Knowledge Mobilization as an Institutional Priority, November 2013
GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual,...
-
Upload
amberlynn-mcbride -
Category
Documents
-
view
213 -
download
0
Transcript of GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual,...
![Page 1: GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649e265503460f94b15279/html5/thumbnails/1.jpg)
GEO Work Plan Symposium 2012
ID-05Resource Mobilization for
Capacity Building(individual, institutional &
infrastructure)
![Page 2: GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649e265503460f94b15279/html5/thumbnails/2.jpg)
Scope of Task ID-05-C1
Expected Achievements by 2015
MARKETING = PROMOTION + CAPACITY BUILDING
• OPPORTUNITY IDENTIFICATION • BROKERING MECHANISM• AWARENESS RAISING• EARTH OBSERVATION AIDED DECISION SUPPORT• SUCCESS STORIES
![Page 3: GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649e265503460f94b15279/html5/thumbnails/3.jpg)
Recent Progress and Key Outputs for 2012 (1)
INFRASTRUCTURE & DATA SHARING: • Inventory of and reference to free and low-cost open
source software
CAPACITY BUILDING: • Increased support software providers for capacity building• Capacity building web operational (GEO portal)• End-user target groups aware of earth observation
solutions & capacity building opportunities• Success stories on capacity building available &
disseminated
![Page 4: GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649e265503460f94b15279/html5/thumbnails/4.jpg)
Recent Progress and Key Outputs for 2012 (2)
SCIENCE AND TECHNOLOGY + USER ENGAGEMENT:
• Feedback on funding opportunities, trends and possible application areas
• Success stories on research spin-off available and disseminated to key target groups
SOCIETAL BENEFIT
• Success stories on earth observation solutions in SBAs
• Capacity building material on SBAs included in capacity building web
• Marketing toolkits for promotion of earth observation solutions in each SBA developed and disseminated
![Page 5: GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649e265503460f94b15279/html5/thumbnails/5.jpg)
Relationship to, or Support of, 2015 GEOSS Targets:
• Catalyze national, regional and global investments in scientific and technological advances and innovative approaches for upgrading and expanding Earth observations;
• Build the capacity of individuals, institutions and systems to benefit and contribute to GEOSS, particularly in developing countries;
Suggestions for Assessing Progress against GEOSS Targets
• To be defined: see also GEONetCab capacity building strategy report
![Page 6: GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649e265503460f94b15279/html5/thumbnails/6.jpg)
Issues (key impediments to progress) and Gaps+ side: GEONetCab project focuses on this task -> will
provide platform & tools
+ side: network established
- side: complex issue (very cross-cutting, no standard solutions, serves all GEO-activities)
- side: no funding for the activity secured for 2013 and beyond
+ ??
![Page 7: GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649e265503460f94b15279/html5/thumbnails/7.jpg)
Linkages with other Tasks; Opportunities for Collaboration; Past and Expected Benefits of Collaboration within and across Tasks
• IN-03-C1, IN-04-C2• ID-01-C1, ID-02-C1, ID-02-C2, ID-05-C2• All SB tasks: analysis of tasks sheets carried out to identify
‘winners’ and ‘quick-wins’ for this work plan + information exchange of work plan symposium
![Page 8: GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649e265503460f94b15279/html5/thumbnails/8.jpg)
Recommendations / Ideas for Accelerating
Work Plan Implementation
• Very open, quick and active information exchange• Adopt buddy system for strong links between tasks• Monitor task links trough implementation boards
![Page 9: GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649e265503460f94b15279/html5/thumbnails/9.jpg)
Options for Better Connecting Existing Systems (observing, modeling, information) and/or the Outputs of those Systems (data, products, information)
• Provide feedback on experiences and requirements of end-users: link with User Requirement Registry
![Page 10: GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649e265503460f94b15279/html5/thumbnails/10.jpg)
Contributions to the GEOSS DataCORE
• Not directly, indirectly through capacity building web
![Page 11: GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649e265503460f94b15279/html5/thumbnails/11.jpg)
Potential Benefits from a Systematic User Requirements Review
• Link with URR on end-users, value chains and capacity building
![Page 12: GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649e265503460f94b15279/html5/thumbnails/12.jpg)
Current Role of Communities of Practice and Options for Strengthening this Role
• Link with CoPs through task links, see above
![Page 13: GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649e265503460f94b15279/html5/thumbnails/13.jpg)
Ways of Extending Task Participation to Wider (representative) Communities
• Spread the gospel outside ‘traditional’ GEO community -> probably no direct participation, but increased interest and matching with funding opportunities
![Page 14: GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649e265503460f94b15279/html5/thumbnails/14.jpg)
Scope of Task ID-05-C2
Expected Achievements by 2015
• Establish a dialogue between GEO and funding agencies for the research and development needed to fully develop GEOSS and exploit the benefits of GEOSS
• Develop means to (i) communicate GEOSS Science & Technology needs; (ii) match research projects with available funding programs; and (iii) support effective transition from research to operations
![Page 15: GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649e265503460f94b15279/html5/thumbnails/15.jpg)
Recent Progress and Key Outputs for 2012
• Dialog with OECD, Belmont Forum, EC, others• Discussion paper (background information, introduction of
'language', description of the research system etc)• Feed-back from stakeholders at Workshop in Bonn 2011 &
Salzburg• Deliverable “Framework concept for European funding
agencies” (Egida project) including recommendations for further progression
• Best practices• ERA-Net + - invitation to engage GEO community
![Page 16: GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649e265503460f94b15279/html5/thumbnails/16.jpg)
EU
![Page 17: GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649e265503460f94b15279/html5/thumbnails/17.jpg)
The Alliance
![Page 18: GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649e265503460f94b15279/html5/thumbnails/18.jpg)
International coordination
Starting point: ERA-Net +
BarriersMultidisciplinary Challenges
AgricultureHealthEnergyWater
![Page 19: GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649e265503460f94b15279/html5/thumbnails/19.jpg)
Relationship to, or Support of, 2015 GEOSS Targets:
• Indirect relationship to all targets.– This is enabling rather than directly contributing.
Suggestions for Assessing Progress against GEOSS Targets
• To be defined
![Page 20: GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649e265503460f94b15279/html5/thumbnails/20.jpg)
Best practices
EU– FP7– ESRFI
The Alliance– The Future Earth
![Page 21: GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649e265503460f94b15279/html5/thumbnails/21.jpg)
Issues (key impediments to progress) and Gaps
•Task Coordinator in transition.•C2 Component organization impacted by GEO restructure
– EGIDA is the main (only) contributor– Work was partly in support of STC Roadmap efforts– EGIDA management and EC should discuss, along with IDIB
•C2 in need of best practices from GEO Members with– Extensive experience with national R&D funding– Regional experience with key issues (initially water)– Goal is to create a variety of tested options for funding approaches
• From Member experience• From examples