Transcript of Geko Video Team Five Guys, A Girl, and a BalloonSat Christy Predaina (CS, APS) - Team Lead &...
Geko Video Team
Five Guys, A Girl, and a BalloonSat
Christy Predaina (CS, APS) - Team Lead & Satellite Development Cohesion
Jason Worrall (AE)- Requirements Lead
Howard Montgomery (AE)- GPS Lead
Al Del Vecchio (APS)- Video Camera Payload Lead
Dan Gutknecht (AE)- Electrical Lead
Fatos Bajraktari (AE)- Structural Lead
Status - Christy
• Schedule
• Delayed by resubmitting proposal
• Component testing
• Budget
• Mass
• Changes to Proposal
• New Experiment
• GPS
• Servo for Video Camera
• BASIC Stamp Programming
Requirements - Jason
• HOBO testing
• No longer using still camera
• Imaging with Video Camera
• Servo will change Video Camera viewing angle
HOBOHOBOInternal HOBO Power
Internal HOBO Power
PowerPower
GPSGPS
ServoServo
Video CameraVideo Camera
Internal GPS
Power
Internal GPS
Power
Internal CameraPower
Internal CameraPower
MirrorMirror
PowerPower
BASIC StampBASIC Stamp
Switch
HeaterHeaterBattery Pack
Power
Battery Pack
Power
Switch
Switch
Switch
Design - Jason
GPS Payload: Purpose - Howard
• Garmin Geko 101 GPS
Weight: only 3.1oz with batteries
Compact size: 1.9" W x 3.9" H x .96" D
High-contrast display: 64 x 100 pixels
Battery life: 12 hours on 2 AAA batteries
Waypoint/Route storage: 250/0
Automatic track storage: 3,000 trackpoints with PanTrack and TracBack®
Waterproof: submersible for 30 minutes in one meter of water
Video Camera Payload - Al
Launching•Rewiring
•Testing
•Realizing Limitations
•Can’t add more memory
Electrical Subsystem - Dan
• Heater Done
• Testing
• No longer using still camera
• Imaging with Video Camera
• Wiring timing circuits
Structural Subsystem - Fatos
• Foam Core
• Insulation
Moving Forward & Questions
• Assembly and Testing
• Finish Foam Core Construction
• Do Dry Ice test