    3.3.1 General and Special

    conditions of Contract The general conditions of a contact list the conditions

    under which the contract for a building is administered.

    The various conditions that are covered under generalconditions are statutory obligations

    Possession of site Site-conditions

    Materials and workmanship

    Access to site

    Sub-letting

    Rise and fall Progress payments

    Prime cost and provisional sums

    Variations to the contract

    Insurances

    Delays and extension of time and practical completion.

  • 8/11/2019 Generral and Special Conditions of Contract

    3/11

    General and Special conditions of

    Contract . contd

    The special conditions of contract cover those aspects thatare unique to that particular object.

    The standard printed forms available may not be adequateto cover all the special aspects that are unique to that

    particular object. Therefore these forms generally include a blank sheet

    headed special conditions to type in the specialarrangements, charges, conditions and commitments that

    are negotiated. On completion it is signed and countersigned by the

    respective parties and they become party to the contract.

    Examples of special conditions include extended defectsliability periods, bonus and / or penalty payments.

  • 8/11/2019 Generral and Special Conditions of Contract

    4/11

    The Contract Documents

    The size and the complexity of theproject determine the type of documentsincluded in the contract documents.

    The list of documents included is uniqueto each contract.

    Some of the likely documents that are

    included are as follows.

  • 8/11/2019 Generral and Special Conditions of Contract

    5/11

    Agreements and conditions

    A printed standard document signed byboth parties with the pages and changesInitialled by each party and the special

    conditions and schedules filled in

  • 8/11/2019 Generral and Special Conditions of Contract

    6/11

    The drawings

    The drawing may comprise architectural,engineering,services and landscapingdrawings etc.The drawings that are

    included in the contract document will bethe original tender drawings without anychanges or amendments.the drawing will

    be numbered and listed as a part of thecontract documents.

  • 8/11/2019 Generral and Special Conditions of Contract

    7/11

    Specification

    A document to be read in conjunction with thedrawings.

    The purpose of the specification is to give a

    written description of the works described in thedrawings in terms of the standard,workmanshipand the quality of the work expected from thecontractor.

    It conveys the intentions of the client andinforms the public authorities on details notshown on the drawings.

  • 8/11/2019 Generral and Special Conditions of Contract

    8/11

    Bill of quantities

    Describes materials and workmamship insufficient detail for pricing and representsthe quantites of work to be executed.

    Bill of quantity may or may not beincluded and its inclusion will depend onthe conditions of contract chosen for the

    project.

  • 8/11/2019 Generral and Special Conditions of Contract

    9/11

    Schedule of rates

    Includes the material and labour costsincluding overheads and profit margins fora particular work section or sections. The

    schedule is generally used if variationsoccur in the contract.

  • 8/11/2019 Generral and Special Conditions of Contract

    10/11

    The Program of Work

    Stipulates work to be carried out within theagreed time schedule. It generally fits in withthe clients planned occupancy of the building atstipulated time during the contract.

    The contract conditions stipulates variousinsurances to be taken by the contractor duringthe life of the contract such as Workerscompensation, public risk etc.

    The insurance covers may require to be taken inboth contractors and the clients name. In thisinstance, an endorsed cover note may form partof the contract documents.

  • 8/11/2019 Generral and Special Conditions of Contract

    11/11

    Evidence of Liquidity

    On larger projects the contractor may berequired to give a Bank guarantee for anominated amount. In this instance the