5503460f949f0270/html5/thumbnails/9.jpg)
Subsystem Acceptance 9
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review
Presentation 5 of 12
SummarySummary
• LAT subsystems were well tested prior to integration• Liens from those subsystem tests have been promoted to LAT
level NCRs where appropriate• Ready to go to environmental test