FOREWORDVision Marine Construction is registered and situated in the State of Qatar and is the sister company of Vision Development Company (Bahrain Grade A General Contracting, (Civil and Building) Marine Contracting, Dredging and Reclamation). Both the aforementioned companies receive management and commercial support from Vision Holding company.
The owners of Vision commenced business in dredging reclamation and marine construction, the first significant project in Bahrain was for the dredging, reclamation and marine construction work in ASRY(Arab Ship Repairing Yard) basin and other associated marine construction works.
Vision has continually expanded and accomplished international quality recognition of ISO 9001 and ISI certificates whilst developing and maintaining quality combined with efficient and cost effective performance in each and every project completed.
9
Vision Company, have the following range of services available;
u Marine Construction
u Dredging & Reclamation
u Shore-line Protection Works.
u Sub Marine Cable Laying
u Civil and Building Construction.
u Steel Structural work.
u Concrete batching plant & Precast factory
u Electro-Mechanical Erection & Installation
u Maintenance Works Electro-Mechanical & Ports Cleaning.
u Survey works Topo, Hydrographic and Air craft Lidar system.
u Commercial Diving Services.
u Pipeline inspections and maintenance.
u Tunnelling works
11
SERVICES
12
SERVICESVision Company, has services like marine construction, dredging & reclamation, shore-line protection works, sub marine cable laying, civil and building construction, steel structural work, concrete batching plant & precast factory, electro-mechanical erection & installation , maintenance works electro-mechanical & ports cleaning, survey works topo, hydrographic and air craft lidar system, commercial diving services, pipeline inspections and maintenance and tunnelling works.
This section gives a detailed description of the same.
13
DReDGinG, ReClaMation anD MaRine ConStRuCtion
Dredging and Reclamation projects are carried out using cutter suction dredgers and trailer suction dredgers. Strict environmental controls and monitoring are observed to comply with environmental authorities.
Dredger (CSD)
Cutter suction dredger
14
SERVICES
Discharge to Silt trap
Break water for port
BAHRAIn nATIOnAL ASSEMBLY DREDGInG AnD RECLAMATIOn PROjECT
15
16
SERVICES
Rabigh port section
Rabia port
Rabia port
17
Rabigh port section
Marine jetty
18
SERVICESTOURIST HARBOURPorto Mirabello is the only one Italian tourist and urban Marina completely in the sea, an artificial peninsula of 40.000 square meters and a water surface for 300.000 square meters. The marina, equipped with modern and efficient building facilities including a helideck, has 470 berths starting from 14 meters, berths to accomodate super yachts from 25 to 100 meters. On the wharves some single floor buildings are provided to services users. Also an internal system of transit routes, boxes and open parking for a total amount 1.300 units.
19
Porto Mirabello has an excellent position, in front of the city promenade and it is perfectly placed in the La Spezia›s Gulf.
Royal commissions, jubail
20
SERVICESPILInG WORKS OnSHORE & OFFSHORE
21
ZUWARA PORT MAInTEnAnCE AnD DEVELOPMEnT
The project shall include the Port functional design and the detailed design and construction of the following:
Maritime works:u Maintenance of 539m existing breakwater, and development of it: recon-
struction of the berm at the foot of the work, reconstruction of the cover protection layer with rocks up to 5 tons, construction of the new protec-tion wall on the breakwater
u Dredging of the existing harbour basin with depth up to 7.60 meters under medium sea level, creation of the new turning basin and approach channel
u Reclamation and filling of the apron and container yard area
Harbour works:u Construction of the new commercial quay for a lenght of 485m. Work will
be composed by a main sheet pile wall connected to an anchor wall by tie rods. The new quay will be suitable for ship with length over all of 100 m, beam of 18.2 m, draft of 6.6m and DWT of 5500 ton
u Construction of new navigation aids
22
SERVICESContainer Yard:u Construction of the new container yard with an extension of more that 31000 square meters. The new paving will be able to withstand the loads resulting from the container traffic in the portu Construction of all infrastructure networks: drinking water system, storm water drainage, sewage, streets and roads, street and yard lighting, electricity, telecommunications and fire extinguisher systemu Construction of fences
Buildings on the on-dock yardu Construction of the shedu Construction of the firefighting buildingu Construction of the radio building
Buildings on the off-dock yardu Construction of the gate and the gate houseu Construction of the customs and agencies building
Shore-line Protection WorksVision project include considerable rock revetment and shore protection works in off-shore and on-shore locations above and below sea level using special plant e.g. long boom excavators/grab/arm which are provided with GPS sensors and computer hardware in order to accurately construct the works.
23
24
SERVICESCivil and Building ConstructionVision Co.also are experienced in Civil and building construction projects with a broad range of equipments to carry out various works.
25
COMMERCIAL
Civil and Building Construction
26
SERVICES
MOW, Hoora Customs
COMMERCIAL
In conjunction with MjC (Mohammed jalal Contracting), Vision has constructed building projects for various client as per the following project photographs.
nBB
27
HSBC
COMMERCIAL
CPR
BBK Health Centre
28
SERVICES
Commercial
COMMERCIAL
MOE, Juffair
GOSI
Gulf Air
29
S POOL
Crowne Plaza
Bahrain Conference Centre
COMMERCIAL
30
SERVICES
MPSH Indoor
SPORTS
Sports City Pools
Sports City L Pool
31
Dry Dock
InDUSTRIAL
US Embassy
DIPLOMATIC
BTI 2
32
SERVICES VISIOn PROFILE - CIVIL
In conjunction with Mojest, Vision has constructed building projects for various client as per the following project photographs.
The quality assurance manager burdens the responsibility of checking and auditing the work performed at every project site, making sure that it is carried out in compliance with the quality standard manual. Reports discrepancies and irregularities to the management, as well, recommend corrective measures to site supervisors to guarantee that VISIOn delivers its quality promise.
33
VISIOn PROFILE - CIVIL
McDonalds building construction
McDonalds interiors
34
SERVICESUndertaking Civil Engineering projects was among our premier products / services; backfilling, leveling and asphalting; we fulfilled thousands of projects ranging from road asphalt works, parking lots, factory and schoolyards. Moreover, one of our civil engineering specialty work is the complete civil works (excavation, electric, mechanical & communication) associated with the installation of Banks ATM Machines, across the kingdom.
Till to date, VISIOn executed around 20 million square meters in 125,000 labor hours of asphalt and other civil engineering work.
35
STEEL STRUCTURAL WORK
The owner: Al Shawaier State Office
Vision provides different types of steel structure constructions with; anti-corrosion,insulation,waterproofing,fireproofing,heat preservation.
36
SERVICES
Batching Plant
COnCRETE BATCHInG PLAnT & PRECAST FACTORY
A number of Vision’s projects require quantities of concrete, therefore a batching plant and a precast yard to provide a maximum capacity of 700 cubic meters per day has been established.
37
Precast yard
38
SERVICES
Storm Water Chambers / Pipes
ElECTrO-MEChAniCAl ERECTIOn & InSTALLATIOn1. electrical Works• Cable laying & Termination• SG Erection• Control Panel installation & Commissioning• Control rooms Services• Fire Alarm Systems• instrumentation
39
Water Pipe Line Laying
2. Mechanical Works• Piping (SC, SS, GrP, P91, P22, hDBE)• Motors & Pumps Erection• Steel Structure Fabrication• Warehouses• G Cranes• Welding Activities • insulation Works• Fire Fighting networks
3. Power Plants erection• Gas Turbines• Steam Turbines• Boilers• Diesel Generators
40
SERVICES
GRP Installation:
GRP FABRICATIOn AnD LAYInG
GRP FABRICATIOn AnD LAYInG
Desalination erection• MED Units• MSF Units• rO Plants• hYPO Plants• CO2 Plants
GRP for:•Water transmission and distribution (potable and raw water)• Gravity & pressure sewer lines• irrigation• Storm sewers• Sea water intake and outfalls• Circulating water, make-up and blow down lines for power plants• hydroelectric penstock lines• industrial applications
Desalination plant Algerian Project
Telmcen Project Site
41
DISTRICT COOLInG PIPELInES
Power & Desalination Plant
Desalination plant Outlet excavation Sea Water Pump and Motor Installation
Sea Water Intake Bar Grids
Sea Water intake Systems• Sea Water intake Band Screens• Sea Water intake Trash racks• Sea Water intake Stop logs• Sodium hypochlorite injection Systems• Water reject Culverts
42
SERVICESMAInTEnAnCE WORKS ELECTRO-MECHAnICAL & PORTS CLEAnInG Vision Co is involved with maintenance electrical, mechanical, concrete repairs, marina maintenance and ports cleaning. Undertaking electro-mechanical maintenance projects maintain Vision in constant touch with the market thus strengthening our position due to the nature and duration of these projects. Marina maintenance is the “jewel on the crown” of our maintenance services. At present, Vision is a preferred maintenance contractor in many areas of the GCC.
43
SURVEY WORKS
topographic , Hydrographic and lidar system Vision Co qualified surveyors utilise state-of-the-art high quality equipment in executing Survey works. Ensuring high quality for any type of survey, contour nets, topographic and hydrographic providing impressive results and mapping system.
44
SERVICESCOMMERCIAL DIVInG SERVICES
With a team of highly qualified divers Vision offers a wide range of services including;
• Civils Diving Services – inspections, Construction and maintenance on bridges, piles, quay walls, jetties, etc. • Video and photographic hull inspections on vessels ranging from tugs to super tankers• Underwater cutting and welding• hull Cleaning• Propellor Polishing• hydrographic Surveys• Pipeline inspections and maintenance• Cable laying • Salvage• rOV Operations• nDT ( non Destructive Testing)• Anode & iCCP installation & Testing
Vision owns 80% of island Diver Commercial Services Co W.l.l, which over the past ten years with Vision & IDCS’s management diving team has been responsible for the successful completion of the majority of commercial diving projects in Bahrain.
45
CIVIL DIVInG
Major Projects worked on in Bahrain:• Khalifa Bin Salman Port• Sitra Fishing harbour• Maharaq Fishing harbour• Financial harbour• Durrat Al Bahrain• Samaheej Jetty• reef (lulu) island• Diyaar Al Maharaq • national Assembly Project
Diving Chamber Diving Accessories
46
SERVICES CIVIL DIVInG
47
PIPELInE InSPECTIOnS AnD MAInTEnAnCE
WE FInD SOLUTIOnS
Entering a Pipe for Inspection
Vision offers in-line inspection services for both onshore and offshore pipelines. Various inspection techniques are applied on-board “intelligent pigs”, which measure different integrity parameters while being pumped through the pipeline together with the product. Pipelines are inspected for metal loss (eg. internal and external corrosion), mechanical deformations and other features without interrupting the flow process.
Inspection technology for difficult pipelinesVisions specialize in applying inspection technologies to pipelines that are considered to be difficult or impossible to pig. Our methodology means that we tailor-make the inspection tools that we will use in nearly every inspection project.
48
SERVICESSpecialized inspection equipmentVisions specialized inspection equipment and software are continually updated to keep up with the most modern techniques.
ROVVision has a team which specializes in cable and pipeline operating in the utilities sector. We pride ourselves on being able to offer a complete service from project design to successful installation.
nDT ( non Destructive Testing), Inspections & SurveysVision Diving inspectors are trained & certified in all forms of underwater non-destructive examination:• Ultrasonic Wall Thickness (UT) • Magnetic Particle inspection (MPi)• Eddy Current • Side Scan Sonar • Sub Bottom Profiling Systems • Magnetometer• CCTV, Video & Still Photography
Salvage Vision Commercial Diving Services have extensive experience in locating and recovering sunken vessels, debris and seabed clearance. Our experienced salvage divers can undertake recovery operations throughout the Middle East, executing each operation to minimize any further damage to the vessel or surrounding environment.
49
PIPELInE InSPECTIOnS AnD MAInTEnAnCE
• Search and recovery of vessels • Ship lightening and fuel removal work• Wreck removal• The use of fully certified air lift recovery systems • Seabed and debris clearance and leveling• hydraulic Tooling, including Underwater Chainsaws
Salvaging a sunken yacht
Before After
Underwater Cutting (oxy-arch) and Welding This is the method we use underwater to cut steel with the use of a ‘broco torch’, ‘broco rods’ and oxygen. Vision Diving Services provide a high quality underwater cutting and welding service with our experienced and fully qualified divers and supervisors.
50
SERVICESMAjOR PROjECTS MAnAGED
Bahrain• Khalifa Bin Salman Port
• Sitra Fishing harbour
• Muharraq Fishing harbour
• Financial harbour
• Durrat Al Bahrain
• Samaheej Jetty
• reef (lulu) island
• Diyaar Al Maharaq (in progress)
51
Khalifa Bin Salman Port ProjectIn February 2002 our team managed the diving works on the Khalifa Bin Salman Port Project, the biggest project of its kind in Bahrain.
Over a three years period six highly qualified teams were involved in the construction of the six-kilometer breakwater and the two-kilometer Quay wall at depths ranging between 6 and 18 meters.
Three teams working on the breakwater were involved with lying of Geo Textile, setting of profiles and armor placement. One team was responsible for the leveling of the sea bed in preparation for the laying of 160 ton prefabricated concrete blocks. The team works in zero visibility conditions to operate a specialized hydraulic stone spreader on the ocean floor.
The fifth and sixth teams were responsible for the laying of the concrete blocks. The divers were used to guide surface cranes in lowering of the blocks onto the prepared stone bed using surface supplied air and communications.
Duration: 3 yearsValue: 214 million US Dollars (Total Project Value)
MAjOR PROjECTS MAnAGED
52
SERVICESMAjOR PROjECTS MAnAGEDDurat Al BahrainIn February 2005, our team managed the diving contractors on the Durrat Al Bahrain project.
The project required diving works on the revetments, Quay wall and jetties for this newly developing commercial and residential area.
Duration: 3 yearsValue: 56 million US Dollars (Total Project Value)
Financial HarborIn February 2005, our team managed all the construction works on the Financial Harbor project.
The Financial Harbor is an exciting new development creating a Central Business District in the heart of Manama, the Capital of Bahrain.
And the Tech Dive has been commissioned for diving works on the quay walls and revetments.
Duration: 3 yearsValue: 25million US Dollars (Total Project Value)
53
AMA - Three Fishing Ports – Sitra, Muharraq, Budhaiya in May 2004, our team managed the diving contract for the construction of the Quay walls and revetments for the three new fishing ports.
Duration: 1 yearValue: 11 million US Dollars (Total Project Value)
Reef Islandin June 2004, our team managed the diving contractors on the reef island project, a reclamation and shore protection works to create a residential and leisure island in front of the «Cornice» of the Bahrain capital Manama.
Duration: 1 yearValue: 21 million US Dollars (Total Project Value)
MAjOR PROjECTS MAnAGED
54
SERVICESMAjOR PROjECTS MAnAGED
ASRY Dreadging & Reclamation Works.in 2004 Vision started contract with Arab Ship build repair Yard Co. for dreadging & reclamation of ASrY basin deepening of the channel upto -16cd with reclamation, shore protection and Diving.
And the project was completed in accordance with the conditions and specifications were received on time and in good progress.
ASRY Slipway projectin 2006 Vision Co team to designed, and built a 2 million m3 cofferdam, for the biggest such project in the middle east.
The project was completed in accordance with the conditions and specifications and on time.
55
Vision has a jV with STS company for tunnelling and boring works.
TUnnELLInG SERVICES
57
QUALITY SYSTEM
59
QUALITY SYSTEMAt Vision, we take great pride in the quality of work we produce. no effort or expense is spared to maintain our exemplary health, safety, environmental and quality records. Our reputation in our areas operation and the very high percentage of returning clients are clear indications of our performance.
This is all achieved by our very well trained, dedicated and experienced project teams, by maintaining an impressive top of the line fleet of equipment and by a quality department with the highest standards.
Vision has adopted a practical and effective quality system that conforms to the ISO 9001 standard. This quality system is composed of policies, procedures and records that are integrated into everything we do. Though continuously improving, this system has provided us with a robust framework that allows for smooth operations and facilitates consistency in project quality control and services.
The characteristics that compose and define our proactive quality system and associated processes are as follows:
u People are behind the success of our business. proper recruitment, training and a generous incentives programme bring out the best in our employees.
u We hold individuals and groups responsible for achieving the expected level of quality.
u Clear, concise and practical quality policies and standards and process and goals.
u A clear, well organized, carefully planned system of verification and inspection.
u A corrective and preventive action system that minimizes or eliminates the repetition of nonconform ance and reduce work.
u Continuous review and update of the whole system.
61
EQUIPMENTS
62
EQUIPMENTSMARInE EQUIPMEnT
Hopper Barge Bottom Door Left Side 10,000M3 Right Side 3500M3
Crane Barge And Grab 300Ton Capacity
Split Bottom Barges 3500M3 And Tug Boat (1,200Hp)
Flat Barge
Flat Barge
63
MARInE EQUIPMEnT
Cutter Suction Dredger (Upto 2000M3/Hour) 7Km Pumping Distance
Cutter Suction Dredger Upto 2000M3/Hour) 2Km Pumping Distance
150 Ton Crane Barge Laying Grp Pipes
Batching Plant
64
DREDGER MOBILISATIOn
Dredger Demobilisation
Trailing Suction Dredger (6500M3)
EQUIPMENTS
65
DREDGER MOBILISATIOn
Cable Laying Barge Murai 3 Dredger (Cutter Suction Dredger)
Pit Hog Auger Dredger For Silt,Sludge And Clay Cleaning
jackup Barge
Medium Dredger (Lagoon Operation) jackup Barge With Excavator
66
LAnD EQUIPMEnTA. Land Equipments (Earth Works)• Excavator (Short & long boom) 8• Wheel loader 6• Compressor 3• Compactor (jumping & Plate) 4• Front End loader 3• Grader 2• Bulldozer (D6, D8 & D9) 3• Asphalt Cutting Machine 2• roller 3• Dump Truck (13m3) 7• Dump Truck (20 m3) 8• Trailers & Trucks 8• Water Tanker 4• Medium size trucks 4• light & sedan vehicles 15
B. Production Units • Batching Plant (70m³/Hour) 1
C. Asphalt Division.
• Asphalt Plant (70m3 / Hour) 1• Paver 1• Tire roller 4• Steel roller 5
D. Precast Division• Able to cast different types of concrete up to 400m3 / day.
EQUIPMENTS
67
DIVInG EQUIPMEnT
Diving Equipments• Containerized decompression chambers.
• Underwater CCTV System consisting of fixed focus colour camera, Led light unit , 150 Mtrs of Video / Lights Umbilical , Surface control unit with LCD monitor and hard disc recorder with DVD writer, Built into two unbreakable cases, Make Outland Technology, USA.
• KMB 28 band mask with nale connection
• KirBY MOrGAn PAnEl with Comms
• Floating umbilical, 150 Mtrs length, twisted core with all end fittings and test certificate.
• Bauer diesel compressor, complete with 225 bar filling, 4 filling points, filtration system and breathing air certification.
• Bail out cylinder
• Wetsuit 5mm Two piece with fins
• Arvest harness with bailout backpack, hard
• Communication set.
• 50 Ltr Bailout bottles, 200 Bar with valve.
69
PROJECT LIST
70
PROJECT LISTPROjECT LIST
nos. Client Project Location Type of work Start End Value
1 Conpeed jetty/Wharf Bahrain jetty for 60,000T ship 2015 2015 BD 4 million
2 Al Batinah Port
Port In Oman Oman Port jetty Construction,Dredging Work,Quay wall,Reclamation,Rock bunding precast gravity walls ( 167,051m3)for aggregate loading jetty length 3.9km
2014 2019 SR 600 Million
3 PEO Beach Works Qatar Excavation Beach Wakra 2014 2015 BD 4 million
4 PEO Beach Works Qatar Excavation Beach Lusail 2014 2015 BD 10 million
5 Open Sea jetty Work Bahrain Private jetty work 2013 2014 BD 2million
6 Private Client
Fiber optic cable
KSA Supply and install 20km multicore fiber optic on sea bed
2012 2013 BD.8 Million
7 Saudi CoastGuard
Placing of Beacons
KSA Installation of beacons in the Arabian Gulf Sea KSA
2012 2012 SR 10 Million
8 Saudi Electricity Co
Borehole jeddah, KSA
Geotechnical investigation work 2012 2012 SR 10 Million
9 Zallaq Resort Co. Bsc
Supplying Beach sand
Bahrain Supply and Filling Marine Beach sand
2011 2011 BD 100 Thousand
10 Zallaq Resort Co. Bsc
Shoreline Protection
Bahrain Shoreline protection for Zallaq Resort
2011 2011 BD 200 Thousand
11 Elconcorde jetty Work jordan Phosphate jetty 2009 2010 US20$ million
12 Ministry of Works/SPD
national Assembly Project
Bahrain Dredging, Reclamation, Concrete Quay wall construction including Civil works. This was a Design and Build Project; Construction of about 3.5 km Concrete quay wall , from a depth of – 12.0 nSD to 5.0+ nSD.
2008 2010 BD 18.5 Million
13 SEC 11KV submarine cable supplying and instalaltion
KSA Supply and instalaltion of 11KV submarine cableincluding substation 18km
2008 2009 SR 400 Million
14 ASRY Slipway Bahrain Dewatering works of the temporary cofferdam
2007 2008 BD.230 Thousand
15 SEC 36KV Submarine Cable
KSA Supply and install and protection 36KV submarine cable 15km eastern provience
2007 2008 SR 300 Mmillion
16 Ministry of Works/Gamuda Berhad
new Sitra Bridge
Bahrain Supply of Dredged sand 2007 2008 BD 2.45 Million
71
PROjECT LIST
17 ARMACOn for ready mix concrete
Supply Marine Dredged Sand
Bahrain Supply of Dredged sand 2007 2008 BD.115 Thousand
18 Shaik Rashid A.Al Khalifa by (AUB)
Reclamation of 1 million M3 for waterfront land in Juffair
Bahrain Dredging & Reclamation of 1 million m3 for waterfront land in Juffair
2007 2008 BD. 1.6 Million
19 ASRY ASRY Slipway Bahrain Dredging & Construction Cofferdam -The works for the project included the following; Construction of a Cofferdam to protect the necessary repairs to be done on the slipway, Servicing and protection work for the existing temporary jetty.
2006 2009 BD.8 Million
20 Various jetty and assosiated work
GCC jetty repair and construction works
2005 2012 SR 150 Million
21 ASRY Asry Basin Bahrain Dredging & Reclamation- The works include the following; Dredging of the Basin to provide access to bigger ships to dock in ASRY, Investigation of the Concrete Quay walls and rock foundation for any damage and conduct repair, Inspect the rubber dampers for possible repair or replacement, Construct a temporary Floating jetty for use during the works to the main facility.
2005 2009 BD.40 Million
22 ASRY Removal of existing marine Gas pipe line
Bahrain Dredging trench and Removal of Gas pipe 1.2km long
2005 2006 BD.350 Thousand
23 ASRY Embankments around north Asry
Bahrain Supply & Placing Rock 2009 BD.260 Thousand
24 ASRY Shoreline Protection work
Bahrain Slipway shore protection & Rock Armour and Civil works
2008 BD.85 Thousand
25 ASRY Cofferdam Bahrain Cofferdam & Shoreprotection 2007 BD.290 Thousand
26 Private Client
Reclamation and Revetment works
KSA Reclamation and Revetment Development Works in Al Ramis Area Ksa
SR 420 million
27 Private Client
Reclamation and Revetment works
KSA Reclamation and Revetment Development Works in Al Al Azizia Al Khobar Ksa
SR 300 million
28 Private Client
Reclamation works
KSA Reclamation and Development Works in West King Fahad Airport Dammam
SR 130 million
73HEALTH & SAFETY/
ENVIRONMENT
74
HEALTH & SAFETY/ENVIRONMENTAt VISIOn, we respect the equation:
PROFESSIOnAL TEAM + GOOD EQUIPMEnT + SAFETY WORKInG COnDITIOnS = QUALITY PRODUCT
u nO jOB OR TASK IS MORE IMPORTAnT THAn EMPLOYEE HEALTH AnD SAFETYu IF A jOB CAnnOT BE DOnE SAFETY IT SHALL nOT BE DOnEu OUR FUTURE IS OnLY BUILT THROUGH OUR PEOPLE. WE AIM TO PROTECT THEMAn effective hSE program is carried out throughout our organization, which in turn assists management and non-supervisory employees in controlling hazards and risks, This minimizes if not eliminates inquiries and the damage or destruction of property.
This program is designed to encourage all employees to promote the safety of themselves and of their fellow employees and clients. To accomplish our safety and health goals, all company employees, and those of our subcontractors are responsible and accountable for implementing company HSE policy and ensuring that it is followed.
Our ultimate goal is to maintain “zero accidents”. Along with careful job planning, increasing safety awareness, continuous system improvement and a fully supportive management we aim to achieve the task by:
u Complying with all applicable local, international HSE regulations and those established by the client.u Employing qualified safety personnelu Making regular job site inspectionsu Enforcing the use of safety equipment through regular tool box talksu Following HSE procedures and rulesu Providing on-going safety training
All works have inherent health ,safety and environmental (HSE ) Hazards. The size of the equipment used and nature of the work itself impose very high risk activities that could result in severe consequences. hence it is imperative that all efforts be focused on work place safely , proper HSE plan be implemented and appropriate safe work procedures followed.
75
The company ‘s approach will mainly be based on the identification and control of risks and elimination of potential hazards in a planned and controlled manner. The on-site implementation of HSE policies and procedures will be monitored and reviewed on a regular planned basis to ensure the companies aims and objectives are being carried out . The following general procedures is implemented on objects.
Procedures followed at Vision:
Brief all construction personnel on the project HSE plan and Method statements and raise their awareness of the presence of high risk hazards, Encourage all to report any unsafe practices, unnoticed or unidentified hazards or any perspective vulnerability.
u Encourage teamwork and experienced employees for safe working procedure.
u Encourage and strengthen a safety oriented culture.
u Conduct appropriate induction training for all involved personnel and appoint safety and security officers to the project site.
u Emphasize importance of using appropriate Personnel Protective Equipment (PPE)
u Ensure that the site safety precautions are taken and hazard control measures implemented prior to commence of activities in accordance with company procedures.
u Ensure that all machine operators and licensed, well trained and implemented the relevant manufactures requirements for safe operation and recommended maintenance practices.
u Verify that appropriate fencing, hoarding and signage are installed as required.
u Ensure that all pertinent HSE statutory regulations,by laws and Vision safety procedures and plans are followed.