Doing it right from start . . . . . .
Abhishek Singh Petro IT Ltd.
GIS based Data Management System for New Pipeline Construction
![Page 2: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/2.jpg)
Agenda
What is an integrated GIS based solution to track and archive new construction ?
How does a CMS help projects and operations teams ? A real life study of such a deployment
The benefits to team by implementing a GIS enabled web based CMS
![Page 3: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/3.jpg)
What Will You Learn
Using a GIS based solution for construction management and material delivery How GIS based systems can be used for project quality assurance
Traceability during new construction and after How a GIS based CMS helps in regulatory and design compliance How GIS supports the integrity of historical record-keeping
![Page 4: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/4.jpg)
Integrated GIS Based Solution
Pre Construction During Construction
Land Management & Asset Mapping
Alignment Sheets
Engineering Records
Construction Management
Project Certification Management
Material Management
Work Flows
Design Compliance/QA/Traceability
![Page 5: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/5.jpg)
A Case Study…
Pipeline Owner – Indian Oil Corporation Limited
Diameter – 18/14/12/10 Pipeline Length – 670 Miles
Pipeline Contractors – 2
Number Of States – 3
Stations – 8
Districts – 16
Crossings – 1144
Number Of Forests – 590
![Page 6: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/6.jpg)
Project Challenges
Environmental clearances
Meeting Design Compliance Requirement
Traceability of material and work
Quality Assurance of Material and installation
Management of data and information
Capturing field data during execution
Project on-time delivery
![Page 7: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/7.jpg)
A Case Study -Project Phases
Phase-I GIS Implementation ( Forest Mapping )
DGPS Survey
Delivery
Pre-construction stage
Phase-II Implementation of CMS
till handover
Asset Mapping
Handover to O/M
During Construction
Phase-III
System handover
Special Queries generation
Post Construction
![Page 8: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/8.jpg)
Execution Strategy
Integration of Pre-construction information over GIS Application
Geo-referencing of Digital Map over route
Integration of Land management systems
Integration of Material management system
Implementation of new construction database Asset mapping for entire pipeline route
Integration of Completion and Certification system
![Page 9: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/9.jpg)
Preparation Of Forest Map From Cadastral Sheets
Merging of Cadastral Sheets to get a Complete Village Map
![Page 10: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/10.jpg)
Forest Information
![Page 11: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/11.jpg)
Forest Information
![Page 12: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/12.jpg)
Land Parcels
![Page 13: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/13.jpg)
Deliverables to Authorities-Phase-I Completion
Shape Files
Linked Permit Documents Digital Map with land Parcels Land Usage details
Boundary Information
![Page 14: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/14.jpg)
GIS Implementation Phase -II
• Spatial Analysis – Query based tools for Disaster Management – Population Density Information – Ground Elevation charting – Focused areas for CSR (Corporate Social Responsibility ) activities – Measurement tools – Risk Analysis Tools – HSE Reporting and alerts
• Data Collection – Ground survey 5 kms on either side of Route with 1 Mtr accuracy – Asset mapping survey (Stations, Police stations, Hospitals etc.) – Kilometer/Weld Joint locations – Pictures/Audio/Videos
• Web based Application – Integration with CMS/MT/PCMS/EDMS/OM/ASM – Alerts and Notification mechanism – Handover of application with editing feature
![Page 15: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/15.jpg)
GIS Based CMS
• CMS = Construction Management System • Monitoring tool for near real time progress monitoring • Aids project teams in
– Design compliance – Schedule compliance – Maintain Quality assurance – As built documentation
• Critical as-built data is archived and stored alongside construction • Aids Operations teams in
– Availability of an electronic as-built database – Data related to each aspect of the pipeline asset including engineering – The ability to add to this core data to create an inter-linked history over time
• Regulatory requirements can be met at the onset of operations itself
![Page 16: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/16.jpg)
Deployment of CMS
• Deployment stage : Project Execution Stage • Goal : To archive data related all the construction activities and
enhance the project monitoring mechanism • Need – Integrated application which brings together information
related to : – Land & Administration (Cadastral information ) – Materials (Free issue , Bought out materials ) – Pipeline Construction (Kilometer , Weld Information etc.) – Documentation (Engineering documentation ) – Certification (Certification management ) – Asset (Disaster Management ) – Operation and Maintenance
![Page 17: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/17.jpg)
Cadastral Information-Land Management System
![Page 18: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/18.jpg)
Cadastral Information
![Page 19: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/19.jpg)
Managing Permits/Validity
![Page 20: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/20.jpg)
Material Tracking
![Page 21: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/21.jpg)
Material Information
PO Link
![Page 22: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/22.jpg)
Tracing Cut Pipes
Pipe Reconciliation Report
![Page 23: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/23.jpg)
Logistics Reporting
![Page 24: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/24.jpg)
Crossing Information
![Page 25: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/25.jpg)
Stations Progress
![Page 26: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/26.jpg)
Stations Progress
![Page 27: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/27.jpg)
Weld Data
Tabular Report
Graphical Report
![Page 28: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/28.jpg)
Statistics
![Page 29: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/29.jpg)
Welder Performance
![Page 30: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/30.jpg)
Validated Pipebook
![Page 31: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/31.jpg)
Weld Chart
![Page 32: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/32.jpg)
NDT Information
![Page 33: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/33.jpg)
Progress Chart
![Page 34: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/34.jpg)
Tie-In Chart
![Page 35: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/35.jpg)
Progress Review Report
![Page 36: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/36.jpg)
S-Curve
![Page 37: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/37.jpg)
Construction Information
![Page 38: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/38.jpg)
Exceptions
![Page 39: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/39.jpg)
Certification Management
![Page 40: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/40.jpg)
Query Based Tools
![Page 41: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/41.jpg)
Content Management
![Page 42: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/42.jpg)
Geo Tagged Information
![Page 43: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/43.jpg)
As-built Information
![Page 44: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/44.jpg)
Asset Mapping -Information
• Block Valve Stations • Test Lead Points • Turning Points • Private Structural Encroachments • Foreign Pipeline • Crossings • Boundary Marker • HOV/MOV • RCP/CP • KM Post • Land-details • Warning Signs • Hospitals • Fire Stations • Police Station • Retail Petrol Pump
Point Of Interest
![Page 45: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/45.jpg)
Asset Mapping -Information
![Page 46: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/46.jpg)
Benefits to teams
Accurate Land Records : Helps identify and eliminate errors in data and parcel boundaries Less land conflicts: Safeguarding the records and prevent land disputes Record updation: History of property transfer as well as division of land parcels can be visualized Historical data overlaid with current land use data illustrates the impact of development within a community,
areas of greatest environmental pressure can be identified
Land and Administration
Information on critical aspects and events that describe a pipeline (Line pipe, facilities, CP etc.)
Analyzing and visualizing of historical HSE data assists in taking a well-informed decision-making Improves Fire Incidence Response
HSE Team
![Page 47: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/47.jpg)
Benefits to teams
End of Day Progress and Compliance Reporting, enabling efficient project monitoring (over the web) Material Reconciliation
Interlinked Documentation
Real time progress monitoring
Smooth handover of data to operations team
Projects Team
Enables knowledge base to help plan effectively and mitigate risks associated with HSE Alert mechanism for accidents or ill health causation and keep teams in a state of better preparedness
Enhance the emergency response system
Detail information of Demographics available through one interface
Operation & Maintenance Team
![Page 48: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/48.jpg)
Summary
GIS based CMS enables companies to save time , energy , paper , cost and many other impact areas
Regulatory requirements can be met at the onset of operations itself
Quick accessibility of data and information A GIS enabled CMS provides visualization and analysis of project activities, and
supports the more productive execution of work:
Construction activities and material delivery, and associated issues are managed and resolved near real-time
GIS visualization provides transparency of all work and issues to stakeholders Post-commissioning hand-off of documentation is seamless and does not
require months of re-engineering paperwork
![Page 49: GIS Data Mgmt Pipeline Construction - Singh](https://reader033.fdocuments.us/reader033/viewer/2022051521/586a2e741a28abab4a8bdde2/html5/thumbnails/49.jpg)
Questions to ask during start of project ?
• How the regulatory requirements can be met using such systems?
• How to make use of available data and information ? • What would projects teams like in terms of critical monitoring
aids • What would we like in terms of information critical for
operations and maintenance teams? • What kind of information could help for future Integrity
management plans? • Set up such a system for capturing this relevant data at the
construction stage itself and then build on it