Transcript of ge scada
-
8/2/2019 ge scada
1/12
GE Wind Energy
Overviewof Windfarm Communications
Using DNP3
NRELNovember 17, 2003
-
8/2/2019 ge scada
2/12
GE Company Confidential
Next Gen SCADA &Automation Program
Windfarm High Level Communications Requirements
Acquire quality and reliable real time and historical data on turbine and windfarmoperations
Integrating all windfarm assets data (substation, met mast, relays, meters)
data into the system so one integrated homogeneous database for all windfarmassets
Integrated data for remote monitoring and diagnostics, asset management,advanced diagnostics, condition based maintenance
Allow for choosing best-in-class software and hardware
Optimize system maintenance & configuration processes and costs
Improved functional reliability improved availability
Improved secure real time access to data anyone, anywhere, anytime
Ability to reduce project configuration time
Support advanced security technologies
Windfarm High Level Communications Requirements
Acquire quality and reliable real time and historical data on turbine and windfarmoperations
Integrating all windfarm assets data (substation, met mast, relays, meters)data into the system so one integrated homogeneous database for all windfarmassets
Integrated data for remote monitoring and diagnostics, asset management,advanced diagnostics, condition based maintenance
Allow for choosing best-in-class software and hardware
Optimize system maintenance & configuration processes and costs
Improved functional reliability improved availability Improved secure real time access to data anyone, anywhere, anytime
Ability to reduce project configuration time
Support advanced security technologies
-
8/2/2019 ge scada
3/12
GE Company Confidential
Next Gen SCADA &Automation Program
Windfarm LAN Protocol Requirements
Flexible polling schemes, ability to poll by device, by class, by database points,unsolicited (report by exceptions)
Multimedia: seamless integration across multiple physical media: Ethernet, serial,
radio licenses / unlicensed RF, phone, Seamless integration across corporate LAN / WAN and Intranets / Internet
Supported by multiple vendors, open, well documented, deployed in the field
No significant processor requirements on slave devices (low overhead)
Windfarm LAN Protocol Requirements
Flexible polling schemes, ability to poll by device, by class, by database points,unsolicited (report by exceptions)
Multimedia: seamless integration across multiple physical media: Ethernet, serial,radio licenses / unlicensed RF, phone,
Seamless integration across corporate LAN / WAN and Intranets / Internet
Supported by multiple vendors, open, well documented, deployed in the field
No significant processor requirements on slave devices (low overhead)
SCADAnet
Intranet
Histor
ianUser
Historian
Server
Remote User
EMS
Router
OperationsControl Center
SCADA
Control
Ethernet
Backup
Radio
-
8/2/2019 ge scada
4/12
GE Company Confidential
Next Gen SCADA &Automation Program
Future Protocol Requirements
Self description, auto-configuration
Device based object models
Access security: encryption
Peer to Peer communications
What to Watch Out for..
Still a lot of low bandwidth systems the last mile scenario
Cost of implementation, learn from experiences of electric utilities with UCA, IEC 68150, millions of $$have been and still not widely adopted by the industry
Is the protocol stack too heavy for simple devices processor requirements, $$
Size, complexity and licensing issues of the protocol stack
The learning curve for a complex protocol for windfarm implmentors
Future Protocol Requirements
Self description, auto-configuration
Device based object models
Access security: encryption
Peer to Peer communications
What to Watch Out for..
Still a lot of low bandwidth systems the last mile scenario
Cost of implementation, learn from experiences of electric utilities with UCA, IEC 68150, millions of $$have been and still not widely adopted by the industry
Is the protocol stack too heavy for simple devices processor requirements, $$
Size, complexity and licensing issues of the protocol stack
The learning curve for a complex protocol for windfarm implmentors
-
8/2/2019 ge scada
5/12
GE Company Confidential
Next Gen SCADA &Automation Program
GE Wind Energys Implementation of DNP3
GEWE required a windfarm LAN protocol that was already deployed, well documented and supported by companies(source code, OPC drivers, test sets, defined subets, etc)
DNP3 met these requirements, today
Promised migration path for future enhancements
-
8/2/2019 ge scada
6/12
GE Company Confidential
Next Gen SCADA &Automation Program
History of DNP3
Distributed Network Protocol, completely open protocol, extremely well documented and supported, has reached alevel of maturity that makes deployment risk-free
Based on early parts of IEC 870-5
Turned over to Users Group in 1993
DNP and IEC 870-5-101 have been specified in IEEE P1379
Recommended Practice for Data Communications Between Intelligent Electronic Devices and Remote TerminalUnit
DNP3 protocol is now the most popular protocol in use by global electric utilities
DNP LAN implementation leads the way for use by both North American and international utilities.
Vendor Products
- >100 vendors, +250 DNP products and services, global
Utilities/Industrials
- used by >300 utilities and industrials worldwide
Countries
- used in over 32 countries. National standard in many
Total Industry
- $250 Million / year of DNP products and services
Industries
- Electric, Oil & Gas, Water and Industrial
DNP Users Group: >300 active members, controlsthe protocol and migration, support web site, active TechnicalCommittee, evolving documentation, technical bulletins
www.dnp.org
-
8/2/2019 ge scada
7/12
GE Company Confidential
Next Gen SCADA &Automation Program
PowerLink Client
GUITelephone Co.
Dial Up Network
SCADA/EMS Masters
Ethernet LAN
IED atcircuit breaker
Fibre Optic Cables
Bridge/Router
Outdoor Locations
Server/Gateway
RemoteCommunications
Controller
D25
I/O
I/O
To Enterprise
GUI
WANGPS Receiver
GUI
SLIP/PPP
PowerLink Clients
Redundant PowerLink Server
I/O
IED's forProtection
IEDs
I/O
DigitalFault
Recorder
I/OI/O
Controls
Analogs
AC inputs
DistributedI/O
Status
Remote SER/DFRMaster or Maintenance
Computer
DNP3 in Substation LAN
Deployed in many hundreds of substations
around the world by many vendors
-
8/2/2019 ge scada
8/12
-
8/2/2019 ge scada
9/12
GE Company Confidential
Next Gen SCADA &Automation Program
Wind Farm
OperationsCenter
SCADA Master / Server
Web Access,RemoteConfiguration, FileTransfer, ODBC
Web Access,
RemoteConfiguration, FileTransfer, ODBC
Pager, Email orSMS Operator Alarms / Reports /
Notification
Pager, Email or
SMS Operator Alarms / Reports /Notification
User interface,trending,alarming,reports, SQLserver
GPS TimeSync
WAN / Internet /Dial-In
BackupAccess
Graphical User Interface ScreensPark / Turbine overview: animatedAnnunciatorCommunications network overview, alarmsConfiguration screens
SQL Database
Report Generation
Real Time or Historical Trending
Alarm Management
Email, SMS, voice, fax
Remote User Interface
Communications to WindfarmDNP3 for real time mission critical dataODBC for historical data
High configurable and tunable
SCADA Master Station
-
8/2/2019 ge scada
10/12
GE Company Confidential
Next Gen SCADA &Automation Program
485.6 AMPS
Utility Gateway
Utility SCADA / EMS/ RTA / ISO.
(Multiple)
Utility SCADA / EMS/ RTA / ISO.
(Multiple)
10/100 Mbit LAN DNP3/TCP/IP - ODBC
Substation
Substation Meters,
Relays,..
Wind FarmOperations
Center
Scada ProtocolsDNP3
IEC 60870-5-101UCAOthers
MET Tow er
Wind Turbines with Turbine Communications Server
SCADA Master / Server
Web Access,Remote
Configuration, FileTransfer, ODBC
Web Access,Remote
Configuration, FileTransfer, ODBC
Pager, Email orSMS Operator Alarms / Reports /
Notification
Pager, Email orSMS Operator Alarms / Reports /
Notification
485.6 AMPS
User interface,trending,alarming,reports, SQLserver
GPS TimeSync
Switch / Router
TurbineCommunications
Server
BachmannController
Converter
WAN / Internet /Dial-In
RCC Gateway
GEWE RemoteControl Center
GEWE RemoteControl Center
BackupAccess
-
8/2/2019 ge scada
11/12
GE Company Confidential
Next Gen SCADA &Automation Program
DNP3 and IEC 61400-25
Many members of the DNP Technical Committee also on IEC 61850 committee
Many discussions ongoing regarding migration / melding of DNP3 and 61850
61400-25 can leverage from these activities, many similarities and much larger focus ($$)associated with 61850 activities and years of work
DNP3 and 61400-25 can run concurrently on the same physical LAN, an ideal migrationstrategy
-
8/2/2019 ge scada
12/12
GE Company Confidential
Next Gen SCADA &Automation Program
Substation Automation after IEC 61850
BayController
CTs PTs PrimaryEquipmentMonitors
Self-ConfiguringWeb Server
Firewall/Router
BrowserLaptop
HMIHMI with
Power-Assisted
Configuration
ToWAN
ToLegacyMasters
CTs PTs
CTs PTs
BayController
SampledValues
Interlocking/Tripping
Gateway/Coordinator
Client/Server