German LNG Terminal GmbH
Marcel Tijhuis, 17-06-2020
-
Introduction – Germany ready for LNG
16-6-2020 www.germanlng.com 2
Nuclear power generation being phased out by 2022: “Atomausstieg”
Phase out of coal & lignite: “Kohleausstieg”
Dutch gas accelerated decline of production to zero by 2022
TTF currently Europe's most liquid gas hub
German hubs NCG & Gaspool to be merged by 2022
Future market integration Germany and Netherlands ??
➢ One single market area of approximately 130 BCM, Europe’s biggest energy market
LNG solution to reduce dependency on pipeline imports
Strong momentum for LNG in Germany
Hamburg
-
German LNG Terminal, scope
16-6-2020 www.germanlng.com 3
Regasification capacity: 8 bcm/year Storage capacity: 1 tank 240,000 cbm or 2 tanks of 165.000 cbmLarge jetty able to receive up to Q-max vesselsSeparate jetty for LNG distribution by vessels Truckloading facilities
-