    Activity

    ID Activity Description Duration Actual Start

    GGIC ARJA, BAGH, AZAD KASHMIR 442

    MOBILIZATION & DISMANTLING WORKS 442

    MO 100 START MILE STONE 0 24-Mar-09

    MO 110 MOBILIZATION ON SITE 10 30-Apr-09

    MO 120 LOCAL AGREEMENT WITH SMC. 2 21-Mar-09

    MO 130 DEVELOPMENT OF SITE OFFICE 30 11-May-09

    MO 150 TEMPORARY SCHOOL SET UP 30 9-Apr-09

    MO 180 DISMANTLING EXISTING STRUCTURE 30 10-Apr-09

    MO 190 REMOVAL OF EXISTING TENTS & SHIFTING 4 10-Apr-09

    MO 210 MAINTAIN TEMPORARY SCHOOL SETUP 0 1-Jun-09

    MO 220 MAINTENANCE OF EMPLOYER OFFICE 0 20-Jul-09

    LEVEL 1 252

    STRUCTURAL WORKS 137

    ST 10 POURING CONC IN COLUMNS 5 3-Oct-09

    ST 11 STEEL WORK OF SHEAR & RETAINING WALLS 12 24-Aug-09ST 13 CONCRETE POURING OF SHEAR & RETAINING WALLS 14 9-Sep-09

    ST 14 FORMWORK OF BEAMS & SLAB 8

    ST 15 STEEL WORK OF BEAMS & SLAB 7

    ST 16 CONCRETE POUR. OF BEAMS & SLAB (L-1 ROOF SLAB) 4

    ST 19 STEEL WORKS FOR GRADE SLAB 3

    ST 20 POURING OF CONCRETE FOR GRADE SLAB 3

    ST 38 SRTRUCTURAL FILL, LEVELLING & DRESSING 5

    ST 81 STAIR - STEEL WORK 5

    ST 91 STAIR - CONCRETE POURING 4

    STL1 100 EXCAVATION, CUTTING , LEVELLING & DRESSING 8 11-Jul-09

    STL1 111 DPC HORIZONTAL & VERTICAL 4

    STL1 140 LEAN CONCRETE OF FOOTINGS 5 14-Aug-09

    STL1 150 STEEL WORK IN FOOTINGS 8 21-Aug-09

    STL1 170 POURING CONCRETE IN FOOTINGS (RAFT ) 8 2-Sep-09

    STL1 180 STEEL WORKS FOR COLUMNS 5 24-Aug-09

    CEMENT SAND WORKS 110

    CS 01 BLOCK MASONRY ABOVE D.P.C. LEVEL 8

    CS 04 INTERNAL PLASTER WORKS 8

    CS 05 EXTERNAL PLASTER WORKS 10

    CS 06 PLINTH PROTECTION 8

    ELECTRICAL WORKS 110EW 01 CONDUITING WORKS IN CEILING 4

    EW 02 CONDUITING IN WALLS 6

    EW 03 WIRE PULLING IN CEILING & WALLS 5

    EW 04 FIXING OF BACK BOXES 5

    EW 05 FIXING OF SWITCH SOCKET & GANG PLATES 5

    EW 06 FIXING FIXTURES & FANS 5

    FINISHING WORKS 103

    FN 06 STONE CLADDING ON EXTERNAL WALLS 6

  • 8/3/2019 Ggic Arja 12b Tracking Sheet Ha

    2/16

    FN 07 GRAFITTO FINISH ON EXTERNAL WALLS 6

    FN 17 MARBLE AT WINDOW CILLS 5

    FN 25 GRINDING & POLISHING 7

    FN 27 GYPSUM GOLA 10

    WOOD & GLAZING WORKS 92

    WD 01 FIXING OF DOOR FRAMES 5

    WD 02 PROVIDING & FIXING OF DOORS 4WD 05 PROVIDING & FIXING OF ALUMINIUM WINDOWS 5

    WD 14 GLASS WORK IN WINDOWS 4

    PAINT & POLISH WORKS 43

    PA 01 BASE COAT & WHITE WASH 7

    PA 02 FINAL PAINT & POLISH 7

    PA 03 LEVEL 1 COMPLETION 1

    LEVEL 2 177

    STRUCTURAL WORKS 111

    HS 04 POURING CONCRETE PLINTH BEAMS 5

    JS 03 STEEL FIXING IN PLINTH BEAMS 4

    JS 05 SRTRUCTURAL FILL IN FOOTINGS 4

    JS 06 TERMITE PROOFING FOR GRADE SLAB 1

    JS 080 POUR. CONC. IN COLUMNS & SHEAR WALLS (ABOVE L-1) 7

    JS 100 FORM WORK OF SHEAR WALLS (ABOVE FOOTINGS) 7

    JS 102 CUTTING,LEVELLING & DRESSING 5

    JS 110 CONCRETE POURING OF SHEAR WALLS (ABOVE FOOTINGS) 6

    JS 130 STEEL WORK OF BEAMS & SLAB 9

    JS 140 CONCRETE POURING OF BEAMS & SLAB (L-2 SLAB) 4

    JS 22 EXCAVATIONS LEVELLING & DRESSING 4

    JS 42 LEAN CONCRETE OF FOOTINGS 4

    JS 50 STEEL FIXING FOR GRADE SLAB 3JS 52 STEEL WORK IN FOOTINGS 5

    JS 60 POURING OF CONCRETE FOR GRADE SLAB 3

    JS 72 POURING CONCRETE IN FOOTINGS 5

    JS 82 STEEL WORK FOR COLUMNS & SHEAR WALLS (ABOVE L-1) 7

    JS 90 STEEL WORK OF SHEAR WALLS (ABOVE FOOTINGS) 9

    STR 510 STAIR - STEEL WORK 5

    STR 520 STAIR - POURING CONCRETE 4

    CEMENT SAND WORKS 132

    JS 200 BLOCK MASONRY ABOVE D.P.C. LEVEL 10

    JS 201 DPC HORIZONTAL & VERTICAL 3

    JS 220 INTERNAL PLASTER WORKS 10

    JS 230 EXTERNAL PLASTER WORKS 10

    JS 240 PLINTH PROTECTION 8

    ELECTRICAL WORKS 101

    JS 330 FIXING OF SWITCH SOCKET & GANG PLATES 6

    JS 340 FIXING FIXTURES & FANS 6

    JS 360 POWR CABLE PULLING 4

    JS 370 FIXING DISTRIBUTION BOARDS 4

    FINISHING WORKS 51

  • 8/3/2019 Ggic Arja 12b Tracking Sheet Ha

    3/16

    JS 830 STONE CLADDING ON EXTERNAL WALLS 7

    JS 840 MARBLE AT SHELVES AND WINDOW CILLS 8

    JS 850 GRINDING & POLISHING 8

    JS 860 GRAFITTO FINISH ON EXTERNAL WALLS 8

    JS 870 GYPSUM GOLA 9

    JS 880 MARBLE PATTI AND PCC IN PANNELS 8

    WOOD & GLAZING WORKS 46JS 520 PROVIDING & FIXING OF DOORS 7

    JS 550 GLASS WORK IN WINDOWS 7

    PAINT & POLISH WORKS 33

    No Responsibility 33

    JS 610 FINAL PAINT & POLISH 8

    LEVEL 3 336

    STRUCTURAL WORKS 224

    BUILDING 2 Admin ( GROUND FLOOR) 57

    B2 110 LAY OUT OF THE BUILDING 3

    B2 330 STEEL WORK OF COLUMNS & SHEAR WALLS 6

    B2 340 FORMWORK OF BEAMS & SLAB 8

    B2 350 FORM WORK FOR COLUMNS & SHEAR WALLS 6

    B2 360 CONCRETE POURING OF COLUMNS & SHEAR WALLS 6

    B2 370 STEEL WORK OF BEAMS & SLAB 6

    B2 380 CONCRETE POURING OF BEAMS & SLAB 4

    BUILDING 3 Toilet ( GROUND FLOOR) 108

    B3 100 LAND CUTTING,LEVELLING & DRESSING 7 7-Jun-09

    B3 101 DPC HORIZONTAL & VERTICAL 3

    B3 110 LAY OUT OF THE BUILDING 4

    B3 120 EXCAVATIONS, LEVELLING & DRESSING 8 7-Jun-09

    B3 150 LEAN CONCRETE OF FOOTINGS 4 6-Jul-09B3 170 STEEL WORKS IN FOOTINGS 7 11-Jul-09

    B3 190 POURING CONCRETE IN FOOTINGS 6 26-Jul-09

    B3 210 STEEL WORK-COLS.,SHEAR & RETAINING WALL 10 11-Jul-09

    B3 290 SRTRUCTURAL FILL, LEVELLING & DRESSING 5 10-Oct-09

    B3 320 STEEL WORK FOR GRADE SLAB 4

    B3 330 POURING OF CONCRETE FOR GRADE SLAB 3

    B3 360 CONC. IN COL. & SHEAR WALL (ABOVE GRADE SLAB) 8 7-Aug-09

    B3 380 STEEL WORK OF BEAMS & SLAB 9 23-Aug-09

    B3 390 CONCRETE POURING OF BEAMS & SLAB 4 24-Aug-09

    BUILDING 1 (Main) Ground Floor 131

    AH 110 LAY OUT OF THE BUILDING 7

    AH 120 EXCAVATIONS LEVELLING & DRESSING 8 12-Jun-09

    AH 140 LEAN CONCRETE OF FOOTINGS 4

    AH 150 STEEL WORKS IN FOOTINGS 7

    AH 160 FORMWORK OF FOOTINGS 6

    AH 170 POURING CONCRETE IN FOOTINGS 7

    AH 180 STEEL WORK-COLS. & SHEAR WALL (ABOVE FOOTINGS) 8

    AH 190 FORM WORK FOR PLINTH BEAM 4

    AH 200 STEEL WORKS IN PLINTH BEAMS 3

  • 8/3/2019 Ggic Arja 12b Tracking Sheet Ha

    4/16

    AH 210 POURING CONCRETE PLINTH BEAMS 3

    AH 220 SRTRUCTURAL FILL,LVELLING & DRESSING 5

    AH 250 STEEL WORK FOR GRADE SLAB 5

    AH 260 POURING OF CONCRETE FOR GRADE SLAB 4

    AH 270 FORMWORK OF COL. & SHEAR WALL (ABOVE GRADE SLAB) 8

    AH 280 CONC. IN COL. & SHEAR WALL (ABOVE GRADE SLAB) 8

    AH 320 FORMWORK OF BEAMS & SLAB 12AH 330 STEEL WORK OF BEAMS & SLAB 9

    AH 340 CONCRETE POURING OF BEAMS & SLAB (L-3 , B-1) 5

    AH 400 STAIR - STEEL WORK 6

    AH 410 STAIR - CONCRETE POURING 6

    AH 510 D.P.C ( HORIZONTAL & VERTICAL) 3

    AH 550 BLOCK MASONARY UPTO D.P.C. LEVEL 5

    MO 22 LAND CUTTING,LEVELLING & DRESSING 5 12-Jun-09

    MO 42 LAYOUT OF COLS. & SHEAR WALL (ABOVE L-2 SLAB) 4

    MO 52 STEEL WORK OF COLS. & SHEAR WALL (ABOVE L-2 SLAB 8

    MO 62 FORM WORK OF COLS. & SHEAR WALL (ABOVE L-2 SLAB) 8

    MO 72 CONC. POUR. OF COLS. & SHEAR WALL (ABOVE L-2) 8

    CEMENT SAND WORKS 217

    BUILDING 2 Admin ( GROUND FLOOR) 20

    B2 500 BLOCK MASONRY 7

    B2 520 INTERNAL PLASTER WORKS 8

    B2 530 EXTERNAL PLASTER WORKS 12

    BUILDING 3 Toilet ( GROUND FLOOR) 63

    B3 650 BLOCK MASONRY ABOVE D.P.C. LEVEL 12

    B3 660 PLINTH PROTECTION 8

    B3 670 INTERNAL PLASTER WORKS 14

    B3 680 EXTERNAL PLASTER WORKS 15BUILDING 1 (Main) Ground Floor 112

    AH 500 BLOCK MASONRY ABOVE D.P.C. LEVEL 15

    AH 520 INTERNAL PLASTER WORKS 15

    AH 530 EXTERNAL PLASTER WORKS 15

    AH 540 PLINTH PROTECTION 15

    ELECTRICAL WORKS 182

    BUILDING 2 Admin ( GROUND FLOOR) 61

    B2 550 CONDUITING WORKS IN CEILING 3

    B2 560 CONDUITING IN WALLS 6

    B2 570 FIXING OF BACK BOXES 6

    B2 580 WIRE PULLING IN CEILING & WALLS 6

    B2 610 FIXING OF SWITCH SOCKET & GANG PLATES 5

    B2 620 FIXING FIXTURES & FANS 5

    B2 640 EARTHING & LIGHTENING PROTECTION WORKS 5

    BUILDING 3 Toilet ( GROUND FLOOR) 111

    B3 700 CONDUITING WORKS IN CEILING 6

    B3 710 CONDUITING IN WALLS 10

    B3 720 FIXING OF BACK BOXES 7

  • 8/3/2019 Ggic Arja 12b Tracking Sheet Ha

    5/16

    B3 730 WIRE PULLING IN CEILING & WALLS 7

    B3 740 POWR CABLE PULLING 4

    B3 750 FIXING DISTRIBUTION BOARDS 4

    B3 760 FIXING OF SWITCH SOCKET & GANG PLATES 6

    B3 770 FIXING FIXTURES & FANS 6

    B3 830 EARTHING & LIGHTENING PROTECTION WORK 6

    BUILDING 1 (Main) Ground Floor 72AH 600 CONDUITING WORKS IN CEILING 7

    AH 610 CONDUITING IN WALLS 12

    AH 620 FIXING OF BACK BOXES 8

    AH 630 WIRE PULLING IN CEILING & WALLS 8

    AH 640 FIXING OF SWITCH SOCKET & GANG PLATES 7

    AH 650 FIXING FIXTURES & FANS 8

    AH 670 POWR CABLE PULLING 6

    AH 680 FIXING MAIN & DISTRIBUTION PANNELS 5

    FINISHING WORKS 179

    BUILDING 2 Admin ( GROUND FLOOR) 19

    B2 660 MARBLE PATTI AND PCC IN PANNELS 6

    B2 670 MARBLE AT SHELVES AND WINDOW CILLS 5

    B2 680 GRAFITTO FINISH ON EXTERNAL WALLS 7

    B2 690 TERRAZZO TOPING 6

    B2 700 GYPSUM GOLA 9

    B2 710 TERRAZO SKIRTING 6

    B2 720 GRINDING & POLISHING 6

    BUILDING 3 Toilet ( GROUND FLOOR) 28

    B3 780 STONE CLADDING ON EXTERNAL WALLS 9

    B3 790 TERRAZO SKIRTING 6

    B3 800 WINDOW CILLS 4B3 810 GRINDING & POLISHING 6

    B3 820 GRAFITTO FINISH ON EXTERNAL WALLS 9

    B3 840 GYPSUM GOLA 9

    B3 850 MARBLE PATTI AND P.C.C. IN PANNELS 9

    B3 900 TERRAZZO TOPING 6

    BUILDING 1 (Main) Ground Floor 109

    AH 720 MARBLE PATTI AND P.C.C. IN PANNELS 12

    AH 730 STONE CLADDING ON EXTERNAL WALLS 10

    AH 740 MARBLE AT SHELVES AND WINDOW CILLS 10

    AH 750 GRAFITTO FINISH ON EXTERNAL WALLS 8

    AH 760 TERRAZZO TOPING 13

    AH 770 TERRAZO SKIRTING 11

    AH 780 GRINDING & POLISHING 13

    AH 790 GYPLSUM GOLA 8

    WOOD & GLAZING WORKS 172

    BUILDING 2 Admin ( GROUND FLOOR) 29

    B2 750 FIXING OF DOOR FRAMES 3

    B2 760 PROVIDING & FIXING OF ALUMINIUM WINDOWS 6

    B2 770 PROVIDING & FIXING OF DOORS 5

  • 8/3/2019 Ggic Arja 12b Tracking Sheet Ha

    6/16

    B2 780 GLASS WORK IN WINDOWS 5

    BUILDING 3 Toilet ( GROUND FLOOR) 48

    B3 1000 FIXING OF DOOR FRAMES 7

    B3 1010 PROVIDING & FIXING OF ALUMINIUM WINDOWS 7

    B3 1020 PROVIDING & FIXING OF DOORS 12

    B3 1050 GLASS WORK IN WINDOWS 7

    BUILDING 1 (Main) Ground Floor 98AH 800 FIXING OF DOOR FRAMES 7

    AH 810 PROVIDING & FIXING OF ALUMINIUM WINDOWS 10

    AH 820 PROVIDING & FIXING OF DOORS 10

    AH 830 MAKING AND FIXING OF CABINETS 7

    AH 840 FIXING OF STEEL DOORS 4

    AH 850 GLASS WORK IN WINDOWS 9

    AH 860 MAKING AND FIXING OF WARDROBES 6

    TOILET WORKS 174

    BUILDING 3 Toilet ( GROUND FLOOR) 174

    TB 03 CERAMIC TILE WORK ON WALL & FLOOR 20

    TB 04 CASTING VANITIY SLAB 8

    TB 05 FIXING MARBLE 6

    TB 06 UPVC PIPING WORK 10

    TB 07 FIXTURE FITTINGS 12

    TB 08 P.P.R. PIPING 8

    TB 17 OHWT FIBRE GLASS 10

    PAINT & POLISH WORKS 146

    BUILDING 2 Admin ( GROUND FLOOR) 21

    B2 900 BASE COAT & WHITE WASH 7

    B2 910 FINAL PAINT & POLISH 7

    BUILDING 3 Toilet ( GROUND FLOOR) 32B3 1100 BASE COAT & WHITE WASH 9

    B3 1110 FINAL PAINT & POLISH 9

    BUILDING 1 (Main) Ground Floor 86

    AH 910 FINAL PAINT & POLISH 15

    ROOF TOP WORKS 117

    BUILDING 2 Admin ( GROUND FLOOR) 50

    B2 970 TERRA COTTA TILES 10

    BUILDING 3 Toilet ( GROUND FLOOR) 105

    B3 1220 TERRA COTTA TILES 12

    LEVEL 4 (BUILDING 1 FF) 131

    STRUCTURAL WORKS 49

    L4 210 CONCRETE POURING IN COLUMNS 7

    L4 215 FORMWORK OF BEAMS & SLAB 11

    L4 220 STEEL WORK OF BEAMS & SLAB 9

    L4 225 CONCRETE POURING OF BEAMS & SLAB 5

    L4 240 STEEL WORK FOR COLUMNS 7

    L4 250 STEEL WORK FOR SHEAR WALLS 7

    L4 260 FORM WORK FOR SHEAR WALLS 8

    L4 270 CONCRETE POURING FOR SHEAR WALLS 8

  • 8/3/2019 Ggic Arja 12b Tracking Sheet Ha

    7/16

    CEMENT SAND WORKS 44

    L4 300 BLOCK MASONRY 20

    L4 305 INTERNAL PLASTER WORKS 20

    L4 310 EXTERNAL PLASTER WORKS 20

    ELECTRICAL WORKS 82

    L4 350 CONDUITING WORKS IN CEILING 8

    L4 355 CONDUITING IN WALLS 14L4 360 FIXING OF BACK BOXES 7

    L4 365 EARTHING & LIGHTENING PROTECTION WORK 10

    L4 370 WIRE PULLING IN CEILING & WALLS 9

    L4 375 POWR CABLE PULLING 6

    L4 380 FIXING DISTRIBUTION BOARDS 6

    L4 385 FIXING OF SWITCH SOCKET & GANG PLATES 8

    L4 390 FIXING FIXTURES & FANS 8

    FINISHING WORKS 36

    L4 400 MARBLE PATTI AND P.C.C. IN PANNELS 12

    L4 405 WINDOW CILLS & MARBLE ON SHELVES 7

    L4 410 TERRAZZO TOPING 12

    L4 420 TERRAZO SKIRTING 9

    L4 430 GRINDING & POLISHING 16

    L4 435 GRAFITTO FINISH ON EXTERNAL WALLS 10

    L4 445 GYPSUM GOLA 12

    WOOD & GLAZING WORKS 44

    L4 450 FIXING OF DOOR FRAMES 6

    L4 455 PROVIDING & FIXING OF ALUMINIUM WINDOWS 7

    L4 460 PROVIDING & FIXING OF DOORS 10

    L4 465 GLASS WORK IN WINDOWS 7

    PAINT & POLISH WORKS 22L4 500 BASE COAT & WHITE WASH 11

    L4 505 FINAL PAINT & POLISH 13

    ROOF TOP WORKS 72

    TW 900 WATER PROOFING 16

    TW 910 ROOF INSULATION WORK 17

    TW 920 TERRA COTTA TILES 15

    TW 921 LEVEL4 COMPLETION 1

    STAIR FINISH WORKS 31

    STR 540 FIXING MARBLE ON STEPS 16

    STR 550 FIXING WOODEN HAND RAILING 14

    RETAINING WALL ( REMAINING) 83

    STRUCTURAL WORKS 83

    RW 100 CUTTING / EXCAVATION 15 18-Jul-09

    RW 130 P.C.C. (1:4:8) 4 19-Jul-09

    RW 140 STEEL WORK IN FOUNDATION 10 20-Jul-09

    RW 150 FORM WORK & CONCRETE POURING IN FOUNDATION 22 26-Jul-09

    RW 160 STEEL WORK ABOVE FOOTING. 10

    RW 170 FORM WORK AND CONCRETE POURING ABOVE FOOTINGS. 22

    RW 171 BACK FILLING & COMPACTION 10

  • 8/3/2019 Ggic Arja 12b Tracking Sheet Ha

    8/16

    RW 180 FINISH WORK 12

    EXTERNAL WORKS 435

    EX 01 LAYING SEWER LINES 20

    EX 04 FENCE WALL WORK 35

    EX 05 EXCXAVATION FOR UGWT,SOCKAGE PIT & SEPTIC TANK 5

    EX 06 STEEL WORK FOR UGWT 14

    EX 07 FORMWORK FOR UGWT 14EX 08 CONCRETE POURING IN UGWT 12

    EX 38 RAMP (EXCAVATION,PCC.,RCC,SECREDING ,MS RAILING) 35

    EX 48 TOUGH PAVERS / FARE FACE BRICK LAYED ON EDGE 38

    MO 140 PERMANENT ELECTRICAL & WATER CONNECTION 10

    MISCELLANEOUS ITEMS 308

    EX 35 POLYSTRENE SHEET 25MM THICK FOR EXPANSION JOINT 10

    EX 45 COATS OF BITUFLEX ON WALL+ LAYER OF POLYETHENE 15

    EX 55 NOTICE/ BLACK BOARD 2 THICK 12

    EX 65 MS PIPE RAILING IN BALCONIES 15

    EX 75 PVC PIPES WITH 1 INTERNAL DIA 10

    EX 85 PPR/PPRC PIPES 15

    EX 95 INTERIOR SIGNS, TEMPORARY SIGNS 10 30-Apr-09

    COMMISSIONING 0

    COM10 Pre-final Inspection 1

    COM11 Handover of building to CDM 0

  • 8/3/2019 Ggic Arja 12b Tracking Sheet Ha

    9/16

    Actual Finish% complete

    last period

    % complete

    this period

    Total %

    completeAccruals

    0% 0

    0% 0

    21-Mar-09 100% 0% 100% 0

    25-May-09 100% 0% 100% 900000

    6-May-09 100% 0% 100% 1000000

    4-Jun-09 100% 0% 100% 1500000

    50% 0% 50% 150000

    10% 5% 15% 150000

    5% 0% 5% 42500

    0% 0

    0% 0

    25% 50% 75% 66048.75

    80% 10% 90% 16537575% 10% 85% 1008138.25

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    13-Aug-09 100% 0% 100% 446065

    0% 0

    14-Aug-09 100% 0% 100% 343995

    31-Aug-09 100% 0% 100% 352500

    4-Sep-09 100% 100% 200% 8455270

    7-Oct-09 90% 10% 100% 68750

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 00% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

  • 8/3/2019 Ggic Arja 12b Tracking Sheet Ha

    10/16

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 00% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 00% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

  • 8/3/2019 Ggic Arja 12b Tracking Sheet Ha

    11/16

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 00% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    4-Jul-09 100% 0% 100% 73632

    0% 0

    0% 0

    4-Jul-09 100% 0% 100% 265402

    15-Jul-09 100% 0% 100% 20196030-Jul-09 100% 0% 100% 205725

    30-Jul-09 100% 0% 100% 583495

    7-Aug-09 100% 0% 100% 23275

    10% 10% 7366.5

    0% 0

    0% 0

    26-Aug-09 100% 0% 100% 50985

    10-Sep-09 100% 0% 100% 180850

    11-Sep-09 100% 0% 100% 765805

    0% 0

    0% 0

    80% 10% 90% 713934.9

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

  • 8/3/2019 Ggic Arja 12b Tracking Sheet Ha

    12/16

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 00% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    60% 20% 80% 238032

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 00% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

  • 8/3/2019 Ggic Arja 12b Tracking Sheet Ha

    13/16

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 00% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 00% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

  • 8/3/2019 Ggic Arja 12b Tracking Sheet Ha

    14/16

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 00% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 00% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

  • 8/3/2019 Ggic Arja 12b Tracking Sheet Ha

    15/16

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 00% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 00% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    50% 0% 50% 75000

    20% 0% 20% 19200

    30% 0% 30% 355732.5

    25% 0% 25% 1720031.25

    0% 0

    0% 0

    0% 0

  • 8/3/2019 Ggic Arja 12b Tracking Sheet Ha

    16/16

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 00% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    0% 0

    40% 40% 100000

    0% 0

    0% 0

    0% 0

    Total 20229068

    17.78%Total Finical Progress %age