General Procedure of Shipbuilding
Soo-Kwan OhTechnical/ Marketing Manager
For the benefit of business and people
![Page 2: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/2.jpg)
2
1 FROM CONTRACT TO DELIVERY
2 CLASSIFICATION SOCIETY
3 LARGE CONTAINER VESSEL
SUMMARY
![Page 3: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/3.jpg)
3
> From Contract to Delivery
1
![Page 4: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/4.jpg)
4GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
CONCEPTCONCEPTFrom Contract to Delivery1
Contract/ Business Dept.Ship Sales Engineering Dept.
Basic/ ProductionPurchasing of Material Purchasing Dept.Owner/ Class Approval
HullHull OutfittingMachinery OutfittingElectric OutfittingPaintingQuality AssuranceProduction Control
A/S
Owner ProjectOwner Project Shipyard
CONTRACT
DESIGN
PRODUCTION
DELIVERY
![Page 5: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/5.jpg)
5GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
BRIEF SPEC’
1 INITIAL STAGEINITIAL STAGEFrom Contract to Delivery
Owner Project Planning
Contract/ Business Dept.Ship Sales Engineering Dept.
NegotiationTechnical Meeting
Full Spec’/ ClassCost Balance
Letter of IntentTotal Quantity
OptionDelivery Date
Contract SpecificationContract G/A, Midship, Piping DiagramAccommodation Plan
CONTRACT
PurposeRouteEconomic
Broker* Owner
* ShipyardShipyard
OFFER
![Page 6: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/6.jpg)
6GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
1 INITIAL STAGEINITIAL STAGEFrom Contract to Delivery
GENERAL ARRANGEMENT
![Page 7: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/7.jpg)
7GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
1 INITIAL STAGEINITIAL STAGEFrom Contract to Delivery
75K MIDSHIP
![Page 8: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/8.jpg)
8GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
1 From Contract to Delivery
75K MIDSHIP
INITIAL STAGEINITIAL STAGE
![Page 9: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/9.jpg)
9GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
1 From Contract to Delivery
DIAGRAM OUTFIT
INITIAL STAGEINITIAL STAGE
![Page 10: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/10.jpg)
10GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
1 From Contract to Delivery INITIAL STAGEINITIAL STAGE
DIAGRAM OUTFIT
![Page 11: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/11.jpg)
11GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
1 From Contract to Delivery INITIAL STAGEINITIAL STAGE
DIAGRAM OUTFIT
![Page 12: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/12.jpg)
12GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
1 From Contract to Delivery
DIAGRAM-MACHINERY
INITIAL STAGEINITIAL STAGE
![Page 13: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/13.jpg)
13GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
1 From Contract to Delivery
DIAGRAM-MACHINERY
INITIAL STAGEINITIAL STAGE
![Page 14: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/14.jpg)
14GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
1 From Contract to Delivery
DIAGRAM-MACHINERY
INITIAL STAGEINITIAL STAGE
![Page 15: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/15.jpg)
15GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
1 From Contract to Delivery
ACCOMMODATION PLAN
INITIAL STAGEINITIAL STAGE
![Page 16: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/16.jpg)
16GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
1 From Contract to Delivery
ACCOMMODATION PLAN
INITIAL STAGEINITIAL STAGE
![Page 17: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/17.jpg)
17GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
1 From Contract to Delivery
ACCOMMODATION PLAN
INITIAL STAGEINITIAL STAGE
![Page 18: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/18.jpg)
18GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
DESIGN STAGEDESIGN STAGE1 From Contract to Delivery
Key DesignProduction Design
Lines, PropellerGeneral ArrangementTrim & StabilityLoading, etc.
Hull Key Plan : Midship Section Construction Profile & Deck Plan Shell Expansion
Structure Drawing : Cargo Hold Engine Room/ Fore Body/ Aft Body Stern Frame/ Accommodation
Production Drawing : Shop Drawing/ Cutting Plan
Structural Analysis : Static Analysis –Coarse Mesh/ Fine Mesh Fatigue Analysis Sloshing Analysis Bow Impact & Slamming Analysis Vibration Analysis
PaintingPurchasing Order : Steel Plate, Angle etc, Paint
DESIGN STAGE
Hull Design
Basic Design
![Page 19: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/19.jpg)
19GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
1 DESIGN STAGEDESIGN STAGEFrom Contract to Delivery
Key Design : Piping Diagram, Ventilation Mooring, Anchoring, Steering Life Saving, Fire Fighting Traffic Arrangement
Production Design : Pipe Piece, Traffic Piece, etc Small Equipment
Accommodation Design : Interior, Piping, Outfitting
Purchasing Order : Pipe, Valve, Equipment
Key Design : E/R Piping Diagram, Machinery Arrangement, M/E, Generator, Boiler, Compressor
Production Design : Pipe Piece, Vent Piece, etc. Small Equipment
Purchasing Order : Equipment, Valve, etc.
Hull Outfitting Design
Machinery Outfitting
![Page 20: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/20.jpg)
20GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
1 DESIGN STAGEDESIGN STAGEFrom Contract to Delivery
Key Design : Automation Electrical System Navigation Equipment
Production Design : Cable Piece Light Equipment
Purchasing Order : Switch Board Equipment, Cable, Sensor
Electric Outfitting
![Page 21: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/21.jpg)
21GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
1 PRODUCTION STAGEPRODUCTION STAGEFrom Contract to Delivery
Yard FacilityProduction Control
Material Control
Production ControlProduction – Hull, Hull Outfitting,
Machinery Outfitting, PaintQuality Assurance
Grand P.E
P.E Block Painting
InspectionOwner/ Class
Pre-Outfitting
Each BlockAssemblySub-Assembly
Dock Erection
CONDITION
HULL PRODUCTION
Cutting
![Page 22: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/22.jpg)
22GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
1 PRODUCTION STAGEPRODUCTION STAGEFrom Contract to Delivery
Pre-OutfittingIn Block
OutfittingIn Dock
OutfittingIn Quay
Block Painting Dock PaintingCosmeticPainting
OUTFITTING PRODUCTION
PAINTING
![Page 23: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/23.jpg)
23GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
Shipyard Ship owner
1 DELIVERY & A/SDELIVERY & A/SFrom Contract to Delivery
Official Sea TrialShipyard, Owner, Class
SpeedEnduranceTank TestAnchoring/ MooringRudder, SteeringVibration, NoiseEquipment OperationNavigation
CorrectionIf Any
DeliverySign
Departure A/S
(1 YEAR)
READY TO SEA TRIAL
![Page 24: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/24.jpg)
24
> Classification
2
![Page 25: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/25.jpg)
25GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
2 MAJOR WORKMAJOR WORKClassification
DRAWING APPROVAL
INSPECTION DURING BUILDING
CERTIFICATION
INSPECTION AFTER DELIVERY
Yard Design
Maker Design
Intermediate
Periodical
SHIP’S SAFETY DURING LIFE TIME
![Page 26: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/26.jpg)
26GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
CLASS PROCESS
T0
Contract
RFC Signed
T0 + C
Deliveryto Owner
Ad 523 signed by
LPO
Commercial Design review Follow-up in service
SHIP NEW CONSTRUCTION :
![Page 27: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/27.jpg)
27GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
CLASS PROCESS
Design review : basically 4 BV actors
Field surveyor
LPO
Marine Center
BVN surveyors
DTM support
![Page 28: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/28.jpg)
28GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
CLASS PROCESS
T0
Contract
RFC Signed
T0 + C
Deliveryto Owner
Ad 523 signed by
LPO
Design review
LPO core activity : Design review
• Design review can start before RFC signed ( TAKE CARE - CONTRACT DEFINITION )
•Completed when Ad 523 + annexes are examined and signed ( technical green light given to CM for Class certificate )
![Page 29: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/29.jpg)
29GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
CLASS PROCESS
T0
Contract
RFC Signed
T0 + C
Deliveryto Owner
Ad 523 signed by
LPO
Design review
LPO core business : Design review against Referential
• Referential : BV Rules / IMO Reg.
• LPO Interpretations : - allowed with BV Rules ( within general conditions) - not allowed for IMO Reg.
• Rules : technical interpretations / protect interest of Owner ( final CLIENT )
• High technical knowledge frequently requested as Clients may be less educated / powerfull than BV
• Great risk of uncontrolled move from design review activity to Consultancy activity
![Page 30: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/30.jpg)
30GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
CLASS PROCESS
T0 + C
Deliveryto Owner
Ad 523 signed by
LPO
Follow-up in service
LPO activity :
• Design review at any time in case of conversion
• Rules : technical interpretations / protect interest of Owner
• Technical support of CMs / Station surveys
• Several LPOs may be concerned
• Technical documentation processing ( drawings + calculation sheets )
Scrap
or
Changeof
Class
![Page 31: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/31.jpg)
31GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
TECHNICAL ASSISTANCE TECHNICAL ASSISTANCE
Different from Class design review : BV acts as designer in scope of Consultancy
Technical expertise and knowledge is ( must be ) sold to Client
Highly profitable
HIGH RISK OF : - transfer of Yard know-how - confusion on status of conclusions - pressure from management
ALWAYS BE CLEAR ABOUT THE CAP YOU WEAR / THE FORMAT OF COMMENTS YOU ARE ALLOWED TO GIVE
![Page 32: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/32.jpg)
32GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
2 IACS MEMBERSIACS MEMBERSClassification
MEMBER
ABS : American Bureau of Shipping
BV : Bureau Veritas
CCS : China Classification Society
DNV : Det Norske Veritas
GL : Germanischer Lloyd
KR : Korean Register of Shipping
LR : Lloyd Register
NK : Nippon Kaiji Kyokai
RINA : Registro Italiano Navale
RS : Russian Maritime Register of Shipping
![Page 33: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/33.jpg)
33GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
2 Classification IACS MEMBERSIACS MEMBERS
ASSOCIATES
IRS : Indian Register of Shipping
REQUIREMENTS
- Procedural Requirement
- Unified Requirements
- Unified Interpretations
- Guide Line & Recommendations, etc.
Web Site
www.iacs.org.uk
![Page 34: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/34.jpg)
34
> Large Container Vessel
3
![Page 35: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/35.jpg)
35
1 General : Large Container Vessels
2 Bureau Veritas References in Large Container Vessels
3 BV Hull Expertise
- Steps of review process
- Torsion analysis
- Fatigue analysis
- Bow flare analysis
4 BV Lashing Expertise
5 BV Shaft Alignment Expertise
6 Parametric Roll Calculation
SUMMARY
![Page 36: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/36.jpg)
36GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
The size range for the largest containerships is expected to increase significantly in the near future as economies of scale remains the dominant operational factor driving efficient transport.
The Largest containerships currently in service are in the 7000-8000 TEU range. Many leading shipyard have developed designs for vessels with additional containers rows, tiers and holds. Increase main dimension and capacity up to 9000/10000 TEU.
In the future the carrying capacity of containerships is expected to increase to 12000 TEU and above
1 GENERAL LARGE CONTAINER VESSELSLARGE CONTAINER VESSELS
![Page 37: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/37.jpg)
37GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
Fleet development for container ships
1
Fleet development in '000 teu
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004
GENERAL LARGE CONTAINER VESSELSLARGE CONTAINER VESSELS
![Page 38: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/38.jpg)
38GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
Order Books for container ships
1
Order book Feb 2005, number of ships
0
50
100
150
200
250
<1000 1000-2000
2000-3000
3000-4000
4000-5000
5000-6000
6000-7000
7000-8000
8000+
GENERAL LARGE CONTAINER VESSELSLARGE CONTAINER VESSELS
![Page 39: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/39.jpg)
39GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
Challenges with the increase of size of containerships
• Torsion/Warping stress
• Fatigue
• Acceleration forces on lashing
• Engine power
• Shaft alignment
• Parametric roll
• Slamming/Bow impact
1 GENERAL LARGE CONTAINER VESSELSLARGE CONTAINER VESSELS
![Page 40: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/40.jpg)
40GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
LAST MAIN REFERENCES
• HHI
» 1x5,500 TEU containerships for YANG MING LINE
» 1x7,800 TEU containership for CMA CGM
» 10x5,100 TEU containerships for CMA CGM (under building)
» 2x5,100 TEU containerships for CMA CGM (under building at HSHI)
» 2x9,200 TEU containerships for CMA CGM (under building)
» 2x9,200 TEU containerships for CMA CGM (under building at HSHI)
» 2x8,200 TEU containerships for CMA CGM (under building)
» 2x8,200 TEU containerships for CMA CGM (under building at HSHI)
» 1x8,200 TEU containership for YANG MING LINE (under building)
• DSME
» 1x6,500 TEU containership for CGM CMA
2 BV REFERENCES CONTAINER SHIPS BUILDINGCONTAINER SHIPS BUILDING
![Page 41: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/41.jpg)
41GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
LAST MAIN REFERENCES
• HHIC
» 2x1,600 TEU containerships for DELMAS
» 4x1,600 TEU containerships for VROON
» 2x4,300 TEU containerships for CMA CGM
» 3x6,500 TEU containerships for CMA CGM
• SHI
» 8 x 5,770 TEU containerships for CMA CGM
• CSBC
» 18x2,200 TEU containerships for WAN HAI LINES, DELMAS, CMA CGM, YANG MING LINE
• IMABARI
» 3x5,500 TEU containerships for COSCO
2 BV REFERENCES CONTAINER SHIPS BUILDINGCONTAINER SHIPS BUILDING
![Page 42: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/42.jpg)
42GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
< 9,200 TEU CONTAINERSHIP >
Main Dimensions:
• Length btw. PP 333,44 m
• Breadth 42,8 m
• Depth, to upper deck 27,3 m
• Draught, summer 14,5 m
• Speed 24,25 kn
• Power 68656 kW
Key elements: Between half December and the end of March the complete structure has been reviewed. This was only possible in close cooperation with the Shipyard. Several meetings at the shipyard site, exchanging information and calculation results and discussing the findings, have taken place. Two offices of Bureau Veritas, Korea and Paris, have been working around the clock in order to make the deadlines of the shipyard.
2 BV REFERENCES PROJECT MANAGEMENTPROJECT MANAGEMENT
![Page 43: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/43.jpg)
43GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
Hatch coamings / Superstructures connection
Bottom Slamming
Transverse Bulkheadconnections
Bow Flare impact
Hatch corners
Longitudinal Hatch Coamings
Cross-deck structures
3 BV HULL EXPERTISECRITIAL AREA OF LARGE
CONTAINER SHIPSCRITIAL AREA OF LARGE
CONTAINER SHIPS
![Page 44: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/44.jpg)
44GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
DESIGN REVIEW PROCESS
» General and subdivision arrangement
» Mid-ship section : Longitudinal strength and local rule scantlings
» All sections : Longitudinal strength and local rules scantlings
» Torsion model : Warping stress estimation all along the vessel (to be included in the global stress)
» Key drawings: primary members calculation (local + global stress)
» Detail drawings / reinforcement : bracket reinforcement under stack...
» Bow impact and flat forward bottom area
» Other calculations: Loading manual strength analysis, Lashing...
IN PARALLEL TO DESIGN REVIEW PROCESS
» FEM (VeriSTAR) calculations: double check for design review
» Fatigue Analysis with Mars/VeriSTAR
3 BV HULL EXPERTISE STEP OF REVIEW PROCESSSTEP OF REVIEW PROCESS
![Page 45: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/45.jpg)
45GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
» TORCIS calculation
3
MARS - TORCIS ANALYSIS
Estimation of warping stress
in side shell , upper-deck
all along the vessel N/mm2
Modelisation of
all cargo holds
Estimation of shear force
in cross deck beams
2 calculations:
wave 60 degree
wave 120 degree
BV HULL EXPERTISE TORSION ANALYSISTORSION ANALYSIS
![Page 46: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/46.jpg)
46GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
3
Fatigue due to warping
(L27) 16 years
(L28) 17 years
(L29) 13 years
(L30) 15 years
(L31) 17 years
Buckling due to warping
MARS - TORCIS ANALYSIS
BV HULL EXPERTISE TORSION ANALYSISTORSION ANALYSIS
![Page 47: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/47.jpg)
47GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
Analyses based on complete ship model
3
Full model of 9200 TEU containership
VeriSTAR is use for
- Buckling analysis (coarse mesh)
- Yielding analysis (fine mesh)
- Fatigue analysis (very fine mesh)
BV HULL EXPERTISE TORSION ANALYSISTORSION ANALYSIS
![Page 48: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/48.jpg)
48GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
Methodology and steps of a VeriSTAR CSM calculations
»σX1 = γs1σs1 + γw1(Cfvσwv1+Cfhσwh1 + CfΏσΩ )
3
Maximum Torsion at fore part50% Vertical Bending moment
Quartering sea: Maximize static , vertical bending (50%), horizontal bending (100%) and torsion (100%)
BV HULL EXPERTISE TORSION ANALYSISTORSION ANALYSIS
![Page 49: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/49.jpg)
49GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
Methodology and steps of a VeriSTAR CSM calculations
» Coarse mesh modelling : full ship
» Definition of ballast areas and container loading points
» Static calculation with lightship weight: loading conditions
– lightship (checking case)
– ballast (maximum Bending moment)
– full load (maximum draft)
– compare data with loading manual (draft,displacement,still water bending moment…)
» Wave Load calculations: load cases
– based on selection of design waves (table 5)
– Head Sea (longitudinal strength)
– Beam Sea (transverse strength)
– Quartering sea (torsion strength)
» Fine mesh analyses
– based on areas to be analysed (Table 1)
– Hatch corners, cross deck, connection superstructure,connection girders...
6 3D FEM CALCULATIONS VERISTAR
COMPLETE SHIP MODELCOMPLETE SHIP MODEL
![Page 50: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/50.jpg)
50GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
Principle Design wave load (see also Table 5)
» Maximum Vertical Wave Bending Moment in Hogging condition
» Maximum Wave Torque at vicinity of 0.25L (aft part)
» Maximum Wave Torque at mid-ship
» Maximum Wave Torque at vicinity of 0.75L (fore part)
» Maximum vertical acceleration in inclined conditions
» Maximum vertical acceleration in upright conditions
» Maximum transverse acceleration
Wave design load to be associate with loading conditions
» Ballast, full load
» Load cases
3
Sea keeping calculation
Iterative process
BV HULL EXPERTISE COMPLETE SHIP MODELCOMPLETE SHIP MODEL
![Page 51: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/51.jpg)
51GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
Stresses and Deformation
3
Head Sea Condition Quartering sea condition
Stress in Hatch coaming
Connection superstructure
Stress Hatch corners
Stress Cross deck
Stress Girders
Buckling in bulkhead and bilge areaBuckling in bottom area
BV HULL EXPERTISE TORSION ANALYSISTORSION ANALYSIS
![Page 52: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/52.jpg)
52GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
Areas to be analysed through fine Mesh models
3
- Hatch Corners
- Connection of hatch coaming
with superstructure
- Transverse Bulkhead
- Support Bulkhead
- Transverse Frame
- Bottom Girders
Examples:
BV HULL EXPERTISE TORSION ANALYSISTORSION ANALYSIS
![Page 53: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/53.jpg)
53GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
Typical stress range in head sea Typical stress range in oblique sea
HATCH CORNERS
3 BV HULL EXPERTISE TORSION ANALYSISTORSION ANALYSIS
![Page 54: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/54.jpg)
54GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
Support Bulkhead
3
Shear stress
at maximum draft
Maximum pressure
in alternate condition
one bay empty
BV HULL EXPERTISE TORSION ANALYSISTORSION ANALYSIS
![Page 55: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/55.jpg)
55GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
Connection with superstructure
3
Stress concentrations
BV HULL EXPERTISE TORSION ANALYSISTORSION ANALYSIS
![Page 56: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/56.jpg)
56GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
Steps for Fatigue calculation of side shell longitudinals:
» 1st step : 2D Fatigue Analysis
» 2nd Step: 3D Fatigue Analysis
Fatigue calculations for Hatch corners
» One Step: 3D Fatigue Analysis
3
Cracks in side shell longitudinal due to fatigue
BV HULL EXPERTISE FATIGUE ANALYSISFATIGUE ANALYSIS
![Page 57: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/57.jpg)
57GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
3
Side Shell longitudinals
Fatigue
Hot spot 1
Fatigue
Hot spot 2
Damage Fatigue
Life calculation
to be over 20 years
To compare with Mars results
BV HULL EXPERTISE FATIGUE ANALYSISFATIGUE ANALYSIS
![Page 58: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/58.jpg)
58GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
3
Hatch Corners
In order to increase fatigue life,
compromise between:
- sufficient reinforcement
- smooth grinding
Hatch corner in the midship and fore part
Hot spot edge of the corner
Especially fore part area due to high
torsional loads
BV HULL EXPERTISE FATIGUE ANALYSISFATIGUE ANALYSIS
![Page 59: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/59.jpg)
59GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
3
Hatch CornersIn order to increase fatigue life,
compromise between:
- sufficient reinforcement
- smooth grinding
Hatch corner in the aft part at ER
Hot spot edge of the corner
Smooth Grinding improves
the fatigue life by 2
BV HULL EXPERTISE FATIGUE ANALYSISFATIGUE ANALYSIS
![Page 60: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/60.jpg)
60GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
3
Slamming
Maximum impact in forward area:
- Buckling in transverse frames
- Buckling on side shell plate and stiffeners
- Detail connections in forward area
VeriSTAR calculations with maximum vertical
acceleration and in sagging condition.
Blow Blow flareflare analysisanalysis
BV HULL EXPERTISE SLAMMING/ BOW IMPACTSLAMMING/ BOW IMPACT
![Page 61: General Procedure of Shipbuilding Soo-Kwan Oh Technical/ Marketing Manager For the benefit of business and people.](https://reader035.fdocuments.us/reader035/viewer/2022081603/56649e205503460f94b0c8c7/html5/thumbnails/61.jpg)
61GENERAL PROCEDURE OF SHIPBUILDING - DD/MM/YY
Buckling in transverse frame at fore part