P 1 0619LOG006-V4 0619LOG006-V4: 19mm log cabin 3.7x3.4m (T&G roof and floor with single (glass) glazing and veranda) 2mm Drill bit Winter = High Moisture = Expansion Summer = Low Moisture = Contraction All buildings should be erected by two adults For ease of assembly, you MUST pilot drill all screw holes and ensure all screw heads are countersunk. CAUTION Every effort has been made during the manufacturing process to eliminate the prospect of splinters on rough surfaces of the timber. You are strongly advised to wear gloves when working with or handling rough sawn timber. Please retain product label and instructions for future reference General Instructions BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY - Check the pack and make sure you have all the parts listed. - When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit. - Ensure there is plenty of space and a clean dry area for assembly. TIMBER As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow. BUILDING A BASE When thinking about where the building and base are going to be constructed: Ensure that there will be access (60cm) to all sides for maintenance work and annual treatment. Ensure the base is level and is built on firm ground, to prevent distortion. Refer to diagrams for the base dimensions. The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm above the surrounding ground level to avoid flooding. TYPES OF BASE - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product. Refer to the instructions pages for your specific product code For ease of assembly use a rubber mallet to fit the log boards. Do NOT use a heavy hammer. Ensure to measure and check before cutting boards. It is advisable to use a hand saw when cutting roof and floor boards. To ensure log boards are even, use a spirit level to check each layer has been installed correctly. For assistance please contact customer care on: 01636 821215 Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN www.merciagardenproducts.co.uk

Transcript of General Instructions Please retain product label and ... · to create your second level. *Doors can...

Page 1: General Instructions Please retain product label and ... · to create your second level. *Doors can be hung once the boarding has enclosed the door frame. *Doors can be hung once

P 1

0619LOG006-V4

0619LOG006-V4: 19mm log cabin 3.7x3.4m (T&G roof and �oor with single (glass) glazing and veranda)

2mm Drill bit

Winter = High Moisture = ExpansionSummer = Low Moisture = Contraction

All buildings should be erected by two adults

For ease of assembly, you MUST pilot drill all screw holes and ensure all screw heads are countersunk.

CAUTIONEvery e�ort has been made during the manufacturing process to eliminate the prospect of splinters on rough surfaces of the timber. You are strongly advised to wear gloves when working with or handling rough sawn timber.

Please retain product label and instructions for future reference

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY

- Check the pack and make sure you have all the parts listed. - When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit.- Ensure there is plenty of space and a clean dry area for assembly.

TIMBER

As with all natural materials, timber can be a�ected during various weather conditions. For the duration of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow.

BUILDING A BASE

When thinking about where the building and base are going to be constructed: Ensure that there will be access (60cm) to all sides for maintenance work and annual treatment.

Ensure the base is level and is built on �rm ground, to prevent distortion. Refer to diagrams for the base dimensions. The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run o� for water. It is also recommended that the �oor be at least 25mm above the surrounding ground level to avoid �ooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for your speci�c product code

For ease of assembly use a rubber mallet to �t the log boards. Do NOT use a heavy hammer.

Ensure to measure and check before cutting boards.

It is advisable to use a hand saw when cutting roof and �oor boards.

To ensure log boards are even, use a spirit level to check each layer has been installed correctly.

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN

www.merciagardenproducts.co.uk

Page 2: General Instructions Please retain product label and ... · to create your second level. *Doors can be hung once the boarding has enclosed the door frame. *Doors can be hung once

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

20

21

22

23

24

25

26

P 2

0619LOG006-V4 Overall Dimensions:Width = 3445mm Depth = 3186mm (Without Veranda) 3671mm (With Veranda) Height = 2641mm

Base Dimensions: Width = 3118mm Depth = 2557mm (Without Veranda) 3459mm (With Veranda)

Please retain product label and instructions for future reference

Before assembly please make sure you have a

suitable base ready to erect your building

MADE IN GREAT BRITAIN

Starter Board - 66x19x3296mm QTY 2LB19RT66-A-3296

Log Board - 120x19x1402mm QTY 6LB19-B-1402

Log Board - 120x19x326mm QTY 30LB19-B-326

Log Board - 120x19x326mm QTY 12LB19-C-326

Log Board - 120x19x3296mm QTY 19LB19-A-3296

Log Board - 120x19x2754mm QTY 23LB19-A-2754

Log Board - 120x19x1002mm QTY 21LB19-B-1002

Log Board - 120x19x1102mmLB19-BE-1102

Log Board - 120x19x1202mmLB19-BE-1202

Log Board - 120x19x1302mmLB19-BE-1302

Log Board - 120x19x2854mm LB19-AE-2854

Log Board 120x19x2954mm LB19-AE-2954

Log Board - 120x19x3054mm LB19-AE-3054

Roof Purlin - 40x90x3154mm QTY 3 F4090-AE-3154

Bearer - 44x44x3104mm QTY 2 F4444-3104-PT

Bearer - 44x44x2469mm QTY 11 F4444-2496-PT

Fascia - 120x16x1775mm QTY 4 S16120-1775

Eaves Frame - 44x27x3154mm QTY 2 F2744-C-3154

Roof Board - 121x16x1752mm QTY 58 MB16-C-1752

Floor Board - 121x16x3060mm QTY 23MB16-C-3060

21

Short Window Pack* QTY 2 Double Door Pack*

Log Board - 120x19x3296mm LB19-AD-3296

Log Board - 110x19x3154mm QTY 2LB19RG110-ADE-3154

Log Board - 110x19x3154mmLB19RG110-AE-3154

*All components for the Windows and Doors are shown in the Windows and Doors instruction packs.

Gable 3296mmAI-0619LOG006-V3G

QTY 2

19

18

Page 3: General Instructions Please retain product label and ... · to create your second level. *Doors can be hung once the boarding has enclosed the door frame. *Doors can be hung once

29

30

31

32

33

34

35

36

37

P 3

Please retain product label and instructions for future reference

Bearer - 44x44x3104mm QTY 3 F4444-3104-PT

Bearer - 44x44x247mm QTY 2 F4444-247-PT

Veranda Floor - 120x16x882mm QTY 25S16120-C-882

Starter Board - 66x19x326mm QTY 2LB19RT66-B-326

Log Board - 120x19x326mm QTY 18LB19-B-326

Log Board - 110x19x326mm QTY 2LB19RG110-B-326

Log Board - 120x19x326mm QTY 6LB19-C-326

Log Board - 120x19x1000mm QTY 8LB19-B-1000

Log Board - 54x19x1000mm QTY 2LB19RG54-B-1000

Pre-assembly

*Please note:

Each board interlocks ateither end in a staggered pattern.

Before securing ensure that the boardsare �tted properly in their respectivetongues and grooves.

38

Felt

27 Closure Trim - 16x28x2400mm (approx length) QTY 14S1628-C-2400

Storm Brace - 27x44x2000mm QTY 8F2744-2000

28

Felt Tacks x25070mm Screw x52

Nail Bag

40mm Screw x330

30mm Screw x8560mm Bolt Set x16

Veranda Components

Roof Spacers QTY 5PI-07-0208 (20x100x2mm)

39

Page 4: General Instructions Please retain product label and ... · to create your second level. *Doors can be hung once the boarding has enclosed the door frame. *Doors can be hung once

P 4

Please retain product label and instructions for future reference

Example picture 2 screws per bearer per end.

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN

www.merciagardenproducts.co.uk

22 22 22 22 22 22 22 22 22

2221

22

21

2221

22

70mm screw

Step 1Parts Needed - No. 21 QTY 2 No. 22 QTY 11

Lay the bearers (No. 21 & No. 22) onto a �rm and level surface (free from areas where standing water can collect) as shown in the illustration.

Fix the framing together at each corner using 8x70mm screws, ensuring the frame is �ush.

8x70mm Screws

Pre drill hole

a

IMPORTANT: Pre-drill before �xing screws.

Pre drill hole

70mm screw

b Following the same method arrange the remaining framing (No. 22) inside the assembled frame.

*Ensure there is an equalamount of space between each frame.

Secure each of the frames in place using 2x70mm screws for each side of the bearer, ensuring the framing remains level.

28x70mm Screws

Pre drill hole

70mm screw

Step 2Parts Needed - No. 4 QTY 2 No. 9 QTY 2

Place the starter boards (No. 4)on to assembled base frame along the longest sides.

*Ensure the notches at either end of each board are �ush and level with the ends of the frame.

Fix each of the starter boards tothe frame by screwing throughthe notch into the frame as shown in the illustration.

Once in position place the nextlog board (No. 9) onto theassembly as shown in theillustration.

4x70mm Screws 4

4

9

9

IMPORTANT: Pre-drill before �xing screws.

4

Page 5: General Instructions Please retain product label and ... · to create your second level. *Doors can be hung once the boarding has enclosed the door frame. *Doors can be hung once

P 5

Please retain product label and instructions for future reference

5

6

8

Step 3Parts Needed - No. 5 QTY 6 No. 6 QTY 6 No. 8 QTY 6 No. 9 QTY 12

Following the same methodoutlined in Pre-Assembly, laythe �rst 6 boards (No’s. 5, 68 & 9) onto the starter boards to create your �rst level.

*Ensure that the boards arelevel and �ush with eachother as you lay each one.

9

9

Step 4

Once you have laid 6 log boards (o� of the starter) up the door section, slide the assembled door frame (No. 2) over the boards resting the frame on top of the starter board.

*Please note: This image is for illustra-tive purposes and may di�er from your choice in product (regarding door position). Nevertheless the process of �tting the door frame is the same.

**Please Note: The short boards at the front of the building (either side of the door and window opening’s) can be placed either side depending on your needs.

7

98

Step 5Parts Needed - No. 6 QTY 12 No. 7 QTY 6 No. 8 QTY 6 No. 9 QTY 6 No. 10 QTY 12

Following the same methodoutlined in Pre-Assembly, laythe next 4 boards (No’s. 6, 7, 8, 9 & 10) onto the assemblyto create your second level.

*Ensure that the boards arelevel and �ush with eachother as you lay each one.

*Doors can be hung once the boarding has enclosed the door frame.

*Doors can be hung once the boarding has enclosed the door frame by 12-13 boards, refer to door installation instructions, if not, you can install the door at step 7.

10

610

6

Page 6: General Instructions Please retain product label and ... · to create your second level. *Doors can be hung once the boarding has enclosed the door frame. *Doors can be hung once

P 6

Please retain product label and instructions for future reference

Step 7Parts Needed - No. 6 QTY 6 No. 7 QTY 3 No. 8 QTY 3 No. 9 QTY 3 No. 10 QTY 6 Following the same methodoutlined in Pre-Assembly, laythe remaining boards (No’s. 6, 7, 8, 9 & 10) onto the assembly to bring the board level to the top of the window and door frames.

*Ensure that the boards arelevel and �ush with eachother as you lay each one.

*Doors can be hung once the boarding has enclosed the door frame.

9

6

76

10

10

8

12

16

Step 6

Once you have laid the secondlevel of boards onto the assemblyslide the window(s) (No. 1) between the smaller boards and rest on to the longer board.

*Ensure the boards are level witheach end.

*Please note: This image is forillustrative purposes and maydi�er from your choice in product(regarding window position).Nevertheless the process of �ttingthe window is the same.

Step 8Parts Needed - No. 6 QTY 6 No. 7 QTY 3 No. 8 QTY 3 No. 10 QTY 9 No. 11 QTY 1 No. 12 QTY 1 No. 13 QTY 1 No. 14 QTY 1 No. 15 QTY 1 No. 16 QTY 1

Following the same methodoutlined in Pre-Assembly, laythe remaining boards (No’s. 6, 7, 8, 10, 11, 12, 13, 14, 15 & 16) onto the assembly to bring the board level to the top of the window and door frames.

*Ensure that the boards arelevel and �ush with eachother as you lay each one.

*Doors can be hung once the boarding has enclosed the door frame.

8

613

11

1415 6

107

Page 7: General Instructions Please retain product label and ... · to create your second level. *Doors can be hung once the boarding has enclosed the door frame. *Doors can be hung once

P 7

Please retain product label and instructions for future reference

Step 9Parts Needed - No. 8 QTY 1 No. 19 QTY 1 Following the same methodoutlined in Pre-Assembly, laythe next two boards (No’s. 8 & 19) onto the front of the assembly.

Step 11Parts Needed - No. 3 QTY 2

Place the gable tops (No. 3)onto the assembly. Fix into position by screwing through the notches as shown in the illustration.

*Ensure that the boards arelevel and �ush with eachother as you lay each one.

4x70mm Screws

Pre drill hole

70mm screw

8

17

18

3

3

19

Step 10Parts Needed - No. 17 QTY 1 No. 18 QTY 1

Following the same methodoutlined in Pre-Assembly, laythe next two boards (No’s. 17 & 18) onto the window and plain side.

IMPORTANT: Pre-drill before �xing screws.

Page 8: General Instructions Please retain product label and ... · to create your second level. *Doors can be hung once the boarding has enclosed the door frame. *Doors can be hung once

P 8

Please retain product label and instructions for future reference

23b 2525

25

Pre drill hole

70mm screw

20

20

20

a

b

Step 12Parts needed - No. 20 QTY 3

Align the Roof Purlin(s) (No. 20) into the cut out slots on each gable top ensuring each purlin interlocks the boards.

Secure the purlins at each end by screwing through the bars into the boards (ensure to pre-drill to avoid the boards splitting) using 4x70mm screws per purlin.

*Please note: The gable shown is for illustrative purposes and may di�er in width from your choice in product. Nevertheless, despite any di�erences the process of �xing the purlins is the same.

12x70mm Screws

a

b

IMPORTANT: Pre-drill before �xing screws.

40mm screwPre drill

hole*Cut to �t

Step 13Parts needed - No. 25 QTY 58

Place the �rst two roof board’s (No. 25) onto the assembly on each side, making sure the boards are �ush to the end of the roof purlin. Once in position �x to each purlin using 3x40mm screws.

Due to natural occurences of wood shrinkage / expansion. You maybe required to use the provided spac-ers and place a space of 2mm to ensure every roof board lines up with the truss’.

*Ensure the roof boards meet at the top of the apex and leave an overhang at the bottom.

Continue adding the roof boardsalong the roof, �xing each one intoposition using 3x40mm screws,making sure that each board is interlocked, �ush at the bottom &meet at the top of the apex.

The last board on each side will overhang: Using a straight edgeand a pencil mark out a line as a guide.

Cut along the pencil mark andremove the excess. Place the cut down board’s back onto the roof and secure into place using 3x40mm screws per board.

*Please Note: This image is for illustrative purposes and may di�er from your choice in product. Nevertheless the process of cutting and �tting the last roof board(s) is the same.

156x40mm Screws

a

b

a

b

Page 9: General Instructions Please retain product label and ... · to create your second level. *Doors can be hung once the boarding has enclosed the door frame. *Doors can be hung once

P 9

Please retain product label and instructions for future reference

Step 14Parts Needed - No. 24 QTY 2

Ensuring the roof boards are �ushat the overhanging side and meetat the apex, �x the eaves frames (No. 24) to the underside of the roofboards using 9x40mm screws as shown in the illustration

*Please Note: This image is for illustrative purposes and may di�er from your choice in product. Nevertheless the process of �xing the eaves frames is thesame.

18x40mm Screws

40mm screwPre drill

hole

Step 15Parts Needed - No. 26 QTY 23

Place the �rst �oor board (No. 26)inside the building �ush to the logboard on one side. Continue addingthe �oor boards (internally) makingsure to interlock each individualboard.

*Do NOT secure the boards untilthe last board has been measuredand cut.

Following the same method outlined previously, measure the gap betweenthe bottom of the tongue (on the last board placed) and the log board.

Using a straight edge mark out the measurement onto the last �oorboard (No. 26) and cut along the length removing the excess.

**Please note: Mark the �nal board2mm under the measurement; Thiswill allow the timber to expand andcontract correctly.

Once all the �oor boards are in position secure each board intoposition using 8x40mm screws.

***Please Note: Ensure to screw through each of the �oor boards into the �oor bearers.

184x40mm Screws

40mm screwPre drill

hole*Cut to �t

24

26

Page 10: General Instructions Please retain product label and ... · to create your second level. *Doors can be hung once the boarding has enclosed the door frame. *Doors can be hung once

P 10

Please retain product label and instructions for future reference

HANDLEWITH CARE

12

3

4

1. 2.

3. 4.

5.

Closure Trim

Internal

23

*Measure and cut theclosure trims to�t the internal space.

23

23

Closure Trim

Internal

27

*Measure and cut theclosure trims to�t the internal space.

27

27

Pre drill hole

30mm screw

*trim to �t

Step 16Parts needed - No. 27 QTY 7 Inside the building place the closure trim (No. 27) against the boarding and align with the roof as shown in the illustration.

Once in position �x each trim into place by pre drilling a pilot hole and using 6x30mm screws per trim, equally spacing them along the face of the board.

42x30mm Screws

30mm screwPre drill

hole*Cut to �t

Step 17Parts needed - No. 27 QTY 7

Once the �oor has been laid arrange theclosure trim (No. 27) around the outside edge of �oor (internally), measure and cut down accordingly to best match the internal space.

Secure each trim section into place using 6x30mm spaced equally along the board as shown in the illustration.

*Do NOT �x the closure trim to the �oorboards.

42x30mm Screws

RoofRoof

Felt tacks

Step 18 Parts needed - No. 38

Cut the felt into �ve strips and lay ontothe roof in the order shown in the illustration.

*Ensure there is approximately 50mmof overhanging felt each side.

Once the felt is laid out �x to the roof using felt tacks at 100mmintervals.

*Felt size: 3030mm

240x Felt Tacks

Page 11: General Instructions Please retain product label and ... · to create your second level. *Doors can be hung once the boarding has enclosed the door frame. *Doors can be hung once

P 11

Please retain product label and instructions for future reference

Step 19Parts Needed - No. 23 QTY 4

Align the fascia’s (No. 23)with the roof and �x intoplace using 3x40mmscrews per fascia, makingto screw through the fascia into the roof purlinsand eaves frame..

*Ensure the angled cuts meetat the top of the apex.

12x40mm Screws

Pre drill hole

40mm screw

23

23

23

23

Pre drill hole

60mm bolt

Step 20Parts needed - No. 28 QTY 8

Arrange the storm braces (No. 28)around the building (internally). Place 2x storm braces per side �xing into place using 2x 60mm bolts per brace making sure the washer & nut are tightened from the outside of the building.

*Ensure the storm braces aresecured at the highest pointpossible on each side.

**Storm braces will help yourbuilding expand and contractproperly.

***Important: Ensure eachbolt is tightened using a washer so as not to damage the log boards.

16x60mm Bolt Sets

28

28

Page 12: General Instructions Please retain product label and ... · to create your second level. *Doors can be hung once the boarding has enclosed the door frame. *Doors can be hung once

P 12

Please retain product label and instructions for future reference

29

a

b

Pre drill hole

70mm screw

a

29

2930

b

32

Step 2Parts Needed - No. 32 QTY 2 No. 36 QTY 2

Following the method outlinedpreviously (see main instructions)secure the starter board (No. 32)onto the smaller frame using2x70mm screws ensuring to screw through the notch into theframing below.

Place the �rst two log boards(No. 36) onto the starter boardand rest onto the starter framesas shown in the illustration.Once in position �x the logboard to the inside of the cabinusing 2x40mm screws per side.

*The centre starter frame at this point is not �xed into position,arrange so there the frame iscentral.

4x40mm Screws2x70mm Screws

70mm screwPre drill

hole

40mm screw

36

3632

32

36

Veranda Fit

Step 1Parts Needed - No. 29 QTY 3 No. 30 QTY 2

Place the �rst Bearer (No. 29) up to the building and �x to the building starter using 4x70mm screws.

Attach the smaller bearer frame (No. 30) to each end of the larger frame using 4x70mm screws.

8x70mm Screws

Page 13: General Instructions Please retain product label and ... · to create your second level. *Doors can be hung once the boarding has enclosed the door frame. *Doors can be hung once

P 13

Please retain product label and instructions for future reference

Step 3Parts Needed - No. 33 QTY 18 No. 34 QTY 2 No. 35 QTY 6 No. 36 QTY 6

Following the method outlinedpreviously (see main instructions)continue placing the boards(No’s. 33, 34, 35 & 36) on to the veranda sides, ensuring to interlock the boards.

*Board 33 are the last boards to�t on to the assembly.

36

35 33

33

37

37

Step 4Parts Needed - No. 31 QTY 25

Following the method outlinedpreviously (see main instructions)place the veranda �oor boards(No. 31) onto the assembly andsecure each board into place using 3x40mm screws ensuring to screw through the boards into the framing below.

75x40mm Screws

40mm screwPre drill

hole

Step 5Parts Needed - No. 37 QTY 2

Fix the last two log boards (No.37) onto the veranda sides using 2x70mm screws through the notches and 2x40mm screws through the boards as shown in the illustration.

2x40mm Screws2x70mm Screws

70mm screwPre drill

hole40mm screw

34

34

33

33

33

31

Page 14: General Instructions Please retain product label and ... · to create your second level. *Doors can be hung once the boarding has enclosed the door frame. *Doors can be hung once

It is ESSENTIAL that you apply wood treat-ment immediately after the building has

been assembled.

P 14

Please retain product label and instructions for future reference