Generic Pay Items FDOT State Specifications & Estimates Office.

43
Generic Pay Items FDOT State Specifications & Estimates Office

Transcript of Generic Pay Items FDOT State Specifications & Estimates Office.

Page 1: Generic Pay Items FDOT State Specifications & Estimates Office.

Generic Pay Items

FDOT State Specifications & Estimates Office

Page 2: Generic Pay Items FDOT State Specifications & Estimates Office.

Outline• Part 1– Definition– Rules– Roles– Processes

• Part 2– Pay Item Structure– Guidance for Trns•port– The GOOD, BAD and UGLY

Page 3: Generic Pay Items FDOT State Specifications & Estimates Office.

What are Generic Pay Items?

• General-use pay items for each design group (component set of plans) that are defined by a pay item supplemental description in the Trns•port system.

• A single generic pay item number can be used many times, but only once per project/ proposal; each time it is used the appropriate descriptive information must be included in Trns•port system.

Page 4: Generic Pay Items FDOT State Specifications & Estimates Office.

Why Do We use Generic Pay Items?

• To facilitate the use of one-time or limited-use non-standard work items.

• To provide more flexibility in Utilities pay item structure.

Page 5: Generic Pay Items FDOT State Specifications & Estimates Office.

Who are our Customers?

• District/Consultant Designers• Contractors• Utility Agencies

Page 6: Generic Pay Items FDOT State Specifications & Estimates Office.

Rules

• Must not be used if there is an existing pay item.– Must not be used to violate or circumvent standard pay item and• Not used to trump standard pay items– Exception for Utilities pay items.

• Must not be used as a standard means to work-around a pay item that has been rejected for statewide usage by Central Office.– For unique situations, an item rejected for statewide

usage may be used as a one-time generic pay item.

Page 7: Generic Pay Items FDOT State Specifications & Estimates Office.

Rules, continued

• Must not be used to circumvent the new pay item request process, if the pay item should be opened for statewide usage.

• Must be supported by a technical special provision and/or plan details (drawings or notes) that include clear definition of work & payment.

• Must be loaded in Trns•port under the appropriate category.

Page 8: Generic Pay Items FDOT State Specifications & Estimates Office.

Roles - Designer

• The Designer is responsible for:– Determining if a generic pay item is needed.– Developing technical special provision (or ensuring

it has been developed).– Ensuring all necessary details are included in the

contract documents.

Page 9: Generic Pay Items FDOT State Specifications & Estimates Office.

Roles – District Estimates Staff

• District Estimates Staff are responsible for:– Determining if a standard pay item should be

requested for statewide usage.– In Trns•port, enter the description, with unit of

measure, in the Supplemental Description; enter the quantity and an estimated unit price.

Page 10: Generic Pay Items FDOT State Specifications & Estimates Office.

Roles – Project Review Team (CO)• Post-Letting - The Project Review Team is

responsible for:– On a quarterly basis, run the Pay Item Future Search

report to determine if any generic pay items were used during the previous quarter.

– Check for proper details and plan notes in contract documents, including:• The Supplemental Description has been entered in

Trns•port, with unit of measure.

• Item is in the correct Trns•port category.

– Coordinate with responsible design office if usage of a generic pay item is questionable.

Page 11: Generic Pay Items FDOT State Specifications & Estimates Office.

Processes

District identifies work that is appropriate for a generic pay item, but must not violate the rules

Designer includes all supporting details for the generic pay item in the contract documents

Designer enters item into Trns•port via Designer Interface, and supplies Estimates staff with the pay

item supplemental description

District Estimates staff loads supplemental description and units into Trns•port

Page 12: Generic Pay Items FDOT State Specifications & Estimates Office.

Part 2Generic Pay Item Structure

and Guidance for Trns•port

Page 13: Generic Pay Items FDOT State Specifications & Estimates Office.

Pay Item Structure & Description

• Generic pay items are structured as: 0000-A00-BBB, Example: 0000-600-

1A = Design Group/Trns•port CategoryB = Sequential number

(Note: Zeros are hard-coded; they are NOT blanks.)

• The pay item description in Trns•port is named generically, by category work type(Structures for 100, Roadway for 200, etc.):

Page 14: Generic Pay Items FDOT State Specifications & Estimates Office.

Supplemental Description &Unit of Measure

• The actual unit of measure must be keyed into

Trns•port with the project-specific description in the Supplemental Description:The project specific description will be keyed into Trns•port in the Supplemental Description field by the District Estimates staff.

Page 15: Generic Pay Items FDOT State Specifications & Estimates Office.

Generic Pay Item with Defaulted Values

0000100 1

Roadway Design Grp- Generic Pay

Item 1

ZZ

Supplemental Description

Field

Page 16: Generic Pay Items FDOT State Specifications & Estimates Office.

Generic Pay Item with Actual Values

Page 17: Generic Pay Items FDOT State Specifications & Estimates Office.

Proposal Summary of Pay Items

Page 18: Generic Pay Items FDOT State Specifications & Estimates Office.

Utilities Pay Item Example

Pipe Items (Generic pay item used for specifying pipe size)

Page 19: Generic Pay Items FDOT State Specifications & Estimates Office.

Utilities Pay Items ExamplePipe and Fittings < 8” (Fittings Included)

(Generic pay items used to break out Fittings)

Page 20: Generic Pay Items FDOT State Specifications & Estimates Office.

Utilities Pay Item ExamplesPipe and Fittings ≥ 8” (Fittings NOT Included)

Fittings Items (Generic pay items used to combine Fittings)

Page 21: Generic Pay Items FDOT State Specifications & Estimates Office.

FDOT State Specifications & Estimates Office

Codings of Generic Pay Items Examples

• The next series of examples shows how to code generic pay items and are called:

THE GOODTHE BADTHE UGLY

Page 22: Generic Pay Items FDOT State Specifications & Estimates Office.

THE GOOD

• Our first example, we shows how a generic pay item should be correctly coded in a project. This example shows a unique situation where a generic pay item call “Helical Piles” is used on two projects that will be strung together on a Proposal and show how the quantities are rolled up correctly.

Page 23: Generic Pay Items FDOT State Specifications & Estimates Office.

THE GOODProject 552754

Page 24: Generic Pay Items FDOT State Specifications & Estimates Office.

THE GOOD

Project 5527541

Page 25: Generic Pay Items FDOT State Specifications & Estimates Office.

THE GOOD

Page 26: Generic Pay Items FDOT State Specifications & Estimates Office.

THE GOOD

Page 27: Generic Pay Items FDOT State Specifications & Estimates Office.

THE BAD

This example shows when inputting a generic pay item in a project, a description of the generic pay item and an actual unit of measure must be typed in the Supplemental Description block in order for the everyone to know the name or the description of the generic pay item.

Page 28: Generic Pay Items FDOT State Specifications & Estimates Office.

THE BAD

Page 29: Generic Pay Items FDOT State Specifications & Estimates Office.

THE BAD

Page 30: Generic Pay Items FDOT State Specifications & Estimates Office.

THE BAD

Page 31: Generic Pay Items FDOT State Specifications & Estimates Office.

THE UGLY

We will show how when inputting incorrectly the generic pay item of the Helical Piles in our special situation of two projects being strung together can cause havoc on our Proposal Summary Report.

Page 32: Generic Pay Items FDOT State Specifications & Estimates Office.

THE UGLYProject 552754

Project 552764

Page 33: Generic Pay Items FDOT State Specifications & Estimates Office.

The Incorrect Way of Inputting Generic Pay Items

Page 34: Generic Pay Items FDOT State Specifications & Estimates Office.

THE SUPPLEMENTAL DESCRIPTION PART TWO FIELD

• The Supplemental Description field maximum character length is 40. If the generic pay item description exceeds the limit of 40 characters, we will show you in this next example how to handle this situation.

Page 35: Generic Pay Items FDOT State Specifications & Estimates Office.

THE SUPPLEMENTAL DESCRIPTION PART TWO FIELD

Page 36: Generic Pay Items FDOT State Specifications & Estimates Office.

THE SUPPLEMENTAL DESCRIPTION PART TWO FIELD

Page 37: Generic Pay Items FDOT State Specifications & Estimates Office.

THE SUPPLEMENTAL DESCRIPTION PART TWO FIELD

Page 38: Generic Pay Items FDOT State Specifications & Estimates Office.

THE SUPPLEMENTAL DESCRIPTION PART TWO FIELD

Page 39: Generic Pay Items FDOT State Specifications & Estimates Office.

Quality Control

• District assumes all responsibility for proper usage of generic pay items;no approvals from CO will be required.

• No Quality Control reviews will be performed by Central Office.

Page 40: Generic Pay Items FDOT State Specifications & Estimates Office.

Quality Assurance

• Quarterly post-letting review of generic pay items will be performed by Project Review team in CO:– Supplemental Description, with Units, has been

entered in Trns•port– Proper documentation exists

• Responsible Design Offices (CO) may be consulted to verify appropriate usage.

Page 41: Generic Pay Items FDOT State Specifications & Estimates Office.

Generic Pay Item Guidance

• Guidelines for usage of generic pay items are included in the Basis of Estimates manual (BOE).

Page 42: Generic Pay Items FDOT State Specifications & Estimates Office.

Generic Pay Items Summary

• Definition• Rules• Roles• Process• Generic Pay Item Structure• Utilities Pay Item Examples• Generic Pay Item Examples• THE SUPPLEMENTAL DESCRIPTION FIELD and• QC/QA

Generic pay items are a good tool for unique pay

item issues.Districts are encouraged not to misuse these pay

items.

Page 43: Generic Pay Items FDOT State Specifications & Estimates Office.

THE END