Gen*NY*Sis Center for Excellence in Cancer Genomics
description
Transcript of Gen*NY*Sis Center for Excellence in Cancer Genomics
![Page 1: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/1.jpg)
Gen*NY*Sis Center for Excellence in Cancer
GenomicsRensselaer, NY
Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008
![Page 2: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/2.jpg)
Gen*NY*Sis Center for Genomics
Meral Kanik Structural Option April 14, 2008
Introduction Building Statistics Existing Structure Proposal Structural
Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
![Page 3: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/3.jpg)
Building Statistics
Owner: University at Albany
Architect/Engineer: Einhorn Yaffee Prescott Architecture & Engineering P.C.
Location: Rensselaer, NY
Function: Cancer Research Laboratories
Size: 117,400 square feet
Height: 87 feet
Number of Stories: 4 above grade, 1 below grade
Cost: $45 million (base building cost)
Project Delivery Method: Fast Track Delivery
Introduction Building Statistics Existing Structure Proposal Structural Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
Meral Kanik Structural Option April 14, 2008
![Page 4: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/4.jpg)
Introduction Building Statistics Existing Structure Proposal Structural Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
Typical Floor LayoutLabs/classroomsOfficesVertical EgressCorridor/gathering
Meral Kanik Structural Option April 14, 2008
![Page 5: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/5.jpg)
Introduction Building Statistics Existing Structure Proposal Structural Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
Existing Structure
Meral Kanik Structural Option April 14, 2008
![Page 6: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/6.jpg)
Typical Bay
Introduction Building Statistics Existing Structure Proposal Structural Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
• 4 ½” normal weight concrete
• 2” composite metal deck
• f ’c = 3.5 ksi
• Fy = 50 ksi
Meral Kanik Structural Option April 14, 2008
![Page 7: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/7.jpg)
Lateral System
Introduction Building Statistics Existing Structure Proposal Structural Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
• Non moment-resisting eccentrically braced frames• Bracing diagonal of HSS8x8x5/16 steel• Wind controlled
Meral Kanik Structural Option April 14, 2008
![Page 8: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/8.jpg)
Proposal Introduction Building Statistics Existing Structure Proposal Structural Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
• Replace steel gravity system• Employ hollow core planks
• Remove steel braced frames• Utilize concrete shear walls
• Evaluate vibration effects
• Implement PSU sustainable designs
• Reduce erection time• Evaluate price differences
Meral Kanik Structural Option April 14, 2008
![Page 9: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/9.jpg)
Proposal Introduction Building Statistics Existing Structure Proposal Structural Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
Transfer the design from SUNY University at Albany to Penn State’s Hershey Medical Center
Meral Kanik Structural Option April 14, 2008
![Page 10: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/10.jpg)
New Design Criteria
Introduction Building Statistics Existing Structure Proposal Structural Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
N
Meral Kanik Structural Option April 14, 2008
![Page 11: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/11.jpg)
Gravity Loading
Introduction Building Statistics Existing Structure Proposal Structural Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
Must account for new roof loading
Previous machine weight of 160 kips
Add live load roof garden assembly
Area of roof garden = 14600 ft2
166 psf
Meral Kanik Structural Option April 14, 2008
![Page 12: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/12.jpg)
Hollow Core Planks
Introduction Building Statistics Existing Structure Proposal Structural Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
4HC8 + 2” topping 20” square columns
20LB24 28IT20
Meral Kanik Structural Option April 14, 2008
![Page 13: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/13.jpg)
New Lateral Loads
Introduction Building Statistics Existing Structure Proposal Structural Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
Original NewN-S E-W A B
Shear Wind 263.1 263.7 404.2 140.0(kips) Seismic 279.0 279.0 331.0 331.0Moment Wind 14244.0 14444.0 21962.0 7541.0(ft-kips) Seismic 15997.0 15997.0 18962.0 18692.0
Cast In Place Concrete Shear WallsPrecast Concrete Shear Wall Panels
Meral Kanik Structural Option April 14, 2008
![Page 14: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/14.jpg)
New Lateral System
Introduction Building Statistics Existing Structure Proposal Structural Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
Meral Kanik Structural Option April 14, 2008
Use vertical egress as shear walls
Add new stair case
![Page 15: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/15.jpg)
Effects of Drift
Introduction Building Statistics Existing Structure Proposal Structural Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
Meral Kanik Structural Option April 14, 2008
FloorStory Height (ft)
Allowable Story Drift (in)
RAM Story Drift (in)
Penthouse 18.42 0.553 0.134 1Roof 18.58 0.557 0.121 13rd 16 0.480 0.084 12nd 16 0.480 0.081 11st 18 0.540 0.036 1
According to IBC, ΔWIND= H/400
![Page 16: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/16.jpg)
Concrete Shear Walls
Introduction Building Statistics Existing Structure Proposal Structural Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
Meral Kanik Structural Option April 14, 2008
Only Continuous Walls Used
![Page 17: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/17.jpg)
Shear Wall Boundary Element
Introduction Building Statistics Existing Structure Proposal Structural Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
Meral Kanik Structural Option April 14, 2008
#5 Vertical 15” o.c.#5 Horizontal 15” o.c.
(8)#9#3 Ties
20”
20”
10”
![Page 18: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/18.jpg)
Laboratory Facilities
Introduction Building Statistics Existing Structure Proposal Structural Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
Meral Kanik Structural Option April 14, 2008
Equipment Used For:•DNA sequencing•Gene cloning•Microarray•Mice Testing•Mass
Spectrometry
![Page 19: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/19.jpg)
Laboratory Facilities
Introduction Building Statistics Existing Structure Proposal Structural Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
Meral Kanik Structural Option April 14, 2008
Steel SystemConcrete System
fn 7.85 5.62Vibration Velocity at: Fast Walking 8870 5204(micro in/ sec) Moderate Walking 1951 1145
Slow Walking 532 312
Microscopes up to 100x
Microscopes up to 400x
Microscopes over 400x
Microscopes up to 30,000x
![Page 20: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/20.jpg)
Green Roof
Introduction Building Statistics Existing Structure Proposal Structural Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
Meral Kanik Structural Option April 14, 2008
“Meadow” Roof Garden Examples set up by RoofScapes inc.
Provide:• Wind Erosion
Stabilization• Passive irrigation• Habitat creation• Moderate maintenance
![Page 21: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/21.jpg)
Metal Mesh Shading
Introduction Building Statistics Existing Structure Proposal Structural Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
Meral Kanik Structural Option April 14, 2008
Metal Screen from Cambridge Architectural
Provide:• Shade from harsh
summer day• Gain heat to save
energy costs• Still utilize curtain
wall view
![Page 22: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/22.jpg)
New Green Look
Introduction Building Statistics Existing Structure Proposal Structural Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
Meral Kanik Structural Option April 14, 2008
![Page 23: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/23.jpg)
Local Materials
Introduction Building Statistics Existing Structure Proposal Structural Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
Meral Kanik Structural Option April 14, 2008
Cambridge Architectural
Nitterhouse RoofScapes, inc.
Hershey Medical Center
![Page 24: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/24.jpg)
Structural System Costs
Introduction Building Statistics Existing Structure Proposal Structural Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
Meral Kanik Structural Option April 14, 2008
COST % of Overall System
Shear Wall 12,531,148.24$ 84%Braced Frames 1,493,536.96$ 9%Precast Overall 14,840,417.98$ Steel Overall 16,618,444.75$
Low $$ Lateral System
Low $$ Gravity System
OR
![Page 25: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/25.jpg)
Structural System Schedule
Introduction Building Statistics Existing Structure Proposal Structural Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
Meral Kanik Structural Option April 14, 2008
Phases of Construction
![Page 26: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/26.jpg)
In Retrospect…
Introduction Building Statistics Existing Structure Proposal Structural Redesign Lateral Redesign Vibration Analysis Sustainability
Concerns Cost Analysis Schedule Change Conclusions
Meral Kanik Structural Option April 14, 2008
Structural• Precast Planks• Drift• Shear Walls• Vibration
Sustainability• Green Roof• PSU LEED
Construction• Erection Time• Cost
![Page 27: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/27.jpg)
Special Thanks To…
• E.Y.P.A.E. • Franklin Lancaster• David Clemenzi
• PSU AE Faculty and Staff• Dr. Ali Memari• Professor Kevin Parfitt• Professor Bob Holland
• Fellow AE students • All of my family (Ben Sizin Seviyorum)
• Penn State Rugby (Lessss GO State!)
Meral Kanik Structural Option April 14, 2008
![Page 28: Gen*NY*Sis Center for Excellence in Cancer Genomics](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815b65550346895dc953a9/html5/thumbnails/28.jpg)
Questions?
Meral Kanik Structural Option April 14, 2008