General Status of the Gaia Mission and Expected Performance · 2010. 10. 4. · General Status of...

15
General Status of the Gaia Mission and Expected Performance Timo Prusti

Transcript of General Status of the Gaia Mission and Expected Performance · 2010. 10. 4. · General Status of...

Page 1: General Status of the Gaia Mission and Expected Performance · 2010. 10. 4. · General Status of the Gaia Mission and Expected Performance Timo Prusti. ELSA, Paris, 7 June 2010 Mission

General Status of the Gaia Mission and Expected Performance

Timo Prusti

Page 2: General Status of the Gaia Mission and Expected Performance · 2010. 10. 4. · General Status of the Gaia Mission and Expected Performance Timo Prusti. ELSA, Paris, 7 June 2010 Mission

ELSA, Paris, 7 June 2010

Mission requirements• A Stereoscopic Census of Our Galaxy

• Astrometry (V < 20):

• completeness to 20 mag (on-board detection) 109 stars

• parallax accuracy: 7 µarcsec at <10 mag; 12–25 µarcsec at 15 mag; and 100–300 µarcsec at 20 mag

• Photometry (V < 20):

• astrophysical diagnostics (low-dispersion photometry) + chromaticity

• 8–20 mmag at 15 mag: Teff ~ 200 K, log g, [Fe/H] to 0.2 dex, extinction

• Radial velocity (V < 16.5–17):

• third component of space motion, perspective acceleration

• <1 km/s at 13-13.5 mag and <15 km/s at 16.5-17 mag

2

Page 3: General Status of the Gaia Mission and Expected Performance · 2010. 10. 4. · General Status of the Gaia Mission and Expected Performance Timo Prusti. ELSA, Paris, 7 June 2010 Mission

ELSA, Paris, 7 June 2010

Gaia mission

3

Page 4: General Status of the Gaia Mission and Expected Performance · 2010. 10. 4. · General Status of the Gaia Mission and Expected Performance Timo Prusti. ELSA, Paris, 7 June 2010 Mission

ELSA, Paris, 7 June 2010

Mission elements

• Satellite and Payload: EADS Astrium

• Launch: Soyuz-Fregat from Kourou

• Mission Operations Centre: ESA-ESOC and ground stations Cebreros and New Norcia

• Science Operations Centre: ESA-ESAC

• Gaia Data Processing and Analysis Consortium (DPAC)

4

Page 5: General Status of the Gaia Mission and Expected Performance · 2010. 10. 4. · General Status of the Gaia Mission and Expected Performance Timo Prusti. ELSA, Paris, 7 June 2010 Mission

ELSA, Paris, 7 June 2010

Mission elements

• Satellite and Payload: EADS Astrium

• Launch: Soyuz-Fregat from Kourou

• Mission Operations Centre: ESA-ESOC and ground stations Cebreros and New Norcia

• Gaia Data Processing and Analysis Consortium (DPAC) including Science Operations Centre at ESAC

5

Page 6: General Status of the Gaia Mission and Expected Performance · 2010. 10. 4. · General Status of the Gaia Mission and Expected Performance Timo Prusti. ELSA, Paris, 7 June 2010 Mission

ELSA, Paris, 7 June 2010

Launcher

6

Page 7: General Status of the Gaia Mission and Expected Performance · 2010. 10. 4. · General Status of the Gaia Mission and Expected Performance Timo Prusti. ELSA, Paris, 7 June 2010 Mission

ELSA, Paris, 7 June 2010

Mission Operations Centre

7

Page 8: General Status of the Gaia Mission and Expected Performance · 2010. 10. 4. · General Status of the Gaia Mission and Expected Performance Timo Prusti. ELSA, Paris, 7 June 2010 Mission

ELSA, Paris, 7 June 2010

Radiation calibration

8

Page 9: General Status of the Gaia Mission and Expected Performance · 2010. 10. 4. · General Status of the Gaia Mission and Expected Performance Timo Prusti. ELSA, Paris, 7 June 2010 Mission

ELSA, Paris, 7 June 2010

Scientific Performance• 2010: Consolidation of performance

estimates with all known effects included

• Payload Critical Design Review: February-April 2010

• Spacecraft Critical Design Review: July-October 2010

• Consolidated scientific performances from February:

9

Page 10: General Status of the Gaia Mission and Expected Performance · 2010. 10. 4. · General Status of the Gaia Mission and Expected Performance Timo Prusti. ELSA, Paris, 7 June 2010 Mission

ELSA, Paris, 7 June 2010

Astrometry

10

Page 11: General Status of the Gaia Mission and Expected Performance · 2010. 10. 4. · General Status of the Gaia Mission and Expected Performance Timo Prusti. ELSA, Paris, 7 June 2010 Mission

ELSA, Paris, 7 June 2010

Photometry

11

Page 12: General Status of the Gaia Mission and Expected Performance · 2010. 10. 4. · General Status of the Gaia Mission and Expected Performance Timo Prusti. ELSA, Paris, 7 June 2010 Mission

ELSA, Paris, 7 June 2010

Spectroscopy

12

Page 13: General Status of the Gaia Mission and Expected Performance · 2010. 10. 4. · General Status of the Gaia Mission and Expected Performance Timo Prusti. ELSA, Paris, 7 June 2010 Mission

ELSA, Paris, 7 June 2010

Conclusions

• Design ready: EADS Astrium focusing on assembly, integration and testing

• DPAC focusing on calibrating Gaia

• Scientific Community getting ready and GREAT is there to help

13

Page 14: General Status of the Gaia Mission and Expected Performance · 2010. 10. 4. · General Status of the Gaia Mission and Expected Performance Timo Prusti. ELSA, Paris, 7 June 2010 Mission

Schedule

ProposalConcept & Technology Study

Mission Selection

Re-Assessment StudyPhase B1

Scientific operation

Launch autumn 2012

Final

Studies

Mission Data Processing

Implementation

Data Processing

Definition

Operation

Mission Products Intermediate

Selection of Prime Contractor (EADS Astrium)

Phase B2Phase C/D

Software Development

1995

2000

2005

2010

2015

2020

1994

1993

1997

1998

1999

2019

2018

2017

2016

2014

2013

2012

2011

2009

2008

2007

2006

2004

2003

2002

2001

1996

2021

Now

Page 15: General Status of the Gaia Mission and Expected Performance · 2010. 10. 4. · General Status of the Gaia Mission and Expected Performance Timo Prusti. ELSA, Paris, 7 June 2010 Mission

24

Gaia

Unraveling the chemical and dynamical history of our Galaxy