GFRG BUILDING SYSTEM
MARKETED BY : BILTECH BUILDING ELEMENTS LTD.
PRESENTED BY : RAJDEEP CHOWDHURY
![Page 2: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/2.jpg)
Avantha Group is one of India’s leading business conglomerates. Having footprint in 90 countries. US$ 4 billion Avantha Group has 25,000 employees worldwide.
Its successful entities includes :
BILT – Paper & Pulp
Crompton Greaves –Power Equipment
The Global Green Company- Food processing
Biltech Building Elements Ltd. – Building Material
Avantha Power & Infrastructure – Power generation
Avantha Technologies – IT & ITES.
![Page 3: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/3.jpg)
Biltech Painting
Biltech Building Elements Ltd.
Design and Build structures with GFRG / Rapid wall Panel system
Biltech Prefab Biltech AAC
Manufacturing & Marketing of AAC
Industrial & Decorative
![Page 4: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/4.jpg)
Conventional building materials are :
Energy intense
Demand is growing
Materials like river sand & water is scarce
Cost’s spiraling up
Increases CO2 emission & impact on environment
&
Construction is time consuming
Therefore , there is a need for an alternative building materials & fast construction methods for housing
![Page 5: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/5.jpg)
RATIONALE
Pospho-gypsum is produced as byproducts of chemical , fertilizer
industries and due to its limited usage , this waste is becoming an
environmental problem.
The Rapidflow Calciner and Rapidwall Technology can help to
overcome these problems by turning waste into plaster and the
plaster into homes that are environmentally friendly, non-
polluting, energy efficient and aesthetically pleasing.
PHOSPHO GYPSUM
PLASTER BUILDING MATERIAL
(RAPIDWALL)
![Page 6: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/6.jpg)
GFRG / RAPIDWALL - A REVOLUTIONARY BUILDING MATERIAL
GFRG/ Rapid wall is load bearing pre-fabricated walling panel. This
is suitable for rapid mass scale building construction was originally developed and used since 1990 in Australia.
GFRG/ Rapid wall is manufactured using Gypsum as a core
material , which is generated as by product in the process of manufacturing fertilizers
GFRG/ Rapid wall is manufactured at RCF , Mumbai and FRBL ,
Kochi. GFRG/ Rapid wall is suitable for load-bearing applications and as
well as hybrid Construction in multi-storey buildings.
![Page 7: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/7.jpg)
Environmental friendliness
![Page 8: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/8.jpg)
reinforced by glass rovings
Micro-strand glass roving role
• Rapidwall panels are 12m
long , 2.85m high and
0.124m thick.
• Made from Gypsum, Glass
Rowing, and Special
Chemicals.
• Made from Australian
Technology
GFRG / Rapid wall Panel
Tensile strength of glass roving (single filament) is 3100-3800 Mpa (tensile strength of glass roving is much higher than even that of steel used for concrete reinforcement which is maximum @ 500 Mpa) Elastic Modulus of glass roving is 76-78 Gpa This provide very high load bearing capability to the panel making into a composite material.
![Page 9: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/9.jpg)
Glass Fiber Reinforced Gypsum (GFRG) Panel, called RAPIDWALL . It is an ideal alternative building material to replace conventional walling system.
MATERIAL
![Page 10: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/10.jpg)
Advantage of GFRG/ Rapid wall Building system
• Light weight
• Less Input material i.e. Steel , cement . sand and water
• More Carpet area
• Faster Construction
• Less Labor Input
• Eco Friendly , controls CO2 Emission
• Saving of recurring energy cost
• Resistant to Earthquake , Cyclone & fire
• Free from Corrosion , rot & termite
![Page 11: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/11.jpg)
Compressive strength (Empty panel ): 73.10 Kg/cm2
(Concrete infill ): 180.70 Kg/cm2
Flexural Strength empty panel : 21.25 Kg/cm2
concrete infill : 20.80 Kg/cm2
Tensile strength
28.8 kN/m
Ductility
4.11
Water absorption
< 2% (24 hrs)
Fire resistance
4 hrs rating 700 oC to 1000 oC.
Thermal resistance
0.36 R
Sound Transmission Class - STC 40
Free from Corrosion
Axial vertical load on
empty panel of 2.85m high x 1m :
14.04 tons
Axial vertical load on concrete infilled panel of
2.85m high x 1m : 154 tons
Rot &
termite proof
Light weight 40 Kg / m2
(1/8th weight of
concrete)
Net Density
1140 Kg / m3
Earthquake resistant: test
withstood earthquakes up
to Richter Scale 8
Eco-friendly (green material)
(raw material recycled waste & no emission
of CO2 )
Saving : •Water
•River sand •Agri top soil
•Cement •Steel
Saves time of construction
• Low maintenance cost •Saving in recurring
energy cost
Cost-effective (affordable cost)
Properties of GFRG/ Rapid wall Panel
![Page 12: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/12.jpg)
TESTS ON GFRG / RAPIDWALL
List of tests : ( carried out by IIT Chennai )
Water absorption Test Rain Water Penetration Test
Compressive Strength Test
Fire Resistance Test
Durability Test
Corrosion Test
Impact Test
Nailing & pull out Test
Sound Transmission Test Test to find Elastic Modulus
![Page 13: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/13.jpg)
Tests carried out by SERC, CSIR Chennai ( 2002)
1. Seismic performance of Rapid wall building system 2. Investigations of behavior of Rapid wall Panel
3. Compressive strength with and without concrete in-fill
Flexural test with Single Point Load on large panel with & without concrete infill
Flexural Test by double point load with or without concrete infill
Axial Compression{ Vertical Load test} on high panel with & without concrete in-fill
![Page 14: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/14.jpg)
Structural Design Manual & PACS
![Page 15: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/15.jpg)
Applications • In apartment buildings, some up to 14 storey's, concrete filled Rapidwall
panels have been used very successfully in load-bearing construction to support combined lateral and vertical loads and to support vertical loads only.
Load-bearing walls in multi-storey construction
• Rapidwall panels, either unfilled or concrete filled, can be used to support domestic structures. Unfilled Rapidwall can be used to support domestic structures up to two storey's providing the suspended floor is constructed from timber.
Individual Dwelling Construction
• Unfilled 100 millimeter Rapidwall (current panels are 124 mm) will provide an FRL of 180/120/60 and concrete filled Rapidwall an FRL of 240/240/240.
Walls that require high fire rating
• Insulation filled Rapidwall panels have been successfully used in cottage construction as structural roof elements over which battened roof sheeting is placed.
Roof panels
• When used as permanent-formwork for suspended concrete slabs, services such as electrical or plumbing can be carried in the cells, noise attenuation between floors is improved and a finished plaster ceiling is obtained.
Permanent formwork for suspended slabs
• Rapidwall has been used extensively for domestic fencing providing a high
quality finish to both neighboring properties. Uniquely Rapidwall can be placed directly in trenches and sand filled to provide solid foundation free fences up to two meters high.
Compound Walling
![Page 16: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/16.jpg)
Manufacturing Process & Plant
![Page 17: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/17.jpg)
Section of GFRG/ Rapid wall Panel
![Page 18: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/18.jpg)
Various construction joints in GFRG/ Rapid wall
![Page 19: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/19.jpg)
![Page 20: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/20.jpg)
![Page 21: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/21.jpg)
Design of Floor Slab
GFRG panel with reinforced concrete micro beams and screed concrete can be used as a slab both as floor slab as well as roof slab for buildings. The basic design philosophy as the same is that given in IS: 456-2000, corresponding to slab behavior .
2Y-12 + 1Y-8
Micro-beams
![Page 22: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/22.jpg)
120
Inside face
Joint sealant
Powder coated steel /
aluminium window /
door frameJoint sealant
Outside face
FixerClamps
(b) TYPICAL WINDOW OPENING / WINDOW FRAME FIXING
(a) TYPICAL DOOR OPENING / DOOR FRAME FIXING
FFL
Section A - A
A A AA
Typical door opening /
door frame fixing
DOOR & WINDOW FIXING
![Page 23: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/23.jpg)
SECTION
Basin - mounted tapware - Note :- wall plumbing
should not be placed inside Rapidwall
party walls
Wall - mounted basin
Rapidwall cores to be concrete filled.
Basin bracket to be bolted through to
outer face of panel with fixing to
manufactuers recommendations.
Countersink and flush finish to face.
120mm Rapidwall panel
Waterproof membrane by others
Floor level
Rapidwall panel to sit
setdwon, not in setdown
120mm Rapidwall panel
concrete fill cores immediately
behind basin.
Fixing to extend through
concrete - flush over bolt
SECTIONAL PLAN
Wall - mounted basin
Base for fixing tiles.
Water pipe
Bridging tap / body screw fixed to
blocking using galvanised metal straps
and 6g x 25 Bugle head screws.
Provide flexible sealant or
approved selected gasket
Provide flexible sealant or
approved selected gasket
Wadding (note the formed hole must
be large enough to accommodate the
positioning of the C - section member)
Waterproof membrane
Wall tiles - direct stick
Provide wadding to 60mm long section
of steel (100.12. (102 x 51 nom)
Screw fix steel member to Rapidwall
using 2 Nos 8g x 30 Bugle head screws
50m
m f
ixin
g c
entr
es
120mm Rapidwall panelR
SECTIONAL PLAN
R
Fixing of
sanitary ware
& piping
BASIN AND URINAL FIXING
![Page 24: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/24.jpg)
METHOD & SEQUENCE OF CONSTRUCTION OF HYBRID SYSTEM
![Page 25: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/25.jpg)
GFRG panels in RCC framed Structure
GFRG/ Rapid wall panels can be used as infill walls / slabs in conventional RCC Framed construction . This system is suitable for low rise to high rise building without any limitation in the number of storey's. The use of GFRG/ Rapid wall panels and composite floor panels can be integrated with the construction of column & beams
![Page 26: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/26.jpg)
![Page 27: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/27.jpg)
GFRG panel in Hybrid Building
![Page 28: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/28.jpg)
Some Projects with GFRG / Rapid wall
![Page 29: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/29.jpg)
Picture Gallery
![Page 30: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/30.jpg)
HIGH RISE APARTMENTS
“CROWN OF THE HILL” at Pennant Hill, Sydney.
MARBURY, Sydney.
![Page 31: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/31.jpg)
Boundary Walling with GFRG
![Page 32: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/32.jpg)
Demo Building after completion
![Page 33: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/33.jpg)
Service matrix offered by BILTECH
• Project Planning
• Designing & Estimation
• Construction & commissioning
• Project Management
![Page 34: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/34.jpg)
Sequence of Construction of G+1 storied Demo Building in IIT Madras campus
• Structural design by IIT Madras & BMTPC • R&D support by Dept. of Science & Technology
![Page 35: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/35.jpg)
Various stages of Construction
![Page 36: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/36.jpg)
![Page 37: GFRG Rapidwall Sustainable Load Bearing Building System](https://reader033.fdocuments.us/reader033/viewer/2022050802/55a8af0f1a28abb76c8b469f/html5/thumbnails/37.jpg)
THANK YOU !
For any Queries Please Contact Rajdeep Chowdhury M:- +91-9811076657 E:- [email protected]