Geophysical Exploration & Landowners’ Rights Farmers’ Advocate Office Alberta Agriculture and Forestry #305, 7000-113 Street Edmonton, AB T6H 5T6 [email protected] www.farmersadvocate.gov.ab.ca Twitter: fao_alberta Facebook: Farmers’ Advocate of Alberta

Transcript of Geophysical Operations and Landowners' Rights (Agdex 878-5)€¦ · explosives by certified...

Geophysical Exploration&

Landowners’ RightsFarmers’ Advocate Office

Alberta Agriculture and Forestry#305, 7000-113 Street

Edmonton, AB T6H 5T6

[email protected] www.farmersadvocate.gov.ab.ca

Twitter: fao_alberta Facebook: Farmers’ Advocate of Alberta

The Farmers’ Advocate Office (FAO) has prepared this publication to provide information in response to

general questions about geophysical exploration

(also referred to as seismic operations) in Alberta.

This publication is intended to provide the surface owner or

occupant with a brief synopsis of their rights regarding

geophysical exploration on private and leased land.

About Geophysical Exploration (1-2)Landowners’ Rights (3-7)Side Notes (8-9)Appendices

Introduction

Ag-Dex 878-5

All photos used with permission from the Alberta Joint Geophysical Steering Committee unless otherwise noted.

Geophysical exploration is a process of mapping the subsurface of the earth to detect the presence and position of petroleum and mineral deposits. Measurements are made using an energy source which is recorded by sensors (geophones) that are placed at specific locations and surveyed.

Exploration will use either an explosive energy source (dynamite) or a non-explosive energy source (vibroseis). When using an explosive source, shot holes are drilled to a depth of typically 6-15 metres and are loaded with explosives by certified technicians on the drilling crew. When using a non-explosive source, seismic vibrators are activated at ground level. Both techniques generate seismic waves, which are refracted and reflected back to the earth’s surface, where they are recorded using geophones.

The simplest form of geophysical exploration is 2 dimensional (2D), which entails distributing geophones and source points along independent recording lines which traverse specific areas of interest. Two dimensional (2D) exploration provides subsurface information only for the area below the line at the surface. The source points and the geophones are positioned by a survey crew following a technical design, regulatory approval conditions, and landowner permit conditions.

Most operators are now opting for 3 dimensional (3D) geophysical exploration. In 3D exploration, a grid of source and receiver lines is set up over an area of interest. The 3D technique records numerous lines and stations at the same time, as opposed to a singular line as in 2D techniques. Because multiples lines are being recorded, the data from each source point is recorded over a large area beneath the 3D grid.

Spacing between the source and receiver lines will depend on the depth of the target zone. The stations and lines are closer together for shallow targets and farther apart for deeper targets. When designing a program for very shallow targets, the station lines could be as close as 2 metres apart and stations as close as 5 metres apart. A deeper target may have lines upwards of 400 metres apart and stations greater than 50 metres apart.

The receiver and source lines are usually kept as straight as possible, but they may meander slightly to avoid structures and other topographical features. When a geophysical permittee acquires a permit for 3D exploration, they will usually want the ability to move or offset source or receiver points from the original permitted locations.

3D geophysical crews typically require more personnel and equipment than 2D crews. Some crews will use a helicopter to move equipment around. This is especially beneficial in situations where vehicle access is an issue.

Landowners should be aware that even if there does not appear to be any crew activity in the vicinity of the equipment in the area, the equipment is still being used to record data.

As technology improves, some companies are now opting to incorporate time as a component of their surveys. This is known as 4 dimensional (4D) geophysical exploration. With 4D exploration, the survey is re-shot at regular intervals – typically annually, though in some cases as often as every six months. The licensee will generally apply for a longer geophysical approval for 4D exploration and negotiate re-entry conditions and additional compensation with landowners as necessary.

About Geophysical Exploration

Page 1

All geophysical activities carried out in the White Area (settled) require that notification be provided to all residents within 400 metres of a seismic line. Notification must occur a minimum of 48 hours prior to the commencement of geophysical exploration, regardless of the energy source being used. The notification process is regulated through the Alberta Energy Regulator (AER).

As a minimum, the notification must contain the following information: • the name of the permittee, • a contact name complete with phone number, and• a description of the energy source.

In Alberta, geophysical exploration is typically contracted from a resource company (licensee) to a permit company (permittee). A landowner may ask the permittee or the AER for the name of the licensee.

NegotiationTo obtain approval for a preliminary geophysical program, a licensee must submit an application to the AER. The AER is responsible for issuing a letter of authorization for an operator to conduct geophysical activity.

The authorization from the AER does not grant access onto private land. The licensee must acquire written consent from the landowner (or a person authorized by the landowner) prior to conducting any geophysical operations on private land.

If entry is refused by the landowner, the operator has no appeal and geophysical activity cannot occur, except in the case of carbon capture and storage. The maximum fine for conducting geophysical exploration on private land without landowner consent is $25,000.

If a company wishes to undertake geophysical exploration on your land, the process will begin when you are approached by a permit agent working on behalf of the licensee. If you do not understand any details of the program, you should not hesitate to ask the permit agent questions.

It is entirely up to a landowner to negotiate the terms of the contract agreement to ensure their needs are protected. A standard permit form entitled Permit to Conduct Geophysical Operations was developed by the Canadian Association of Geophysical Contractors, in conjunction with the FAO, the Canadian Association of Petroleum Producers, the Explorers and Producers Association of Canada, and Alberta Environment and Parks (Appendix A). A landowner is under no obligation to use any other form, and the landowner has the right to refuse entry over dissatisfaction with a licensee’s permit form. A landowner has the right to capture all commitments and agreements as an appendix to the permit form.

The permit agent may have certification through Enform’s Geophysical Permit Agent Program. Although this program is not mandatory, it is highly recommended for all permit agents. A landowner may request that a permit agent’s certification number be provided on the permit form.

The FAO strongly recommends that landowners use the Permit to Conduct Geophysical Operations for all exploration occurring on their land. The agreement provides clauses to help recognize both the landowner’s interests and the licensee’s needs. Both parties may make changes to the permit form to help suit their particular circumstances.

NotificationLandowners’ Rights

Page 2

• Location The permit agent will provide a map of the proposed access routes and program lines. A licensee will usually want some flexibility within the permit to move or offset source points from the original permitted line. A standard clause on the permit form includes a statement providing permission to move, shift, offset or delete lines. Providing some flexibility will enable the operator to move from line to line or to cross fence lines and gates, which helps in the execution of their program. The landowner may want to provide input on the route to follow fence lines or avoid shelterbelts.

• SetbacksRequired setback distances for source points from infrastructure are outlined in AER Directive 2006-15 (Appendix B). Reduced setbacks to certain structures are permitted if the licensee acquires written consent from the owner of structure. Note that if your property is designated as a Provincial Historic Resource, ministerial approval must be in place prior to any land disturbance or seismic testing.

• Width The licensee will typically obtain a right-of-way that is slightly wider than the line to help accommodate the equipment. The permit will specify the width of seismic line, which is typically 5 metres, but will vary depending on the type of terrain. Negotiations should also determine the manner in which brush, trees, or snow may be cleared from the line.

Page 3

• Avoiding Hazards Owners of buried facilities such as pipelines, telephones, or power will locate and mark the positions of their facilities with lath or stakes so that the source points for the geophysical exploration are placed at the proper setbacks. The marking of the buried facilities follows the Alberta One-Call process. Landowners that have unmarked or buried facilities should mark the path and depth on the permit sketch diagrams.

• Access Landowners should ensure they fully understand the traffic and access routes that will be utilized. Trucks, quads, skidoos, buggies, or tracked vehicles may be used during the program. For access, it is beneficial for the both the landowner and the licensee to minimize disturbance. To help reduce detouring, the permit agent may request permission to cut fences, but consideration should be made of any livestock in the area. The crew is responsible for repairs and may opt to contract the work to the landowner. The permit should also outline a plan for clean-up and disposal of any trees or brush that must be cut to accommodate exploration.

• TimingA discussion on timing is an important component of the negotiation considering the seasonal nature of agricultural operations. Geophysical programs can occur at any time of the year, but they generally depend on ground and environmental conditions.

The permit should stipulate the approximate dates the permittee plans to access the property and when they estimate the program will be completed. Since larger areas can be recorded with 3D exploration, the equipment stays on the ground longer compared to 2D exploration.

A landowner may request that they be notified before the permittee enters any part of the property for the commencement of operations, or for each phase of the operation. The phases are generally surveying, locating buried facilities, drilling, recording, and clean-up. Negotiations should specifically recognize a timeline for clean-up and restoration.

• Clean Up and AbandonmentAfter the recording is complete, the geophysical crew will pick up and remove their equipment, survey markers, lath, and refuse. All garbage and toilet facilities should be cleaned up to the landowner’s satisfaction.

For programs that utilize explosive energy sources, each shot hole must be temporarily abandoned immediately after the drilling and loading of the shot hole. The shot hole must be permanently abandoned after detonation. To permanently abandon shot holes, the permittee will insert an approved hole plug approximately 1 metre below the ground surface. Above the plug there will be 40 centimetres of an approved sealing product, such as bentonite, and then 60 centimetres of drill cuttings up to the ground surface.

Page 4

Sealed flowing shot hole.Flowing shot hole.

In areas prone to flowing holes, a landowner may desire to have the entire shot hole plugged with a sealing product. In certain areas of the province, the AER has specific conditions to manage the potential for flowing holes. The minimum standards for abandoning a shot hole are in the Exploration Regulation and associated AER Directive. The method of abandonment should be discussed when the permit is being negotiated.

The permittee is responsible for restoring the ground surrounding the hole to as close as possible to its original condition. Generally the cuttings are placed back into the hole with remaining materials spread level around the hole. However, since drill cuttings will naturally contain clay, spreading them around an abandoned shot hole can be detrimental to vegetation.

Receiver line regrowth after 1 year.

A landowner can specify that they want nothing left behind after the abandonment is complete. Using a containment device to catch drill cuttings when the shot holes are drilled makes cleaning up in the vicinity of the hole much simpler. The holes should be covered and tamped to an extent that there would be no impact to livestock or general use in the area. The landowner’s preferred approach to managing drill cuttings can be discussed in the negotiations with the permit agent and then documented in the agreement.

Before the drilling crews leave the location, the permittee must ensure that an approved source point permit tag is affixed in a readily visible location near each source location. The permit tag must contain the number of the exploration approval for the program and the permit number of the operator. The source point permit tag is to be affixed, where possible, not more than 10 metres from each centre source point.

[¿

+!

[¿

[¿[¿[¿

[¿

[¿

[¿

[¿

[¿

[¿

0 4 3 - 0 5 W 50 4 3 - 0 6 W 50 4 3 - 0 7 W 50 4 3 - 0 4 W 5

0 4 7 - 0 3 W 5

0 4 3 - 0 3 W 5

0 4 4 - 0 3 W 50 4 4 - 0 7 W 5

0 4 7 - 0 5 W 5

0 4 4 - 0 5 W 50 4 4 - 0 6 W 5 0 4 4 - 0 4 W 5

0 4 5 - 0 4 W 5

0 4 7 - 0 4 W 5

0 4 5 - 0 3 W 50 4 5 - 0 6 W 5

0 4 7 - 0 6 W 5

0 4 5 - 0 5 W 5

0 4 6 - 0 4 W 5 0 4 6 - 0 3 W 50 4 6 - 0 6 W 5 0 4 6 - 0 5 W 5

0 4 8 - 0 6 W 5 0 4 8 - 0 5 W 5 0 4 8 - 0 4 W 5

11 1111 11

1111 11

11 11 1111

11

11

11 1111

28

04

30

18141816

28 30

15

26

14

1613

1715

27

30

05

06

1415

26

17

27

27

0103

18

25

02

28

14

15

17

25

26

27

30

01

13

06

13 17

05 01

26

18

17

25

25

18

30

18

04

01

25

28

16

29

15

17

15

25

06 05

29

26

30

0503

29

13

29

14

28

27

04 0206 02

30

16

03

14

03 01

13

28

30

04

30

03

25

0506

28

16

16

06

13

13

26

13

02 05

0406 04

29

01

28

04

26

1316 1617

05

15

17

28

18

02

2825

04

29

01

15

28

18

16

27

27

05

2925 30

29

02

02

15

15

02

14

27

27

13

05

18

25

16

18

28

15

16

06 03

27

03

26

01

13

0503

13

16

26

06

14

28

03 01

25

03

09

25

04

25

26

01

17

05

01

26

17

06

02

1816

0406

30

04

28

25

02 0202

02

14

3030

06

2829 29

16 14 15

01

18

03

26

14

30

01

17

03

27

14

03

26

17 17

06

27

30

15

29

14

03

18

26

17

06

27

14

05

28

35

02

14

02

28

06 01

18

19

01

15

29

15

04

16

13

28

27

03

27

14

30

04

34

18 17

18 15

26

14 13

26

05

27

29

04

18

29

2727

13

26

0707

29

28

02

25

16

30

25

33

29

13

16

30

0405 03

21

13

06 01

26 28

17 16

26

29

14

15

19

17

25

09

16

21

04

1009

15

23

08

33

23

18

12

29

3131

25

30

17

23

08

30

10

22

05

32

21

24

33

08

13

27

23

25

19

10

2224

27

22 20

32

08

34

08

22

31

12

23

10

29

3633

31

07

34

24

35

20

19

20

35

09

24

07

2419

2120

35

23

36

10

36

24

12

19

3232

19

35

20

19

31

31 36

36

34

08

23

34

3332

19

12

29

21

31

24

09

09

22

1212

36

22

21

36

21

35

12

09

343335

08

21

3331

22

36

33

20

07

24

25

21

32

09

09

10

21

24 21

07

24

20

10

33

12

12

19

21

10

32

09

35

33

24

09

22

20

2222

33

23

31 34

07 12

05

10

32

07

34

35

23

23

24 21

36

07

22

08

34

35

23

34

12

35

36

24

21

19

36

08

24

10

07

09

32 34

21

08

19

23

09

31 3533

08

07

20

23

22

3236

20

10

36

19

35

33

31

32

22

19

08

21

23

10

22 23

20

07

31

33

19

35

31

33

10

34

07

34

0812

20

20

35

07

10

07

32

21 20

1207

34

22

23

09

34

10

23

31

20

12

02

12

22

22

21

24

10

2219 24

20

23

3233

23

19

0812

21

09

24

19

21

09

36

23

31 32

090708

20

03

20

10

36

24

32

19

08

04

12

05

19

06

22

36

24 22

31 35

20

34

01

24

32

030503 06 04

08

02 01040601

3533

02

313436

0304

34 33

05

32

05

32 31

0102 06

20

3635 3333 31

17

353234 3432 36313635

S5206

S5213

S5199

S5115

S5136

S5157

S5178

S5066

S5045

S5024

S5150

S5164

S5052

S5038

S5094

S5101

S5108

S5122

S5080

S5129

S5073

S5192

S5185

S5087

S5031

S5171

S5143

S5059

S5234

S5227

S5220

S5241

S5311

S5318

S5325

S5283

S5255

S5297

S5269

S5262

S5290

S5304

S5276

S5332

S5248

S5339

S5346

S5353

S5360

S5367

S5374

S5381

S5388

S5395

S5402

S5409

S5416

R16

01

R17

11

R17

41

R17

31

R17

61

R17

51

R17

26

R17

16

R17

56

R17

36

R17

21

R17

46

R17

66

R17

91

R17

71

R17

81R

1776

R17

86

R18

11

R19

11

R18

21

R18

06

R18

01

R17

96

R18

26R

1831

R18

36R

1841

R18

46R

1851

R18

56

R18

16

R18

61

R18

96

R18

91

R19

06

R18

76

R19

01

R18

86

R18

66

R18

81

R18

71

R16

11

R16

86

R16

96

R16

76

R16

21

R16

66

R16

41

R16

56

R16

31

R16

91

R16

51

R16

36

R16

61

R16

26

R16

71

R16

16

R16

81

R16

06

R16

46

R19

16R

1921

R19

26R

1931

R19

36

R19

41

R19

46

R19

51R

1956

R19

61R

1966

R19

71

R19

76R19

81

R19

86

R19

91R

1996

R20

01

R20

06R

2011

R20

16

R20

21R

2026

R20

31

R20

36

R20

41

R20

46

,

,

655281, 5862865

Anderson CreekNatural Area

Buck LakeNatural Area

Poplar CreekNatural Area

Wilson CreekNatural Area

Horseshoe CreekNatural Area

Buck LakeNatural Area

Medicine Lake Provincial Grazing Reserve

Rocky Mountain House Provincial Grazing Reserve

Rocky Mountain House Provincial Grazing Reserve

BUCK LAKE 133C

Max Depth 9m

Max Depth 6m

Max Depth 9m

Max Depth 6m

Max Depth 9m

Max Depth 6m

Max Depth 6m

Max Depth 0m

Max Depth 6m

Max Depth 9m

Max Depth 9m

Max Depth 9m

Max Depth 9m

Max Depth 9m

Max Depth 6m

Max Depth 12m

Max Depth 9m

Max Depth 9m

Max Depth 9m

Max Depth 9m

Max Depth 6m

Max Depth 9m

Max Depth 9m

Max Depth 9m

Max Depth 6m

Max Depth 12m

Max Depth 12m

Max Depth 15m

Max Depth 15m

Max Depth 12m

Max Depth 9m

Max Depth 12m

Max Depth 9m

Max Depth 15m

Max Depth 12m

Max Depth 12m

White Area

Green Area

¬«22

¬«13

¬«20

¬«761

¬«616

¬«607

¬«761

¬«761

Calhoun BayRecreation Area

Buck LakeRecreation Area

Medicine LakeRecreation Area

645000

645000

650000

650000

655000

655000

660000

660000

665000

665000

670000

670000

675000

675000

5845

000

5845

000

5850

000

5850

000

5855

000

5855

000

5860

000

5860

000

5865

000

5865

000

5870

000

5870

000

5875

000

5875

000

5880

000

5880

000

5885

000

5885

000

Sources: Esri, DeLorme, NAVTEQ, TomTom, Intermap,increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN,GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan,METI, Esri China (Hong Kong), swisstopo, and the GIS UserCommunity

ProjectArea

1:500,000 Access Map

PENDRYL 3D 2013Proceeding Map V8 -

Program Total: 2,297.93 km Program Area: 396.36 sq. km

Licensee: Arcis Seismic SolutionsLicense No.: 6123Geo# 13-0141,13-0084,13-0006,13-0179Arcis No.: S13-028Location: Twp 44-46 Rge 3-6 W5MProjection: NAD 83 UTM Zone 11Date: December 13, 2013Version #8

Energy Source: DynamiteEquipment: Wheeled/TrackedSource Interval: 60 mSource Line Interval: 420 mGroup Interval: 60 mReceiver Line Interval: 300 m

New Cut Mulcher LIS (4.5m):

New Cut Mulcher LIS (3.0m):

New Cut Mulcher LIS (2.7m):

New Cut Mulcher LIS (1.75m):

New Hand Cut (1.5m):

Existing Cut Line (4.5m):

Existing Cut Line (3.0m):

Existing Hand Cut (1.5m):

Minimal Impact (0.0m):

Total Crown:

Total Freehold:

TOTAL SOURCE:

}} }} }} }} }} }} }} }}

0.00 km

32.55 km

0.00 km

3.87 km

0.33 km

0.00 km

40.11 km

0.00 km

0.00 km

76.86 km

0.00 km

76.86 km

This Map is intended for representational purposes only. Arcis Corporation is not responsible for any errors or omissionswhich may be presented on this map

Sports Track

River/Creek

Built-up Area

Dump

Embankment

Golf Course/Park/Sports Field

Runway/Airstrip

Wooded Area/Bush

Intermittent Lake/Slough

Lake/Pond

Wetlands

Building

à Campground

? Tower

Contour - Depression

Contour

Dam

Transmission Line

Mining Area

Oil/Gas Facilities

d d d

d d d Transmission Station

Pipeline

"

d

d

d

Bridge

Railway - Abandoned

Railway - Active

Highway - Paved

Highway - Unpaved

Arterial Road - Paved

Arterial Road - Unpaved

Collector/Local Roads - Paved

Collector/Local Roads - Unpaved

LOC Road/Well Access

Trail

Scale: 1:50,000

GREEN AREA

2100, 250 - 5th Street SWCalgary, Alberta, T2P 0R4

P: 403.781-1700 F: 403.781.1444(Toll Free) 1.888.269.6840

www.arcis.com

Historical Resource Value 1- Government Clearance Required

Historical Resource Value 2- Government Clearance Required

Historical Resource Value 3- Government Clearance Required

Historical Resource Value 4- Government Clearance Required

Historical Resources

Archaeological Site

Provincial Grazing Reserve- No entry til October 15

Provincial Park, Recreational, Natural and/or Protected Area- No Entry into Park- Minimal line 0-100m from park- 1.5m HC line 100-200m from park

First Nation Reserve- Buck Lake 133C- IOGC Approval Required

Green Area / White Area Boundary

Administrative Land

[¿ Spring+!

New Cut Mulcher LIS (4.5m):

New Cut Mulcher LIS (3.0m):

New Cut Mulcher LIS (2.7m):

New Cut Mulcher LIS (1.75m):

New Hand Cut (1.5m):

Existing Cut Line (4.5m):

Existing Cut Line (3.0m):

Existing Hand Cut (1.5m):

Minimal Impact (0.0m):

Total IOGC:

Total Crown:

Total Freehold:

TOTAL SOURCE:

}} }} }} }} }} }} }} }}

0 1,000 2,000 3,000 4,000500Meters

Colonial Nesting Birds - Great Blue Heron- March 1 to July 31 -1000m buffer from nesting site.- Sept 1 to Feb 28 - 1.75m newcut lines within 1000m (no operations within 100m from nesting site)

Key Wildlife & Biodiversity Zone- No entry Jan 15 to April 30.- 1.75m newcut lines.

Sharp Tailed Grouse- Oct 31 to March 15 - No Survey Required- March 16 to Oct 30 - Survey Required- 100m buffer from Lek June 16 to March 14

Wildlife Zones/Ranges(Potential Environmental Assessment Required)

Protective Notation

Consultative Notation

Disposition Reservation

Marsh Habitat Development- Ducks Unlimited Canada- No Entry

Buck for Wildlife- 1.75 newcut lines.

Industrial Sample Plot- No Entry

Grazing Lease/Permit

Recreation Lease

Crown Reservations/Notations/Leases

No Energy Source. -Geophones Allowed

Shot Hole Dept Restriction

Exploration Restricted Areas

Log Crossing/Snowfill

Existing Bridge

Non-Mechanical Crossing

Existing Helipad

Stream Crossings

!?

!?

!?

SOURCE = 951.00 kmSOURCE INFO:WHITE AREA

New Cut Mulcher LIS (4.5m):

New Cut Mulcher LIS (3.0m):

New Cut Mulcher LIS (2.7m):

New Cut Mulcher LIS (1.75m):

New Hand Cut (1.5m):

Existing Cut Line (4.5m):

Existing Cut Line (3.0m):

Existing Hand Cut (1.5m):

Minimal Impact (0.0m):

Total Crown:

Total Freehold:

TOTAL RECEIVER:

}} }} }} }} }} }} }} }}

GREEN AREARECEIVER = 1,346.93 kmRECEIVER INFO:

WHITE AREA

Disposed Access (3.0m):

Additional Access (3.0m):

Disposed Access (3.0m):

Additional Access (3.0m):

Green Area Total: 165.14 km

Area: 25.76 sq kmWhite Area Total: 2132.79 km

Area: 370.60 sq km

244.29 km

296.82 km

37.24 km

75.50 km

2.30 km

1.97 km

212.08 km

3.84 km

0.10 km

26.17 km

314.53 km

533.44 km

874.14 km

0.00 km

14.35 km

0.00 km

42.04 km

3.37 km

0.00 km

28.52 km

0.00 km

0.00 km

88.28 km

0.00 km

88.28 km

New Cut Mulcher LIS (4.5m):

New Cut Mulcher LIS (3.0m):

New Cut Mulcher LIS (2.7m):

New Cut Mulcher LIS (1.75m):

New Hand Cut (1.5m):

Existing Cut Line (4.5m):

Existing Cut Line (3.0m):

Existing Hand Cut (1.5m):

Minimal Impact (0.0m):

Total IOGC:

Total Crown:

Total Freehold:

TOTAL RECEIVER:

}} }} }} }} }} }} }} }}

0.00 km

31.86 km

0.00 km

924.38 km

47.23 km

0.00 km

254.47 km

0.23 km

0.48 km

38.76 km

438.80 km

781.09 km

1258.65 km

Shutouts- NO ENTRY IOGC Receiver Only

(New Lines)

Page 5

• CompensationThe matter of compensation is managed entirely by the landowner and the operator, as there is no legislation governing the amount or method of payment. It is common practice for geophysical operators to offer compensation that is equitable to all landowners who are affected by a specific program. If compensation negotiations are unsuccessful, the owner of the land may refuse entry. Generally, most operators pay access fees within 30 to 90 days following completion of the geophysical program. However, a landowner may request prepayment as part of their negotiation.

• DamagesA landowner will be paid damages for any impacts that occur beyond the normal wear and tear expected from the geophysical program. The licensee will typically anticipate the payment of some damages, particularly if they are working through cropped land. Examples of other potential damages include rutting, compaction, cut or broken fences, flooding from flowing holes, impacts to livestock, damaged culverts, or spilled equipment fuels.

It is highly recommended that the landowner and the permit agent inspect the land surface prior to signing a damage release, so that any outstanding issues can be identified and addressed. Since the permit agent is not present during the program, he or she may be unaware of damages.

The discussion on damages will occur shortly after the program completes. The FAO recommends that any agreements coming out of this discussion be put in writing. It is important to be specific about the types of damages and time period being covered, as a licensee will not want to be held responsible for specific losses for an indefinite period of time. The licensee will want to pay the program damages and then be released from that specific damage. Once a damage release form is signed for a specific loss, there can be no future claim for that item. Having the landowner sign damage release forms is not required by legislation, but is considered to be a standard practice to “close” the permit agreement.

There may, however, be damages that are unforeseen at the time of signing the damage release. By law, the licensee is still responsible for damages unforeseen at the time of signing the release, such as craters (the area around a shot hole subsiding) or flowing holes. If you spot a crater or flowing hole after a geophysical program has completed, document it and report it to the permit agent as soon as possible. Good communication helps both parties. Obtaining payment for unforeseen damages becomes more difficult as time passes. Keep all your records and provide them to future owners of the property.

When a flowing hole occurs, regulation recommends that the operator confine the flow to the aquifer of origin. A flowing hole can be converted to a water well, but this process must be completed in accordance with regulation. Once the conversion is complete, the operator is no longer responsible for the hole, as it is no longer considered a shot hole.

If a shot hole caves in and creates a cratered hole or release of water, the licensee is responsible for present and future claims. If the licensee has been merged, amalgamated or taken over by another company, the liability goes to the new company. Landowners should be aware that no orphan program exists for cratered or flowing holes; this means that if the licensee no longer exists when problems arise, the landowner has no recourse.

A landowner may opt to have an arbitration clause on damages written into the original permit. Arbitration is an expensive process that produces a binding third party decision. It should be a last resort in the event of a dispute over damages. The AER may facilitate a discussion about damages to try to find a resolution between the landowner and the licensee. For more information, please see EnerFAQ: All About Alternative Dispute Resolution at www.aer.ca

Page 6

• Inspection and SupervisionBefore geophysical exploration occurs, a landowner should take photos of the property that could potentially be impacted by the activities. Landowners are encouraged to be proactive in monitoring the geophysical exploration occurring on their property to ensure the conditions communicated to the permit agent working for the licensee are followed by the permittee. Of course, this supervision should be collaboratively arranged with the permittee to ensure that the proper safety precautions are followed.

After the program is completed, the landowner and permit agent should plan an informal inspection of the lands before a damage release is signed off. The landowner should take a camera on the inspection to document any issues that are spotted. It is preferable to complete the inspection under non-frozen and snow-free conditions.

• Water WellsIf you want to be more informed about the construction, operation and maintenance of your water well prior to geophysical exploration occurring, the FAO highly recommends attending a workshop from the Working Well Program, which is a collaborative effort of Alberta Environment and Parks, Alberta Agriculture and Forestry, Alberta Health, the Water Well Drilling Association, and Alberta Health Services.

If there are concerns about the well’s ability to withstand geophysical exploration, the landowner has the right to refuse entry.

The licensee and permittee must abide with the setback distances outlined by the AER Directive 2006-15 (Appendix B). Regulations state that dynamite source points must be a minimum of 180 metres from a water well. However, a reduced distance of a minimum of 64 metres is permitted with the consent of the landowner. Acceptance of a reduced setback distance does not preclude a landowner from a claim if the water well is disrupted by geophysical activity.

The AER does not require water wells to be tested, but it is best practice in the geophysical industry to require water well testing before and after a geophysical program is completed. Appendix C provides the standard form for pre and post activity testing for water quality and quantity.

If a landowner believes that geophysical activities have disrupted their well, they should also contact the licensee immediately. If negotiations with the licensee are unsuccessful, the landowner should also contact the AER at 1-855-297-8311 to have an investigation completed. If the concerns cannot be resolved, the landowner may apply for compensation under the Water Well Restoration or Replacement Program (WWRRP). To be eligible for compensation under the WWRRP, the well must be completely repaired or replaced, and all receipts must be attached to the application form. Funded through industry levies, this program is designed to restore a well to the previous condition, not to make improvements on a former system. For more information, please contact the FAO.

Page 7

@istock.com/Binoe

An operator must obtain approval from the Minister of Alberta Environment and Parks (AEP) to conduct geophysical activities on Crown land. Once the exploration approval is granted, the operator will seek written consent from the disposition holder.

Under the Exploration Dispute Resolution Regulation, any disputes that arise related to operational or land use concerns can be reviewed by a Local Settlement Officer (LSO) with AEP. Mediation and facilitation will be attempted and, if unsuccessful, the LSO will make a determination. Policy dictates that the timeline for reaching a facilitated agreement or LSO adjudicated determination is 10 working days. The outcome is considered an “LSO Decision” regardless of the manner in which it was determined.

Either party may seek a review of the LSO’s decision by making a request to the Review Committee. The Review Committee may make a number of decisions. They may also seek to facilitate an agreement between the two parties. It should be noted that the decision of the LSO is in effect until such time as the Review Committee reaches a decision. The Review Committee should render a decision within 10 working days and notify the parties in writing. The decision of the Review Committee is binding.

Info

rmat

ion

for

Dis

posi

tion

Hol

ders

Historically, it was common for geophysical exploration to occur on road allowances. A licensee may opt to use

road allowances if entry is refused to private land.

Road allowances in Alberta are managed at the municipal level. Some counties allow road allowances to be leased to private

parties, including farmers and ranchers. Permission for exploration on developed road allowances is granted through the AER, and

regulation requires that notice be provided to the relevant municipality.

If the lessee of a road allowance and a geophysical operator are unable to reach a negotiated agreement, the operator may conduct

geophysical operations on the leased road allowance 48 hours after giving written notice to the lessee.

Once an operator enters the leased road allowance, repairs must be made to any fences that are broken or altered as a result of

the exploration activity. The operator must also take all necessary measures to prevent livestock from straying or being injured. They

are also obligated to pay for any reasonable damages to the lessee arising from the exploration.

Side NotesR

oad Allow

ances

Page 8

There are unique considerations for situations where an agricultural lease is in place between a landowner and a tenant. Unless it is otherwise stipulated in an agricultural lease agreement, the lessee of a property may not provide authorization for geophysical exploration without the authorization of the landowner.

To avoid and minimize conflicts, the FAO recommends having a clear agricultural lease agreement that speaks to a division of the entitlements and obligations relating to geophysical exploration.

Generally, the landowner:• has exclusive right to say yes or no to entry,• receives payment for entry, access and recording, and• ensures that the lessee has input on program details such as access and timing.

Generally, the lessee:• is contacted by the operator via the permit agent during the negotiations,• maintains the option of open discussions with the owner of the land in the negotiations

with the permit agent, and• receives payment for crop damage and inconvenience.

Particular concerns brought forward by the tenant to the landowner should be reflected in the permit. Any conditions agreed to by the landowner should be communicated to the tenant.

The AER administers the Geophysical Regulatory Enforcement Program, which assists in resolving issues and concerns between the geophysical industry and municipal districts, counties, special areas and landowners. Geophysical crew inspections are conducted on an ongoing basis as part of the regulatory enforcement program to ensure compliance with the legislation and associated regulations. If an infraction is identified through a crew inspection or a complaint, various levels of enforcement action may be imposed, including a monetary penalty.

This program also assists landowners with geophysical-related inquiries and concerns associated with exploration activity. The AER may investigate landowner concerns such as water wells, structural damage, permit disputes, surface damages, trespassing, flowing or cratered shot holes, livestock damages, and other miscellaneous inquiries.

Geophysical inspectors are presently located in Edmonton, Red Deer and Drayton Valley. This service can be accessed by contacting AER. The information received will be forwarded to an inspector who will respond to the inquiry. An unbiased field investigation may be initiated in an effort to work with both the complainant and the operator to resolve the conflict.

Leased Land E

nfor

cem

ent a

ndD

ispu

te R

esol

utio

n

Page 9

I/We: _______________________________ of ____________________________ (hereinafter called the “Grantor”) being the Owner Lessee Renter or Representative in possession of the lands (hereinafter called the “Lands”) described below and on the attached Geophysical Operations Plat(s), agree to grant to the Licensee: ____________________ and the personnel and equipment of its subcontractors (hereinafter collectively called the “Grantee”) the right and authority to enter onto the Lands for the purposes of conducting all phases of a single geophysical operation. Owned Leased Rented __________________ of Section ____ TWP____ RGE____ W____ M

Furthermore, the Grantor and Grantee hereby covenant the following terms and conditions:1. The Grantee agrees to compensate the Grantor the following Permit Fees:_______ $ / Mile ________________________ (recorded source line) $ _________ / Mile Off-line Access_______ $ / Mile ________________________ $ _________ / Fence Cut / Drop_______ $ / ___ ________________________ $ _________ / ______________

These monies are compensation for Permit Fees and not for damages beyond normal wear and tear, and shall be paid within days following the completion of the geophysical operation. In the event that the Grantee does not enter onto the Lands or portions of the Lands permitted, the Grantee shall not be obliged to make any payment to the Grantor for those lands not entered.

2. The Grantee agrees to compensate the Grantor for any damages in excess of normal wear and tear that may occur as a result of this operation. If damages occur, they will be compensated for at fair market value.

3. The Grantee will conduct all operations in a careful, diligent and responsible manner, in accordance with all applicable laws, geophysical regulations and government approval conditions in the province of ALBERTA

BC MANITOBA SASKATCHEWAN OTHER ______________

4. The Grantee shall indemnify and save the Grantor harmless from any actions, claims, losses or demands by a third party arising from acts or omissions of the Grantee in respect of its operations and for any loss, damage cost and expense to the Grantor in respect of such operations.

5. It shall be the responsibility of the Grantor to accompany the Grantee and to inspect the permitted Lands upon completion of the operation, to establish and agree upon the amount of compensation. A signed Geophysical Operations Release is required from the Grantor before any compensation for damages will be made by the Grantee.

6. The Grantor grants a working area as shown and off-line conditions as specified on the Geophysical Operations Plat(s). All operations shall take place in a working area which is approximately ______ feet / metres wide ( _______ ft / m for cat cutting or snowplowing).

7. The Grantor allows the Grantee to DELETE, SHIFT or OFFSET LINE(s) and/or Receiver and/or Source Points; shift line(s) up to ______ ft/m.

8. Other interested parties: eg: Ducks Unlimited, Offer to Purchase, Renters, Acreages, etc.

9. This permit is in effect from the date endorsed by the Grantor until ________, 20____ excluding a reasonable amount of time to perform a final cleanup which is delayed due to weather conditions.

10. Any additional terms, express or implied, shall have no force or effect unless made in writing and agreed to by the Grantor and Grantee as stated below or on the attached Geophysical Operations Plat(s) which form part of this document.

Permit to Conduct Geophysical ActivitiesAppendix A Note: This is a sample only and has been included to help landowners know what to expect. Your resource agent will provide you with a copy of the Permit to Conduct Geophysical Activities.

Appendix B Table of Required Setback Distances to

Specified Structures Explosive Non-Explosive

Specified Structure Charge Size Distance Distance Residence, barn, or any building(s) with a concrete base, concrete irrigation structures (e.g., drop structures, head works); concrete lined irrigation canals, and concrete water pipelines.

Up to and including 12 kg 180 m 50 m

> 12 kg < = 20 200 mWater wells, developed spring, observation well, or piezometer. Up to and including 12 kg 180 m

100 m> 12 kg < = 20 200 m

High Pressure Pipelines High pressure pipelines are pipelines that operate at, or are intended to operate at a pressure in excess of 700 kilo pascals or less.

Note: All distances are measured from the centre of the pipeline.

< = 2 kg 32 m

15 m

> 2 & < 4 kg 45 m> = 4 & < 6 kg 55m> = 6 & < 8 kg 64 m

> = 8 kg & < 10 kg 70 m > = 10 & < 12 kg 78 m

> = 12 kg < = 20 kg 100 mLow Pressure PipelinesLow pressure pipelines are pipelines that operate at, or are intended to operate at a pressure of 700 kilo pascals or less. Note: All distances are measured from the centre of the pipeline.

Up to and including 20 kg 3 m 3 m

DugoutsMeasured from the inside edge of high water mark. 50 m 25 m

Irrigation Canal (other than concrete lined)Irrigation canals that are more than 4 m wide. 10 m 10 m

Buried Water Pipelines (other than concrete lined) 3 m 3 m DamsDam means a barrier constructed and having a storage reservoir capacity of at least 30,000 m3, and which is at least 2.5 m in height when measured vertically to the top of the barrier.

180 m 50 m

Cemetery Distance to the energy source is measured to the surveyed boundary of the cemetery.

100 m 50 m

Buried Lines and Survey MonumentsTelephone lines and telecommunications lines. 2 m 2 m

Domestic Septic Tank or Mound A septic tank is defined as a tank that is used as septic storage device. A mound is a septic storage device that is located above ground surface.

15 m 15 m

Table of Reduced Setback Distance to Specified Structures with Written Consent of the Owner of

the StructuresExplosive Non-

Explosive

Specified Structure Charge Size Distance DistanceResidence, barn, or any building(s) with a concrete base, concrete irrigation structure (e.g., drop structures, head works), concrete-lined irrigation canals, and concrete water pipelines.

Water wells, developed springs, observation wells, or piezometer.

< = 2 kg 64 m

50 m

> 2 & 4 kg 90 m> = 4 & < 6 kg 110 m> = 6 & < 8 kg 128 m

> = 8 & < 10 kg 142 m> = 10 & 12 kg 156 m

Exploration Directive 2006-15

Please review the instructions and complete this form thoroughly. As required by legislation, be aware that you, the Landowner, are giving consent for the collection of the personal information on this form for the purpose of conducting and completing a water well evaluation. Water well testing before and after geophysical programs is not a regulatory requirement of the Government of Alberta.

1. The landowner/occupant should be available to be on-site during the evaluation of the water well to reducepossible disruption of water usage. Upon completion of the pre and post water well evaluations, ensure that a copy is provided to the landowner/occupant. This does not apply to chemical analysis.

2. A non-pumping (static) water level should be confirmed to determine if your water well has been in useimmediately prior to conducting the evaluation. It is important to establish a static water level at least twice,possibly 15 minutes apart to ensure that it is not continuing to recover. If your well has been in use prior to thestart of the test, the static (non-pumping) water level is not accurate. It is recommended that your well beevaluated over a minimum of 60 minutes drawdown and a minimum of 60 minutes recovery (or until original static non-pumping water level is reached).

3. In addition, measurements should always be taken for the full recovery period, not just at 90% of the starting level.

4. Where possible, the flow of water should be isolated to ensure that it is not being diverted to other uses (e.g. cattle waterers). Difficulties commonly arise during winter months in relation to livestock wells.

5. If disconnection from a cattle trough is not possible, the comment section of the water well evaluation form should reflect this and the landowner/occupant signature should acknowledge the occurrence.

6. Pumping rates are usually reported in gallons/minute as Water Well Drilling Reports usually indicate production capacity in gallons/minute. Measurements are usually reported in metric units since most water level probes/sounders are graduated in metric units.

7. When water wells or water distribution systems of questionable integrity are encountered (aged or corrodedcasing, pipes or connections, well caps welded onto casing, etc.), written notes and photos should be taken and kept as documentation.

8. Water samples should be analyzed by an accredited lab for routine potability (dissolved iron and total iron). Field test kits can be used to determine basic parameters such as temperature, pH, conductivity and TDS (Total Dissolved Solids) at the time of the sample collection. Water samples for analysis should be taken towards the end of the drawdown stage, to ensure that the water collected is from the aquifer not the well bore (document the timing of the water sample). All samples must be properly labelled including the landowner/occupant’s name, the date and time of sample, description of the source well, depth, type (domestic/stock), legal land description, and sampler’s name. The samples should be kept cool between the time of collection and delivery to the lab.

LICENSEE _________________________________ LICENCE # _____________ DATE _________________

PROGRAM/PROSPECT NAME ______________________________________________________________

LANDOWNER NAME _____________________________________________ PHONE # ________________

ADDRESS _______________________________________________________________________________

LEGAL DESCRIPTION – SEC _______ TWP_______ RGE_______ W_______ M

GPS Coordinates/Elev.(NAD83) ______________________________________________________________

DESCRIPTION OF WELL LOCATION ON PROPERTY ____________________________________________________________________________________________________________________________________

Guidelines for Water Well Test Evaluations for Seismic Programs Appendix C

WATER WELL DRILLER ___________________________ JOURNEYMAN CERT # ____________

REFERENCE POINT FOR MEASUREMENTS TAKEN FROM (E.G. Top of Casing) _____________

METRIC / IMPERIAL (please circle) WELL DEPTH ___________ PUMP DEPTH _______________

PUMPING RATE ______________________ NON-PUMPING STATIC _______________________

DEPTH WATER SAMPLE TAKEN ______________________

LAB SENT TO ___________________________________________________________________

AGE OF WELL ____________ CASING SIZE ________CONDITION ____________________________

DEPTH TO WATER LEVEL ELAPSED TIME_________

HAS WATER WELL DRILL REPORT BEEN OBTAINED FROM GOV? YES______ NO_______

WELL ID # ___________________ WATER SAMPLE COLLECTED? YES______ NO_______

CONFINED SPACE? YES____NO_____

LAB SAMPLE ANALYSIS REQUIRED? YES____ NO ____

PUMPING MIN. RECOVERY0123456789101215202530354050

6070

ONSITE OBSERVATIONS• PRE TEST _______ POST TEST _______• TIME OF TEST ____________ AM ____________ PM• BACTERIA PRESENT, IRON, AND/OR SULFATE (please circle)• SHEEN? YES______ NO_______• GASES PRESENT? YES______ NO_______• TANNIN WATER? YES______ NO_______• SEDIMENT PRESENT? YES______ NO_______• ODOUR NOTED? YES______ NO_______• WELL TYPE - DOMESTIC_______ LIVESTOCK _______ OTHER _______• WELL IN USE - YES _______ NO _______

COMMENTS________________________________________________________________________________________________________________________________________________________________

WATER WELL SERVICE HISTORY________________________________________________________________________________________________________________________________________________________________

IF UNABLE TO COMPLETE TEST EXPLAIN BELOW________________________________________________________________________________________________________________________________________________________________

SIGNATURE OF LANDOWNER AND EVALUATOR REQUIRED FOR ACKNOWLEDGMENT.PUMPING RATE SHOULD NOT EXCEED WELL CAPACITY FOR PRODUCTION.USE OTHER SIDE FOR ADDITIONAL COMMENTS.

WATER WELL EVALUATOR __________________________________________

Signature ______________________________________________

LANDOWNER __________________________________________

Contacts Farmers’ Advocate OfficeAlberta Agriculture and Forestry#305, 7000-113 StreetEdmonton, ABT6H 5T6Phone: 310-FARM (3276)Fax: 780-427-3913Email: [email protected]: fao_albertaFacebook: Farmers’ Advocate Office of Alberta

Alberta Energy Regulator Suite 1000, 250-5th Street SW Calgary, Alberta T2P 0R4Phone: 1-855-297-8311Website: www.aer.caEmail: [email protected]

Canadian Association of Geophysical Contractors #1045, 1015 Fourth Street SWCalgary, AB T2R 1J4Phone: 403-265-0045Fax: 403-265-0025Website: www.cagc.caEmail: [email protected]