![Page 1: GHANA’S POWER INFRASTRUCTURE INVESTMENT …...Oil & Gas Sector JUBILEE, TEN AND SANKOFA FIELDS May, 2016 AERIAL EXTENT OF E&P BLOCKS Areas Size (Sq.Km) Area Licensed (%) Area Unlicensed](https://reader035.fdocuments.us/reader035/viewer/2022063011/5fc4b68d2df14d794036ec0a/html5/thumbnails/1.jpg)
MINISTRY OF ENERGY
GHANA’S POWER INFRASTRUCTURE INVESTMENT AND BUSINESS OPPORTUNITIES
BY:
James [email protected]
+233 244 608651
![Page 2: GHANA’S POWER INFRASTRUCTURE INVESTMENT …...Oil & Gas Sector JUBILEE, TEN AND SANKOFA FIELDS May, 2016 AERIAL EXTENT OF E&P BLOCKS Areas Size (Sq.Km) Area Licensed (%) Area Unlicensed](https://reader035.fdocuments.us/reader035/viewer/2022063011/5fc4b68d2df14d794036ec0a/html5/thumbnails/2.jpg)
OUTLINE Demographics & Economic Data of Ghana
Investment Climate
Overview of Power Generation & Demand
Investment Opportunities in Power Sector Value Chain
Investment Opportunities in the Petroleum/Gas Sector
![Page 3: GHANA’S POWER INFRASTRUCTURE INVESTMENT …...Oil & Gas Sector JUBILEE, TEN AND SANKOFA FIELDS May, 2016 AERIAL EXTENT OF E&P BLOCKS Areas Size (Sq.Km) Area Licensed (%) Area Unlicensed](https://reader035.fdocuments.us/reader035/viewer/2022063011/5fc4b68d2df14d794036ec0a/html5/thumbnails/3.jpg)
DEMOGRAPHICS OF GHANALand Area: 238,500 km2
Population: 28.9 million (2017)
Electricity Access: 84 -85% (2018)
Major Export: Cocoa, Gold, Timber, Bauxite, Oil,
Electricity
ECONOMIC DATA
GDP: USD 58.3 billion (2017)
GDP per Capita: USD 2,014 (2017)
GDP Growth Rate: 8.1% annual Change (2017)
Currency: Ghana Cedi trading at about 5.4 Ghs per USD
Inflation: 9.4% in July 2019 (from 9.1% in June 2019)
![Page 4: GHANA’S POWER INFRASTRUCTURE INVESTMENT …...Oil & Gas Sector JUBILEE, TEN AND SANKOFA FIELDS May, 2016 AERIAL EXTENT OF E&P BLOCKS Areas Size (Sq.Km) Area Licensed (%) Area Unlicensed](https://reader035.fdocuments.us/reader035/viewer/2022063011/5fc4b68d2df14d794036ec0a/html5/thumbnails/4.jpg)
Investment Climate Political Stability
Legal and Institutional Framework for Players in the Energy Sector
The Rule of Law
Free and Independent Press
Transparency and Accountability
Commitment to fight Corruption and Crime
Vibrant Private Sector
Strong Civil Society
Attractive Incentives to All Investors (GIPC Act)
![Page 5: GHANA’S POWER INFRASTRUCTURE INVESTMENT …...Oil & Gas Sector JUBILEE, TEN AND SANKOFA FIELDS May, 2016 AERIAL EXTENT OF E&P BLOCKS Areas Size (Sq.Km) Area Licensed (%) Area Unlicensed](https://reader035.fdocuments.us/reader035/viewer/2022063011/5fc4b68d2df14d794036ec0a/html5/thumbnails/5.jpg)
Overview of Power Generation & Demand
68%
8%
9%
5%3%
3% 4%
ACTUAL ENERGY CONSUMPTION 2017
ECG
NED
Mines
VALCO
Export
Direct Customers
Losses
14,177GWH
Hydro36%
Thermal64% Solar
0%
DEPENDABLE GENERATION MIXInstalled Capacity
4,700 MW
Available Capacity
3, 500 MW
Projected 2019 PeakDemand
2,700 MW Of the total capacity, GRIDCo can effectively call on/ dispatch only about half to meet current demand. The highest system demand in 2018 is 2,496 MWrecorded on October 26, 2018.
![Page 6: GHANA’S POWER INFRASTRUCTURE INVESTMENT …...Oil & Gas Sector JUBILEE, TEN AND SANKOFA FIELDS May, 2016 AERIAL EXTENT OF E&P BLOCKS Areas Size (Sq.Km) Area Licensed (%) Area Unlicensed](https://reader035.fdocuments.us/reader035/viewer/2022063011/5fc4b68d2df14d794036ec0a/html5/thumbnails/6.jpg)
![Page 7: GHANA’S POWER INFRASTRUCTURE INVESTMENT …...Oil & Gas Sector JUBILEE, TEN AND SANKOFA FIELDS May, 2016 AERIAL EXTENT OF E&P BLOCKS Areas Size (Sq.Km) Area Licensed (%) Area Unlicensed](https://reader035.fdocuments.us/reader035/viewer/2022063011/5fc4b68d2df14d794036ec0a/html5/thumbnails/7.jpg)
Investment Opportunities-Generation
New investments in power generation capacity beyond 2022
Collaboration and investment in the expansion/rehabilitation of existing plants (VRA-Hydro&Thermal Assets)
Ghana is well placed in the sub-region to generate power for export into the land-locked areas of the region. Investors may wish to site their plants in Ghana to take advantage of the opportunity offered by GoG policy of being a net exporter of power into the sub-region.
![Page 8: GHANA’S POWER INFRASTRUCTURE INVESTMENT …...Oil & Gas Sector JUBILEE, TEN AND SANKOFA FIELDS May, 2016 AERIAL EXTENT OF E&P BLOCKS Areas Size (Sq.Km) Area Licensed (%) Area Unlicensed](https://reader035.fdocuments.us/reader035/viewer/2022063011/5fc4b68d2df14d794036ec0a/html5/thumbnails/8.jpg)
8
NATIONAL GRID SYSTEM• Transmission Network: 5,000 km• Voltage Levels : 69, 161, 225, 330 kV• 68 Substations• Interconnection (WAPP):
Burkina Faso, Togo, Cote D’ivoire
![Page 9: GHANA’S POWER INFRASTRUCTURE INVESTMENT …...Oil & Gas Sector JUBILEE, TEN AND SANKOFA FIELDS May, 2016 AERIAL EXTENT OF E&P BLOCKS Areas Size (Sq.Km) Area Licensed (%) Area Unlicensed](https://reader035.fdocuments.us/reader035/viewer/2022063011/5fc4b68d2df14d794036ec0a/html5/thumbnails/9.jpg)
INVESTMENT IN TRANSMISSION INFRASTRUCTURE DEVELOPMENTInvestment requirements by GRIDCo in Transmission infrastructure between 2017 – 2022 alone was estimated at US$634 million in the areas of construction of new 161kV and 330kV switching stations, substation upgrades, transmission line extensions and upgrades, etc.
• 161kV Takoradi – Tarkwa – Prestea Line Upgrade
• 161kV Aboadze – Takoradi Line Upgrade
Investments, in collaboration with West Africa Power Pool (WAPP), to provide the transmission facilities for power exports into the sub-region. ( GS E&C of Korea is developing the WAPP InterzonalTransmission Hub project from Prestea-Kumasi)
![Page 10: GHANA’S POWER INFRASTRUCTURE INVESTMENT …...Oil & Gas Sector JUBILEE, TEN AND SANKOFA FIELDS May, 2016 AERIAL EXTENT OF E&P BLOCKS Areas Size (Sq.Km) Area Licensed (%) Area Unlicensed](https://reader035.fdocuments.us/reader035/viewer/2022063011/5fc4b68d2df14d794036ec0a/html5/thumbnails/10.jpg)
INVESTMENT OPPORTUNITIES IN POWER PARK/ENCLAVE DEVELOPMENT A very critical system stability and security consideration by GRIDCo, the power system operator, is to have thermal power generation sites not restricted to only the current locations or enclaves of Tema and Takoradi, which are now very heavily developed.
The consideration is, therefore, to encourage increasing the number of power generation enclaves to effectively improve system reliability (stability and security).
Investments opportunities therefore exist for the Domunli Enclave Development (in the Western Region) and DAWA (in the Greater Accra Region).
![Page 11: GHANA’S POWER INFRASTRUCTURE INVESTMENT …...Oil & Gas Sector JUBILEE, TEN AND SANKOFA FIELDS May, 2016 AERIAL EXTENT OF E&P BLOCKS Areas Size (Sq.Km) Area Licensed (%) Area Unlicensed](https://reader035.fdocuments.us/reader035/viewer/2022063011/5fc4b68d2df14d794036ec0a/html5/thumbnails/11.jpg)
INVESTMENT IN DISTRIBUTION AND SALE OF ELECTRICITYElectricity Company of Ghana (ECG) needs investments in the provision Network Capacity expansions/ line extensions projects, Technical Loss Reduction/ Voltage Improvement Projects, Commercial / Revenue Improvement projects and Institutional Development projects between 2017 – 2021 was estimated at US$770 million
Northern Electricity Distribution Company (NEDCo) requires similar investments in the areas of Commercial Improvement projects, Technical Loss Reduction/ Capacity improvements, Technical Assistance, Reliability improvement Projects, etc. between 2017 and 2021 was estimated at US$282 million.
![Page 12: GHANA’S POWER INFRASTRUCTURE INVESTMENT …...Oil & Gas Sector JUBILEE, TEN AND SANKOFA FIELDS May, 2016 AERIAL EXTENT OF E&P BLOCKS Areas Size (Sq.Km) Area Licensed (%) Area Unlicensed](https://reader035.fdocuments.us/reader035/viewer/2022063011/5fc4b68d2df14d794036ec0a/html5/thumbnails/12.jpg)
INVESTMENT IN RURAL ELECTRIFICATION TO PROVIDE WIDER ACCESS TO ELECTRICITYGhana’s current measure of electricity access to its people is a little over 84% (based on population). GoG policy is to cover or provide ‘Universal Access’ (up to 90% or better) of electricity to its people by 2020.
The nation is, therefore, in the “last mile” of extending the grid across the country. Areas yet to be covered are mostly in “Island” communities and in area very expensive to reach with the national grid. 0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%ACCESS TREND
![Page 13: GHANA’S POWER INFRASTRUCTURE INVESTMENT …...Oil & Gas Sector JUBILEE, TEN AND SANKOFA FIELDS May, 2016 AERIAL EXTENT OF E&P BLOCKS Areas Size (Sq.Km) Area Licensed (%) Area Unlicensed](https://reader035.fdocuments.us/reader035/viewer/2022063011/5fc4b68d2df14d794036ec0a/html5/thumbnails/13.jpg)
Renewable Energy Policy Objectives
• Achieve universal access to electricity by 2020
• Increase the renewable energy supply in national energy mix to 10% by 2030
• Solar-target is 250 MW• Mini Hydros• Waste to Energy-want to make our cities very clean
![Page 14: GHANA’S POWER INFRASTRUCTURE INVESTMENT …...Oil & Gas Sector JUBILEE, TEN AND SANKOFA FIELDS May, 2016 AERIAL EXTENT OF E&P BLOCKS Areas Size (Sq.Km) Area Licensed (%) Area Unlicensed](https://reader035.fdocuments.us/reader035/viewer/2022063011/5fc4b68d2df14d794036ec0a/html5/thumbnails/14.jpg)
RENEWABLE ENERGY DEVELOPMENT PROJECTSThere are over 200 islands and more than 2000 communities in 23
districts along the Volta lake that cannot be immediately connected to the
national grid by 2020. The objective is to provide such communities with
decentralized energy solutions;
RE based Mini-grid with diesel hybrid;
Stand alone RE systems (wind, solar, biomass etc);
Solar Lanterns with mobile phone charging facilities until such a time
that grid electricity is extended.
![Page 15: GHANA’S POWER INFRASTRUCTURE INVESTMENT …...Oil & Gas Sector JUBILEE, TEN AND SANKOFA FIELDS May, 2016 AERIAL EXTENT OF E&P BLOCKS Areas Size (Sq.Km) Area Licensed (%) Area Unlicensed](https://reader035.fdocuments.us/reader035/viewer/2022063011/5fc4b68d2df14d794036ec0a/html5/thumbnails/15.jpg)
P3. Mini – Grid RE Electrification ProgramKUDORKOPE
ATIGAGORME
AGLAKOPE
PEDIATORKOPE
Wayokorpe
There are over 2,000 communities along the Volta lake in 23 Districts with populations above 1000 inhabitants that are not likely to be immediately connected to national grid.
![Page 16: GHANA’S POWER INFRASTRUCTURE INVESTMENT …...Oil & Gas Sector JUBILEE, TEN AND SANKOFA FIELDS May, 2016 AERIAL EXTENT OF E&P BLOCKS Areas Size (Sq.Km) Area Licensed (%) Area Unlicensed](https://reader035.fdocuments.us/reader035/viewer/2022063011/5fc4b68d2df14d794036ec0a/html5/thumbnails/16.jpg)
Investors may also look forward and plan to participate in the sale and purchase of the Energy sector bonds that GoG has issued help sector utilities clean their books and allow them to effectively plan, modernize their systems and operate as prudent operators.
The GoG issued two series of bonds totalling GHS 6.5 billion, which were securitized by a portion of the ESLA revenues and is actively trading in the secondary market.
Increase in the ESLA levies implies GoG can raise more revenue to support additional issuance of the Bond. The target is to reach GHS15 billion (aprox US$3 bn)
Energy sector bonds
![Page 17: GHANA’S POWER INFRASTRUCTURE INVESTMENT …...Oil & Gas Sector JUBILEE, TEN AND SANKOFA FIELDS May, 2016 AERIAL EXTENT OF E&P BLOCKS Areas Size (Sq.Km) Area Licensed (%) Area Unlicensed](https://reader035.fdocuments.us/reader035/viewer/2022063011/5fc4b68d2df14d794036ec0a/html5/thumbnails/17.jpg)
INVESTMENT OPPORTUNITIESOil & Gas Sector
![Page 18: GHANA’S POWER INFRASTRUCTURE INVESTMENT …...Oil & Gas Sector JUBILEE, TEN AND SANKOFA FIELDS May, 2016 AERIAL EXTENT OF E&P BLOCKS Areas Size (Sq.Km) Area Licensed (%) Area Unlicensed](https://reader035.fdocuments.us/reader035/viewer/2022063011/5fc4b68d2df14d794036ec0a/html5/thumbnails/18.jpg)
JUBILEE, TEN AND SANKOFA FIELDS
May, 2016
![Page 19: GHANA’S POWER INFRASTRUCTURE INVESTMENT …...Oil & Gas Sector JUBILEE, TEN AND SANKOFA FIELDS May, 2016 AERIAL EXTENT OF E&P BLOCKS Areas Size (Sq.Km) Area Licensed (%) Area Unlicensed](https://reader035.fdocuments.us/reader035/viewer/2022063011/5fc4b68d2df14d794036ec0a/html5/thumbnails/19.jpg)
AERIAL EXTENT OF E&P BLOCKSAreas Size
(Sq.Km)Area
Licensed(%) Area
UnlicensedVoltaian Basin (Inland)
103,600 0 0 103,600
Onshore (extensionsof offshore basins)
3,500 0 0 3,500
Shelf Region (0 –200m)
23,000 6,650 29.0 16,350
Deepwater (200-3000m)
27,000 18,000 66.5 9,000
Total Area 157,000 24,650 16.0 132,450
![Page 20: GHANA’S POWER INFRASTRUCTURE INVESTMENT …...Oil & Gas Sector JUBILEE, TEN AND SANKOFA FIELDS May, 2016 AERIAL EXTENT OF E&P BLOCKS Areas Size (Sq.Km) Area Licensed (%) Area Unlicensed](https://reader035.fdocuments.us/reader035/viewer/2022063011/5fc4b68d2df14d794036ec0a/html5/thumbnails/20.jpg)
Unit Area
DW/TCTP
Dzata
Unit Area
AboadzeSanzule
Axim
GNGC
111 km
GNGC 20”
AkasaMahogany
Teak
Jubilee
Odum
Ebony
S. Tano
WCTP
3
N. Tano
eniOCTP11A
2-2ASankofa
SKEGye Nyame
ACCRA
Tema
Saltpond
W Tano
Atuabo
Ntonne
EnyenraTweneboa
DWTano
0 50 100 km
Takoradi
TOGO
NATURAL GAS TRANSMISSION SYSTEM
Almond
Cob
Pecan N
PecanHickory
Beech
Paradise
CÔTED’IVOIRE
May, 2016
![Page 21: GHANA’S POWER INFRASTRUCTURE INVESTMENT …...Oil & Gas Sector JUBILEE, TEN AND SANKOFA FIELDS May, 2016 AERIAL EXTENT OF E&P BLOCKS Areas Size (Sq.Km) Area Licensed (%) Area Unlicensed](https://reader035.fdocuments.us/reader035/viewer/2022063011/5fc4b68d2df14d794036ec0a/html5/thumbnails/21.jpg)
Gas-to-Power Projects
21
![Page 22: GHANA’S POWER INFRASTRUCTURE INVESTMENT …...Oil & Gas Sector JUBILEE, TEN AND SANKOFA FIELDS May, 2016 AERIAL EXTENT OF E&P BLOCKS Areas Size (Sq.Km) Area Licensed (%) Area Unlicensed](https://reader035.fdocuments.us/reader035/viewer/2022063011/5fc4b68d2df14d794036ec0a/html5/thumbnails/22.jpg)
1. Large unallocated acreages including the extended continental shelf
2. Data acquisition projects
3. Farming into existing petroleum licenses
4. Voltaian Basin enhancement project
5. Significant prospects in the deepwater de-risked Tano Basin
6. Development of gas infrastructure
7. Development of petrochemical industry/hub-essentially to refine crude for export
and also to develop associated petrol chemical business
8. Expansion of existing refinery to increase capacity from 45K to 145K Barrels per
Stream Day (BPSD)
Opportunities
![Page 23: GHANA’S POWER INFRASTRUCTURE INVESTMENT …...Oil & Gas Sector JUBILEE, TEN AND SANKOFA FIELDS May, 2016 AERIAL EXTENT OF E&P BLOCKS Areas Size (Sq.Km) Area Licensed (%) Area Unlicensed](https://reader035.fdocuments.us/reader035/viewer/2022063011/5fc4b68d2df14d794036ec0a/html5/thumbnails/23.jpg)