PRESENTED BY:SAIFULLAH KHALID

Page 3: Gepco

www.saifullahkhalid.com

3

GEPCO(GUJRANWALA ELECTRICAL POWER COMPANY)

Page 4: Gepco

www.saifullahkhalid.com

4

POWER SECTOR IN PAKISTAN

Page 5: Gepco

www.saifullahkhalid.com

5

Pakistan’s industrial growth and development depended on the availability electric power .

Power supply has lagged behind demand, resulting in major load shedding

Power-generating capacity grew from 119 MW at the time of partition

The share of public sector was around 70 per cent and the private sector 30 per cent

Page 6: Gepco

www.saifullahkhalid.com

6

WAPDA AND THE KARACHI ELECTRIC SUPPLY CORPORATION (KESC) WAS TWO BODIES WHO WERE RESPONSIBLE OF GENERATION, TRANSMISSION, DISTRIBUTION AND RETAIL SUPPLY OF ELECTRICITY IN PAKISTAN WAPDA SUPPLIED POWER TO ALL OF PAKISTAN KESC SUPPLY THE METROPOLITAN CITY OF KARACHI AND SOME OF ITS SURROUNDING AREAS

Page 7: Gepco

www.saifullahkhalid.com

7

WAPDA(WATER AND POWER DEVELOPMENT

AUTHORITY)

Page 8: Gepco

www.saifullahkhalid.com

8

WAPDA was created in 1958

The purpose of coordinating and giving a unified direction to the development of schemes in Water and Power Sectors

This function was previously being dealt with, by the respective Electricity and Irrigation Department of the Provinces

Page 9: Gepco

www.saifullahkhalid.com

9

Generation, Transmission and Distribution of Power.

Irrigation, Water Supply and Drainage.

Prevention of Water logging and Reclamation of Waterlogged and Saline Lands.

Flood Management. Inland Navigation.

THE CHARTER OF DUTIES OF WAPDA IS TO INVESTIGATE, PLAN AND EXECUTE SCHEMES FOR THE FOLLOWING FIELDS:

Page 10: Gepco

www.saifullahkhalid.com

10

FINANCIAL RESOURCES:

INTERNAL CASH GENERATION; GRANTS MADE BY THE GOVERNMENT; LOANS OBTAINED FROM THE

GOVERNMENT; SALE PROCEEDS OF BONDS ISSUED

UNDER THE AUTHORITY OF GOVERNMENT;

LOANS OBTAINED BY THE AUTHORITY FROM THE FINANCIAL INSTITUTIONS;

FOREIGN LOANS OBTAINED FROM THE WORLD BANK, ADB ETC. AND

ALL OTHER SUMS RECEIVED BY THE AUTHORITY.

Page 11: Gepco

www.saifullahkhalid.com

11

The settlement with India over the water usage of the Indus Basin rivers was being negotiated

Development of Indus Basin Project comprising works of two large dams at Mangla and Tarbela

WAPDA has planned and investigated schemes for exploitation of surface water resources ACHIEVEMENTS:

Page 12: Gepco

www.saifullahkhalid.com

12

Constructed medium size dams at Tanda, Khanpur and Hub

Chablat Kas Irrigation scheme near Hasanabdal

Karachi (North Karachi) Irrigation scheme

Page 13: Gepco

www.saifullahkhalid.com

13

Power Wing is currently head by Member (Power)

Comprising of Generation, Transmission and Distribution

POWER WING:

Page 14: Gepco

www.saifullahkhalid.com

14

Four (4) Thermal Power Generation Companies (GENCOs)

Nine (9) Distribution Companies (DISCOs)

One (1) National Transmission & Power Dispatch Company (NTDC)

POWER WING IS RESTRUCTURED INTO FOURTEEN (14) PUBLIC LIMITED COMPANIES

Page 15: Gepco

www.saifullahkhalid.com

15

Southern Generation Power Company Limited (GENCO-1) headquarter at Jamshoro district Dadu near Hyderabad Sindh.

Central Power Generation Company Limited (GENCO-2) headquarter at Guddu district Jacobabad Sindh.

FOUR (4) THERMAL POWER GENERATION COMPANIES (GENCOS)

Page 16: Gepco

www.saifullahkhalid.com

16

1] (LESCO) - Lahore Electric Supply Company 2] (GEPCO) - Gujranwala Electric Power Company 3] (FESCO) - Faisalabad Electric Supply Company 4] (IESCO) - Islamabad Electric Supply Company 5] (MEPCO) - Multan Electric Power Company 6] (PESCO) - Peshawar Electric Power Company7] (HESCO)- Hyderabad Electric Supply Company8] (QESCO) - Quetta Electric Supply Company9] (TESCO) - Tribal Electric Supply Company

NINE (9) DISTRIBUTION COMPANIES (DISCOS) AS UNDER :

Page 17: Gepco

www.saifullahkhalid.com

17

Page 18: Gepco

www.saifullahkhalid.com

18

Undertake the task of investigating, planning and executing schemes for irrigation

Drainage, prevention of water logging Reclamation of saline land as an

autonomous body responsible for integrated development of water and power resources in Pakistan

Entrusted with the work of implementing Indus Basin Settlement Plan

WATER WING:

Page 19: Gepco

www.saifullahkhalid.com

19

GEPCO(GUJRANWALA ELECTRIC POWER

COMPANY)

Page 20: Gepco

www.saifullahkhalid.com

20

GEPCO has been setup over an area of jurisdiction and network of former

Area Electricity Board, which was created in early eighties

It encompassed the areas of existing Districts of Gujranwala, Hafizabad, Sialkot, Narowal, Gujrat and Mandi Bahauddin

GEPCO was incorporated on 25th April, 1998

Obtain certificate for commencement of business on 5th June, 1998

GEPCO is distribution company (DISCO)

Page 21: Gepco

www.saifullahkhalid.com

21

Provide Safe, Secure, Accessible and Reliable Electric Power supply to our esteemed Customers in accordance with their varying needs in a cost effective and efficient manner with special emphasis on excellence and innovation .

MISSION STATEMENT:

Page 22: Gepco

www.saifullahkhalid.com

22

To acquire or take over those properties, rights and liabilities of WAPDA AEB Gujranwala

To carry on expand and extend the business and activities

To acquire or take over those properties, rights and liabilities of the Grid stations of the Pakistan WAPDA and the transmission lines in relation

OBJECTIVE:

Page 23: Gepco

www.saifullahkhalid.com

23

To carry on all or any of the business of purchasing, importing, transforming, converting, distributing, supplying, exporting and dealing in electricity

promoting the conversation and efficiently use of electricity and all other forms of energy.

Page 24: Gepco

www.saifullahkhalid.com

24

To improve financial management to maximize utilization of Company resources. 

To make the operations of Company profitable. 

To generate sufficient cash flows to meet operating and investment requirements of the Company. 

To achieve optimum debt equity ratio which provides financial soundness to Company and better return on investment to shareholders.FINANCIAL OBJECTIVES:

Page 25: Gepco

www.saifullahkhalid.com

25

To maintain and develop network that meets consumers demand. 

To reduce line losses by improving line maintenance and metering security.

To ensure continuity of supply to electricity consumers round the clock.

TECHNICAL OPERATIONS OBJECTIVES:

Page 26: Gepco

www.saifullahkhalid.com

26

To ensure speedy provision of electricity connections to prospective consumers. 

To provide timely and accurate billing to consumers. 

To facilitate consumers for timely deposit of bills. 

To improve quality of service by taking prompt action on complaints and redressal of their grievances.

COMMERCIAL OPERATIONS OBJECTIVES:

Page 27: Gepco

www.saifullahkhalid.com

27

To ensure recruitment of best possible employees in accordance with the operational requirements. 

Train manpower in accordance with their assignments to improve their skills and efficiency. 

MANPOWER PLANNING OBJECTIVES:

Page 28: Gepco

www.saifullahkhalid.com

28

To procure equipment and material in a transparent manner. 

To ensure timely availability of equipment and material. 

To make cost effective procurement of materials without compromising on quality

PROCUREMENT PLANNING OBJECTIVES:

Page 29: Gepco

www.saifullahkhalid.com

29

Loans Awarded Pick & Drop Service Medical Facilities Marriage Grant Scholarships Free Electricity Supply

EMPLOYEE WELFARE:

Page 30: Gepco

www.saifullahkhalid.com

30

Page 31: Gepco

www.saifullahkhalid.com

31

Chairman : Mr. Ikhlaq Ahmed Butt (Chief Executive, Sonex Industry Ltd.

Gujranwala ) Director : Rana Muhammad Ashraf Zahid (Chief Executive Officer GEPCO,

Gujranwala ) Director : Mr. Khalid Javed (GM (C&M) - WAPDA, G-44, Wapda

House, LHR. )BOARD OF DIRECTORS:

Page 32: Gepco

www.saifullahkhalid.com

32

DIRECTOR : MR. ZAHOOR-UL-HAQ (CHIEF ENGINEER (R.E) WAPDA IEEEP BUILDING, 17/C-1, FAISAL TOWN, LHR.)

DIRECTOR : MIRZA MUHAMMAD IMTIAZ AHMED (CHIEF EXECUTIVE, METRO HI-TECH PVT. LTD. GUJRAT. )

DIRECTOR : MR. KHAWAR ANWAR KHAWAJA (CHIEF EXECUTIVE - GRAYS OF CAMBRIDGE PAK, SIALKOT. )

DIRECTOR : MR. IQBAL ANWAR (CHIEF ENGINEER - GSC (NORTH), NTDC )

Page 33: Gepco

www.saifullahkhalid.com

33

Page 34: Gepco

www.saifullahkhalid.com

34

DEPARTMENTS

Page 35: Gepco

www.saifullahkhalid.com

35

Human Resource Planning, Selection, Recruitment

Human Resource Development Compensation & Benefits Safety & Health Allowances Employee and Labor relation Human Resource research

HUMAN RESOURCE DEPARTMENT

Page 36: Gepco

www.saifullahkhalid.com

36

Maintains secrete service records of officers/officials of GEPCO

maintain Seniority lists Annual Confidential Records of the employees

Promotion is held only for regular officers

seniority lists are prepared in their respective cadres

BPS-5 and above is required to pass Departmental Promotion examination and Training

PROMOTION CELL

Page 37: Gepco

www.saifullahkhalid.com

37

Deals with all disciplinary cases Enquiries are also checked Complaints are received and appeal cases and

complaints are also processed. General, DC, NAB complaints are also enquired in

this department Show cause notices are also issued if some one

involved in a case

INQUIRY SECTION

Page 38: Gepco

www.saifullahkhalid.com

38

Assistants do work related to traveling & medical allowances

Marriage grants, widow grants, flat allotment, scholarship of students (children of employees

Service books of all employees are also maintained under this department

GENERAL SECTION

Page 39: Gepco

www.saifullahkhalid.com

39

Sanction of all kind of leaves Grants for advances, lease and it also

include posting and transfer of employees

Courses and training are also dealt by this section

Deals with man power planning, increments, regulations of disputed period, causality reports and renewals and also NOC Certificates

Issuance of ID card and, condolence letter also dealt

ADMIN SECTION

Page 40: Gepco

www.saifullahkhalid.com

40

TRAINING &

DEVELOPMENT

Page 41: Gepco

www.saifullahkhalid.com

41

REGIONAL TRAINING CENTER

TECHNICALNON TECHNICALSAFETYCOMMERCIALMANAGEMENTTRAINING LAB

Page 42: Gepco

www.saifullahkhalid.com

42

METHOD OF TRAINING

THEORETICALPRACTICAL

Page 43: Gepco

www.saifullahkhalid.com

43

TRAINING NEED ASSESSMENT

Page 44: Gepco

www.saifullahkhalid.com

44

LEVELS OF TRAINING NEED ASSESSMENT

ORGANIZATIONAL LEVELTASK ANALYSISINDIVIDUAL OR PERSONAL LEVEL

Page 45: Gepco

www.saifullahkhalid.com

45

TRAINING SCHEDULE AT GEPCOFOR YEAR 2009

Page 46: Gepco

www.saifullahkhalid.com

46

Page 47: Gepco

www.saifullahkhalid.com

47

Page 48: Gepco

www.saifullahkhalid.com

48

Page 49: Gepco

www.saifullahkhalid.com

49

Page 50: Gepco

www.saifullahkhalid.com

50

Page 51: Gepco

www.saifullahkhalid.com

51

ORGANIZATIONAL LEVEL

ORGANIZATIONAL GOALSORGANIZATIONAL RESOURCESORGANIZATIONAL CLIMATEENVIRONMENTAL CONSTRAINTS

Page 52: Gepco

www.saifullahkhalid.com

52

TASK ANALYSIS

OVERALL JOB DESCRIPTIONTASK IDENTIFICATIONIDENTIFY WHAT IT TAKES TO DO THE JOBIDENTIFY THE AREAS THAT CAN MOST BENEFIT FROM HRD

Page 53: Gepco

www.saifullahkhalid.com

53

PERSON ANALYSIS

BUILDING ACRISSUANCE OF CERTIFICATESNO PROPER PERFORMANCE APPRAISAL BECAUSE OF SENIORITY

Page 54: Gepco

www.saifullahkhalid.com

54

Page 55: Gepco

www.saifullahkhalid.com

55

Page 56: Gepco

www.saifullahkhalid.com

56

Page 57: Gepco

www.saifullahkhalid.com

57

Page 58: Gepco

www.saifullahkhalid.com

58

Page 59: Gepco

www.saifullahkhalid.com

59

Page 60: Gepco

www.saifullahkhalid.com

60

Thank you !