GENERAL MANAGER UCLEAR SERVICES August 3, …...August 3, 2016 Mitsubishi Nuclear Energy Systems,...
Transcript of GENERAL MANAGER UCLEAR SERVICES August 3, …...August 3, 2016 Mitsubishi Nuclear Energy Systems,...
Proprietary & Confidential
MITSUBISHI WATER JET PEENING
AN ILLUSTRATED JOURNEY FROM JAPAN TO THE US
1
GREGORY L MARTINGENERAL MANAGER | NUCLEAR SERVICES
Mitsubishi Nuclear Energy Systems, Inc.August 3, 2016
Proprietary & Confidential 2
THE JOURNEY BEGINS
Proprietary & Confidential 3
A FIELD-PROVEN SOLUTION FROM THE FAR EAST
BMN APPLICATIONS: 11RVN APPLICATIONS: 9SI NOZZLE APPLICATIONS: 2
BMN APPLICATIONS: 6RVN APPLICATIONS: 5SI NOZZLE APPLICATIONS: 2
BMN APPLICATIONS: 1RVN APPLICATIONS: 1
BMN APPLICATIONS: 3RVN APPLICATIONS: 3SI NOZZLE APPLICATIONS: 2
INTERNATIONAL WJP EXPERIENCE
Years of Operations Experience 15
Total Plants Mitigated 21
Total WJP Projects 45
- Bottom Mounted Nozzle (BMN) Projects 21
- Reactor Vessel Nozzle (RVN) Projects 18
- Safety Injection Nozzles Projects 6
MITSUBISHI WJPUnparalleled international experience in Alloy 600 mitigation.
Proprietary & Confidential 4
US CUSTOMERS WITH A NEED
Safe-endInlet/outlet
nozzle
(Low-alloy steel)
OutsideWelding portion
(Alloy 600)Buttering
(Alloy 600)
Inside
(wetted surface)Overlay
(SS304 equivalent
material)
Buttering
(Alloy 600)
Overlay
(SS304
equivalent
material)
BMN(Alloy 600)
J-welding
portion
(Alloy 600)
RV Lower Head
(Low-alloy
steel)
WJP Implementation Locations
Shown in Red
Compressive Effect
Environment Material
Proprietary & Confidential 5
A TEAM EMERGES
Proprietary & Confidential 6
A PROJECT IS DEVELOPED
Project Kickoff
Jun 2013
Tech Basis, Equipment
Specs, Engineering
DraftProcedures Complete
2013-2014
WJP & NDE
Equipment Complete
May 2015
Equipment Integration Testing &
Quals. Complete
Dec 2015
Wolf Creek Traveler
Walk Through
Feb 2016
Equipment Setup at
US Facility
Jun 2016
Outage Crew
Training
Aug 2016
WJP & NDE
Equipment Shipment
to USA
Mar 2016
WOLF CREEK GENERATING STATION
SEPTEMBER 2016
Outage Crew
Training
Sep 2017CALLAWAY ENERGY CENTER
OCTOBER 2017
Proprietary & Confidential 7
US BASED TOOLING FABRICATED
2X RVN TOOL
2X BMN WJP TOOL
3X BMN NDE TOOL
Proprietary & Confidential 8
A TRAINING CENTER CONSTRUCTED
Proprietary & Confidential 9
AND TRAINING CONDUCTED
Proprietary & Confidential 10
PROCESS QUALIFICATION TESTING OCCURS
Proprietary & Confidential 11
A SYSTEM IS INTEGRATED
Proprietary & Confidential 12
A SOLUTION IS DELIVERED
WOLF CREEK GENERATING STATION
SEPTEMBER 2016
CALLAWAY ENERGY CENTER
OCTOBER 2017
Proprietary & Confidential 13
BARRY CRAIG561 622 6772: Office561 379 5235: [email protected]
Please contact us now to book your tour of the Mitsubishi WJP US Field Training Facility!
AN INVITATION IS EXTENDED
GREG MARTIN704 945 2782: Office704 608 7501: Mobile
SCOTT BAUMGARTNER704 945 2786: Office
908 250 0063: [email protected]