GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George...

22
GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January 2012

Transcript of GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George...

Page 1: GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.

GEO Task IN-05GEOSS Design and Interoperability

Steve Browdy, IN-05 C1 Component Lead

George Percivall, IN-05 Task Facilitator

GEO IIB Prep Meeting

January 2012

Page 2: GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.

GEO Task IN-05GEOSS Design and InteroperabilityRelated GEOSS Strategic Targets•Architecture: Deployment, population, and enablement of sustained operations and maintenance of a user-friendly and user-accessible GEOSS Common Infrastructure (GCI), including the core components and functions that link the various resources of GEOSS.

Description•Manage the evolutionary technical architecture (design) of GEOSS and contributed Earth observation data and service resources. •Promote GEOSS interoperability principles. •Enable a sustainable GEOSS of value to the user – supporting the development of the GEOSS Common Infrastructure (GCI) and GEOSS communication networks for the access to, and use of, Earth observations and related services.

Page 3: GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.

GEO Task IN-05GEOSS Design and Interoperability

C1 GEOSS Design and Interoperability

Status•Based on existing status of AIP and SIF•Details to follow

Priority Actions•Technical Design of GEOSS and Contributed Resources•GEOSS Interoperability Analysis and Support•GEOSS Research and Prototyping

Page 4: GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.

GEO Task IN-05GEOSS Design and Interoperability

• Transition Issues– Implementing task team telecons– Introducing more than one component to IN-05– Establishing management guidelines for the task

and components– Establishing reporting requirements with the IIB– Establishing working arrangements with IN-03– Community outreach

Page 5: GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.

GEOSS Task AR-09-01b

Architecture Implementation PilotAIP-4 Results, AIP-5 Planning

Points of Contact:

Nadine Alameh, George Percivall, Ingo Simonis

Open Geospatial Consortium (OGC)

January 2011

Page 6: GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.

Architecture Implementation Pilot, Phase 4 (AIP-4)

Accessibility

to Critical

Earth

Observation

Priority Data

Sets

Thesaurus

for Earth

Observation

Parameters

Software

tools for

publishing

accessing

and using

data

Tutorials to

support data

providers to

get data

online

Page 7: GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.

AIP-4 Primary Results

Accessibility

to Critical

Earth

Observation

Priority Data

Sets

• Table constructed of candidate data sets• Data sets registered in the GCI• GEOSS Data-CORE supported• Access services registered

• WMS, WFS, WCS, WPS, SOS, OPeNDAP

Thesaurus

for Earth

Observation

Parameters

• Served as SKOS at SPARQL endpoint• Format either JSON or XML • Made available at Geo Web Portal for

data discovery

Page 8: GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.

AIP-4 Primary Results

• Semantic-enabled Mediation Components• EuroGEOSS Broker

• GENESI-DEC Search Service

• PML NETMAR

• Web Processing Services Components• Population estimation service – CIESIN

• Ecological forecasting – EuroGEOSS – UncertWeb

• Spatio-temporal processing services – Graphitech

• Coverage Processing – Rasdaman and Vightel

• Solar radiation parameters extraction – Mines Paris Tech

• Satellite, in-situ and model data processing – PML

• Heterogeneous data for common grids – EuroGEOSS Access Broker

General and

specialized

software

tools for

using data

Page 9: GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.

Software

Tools for

publishing

accessing

and using

data

AIP-4 Primary ResultsClient Components for data exploitation

Page 10: GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.

Areas of Coordination with the GCI

• Registration of the clients– Specification of supported ServiceTypes and

DataTypes during Registration– Impacts on CSR and SIR (list of mime types,

association between services and mime types)• Capture of parameters for invoking clients from GWP• Integration testing with GWP• Categorization of Processing Services to increase

reuse

Page 11: GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.

AIP-4 Recommendations

• More exploitation clients and enabler components needed to fully achieve potential of GEOSS

• Continue to improve and evolve the GCI– Process for influencing features in the next release– Further automation of resource registration– More focus on resource monitoring

• Build on the success of AIP– Increase awareness of the value of contributing to GEOSS– Increase coordination with interdependent tasks– Continue development of tutorials– Distinguish between operational and development

contributions

Page 12: GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.

Publishing AIP-4 and STP results on Web

http://www.ogcnetwork.net/pub/ogcnetwork/GEOSS/AIP4/index.html

Page 13: GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.

Planning for AIP-5

• Scenario Driven Development as in AIP-3 and AIP-2

• Draft Schedule– Release CFP: February 2012– Kickoff Workshop: May 2012– Integration begins: September 2012– Results for GEO Plenary in 2012

• Routine Telecons on Tuesday

Page 14: GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.

AIP-5 SBA Themes - Draft

• Disaster Management • Health: AQ and Waterborne • Water Resource Observations• Agriculture• (Biodiversity?)

Page 15: GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.

AIP-5 Tech Themes - Draft

• User management and access services• Data access metrics• Data licensing support• Mobile clients• Coordinate Reference System IDs• Quality Assurance, Uncertainty, Provenance • (Ontology registry/Semantics?)• OpenSearch GEO • Capacity building repository• Continued tutorial development led by SIF

Page 16: GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.

References

• GEO – earthobservations.org

• GEO Architecture Implementation Pilot– www.ogcnetwork.net/AIpilot

• GEOSS registries and SIF– geossregistries.info

Page 17: GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.

GEOSS Task AR-09-01a

Standards and Interoperability Forum (SIF)Results and Planning

Points of Contact:

David Arctur, OGC

Steve Browdy, IEEE

January 2011

Page 18: GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.

SIF 2011 Primary Results

• GEOSS Interoperability Assessment– Many GCI recommendations were implemented during StP– Pilot survey with communities

• Sprint-to-Plenary tutorial activity– Used the BPW as the development platform and publishing

platform– Formally worked in conjunction with AIP-4– This is an ongoing effort

• 3rd annual GEOSS Interoperability Workshop– Had many presentations by groups wanting to establish or

improve their relationships with GEO/ GEOSS– Discussed ways to improve GEOSS interoperability and

community engagement

Page 19: GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.

Assistance for bringing more services online

• Led by SIF • AIP-4 Tutorials

– WFS: CREAF, enviroGRIDS, UAB– WCS: GMU, Jacobs University, CSISS, CREAF…– WMS: enviroGRIDS– SOS: EO2HEAVEN– WPS: Mines ParisTech– ‘Quality of data’ visualization: GeoVIQUA– Resource registration: SIF, GMU

• WCS software available– EOX/Rasdaman– GMU

Tutorials to

support data

providers to

get data

online

Page 20: GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.

Tutorials on Best Practice Wiki

• Private area for development

• Made public when published

• Allows feedback from readers

• Links back to services, applications, and videos

Page 21: GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.

SIF 2012 Plans

• Publish Interoperability Workshop report• Extend work on GEOSS Interoperability Assessment

– Community survey– Metric development– Interface with IN-03

• Continue tutorial development– Improve BPW experience– Work in conjunction with AIP-5 under IN-05

• Engage in follow-up discussions and plans with certain 2011 Interoperability workshop participants– GeoSUR (has begun)– WMO WIS– UNEP Live

Page 22: GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.

Q & A