GIC 05 of 2012- MW Inspection and Jacking Precautions
-
Upload
pankaj-khondge -
Category
Documents
-
view
6 -
download
0
description
Transcript of GIC 05 of 2012- MW Inspection and Jacking Precautions
No.
Sta Effe Ref Purdur DesIn tresMaireqAlspreposits The Jac
GIGO/E&M/G
Subjec
atus: Mand
ective:For
f: GIC 05/2
rpose:To rring wheel
scription: the past t
sulting in fin wheels
quired to bso, it has essures hases as a hreliability.
e following
cking prec
- Adequ- Safety- Before
be opegets b
- Suddefrom lorelease
GENERGIC/No.31/ISS
ct: Inspreplac
datory
rthwith
2011
reduce furl replacem
there havefurther dams and duribe strength
been obsave the sahindrance .
g should b
cautions:
uate clearay devices me the jackiened moreent or its
en lowerinowering. Te valve to
RAL INSUE 01
pectionscements
rther damments.
e been incmages to
ring aircrahened. served in
ame value,to accura
be ensure
ance shoumust be ining procese than 70 mthreads wg of the ja
To reset th slowly lo
NFORM
s durings and jac
mage to air
cidences wheel. Ins
aft walk-ar
the nigh, therefore
ately moni
ed during M
uld be mainstalled anss, it shoumm. When
will shear.acks can che fuse, cl
ower the ja
MATIO
Main wcking.
rcraft whee
of unevensufficientround ma
ht inspectie indicatinitor the co
Main whee
intained arnd the airculd be ensn used wit
cause the lose releaack.
ON CIR
wheel
els/tire, an
n tire weainspectio
ay lead to
tion schedng no requondition o
el replace
round thecraft must
sured that th excess
hydraulicse valve,
RCULA
GIC NDate
nd to ensu
ar and breon procedu
such occ
dules thatuirement oof the tire
ement:
e aircraft bt be in a sthe Extenive extens
c fuse to coperate p
AR
No. 05 oe : 21/0
ure proper
eakage of ures whilecurrences
t the initiof charginand in the
before jacktable cond
nsion Scresion, the s
close and pump and
of 20128/12
r usage of
single Tiee replacems. The sam
ial and finng the tiree assessm
king. dition. ew shouldscrew will
prevent thagain ope
f jacks
e-bolts ment of me are
nal tire es. This ment of
d not either
he jack en
Wh
Durbroparit is
G.LDy.
G.L
heel inspec
- Besidebolts a
- Numernew ware protape.
- The tirMax 22
- Duringmentio
ring Walkoken, the rt is remais expected
L.Gupta . G.M Engg
Raised B
L.Gupta
ction:
es the proand the whrous time
wheel asseroperly ins
re pressur20 Psi. g tire preoned, even
k-around iwheel canining. Onlyd that the
g. (LMM) By
oper seatinheel heat s
es high spemblies frstalled wit
re of the M
ssure insn if minor
inspectionn be dispy one Tie-Main/nose
Da
21/0
ng of the wshields sh
peed tape rom shopth all edg
Main whee
spection icharging
n in transpatched, p-bolt is alle wheel w
ate
08/12
wheel beahould be c
is observ. These h
ges cleanly
el assemb
it is requis require
sits only, provided tlowed mis
with a brok
Ef
Fo
ring and tchecked thrved on thhigh speedy sticking
bly should
uired that ed.
if a Mainthe remainssing per ken Tie-bo
ffectivity
orthwith
the circlip,horoughlyhe sleeve d tapes a
g to the sl
d be ascer
exact ini
n/nose whning bolt wheel.Dur
olt, is repla
A
, the condy. between re alloweleeve. Do
rtained to
itial and f
heel Tie-bis removering nightaced.
Authorized
V.P Engg
dition of th
the bearid providenot remo
be Min 2
final valu
bolt is obsed, ensurt halt insp
d by
g.
he Tie-
ings of ed they ove the
10 Psi-
ues are
served ring no ection,