KEY: A . The main contractor must calculate the load bearing of the slabin the area indicated for back propping (if required) and confirm in
B . Due to the distance of reach for placing the chiller the crane will require a large footprint area, this may result in road closure.
FALCON TOWER - Ground Level Chiller Lift & Shift
NOT TO SCALE
1. FINAL CHILLER LOCATION
2. ANCHOR POINT REFERANCE
3. TIRFOR ANCHOR POINTS
5. CHILLER INITIAL MOVEMENTS
NOTES:
writing the calculation.(Area F)
6. MOBILE PLANT
4. MOVEMENT DIRECTION
(TBC)
7. MOBILE CRANE
A
A B C
E
F
D
CRANE
CRANE