GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

32
Geothermal Power at Oserian Farms, Naivasha, Geothermal Power at Oserian Farms, Naivasha, Kenya Kenya Geothermal Development Associates Geothermal Development Associates ARGeo C2 Conference, Entebbe ARGeo C2 Conference, Entebbe

Transcript of GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

Page 1: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

Geothermal Power at Oserian Farms, Naivasha, Geothermal Power at Oserian Farms, Naivasha, KenyaKenya

Geothermal Development AssociatesGeothermal Development Associates

ARGeo C2 Conference, EntebbeARGeo C2 Conference, Entebbe

Page 2: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

KenyaKenya’’s Use of Geothermal s Use of Geothermal PowerPower

••Most power generated in Kenya from Most power generated in Kenya from hydrohydro

••Drought is constant riskDrought is constant risk••Initially 45 MW installed 1981Initially 45 MW installed 1981--8585••Presently 135MW installed, 10% Presently 135MW installed, 10%

national capacitynational capacity••561MW planned by 2026561MW planned by 2026

Page 3: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

ODC LocationODC Location

Page 4: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

ODC LocationODC Location

Page 5: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

OLKARIANORTH-WEST

OLKARIASOUTH-WEST

OLKARIACENTRAL

FIELD

OLKARIAEAST

PRODUCTIONFIELD

OLKARIADOMESFIELD

OLKARIANORTH-EAST

FIELD

OLKARIASOUTH-EAST

FIELD

192000 194000 196000 198000 200000 202000 204000 206000

Eastings

9897000

9899000

9901000

9903000

9905000

9907000

9909000

9911000

Nor

thin

gs

101

102

301

302

305

306

307

308

401

601

304D

X1

X2

OW1

OW2

701

704703

705

601

801

901

902

903

201202

203

204

303A

306

OLO

LBUTOT F

AULT

OLKARIA

FRACTURE

Olkaria Area Geo Wells

Domes

Olkaria NE

Olkaria NW

Olkaria SE

Olkaria SW OlkariaEast

Olkaria Central

ODC Well

Page 6: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

HistoryHistory• Oserian Development Co. Ltd. (ODC) established 1969

as 5 hectare veg farm. Expanded 1982 to include cut flowers

• Using KenGen geothermal exploration well, ODC investigated geothermal use

• Studied Davao City, Philippines experience supplying 60% country’s cut flowers using geo plant in national park

• Contracted for 1.8 MW binary plant 2003

• Plant successful, ODC expanded geo use

Page 7: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

GDA Supply of Second Geothermal GDA Supply of Second Geothermal Plant to OserianPlant to Oserian

• June 2006 - ODC signed GDA contract to design, manufacture, ship, commission 2 MW nominal geothermal turbine-generator set from Reno, NV to Naivasha, Kenya

• Plant ready for shipment 10 months following contract signature

• Operating since Nov. 2007 in parallel with existing binary plant

Page 8: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

Geothermal Plant System ComponentsGeothermal Plant System Components

• Elliott 4 stage GYR turbine - Jeanette, PA USA• Kato Engineering 1,750kW, 3 phase

synchronous generator - Mankato, MN USA• Lufkin N12C, double helical gearbox - Lufkin, TX

USA • Oil lubrication system – GDA, Reno, Nevada,

USA

Page 9: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

ODCODC’’ss Use of Geothermal Energy Use of Geothermal Energy TodayToday

• Today 230 hectare greenhouses exporting >400 million stems/year to Europe (30% European cut flower market)

• Largest geothermal greenhouse system in world

• Used for temperature regulation, rose health, power generation for water pumping, lighting, humidity control, computerization

Page 10: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

Turbine Rotor in Elliott Factory

Page 11: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

Plant Before Shipment from USPlant Before Shipment from US

Page 12: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

Isometric of Oserian Geo PlantIsometric of Oserian Geo Plant

Generator

Gear Box

Steam Turbine

Dimensions (L x W x H):6.0 x 2.0 x 3.2 m

Lube OilConsole

Page 13: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

Plant Assembled in RenoPlant Assembled in Reno

Page 14: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

ODC Workers Preparing FoundationODC Workers Preparing Foundation

Page 15: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

Steam Line InstallationSteam Line Installation

Page 16: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

Connecting Steam Line to PlantConnecting Steam Line to Plant

Page 17: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

Electrical ConnectionsElectrical Connections

Page 18: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...
Page 19: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

Unloading the PlantUnloading the Plant

Page 20: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

Plant InstallationPlant Installation

Page 21: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...
Page 22: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

Housing & InstallationHousing & Installation

Page 23: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

Fully Assembled at ODCFully Assembled at ODC

Page 24: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

Ready for CommissioningReady for Commissioning

Page 25: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

Wellfield TestingWellfield Testing

Page 26: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

In OperationIn Operation

Page 27: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

A Job WellA Job Well--DoneDone

Page 28: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

Initial 1.8MW Ormat PlantInitial 1.8MW Ormat Plant

Page 29: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

Why Small-Scale Geothermal?

• Short manufacturing, shipping, installation times• Well suited for small island countries, rural

electrification• Allows resource analysis without add’l drilling• Transportable from site to site• Facilitates training HC personnel• Catalyst for political support for larger geo

installations

Page 30: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

WhatWhat’’s Needed to Advance SS Geo s Needed to Advance SS Geo Development in E. Africa?Development in E. Africa?

Expertise and financing for:• Geological, geochemical, geophysical studies, temp

gradient drilling

• Exploration drilling, resource testing

• Short Term operational assistance for initial plant O&M

• Training for HC plant operators, wellfield / resource managers

Page 31: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...

How GDA Can HelpHow GDA Can Help

••Resource identification, assessment, Resource identification, assessment, project design, implementationproject design, implementation

••Design, engineering, supply of 2Design, engineering, supply of 2--20 MW 20 MW geo plantsgeo plants

••Possible equity coPossible equity co--ownership/investmentownership/investment••Training Training wellfieldwellfield and plant operatorsand plant operators

Page 32: GGeothermal Power at Oserian Farms, Naivasha, eothermal ...