Geothermal Power at Oserian Farms, Naivasha, Kenya … Oserian... · Isometric of Oserian Geo Plant...

32
Geothermal Power at Oserian Farms, Naivasha, Kenya Geothermal Power at Oserian Farms, Naivasha, Kenya Steve Hirsch, Geothermal Development Associates Steve Hirsch, Geothermal Development Associates ARGeo C2 Conference, Nov. 24 ARGeo C2 Conference, Nov. 24 - - 28, 2008, Entebbe 28, 2008, Entebbe

Transcript of Geothermal Power at Oserian Farms, Naivasha, Kenya … Oserian... · Isometric of Oserian Geo Plant...

Geothermal Power at Oserian Farms, Naivasha, KenyaGeothermal Power at Oserian Farms, Naivasha, KenyaSteve Hirsch, Geothermal Development AssociatesSteve Hirsch, Geothermal Development AssociatesARGeo C2 Conference, Nov. 24ARGeo C2 Conference, Nov. 24--28, 2008, Entebbe28, 2008, Entebbe

KenyaKenya’’s Use of Geothermal s Use of Geothermal PowerPower

••Most power generated in Kenya from Most power generated in Kenya from hydrohydro

••Drought is constant riskDrought is constant risk••Initially 45 MW installed 1981Initially 45 MW installed 1981--8585••Presently 135MW installed, 10% Presently 135MW installed, 10%

national capacitynational capacity••561MW planned by 2026561MW planned by 2026

ODC LocationODC Location

ODC LocationODC Location

OLKARIANORTH-WEST

OLKARIASOUTH-WEST

OLKARIACENTRAL

FIELD

OLKARIAEAST

PRODUCTIONFIELD

OLKARIADOMESFIELD

OLKARIANORTH-EAST

FIELD

OLKARIASOUTH-EAST

FIELD

192000 194000 196000 198000 200000 202000 204000 206000

Eastings

9897000

9899000

9901000

9903000

9905000

9907000

9909000

9911000

Nor

thin

gs

101

102

301

302

305

306

307

308

401

601

304D

X1

X2

OW1

OW2

701

704703

705

601

801

901

902

903

201202

203

204

303A

306

OLO

LBUTOT F

AULT

OLKARIA

FRACTURE

Olkaria Area Geo Wells

Domes

Olkaria NE

Olkaria NW

Olkaria SE

Olkaria SW OlkariaEast

Olkaria Central

ODC Well

HistoryHistory• Oserian Development Co. Ltd. (ODC) established 1969 as 5

hectare veg farm. Expanded 1982 to include cut flowers

• Using KenGen geothermal exploration well, ODC investigated geothermal use

• Studied Davao City, Philippines experience supplying 60% country’s cut flowers using geo plant in national park

• Contracted for 1.8 MW binary plant 2003

• Plant successful, ODC expanded geo use

GDA Supply of Second Geothermal Plant GDA Supply of Second Geothermal Plant to Oserianto Oserian

• June 2006 - ODC signed GDA contract to design, manufacture, ship, commission 2 MW nominal geothermal turbine-generator set from Reno, NV to Naivasha, Kenya

• Plant ready for shipment 10 months following contract signature

• Operating since Nov. 2007 in parallel with existing binary plant

Geothermal Plant System ComponentsGeothermal Plant System Components

• Elliott 4 stage GYR turbine - Jeanette, PA USA• Kato Engineering 1,750kW, 3 phase synchronous

generator - Mankato, MN USA• Lufkin N12C, double helical gearbox - Lufkin, TX

USA • Oil lubrication system – GDA, Reno, Nevada, USA

ODCODC’’s Use of Geothermal Energy Todays Use of Geothermal Energy Today

• Today 230 hectare greenhouses exporting >400 million stems/year to Europe (30% European cut flower market)

• Largest geothermal greenhouse system in world• Used for temperature regulation, rose health,

power generation for water pumping, lighting, humidity control, computerization

Turbine Rotor in Elliott Factory

Plant Before Shipment from USPlant Before Shipment from US

Isometric of Oserian Geo PlantIsometric of Oserian Geo Plant

Generator

Gear Box

Steam Turbine

Dimensions (L x W x H):6.0 x 2.0 x 3.2 m

Lube OilConsole

Plant Assembled in RenoPlant Assembled in Reno

ODC Workers Preparing FoundationODC Workers Preparing Foundation

Steam Line InstallationSteam Line Installation

Connecting Steam Line to PlantConnecting Steam Line to Plant

Electrical ConnectionsElectrical Connections

Unloading the PlantUnloading the Plant

Plant InstallationPlant Installation

Housing & InstallationHousing & Installation

Fully Assembled at ODCFully Assembled at ODC

Ready for CommissioningReady for Commissioning

Wellfield TestingWellfield Testing

In OperationIn Operation

A Job WellA Job Well--DoneDone

Initial 1.8MW Ormat PlantInitial 1.8MW Ormat Plant

Why Small-Scale Geothermal?

• Short manufacturing, shipping, installation times• Well suited for small island countries, rural

electrification• Allows resource analysis without add’l drilling• Transportable from site to site• Facilitates training HC personnel• Catalyst for political support for larger geo

installations

WhatWhat’’s Needed to Advance SS Geo s Needed to Advance SS Geo Development in E. Africa?Development in E. Africa?

Expertise and financing for:• Geological, geochemical, geophysical studies, temp

gradient drilling

• Exploration drilling, resource testing

• Short Term operational assistance for initial plant O&M

• Training for HC plant operators, wellfield / resource managers

How GDA Can HelpHow GDA Can Help

••Resource identification, assessment, Resource identification, assessment, project design, implementationproject design, implementation

••Design, engineering, supply of 2Design, engineering, supply of 2--20 MW 20 MW geo plantsgeo plants

••Possible equity coPossible equity co--ownership/investmentownership/investment••Training wellfield and plant operatorsTraining wellfield and plant operators

Thank YouThank You

Steve HirschSteve HirschGeothermal Development AssociatesGeothermal Development Associates

770 770 SmithridgeSmithridge Drive, Suite 550Drive, Suite 550Reno, NV 89502Reno, NV 89502

775 826775 [email protected]@gdareno.com