GFS_QA Manual_2009.pdf

download GFS_QA Manual_2009.pdf

of 34

Transcript of GFS_QA Manual_2009.pdf

  • 8/11/2019 GFS_QA Manual_2009.pdf

    1/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    MISSION STATEMENT

    We at GENERAL FABRICATING SERVICES, as a quality industrial manufacturer and

    contractor, through innovative ideas and services, will provide our value-added expertise and

    experience, to meet your project requirements, while continually adapting to the ever-changing

    business environment.

    COMPANY VALUES

    1. To maintain or exceed the highest standards of quality for the products we produce within the

    given specifications and expectations of our customers.

    2.

    To hire, sustain, and maintain open minded, responsive personnel who uphold our companyvalues and have an unbending desire to succeed and fulfill our customer requirements.

    3. We will not tolerate laziness, degradation, finger pointing, blaming or any other behavior that

    could be described as mediocre and undesirable in our employees.

    4. We require all our employees to be free of Drugs and Alcohol at the workplace.

    5. We believe our employees should possess an attitude that reflects fairness, honesty, trust,

    cooperation and respect in our dealings with each other, our clients, and with other

    constituencies.

    6. We pride ourselves on having talented personnel who are capable of thinking strategically,

    being creative, sharing in the decision making process and seeing themselves as responsible

    for all dimensions of our corporate mission.

    7.

    Our main goal is to continually improve what we do through research, planning and training

    to ensure that our company is competitive and seen as an industry leader.

    8. We believe that operating as organized, structured, and enthusiastic professionals is

    paramount to satisfying our customers needs and maintaining our highest levels of

    performance.

    9. Our employees will do what ever it takes to meet the time schedules set by our customers

    without sacrificing product quality.

    10.We do not want to take ourselves so seriously that we forget to have fun, to be able to

    celebrate our successes, and to reduce excess stress while meeting our high standards.

    11.We expect all of our people to do good work and fulfill their potential, and we will provide

    on-the-spot support to ensure that this happens, and when any of our people transcend the

    ordinary (work as usual) we will provide appropriate recognition.

    12. In order to balance our desire for profitable growth with the obligation to our customers and

    employees we will seek to uphold their values in all our transactions.

    Quality Assurance Manual

    General Fabricating Services, LLC.

    # 1 Lewis Avenue

    Coraopolis, PA 15108

    2002 Edition

    www.gfsfab.com

    2009 Edition

  • 8/11/2019 GFS_QA Manual_2009.pdf

    2/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    Issue and Review Record

    Rev. Date Pages Description or Remarks

    0 Nov 2, 1998 1 to 17 Initial issue

    - Jan 22, 1999 - 1999 Annual Quality Manual Review

    1 Nov 29, 1999 15-1 Rev. Section References in Paragraph 15.2.1 & 15.3.1- Jan 13, 2000 - 2000 Annual Quality Manual Review

    - Jan 18, 2001 - 2001 Annual Quality Manual Review

    -

    -

    -

    -

    -

    -

    Jan 11, 2002

    Nov 19,2004

    Jan 12,2006

    Jan 29,2007

    Jan 21,2008

    -

    2

    -

    -

    -

    -

    2002 Annual Quality Manual Review

    Rev, Mission Statement and Company Values

    2006 Annual Quality Manual Review

    2007 Annual Quality Manual Review

    2008 Annual Quality Manual Review

    2009 Annual Quality Manual Review

  • 8/11/2019 GFS_QA Manual_2009.pdf

    3/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    Table of Contents

    Description Section

    Scope and Purpose 1.0

    Responsibilities 2.0

    Configuration Control 3.0

    Purchase Order Control 4.0

    Receiving Inspection 5.0

    In Process Inspection 6.0

    Fabrication Procedures 7.0

    Welding Procedures 8.0

    Piping Procedures 9.0

    Machining Procedures 10.0

    Assembly Procedures 11.0

    Electrical Procedures 12.0

    Refractory Procedures 13.0

    Cleaning and Painting 14.0

    Inspection Procedures 15.0

    Shipping Procedures 16.0

  • 8/11/2019 GFS_QA Manual_2009.pdf

    4/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    Miscellaneous 17.0

    Page i REV. 0 November 2, 1998

    1.0

    Scope and Purpose

    1.1.Purpose

    The purpose of this manual is to define and publish a quality control system for

    implementation by GFS

    1.2.

    Policy

    1.2.1. GFS will implement systems and procedures necessary to assure that all

    manufactured products and services offered, meet the requirements and standards

    established by our management team and customer requirements, to provide a better

    product and service to our customers.

    1.2.2. This manual is subject to review by customer representatives at any time prior to

    issuance of a contract and at all times when a contract is in force.

    1.2.3.

    Procedures to document and resolve Customer complaints have been establishedin a separate GFS standard.

    1.3.Application

    The Quality Assurance System defined herein conforms to the requirements of the

    GFS Management Team.

    1.4.Responsibilities

    1.4.1. This manual and supporting documents will be reviewed on an annual basis, and

    revised as necessary to ensure conformance.

    1.4.2 Revisions will be issued by the Quality Assurance Manager and controlled in

    accordance with the applicable procedures.

  • 8/11/2019 GFS_QA Manual_2009.pdf

    5/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    Page 1-1 REV. 0 November 2, 1998

    2.0 Responsibilities

    2.1 The Quality Assurance Team Leader reports to the President of the company in

    matters relating to Quality and for manufacturing priorities.

    2.1.1. The QA Team (Shop Superintendent and Foremen) will have the authority and

    organizational freedom to resolve any quality problems.

    2.2 The Quality Assurance Review Board responsibilities include.

    2.2.1. Planning how to meet customers quality requirements.

    2.2.2. Reviewing customer drawings and specifications.

    2.2.3.

    Determining inspection points.

    2.2.4. Writing inspection and test plans.

    2.2.5. Establish and monitor effectiveness of quality program procedures.

    2.2.6. Keeping adequate quality assurance records.

    2.2.7. Reviewing quality assurance records and overseeing follow-up for correction

    and correction of defects.

    2.2.8. Assure that supplier quality control and follow-up are adequate.

    2.2.9. Coordinating in-plant correction of items rejected by customers, explaining to

    customers what action will be taken, and evaluating the actions for

    effectiveness.

  • 8/11/2019 GFS_QA Manual_2009.pdf

    6/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    2.3 The GFS main office is responsible for establishing job costs, client liaison, in-

    process project management and job close out. A standard has been set up for these

    procedures.

    Page 2-1 REV. 0 November 2, 1998

    3.0 Configuration Control

    3.1 We manufacture to customer drawings and specifications. Sets of these are filed in

    job number folders in our main office.

    3.2 Any detail drawings made by GFS, Inc., from customer supplied design drawing

    will conform to GFS, CAD standards.

    3.3 The main office is responsible for the following:

    3.3.1. Charging out and keeping track of drawings and specifications.

    3.3.2. Receiving Engineering changes from our customer and sending these changes

    to our shop immediately.

    3.3.3. Voiding outdated Engineering changes, drawings, and specifications.

    3.4 A standard procedure has been set up to control changes by effective date.

  • 8/11/2019 GFS_QA Manual_2009.pdf

    7/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    Page 3-1 REV. 0 November 2, 1998

    4.0 Purchase Order Control

    4.1 When a purchase order is issued to subcontractors, our buyer will send our supplier all

    required drawings, specifications, and quality requirements (such as GFS fabrication

    terms and conditions, material or process certifications, physical or chemical analysis,

    source inspection) with the purchase order. The PO Number and Job Number will be

    identified on all material processing.

    4.1.1 If there is a drawing or specification change after our order is placed with the

    supplier our buyer will send the supplier a purchase order amendment including

    our latest Engineering change and the latest drawings or order specifications.

    4.2 When a purchase order is issued for raw material, the supplier will issue mill

    certification test reports to GFS where they will be kept on file. The PO Number and

    Job Number will be identified on all material.4.3 Copies of all purchase orders will be kept on file for our customers to review.

  • 8/11/2019 GFS_QA Manual_2009.pdf

    8/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    Page 4-1 REV. 0 November 2, 1998

    5.0

    UNLOADING, RECEIVING AND IDENTIFYING INCOMING MATERIAL

    5.1 The receiver shall determine the contents of incoming shipments from the shipping

    papers and will check the items for quantity, damage, incomplete, illegible

    identification or identification not in accordance with the shipping papers.

    The receiver shall record his findings on the shipping papers and forward them as

    required.

    5.2 The Foreman shall instruct the receiver on any special handling, storage or

    preservation requirements specified on the drawings. The receiver shall follow these

    requirements during unloading and storage operations.

    All material shall be handled and blocked in a manner to prevent permanent distortion

    or damage.

    5.3 If the Vendors marking or tagging are complete, legible and in accordance with

    Purchase Order requirements, the contract number and Purchase Order number will be

    marked on all items.

    5.4 Rejected items will be identified and set aside until the Purchasing Department and

    Shop Superintendent decides on disposition.

    5.5 The Purchasing Department has the responsibility of assuring that a pattern of

    continually receiving faulty items from any supplier doesnt develop, and assuring

    supplier corrective action.

    5.6 Material that is to be cut (sawed, sheared, burned, etc.) for a contract must be verified

    by a Purchase Order Number, Contract Number, size, weight, or grade as shown on the

    GFS, Inc. cutting list. Material taken from stock must have size, weight and grade

    verified before using.

  • 8/11/2019 GFS_QA Manual_2009.pdf

    9/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    The Foreman will monitor compliance.

    5.7 Any material being returned to GFS stock must have size, weight, and grade marked

    on it.

    Page 5-1 REV. 0 November 2, 1998

  • 8/11/2019 GFS_QA Manual_2009.pdf

    10/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    6.0

    INPROCESS INSPECTION

    6.1 Item identification shall be maintained at all times. Detail piece marks, sub-assembly

    piece marks and/or shipping piece marks must be maintained as applicable. Plant

    personnel are responsible for maintenance of identification and Foreman will monitor

    compliance

    6.2 Material that has been cut (sawed, sheared, burned, etc.) will be dimensionally

    checked.

    6.3 During Fitting stage of fabrication, dimensional checks will be made routinely per

    section 7.2 and customer requirements.

    6.4 Foremen will be responsible for visual inspection of product thru out the fabrication

    and assembly process per section 15.0.

  • 8/11/2019 GFS_QA Manual_2009.pdf

    11/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    Page 6-1 REV. 0 November 2, 1998

    7.0

    FABRICATION

    7.1 Cutters, Drawings and Specifications.

    7.1.1 The production personnel will be issued contract specifications, cutters, and

    drawings (latest revision) as per contract number and sequence number.

    7.1.2 Shop Foreman will see to it that all revised documents are issued immediately to

    shop personnel for work on said contract. All previous revisions will be marked

    VOID and returned to the shop office. No documents that have VOID

    marked on them are to be left on the shop floor.

    7.2

    Dimensional Tolerances.

    7.2.1 The Shop will work to the tolerance as it is shown on the shop detail drawing.

    7.2.2 If no tolerances are on the shop detail drawings, the shop will use GFS, Inc.

    standard dimensional tolerances.

    7.2.3 GFS, Inc. standard dimensional tolerances for welding structural members such as

    beams, channels, angles, columns, trusses, etc.

    Lengths of 30 ft. or less:

    Overall length 1/8

    Straightness 1/8 x total length divided by 10

    Lengths over 30 ft. to 45 ft.:

    Over all length 1/4

    Straightness 3/8 x total length divided by 10

    Lengths over 45 ft.:

    Overall length 3/8

    Straightness 3/8 + 1/8 x total length divided by 10

  • 8/11/2019 GFS_QA Manual_2009.pdf

    12/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    Page 7-1 REV. 0 November 2, 1998

  • 8/11/2019 GFS_QA Manual_2009.pdf

    13/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC

    7.2.4 GFS, Inc. standard dimensional tolerances for welding a furnace box section.

    Width of box 10 ft. or less 1/8

    Height of box 10 ft. or less 1/8

    Squareness 1/8

    Flatness of walls 1/8

    Overall length of Box 30 ft. or less 1/8

    Width of boxes over 10 ft. to 15 ft. 3/16

    Height of boxes over 10 ft. to 15 ft. 3/16

    Squareness

    3/16

    Flatness of walls 3/16

    Overall length of box over 30 to 45 ft. 3/16

    Width of boxes over 15 ft. 1/4

    Height of boxes over 15 ft. 1/4

    Squareness (16 & over x 16 & over) 1/4

    Flatness of walls 1/4

    Overall length over 46 ft. 3/8

    7.3 Preparation of Base Metal:

    7.3.1 Surfaces on which weld metal is to be deposited shall be smooth, uniform and free

    from fins, tears, cracks and other imperfections, which would adversely affect the

    quality or strength of the weld. Surfaces that are to be welded, and surfaces

    adjacent to a weld, must be free from loose or thick scale, slag, rust, moisture,grease and other foreign materials that would prevent proper welding or produce

    objectionable fumes. Mill scale that can withstand vigorous wire brushing, a thin

    rust-inhibitive coating or an anti-spatter compound may remain.

    7.3.2 In thermal cutting, the equipment will be adjusted and manipulated to avoid

    cutting beyond (inside) the prescribed lines. The roughness of all thermal-cut

    surfaces shall be no greater than that defined by AWS-C-4-1 (latest revision)

    Criteria for Describing Oxygen-Cut Surfaces.

  • 8/11/2019 GFS_QA Manual_2009.pdf

    14/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC

    Page 7-2 REV. 0 November 2, 1998

    7.4

    Cope and Block Cuts:

    7.4.1 All cope cuts and re-entrant cuts will be notch-free and cut to a radius of at least

    1/2, unless otherwise shown on shop detail drawings.

    7.5 Fit-Up:

    7.5.1 The parts to be joined by fillet welds shall be brought into as close contact as

    possible. The root opening is not to exceed 3/16 except in cases involving either

    shapes or plates 3 or greater in thickness. After straightening and fit-up, if the

    root opening cannot be sufficiently closed to meet this tolerance, a maximum root

    opening of 5/16 is acceptable, provided suitable backing is used. If the

    separation is greater than 1/16, the leg of the fillet weld can be increased by the

    amount of the root opening. The separation between faying surfaces of the plug

    and slot weld, and of butt joints landing on a backing bar, is not to exceed 1/16.

    7.6 Tack Welds:

    7.6.1 Tack welds are made by the fitter and or helper to hold assembly together before

    final welds are made.

    7.6.2

    Tack welds are subject to the same quality requirements as the final welds, with

    the following exceptions:

    A. Preheat is not mandatory for single-pass tack welds that are remelted and

    incorporated into the final weld, regardless of whether it is a continuous weld

    or a stitch weld.

    B. Discontinuities, such as undercut, unfilled craters and porosity need not be

    removed before the final weld is made.

    7.6.3

    Tack welds, which are incorporated into the final weld, will be made with theelectrodes meeting the requirements of the final welds and are to be cleaned

    thoroughly.

    7.6.4 Fitter will mark the weld size and length on assembled section, regardless of

    whether it is a continuous weld or a stitch weld.

    7.6.5 Fitter will tack and assemble section in such a manner so that all tacks are in the

    welded area.

  • 8/11/2019 GFS_QA Manual_2009.pdf

    15/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC

    7.6.6 Fitter will layout all stitch welds in such a manner as to have a full-length stitch

    weld at each end of a weld run.

    Page 7-3 REV. 0 November 2, 1998

    7.7

    Control of Distortion and Shrinkage:

    7.7.1 In assembling and joining parts of a structure or built-up member, and in welding

    reinforcement parts to members, the procedure and sequence shall be such to

    minimize distortion and shrinkage.

    7.7.2 All welds will be made in a sequence that will balance the applied best of welding

    while the welding progresses.

  • 8/11/2019 GFS_QA Manual_2009.pdf

    16/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC

    Page 7-4 REV. 0 November 2, 1998

    8.0

    WELDING

    8.1 Weld Material (Weld Wire and Gasses) Control:

    8.1.1 Welding materials that are ordered for stock (not for a particular contract) and

    which have the manufacturers markings required by the AWS. Specification need

    not have additional information marked on them, provided they can be traced to

    any required material certifications.

    8.1.2 Low Hydrogen electrodes will be issued only in quantities that can be used within

    the exposure time period specified by the manufacturer or control codes. When a

    container is opened, low hydrogen electrodes will be immediately distributed or

    placed in holding ovens.

    8.1.3 At the end of a shift, or upon completion of welding operations, unused bare

    electrodes in the plant will be left on the machine or removed and returned to the

    issuance area.

    8.2 Welder Qualifications:

    8.2.1 All welder qualifications must be as per AWS standards

    8.2.2 All welders will be assigned a unique identifying symbol. The Shop

    Superintendent will maintain a list of the symbol assignments. It is the Foremansresponsibility to insure that these symbols are regularly and consistently steel-die

    stamped, when permitted by the contract specifications, or otherwise identified

    adjacent to all welds.

    8.2.3 Copies of Welder qualification test reports and Welder performance qualifications

    will be maintained and filed by the Shop Superintendent.

    8.3 Qualification of Tackers:

    8.3.1

    GFS, Inc. tackers will be qualified as per AWS qualification of tack welders. PartE, Section 5.43 thru Section 5.52. AWS D1.1 (latest revision)

    8.4 Welding standards

    8.4.1 All welding to be made in accordance with AWS Dl.1 (latest revision)

    8.4.2 All Stud welding to be made in accordance with Chapters 7 and C7 in AWS Dl.1

    (latest revision)

  • 8/11/2019 GFS_QA Manual_2009.pdf

    17/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC

    Page 8-1 REV. 0 November 2, 1998

    9.0

    PIPING PROCEDURES9.1 Procedures for Pipe Installation

    9.1.1 Piping information will be obtained from contract documents and drawings. If no

    information is available, GFS will use standard practices from The Pipe Fitters

    and Pipe Welders Handbook, latest edition, published by Glencoe Publishing

    Company.

  • 8/11/2019 GFS_QA Manual_2009.pdf

    18/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC

    Page 9-1 REV. 0 November 2, 1998

    10.0

    MACHINING PROCEDURES

    10.1 Procedures for Machining

    10.1.1 Machining information will be obtained from contract documents and drawings.

    If no information is available, GFS will use standard practices from The

    Machinerys Handbook, latest edition, published by Industrial Press, Inc.

  • 8/11/2019 GFS_QA Manual_2009.pdf

    19/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC

    Page 10-1 REV. 0 November 2, 1998

    11.0

    ASSEMBLY PROCEDURES

    11.1 Assembly criteria

    11.1.1 All assembly criteria will be obtained from contract documents and drawings.

    This includes, but is not limited to, centerline alignment, chain alignment,

    sprocket settings, roll settings, bearing settings, bolting requirements, etc.

    11.2 Traceability of assembly items

    11.2.1 All free-issue items supplied by the customer must be tagged with purchase order

    number, drawing number, and item number. (All operations manuals receivedwith customer supplied free-issue items, will be packaged and shipped to field

    with free issue item).

    11.2.2 All assembly items purchased by GFS, Inc. will be tagged with GFS purchase

    order number, contract number, drawing number, and item number.

    11.3

    Disassembly

    11.3.1 Shop assembled items will be disassembled per customer requirements and

    shipping limitations.

  • 8/11/2019 GFS_QA Manual_2009.pdf

    20/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC

    Page 11-1 REV. 0 November 2, 1998

    12.0 ELECTRICAL PROCEDURES

    12.1 Procedure for electrical installation

    12.1.1 All electrical specifications and information will be obtained from the contract

    documents and drawings. If this information is not available, GFS will use the

    codes and procedures found in:

    12.1.1.1 USA - The National Electrical Code, latest edition published by The

    National Fire Protection Association.

    12.1.1.2 Canada - The Canadian Electrical Code, latest edition.

    12.1.2 If Customer documents do not specify, GFS will use standard ridged conduit,

    standard flexible conduit, standard wire and standard junction boxes.

  • 8/11/2019 GFS_QA Manual_2009.pdf

    21/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC

    Page 12-1 REV. 0 November 2, 1998

    13.0

    REFACTORY PROCEDURES

    13.1 Procedures for the installation of refractory

    13.1.1 All refractory specifications (installation instructions, material type, expansion

    joints, stud patterns, etc.) will be obtained from the contract documents and

    drawings. If this information is not available, GFS will use procedures that are

    recommended by the refractory manufacturer and approved by the customer.

  • 8/11/2019 GFS_QA Manual_2009.pdf

    22/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC

    Page 13-1 REV. 0 November 2, 1998

  • 8/11/2019 GFS_QA Manual_2009.pdf

    23/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC

    14.0

    CLEANING AND PAINTING PROCEDURES

    14.1 Cleaning and Painting

    14.1.1 Surface preparation on contract work shall be done in conformance with the

    required SSPC specification called for in the contract documents and drawings.

    (GFS standard surface preparation is, SSPS SP3, Power Tool Cleaning)

    14.1.2 The paint material shall be stored in an enclosed shop area. Application shall be

    consistent with the coating instructions and the manufacturers recommendations.

    14.1.3 Prior to shipment, all items shall be cleaned, painted, packaged, and loaded in

    accordance with instructions specified in the contract documents and on the shop

    drawings. If no special instructions are given, good shop practice shall be

    followed to prevent damage, deterioration, or loss of items during shipment.

  • 8/11/2019 GFS_QA Manual_2009.pdf

    24/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC

    Page 14-1 REV. 0 November 2, 1998

  • 8/11/2019 GFS_QA Manual_2009.pdf

    25/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC

    15.0

    INSPECTION PROCEDURES

    15.1 General

    15.1.1

    Fabrication inspection and tests shall be performed by the Quality

    Control/Production Team as necessary prior to, during, and after all stages of

    fabrication to ensure that materials and workmanship meet the requirements of

    contract documents. Verification, inspection and testing shall be performed and

    their results reported to the owner and contractor in a timely manner to avoid

    delays in the work.

    15.1.2

    Inspection procedures supplied in the customers original contract documents will

    take precedence in all stages of fabrication. If no inspection procedures are given,

    GFS will use the inspection procedures described in this Quality Control Manual.

    15.2 Fabrication

    15.2.1 Dimensional inspections will be performed in accordance with the Procedure for

    Fabrication (Section 7.2) of this manual.

    15.3 Welding

    15.3.1 Visual welding inspection will be conducted in accordance with the Welding

    Procedures (Section 8.4) of this manual.

    15.3.2 If Hydro-Static testing procedures are not spelled out on shop drawings or job

    specification, but are required, GFS will use the following procedures:

    15.3.2.1 Remove dirt, grease, and weld spatters in seams that are to be tested.

    15.3.2.2 Visually inspect for defects and repair as required

  • 8/11/2019 GFS_QA Manual_2009.pdf

    26/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC

    15.3.2.3 Attach the proper pipes, plugs, and gauges

    15.3.2.4 Pressurize to fifty (50) pounds of air pressure

    15.3.2.5

    Splash a detergent/water mixture over welds that are to be tested:

    15.3.2.5.1 If leaks show, mark and release pressure

    15.3.2.5.2 Grind repair area and reweld (must be qualified welder).

    15.3.2.5.3 Retest weld

    15.3.2.6 Fifty (50) pounds of air pressure is to be held for _ hour. Foreman is to

    witness start and finish of holding period.

    15.3.2.7 Foreman is to document test and give results to the shop superintendent.

    15.3.3 Dye penetrant testing will be done on all gas tight welds that are accessible from

    both sides using the following method:

    15.3.3.1 The weld will be visually checked for any potential leaks and a qualified

    welder will make repairs at the time.

    15.3.3.2

    All dirt, grease, weld spatter, slag, and loose scale will be removed.

    15.3.3.3 The developer will be applied on the gas tight side of the weld.

    15.3.3.4 The penetrant will be applied liberally on the opposite side of the weld.

    15.3.3.5 If a leak appears

    15.3.3.5.1 Repair area will be marked

    15.3.3.5.2 Repair area will be ground or gouged

    15.3.3.5.3 Repair area will be rewelded by a qualified welder

    15.3.3.5.4

    Steps 15.3.3.1 to 15.3.3.4 will be repeated to retest the weld.

    15.3.4 Dye penetrant testing will be done on all gas tight welds that are accessible from

    only one side using the following method:

    Page 15-1 REV. 1 November 29, 1999

  • 8/11/2019 GFS_QA Manual_2009.pdf

    27/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC

    15.3.4.1 The weld will be visually checked for any potential leaks and a qualified

    welder will make repairs at that time.

    15.3.4.2 All dirt, grease, weld spatter, slag, and loose scale will be removed.

    Page 15-2 REV. 0 November 2, 1998

    15.3.4.3

    The penetrant will be applied to the weld and allowed to work into any

    weld imperfections for fifteen minutes

    15.3.4.4 The penetrant will then be removed

    15.3.4.5 The developer will be applied over the weld surface

    15.3.4.6 If a leak appears

    15.3.4.6.1 Repair area will be marked

    15.3.4.6.2 Repair area will be ground or gouged

    15.3.4.6.3 Repair area will be rewelded by a qualified welder

    15.3.4.6.4 Steps 15.3.4.1 to 15.3.4.5 will be repeated to retest the weld.

    15.4 Assembly

    15.4.1 Any inspection on assembled items will be done by the customer or by GFS in

    accordance with instructions supplied by the customer.

    15.5 Machining

    15.5.1 The general shop foreman will inspect machined pieces in accordance with the

    dimensional tolerances shown on the contract documents and drawings.

    15.6

    Piping

    15.6.1 The pipe foreman will perform dimensional inspections on pipe assemblies in

    accordance with contract documents and specifications.

  • 8/11/2019 GFS_QA Manual_2009.pdf

    28/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC

    15.6.2 Any leak testing will be done in accordance with contract documents and

    specifications. If no testing criteria is given, GFS will use one of the testing

    methods described in section 15.3 of this manual.

    Page 15-3 REV. 0 November 2, 1998

    15.6.3 Large, multi threaded connected pipe assemblies will not be pressure tested due to

    the inability to prevent the vibration during transit from loosening the connection.

    15.7

    Electrical

    15.7.1 Any inspection on electrical items will be done by the customer or by GFS in

    accordance with instructions supplied by the customer.

    15.8 Refractory

    15.8.1

    Any inspection on refractory items will be done by the customer or by GFS in

    accordance with instructions supplied by the customer.

    15.9 Painting

    15.9.1 The initial paint inspection will be a visual inspection to check for runs, sags, light

    spots, and missed spots. Appropriate corrective measures will be taken for any

    imperfections that are found.

    15.10Inspection Documentation

  • 8/11/2019 GFS_QA Manual_2009.pdf

    29/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC

    15.10.1 All gas tight weld testing and pressure testing will be documented on the

    appropriate form and signed by the Quality Control/Production Team member and

    forwarded to the Shop Supervisors office.

    15.10.2 Each department will use the standard inspection report to document inspection

    and repairs, if any. The report will be signed by the Quality Control/Production

    Team member and forwarded to the Shop Supervisors office.

    Page 15-4 REV. 0 November 2, 1998

    15.10.3 Any special inspection witnessed or performed by the customer or his

    designated representative will be documented on the appropriate form, signed by

    the Quality Control/Production Team member and the customer representative

    then forwarded to the Shop Supervisors office.

    15.10.4 At completion of job, all forms will be placed in the Job folder at the Main

    Office where they will be stored for a period of 2 (Two) years.

  • 8/11/2019 GFS_QA Manual_2009.pdf

    30/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC

    Page 15-5 REV. 0 November 2, 1998

    16.0

    SHIPPING PROCEDURES

    16.1 Piece Marking

    16.1.1 All pieces that are to be shipped will be properly identified in accordance with the

    marking instructions found in the contract documents and drawings. The shop

    foremen will monitor compliance.

    16.2 Shipping papers

    16.2.1 All shipping papers will be completed in accordance with the instructions found

    in the contract documents and drawings. The shop foremen will insure that what

    is listed on the shipping papers corresponds to what is loaded on the truck.

    16.3

    Bracing

    16.3.1 All fabricated members will be braced for shipping in accordance with

    instructions found in the contract documents and drawings. If no bracing

  • 8/11/2019 GFS_QA Manual_2009.pdf

    31/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC

    instructions are given, GFS will use good shop practice to provide sound bracing

    for shipment.

    16.4

    Refractory

    16.4.1 All refractory shipped (either loose or installed in a fabricated structure) will be

    100% tarpped regardless of distance to be traveled or predicted weather

    conditions.

    Page 16-1 REV. 0 November 2, 1998

    16.5 Lifting Lugs

    16.5.1 Customer approved Lifting lugs may be installed on fabricated structures in order

    to aid in loading. Lifting lug placement will be done in such a way as to avoid

    any distortion during lifting.

    16.6 Tie Down Points

    16.6.1 Tie down points will be determined in such a way as to avoid any distortion in

    transit. GFS and the trucking company responsible for the load will agree upon

    tie down points.

  • 8/11/2019 GFS_QA Manual_2009.pdf

    32/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC

    Page 16-2 REV. 0 November 2, 1998

  • 8/11/2019 GFS_QA Manual_2009.pdf

    33/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC GFS, LLC

    17.0

    Miscellaneous

    17.1 The Quality Assurance Team, thereto, will determine control of manual and Quality

    Control forms and changes.

    17.2 Security of welders stamps will be the responsibility of the shop superintendent.

    17.3 These stamp records will be made available to customers upon request.

  • 8/11/2019 GFS_QA Manual_2009.pdf

    34/34

    GFS, LLC. QUALITY ASSURANCE MANUAL

    Page 17-1 REV. 0 November 2, 1998