    KEY: A . The main contractor must calculate the load bearing of the slabin the area indicated for back propping (if required) and confirm in

    B . Due to the distance of reach for placing the chiller the crane will require a large footprint area, this may result in road closure.

    FALCON TOWER - Ground Level Chiller Lift & Shift

    NOT TO SCALE

    1. FINAL CHILLER LOCATION

    2. ANCHOR POINT REFERANCE

    3. TIRFOR ANCHOR POINTS

    5. CHILLER INITIAL MOVEMENTS

    NOTES:

    writing the calculation.(Area F)

    6. MOBILE PLANT

    4. MOVEMENT DIRECTION

    (TBC)

    7. MOBILE CRANE

    A

    A B C

    E

    F

    D

    CRANE

    CRANE