GE Telecom Base Station Project

12
GE Telecom Base Station Project Design Team 5: Jay Martinson Brian Bernens Tyler Gordon Dan Krohnemann

description

GE Telecom Base Station Project. Design Team 5: Jay Martinson Brian Bernens Tyler Gordon Dan Krohnemann. Introduction. Mission Statement. Power Telecom station with sustainable energy. Solar Power Create constant 1.2-kW load, with additional load created to power the hut equipment - PowerPoint PPT Presentation

Transcript of GE Telecom Base Station Project

Page 1: GE Telecom Base Station Project

GE Telecom Base Station Project

Design Team 5:Jay MartinsonBrian Bernens

Tyler GordonDan Krohnemann

Page 2: GE Telecom Base Station Project

Throughout the world, there are many developing countries that do not have the luxury of possessing telecommunication stations for cell phone use.

GE Corporation assigned engineering students to solve this problem for these communities and nations, by creating a No Grid Telecom Base Station

Team Five created a station that uses sustainable energy sources and optimizes green power for infrastructures without connections AC utility grid.

Introduction

Page 3: GE Telecom Base Station Project

Power Telecom station with sustainable energy. Solar Power Create constant 1.2-kW load, with additional load

created to power the hut equipment Integrate suitable “Hybrid” application to obtain

minimum operating costs

Mission Statement

Page 4: GE Telecom Base Station Project

707,400 people 295 sq. kilometers Economy

◦ Trading◦ Export◦ Tourism

Terrain◦ Island◦ Flat

Mombasa, Kenya

Page 5: GE Telecom Base Station Project

In Mombasa, Kenya, there is already a large amount of cellular towers.

In this region, the GE Telecom Station will compete with local cellular companies, but will offer a station that runs off sustainable energy instead of utility grid power.

This cost efficient system will be able to use green technology to lower the maintenance cost of the station, making the cellular market more competitive.

Customer Needs Assessment

Page 6: GE Telecom Base Station Project

Converts solar radiation into DC power via photovoltaic modules

Typical solar panel: 14 Watt / Square Foot

Typical System: 1,300 kWh / every kilowatt installed

About Solar Power

Page 7: GE Telecom Base Station Project

Design

Tower

Hut/Solar Panels

North-facing solar panels at 4 degree angle

Page 8: GE Telecom Base Station Project

Energy Flow Diagram

Page 9: GE Telecom Base Station Project

Base Cost Analysis

PV Size Batt size Fuel Use 3yr 6yr 9yr 15yr 30yr

(kw) (kwh) (gal) ($) ($) ($) ($) ($)

0 0 1138 14339 28678 43016 71694 143388

1 0 565 10619 17738 24857 39095 74690

1.5 15 306 17543 21399 25254 32966 52244

1.5 10 281 14416 17956 21497 28578 46281

1.75 15 152 16478 18393 20308 24139 33715

1.75 10 199 14257 16765 19272 24287 36824

2 10 194 15069 17514 19958 24847 37069

2 15 25 15753 16068 16383 17013 18588

3 24 0 24000 24000 24000 24000 24000

Page 10: GE Telecom Base Station Project

Co$t Analysis / Ca$h FlowSystem Components Initial Cost

Maintenance Cost

Estimated Revenue NPV MARR Packback Period Total Payback (9 years)

Solar Cells $7,000 $8,000 $80,000/year $375,560 13%2 years & 8 months $518,000

Batteries $7,987.50

Fuel $945

Hut / Tower $175,000

Net Initial Cost

$190,933

Page 11: GE Telecom Base Station Project

Conclusion

Page 12: GE Telecom Base Station Project

Questions